HomeMy WebLinkAboutStaff Report 273-10TO: HONORABLE CITY COUNCIL
FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS
DATE: JUNE 14,2010 CMR:273:10
TYPE: PUBLIC HEARING
SUBJECT: Levy of Assessment for California Avenue Area Parking Bonds -Plan G: Fiscal
Year 2010-2011 and Adoption of a Resolution Confirming Engineer's Report
and Assessment Roll, California Avenue Parking Project No. 92-13 (For Fiscal
Year 2010-2011)
RECOMMENDATION
Staff recommends that Council adopt the attached resolution (Attachment A) confirming the
Engineer's Report and Assessment Roll for California Avenue District, Project No. 92-13 and
levying assessments for FY-2011.
BACKGROUND
By virtue of the prior establishment of the assessment district and issuance of debt, Council action is
required to levy assessments for the active parking project in the California Avenue area. These
assessments will be utilized for the payment of principal and interest on bonds for capital
improvements pursuant to the attached resolution. These funds are separate and distinct from permit
fees that are used to pay for operation and maintenance of parking facilities.
The active project is listed and described as follows:
1. California Avenue District, Ted Thompson Parking Structure, Project 92-13: Construction of a
two-level parking structure on Cambridge Avenue between Birch Street and Nogal Lane.
Parking bonds issued under Bond Plan G (Section 13.16.150, Palo Alto Municipal Code) require that
a public hearing be held annually (the second Monday in June) on the assessments, which must be
levied to pay principal and interest on the bonds. The purpose of the public hearing is to allow each
property owner the opportunity to question the computation ofhislher assessment and the elements
which comprise it, that is, the square footage of each occupied building, the off-street parking
requirements for the usage, and the off-street parking provided. Assessments are levied on the basis
of building square footage, with a credit given for the off-street parking provided by the property
owner. Additional details about the Parking Assessment District-Plan G bond capital improvement
program projects can be found in Attachment B.
CMR:273:10 Page 1 of3
DISCUSSION
The assessment rates for FY 2010-11 (Attachment C) per square foot of adjusted building area and
the amount levied for the projects are:
PROJECT
1. California Avenue District, Ted Thompson
Parking Structure, Project 92-13
*Rate per weighted assessment factor.
* * Rate per land square footage.
ASSESSMENT RATE PER
ADJUSTED BUILDING
SQUARE FOOTAGE
$9.89*
$0.056**
Total:
DOLLARS
LEVIED
$114,328.22
$ 38.109.39
$152,437.61
Approximately $341,000 in excess construction funds in the California Avenue District bond fund
for the Ted Thompson parking garage, Project 92-13, was used to reduce the tax roll required to pay
offfue bonds sold to fmance the project. To equalize assessments, the funds were spread uniformly
over the duration of the bonds (20 years) beginning with the 1996 assessments.
Attachment D lists changes made to the assessment rolls. The estimated assessments were sent to
property owners within the California Avenue district on March 25, 2010. Assessments were
modified due to recent changes in business site conditions (square footage, vacancy, etc.), which
were brought to staffs attention by property owners since the estimated assessments were prepared.
Because the hearing is the legally prescribed process for property owners to raise assessment
questions, it may be necessary to have a second addendum available at the Council meeting that
reflects changes brought to staff's attention since the Council packet was delivered. The public
hearing for the assessment district may need to be continued if staff receives late information from a
property owner that cannot be verified and included in the amended rolls prior to the hearing.
RESOURCE IMPACT
The project is funded by the assessment district and no City General Fund monies are involved.
Although assessments are generally subject to Proposition 218, this particular assessment is exempt
from Proposition 218 since all of the assessment proceeds are pledged to repay bond indebtedness
issued prior to enactment of Proposition 218 in 1996.
Parking district maintenance costs, including sweeping, landscaping, signing and lighting are
paid for by parking permit fees, which were last increased in 2005 in the California Avenue
Parking District. These are separate from the funds used to pay for construction of the parking
garage.
