HomeMy WebLinkAboutStaff Report 410-10TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DATE: NOVEMBER 22,2010 REPORT TYPE: INFORMATIONAL \ DEPARTMENT: PLANNING& COMMUNITY ENVIRONMENT CMR: 410:10 SUBJECT: Implementation Status of the Arastradero Road Trial Restriping Project between EI Camino Real and Gunn High School RECOMMENDATION This report is for informational purposes only. No action is requested. BACKGROUND The Arastradero Road -Trial Restriping Project between EI Camino Real and Gunn High School is the second phase of the Charleston-Arastradero Corridor Plan. Improvements along Charleston Avenue were implemented in 2006 and approved in 2008 to remain in place permanently. Those improvements included a lane reduction from 4-lanes to 3-lanes including center tum lanes into residential streets and commercial properties. Resurfacing and restriping improvements on Arastradero Road were implemented in August and September 2010. Major construction was completed in early October. Two improvements that were previously scheduled for that time remain to be implemented: • Clemo Drive Crosswalk A new enhanced crosswalk with a raised median refuge island and pedestrian-activated flashing beacons • Coulombe Drive Traffic Signal Modification Traffic signal modification to install longer traffic signal mastarms to align traffic signal indications with lane lines and protected "left arrow" signal indications for eastbound Arastradero Rd. traffic turning onto Coulombe Drive .. Post-construction traffic data collection for the project started in October. i \. , \ ., I. \ Project Map Arastradero Road -Trial Restriping Project \ Page DISCUSSION The Arastradero Road -Trial Restriping Project between E1 Camino Real and Gunn High School includes a new street slurry wearing surface application, restriping from a 4-lane to 3-lane configuration with a center tum lane, a new crosswalk and raised median island at Clemo Drive, and traffic signal improvements at Coulombe Drive. Major construction on the restriping project was completed in October after a brief delay in the installation of roadway stencils due to a nationwide shortage in roadway marking thermoplastic material. Installation of the permanent bike lane and parking lanes in thermoplastic is still pending but marked in paint. The final planned improvements at Clemo Drive and Coulombe Drive are scheduled for implementation in NovemberlDecember. The first round of traffic data collection for the Arastradero Road restriping project started in October and a community meeting was held on October 19th to present the data findings, note community comments to date with City responses/proposed solutions, and to solicit additional , community input regarding the project. ' The traffic data presented shows an overall minor decrease of less than 3% on average in vehicle volumes during the morning school commute period and the evening work commute period compared to pre-project data collected in May. Vehicle speed data also shows a very minor decrease in vehicle speeds overall on a daily basis of less than 2-MPH. Travel time data on Arastradero Road was also collected and showed an average travel time of 6-minutes to travel from Alma Street to Gunn High School and just under 4 minutes from EI Camino Real to Gunn High School. Minor reductions or stagnant traffic volume changes would be anticipated in a project of this type as commuters find alternative routes to their destinations. The minor change of 3% though is a positive indicator that the project is not drastically shifting traffic onto adjacent streets, an initial goal of the project; Maybell Street for example, parallel to but north of Arastradero Road, has a daily traffic volume change of less than 1 %. Vehicle speed changes with lane reduction products