Loading...
HomeMy WebLinkAboutStaff Report 319-10TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: AUGUST 2, 2010 CMR:319:10 REPORT TYPE: CONSENT SUBJECT: Approval of Contract Amendment No. One with Callander Associates Landscape Architecture, Inc., to Add $14,829 for Greer Park Renovation Construction Administration Services for a Total Contract Amount Not to Exceed $191,015 -CIP #PE-09002 RECOMMENDATION Staff recommends that Council approve and authorize the City Manager or his designee to execute Amendment No. One to Contract No. C09126814 with Callander Associates Landscape Architecture, Inc. (Attachment A), in the amount of $14,829 for construction administration services for the Greer Park Renovation and Pump Station Replacement Project, CIP #PE-09002. The amended contract amount for project design and construction administration services would total $191,015. BACKGROUND On August 4, 2008, Council approved Contract No. C09126814 with Callander Associates Landscape Architecture, Inc., in the amount of $176,186 for landscape and engineering design services for the Greer Park Renovation and Pump Station Replacement Project, CIP #PE-09002 (CMR:333:08). The contract included a relatively small allowance of $12,150 for the consultant to assist staff with administration tasks during project construction. At the time, the project was being managed by a professional landscape architect in the Public Works Engineering Division, who was qualified to review landscape-related contractor submittals and inspect planting and irrigation system improvements in the field. On December 14, 2009, Council approved Contract No. C10134205 with Elite Landscaping, Inc., in the amount of$1,220,075 for construction of the Greer Park Renovation and Pump Station Replacement Project (CMR:423:09). DISCUSSION In February 2010, shortly after the start of construction on the Greer Park Renovation Project, the staff landscape architect managing the project retired from the City and the position was frozen. The project is now being managed by a civil engineer in the Public Works Engineering Division with less project-specific knowledge and less expertise in landscape architecture. As a result, there is an increased need for assistance from the landscape architecture consultant in reviewing contractor submittals, responding to requests for information, inspecting irrigation and reclaimed water pump station improvements, and preparing record documents upon completion of the work. Staff has worked diligently throughout the project to-date to minimize the use of CMR:319:1O Page 10f2 the consultant in administering the project. In order to bring the project to a successful completion, however, it will be necessary to increase the construction administration portion of the consultant contract. Upon approval of Amendment No. One, the construction administration budget for the proj ect will total $26,979, which is approximately 2 % of the construction cost and well under the standard allowance for such services on City capital improvement projects. Staff has been working cooperatively with the project contractor to reopen portions of the park as the renovation work progresses. For example, the soccer and softball fields at the north end of the park and the park restroom were reopened for public use on June 15, 2010, in time for the peak summer soccer season. The remaining playing fields will be ready to open by September 1, 2010 in order to accommodate additional organized sports activity. The balance of the park renovation, including the construction of new picnic areas and pathways at the comer of West Bayshore Road and Colorado Avenue, is scheduled to be completed by the end of October 2010. RESOURCE IMPACT Funds for this contract amendment are available in the approved budget for Capital Improvement Program Project #PE-09002. ENVIRONMENTAL REVIEW This is not a project under the California Environmental Quality Act (CEQA) pursuant to Section 21065 of the Public Resources Code. ATTACHMENTS Attachment A: Amendment No. One to Contract No. C09l26814 PREPARED BY: DEP ARTMENT HEAD: CITY MANAGER APPROV AL CMR:319:10 J TERESI &:in~f. gA~_ GLENN S. ROBERTS Director of Public Works Page2of2 ATTACHMENT A ~ CITY OF PALO ALTO CONTRACT NO. C09126814 AMENDMENT NO. 1 TO CONTRACT NO. C09126814 BETWEEN THE CITY OF PALO ALTO AND CALLANDER ASSOCIATES LANDSCAPE ARCHITECTURE, INC. This Amendment No. 1 to contract No. C09126814 ("Contract") is entered into , 2010, by and between the CITY OF PALO ALTO, a California Charter City ("CITY"), and CALLANDER ASSOCIATES LANDSCAPE ARCHITECTURE, INC., a corporation in the state of California with offices located at 311 Seventh Avenue, San Mateo, CA 94401 ("CONSULTANT"). R E CIT A L S: WHEREAS, the Contract was entered into between the parties for the provision of professional consulting replace the existing pump station and irrigation system at Greer Park, to renovate the children's play area and other areas within the park, and to design and implement improvements to the undeveloped portion of the park ("Project"); and WHEREAS, the parties wish to amend the Contract to increase the scope of services and compensation; NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the parties agree: SECTION 1. Section I, SCOPE OF SERVICES, is hereby amended to add