POLICY IMPLICATIONS
Approval of this action does not represent any change to existing City policies.
CMR:273:10 Page 2 of3
I
TIMELINE
The assessments will be sent to the Santa Clara County Tax Collector in July and will appear on the
October property tax bills.
ENVIRONMENTAL ASSESSMENT
Approval of assessments is exempt by from the California Environmental Quality Act (CEQA).
ATTACHMENTS
Attachment A: Resolution (1)
Attachment B: Capital Improvement Program Project
Attachment C: California Avenue Assessment Rates
Attachment D: California Avenue District Amendments
PREPARED BY:
DEPARTMENT HEAD:
Director of Public Works
CITY MANAGER APPROVAL:
cc: California Avenue Area Development Association
Chamber of Commerce
CMR:273:10
-~
Page 3 of3
ATTACHMENT A
RESOLUTION NO. ---
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO
CONFIRMING ENGINEER'S REPORT AND ASSESSMENT ROLL
CALIFORNIA AVENUE PARKING PROJECT NO~ 92-13
(For Fiscal Year 2011)
THE COUNCIL OF THE CITY OF PALO ALTO DOES RESOLVE asfollows:
Section 1: After proceedings conducted pursuant to the Palo Alto Municipal Code, a public
hearing has been duly held on the Engineer's Report and assessment roll prepared for the above fiscal
year to pay the principal and interest on bonds issued pursuant to Resolution of Intention No. 7930,
adopted by the Council of the City of Palo Alto on August 9, 1993;
Section 2: This Council has heard all persons having an interest in any real property within the
parking assessment district; has heard all objections, protests, or other written communications from any
persons interested in the real property within the district; has taken and received oral and documentary
evidence pertaining to the matters contained in the report; and has remedied and corrected any errors or
informalities in the report and revised and corrected any of the acts or determinations of the various City
officials as contained therein;
Section 3: The Engineer's Report and assessment roll, and each of the assessments. therein as
fully revised and corrected, is hereby approved and confirmed and adoption of this Resolution constitutes
the levy of the assessments for fiscal year 2010-11. '
/I
/I
/I
/I
/I
/I
/I
/I
/I
/I
-1-
Section 4: The report together with the certificate of the City Clerk as to the fact and date of
approval by this Council, shall forthwith be delivered to the County of Santa Clara, and the proper County
officer shall cause to be posted to the tax rolls, in the column provided therefore the amount of each of the
assessments proposed to be levied and collected for the fiscal year as set forth in the report as confirmed.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Jones Hall,
A Professional Law Corporation
BY:4-__ ~~~~~+-~ ______ __
-2-
APPROVED:
Mayor
City Manager
Director of Public Works
Director of
Administrative Services
Senior Asst. City Attorney
California Avenue
Project 92-13
(Ted Thompson
Garage)
ATTACHMENT B
CAPITAL IMPROVEMENT PROJECT
FINANCED BY ASSESSMENT PROCEDURES USING G-BONDS
$2,055,000
CALIFORNIA AVENUE AREA
Construction of a future two level parking structUre on lot C-3 and the I 11/93
two parcels acquired by project 86-01.
09/02/2015 3.4% -5.4%
w
(!)
~
0
0 u..
w
0:::
<C ::::>
0 en
0 z
:5 --w
~
I-z w ::a: en en w en en
<C
0:::
0 I-
~
l-:z w :::a: en en w en en «
Cl w
I-:c
(.!)
jjj s: --. w
~
I-:z w :::a: en en w en
~
ATTACHMENT C
CALIFORNIA AVENUE AREA PARKING DISTRICT
ANNUAL ASSESSMENT RATES
Project 92-13
LAND ASSESSMENT
O.OB <.0 U")
0 I") f'. Ol 0 ..-0 <.0 ex) ex) 0 <.0 0 <.0 <.0 0 f'. <.0 U") U") 0 <.0
N I") ~ U") 0 0 0 0 0 ~ L(')
0 ..-
U") ..-N U") U") 0 0 ·0 U"). 0 U") U") U") 0 0 0 0 0.06 0 0 0 0 0 0 0 0 0 0 0 0
0.04
0.02
11
12
BUILDING ASSESSMENT
,......
