HomeMy WebLinkAboutStaff Report 446-06TO: FROM: City City of Palo Alto Manager’s Report HONORABLE CITY COUNCIL CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT 13 DATE: SUBJECT: DECEMBER 18, 2006 CMR: 446:06 CITY COUNCIL AUTHORIZATION TO COMMENCE THE PROCESS FOR REVIEW OF THE STANFORD SHOPPING CENTER PROJECT; APPROVAL OF REIMBURSEMENT AGREEMENT; AND AUTHORIZATION FOR THE CITY MANAGER AND CITY ATTORNEY, WITHASSISTANCE FROM THE DIRECTORS OF PLANNING AND COMMUNITY ENVIRONMENT AND ADMINISTRATIVE SERVICES, TO NEGOTIATE AN AMENDMENT TO A DEVELOPMENT AGREEMENT. RECOMMENDATION Staff recommends that the City Council authorize the City Manager to commence the process for review of the Stanford Shopping Center development project, according to the process and timeline outlined in Attachment A; authorize the City Manager to sign a reimbursement agreement to recover the costs of project review (Attachment B); and authorize the City Manager and City Attorney, with the assistance of the Directors of Planning and Administrative Services, to negotiate an amendment to the Sand Hill Corridor Development Agreement. BACKGROUND On December 11, 2006, Simon Property Group Inc. presented the City Council with concepts for the expansion of the Stanford Shopping Center. The proposal included the addition of approximately 240,000 square feet of new retail area, 1,100 new parking spaces in expanded parking structures, and a 120-room, 100,000 square foot hotel with retail, restaurant, conference and meeting room areas and a 120-car parking garage. At the study session, the City Council asked questions of staff and the proj ect representatives and provided initial comments regarding the proposed development. The City Manager indicated that staff would return to the City Council to present an outline of the review process and a timeline for the required rezoning and other entitlements, Comprehensive Plan amendment, and formulation of an Amendment to the existing Development Agreement, as well as the preparation of a joint Environmental Impact Report covering the Shopping Center and Stanford Medical Center projects. CMR: 446:06 Page 1 of 5 DISCUSSION Staff has developed a preliminary timeline for review, identified some initial issues and community benefits for public discussion and future negotiation, and prepared a Reimbursement Agreement to recover the costs of project review. Proiect Review Process and Timeline Staff has prepared a tentative project timeline that outlines a suggested review process with important milestones identified over the next eighteen months (Attachment A). The project timeline has been divided into two phases: Phase I (Information Sharing and Identification of Benefits and Challenges) from December 2006 through July 2007 and ’Phase II (EIR and Entitlements) from July 2007 through July 2008. The key components of the process include the following: Phase I: Information Sharing and Identification of Benefits and Challenges Phase I would begin with the City Council’s direction to initiate the review process for the Stanford Shopping Center project and would encompass approximately six months of review. The intent of Phase I is to collect and synthesize information to share with the applicant, the public, the Planning and Transportation Commission, and the City Council and to identify the key benefits and challenges of the project. This information-sharing and issues discussion will provide background for and help to focus discussion on the primary issues of concern during the Phase II entitlement process. The activities anticipated during Phase I include: Contract proposals and retention of traffic, environmental, economic, urban design, and other consultants to assist with the review. Submittal of conceptual project information and application for the project. Analysis of the "existing setting" of the Shopping Center project and preliminary impacts on traffic, housing, population, and city services. Review by economic and market consultants of the desirability and viability of retail and hotel uses at the Stanford Shopping Center site. Community workshops to inform the public of the project, preliminary data collection and analysis, and key issues. Study session reviews and hearings with the Planning and Transportation Commission to solicit input and direction regarding the project issues. A report to the City Council in July of 2007 regarding the project status and a summary of expected benefits and challenges. Phase II: EIR and Entitlements Phase II would begin in July, 2007 following City Council’s review of key project issues. The intent of Phase II is to proceed with the development of the Environmental Impact Report (EIR) and project entitlements, including rezoning, a Comprehensive Plan amendment, and an Amendment to the existing Sand Hill Corridor Development Agreement. The activities anticipated during Phase II include: CMR: 446:06 Page 2 of 5 o o Submittal of a detailed project application, including a request for an Amendment to the Sand Hill Corridor Development Agreement. The preparation of a Draft Environmental Impact Report (EIR) to cover both the Stanford Shopping Center and Stanford Medical Center projects would begin with a Notice of Preparation and scoping meeting for public input. Ongoing collection and analysis of detailed information related to the environmental review and economic benefits and impacts of the project. Identification of project impacts and mitigation measures in the Draft Environmental Report (DEIR), which would then be released for public review. Negotiations with the applicants regarding key Development Agreement issues and pertinent mitigation measures. Planning and Transportation Commission reviews regarding the project status, key issues, and development applications. Preliminary design review meetings with the Architectural Review Board. Community workshops and other public outreach. Public hearings on the DEIR with the ARB and the Commission. Preparation of a Final EIR (FEIR). Preparation of an Amendment to the Development Agreement and zoning and Comprehensive Plan amendments. Public hearing(s) on the FEIR, .rezoning and other entitlements, Comprehensive Plan amendment and amended Development Agreement with the Commission for recommendation to the City Council. Public hearing(s) and final decision(s) by the City Council in July, 2008. Community Outreach Each phase of the process would include opportunities for public outreach and public participation. Staff will establish a website for the project and will conduct City-sponsored community workshops for neighborhood, business, and other community groups throughout each phase. Study sessions and public hearings with the Planning and Transportation Commission and ARB will provide further opportunities for public input. Staff anticipates that the Shopping Center applicants will also initiate public outreach efforts to the affected community. Planning and Transportation Commission Review and lnput On December 13, 2006, the Planning and Transportation Commission held a study session to review the review process and timeline for the Medical Center and Shopping Center projects and to provide input on the process for Council consideration. Minutes from the meeting will be available to the City Council by e-mail and at places and to members of the public at the meeting on Monday, December 18, 2006. The Commission will provide frequent input to the formulation and progress of the Shopping Center and Medical Center projects, including initial identification of benefits and challenges, review of the preliminary Medical Center Area Plan, scoping for the EIR, and hearings for the EIR and project reviews. CMR: 446:06 Page 3 of 5 Discussions of Mitigation Measures and Community Benefits It is anticipated that the development will have a variety of land use impacts. The CEQA process is designed to fully identify, analyze and, where feasible, mitigate these impacts. The CEQA process will not only examine current project impacts, but will also analyze cumulative impacts associated with other development anticipated during the project build out phase. Because a development agreement would "freeze" certain development standards, State law authorizes local agencies to impose through the development agreement process additional public benefits which do not have a direct nexus to project impacts. As part of the CEQA and development agreement negotiation phase, the City will identify key mitigation measures and community benefits that would minimize project impacts and provide for appropriate amenities for the area and community as a whole. The following areas will likely be addressed in this process: 1.Traffic, transit, and parking programs and improvements 2.Housing provisions or fees 3.Project sustainability/green building components ..... 