the following: "CONSULTANT shall perform the Services described in Exhibit "A", as revised in accordance with the terms and conditions contained in this Agreement. The performance of all Services shall be to the reasonable satisfaction of CITY." SECTION 2. Section 4, NOT TO EXCEED COMPENSATION, is hereby amended to read as follows: "The compensation to be paid to CONSULTANT for performance of the Services described in Exhibit "A", as revised including both payment for professional services and reimbursable expenses, shall not exceed one hundred seventy-five thousand fifteen dollars ($175,015.00). In the event Additional Services are authorized, the total compensation for services and reimbursable expenses shall ,not exceed one hundred ninety-one thousand fifteen dollars ($191[015.00). The applicable rates and schedule of payment are set out in Exhibit "C", entitled "COMPENSATION[" which is attached to. and made a part of this Agreement. 1 S:ATT/USERS/OFFICE FORMS/City Approved Contracts 3/20/07 (REV) CITY OF PALO ALTO CONTRACT NO. C09126814 CONSULTANT shall not receive any compensation for Additional Services performed without the prior written authorization of CITY. Additional Services shall mean any work that is determined by CITY to be necessary for the proper completion of the Project, but which is not included within the Scope of Services described in Exhibit "A" . SECTION 3. The following exhibit(s) to the Contract are hereby amended to read as set forth in the attachment(s) to this Amendment, which are incorporated in full by this reference: EXHIBIT "A": EXHIBIT "C": SCOPE OF SERVICES COMPENSATION SECTION 4. Except as herein modified, all other provisions of the Contract, including any exhibits and subsequent amendments thereto, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have by their duly authorized representatives executed this Amendment on the date first above written. CITY OF PALO ALTO: City Manager APPROVED AS TO FORM: Sr. Assistant City Attorney S,ATT/USERS/OFFICE FORMS/City Approved Contracts 2 CONSULTANT: CALLANDER ASSOCIATES LANDSCAPE ARCHITECTURE, INC. 3/20/07 (REV) CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One Task 1 -PROJECT STARTUP Consul tant shall: EXHIBIT "A" -Revised SCOPE OF SERVICES 1.01 Attend one initial meeting with City staff to review design program, schedule, budget, project goals, and available base information. Prepare meeting summary and written design program. (Staff Meeting #1) TASK 2 -PRELIMINARY INVESTIGATION AND DESIGN Consultant shall: 2.01 Gather and evaluate existing park record drawings (furnished by City) and other available base information for the site. Obtain an electronic copy of City's topographic survey for the annex. 2.02 Conduct a topographic survey of the existing park improvements exclusive of the annex (topographic survey of annex to be provided by City in AutoCAD for incorporation into overall site survey). Survey to be prepared at a scale of 1" = 30'. Combine field survey with survey provided by City into a composite drawing suitable for development of base sheets. 2.03 Inventory existing conditions and above grade features on the annex site and children's play area. Conduct an operational inspection of the existing pump station and irrigation system. Photograph existing conditions for meetings and in-house use. Obtain up to two (2) soil samples in the annex area for horticultural soils testing by Soil and Plant Laboratory of Santa Clara for soils analysis and general amendment and fertilizer recommendations for landscape areas. The lab recommendations will be incorporated into the soil preparation specification. 2.04 Review municipal codes and applicable environmental clearance requirements and prepare a permitting requirements matrix summarizing agencies, jurisdictions, fees, permit type and permit processing requirements. Matrix to include any environmental heath permitting requirements that may be triggered by upgrades to non-potable and potable water services. 2.05 Pump Station: As multiple solutions are available to address the deficiencies of the existing pump station, the preliminary design phase includes development and evaluation of alternatives. All alternatives will show new water service(s) to the new pump station to address the recharge deficiencies of the existing make-up lines. Concepts will be developed delineating alternatives to facilitate selection by City. Alternatives include: Horizontal Centrifugal Pump: Installed adjacent to existing pumps to minimize down time during "switchover". Horizontal centrifugal pump concept plan to be prepared at a scale of W' = 1'-0". 100716 Professional Services Revised 10/18/07 CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One Vertical Turbines: Installed over the existing tank. Vertical turbine concept plan to be prepared at a scale of W' = l' -0". Prefabricated or Custom Pumps w/Wet Well: Wet well installed adjacent to existing well, and may be interconnected. System available for testing and evaluation before switchover. Wet well concept plan to be prepared at a scale of W' = 1 ' -0". 2.06 Develop two (2) preliminary play area plans for the children's play area at a scale of 1,14" = l' -0". Prepare two (2) preliminary annex plans for the annex at a scale of 1" = 10'. Develop one (1) preliminary overall park plan at a scale of 1" = 3 0 ' to show other contemplated improvements including renovation of picnic areas, dog run, pathway lighting, new fencing, dugouts, backstops, exercise stations and new plantings. 