13.0 Ol ,......
I")
12.0 N 0'> Ol
U") ,...... <.0 00
0 0 0 0 0 11.0 0 T'"" ..-Ol I") 0 00 N ,...... ,...... U") ..-
I") ..-N Ol 10.0 T'"" ..-
Ol Ol Ol Ol
9.0
B.O
7.0
6.0
M ~ .iii .iZ .iB
95 96 97 98 99
AB13B-2010
Page 1 of 1
ATIACHMENTD
CALIFORNIA AVENUE DISTRICT AMENDMENTS
PRELIMINARY ROLL
Address, Use Square Parking Parking Assessments
Parcel Number Feet Reqd. Prov 92-13
2250 Park 20C 1755 6 3 $527.43
124-28-002
240 Cambridge 13C 1620 13 3 $747.86
124-28-004 26B 780
306 Cambridge 20C 2125 7 0 $646.11
124-28-009
318 Cambridge 26B 4912 20 0 $1349.17
124-28-010
350 Cambridge 20C 19762 82 18 $4838.49
124-28-011 20C 2969 10
VAC 2467
200 California 20C 8133 27 $1692.23
124-28-027 20C 450
206 California 20C 10000 32 6
, $1713.13
124-289-028
220 California 20C 6930 22 0 $1423.08
124-28-029
230 CaIifornia 20C 6930 22 0 $1423.08
124-28-030
260 California 13C 9625 62 6 $4306.40
124-28-033
290 California 15B 7965 55 0 $3870.17
124-28-034 26B 7965
2363 Birch 23B 625 5 0 $405.57
124-28-035 13C 646
-2307 Birch 13C 923 31 $2080.55
124-28-036 26B 1285
23B 915
26B 4250
164 California 26B 16514 95 81 $3481.92
124-28-045 23B 680
20C 7406
250 Cambridge 20C 15908 113 28 $6363.73
124-28-050 20C 9000
VAC 10269
265 Cambridge 32 3493 9 5 $513.71
124-28-053
0
201 California 13C 2410 20 0 $1273.06
124-29-001 20C 1350
2418 Park 13C 1920 25 0 $1765.47
124-29-002 20C 3168
23B 1240
2435 Birch 13C 1246 24 0 $1460.45
124-29-004 20C 3776
23B 1350
299 California 20C 11608 52 0 $3376.28
124-29-005 23B 6662
249 California 26C 9844 28 $2058.22
124-29-007
265 California 32 4000 22 2 $1477.30
124-29-021 VAC 2800
261 California 26B 6820 28 0 $1792.25
124-29-022
2290 Birch 20C 3059 10 0 $803.59
124-32-002
366 Cambridge 13C 2250 20 0 $1358.13
124-32-003 20C 1075
20C 700
378 Cambridge 20C 8797 40 2 $2412.71
124-32-005 26B 2015
23B 1600
400 Cambridge 20C 9800 32 0 $1971.28
124-32-006
410 Cambridge 20C 6200 32 0 $1971.28
124-32-007 VAC 3600
430 Cambridge 20C 5420 20 0 $1412.11
124-32-009 20C 834
438 Cambridge 20C 3536 14 4 $934.27
124-32-010 VAC 776
450 Cambridge 26B 2400 10 $788.96
124-32-011
454 Cambridge 15B 1542 7 0 $770.39
124-32-012 23B 1542
2237 El Camino 13C 760 7 $435.66
124-32-016 20C 760
2231 El Camino 26B 2868 12 3 $620.45
124-32-017
2225 El Camino 15B 1040 7 5 $409.06
124-32-018 26B 72
2209 El Camino 13C 3167 21 3 $1239.65
124-32-019 15B 385
310 California 13C 1695 47 0 $3339.18
124-32-034 26B 2685
26B 6000
330 California 15B 4360 21 10 $1239.24
124-32-035 15B 3240
360 California 26B 6707 28 6 $1510.13
124-32-036