4.Public infrastructure improvements and permanent easements 5.School impacts 6.City services impacts 7.Development impact fees, payments and other exactions 8.Protection of scenic views 9.Public meeting and conference facilities as part of the hotel 10.Allocation of out-of-state use taxes directly to State of California 11.Urban design, especially E1 Camino Real frontage and open space elements 12.Impacts on University Avenue shopping area 13.Construction impacts Staff anticipates initial discussions with the applicants on these and other impacts, issues, and benefits, and identification of key remaining issues for public review and consideration by the Planning and Transportation Commission and City Council. RESOURCE IMPACTS All costs of review for the Shopping Center project are expected to be reimbursed by the Simon Group. A Reimbursement Agreement (Attachment B) has been prepared by the City Attorney’s Office outlining the reimbursable costs that would be incurred during the preliminary project work in Phase I and subsequent work on the EIR and Development Agreement in Phase II. Costs to be recouped include, at a minimum, time and expenses of: o ® o City staff and outside project management, In-house or outside legal staff, Economic review and marketing consultants, EIR and traffic consultants, and Other costs associated with services and materials provided by third parties to the City. Other resource impacts will be a key element of the evaluation of the project’s impacts and benefits. Preliminary estimates of potential resource impacts were provided in the December 11, 2006 CMR (Attachment C). CMR: 446:06 Page 4 of 5 POLICY IMPLICATIONS The Comprehensive Plan policies and programs relevant to the development of the Shopping Center have been included in the City Manager Report (CMR) prepared for the December 11, 2006 study session. The CMR is included Attachment C. ENVIRONMENTAL REVIEW The request for City Council’s authorization to proceed with the review process is not considered a "project" per the California Environmental Quality Act. A complete environmental analysis would be prepared when the applications for the Development Agreements are submitted to the City. PREPARED BY: DEPARTMENT HEAD: CITY MANAGER APPROVAL: STEVEN TURNER Senior Planner Direct of Planning and Community Environment FRANK BENEST ’ City Manager ATTACHMENTS A.Tentative Stanford Shopping Center Timeline B.Reimbursement Agreement C.December 11, 2006 CMR re: Stanford Shopping Center D.Verbatim Minutes of the Planning and Transportation Commission meeting of December 13, 2006 (at places) COURTESY COPIES Jean McCown, Stanford University Charles Carter, Stanford University Planning Office Bill Phillips, Stanford Management Company Art Spellmeyer, Simon Property Group, Inc. CMR: 446:06 Page 5 of 5 Attachment B DRAFT - FOR DISCUSSION PURPOSES ONLY MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF PALO ALTO AND SIMON PROPERTY GROUP FOR RE IMBLTRSEMENT OF DEVELOPMENT AGREEMENT COSTS This Memorandum of Understanding regarding Reimbursement of Development Agreement Costs ("Reimbursement Agreement") is made and entered into the 19th day of December, 2006, by and between the City of Palo Alto ("City") and Simon Property Group, a Delaware corporation ("Simon"). RECITALS: A. Simon intends to submit an application for a Development Agreement to add approximately 240,000 square feet of retail and to construct a 120 room hotel at the Stanford Shopping Center ("Proposal"); B. On December ii, 2006, the City Council of the City of Palo Alto conducted a Study Session regarding Simon’s Proposal. C. The Proposal will require various City entitlements which will take substantial time to process. To create more certainty in the entitlement process and to promote comprehensive planning, Simon proposed entering into a Development Agreement with the City; D. On December 18, 2006, the City Council directed the City Manager and the City Attorney, with assistance from the Director of Planning and Community Development and the Director of Administrative Services, (collectively "City Staff") to begin preliminary discussions with Simon regarding its Proposal; E. On December 18, 2006, the City Council further directed City Staff to negotiate a Reimbursement Agreement with Simon to recoup certain costs associated with Simon’s Proposal; F. City Council Resolution No 6597 authorizes the City to enter into a Development Agreement with any person having a legal or equitable interest in real property for the development of property within the City or within the City’s sphere of influence; 061212 syn 0130033 G. City Council Resolution No. 6597 requires the applicant for a Development Agreement to pay the fee prescribed by the municipal fee schedule; H. The 2006.07 Planning Department Fee Schedule is attached hereto as Exhibit A and incorporated into this Reimbursement Agreement by reference; I. The parties desire to begin preliminary work and discussions regarding certain preliminary matters before Simon files a formal~ Development Agreement Application without the City incurring out of pocket or staff costs in connection with such work; and J. The parties wish to memorialize their agreement for Simon’s reimbursement to the City of certain costs. NOW, THEREFORE, the parties agree as follows: I. Simon shall reimburse the City for the following ¯ listed costs reasonably incurred by the City after December 18, 2006 in connection with the City’s review and consideration of Simon’s Proposal: (a) reasonable fees and expenses charged by the consultant or consultants retained by the City to assist in the preparation of the Environmental Impact Report (’~EIR") evaluating the Proposa! and the separate proposal for expansion of the Stanford Medical Center, and for studies or analyses prepared for or used in the EIR, including but not limited to the Citywide Traffic Study, shall be paid by Stanford in accordance with the Reimbursement Agreement between the City of Palo Alto and Stanford, dated December 19, 2006; (b) reasonable fees and expenses charged by the consultant or consultants retained by the City to conduct economic and/or housing needs analyses of the Proposal, whether or not such analyses are utilized in the EIR; (c) reasonable fees and expenses charged by the consultant or consultants retained by the City to peer review the key retail or hotel planning standards pertaining to the Proposal; (d) reasonable fees and expenses charged by outside legal counsel retained by the City in relation to the Proposal; 2 061212 syn 0|30033 (e) reasonable fees and expenses charged by the consultant or consultants retained by the City to provide planning services in connection with the Proposal; (f) documented reasonably incurred City staff, including but not limited to in-house legal staff, time and expenses incurred in connection with the Proposal; and or services connection Costs"). (g) the reasonable costs of any other materials provided to City by other third parties in with the Proposal (collectively "Reimbursable In each instance where a consultant is to be retained by the City to perform work for which the City will seek reimbursement under this Agreement, the City shall provide Stanford with a scope of work and budget for the consultant’s services and expenses prior to commencement of work by the consultant, and the City shall meet and confer within five (5) business days of presentation of the documentation with Simon to attempt in good faith to reach agreement upon the amount of Reimbursable Costs that will be incurred by the consultant. Further, before the City decides to expand the consultant’s scope of work to increase the amount paid to the consultant beyond the budgeted amount, the City shall provide Simon with the revised scope of work and/or revised budget for the consultant’s services and expenses, and the City shall meet and confer within five (5) business days of presentation of the documentation with Simon to attempt in good faith to reach agreement on the amount of any additional Reimbursable Costs that will be incurred by the consultant. 