HomeMy WebLinkAboutStaff Report 441-06City of Palo Alto
City Manager’s Report
INFORMATION CMR
TO:
FROM:
DATE:
SUBJECT:
HONORABLE CITY COUNCIL
CITY MANAGER
DECEMBER 11, 2006
DEPARTMENT: PLANNING
AND COMMUNITY ENVIRONMENT
:CMR: 441:06
PRESENTATION OF PROPOSED EXPANSION PROJECT FOR
STANFORD SHOPPING CENTER
This is an informational report and no Council action is required.
BACKGROUND
The Simon Property Group is proposing to expand Stanford Shopping Center and has
requested a City Council study session to present the concepts for the proposed shopping
center expansion. Simon proposes to add approximately 240,000 square feet of retail
expansion distributed throughout the site. Simon also proposes a 120 room hotel focused
primarily on serving Stanford University, the Stanford Medical Center, and the Stanford
Shopping Center. The hotel will also feature conference and meeting room facilities.
In 2005, the Mayor’s Retail Attraction Committee (RAC) identified several ways to
attract and retain local businesses. One element of the Action Plan presented to City
Council and the Planning and Transportation Commission included enhancing Stanford
Shopping Center and assisting the Center become more competitive, particularly relative
to other regional shopping centers. The RAC and City Council generally indicated
support for helping maximize the Shopping Center’s potential for expansion and revenue
enhancement to the City. The City Council has also identified the Shopping Center
expansion as a key potential source of revenue as part of the City’s efforts to add
$3 million of annual revenue for infrastructure improvements.
Stanford Shopping Center Background
The following background information about the shopping center is being provided for
the Council to facilitate its consideration of the Simon Property Group’s presentation.
The Stanford Shopping Center (SSC) comprises the area located between Sand Hill
Road, E1 Camino Real, Quarry Road and Vineyard Lane. The site includes a total of 70
acres, with 54 acres in the main shopping center area and an additional 15.88 acres in the
CMR:441:06 Page 1 of 6
area between Arboretum Road and Vineyard Lane. The area is zoned Community
Commercial (CC). An aerial view of the Shopping Center area is attached. ¯
The shopping center was constructed in 1956 and has undergone several expansions and
upgrades since then. The most recent expansion was the 1997 approval of 80,000 square
feet of new space, a 49,000 square-foot increase in the development cap at the SSC
beyond the development existing on June 14, 1996, resulting in a total current
development of 1,412,162 square feet.
The 1997 expansion project was one of four development projects approved together as
the Sand Hill Corridor projects. In addition to the SSC expansion, these projects included
the Stanford West Apartments, the Hyatt Senior Housing, and several roadway
modifications including: the widening of Sand Hill road to four lanes from Santa Cruz
Avenue to Arboretum-Road; a two-lane extension of Sand Hill Road from Arboretum
Road to E1 Camino Real, widening and improvement of Quarry Road, construction of a
new Vineyard Lane, extension of Palo Road, and the extension of Stockfarm Road.
These projects were considered together in one Environmental Impact Report (EIR), and
were addressed in a single Development Agreement. While the EIR.identified significant
unavoidable impacts from the projects, including the SSC expansion (including
incremental increases in traffic), the City Council adopted overriding considerations for
the projects because the impacts were considered to be limited, and the projects would
make the Sand Hill Road Extension and related roadway improvements economically
feasible. The total approved expansion for the SSC increased the SSC’s existing floor
area by about six percent. Information provided by independent experts showed that the
expansion was needed to assist the SSC in remaining a competitive and viable regional
shopping area by allowing continued growth and flexibility to maintain parity with other
competitive shopping centers.
Keg issues in the 1997 SSC expansion proiect
Following is a summary of key planning, transportation, and economic issues that were
addressed in the City review and approval of the 1997 SSC expansion project.
Connection of Stanford Shopping Center to Downtown and Transit Station.
An important City objective in the design of the 1997 SSC expansion was to strengthen
the connection between the shopping center, Downtown, and the Caltrain station. The
design was modified to locate a retail building at the coruer of E1 Camino Real and
Quarry Road, providing a bridge between the SSC and Downtown by shifting the "center
of gravity" of the SSC nearer the transit station and Downtown. The pedestrian link
between the SSC, Downtown and the transit station was strengthened by improving the
crossing of E1 Camino Real at Quarry Road and extending the pedestrian path into the
shopping center.
Protection of San Francisquito Creek riparian area.
San Francisquito Creek and creekside riparian area is adjacent to the north side of the
SSC. This natural resource was protected by locating the newly created Sand Hill Road
extension away from the creek on the existing paved area of the shopping center parking
lot. To provide permanent protection for the creekside open space, the area between the
CMR:441:06 Page 2 of 6
north edge of the Sand Hill Road extension and San Francisquito Creek was rezoned to
CC (L), adding a Landscape (L) overlay to this area.