366 California 20C 5070 32 2 $1990.72
124-32-037 23B 2300
32 4430
392 California 26B 4000 20 5 $1085.81
124-32-038 26B 800
406 California 13C 3150 24 6 $1293.19
124-32-039 23B 1598
414 California 14A 6098 34 20 $1639.48
124-32-040
440 California 13C 1000 24 0 .$1661.22
124-32-041 26B 4250
442 California 20C 263 3 2 $278.93
124-32-042 15B 659
448 California 13C 1825 18 9 $928.59
124-32-043 23B 1000
26B 992
460 California VAC 7404 35 0 $2119.44
124-32-044 23B 3200
VAC 1196
480 California 20C 14166 73 5 $4136.03
124-32-045 20C 2204
20C 3010
20C 3240
490 California 20C 18387 81 37 $3391.17
124-32-046 15b 8037
2335 EI Camino 20C 5292 17 $1006.13
124-32-047
2325 EI Camino 26B 1360 9 5 $428.49
124-32-048 23B 1360
2305 EI Camino 13C 285 22 2 $1310.28
124-32-049 23B 1257
433 Cambridge 20C 2119 16 . $969.91
124-32-051 20C 1150
23B 1551
20C 330
20C 400
415 Cambridge 20C 6112 20 0 $1356.37
124-32-052
409 Cambridge 20C 3466 11 5 $621.48
124-32-054
375 Cambridge 20C 4934 16 6 $837.59
124-32-056
2265 EI Camino 13C 1716 40 0 $3221.70
124-32-070 20C 5621
23B 700
26C 3247
321 California 13C 4905 32 14 $1509.21
124-33-001
410 Sherman 20C 6691 22 8 $1518.30
124-33-005
430 Sherman 20C 11094 36 0 $2186.05
124-33-006
475 California 13C 1852 13 0 $845.66
124-33-012 23B 454
463 California 13C 1475 20 7 $1010.33
124-33-013 26B 2361
459 California 26B 3362 14 4 $829.23
124-33-014
451 California 26B 1062 8 3 $520.22
124-33-015 26B 1062
445 California 13C 1427 11 9 $425.45
124-33-016 15B 1248
437 California 20C 2200 1129 6 $1555.65
124-33-017 26B 5186
433 California 23B 1160 3 2 $191.82
124-33-018
429 California 26C 4989 16 0 $1195.39
124-33-019 26C 726
421 California 13C 1320 9 0 $548.50
124-33-020
415 California 13C 2514 26 4 $1426.13
124-33-021 26B 2513
405 California 20C 2370 21 6 $1079.98
124-33-022 15B 1200
26B 2291
2450 Ash 20C 1794 6 0 $578.20
124-33-025
2443 Ash 23B 421 25 $2332.56
124-33-027 20C 7388
381 California 3 580 47 0 $2819.94
124-33-028 13C 207
26B 1480
13C 2486
17 7407
361 California 13C 1872 12 5 $907.77
124-33-029
341 California 26B 4000 32 5 $1743.67
124-33-030 20C 4500
449 Sherman 20C 4500 33 0 $2401.04
124-33-042
445 Sherman 20C 22100 84 0 $8131.93
124-33-043 20C 3900
409 Sherman 20C 7869 38 6 $2406.78
124-33-046 VAC 4000
407 Sherman 20C 5074 16 0 $1051.66
124-33-047
385 Sherman 20C 21600 70 0 $5455.04
124-33-055
2401 El Camino 14A 3953 22 14 $1003.28
124-33-061
425 Sherman 20C 17752 74 0 $5153.53
124-33-065 VAC 5268
2441 Park ZOC 1191 4 2 $173.54
124-37-002
2441 Park 20C 1211 4 3 $108.01
124-37-014