2. Any consultants, attorneys or other third parties hired by~ the City to assist in the Proposal shall be directed solely by the City. Simon shall not direct, influence or control their work or conclusions in any way. 3.The Reimbursable Costs shall be paid in accordance with the terms of this Reimbursement Agreement and the City of Palo Alto Planning Department Fee Schedule attached hereto as Exhibit A and as amended by City Council from time to time. 4. Should Simon determine, in its sole discretion, that the amounts for which City claims reimbursement under this Agreement are unreasonable, it may cancel this Memorandum upon 3 061212 syn 0130033 fifteen (15) calendar days written notice to City after which it shall no longer be obligated to reimburse City for any subsequently incurred costs. If Stanford cancels this Memorandum, City may, in its discretion, stop work on the Proposal,including any applications filed in connection therewith,which shall toll all applicable time periods governing City’s processing, consideration or action upon any such applications until such time as the parties have resolved their differences. Further in the event of cancellation under this paragraph, Simon shall not assert any claim under the Permit Streamlining Act. If for any reason Simon decides not to proceed with the Proposal, it shall promptly notify the City in writing and the City, its consultants, and their subconsultants and its outside counsel immediately shall cease performing work in connection with the Proposal. In the event of such cancellation, Simon shall not under any circumstances be responsible for Reimbursable Costs incurred after thirty (30) days following the cancellation notice, except that Simon shall be responsible for any Reimbursable Costs charged by third parties under fixed price existing contracts. 5. The City shall bill Simon for the Reimbursable Costs ~on a monthly basis by providing documentation to Simon that is sufficiently detailed to enable Simon to review the reasonableness of the costs incurred and to determine whether the costs are consistent with the scope of work and budget for each consultant. The City shall use its best efforts to submit documentation of any amounts described in paragraph~ l(f) to Simon no later than the last day of the month following the month in which the costs are incurred. Simon shall pay reasonable Reimbursable Costs within 30 days of its receipt of the invoices and documentation described in this paragraph. 6. Simon shall make a deposit of $150,000.00 within I0 days of execution of this Reimbursement Agreement. The funds shall be deposited in a seqregated interest bearing account and the funds so deposited and the interest earned thereon shall be credited to the initial Reimbursable Costs, as such become due as provided in this Reimbursement Agreement. 7. All notices hereunder will be given in writing and mailed, postage prepaid, by certified mail, addressed as follows: 061212 syn 0130033 To City:City Manager City of Palo Alto 250 Hamilton Avenue Palo Alto, CA 94301 To Simon:Executive Vice President Development 115 West Washington Street Indianapolis, IN 46204 8. This document represents the entire and integrated agreement between the City and Stanford regarding reimbursement of the Reimbursable Costs and supersedes all prior negotiations, representation, or agreements, either written or oral between the parties on this subject. This document may be amended only by written instrument, signed by the City Manager on behalf of the City and Executive Vice President - Development on behalf of Simon. This Reimbursement Agreement shall be governed by the laws of the State of California. IN WITNESS WHEREOF, CITY and Simon have executed this Reimbursement Agreement on the day and year written above. CITY OF PALO ALTO SIMON PROPERTY GROUP By: City Manager APPROVED AS TO FORM: By: Art Spellmeyer Its: Executive Vice President - Development Senior Asst. City Attorney APPROVED: Director of Planning and Community Environment 061212 syn 0130033 EXHIBIT A 061212 syn 0130033 2006-07 Pl:anning Dep artment $1.00 to $1,000.00 $1,001.00 to $2,000.00 $2,000.01 to $25,000.00 $~25,000.01 to $50,000.00 $50,000.01 to $100,000.00 $100,000.01 to $500,000.00 $500,000.01 to $1,000,000.00 $1,000,000.01 and up Building De~nolition Permit Commercial Interior Non-Structural Demolition Permit $54.11 $54.11 for the first $1,000.00 plus $4.26 for each additional $100.00 or fraction thereof, to and including $2,000.00 $96.71 for the first $2,000.00 plus $19.55 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $546.36 for the first $25,000.00 plus $14.09 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $748.76 for the first $50,000.00 plus $8.14 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $1,387.’11 for the first $100,000.00 plus $7.84 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 $4,523.11 fo~ the first $500,000.00 plus $6.65 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 $7,848.11 for the first $1,000,000.00 plus $5.11 for each additional $1,000 00 or fraction thereof. 5250.00 $150.00 $54.11 $54.11 for the ~rst $1,000.00 plus $4.26 for each additional $100.00 or fraction thereof, to and including $2,000.00 $96.71 for the first $2,000.00 plus $19’:55 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $546.36 for the first $25,000.00 plus $14.09 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $898.61 for the first $50,000.00 plus $9.77 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $1,387.11 for the first $100,000.00 plus $7.84 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 $4,523.11 for the first $500,000.00 plus $6.65 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 $7,848.11 for the first $1,000,000.00 p!us $5.11 for each additional $1~000.00 0r-- fraction there6fl ~f ~a!uation exceeds $3o, oo0,0oo.oo. alternative deposit and fiaYmehi arr~nge~hent~ may.be made at d[~br~tion~f t~ Di?ebtor ~f Pla~ning~ and co~muni@ ~vi?bnment. 