typically do yield higher vehicle speed reductions but the project is still early in its implementation so on-going monitoring is appropriate. City-suggested alternatives to further encourage vehicle speed reductions are discussed further within this report. Meeting participants requested a better comparison of post-construction travel time data compared to the pre-project condition because those data were unavailable at the community meeting. Staff is working to extrapolate the pre-project condition data for the next community meeting. Meeting participants also noted that the vehicle speed data should be compared by periods of the day instead of an overall daily basis. Staff is also separating out that data for the next community meeting. Page 2 Below is a matrix of comments received prior to the community meeting and responses or suggested improvements that were presented at the meeting: . General Comments: Do Not Like Improvements, Travel Time has Increased, Lane Drop/Merges are confusing El Camino Real Traffic Signal Operations Need Improvement Alta Mesa-McKellar Lane Left Tum Access Needs Improvement Clemo Dr. Crosswalk Needs to be Built Coulombe Dr. Traffic Signal Modifications schedule Donald Drive-Terman Road Traffic Signal Operations Impact corridor operations during the school commute Speeding has not changed on Arastradero Road RESOURCE IMPACT Project is a one-year trial scheduled to end next summer, City will monitor regularly to implement appropriate improvements during the trial City is working with Caltrans to monitor and implement traffic signal timing changes and with the VT A to relocate a bus stop at the westbound lane merge to alleviate impacts City will be adding "Keep Clear" stencils in the eastbound direction of Arastradero Road with "Do Not Block Intersection" signage Construction is scheduled in NovemberlDecember Construction is scheduled in NovemberlDecember The "all-pedestrian" only movement during school commute periods provides a safety enhancement to the community but restriping alternatives to extend the left-tum storage into Terman Road will be pursued New vehicle speed feedback signs are proposed at Hubbart Street and will be installed in the Fall to encourage vehicle speed reductions towards the westerly end of the project area. This project is currently funded from the City's -Capital Improvement Program (CIP) and no additional resources are being requested. POLICY IMPLICATIONS The Arastradero Road Trial Restriping project is consistent with the City Council's policy recommendations in the approval of the Charleston-Arastradero Road Corridor Plan. Page 3 ENVIRONMENTAL REVIEW The City Council adopted a mitigated negative declaration for Phase One and Phase Two of the Charleston Avenue-Arastradero Road Corridor Plan in 2004. ATTACHMENTS A. Presentation given at the October 21, 2010 project community meeting PREP ARED BY: DEPARTMENT HEAD: CURTIS W LLIAMS Director of Planning and Community Environment CITYMANAGERAPPROVA/<1 ~~~ -tc,J:.-JAMES KEENE . J City Manager Page 4 Arastradero Road Trial Restriping Project Post-Construction Community Outreach Meeting No.1 October 21, 2010 > ~ ~ n ~ l'!j z ~ :> Agenda • Staff Introductions • Project Background • Project Status • Traffic Data Collection Summary • Current Community Input • Proposed Immediate and Long-Term Improvements • Question/Answers ,1.., Project Background • Charleston-Arastradero Traffic Calming Project • Arastradero Rd Community Input Period 2007-09 -• One-Year Trial Period (Aug 2010-11) • Lane Reduction • Traffic Calming Treatments Project Status • Major Construction Complete -Aug/Sept 2010 • Pavement Surface Treatment • Trial Restriping • Pending Arastradero Rd Improvements • Final Bike Lane/Parking'Lane • Bike Lane Stencils • Clemo Av-Suzanne