109 California 13C 1112 9 8 $121.83
124-37-029 26B 480
125 California 20C 1530 5 3 $185.81
124-37-032
151 California 20C 3201 10 3 $575.02
124-37-043
AMENDED ROLL
Address, Use Square Parking Parking Assessments
Parcel Number Feet Reqd. Prov 92-13
2250 Park 20C 1755 6 3 $521.83
124-28-002
240 Cambridge 13C 1620 1~ 3 $705.45
124-28-004 26B 780
306 Cambridge 20C 2125 7 0 $634.95
124-28-009
318 Cambridge 26B 4912 20 0 $1316.60
124-28-010
350 Cambridge 20C 19762 82 18 $4709.46
124-28-011 20C 2969 10
VAC 2467
200 California 20C 8133 27 1 $1650.68
124-28-027 20C 450
206 California 20C 10000 32 6 $1671.58
124-289-028
220 California 20C 6930 22 0 $1387.97
124-28-030
230 California 20C 6930 22 0 $1387.97
124-28-030
260 California 13C 9625 62 6 $4197.42
124-28-033
290 California 15B 7965 55 0 $3767.43
124-28-034 26B 7965
2363 Birch 23B 625 5 0 $396.68
124-28-035 13C 646
2307 Birch 13C 923 31 $2080.55
124-28-036 26B 1285
23B 915
26B 4250
164 California 26B 16514 95 81 $3459.60
124-28-045 23B 680
20e 7406
250 Cambridge 20C 15908 113 28 $6196.92
124-28-050 20C 9000
VAC 10269
265 Cambridge 32 3493 9 5 $507.36
124-28-053
201 California 13C 2410 20 0 $1241.13
124-29-001 20C 1350
2418 Park 13C 1920 25 0 $1724.09
124-29-002 20C 3168
23B 1240
2435 Birch 13C 1246 24 0 $1422.17
124-29-004 20C 3776
23B 1350
299 California 20C 11608 52 0 $3286.85
124-29-005 23B 6662
249 California 26C 9844 28 $2015.13
124-29-007
265 California 32 4000 22 2 $1442.19
124-29-021 VAC I 2800
261 California 26B 6820 28 0 $1747.53
124-29-022
2290 Birch 20C 3059 10 0 $787.62
124-32-002
366 Cambridge 13C 2250 20 0 $1321..32
124-32-003 20C 1075
20C 700
378 Cambridge 20C 8797 40 2 $2352.02
124-32-005 26B 2015
23B 1600
400 Cambridge 20C 9800 32 0 $1919.71
124-32-006
410 Cambridge 20C 6200 32 0 $1919.71
124-32-007 VAC 3600
430 Cambridge 20C 5420 20 0 $1380.18
124-32-009 20C 834
438 Cambridge 20C 3536 14 4 $914.62
124-32-010 VAC 776
li50 Cambridge 20C 8942 29 10 4,228.61
124-32-011
454 Cambridge 15B 1542 7 0 $759.23
124-32-012 23B 1542
2237 El Camino 13C 760 7 $424.88
124-32-016 20C 760
2231 El Camino 26B 2868 12 3 $606.12
124-32-017
2225 EI Camino 15B lQ40 7 5 $405.46
124-32-018 26b 972
2209 El Camino 13C 3167 21 3 $1210.75
124-32-019 15B 385
310 California 13C 1695 47 0 $3258.31
124-32-034 26B 2685
26B 6000
330 California 15B 4360 21 10 $1221.64
124-32-035 15B 3240
360 California 26B 6707 28 6 $1475.02
124-32-036
366 California 20C 5070 32 2 $1941.00
124-32-037 23B 2300
32 4430
392 California 26B 4000 20 5 $1061.68
124-32-038 26B 800
406 California 13C 3150 24 6 $1264.43