100" ~. : percent of prdcessing costs Will $250.00 $150.00 City of Palo Alto 2006-07 Municipal Fee Schedule 16-1 To site outside City To site within City Temporary Occupancy Inspection (Minor’project) Temporary Occupancy Inspection (Major project) $100.00 plus cash deposit or bond $100.00 plus cash deposit or bond $500~00 plus cash deposit or bond $500.00 plus cash deposit or bond ;300.00/each $300.00/each ;720.00/each $720.00/each Building Plan Check Elective Plan Check Fire and Life Safety Plan Check ~,oning Plan Check Public Works Plan Check Stron,q Motion Instrumentation Surcharqe Commercial Minimum Residential Documents Optical Disk Cop~’ Fee Electrical Permits 80% of building permit fee 25% of building plan check fee when application utilizes an approved 3ra party ~lan check agency 45% of building permit fee 30% of building permit fee 12% of building permit fee 521.00 per $100,000.00 $0.50 $10.00 per $100,000.00 80% of building permit fee 25% of building plan check fee when application utilizes an apprgved 3rd party 31an check agency 45% of building permit fee 30% of building permit fee 12% of building permit fee $21.00 per $100,000.00 $0.50 $10.00 per $100,000.00 l$0.50/page [$0.50/page Each applicant shall pay to the Building Official for each permit issued at the time of issuance, a fee in accordance with the following ’chedule and the rate provided for each classification shown therein. $72.00/permit [$72.001permit $0,09 per square foot 150.09 per square foot I1$25.00 Base Fee New or remodeled square footage (includes all electrical work) Air conditioners, each Air cooled or oil cooled lighting and/or power transformer ;25.00 .ach KVA shall be considered as one horsepower and charged for as per motor zhedule. City of Pale Alto 2006-07 Municipal Fee Schedule 16-2 E ectr Cai Permits (cbntinued); Fixtures, switches, outlets For each motor generator For each motor of not more than 2 horsepowek . For each motor of not more than 5 horsepower, but more than 2 horsepower For each motor of not more than 15 horsepower, but not less than 5 horsepower For each motor of not more than 25 horsepower, but not less than 15 horsepower For each motor of more than 50 horsepo~ver, but not less than 25 horsepower For each motor of more than 100 horsepower For each range, electric clothes dryer, or water heater For each special circuit (circuits not listed herein) Service Equipment For each busway, power duct or floor duct per foot For each lighting, power and/o.r control panelboard~ switchboard cabinet or panel For each photovoltaic panel For installation of each set of service entrance conductors and/or service switch, including single meter: Not more than 200 ampere Not more than 800 ampere Over 800 ampere Each additional meter Temporary power pole, each Temporary wiring for construction; Christmas tree lots. etc. ;1.00 each ;3.00~KVA $1.00 $10.00 $15.00 $20.00 $25.00 $30.00 $5.00 $5.00 $0.50 $5.00 $10.00 $15.00 $25.00 $35.00 $5.00 $25.00 $25.00 $1.00 each $3.00/KVA $1.oo $10.00 $15.00 $20.00 ;25.00 ;30.00 $5.00 $5.00 $0.50 $5.OO $10.00 $15.00 $25.00 $35.00 $5.00 ;25.00 ;25.00 CityofPalo Alto 2006-07 Municipal Fee Schedule 16-3 Additional plan review required by changes, additions, or revisions to plans (1/2 hour minimum) Address changes .... Drawing; Copy Fee Inspections for which no fee is specifically indicated (2 hour minimum) Inspections outside of normal business hours (2- hour minimum) ~eo-Tech Report Review (1 ;-hour minimum) Microfilm Copy/Print Microfilming (To Film) Real Property Research Fee (1-hour minimum) !Record Management Fee Re-inspection Fee Permit Automation Fee (applies to all applications & permits) Permit Reactivation (final inspection only) " Mechanical Permits : Base Fee New or remodeled square footage (includes all mechanical work) Air conditioner or heat pump Boiler (certified design) Duct outlet (each) Each evaporative cooler Each exhaust hood (kitchen or industrial) Each furnace and flue Each vent fan (bath, dryer, residential kitchen) Fire damper (each) Flue (each) Process piping system Process piping system (hazardous) Water heatin6 solar panel (each) Swimming pool heater $88,00/hour $150.00 plus Other Application Fees on page 17-6 $36:00/request $78.00/hour $126.00/hour $158.00/hour $3.00/sheet $3.00/sheet $56.00 per hour $8&00/hour $l 50,00 plus Other Application Fees on page 17-7 $36.00/request $78.00/hour $126100/hour $158.00/hour $3.00/sheet $3,00/sheet $56.00 per hour Please look under the Planning Department, Planning Division section. $53.00 each $2.00 per application or permit $300,00 or reactivation fee per PAMC SectiOn 16104.100 (whichever is less) $72.00/permit $0.09 per square foot $25.00 $25.00 $0.50 $25.00 $25.00 $25.OO $10.00 $5.00 $5.00 $25.00 $50.00 $10.00 $25.00 $53.00 each $2.00 per application or permit $300.00 or reactivation fee per PAMC Section 16.04.100 (whichever is less) $72.00/permit $0.09 per square foot ;25.0O ;25.00 ;0.50 ;25.00 ;25.00 ;25.00 ;10.00 ;5.00 ;5.00 ;25.00 ;50.00 ;10.00 ;25.00 City of Paio Alto 2006-07 Municipal Fee Schedule 16-4. Base Fee Newor remodeled square footage (includes all ~lumbing work) Commercial/industrial sewer Fixtures (each) Gas outlet Industrial waste system Radiant heat piping system Rain water system (per drain) Residential sewer Storm drain system Swimming pool Water heater Water piping system, or repatr to a water piping system Re-roofing Permit Use and Occupancy Permits Certificate of" Occupancy or Certificate of Use $72,00/permit $0.09 per square foot ;25.00 ;3.00 ;5.00 $25.00 ;25.00 ;5.00 ;10,00 ;25.00 ;25.00 $5.00 $5.00 $72.00/permit. $0.09 per square foot $25.00 $3,00 $5.00 $25.00 $25.00 $5.00 $I0.00 $25.00 $25.00 $5.00 $5.00 Saine as fees charged under Planning Department, h~spection Services Division, Building Inspection fees, Building Code valuations. City of Palo Alto 2006-07 Municipal Fee Schedule 16-5 Design Enhancement Exception Major Project Minor Proj6ct requiringArChii~cturalReview : M~nor Pro ect .................re utrmg Preliminaq Review Signs (exceptions) $1,164.00 plus Other Application Fees on page 17-5 Initial deposit of $2,000.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact Assessment and any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. $529.00 plus Other Application Fees on page 17-5 $252.00 plus Other Application Fees on page 17-5 $158.00/minor - $977.00/major plus Other Application Fees on page 17-5 $1,046.00 plus Other Application Fees on page 17-5 $1,164.00 plus Other Application Fees on 9age 17-7 $529.00 plus Other Application Fees on page 17-7 $252.00 plus Other Application Fees on page 17-7 15977.00 plus Other Application Fees on: pag~ i7~7 $1,046.00 plus Other Application Fees on page 17-7 : SignSl (new~ rep!aceme~t) requiring $529.00 plus Other Application Fees on page 17-5 Signs Erected Without Approval $1,046.00 plus Other Application Fees page 17-5Signs ~requiring s!aff~ review:’ $252.00 plus Other Application Fees on on!y ~:’: ~ page 17-5 Temporary Sign permit $48.00/15 days plus Other Application Fees on page 17-5 Historic Resource.:: . ::i :,:: i:i~ ~:: :~:: :i:i .~::.i:~. i :~i :: i’i::~: :~ $2,520.00 plus Environmental Impact Assessment plus Other Application Fees on page 17-5 $529.00 plus Other Application Fees on page 17-5 $529.00 plus Other Application Fees on page 17-7 $1,046.00 plus Other Application Fees on page 17-7 $252.00 plus Other Application Fees on page 17-7 $48.00/15 days plus Other Application Fees on page 17-7 Majoi" Project Minor Project requiring Historic Resources $2,520.00 plus En~,ifonmemal Impact: $529.00 plus Other Application Fees on ~age 17-7 City of Palo Alto 2006-07 Municipal Fee Schedule 17-1 $252.00 plus Other Application Fe’es o’~ ’ page 17-5 Demolition Application for Historic Buildings $1,920.00 plus Other Application Fees on ,page 17-5 Transfer of Developmen( Rights Projects Initial deposit of $500 plus Other Mills Act Contract - Establish or Withdraw Williamson Act Contract - Establish or Withdraw Application Fees on page 17-5. 100 percent of processing costs will be recovered, plus Environmental Impact Assessment and any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. Initial deposit of $1,500.00, plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered. Initial deposit of $1,575.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered, including any charges for specialized consultants. Comprehensive Plan Change¯ " Comprehensive Plan Change (outside of Annual Review) Initial deposit of $5,000.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact Assessment and any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not, Development Agreement Development Agreement Development Agreement - Annual Review City of Palo Alto $252.00 plus Other Application Fees on 9age 17-7 $1,920.00 plus Other Application Fees on page 17-7 Initial deposit of $500 plus Other N~pli~aiion Fees andLegal Fees on pag~si7-6 and 17-7. 