HomeMy WebLinkAboutStaff Report 435-10TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: DECEMBER 6, 2010 REPORT TYPE: ACTION CMR:435:10 SUBJECT: Update on the Design of the Main Library lI~provements (PE 11000) and Staff Recommendation to Temporarily Relocate the Main Library to the Arts Center Auditorium, Option No.1, During Construction of Main Library EXECUTIVE SUMMARY Design of the Main Library Improvements has begun and will be completed so that construction can commence in late 2012. This timing allows the Mitchell Park Library to be opened (September 2012) and fully functional during the closure of Main Library. Service to residents will still be needed in north Palo Alto, however, during the construction at Main. Staff is therefore recommending a small temporary library in the Arts Center Auditorium (Option No.1) immediately adjacent to Main Library. Construction as part of a separate CIP PF-07000, Electrical and Mechanical Improvements to the Arts Center, will commence in the Spring of 2011 and will be completed in the spring of 2012, in time to accommodate the temporary library. Sufficient funds are available within the total bond amount to provide a temporary Main library. RECOMMENDATION Staff recommends that Council accept Option No.1 (see below) to provide a small temporary Main Library in the Arts Center Auditorium during construction at Main Library and direct Staff to return to Council with appropriate modifications to the Library bond program design and construction management contracts for approval by Council. BACKGROUND On July 7, 2008, Council directed staff to proceed with placing on the November 2008 ballot a library/community center bond measure. Measure N, which passed on November 4, 2008, includes funding for construction of a new and expanded Mitchell Park Library and Community Center (MPLCC), renovation of the Downtown Library and renovation and expansion of the Main Library. Detailed history of the design development can be found in past City Manager's Reports to Council (CMR:286:02, CMR:119:06, CMR:343:06, CMR:434:06, CMR:225:07, CMR:321:08, CMR:473:08, CMR:149:09 and CMR:334:10) that can be viewed at: http://www.cityofpaloalto.org/knowzone/reports/cmrs.asp). CMR:435:10 Page 1 of6 Construction of the Downtown Library and the MPLCC has begun. The Downtown Library will be completed in the summer of 2011 and the MPLCC will be completed in approximately September of 2012. The schematic design phase (35%) for all of the library bond projects was completed before the bond measure was placed on the ballot. The continuation of the design for the Main Library has begun and will be completed in 2011. DISCUSSION Main Library Status Update The design of the Main Library has started and the project status was discussed at meetings of the following groups in November 2010; the Historic Resources Board, the Architectural Review Board, the Library Advisory Commission, the Finance Committee, and a community meeting. The Main Library improvements will include 4 small group study rooms that are acoustically separated from the rest of the existing building, and a new detached program space that will seat 100 people. To accommodate the new program space, the Main Library will expand by approximately 4,000 square feet from the current 21,000 square feet on the ground floor of the building (CMR:434:06). The interior of the existing library will also be reconfigured to make better use of areas that are vacated by relocating certain materials into the new detached building. Lighting and other existing building systems will also be upgraded. All of the improvements will be made with consideration for the historic nature of the existing building. The building will be designed to Leadership in Energy and Environmental Design (LEED) "Silver" level. Improvements to the Main Library will be the final phase of the Measure N Bond measure projects. Temporary Main Library-Needs and Options The existing Main Library houses 130,000 items, including a historic collection. The new Mitchell Park branch will house a good portion of these items but a large percentage will be put into storage. A temporary Main Library will allow current Main Library users to have access to a small, well-chosen variety of materials as well as a convenient place to pick up their holds, an increasingly popular service. This will save automobile trips and help decrease cross-town traffic and maintain a local amenity. Several options are available for a temporary Main Library. A summary of these options is available in Attachment A. Staff considered a variety of locations such as parks, private building rentals, and public facilities and has summarized the most feasible options below: • Option 1: Art Center auditorium, approximately 2,500 square feet; $350,000-500,000; collection size 10,000 items The auditorium at the Art Center is approximately 2,500 square feet. The auditorium could be used as a place to pick up holds, drop off books and browse a limited selection of periodicals. The collection size at the auditorium would be roughly 10,000 items. Parking for this'site would be shared with the Art Center. The historic collection could be relocated to the existing temporary library at the Cubberley Community Center and staff from the Main Library would be dispersed to work at the Art Center auditorium, the existing temporary library at the Cubberley Community Center and the new MPLCC. The construction cost is estimated to be $350,000 to $500,000 and would include accessibility, lighting, shelving, new flooring, and other basic upgrades to the auditorium. The key advantage of this option is that it is immediately adjacent to the Main Library. CMR:435:10 Page 2 of6 Construction of the first phase of the Art Center renovation project is scheduled to begin in the spring of 2011 and be completed approximately one year later in the spring of 2012 (including move-back