124-32-039 23B 1598
414 California 14A 6098 34 20 $1617.16
124-32-040
440 California 13C 1000 24 0 $1621.29
124-32-041 26B 4250
442 California 20C 263 3 2 $277.30
124-32-042 15B 659
448 California 13C 1825 18 9 $914.26
124-32-043 23B 1000
26B 992
460 California VAC 7404 35 0 $2063.11
124-32-044 23B 3200
VAC 1196
480 California 20C 14166 73 5 $4025.75
124-32-045 20C 2204
20C 3010
20C 3240
490 California 20C 18387 81 37 $3312.84
124-32-046 15b 8037
2335 EI Camino 20C 5292 17 $980.55
124-32-047
2325 EI Camino 26B 1360 9 5 $422.14
124-32-048 23B 1360
2305 EI Camino 13C 285 22 2 $1278.35
124-32-049 23B 1257
433 Cambridge 20C 2119 16 $945.96
124-32-051 20C 1150
23B 1551
20C 330
20C 400
415 Cambridge 20C 6112 20 0 $1324.44
124-32-052
409 Cambridge 20C 3466 11 5 $611.86
124-32-054
375 Cambridge 20C 4934 16 6 $821.62
124-32-056
2265 EI Camino 13C 1716 40 0 $3145.07
124-32-070 20C 5621
23B 700
26C 3247
321 California 13C 4905 32 14 $1480.28
124-33-001
410 Sherman 20C 6691 22 8 $1490.62
124-33-005
430 Sherman 20C 11094 36 0 $2126.81
124-33-006
475 California 13C 1852 13 0 $824.07
124-33-012 23B 454
463 California 13C 1475 20 7 $989.56
124-33-013 26B 2361
459 California 26B 3362 14 4 $813.26
124-33-014
451 California 26B 1062 8 3 $512.24
124-33-015 26B 1062
445 California BC 1427 11 9 $422.27
124-33-016 15B 1248
437 California 20C 2200 29 6 $1518.91
124-33-017 26B 5186
433 California 23B 1160 3 2 $190.19
124-33-018
429 California 26C 4989 16 0 $1169.81
124-33-019 26C 726
421 California 13C 1320 9 0 $534.17
124-33-020
415 California 13C 2514 26 4 $1389.41
124-33-021 26B 2513
405 California 20C 2370 21 6 $1056.03
124-33-022 15B 1200
26B 2291
2450 Ash 20C 1794 6 0 $564.74
124-33-025
2443 Ash 23B 421 25 $2273.40
124-33-027 20C 7388
381 California 3 580 47 0 $2744.91
124-33-028 13C 207
26B 1480
13C 2486
17 7407
361 California 13C 1872 12 5 $896.61
124-33-029
341 California 26B 4000 32 5 $1700.58
124-33-030 20C 4500
449 Sherman 20C 4500 33 0 $2348.33
124-33-042
445 Sherman 20C 22100 84 0 $7913.28
124-33-043 20C 3900
409 Sherman 20C 7869 38 6 $2342.11
124-33-046 VAC 4000
407 Sherman 20C 5074 16 0 $1026.08
124-33-047
385 Sherman 20C 21600 70 0 $5334.66
124-33-055
2401 E1 Camino 14A 3953 22 14 $990.49
124-33-061
425 Sherman 20C 17752 74 0 $5014.50
124-33-065 VAC 5268
2441 Park 20C 1191 4 / 2 $169.60
124-37-002
2441 Park 20C 1211 4 3 $106.04
124-37-014
109 California 13C 1112 9 8 $119.86
124-37-029 26B 480
125 California 20C 1530 5 3 $181.87
124-37-032
151 California 20C 3201 10 3 $561.01
124-37-043