HomeMy WebLinkAboutStaff Report 423-06City City of Palo Alto Manager’sReport TO:HONORABLE CITY COUNCIL ATTENTION:FINANCE COMMITTEE FROM:CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES DATE:DECEMBER 12, 2006 CMR: 423:06 SUBJECT:2005-06 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS REPORT This is an informational report and no Council action is required. BACKGROUND This report provides information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of fiscal year 2005-06. The attached matrix (Attachment A) lists all CIP projects and current status, including any issues that might cause a change in the scope or timing of the projects. Information in this report is intended to keep Council informed on the progress of all CIP projects opened at the beginning of the 2005-06 fiscal year and on those projects that were added or completed during the same fiscal year. DISCUSSION The attached matrix categorizes CIP projects into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase the project was in at fiscal year-end. Information on phases is intended to give Council a perspective on how much progress was made on a project. Three distinct phases are utilized, as follows: CMR: 423:06 Page 1 of 3 Phase:Possible Activities: Pre-Design Design Construction o Preparation of feasibility study o Development of a master plan o Definition of a project scope o Environmental Review o Hiring a design consultant o Completion of project design o Soliciting bids or proposals o Acquisition of major equipment o Installation o Implementation of a project The comment section of the matrix provides Council with information clarifying the status of certain projects. In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. The matrix also includes information on the total budget from inception for the project, the available budget as of the beginning of the fiscal year, the fiscal year expenditures, the fiscal year contingencies, the fiscal year commitments (encumbrances) through June 2006, the remaining balance in the project budget as of year-end, and the percentage of completion for the project. The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. During fiscal year 2005-06, progress was made on all of the City’s "continuous" projects (Attachment B). At year-end, all completed CIPs (after settlement of encumbrances) and CIPs where no activity is planned in the near future were closed and the remaining balances transferred to the Infrastructure Reserve for General Fund projects; to Retained Earnings for Internal Service Funds; and to the appropriate Rate Stabilization Reserve for Utility Fund projects. Infrastructure Management Plan Below is a high level analysis of the Infrastructure Management Plan (IMP) budget through June 30, 2006 showing expenditures and the various stages and status of projects. CMR: 423:06 Page 2 of 3 Total Adjusted Budget FY 2005/06 Less: Actual expenditures as of 6/30/06 Encumbered balance as of 6/30/06 Projects that are ongoing Projects in pre-design stage Projects in design stage Projects in construction stage Projects completed with remaining balance Projects on hold due to lack of budget to proceed $32,282,069 (10,193,889) (6,109,068) (2,749,831) (1,928,889) (7,920,582) (2,811,624) (514,481) ( 53,705) PREPARED BY: ~ eH2oRr OANccBouO~Mnt~nt_AN 0 Staff Accountant DEPARTMENT HEAD APPROVAL: CITY MANAGER APPROVAL: Assistant City Manager ATTACHMENTS Attachment A: Year-end Capital Improvement Projects Status Matrix Attachment B: List of Continuous Projects CMR: 423:06 Page 3 of 3 ~ o~ ~ °o )~o LIST OF CONTINUOUS PROJECTS Community Services AC-86017 PG-94015 Art in Public Places Park Facilities Improvements Planning & Community Environment PL-05030 (formerly EL-89030) Traffic Signal Upgrades Public Works General Fund PO-89003 PE-86070 PF-90018 PE-91001 PF-93009 PF-00006 PF-01003 PF-02022 PO-05054 (formerly EL-93054) Sidewalk Improvements Street Improvements (Street Improvement Fund) Cubberley Building Code Modification Tank Investigation and Removal ADA Compliance Roofing Replacement Building Systems Improvement Facility Interior Finishes Street Lights Improvements Storm Drainage Fund SD-06101 SD-06105 SD-88070 Storm Drain System Replacement Innovative Storm Drain Improvements Collection System Improvements WastewNer Treatment WQ-80021 WQ-80022 RWQCP Plant Equipment Replacement RWQCP System Flow Metering Attachment B Utilities Electric Fund EL-89028 EL-89038 EL-89044 EL-06005 EL-06006 EL-98003 Customer Design Substation Protection Improvements Substation Facility Improvements Fiber Optics Ring System Improvements Fiber Optics Customer Design and Connection Services Electric Distribution System Reconstruction and Improvements Gas Fund GS-80017 GS-80019 GS-92030 GS-02013/GS-03007 GS-03002/GS-04003/GS-05002 GS-06001 GS-03009 Gas System Extensions Gas Meters and Regulators Natural Gas Vehicle Conversions and Purchases Directional Boring Equipment Gas Main Replacements Gas Main Replacements System Extensions- Un-reimbursed Wastewater Collection WC-80020 Sewer System Extensions WC-99013 Sewer Manhole Rehabilitation WC-00003/WC-01005/WC-02002 Sewer System Rehabilitation and Augmentation WC-03003/WC-04002WC-05003 Sewer System Rehabilitation and Augmentation WC-06003 Sewer System Rehabilitation and Augmentation Water Fund WS-80013 WS-80014 WS-80015 WS-02014 WS-02003/WS-03004 WS-05001/WS-06002 LIST OF CONTINUOUS PROJECTS Water System Extensions Service and Hydrant Replacements Water Meters Water -Gas Wastewater Utilities GIS Data Water Main Replacements Water Main Replacements Attachment B