100 percent of processing costs will be recovered, plus gnvir0nmental Impact Assessment and anylotl;ie{entitiements necessary to complete the project, whether indicated as 100percent cost recovery in this schedule 0rnOt. : Initia! ~deposit of $1,500.00, plus Other Application Fees and Legal Fees on pages !7-6 and 17-7. 1 O0 percent of processing costs will be recovered. Initial deposit of $1,575.00 plus Other Application Fees andLegal Fees on pages 17-6 and 17-7. 100 percent of processing costs will be recovered, including any charges for specialized consultants. !nitial.deposit of $5,000.00 plus Other Application Fees andLegal Fees on 9ages 17-6 and 17-7, 100 percent of processing costs will be recovered plus Environmental Impact Assessment and any other entitlements necessary to complete the project, whether indi~.ated as 100 percent cost recovery in this schedule Initial Deposit of $5,800.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact Assessment plus any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. Initial deposit of $2,000 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered. Initial Deposit of $5,800.00 plus Other- Ai~plic’ation Fees and Legal Fees on P£~S i.7~6 and i777. i00 Percent of processing costs will be recovered plus Environmental Impact Assessment plus anY other entitlements necessary to ~omplete the project, whether indicated as 100 percent cost recovery in this schedule or not. Initial deposit of $2,000 plus Other ¯ ;’i"::’: :E._~piication Fees and Legal Fees on pages 17-6 and 17-7. 100 percent of processing costs will be recovered. 2006-07 Municipal Fee Schedule 17-2 Parks Community Centers Libraries Residential: Single family~ $8,670/residence (or $12,946/residence larger than 3,000 square feet); Multi- family $5,675/unit (or $2,869/unit smaller than or equal to 900 square feet). Nonresidential: Commercial/Industrial, $3,682.00 per 1,000 square feet; Hotel/Motel, $1,664.00 per 1,000 square feet Residential: Single family~ $2,248/residence (or $3,364/residence larger than 3,000 square feet); Multi- family $1,479/unit (or $746/unit smaller than or equal to 900 square feet) Nonresidential: Commercial/Industrial, $208.00 per 1,000 square feet; Hotel/Motel, $94.00 per 1,000 square feet Residential: Single family~ $784/residence residence (or - $1,166/residence larger than 3,000 square feet); Multi-family $513/unit (or $257/unit smaller than or equal to 900 square feet) Nonresidential: Commercial/Industrial, $198.00 per 1,000 square feet; Hotel/Motel, $83.00 per 1,000 square feet Regidenfiali single famiiy’:’ ~: ’:.. ~2;:30~2)relid~ce (o~; S3i~B~/re~ide~le6 targei~th)in 3,000 ?~qt~e fee0i l~luiti- [’amiiy $!;~i ~)uni~ (61 $764/~nit Smaller :ban 0~ eqeal t0 900 square feet) " ¯ Nonresidential: Commercial/Industrial; $213,00 per 1,000 square feet or fraction tfibreef; Hbtel~tel; $96~00 p~r 1,000 square feet or fra~ti0n thereof . ’ Residential: Single: family,.-:... $803/r~sidenc~~es~dence (or $1;194/residende larger th~n 3,000 square feet); Multi-family $525iunit (0r . ’ $263/unltSmallerthanor equal to 900 square feet)_: :~ ~_~?_~ Nonresidential: Commercial/Industrial, $203,00 per 1,0OO square feet or fraction tgereof; Hotel/Motel, $85.00 per 1,000 square feet or fraction thereof Development Projects Preliminary.Review Development Projects Preliminary Review Initial deposit of $3,000.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact Assessment plus any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. InitiaI deposit of $3,000~00 plus Other.. Appli;~atiO~ Fe~ hhd~@al Febs~ on :?/i js~ges 17;6 ~ind/17:~711100 ~O:cent 6f ~. proc~gsi~g Eel,s Mllb~recovered plus En+irofimental Impact AsSessment plus any other entitlements necessau to Complete the project, whether indicated as 100 percent cost recove~ in this schedule or not."- " City of Palo Alto 2006-07 Municipal Fee Schedule 17-3 ;4.00 if mailed I $11.00 + $4.00 if mailed $44.00 + $4.00 if mailed $0.50/pa~e $58.30/hour, 1-hour minimum Board or Commission Agendas * l$30.00/annual per Board or Commission [$30.00/annual per Boardor Commission Boar’d or Commission Minutes * l$50.00/annual per Board or Commission [$50.00/annual per Board or Commission Environmental Impact Assessment (EIA) -, ..............:..,"". ..~ :",: ~i--:~5:.:.. : Mitigated Negative Declaration Initial deposit of 100 percent of estimated costs due upon application plus Other Application Fees on page 17-5. If estimated costs exceed $100,000 alternative deposit and payment schedule arrangements may be made at the discretion of the Director of Planning and Community Environment. 100 percent of )rocessing costs will be recovered. Initial deposit of 100 percent of estimated costs due upon application plus Other Application Fees on page 17-7. If estimated costs exceed $100,000 alternative deposit and payment schedule arrangements may be made at the discretion of the Director of Planning and Community Environment. 100 percent of )rocessing costs will be recovered. Environmental Impact Assessment (EIA)$996.00 plus Other Application Fees on page 17-7 Environmental Impact Report (E1R)Ir ~ $996.00 plus Other Application Fees on ~age 17-5 Initial deposit of 100 percent of estimated costs due upon application plus Other Application Fees on page 17-5. If estimated costs exceed $100,000 alternative deposit and payment schedule ~rrangements may be made at the discretion of the Director of Planning and Community Environment. 100 percent of 9rocessing costs will be recovered. City of Palo Alto 2006-07 Mugicipal Fee Schedule 17-4 Mitigation Monitoring - Environmental Impact Report Mitigation Monitoring - Mitigated Negative Declaration Initial deposit of $3,000 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered, including any charges for specialized consultants. Initial deposit of $1,000 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered, including any charges for specialized consultants. Initial deposit 0f $3,000 plus other Application Fees on page 17-7. 100 percent of processing costs will be recovered, including any charges for specialized consultants. Initial deposit of $1,000 plus Other Application Fees on page 17-7. i 00 percent of processing costs will be recovered, including any charges for specialized consultants. Home Improvement Exception Protected Tree Removal Neighborhood Preservation Zone Exceptions $582.00 plus Other Application Fees on page 17-5. $190.00 plus Other Application Fees on ,page 17-5. $1,576.00 plus Other Application Fees on page 17-5 plus Environmental Impact Assessment. $582.00 plus Other Application Fees on page 17-7. $190.00 plus Other Application Fees on page 17-7., $1,576.00 plus Other Application Fees on page 17-7 plus Environmental Impact Assessment. New 2nd story addition or new 2-story home $2,960.00 plus Other Application Fees on $2,960.00 plus Other Application Fees on page 17-5 and any other entitlements page 17-7 and any other entitlements necessary to complete the project,necessary to complete the project. Expansion of existing 2nd story greater than 150 square feet $2,050.00 plus Other Application Fees on page 17-5 and any other entitlements necessary to complete the project. $2,050.00 plus Other Application Fees on page 17-7 and any other entitlements necessary to complete the project. ¯ Exception 1$4,315.00 plus Other Application Fees on [andLegai~Fees On pages 17-6&17-.)page 17-5 $4,315.00 plus Other Application Fees Review 1$428.00 plus Other Application Fees on [$428.00 plus Other Application Fees on [page 17-5 [page 17-7 City of Palo Alto 2006-07 Municipal Fee Schedule 17-5 Legal Review Fee : Mills Act Contract-. / : Estabii~h 0~: Wiih~a~V: : ::[3 ~. ,f ,~i~ 3-~-. -Legal Review Fee : Williamson Act Contract= Establish or WitfidraW: ¯ : ~ ¯ ¯ i ’. : ~. Legal Review Fee = Comprehensive Plan . Change " " : ~" <: -~ Legal Review Fee - Development Agreement Legal Review Fee : Development Agreement - Annual Review ~ Legal Review Fee - Development Project Prelimin~r~ Review ’ . ’ Legal Review Fee - Environmental Impact. Report - ’~ " " ~ Legal Review Fee ÷ Nonconforming Use . ~ Exception " " " ~ . i Legal Review Fee - Site and Design Fee Legal Review Fee : Minor Subdivision - Preliminary Parcel Map " : .’ Legal Review Fee - Minor Subdivision - Preliminary Parcel Map, with Exception . Legal Review Fee - Major Subdivision- Tentative Map Legal Review Fee - Variance, Commercial & Manufacturing Legal Review Fee = Zone Change = RegUlar Legal Review Fee - Planned Community Zone Change . (: : ; ~? : ~ ~ ;~-.i (’~ i :i:i:.:!~ Lega! Review. Fee~. Minor, Change. t9 PlannedCommunity Z6ne-, :~- :i...:L ~:".)i://. : Legal Review Fee~ Complex Projects over 50,000 Squai-e fdet" : -- Initial Deposit of $5,000.00. 100 percent Of ie~algerVices and Cdsts incurred will be recm, ered..i ~ ~ ;: ~.,33: 5: i~ ~ ~ - $750.00 " .’ $2,000 O0 - ? $1,000.00 : ~ ~ $2,000 O0 $750.00. Initial Deposit of $1,500.00. : 100 percent 0fiegai:SerViC~S ~iad 6oSts incUrred" . relatifig i0 C6rnplex matters requiring specialized legal services ordocuments will be recO:vered2" City ofPaloAlto 2006-07 Municipal Fee Schedule 17-6 Public Notice Record Management Fee (Optical disk record) Microfilming (to film) Permit Automation Fee Recording Fee $60.00; if noticing is required $0 ifnoticinl~ is not required $23.00 per file $3:00/sheet $2.00 per application or permit County cost of Recording, if required ($19.00 per page as of 2003) $60.00; if noticing is required $0 if noticin~ is not required $23.00 per file $3.00/sheet $2.00 per application or permit Major Initial deposit of $5,000,00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact an~ any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. Minor Change $926.00 plus Other Application Fees on page 17-5 Initial deposit of $5,000.00 plus Other Application Fees andEegal Fees on page~ 17-6 and i7-7. i00 percent of processing costs will be recovered plus Environmental Impact and any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. $926.00 plus Other Application Fees on page 17-7 CiO~ of Palo Alto 2006-07 Municipal Fee Schedule 17-7 Preliminary Parcel Map Parcel Map $2,104.00 plus Other Application Fees on page 17-5 plus Environmental Impact Assessment. ’ $860.00 plus Other Application Fees on page 17-5. $2 104.00 plus Other Application Fees hh 1Legal:Fees on p~ges i726 & 17-7 plt.s Environmental Impact AsSessment. $860.00 plus Other Application Fees on page 17-7. Parcel Map $4,158.00 plus Other Application Fees on $4,158.00 plus Other Application Fees page 17-5 plus Environmental Impact and Legat FeeS On pages i7-6:& 17-7 Assessment.plU~ Environmental impactAssessment. $1,008.00 plus Other Application Fees on $1,008.0.0 plus Other Application Fees On page 17-5. page 17-7. Subdivision (five or more parcels):,i. ¯ ¯. . .: ::: :. ’ . All subdivision proposalsrequire Environmental lmpact Assessment applications" ’ " Tentative Map $6,829.00 plus Other Application Fees on $6,829.00 plus Other Application Fees page 17-5 plus Environmental lmpact and Legal Fees on pages 17-6& 17-7 Assessment plus Environmental Impact Assessment Final Maps ’ $2,716.00 plus Other Application Fees on $2,716.00 plus Oiher Application Fees on page 17-5 page 17-7 Use Permit. ¯ .i f~.~{: ~...i:.i -.~... i....~...~ i iii~(, i. i.: Regular $3,150.00 plus Other Application Fees on $3,150.00 plus Other Application Fees on page 17-5 plus Environmental Impact page 17-7 plus Environmental impact Assessment Assessment . ¯. " ¯ Minor Change to Existing $800.00 plus Other Application Fees on $800.00 plus Other Application Fees on page 17-5 page 17-7 Day Care Center $151.00 plus Other Application Fees on $151.00 plus Other Application Fees on page 17-5 plus Environmental Impact page 17-7 plus Environmental lmpact Assessment Assessment Temporary Use Permit Minor Variance Commercial and Manufacturing Fence Residential 1-,~, ~ , ~ :.~,.~ " . $158.00 plus Other Application Fees on 9age 17-5 $3,150.00 plus Other Application Fees on page 17-5 plus Environmental lmpact Assessment $832.00 plus Other Application Fees on page 17-5 $1,654.00 plus Other Application Fees’ on page 17-5 $158.00 plus Other Application Fees on page 17-7 $3,150.00 plus Other Application Fees and Legal Fees 6n p~ges !7:6 & 1%7 plus EnVironmental irnpgct A~s~Ssrnent. $832.00 plus Other Application Fees on page 17-7 $1,654.00 plus Oiher Application Fees on page 17-7 City of Palo Alto 2006-07 Municipal Fee Schedule 17-8 Preliminary Parcel Map $2,104.00 plus Other Application Fees on $2;104 00’plug Oth~ AppliEation iFees page 17-5 plus Environmental Impact Assessment. "~lfi§iEn~ii0h~ntal i~p~t A~geS:sment,:: Parcel Map $860.00 plus Other Application Fees on $860.00 plus Other Application Fees on page 17-5.~age 17-7. Preliminary Parcel Map $4,158.00 plus Other Application Fees on $4~158;00 plUS other Appli~ati0n =Fees Assessment. Parcel Map $1,008.00 plus Other Application Fees on $1,008.00 plus Other Application Fees 0n page 17-5. page 17-7. Tentative Map $6,829.00 plus Other Application Fees on $6,829.00 plus Other Application Fees Assessment Final Maps $2,716.00 plus Other Application Fees on $2,716.00 plus Other Application Fees on page 17-5 page 17-7 Regular $3,150.00 plus Other Application Fees on $3;150~00 plU~ Ot~e~ AppliCation Fees on nvi onm nta Minor Change to Existing $800.00 plus Other Application Fees on $800.00 plus Other Application Fees on page 17-5 page 17-7 Day Care Center I$151.00 plus Other Application Fees on $151.00 plus Other Application Foes on ~age 17-5 plus Environmental lmpact page 17-7 plus Environmental Impact Assessment Assessment Minor Variance Commercial and Manufacturing $158.00 plus Other Application Feds on $158.00 plus Other Application Fees on ?age 17-5 page 17-7 $3,150.00 plus Other Application Fees on page 17-5 plus Environmental Impact Assessment Fence $832.00 plus Other Application Fees on page 17-5 Residential $1,654.00 plus Other Application Fees on page 17-5 $3,150.00 pluS Other Application Fees 51US~ E~+ii~0ii~htal lnip~t A~essment $832.00 plus Other Application Fees on page 17-7 $1,654.00 plus Other Application Fees on page 17-7 City of Palo Alto 2006-07 Municipal Fee Schedule 17-8 Regular Planned Community Zone Change Minor Change to Planned Community Zone Initial deposit of $5,000.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact Assessment and any other entitlements necessary to complete the project, whether indicated as 100 percent cost recovery in this schedule or not. Initial deposit of $6,000.00 plus Other Application Fees on page 17-5. 