Dr Crosswalk -Nov 2010 • Coulombe Dr Traffic Signal Modification -Nov 2010 • On-Going One-Year Trial Period Monitoring Pre-Project Traffic Count and Speed Summary -Arastradero May 2010 w/o Georgia elo Pomona elo McKellar AM -EB 592 680 733 AM-WB 992 952 1016 PM-EB 963 960 870 PM-WB 638 653 712 Average Daily 18,523 18,458 18,137 850/0 Speed 35.1 36.0 32.0 Pre-Project Traffic Count and Sp'eed Summary -Arastradero May 2010 w/o Georgia elo Pomona elo McKellar Donald Maybell AM -EB 592 680 733 AM-WB 992 952 1016 PM -EB 963 960 870 PM-WB 638 653 712 Average Daily 18,523 18,458 18,137 755 1,638 85% Speed 35.1 36.0 32.0 24.0 24.0 Post-Project Data #1-Oct 2010 Traffic Count and Speed Summary -Arastradero October 2010 wto Georgia eto Pomona eto McKellar AM-EB 560 672 720 AM-WB 968 924 924 PM-EB 1,076 996 912 PM-WB 596 709 682 Average Daily 18,022 18,467 18,064 85% Speed 34.2 33.8 32.7 Post-Project Data #1 -Oct 2010 Traffic Count and Speed Summary -Arastradero , October 2010 w/o Georgia elo Pomona elo McKellar Donald Maybell AM -EB 560 672 720 AM-WB 968 924 924 PM -EB 1,076 996 912 PM-WB 596 709 682 Average Daily 18,022 18,467 18,064 812 1,646 85% Speed 34.2 33.8 32.7 25.1 24.2 Travel Time Survey Summary October 2010 AM Peak Hour Average 7:25AM to 8:00 PM Minimum 4 days / 9 runs Maximum PM Peak Hour Average 5:15 PM to 6:30 PM Minimum 1 days / 4 runs Maximum Westbound Alma St to Foothill (EI Camino to Gunn HS) a 8:40 (4:29) 6:09 ( 3:51) 12:38 (5:16) 5:51 (2: 10) 5:06 (1 :57) 6:36 (2:20) a time from after entering EI Camino Real intersection Eastbound Gunn HS to Alma St (Gunn HS to EI Camino) ~.. 6:43 (4:07) 4:53 (2:49) 9:29 (6:08) 6:41 (4:16) 5:15 (3:25) 8:07 (5:19) Community Input -Positive Input • Easier to Turn On/Off of Arastradero • Speed Reduction • More comfortable for bicyclists • More comfortable for pedestrians • Neighborhood street feel • No difference in commute period • Faster commute at Times · Community Input -Areas of Concern • General Comments • Do NotLike Improvements • Travel Time on Arastradero Rd Increased • Lane Drops/Merges Confusing Community Input -Areas of Concern Response • General Comments • One-Year Trial • Do Not Like Improvements • Monitor/Solicit Input • Travel Time on Arastradero Rd Increased • Corridor Signage Evaluation • Lane Drops/Merges Confusing Community Input -Areas of Concern ~ General Comments " Do Not like Improvements " Travel Time on Arastradero Rd Increased III Lane Drops/Merges Confusing • EI Camino Real Traffic Signal Operations ~-"""""'-.--~---'--'-'--'-~''''''''''''''''''~~".~~-'-'''''''. Response " One-Year Trial tI Monitor/Solicit Input <II Corridor Signage Evaluation EI Camino Real Traffic Signal Operations • ,,,,N,,,, '''" ... :: ?,:> • City/Caltrans -Traffic Signal Ops Coordination • VTA Bus Stop Relocation • Crossing Guard Operations Community Input -Areas of Concern • General Comments o Do Not Like 1m rovements • Travel Time on Arastradero Rd Increased $ lane Drops/Merges Confusing • EI Camino Real Traffic Signal Operations • Alta Mesa-McKellar Lane Left-Turn Access Response (/) One-Year /I I\lIonitor/Solicit Inp o Corridor Signage Evaluation e City/Caltrans/VTA Coord Alta Mesa-McKellar Ln -Left Tl,Jrn Access Immediate: • Eastbound "KEEP CLEAR" stencils • "00 Not Block I ntersection" Signs Watch for Future • 24-inch White Bars to "Box I ntersection" Community Input -Areas of Concern e General Comments o Do Not Like 1m rovements o Travel Time on Arastradero Rd Increased I» Lane Drops/Merges Confusing • EI Camino Real Traffic Signal Operations • Alta Mesa-McKellar Lane Left-Turn Access • Clemo Dr Crosswalk -Nov 2010 Response \9 One-Year Trial «I Monitor/Solicit Input <;I Corridor Signage luation o City/Caltrans/VTA Coo «I Signage & Striping .-......., V') .