time). Construction at the Main Library is scheduled to begin after the MPLCC has re-opened in approximately September 2012. This would allow time to make improvements to the Art Center auditorium that is needed to accommodate the temporary library prior to closure of the Main Library. • Option 2: Modular building at the Lucie Stern Center, approximately 2,880 square feet; $500,000-$700,000; collection size 10,000 items Modular buildings totaling approximately 2,880 square feet could be placed in the parking lot at the Lucie Stem Center and be used as a place to pick up holds, drop off books, and browse a limited selection of periodicals. The collection size in the modulars would be roughly 10,000 items. A significant disadvantage of this location is that parking at the Lucie Stem Center is very limited and would be shared with other uses already there as well as spillover parking from the adjacent elementary school. The historic collection at the Main Library could be relocated to the existing temporary library at the Cubberley Community Center and staff from the Main Library would be dispersed to work at the modular buildings, the existing temporary library at the Cubberley Community Center, and the new Mitchell Park Library. The construction cost is estimated to be $500,000 to $700,000 and would primarily include directing site utilities to the trailer and potential reconfiguration of the parking lot to accommodate the modular buildings and increased parking demand. Restoration of the parking lot would also be necessary after the modulars are removed. • Option 3: Leased East Bayshore Road office space, Program A, approximately 2,880 square feet; $350,000-$500,000; collection size 10,000 items Leased space in the immediate vicinity of the Main Library does not exist. however, various lease space opportunities are currently available on East Bayshore Road, or east of Highway 101. Staff recently toured two large spaces that are currently available, however, the challenge as to what might be available in the year 2012, especially for a short term rental of 2 years, is unknown. Current rents in the vicinity range from $1.50 to $3.50 per square foot per month. In addition to this rent, smaller spaces in the range of 2,500 to 3,000 square feet are likely built out as office space, or bare industrial space, so costs to build tenant improvements must also be considered. After evaluating two current options, the overall cost for a leased space, for a 24 month term, plus tenant improvements, would be approximately the same as the cost for converting an equivalent-sized space at the Art Center auditorium. While adequate parking would likely be available, library staff felt that patrons would be unwilling to cross the freeway to access a temporary library, particularly if they were pedestrians or bicyclists. • Option 4: Leased East Bayshore Road office space, Program B, approximately 8,192 square feet; $850,000-$1,000,000; collection size 50,000 items This scenario is similar to Option 3; however a collection of 50,000 items could be housed in this space. Like Option 3, this option has the disadvantages of being on the other side of the freeway from the Main Library, the uncertainty of what spaces might be available for lease in the year 2012, and the disadvantage of a commitment or requirement of only a two year lease, which landlords may be reluctant to entertain. CMR:435:10 Page 3 of6 • Option 5: Existing temporary library at the Cubberley Community Center, approximately 5,000 square feet; $1,000-$10,000; collection size 45,000 volumes An approximately 5,090 square foot temporary library with books, computer terminals, and seating has been constructed in the auditorium of the Cubberley Community Center. This temporary library has approximately 45,000 volumes, 28 reader table seats, 10 study carrel seats, 18 computers and associated seats, and 10 lounge seats. This temporary library is scheduled to close upon the completion of the Mitchell Park Library in late 2012; however it could remain open, using the same configuration as it has now, and serve as the temporary library during the construction on the Main Library. Costs related to this option are primarily related to moving and adjusting stacks and lighting as needed. The main disadvantage of using the temporary library at Cubberley as the temporary Main Library is that it is in south Palo Alto, therefore not as convenient to the patrons of Main Library. • Option 6: No temporary Main Library facility. The north Palo Alto community's closest library access for adult level materials would be the Downtown Branch and would be difficult for those library users who currently walk or ride their bikes to the library because Downtown Library is approximately 1.5 miles away from Main Library. Having a temporary facility adjacent to the building being remodeled keeps the community informed about the progress of the Main Library building and promotes an easier transition into the Main Library when reopened. The community has expressed the desire to have a temporary building and the favorable construction bidding climate allows the City to allocate some funding for this temporary facility. Recommended Option The Options were discussed at the Community Meeting held on November 16. Although the group was small, almost all of those commenting favored having a Temporary Main Library, and having it in the Arts Center Auditorium (Option 1). The question of a Temporary Main Library was also discussed at the Public Art Commission on November 18. Commissioners did not make recommendations on this question, but noted the positive aspect of creating a connection between the Arts Center and Main Library by using the Auditorium. The issue was also discussed at the Library Advisory Commission meeting on the same day. The Library Advisory ,Commission did not make formal recommendations, but individual Commissioners indicated that