2.07 Assemble details, catalog cuts, sketches and other information as necessary to convey design intent. Materials assembled may include catalog cuts and photos of proposed play equipment, site furnishings, plant palette, light fixtures, and other improvements. Assemble and mount images on presentation board for use in public presentation. 2.08 Prepare a detailed estimate of probable construction costs for all park elements. Estimate to be formatted to separate costs associated with required (irrigation system, pump station, play areas) from optional (dog run, ballfield dugouts & backstops, exercise stations) improvements. Estimate to include design and construction contingencies and allowance for inflation. 2.09Meet with City staff to present and discuss preliminary park and pump station improvement plans, park furnishings and cost estimate. Evaluate the scope of the work and coordinate with the City to prioritize work items. Recommend alternatives to enhance the project or reduce costs. Prepare meeting summary. (Staff Meeting #2) 2.10 Revise preliminary park improvement plans, presentation board and estimates of probable construction costs based on comments in staff meeting #2. Prepare a Powerpoint presentation and large format graphics for public presentation. 2.11 Community Presentation # 1: Utilizing large format graphics and Powerpoint, present draft preliminary design plans in a single community meeting. Solicit input from attendees and facilitate consensus during the meeting. Record comments and prepare meeting summary. TASK 3 -DESIGN DEVELOPMENT Consultant shall: 3.01 Meet with staff to discuss City and Community input. Identify preferred alternative or preferred elements of each alternative for purposes of establishing final design. Re-confirm 2 100716 Professional Services Revised 10/18/07 CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One project parameters including project budget and schedule as necessary to respond to program. Record comments and prepare meeting summary. (Staff Meeting #3) 3.02 Incorporating comments from phase 2.0 community presentation and staff meeting proceed to prepare design development plans with layout of all major elements clearly defined. Specific drawing index to be established at the completion of this task. The index will likely include the following: a. cover sheet with general notes, sheet index, existing conditions legend, site and vicinity maps (1 sheet) b. demolition plan with notes, legend and disposition list (3 sheets, 30 scale) c. annex area grading plan with legend and notes (1 sheet, 30 scale) d. site construction plan with all improvements located and referenced (3 sheets, 30 scale) e. irrigation plan with all irrigation improvements shown (3 sheets, 30 scale) f. irrigation details including controller, valves, quick couplers, and other new irrigation system components (2 to 3 sheets, scale varies) g. pump station drawings including plan and elevation drawings of pump station improvements (1 to 2 sheets, scale varies) h. piping plans showing plan and profile of existing and new pump station service lines, including tie-ins, cross sections and details of pump station enclosure (1 to 2 sheets, scale varies) 1. planting plan showing new plantings throughout annex area (1 sheet, 30 scale) and replacement plantings elsewhere in park (2 sheets, 30 scale) J. pump station and piping details (2 to 3 sheets) k. landscape details including planting, fencing, exercise stations and other site furnishings as selected for incorporation in project (2 to 3 sheets, scale varies) 1. electrical site plan showing parking and pathway lighting as selected for incorporation in project and electrical service to pumping station and controller (3 sheets, 3 0 scale) m. electrical details including single line diagrams, panel schedules, grounding, pull box and electrolier details (3 sheets, scale varies) 3.03Prepare technical specifications addressing all major items of work. Specifications to be prepared in CSI format. Specification sections to be established at the completion of this task. Landscape specifications sections to include: demolition, site concrete, site furnishings, irrigation, planting, landscape maintenance, soil preparation, earthwork, site drainage. Pump Station specifications to include: performance specifications for pumps, motors, VFD's, programmable logic controllers, valves pressure gauges, motor starters, and technical specifications for pipeline installation including pipe material, bedding, trench excavation, disinfection, and recycled water main labeling. Electrical specifications sections to include: general electrical requirements, materials and 3 100716 Professional Services Revised 10/18/07 CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One methods, light fixtures, electrical equipment and electrical site work. 3.04 Prepare a detailed estimate of probable construction costs including an itemization of all major items of work, unit prices (based on actual bid results), cost extensions and construction contingencies. 