Fiscal and economic impacts.
An analysis was prepared to study the fiscal impacts of the four Sand Hill Corridor
projects on the City of Palo Alto and the Palo Alto Unified School District (PAUSD), and
possible economic impacts on retail sales in downtown Palo Alto and downtown Menlo
Park. The study found that development of the four projects would provide new annual
revenues in excess of costs for necessary services for the City and fgr the PAUSD.
Additional significant positiV~ fiscal impact for the City resulted from th~,amendment. In
addition, the City achieved the extension of the E1 Camino Park lease that was part of the
development agreement. The economic analysis also found that projected increases in
local population, income, and employment would provide sufficient resident- and
employee-generated demand to support both the shopping center expansion, downtown
Palo Alto and downtown Menlo Park retailers.
Multimodal transportation improvements.
A major objective of the City was that the project would not only improve vehicular
circulation but also would encourage non-vehicular access to the SSC by improving
conditions for pedestrians, bicyclists and transit users. In addition to many mitigation
measures imposed to offset expected traffic increases resulting from the Sand Hill
Corridor projects, accommodating pedestrians and bicyclists was incorporated into the
design of all the projects. Due to the major scale of pedestrian and bicycle improvements
throughout the projects, a condition of project approval was that a post-construction
evaluation of the bicycle and pedestrian improvements would be conducted to monitor
the success of the circulation system design for non-automobile modes of travel. This
evaluation is to be conducted two or three years after completion of all the transportation
features of the project; Stanford expects to conduct this study next year.
Scenic quality of northern gateway and Sand Hill Road corridor.
The SSC is located at the north gateway to the city where E1 Camino Real crosses San
Francisquito Creek and where Sand Hill Road intersects E1 CaminO. Sand Hill Road
provides a linkage between E1 Camino Real, a state, historic route, and Interstate 280, a
California scenic highway. At the time the Sand Hill Corridor projects were approved,
the Comprehensive Plan was amended to add Sand Hill Road to the city’s scenic
corridors. Possible impacts on the scenic quality of the north gateway and Sand Hill
Road was an important consideration for the City in the design of the SSC expansion.
During the review process, proposed new development was shifted away from the north
side of the shopping center to locations along Quarry and Arboretum Roads, to protect
vistas from Sand Hill Road. The roadway was specially designed to retain a rural
character, and the new extension from Arboretum to E1 Camino Real was reduced to two
lanes.
Stanford Shopping Center purchased by Simon.
In 2003, OPG Center, LLC, an affiliate of Simon Property Group, a publicly traded real
estate investment trust ("SIMON"), acquired the Stanford Shopping Center from Stanford
University, subject to a long-term ground lease. The development agreement and the
CMR:441:06 Page 3 of 6
maintenance agreement (the Stanford Agreements) between the City and Stanford contain
provisions that apply to the SSC as well as other properties owned by Stanford. At the
time Simon purchased the SSC, the City agreed to an Assignment and Assumption
Agreement that severed the SSC-related obligations under the Stanford.Agreements so
that those obligations were assigned to and assumed by Simon. This did not release
Stanford from any of its obligations and liabilities under_~ Stanford Agreements, for
which it remains liable to the City. In the event of a breach of any of the SSC-related
obligations assumed by Simon, the City may exercise its rights and remedies .against
Stanford or against Simon.
Development Agreement Annual Report.
The terms of the Development Agreement for the Sand Hill Corridor projects require that
Stanford submit an annual report to the City demonstrating good faith compliance with
the terms of the agreement. Nearly all of the components of the projects have been
completed and most of the conditions and mitigations have been satisfied.
POLICY IMPLICATIONS
Following are Comprehensive Plan policies
Shopping Center proposal.
and programs relevant to the Stanford
Policy B-22: Work with Stanford University to ensure that the Stanford Shopping Center
is sustained as a distinctive, competitive, high quality regional shopping center.
Policy B-22, Text: While the Center has had many positive economic benefits, it is
primarily auto-oriented and is not as well integrated into the fabric of the community as it
might be. The Shopping Center’s parking lot redevelopment and building expansion
plans approved in 1997 incorporate improved pedestrian and transit connections to
University Avenue/Downtown, the University Avenue multi-modal Transit Station, and
nearby housing.
Policy L-26: Maintain Stanford Shopping Center as one of the Bay Area’s premiere
regional shopping centers. Encourage any new development at the Center to occur
through infill, including development on existing surface parking lots.
Program L-23: Identify strategies to reuse surface parking lots and improve pedestrian
and transit connections at Stanford Shopping Center.
Program L-24: Maintain a Stanford Shopping Center development cap of 80,000 square
feet of additional development beyond that existing on June 14, 1996.