either locating the temporary library at the Art Center Auditorium (Option 1 ) or not having a Temporary Library (Option 6) were both viable Options, and better than any of the other Options. Staff recommends that Option 1 (use of the Art Center Auditorium) be selected. If Council selects this option, or any combination of Options 1 through 5, staff will return with a contract amendment with Group 4 Architecture and Turner Construction to provide design and construction management services. Option 1 is most desirable because: 1) The Arts Center Auditorium is immediately adjacent to the Main Library and the best location to serve residents who currently use Main. 2) The cost is comparable or lower than the other Options, except for Option 5 (Cubberley) and Option 6 (no temporary facility). However, Option 5 is in south Palo Alto, several CMR:435:10 Page 4 of6 miles away from Main Library. Option 6 would result in a temporary decrease in library services available in north Palo Alto. 3) Design and construction costs for any temporary Main Library are bondable. Given lower than anticipated construction costs on these projects, the City can provide a temporary Main Library facility within the available bond funding if Council approves moving forward with the new temporary library. RESOURCE IMPACT Design and construction costs for a temporary Main Library can be covered by bond funds and, because of the low bids that have been received on the library projects to date, there is sufficient financial flexibility to provide a temporary Main Library facility. A new CIP would be established for this project, if approved by Council. Costs for the preliminary design needed for the selected option will be paid from the Main Library CIP PE-11000 but will be tracked separately. After library projects in the first phase of construction and planning are completed, any remaining funds from the first bond issue can and will be used for the Main Library project. Regardless of whether a temporary Main Library is constructed or leased, a second bond issue will be needed to construct the Main Library improvements, which are estimated at $15,000,000. Funds donated for this project through the Palo Alto Library Foundation would only be used for Library facilities and operational purposes. For details on the bond issuance and the applicable tax rates and assessments for 2011, see the Discussion section in CMR 337:10, August 2,2010. Once the second series of bonds is issued for Main Library work (estimated to begin in late 2012), property owners will see a second increase in their property taxes. This increase will be dependent upon the amount of bonds required for the second issue and the prevailing interest rate at the time of the bond sale. POLICY IMPLICATIONS Choosing either to establish, or not establish, a Temporary Main Library would not constitute a change in City Policy. TIMELINE The existing Mitchell Park Library has been closed and its staff, books, and equipment have been relocated to a temporary library at the Cubberley Community Center. Construction of the new Mitchell Park Library began in September 2010 and will be complete in approximately September 2012. This timeline includes the installation of furniture and equipment and the relocation of Technical Services staff now located at the temporary library at the Cubberley Community Center. The construction at the Main Library is being planned to start in the end of2012, so that Mitchell and Main will not be closed at the same time. The public and Library Staff will both benefit from this sequencing of the two projects. This timing also allows the Arts Center remodeling to be completed so that it can serve as the temporary site for Main (Option 1 above). Timing for other options depends on a number of other factors. Option 2 would require the CMR:435:10 Page 5 of6 design and construction of supporting utilities and other ancillary items for the modulars. This could be accomplished before the Summer of 2012. Options 3 & 4 are dependent on the real estate market and the relative availability of leased space, Options 5 & 6 would require only logistical and operational changes by Library Staff. ENVIRONMENTAL REVIEW On July 21, 2008, the Council confirmed the Director of Planning and Community Environment's approvals of a 2007 Addendum to the 2002 fInal Environmental Impact Report for the Main Library. ATTACHMENTS Attachment A: Temporary Main Library Options Matrix PREPARED BY: / ,I .~ _______ -----". / ./ (,.. , KAREN BENGARD Senior Engineer DEPARTMENT HEAD: (~- J. MIC L SAf[OR CITY MANAGER APPROVAL: r: c JAMES KEENE l,....Y" City Manager CMR:435:10 Page 6 of6 '- MAIN TEMPORARY LIBRARY SITE SERVICE ~ Z ~. ~ (!) 5 0 (!) ~. z (!) 5 z ~ ~ a.. Z LU S2 ~ j:: .... OPTIONS MATRIX .... 0 o .~ .~ 0 0 ':<:( a:::: LIJ U :r: CIQ u ~ u c;; NO TEMPORARY USE REMAINING FOUR LIBRARIES FOR ALL SERVICES NO TEMP & CUBBERLEY ENTIRE MAIN COLLECTION MOVE INTO STORAGE TEMPORARY OPTIONS OPTION 7 (PROGRAM A): ART CENTER ,( ,( ,( ,( AUDITORIUM; APPROXIMATELY 2,500 SF. OPTION 2 (PROGRAM A) :MODULARS ~ @ LUCIE STERN; APPROXIMATELY ,( ,( ,( 2,880 SF wi SHARED PARKING ~PTION 3 (PROGRAM A) S3 LEASED OFFICE SPACE; APPROXIMATELY ,( ,( ,( 2,880 SF W / EXISTING PARKING OPTION 4 (PROGRAM B) LEASED OFFICE SPACE; APPROXIMATELY ,( S3 ,( ,( 8192 SF W / EXISTING PARKING (l)ln 2009, Th-e-Ari Center Auditorium generatecFapproximately $45)(i" rentCiTrees (2) In 2009, The Cubberley Community Center generated approximately $11 OK in renf'al fees. (3) All Main staff to be moved to Leased Office Space (4) The Historical Col/ection will b~ located @ Cubber/ey and accessible to the community ,( ,( 10,000 ITEMS 10,000 ,( ,( ITEMS 10,000 ,( ,( ITEMS 50,000 ,( ,( ITEMS ATTACHMENT A MAIN·STAFF ~ ~ ESTIMATED ~ .... I¥ COST RANGE <? m e CIQ -CIQ Q z a ~ 0 ,((4\ TBD (2) 50K-60K ,( ,((4) 350K-500K (1) (2) ,( ,/(4) 500K-700K (2) ,( ,/(4) 350K-500K (2) ,1(3) S3 850K-1M