-x UJ I ~ ro ~ V') V') o '-u '-o o E Q) u Clemo Dr Crosswalk -Proposed Crosswalk (Nov 2010) Immediate: • Raised Median • Ped-Activated Flashing Beacon • Enhanced Crosswalk rna rki ngs/signage Clemo Dr Crosswalk -Proposed Crosswalk (Nov 2010) .. -..... -.. -~""~.~~~-- Immediate: • Raised Median • Ped-Activated Flashing Beacon • Enhanced Crosswalk rna rki ngs/signage ____ ... ~~-_~=_~rc-~-...... ~L.-_~~~ _ _"__'~ __ _'_' __ ~ __ .~,_._~.~ __ ....... , ... """"",,,,,,,.,,,,,,,, ___ ~~~ Community Input -Areas of Concern • neral Comments o Do Not like Improvements o Travel Time on Arastradero Rd inc ased " Lane Drops/rVlerges Confusing o EI Camino Real Traffic Signal Operations «I Alta Mesa-McKellar Lane Left-Turn Access a Clemo Dr Crosswalk -Nov 2010 • Coulombe Dr Traffic Signal Modification ~-_,,_>«, ,~ ___ •. ~,,_C_~~~~.>~,>>> ._~ __ Response e One-Year Trial @ Monitor/Solicit Input • Corridor Signage Evaluation \l) City/Caltrans/VTA Coord (/I Signage & Striping o Enhanced CrossWalk c: o ......, ro u ij:::: .- "'0 o ~ ro c: tlO V') u ~ ro ~ I L.. o OJ ..c E o ::l o U c o +"'" ro u 4= "'0 o ~ ro c bO Vl u ~ ro ~ I L.. o Q) ..c E o :::J o U ~ D:: (!) 4: 0 w ~n~~t ~ ~ III r Cl. SdO ElNIl.SIX3 J '<t .----. lSI 03d ~ D:: ~1~t U) ~ It .., lSI i5 lSI ~ . w 111 ~ r Cl. it ttl • • ~ NDlsao l.N:MInO Ol. NElIS:lO 9DNVHO Community Input -Areas of Concern • General Co ments 1& Do Not ke Improvements • Travel me on Arastradero Rd Increased & Lane Drops/Merges Confusing 9 EI Camino Real Traffic Signal Operations o Alta Mesa-McKellar Lane Left-Turn Access ell Clemo Dr Crosswalk -Nov 2010 • Coulombe r Traffic Signal Modificati n • Donald Dr-Terman Rd Traffic Signal Ops Response 1& One-Year Trial 1& Monitor/Solicit Input ~ Corridor Signage Eva I uation \9 City!Caltrans/VTA Coord I') Signage & Striping e Enhan Crosswalk fIl Enhanced Signal Phasing Donald Dr-Terman Rd Traffic Signal Operations Existing Configuration Today 01-05 02-1'5 02-11)6 04-,oS 04-,oS PHASE DIAGRAM (7:30-8:15) Donald Dr-Terman Rd Traffic Signal Operations Option: • Extended Left Turn Storage to Terman Dr • Helps Eliminate Left Turn Queue Spill over to Westbound Arastradero Rd Traffic • King Arthur Ct Shared Left-Turn Lane 02·1>5 02"06 04·.l}8 04· n8 PHASE DIAGRAM 0:30"8:15) ~_,i_.~, Community Input -Areas of Concern ® General Comments ® Do Not Like improvements .. Travel Time on Arastradero Rd Increased • lane Drops/Merges Confusing e EI Camino Real Traffic Signal Operations (1) Alta Mesa-McKellar Lane Left-Turn Access III Clemo Dr Crosswalk -Nov 2010 @ Coulombe Dr Traffic Signal Modification • Donald Dr-Terman Rd Traffic Signal Ops • Speeding West of Hubbart Dr Response \11 One-Year Trial e Monitor/Solicit Input • Corridor Signage Evaluation • City!Caltrans/VTA Coord $ Signage & Striping e Enhanced Crosswalk • Enhanced Signal Phasing " Striping & Signal Timing 0 __ J ,_ , __ Speeding -Vehicle Speed Feedback Signs Option: • New raised median island with VSFS facing westbound Arastradero Rd • Relocate VSFS from Cemetary to Hubbart Dr facing eastbound Arastradero Rd Community Input -Areas of Concern Response • General Comments • One-Year Trial • Do Not Like Improvements • Monitor/Solicit Input • Travel Time on Arastradero Rd Increased • Corridor Signage Evaluation • Lane Drops/Merges Confusing • EI Camino Real Traffic Signal Operations • City!Caltrans/VTA Coord • Alta Mesa-McKellar Lane Left-Turn Access • Signage & Striping • Clemo Dr Crosswalk -Nov 2010 • Enhanced Crosswalk • Coulombe Dr Traffic Signal Modification • Enhanced Signal Phasing • Donald Dr-Terman Rd Traffic Signal Ops • Striping & Signal Timing • Speeding West of Hubbart Dr • Vehicle Speed Feedback Signs Vl I­ Z UJ ~ ~ o u ........... Vl Z o -tn UJ :::J o tlO I.-o • o ....... -res o res a. 4-o >­....... . -U @J C o .-....... res 1:: o a. V') c res I.-.......