3.05 Prepare an 8-1/2 x 11 bound design development booklet showing all major elements proposed. Booklet to include: Catalog cuts of park site furnishings: including play equipment, fencing, backstops, exercise equipment, and other site furnishings. Pump station information: including catalog cuts of maj or pump station components, and an integrated Supervisory Control and Data Acquisition (SCADA) system. Irrigation system information: including irrigation equipment catalog cuts. Landscape improvements: including photos of proposed plant types, horticultural soils report and tabulation of plants by seasonal color, growth rates and other selection criteria. 3.06Meet with City staff to present and discuss design development submittal including plans, specifications, cost estimate and design development book. Identify minor modifications to design development package to be incorporated prior to Community Presentation #2. Prepare meeting summary. (Staff Meeting #4) 3.07 Community Presentation #2: Prepare a color rendering of the planting plan to serve as a presentation drawing. Add labels as appropriate to further delineate key improvements. Prepare a Powerpoint presentation to include overall plan, enlargements of select areas including park annex, play and picnic areas. Presentation to include images culled from design development booklet to show proposed play equipment, site furnishings and other elements as may be of interest to the community. Powerpoint presentation to be complemented with presentation boards to facilitate dialogue with public at completion of presentation. Note public comments and seek consensus. Prepare meeting summary and forward to City for review and distribution. TASK 4 -CONSTRUCTION DOCUMENTS (95% SUBMITTAL) Consultant shall: 4.01 Meet with staff to discuss City and community input. Discuss suggested plan revisions and reach consensus regarding appropriate incorporation. Review project parameters including budget and schedule as warranted to respond to any program changes. Record comments and prepare meeting summary. (Staff Meeting #5) 4.02 Incorporating comments from community presentation and subsequent staff meeting, revise and prepare 95% complete plans. Furnish supporting data as may be required to facilitate City plan review. Plans to include drawings for turnkey pump station showing transition from 4 100716 Professional Services Revised 10/18/07 CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One old to new pump systems. 4.03 Revise and update specifications. Edit as needed to incorporate geotechnical and horticultural recommendations. Specifications to be edited to include measure and pay clauses and bid form. 100% specifications to be furnished to City with 95% submittal. 4.04 Revise the final statement of probable construction costs as warranted to address plan changes and most current contract cost data available. Completed estimate shall be suitable for establishment of the "Maximum Construction Budget" as defined in Article I.B of the Agreement for Services. TASK 5 -CONSTRUCTION DOCUMENTS (100% SUBMITTAL) Consultant shall: 5.01 Incorporating comments from City review, proceed to prepare 100% plans. Furnish City with one (1) full size reproducible set of 100% submittal drawings, stamped and signed by the appropriate licensed professional. 5.02 Update project manual as warranted and in accordance with comments received on prior submittal. Incorporate City prepared sections including Notice Inviting Bids, Proposal Requirements and Instructions to Bidders, Proposal and Bond Forms, and Conditions of the Contract. 5.03 Public Meeting: Attend public meeting or present proj ect to Park and Recreation Commission as warranted. TASK 6 -BIDDING PHASE Consultant shall: 6. 0 1 Provide information and assistance during the bidding phase, including answering questions from bidders, assisting City in soliciting qualified bidders, preparing written drafts of addenda, assisting City in evaluation of bids received, and providing written recommendations for the award of the bid. TASK 7 -CONSTRUCTION PHASE Consultant shall: 7.01 Attend pre-construction meeting with the responsive low bid Contractor and City staff. Prepare meeting summary. (Staff Meeting #6) 7.02 Provide administrative services to City including review and responses to Contractor initiated inquiries as noted below. City shall have the primary responsibility for this phase of services and shall be the primary point of contact with the Contractor. Services to include: 5 100716 Professional Services Revised 10/lB/07 CITY OF PALO ALTO CONTRACT NO. C09126814 -Amendment One a. Review and respond to Contractor submittals and request for substitution. b. Respond to Contractor requests-for-information. 