Policy L-27: Pursue redevelopment of the University Avenue Multi-modal Transit
Station area to establish a link between University Avenue/Downtown and the Stanford
Shopping Center.
The Mayor’s Retail Attraction Committee (RAC) in 2005 identified as a key issue the
need to actively attract and retain local businesses that add to the City’s revenues and
business mix. The RAC Action Plan was reviewed by the City Council at a joint study
CMR:441:06 Page 4 of 6
session with the Planning and Transportation Commission on December 12, 2005 and
calls for exploring ways to enhafice the SSC and help it become more competitive.
NEXT STEPS
The presentation and Council discussion on December 11 will be similar to the study
session held on November 20 for the Stanford Medical Center. It will provide an
opportunity for the Council to provide initial comments on the SSC schematic plans and
raise issues regarding the proposal. On December 18, the Council is scheduled to discuss
authorizing the City Manager and City Attorney to initiate the process for project review
and negotiation of an amendment to the development agreement between the City, the
Simon Group and Stanford regarding the future expansion of the SSC. At that time, staff
will summarize for Council the issues raised atboth study sessions that will form the
basis for the future process and discussions. The development agreement will allow the
City to negotiate with the Simon Group and Stanford, and will require conditions to
adequately mitigate potential impacts of the project and to provide for appropriate public
benefits. Any proposal will likely require a Comprehensive Plan and zoning code
amendment.
An EIR will be required to address impacts from the project and is likely to include the
Stanford Medical Center project as part of a joint EIR. A Request for Qualifications
(RFQ) for an EIR consultant will be circulated in January with consultant selection in
February. The EIR is anticipated to take up to a year to prepare. Staff will provide
Council with progress reports over the course of the EIR preparation.
All costs of project review, including the EIR preparation, legal fees, contract planner
services and City staff time will be reimbursed by the Simon Group through a
reimbursement agreement. The City also expects to retain independent experts regarding
the economic and design aspects of shopping center and hotel facilities. Costs associated
with these experts will also be reimbursed by the Simon Group.
Although the Simon Group plans extensive public outreach regarding the project, the
City will also hold public workshops and develop a project website in addition to
conducting public hearings on the EIR, the development agreement and any other
required entitlements.
RESOURCE IMPACTS
The Stanford Shopping Center generates a significant portion of the City’s General Fund
Sales Tax Revenues. As staff has indicated in our Long Range Financial Forecast for this
year and in prior years, the Shopping Center is facing increasing competition from other
regional commercial retail centers. If this trend continues, the City could face the
potential of declining sales tax revenues in the future.
The proposed expansion of 240,000 square feet should address the competition issues by
insuring a balanced, attractive retail mix. Currently, retail space at the shopping center
generates approximately $800 dollars per square foot. This expansion can generate
significant additional sales tax revenues. Initially, new retail space is projected to
generate about $650 per square foot in sales; this would yield approximately $156 million
CMR:441:06 Page 5 of 6
in gross sales, or approximately $1.5 million per year in new sales tax revenues. As retail
space matures, the increased floor area is anticipated to generate closer to the $800 per
square foot level, which would equal approximately $192 million in gross sales, or $1.9
million per year in sales tax revenues.
Also included in the proposed development project is a 120 room hotel. Based on current
Transient Occupancy Tax (TOT) reports, the average room rate in Palo Alto is
approximately $131 per night with occupancy rates at about 70%.’ Using the same
occupancy rate and room rates for a hotel of this type, annual TOT could increase by as
much as $800,000. ,. ~
As with any significant development project, there will also be incremental property tax
revenues generated by the increased construction value as well as Utility User Tax (UUT)
revenues once the space is occupied. Property Tax estimates will be determined once
construction documents have been received by the City; UUT revenues are roughly
estimated at $21,000 annually.
Finally, in addition to the revenues listed above, there are also one-time fees that will be
paid by the developer. These include building permit fees, roughly estimated at
$760,000, and parks, libraries, community centers, and housing impact fees totaling
$6.6 million. In addition, a citywide traffic impact fee ordinance, scheduled to return to
the City Council in early 2007, would generate a $2.2 million fee for transportation
projects.
ENVIRONMENTAL REVIEW
This report is an information item and i.s not subject to the California Environmental
Quality Act (CEQA).
ATTACHMENT
Attachment A: Aerial map of Stanford Shopping Center
PREPARED BY:
DEPARTMENT HEAD:
CITY MANAGER APPROVAL:
VIRGINIA WARItEIT
Senio an ~
~ST~VE l~MSLIE .
Director of Planning and Community
Environment ’
City Manager
CMR:441:06 Page 6 of 6
Attachment A
The City of
Palo Alto
Idvera, 2006-12-06 14:24:33stanford mall 1106 (~cc-maps~gis$~gls~ad rnln~Persona[Vrlvera.rndb)
This map is a product of the
City of Palo Alto GIS
Stanford Shopping Center