100 percent of processing costs will be recovered plus Environmental Impact and any other entitlements necessary to complete the project, whether indicated as 1 oo percent cost recovery in this schedule or not. $926.00 plus Other Application Fees on page 17-5 1 O0 percent City of Palo Alto 2006-07 Municipal Fee Schedule 17-9 Attachment C City of Palo Alto City Manager’s Report INFORMATION CMR TO: FROM: DATE: SUBJECT: HONORABLE CITY COUNCIL CITY MANAGER DECEMBER 11, 2006 DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT CMR: 441:06 PRESENTATION OF PROPOSED EXPANSION PROJECT FOR STANFORD SHOPPING CENTER This is an informational report and no Council action is required. BACKGROUND The Simon Property Group is proposing to expand Stanford Shopping Center and has requested a City Council study session to present the concepts for the proposed shopping center expansion. Simon proposes to add approximately 240,000 square feet of retail expansion distributed throughout the site. Simon also proposes a 120 room hotel focused primarily on serving Stanford University, the Stanford Medical Center, and the Stanford Shopping Center. The hotel will also feature conference and meeting room facilities. In 2005, the Mayor’s Retail Attraction Committee (RAC) identified several ways to attract and retain local businesses. One element of the Action Plan presented to City Council and the Planning and Transportation Commission included enhancing Stanford Shopping Center and assisting the Center become more competitive, particularly relative to other regional shopping centers. The RAC and City Council gen.erally indicated support for helping maximize the Shopping Center’s potential for expansion and revenue enhancement to the City. The City Council has also identified the Shopping Center expansion as a key potential source of revenue as part of the City’s efforts to add $3 million of annual revenue for infrastructure improvements. Stanford Shopping Center Background The following background information about the shopping center is being provided for the Council to facilitate its consideration of the Simon Property Group’s presentation. The Stanford Shopping Center (SSC) comprises the area located between Sand Hill Road, E1 Camino Real, Quarry Road and Vineyard Lane. The site includes a total of 70 acres, with 54 acres in the main shopping center area and an additional 15.88 acres in the CMR:441:06 Page I of 6 area between Arboretum Road and Vineyard Lane. The area is zoned Community Commercial (CC). An aerial view of the Shopping Center area is attached. The shopping center was constructed in 1956 and has undergone several expansions and upgrades since then. The most recent expansion was the 1997 approval of 80,000 square feet of new space, a 49,000 square-foot increase in the development cap at the SSC beyond the development existing on June 14, 1996, resulting in a total current development of 1,412,162 squ are feet. The 1997 .expansion project was one of four development projects approved together as the Sand Hill Corridor projects. In addition to the SSC expansion, these projects included the Stanford West Apartments, the Hyatt Senior Housing, and several roadway modifications including: the widening of Sand Hill road to four lanes from Santa Cruz Avenue to Arboretum. Road; a two-lane extension of Sand Hill Road from Arboretum Road to E1 Camino Real, widening and improvement of Quarry Road, construction of a new Vineyard Lane, extension of Palo Road, and the extension of Stockfarm Road. These projects were considered together in one Environmental Impact Report (EIR), and were addressed in a single Development Agreement.. While the EIR identified significant unavoidable impacts from the projects, including the SSC expansion (including incremental increases in traffic), the City Council adopted overriding considerations for the projects because the impacts were considered to be limited, and the projects would make the Sand Hill Road Extension and related roadway improvements economically feasible. The total approved expansion for the SSC increased the SSC’s existing floor area by about six percent. Information provided by independent experts showed that the exPansion was needed to assist the SSC in remaining a competitive and viable regional shopping area by allowing continued growth and flexibility to maintain parity with other competitive shopping centers. Key issues in the 1997 SSC expansion project Following is a summary of key planning, transportation, and economic issues that were addressed in the City review and approval of the 1997 SSC expansion project. Connection of Stanford Shopping Center to Downtown and Transit Station. An important City objective in the design of the 1997 SSC expansion was to strengthen the connection between the shopping center, Downtown, and the Caltrain station. The design was modified to loca~e a retail building at the coruer of E1 Camino Real and Quarry Road, providing a bridge between the SSC and Downtown by shifting the "center of gravity" of the SSC nearer the transit station and Downtown. The pedestrian link between the SSC, Downtown and the transit station was strengthened by improving the crossing of E1 Camino Real at Quarry Road and extending the pedestrian path into the shopping center. Protection of San Francisquito Creek riparian area. San Francisquito Creek and creekside riparian area is adjacent to the north side of the SSC. This natural resource was protected by locating the newly created Sand Hill Road extension away from the creek on the existing paved area of the shopping center parking lot. To provide permanent protection for the creekside open space, the area between the CMR:441:06 Page 2 of 6 north edge of the Sand Hill Road extension and San Francisquito Creek was rezoned to CC (L), adding a Landscape (L) overlay to this area. Fiscal and economic impacts: An analysis was prepared to study the fiscal impacts of the four Sand Hill Corridor projects on the City of Palo Alto and the Palo Alto Unified School District (PAUSD), and possible economic impacts on retail sales in downtown Palo Alto and downtown Menlo Park. The stti’dy found that development of the four projects would provide new annual revenues in excess of costs for necessary services for the City and for the PAUSD. Additional significant positive fiscal impact for the City resulted from the amendment. In addition, the City achieved the extension of the E1 Camino Park lease that was part of the development agreement. The economic analysis also found that projected increases in local population, income, and employment would provide sufficient resident-, and employee-generated demand to support both the shopping center expansion, downtown .Palo Alto and downtown Menlo Park retailers. Multimodal transportation improvements. A major objective of the City was that the project would not only improve vehicular circulation but also would encourage non-vehicular access to the SSC by improving conditions for pedestrians, bicyclists and transit users. In addition to many mitigation measures imposed to .offset expected traffic increases resulting from the Sand Hill Corridor projects, accommodating pedestrians and bicyclists was incorporated into the design of all the projects. Due to the major scale of pedestrian andbicycle improvements throughout the projects, a condition of project approval Was that a post-construction evaluation of the bicycle and pedestrian improvements would be conducted to monitor the success of the circulation system design for non-automobile modes of travel. This evaluation is to be conducted two or three years after completion of all the transportation features of the project; Stanford expects to conduct this study next year. Scenic quality of northern gateway and Sand Hill Road corridor. The SSC is located at the north gateway to the city where E1 Camino Real crosses San Francisquito Creek and where Sand Hill Road intersects E1 Camino. Sand Hill Road provides a linkage between E1 Camino Real, a state, historic route, and Interstate 280, a California scenic highway. At the time the Sand Hill Corridor projects were approved, the Comprehensive Plan was amended to add Sand Hill Road to the city’s scenic corridors. Possible impacts on the scenic quality of the north gateway and Sand Hill Road was an important consideration for the City in the design of the SSC expansion. During the review process, proposed new development was shifted away from the north side of the shopping center to locations along Quarry and Arboretum Roads, to protect vistas from Sand Hill Road. The roadway was specially designed to retain a rural character, and the new extension from Arboretum to E1 Camino Real was reduced to two Ianes. Stanford Shopping Center purchased by Simon. In 2003, OPG Center, LLC, an affiliate of Simon Property Group, a publicly traded real estate investment trust ("SIMON"), acquired the Stanford Shopping Center from Stanford University, subject to a long-term ground lease. The development agreement