7.03 Provide construction support services to City in monitoring the Contractor's execution of the work for conformance with design intent, contract requirements, schedules, and cost limits. City shall have the primary responsibility for this phase of services and shall be the primary point of contact with the Contractor. Services to include: 100716 a. Attend up to two (2) progress meetings on site to review project development and provide clarification of design intent or recommendations for accommodating field conditions as appropriate. b. Provide interpretation of contract documents as required to facilitate project implementation. c. Review construction schedule, schedule of values, payment requests and change order requests. d. Prepare change orders, review Contractor's quote and advise City. e. Perform substantial and final completion walk-thrus and assemble punchlists of outstanding items of work. f. Attend close-out meeting. g. Perform up to three (3) additional site visits by as requested by the City and up to (3) site visits by the pump design sub consultant to review the pump station installation, testing and start-up. h. Review and transfer record drawings onto (1) set of mylar drawings and (1) CD and deliver to the City. 6 Professional Services Revised 10/18/07 100715 CITY OF PALO ALTO CONTRACT NO. C09126814 -AmendmenfOne EXHIBIT "C" -Revised COMPENSATION The CITY agrees to compensate the CONSULTANT for professional services performed in accordance with the terms and conditions of this Agreement, and as set forth in the budget schedule below. Compensation shall be calculated based onthe hourly rate schedule attached as exhibit C-l up to the not to exceed budget amount for each task set forth below. The compensation to be paid to CONSULTANT under this Agreement for all services described in Exhibit "A" ("Basic Services") and reimbursable expenses shall not exceed $175,015. 00. CONSULTANT agrees to complete all Basic Services, including reimbursable expenses, within this amount. In the event CITY authorizes any Additional Services, the maximum compensation shall not exceed $191,015.00. Any work performed or expenses incurred for which payment would result in a total exceeding the maximum amount of compensation set forth herein shall be at no cost to the CITY. CONSULT ANT shall perform the tasks and categories of work as outlined and budgeted below. The CITY's project manager may approve in writing the transfer of budget amounts between any of the tasks or categories listed below provided the total compensation for Basic Services, including reimbursable expenses, does not exceed $175,015.00 and the total compensation for Additional Services does not exceed $16,000.00. BUDGET SCHEDULE Task 1 (Project Startup) Task 2 (Preliminary Investigation and Design) Task 3 (Design Development) Task 4 (95% Construction Documents) Task 5 (100% Construction Documents) Task 6 (Bidding Phase -Support) Task 7 (Construction Phase -Support) NOT TO EXCEED AMOUNT $2,000 $48,672 $39,899 $34,832 $13,072 $3,400 $25,479 Professional Services Revised 10/18/07 CITY OF PALO ALTO CONTRACT NO. C09T26814 -Amendment One Sub-total Basic Services $167,354 Reimbursable Expenses $7,661 Total Basic Services and Reimbursable expenses $175,015 Additional Services (Not to Exceed) $16,000 Maximum Total Compensation $191,015 REIMBURSABLE EXPENSES The administrative, overhead, secretarial time or secretarial overtime, word processing, photocopying, in-house printing, insurance and other ordinary business expenses are included within the scope of payment for services and are not reimbursable expenses. CITY shall reimburse CONSULTANT for the following reimbursable expenses at cost. Expenses for which CONSULTANT shall be reimbursed are: A. Travel outside the San Francisco Bay area, including transportation and meals, will be reimbursed at actual cost subj ect to the City of Palo Alto's policy for reimbursement of travel and meal expenses for City of Palo Alto employees. B. Long distance telephone cellular phone, facsimile transmission and postage charges are reimbursable at actual cost. All requests for payment of expenses shall be accompanied by appropriate backup information. Any expense anticipated to be more than $200.00 shall be approved in advance by the CITY's project manager. ADDITIONAL SERVICES 100715 The CONSULT ANT shall provide additional services only by advanced, written authorization from the CITY. The CONSULTANT, at the CITY's project manager's request, shall submit a detailed written proposal including a description of the scope of services, schedule, level of effort, and CONSULTANT's proposed maximum compensation, including reimbursable expense, for such services based on the rates set forth in Exhibit C-1. The additional services scope, schedule and maximum compensation shall be negotiated and agreed to in writing by the CITY's project manager and CONSULTANT prior to commencement ofthe services .. Payment for additional services is subject to all requirements and restrictions in this Agreement Work required because the following conditions are not satisfied or are exceeded shall be considered as additional services: 2 Professional Services Revised 10/18/07 100715 CITY OFPALOALTOCONTRACTNO.C09126814 -AmendmefitOne . a. Revisions to plans subsequent to approval. b. Supplemental unforeseen services as may be required by the City or Contractor. c. Record document preparation. d. Economic analysis. e. Additional meetings, presentations or workshops other than those specifically listed in the scope of services. f. Evaluation or inventorying sites other than the immediate project site. g. Change order document preparation where change order is not necessitated by an error or omission on the plans. h. Expert witness or other legal proceeding services. 1. Any other services not specifically indicated in the scope of services. 3 Professional Services Revised 10/18/07