and the CMR:441:06 Page 3 of 6 maintenance agreement (the Stanford Agreements) between the City and Stanford contain provisions that apply to the SSC as well as other properties owned by Stanford. At the time Simon purchased the SSC, the City agreed to an Assignment and Assumption Agreement that severed the SSC-related obligations under the Stanford Agreements so that those obligations were assigned to and assumed by Simon. This did not release Stanford from any of its obligations and liabilities under the Stanford Agreeme~, for which it remains liable to the City. In the event of a breach of any of the SSC-related obligations assumed by Simon, the City may exercise its rights and remedies against Stanford or against Simon. Development Agreement Annual Report. The terms of the Development Agreement for the Sand Hill Corridor projects require that Stanford submit an annual report to the City demonstrating good faith compliance with the terms of the agreement. Nearly all of the components of the projects have been completed and most of the conditions and mitigations have been satisfied. POLICY IMPLICATIONS Following are Comprehensive Plan policies and programs relevant to the Stanford Shopping Center proposal. Policy B-22: Work with Stanford University to ensure that the Stanford Shopping Center is sustained as a distinctive, competitive, high quality regional shopping center. Policy B-22, Text: While the Center has had many positive economic benefits, it is .primarily auto-oriented and is not as well integrated into the fabric of the community as it might be. The Shopping Center’s parking lot redevelopment and building expansion plans approved in 1997 incorporate improved pedestrian and transit connections to University Avenue/Downtown, the University Avenue multi,modal Transit Station, and nearby housing. Policy L-26: Maintain Stanford Shopping Center as one of the Bay Area’s premiere regional shopping centers. Encourage any new development at the Center to occur through infill, including development on existing surface parking lots. Program L-23: Identify strategies to reuse surface parking lots and improve pedestrian and transit connections at Stanford Shopping Center. Program L-24: Maintain a Stanford Shopping Center development cap of 80,000 square feet of additional development beyond that existing on June 14, 1996. Policy L-27: Pursue redevelopment of the University Avenue Multi-modal Transit Station area to establish a link between University Avenue/Downtown and the Stanford Shopping Center. The Mayor’s Retail Attraction Committee (RAC) in 2005 identified as a key issue the need to actively attract and retain local businesses that add to the City’s revenues and business mix. The RAC Action Plan was reviewed by the City Council at a joint study CMR:441:06 Page 4 of 6 session with the Planning and Transportation Commission on December 12, 2005 and calls for exploring ways to enhafice the SSC and help it become more competitive. NEXT STEPS The presentation and Council discussion on December 11 will be similar to the study session held on November 20 for the Stanford Medical Center. It will provide an opportunity for the Council to provide initial comments on the SSC schematic plans and raiseissues regarding the proposal. On December 18, the Council is scheduled to discuss authorizing the City Manager and City Attorney to initiate the process for project review and negotiation of an amendment to the development agreement between the City, the Simon Group and Stanford regarding the future expansion of the SSC. At that time, staff will summarize for Council the issues raised at both study sessions that will form the basis for the future process and discussions. The development agreement will allow the City to negotiate with the Simon Group and Stanford, and will require conditions to adequately mitigate potential impacts of the project and to provide for appropriate public benefits. Any proposal will likely require a Comprehensive Plan and zoning code amendment. An EIR will be required to address impacts from the project and is likely to include the Stanford Medical Center project as part of a joint EIR. A Request for Qualifications (RFQ) for an EIR consultant will be circulated in January with consultant selection in February. The EIR is anticipated to take up to a year to prepare. Staff will provide Council with progress reports over the course of the EIR preparation. All costs of project review, including the EIR preparation, legal fees, contract planner services and City staff time will be reimbursed by the Simon Group through a reimbursement agreement. The City also expects to retain independent experts regarding the economic and design aspects of. shopping center and hotel facilities. Costs associated with these experts will also be reimbursed by the Simon. Group. Although the Simon Group plans extensive public outreach regarding the project, the City will also hold public workshops and develop a project website in addition to conducting, public hearings on the EIR, the development agreement and any other required entitlements: RESOURCE IMPACTS The Stanford Shopping Center generates a significant portion of the City’s General Fund Sales Tax Revenues. As staff has indicated in our Long Range Financial Forecast for this year and in prior years, the Shopping Center is facing increasing competition from other regional commercial retail centers. If this trend continues, the City could face the potential of declining sales tax revenues in the future. The proposed expansion of 240,000 square .feet should address the competition issues by insuring a balanced, attractive retail mix. Currently, retail space at the shopping center generates approximately $800 dollars per square foot. This expansion can generate significant additional sales tax revenues. Initially, new retail space is projected to generate about $650 per square foot in sales; this would yield approximately $156 million CMR:441:06 Page 5 of 6 in gross sales, or approximately $1.5 million per year in new sales tax revenues. As retail space matures, the increased floor area is anticipated to generate closer to the $800 per square foot level, which would equal approximately $192 million in gross sales, or $1.9 million per year in sales tax revenues. Also included in the proposed development project is a 120 room hotel. Based on current Transient Occupancy Tax (TOT) reports, the average room rate li’i"Palo Alto is approximately $131 per night with occupancy rates at about 70%. Using the same occupancy rate and room rates for a hotel of this type, annual TOT could increase by as much as $800,000. As with any significant development project, there will also be incremental property tax revenues generated by the increased construction value as well as Utility User Tax (UUT) revenues once the space is occupied. Property Tax estimates will be determined once construction documents have been received by the City; UUT revenues are roughly estimated at $21,000 annually. Finally, in addition to the revenues listed above, there are also one-time fees that will be paid by the developer. These include building permit fees, roughly estimated at $760,000, and parks, libraries, community centers, and housing impact fees totaling $6.6 million. In addition, a citywide traffic impact fee ordinance, scheduled to return to the City Council in early 2007, would generate a $2.2 million fee for transportation projects. ENVIRONMENTAL REVIEW This report is an information item and is not subject to the California Environmental Quality Act (CEQA). ATTACHMENT Attachment A: Aerial map of Stanford Shopping Center PREPARED BY: DEPARTMENT HEAD: VIRGINIA WARHEIT ) CITY MANAGER APPROVAL: Director of Planning and Community Environment City Manager CMR:441:06 Page 6 of 6 Attachment A The City of Palo Alto Stanford Shopping Center This map is a product of the City of Palo Alto GIS