Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Staff Report 339-06
City City of Palo Alto Manager’s Report TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: ADMINISTRATIVE ¯ SERVICES DATE:SEPTEMBER 11, 2006 CMR:339:06 SUBJECT:CITY OF PALO ALTO’S ENERGY RISK MANAGEMENT REPORT FOR THE FOURTH QUARTER, FISCAL YEAR 2005-2006 This is an information report and no Council action is required. OVERVIEW Staff has continued to purchase electricity and gas in full accordance with the City’s Energy Risk Management Policies and Procedures. There have been no exceptions to report. The total net market value for all gas and electricity commodities is $43.5 million. The current Mark to Market (MTM) value and credit exposure of the City’s fixed price purchases is $15.0 million for electricity, down from $15.6 million at the end of last quarter; and $5.6 million for gas, down from $7.9 million at the end of last quarter. The current Mark to Market value of the City’s wind power contracts for the next 12 months is a negative $179,000. The market value of the hydro contracts with Western and NCPA is $20.7 million. The electricity Value at Risk (VaR) measure is 0.03% and remains well below maximum limits. The VaR of the gas portfolio remains above the 10% benchmark and the value increased from 11% to 19.2% during the quarter. Electricity supply reserves are adequate for the current risk profile, however, the gas reserves are not considered adequate for the current level of risks and additional reserve levels are recommended. BACKGROUND The purpose of this report is to inform the City Council of the status of the City’s energy portfolio and transactions executed with energy suppliers as of the end of the fourth quarter of Fiscal Year 2005-06. The City’s Energy Risk Management Policy requires that staff report on a quarterly basis to Council on: 1) the City’s energy portfolio, 2) the City’s credit and market risk profile, 3) portfolio performance, and 4) other key market and risk information. Table 1 and Table 2 below summarize the current position and exposure of the City with the electricity and gas commodity portfolios, respectively. Table 1 summarizes the electric portfolio in terms of forward purchase volumes, headroom (volume limit less current purchases volumes) and mark to market value (current market price less purchase price). Table 2 summarizes the gas portfolio in terms of transaction volume, market value, mark to market value and limits. CMR:339:06 Page 1 of 17 DISCUSSION Open Transactions as otZJune 30, 2006 Open transactions are commitments by the City to purchase either electricity or gas, for which supplies have not yet been delivered. The analysis presented here is restricted to forward fixed price purchases with corporate counterparties, and, except where specifically stated, does not include purchases from Western Area Power Administration (Western) or the Calaveras Project operated by NCPA. Additionally, the electricity analysis separates standard bulk power purchases from long-term wind and landfill contracts which the City has recently implemented. Electricity. As of June 30, 2006 the electric portfolio consisted of 57 open transactions through December 2009. Figure 1 illustrates the sources of electricity supplies by month for the next 36 months. The City currently has purchased supplies of electricity totaling 0.66 million MWh for delivery between July 1, 2006 and December 31, 2009. The average price for all of the fixed- price purchases was $47.10 per MWh, slightly up from $46.94 last quarter. The forward purchases have been transacted with three approved counterparties: Coral Energy, Sempra Energy and British Petroleum. Note that one of the City counterparties, Duke, has withdrawn from participation in the market. In addition, note that in Figure 1, the Seattle City Light (SCL) volumes represent an "exchange" whereby Palo Alto supplies power to Seattle City Light in the winter months and Seattle provides power to Palo Alto during the summer months. 140,000 120,000 100,000 80,000 60,000 40,000 20,000 Figure 1. Load Resource Balance (20,( (40,000) Western SCL ~Wind Gen Spot Market - Surplus +/Deficit (-) Forward Month Calaveras Landfill Gas Gen Forward Market Purchases "=e"==Load CMR:339:06 Page 4 of 17 The distribution of purchases by month and by counterparty is presented in Figure 2. 70,000 60,000 50,000 40,000 20,000 10,000 Figure 2. Forward Electric Purchases by Volume [] Sempra [] Coral Energy []BP The mark to market (MTM) value represents the difference in price between the current market value of the contracted supply and the original contracted price. A positive MTM value indicates an increase in the value of the purchase, which would be realized only if the transaction was liquidated. While a positive MTM value represents an increase in value to the City, it also represents the City’s credit exposure with the supplier. In other words, should a counterparty default on delivery of supply, the City would need to purchase replacement energy on the open market when prices could be higher. A negative MTM represents the supplier’s credit exposure with the City. The MTM value is based on the current forward prices, that is, the prices at the end of the quarter for deliveries in the future. Prices moved slightly during the quarter. As shown in figure 3, prices during the quarter for deliveries in Calendar Year (CY) 2007 dropped by less than 5%. Prices for CY 2008 ended the quarter essentially unchanged. Price for CY 2009, and 2010 increased marginally (less than 10%). CMR:339:06 Page 5 of 17 $100.00 $95.00 $90.00 $85.00 $80.00 $75.00 s7o.oo $65.00 Figure 3. Electricity Forward Prices at NP15 $60.00 .............. Date of Price Note: NP15 refers to North Path 15 which serves as the key delivery and market point for Northern California. As such it represents an aggregated price forthe region. Because of this slight price decline, the total MTM value of the City’s forward transactions dropped slightly during the quarter from $15.6 million to $15.0 million. Figure 4 presents the MTM positions for each supplier by month. $1,200 $1,000 $8oo s6oo $400 $200 $- $(2o0) $(400) $(6o0) $(800) Figure 4. Forward MTM by Month. :,: ...... ....[] Sempra [] Coral Energy CMR:339:06 Page 6 of 17 Hydro Power. Based on forecasts provided by Western and the Calaveras Project and forward market projections, staff has calculated values for CPAU’s hydro contracts. It should be noted- that for both Western and Calaveras, values are based on the expected volumes of delivery for the next 12 months. These values will change as actual volumes will differ from those predicted at this moment in time. At present, the 12-month value for deliveries from Western through June 30, 2007 is $26.7 million, up from $24.6 million last quarter. For Calaveras, the 12-month value of deliveries is $9.8 million, up from the previous quarter results of $9.2 million. The 12 month costs of Western total $6.5 million and those of Calaveras are $9.3 million. Therefore the 12- month Mark to Market value of the Western contract is $18.1 million, and for Calaveras is $0.3 million. Seasonal Exchange Contracts. The sole seasonal exchange transaction in which Palo Alto is engaged involves Seattle City Light. Under this contract, which was signed in 1992, Palo Alto receives 9 MW from November through March, and sends 10 MW from June through October. The 12-month MTM value of this contract is $278,044. Wind Power. The City has two long-term contracts with Pacificorp Power Marketing (PPM) for supplies of wind energy. Wind power has different characteristics from a normal power purchase because it is not volumetrically firm. The amount Palo Alto receives directly relates to how strongly the wind blows. Based on historic meteorological conditions, Palo Alto expects to receive approximately 58,000 Megawatt hours per year from the High Winds project and 74,800 MWh from Shiloh project. The later project began deliveries in June 2006. Based on these data, the current MTM of the wind power contracts is negative $179,000. Landfill Gas Power. The City has entered into a 23 year landfill gas contract with Amereso to produce electricity from the gas produced at landfills in Santa Cruz and Half Moon Bay. The first of these plants is now operational, and produces over 48,800 MWh per year. The current 12 month MTM value of this contract is $145,000, which means that the City is purchasing this renewable energy for less than the market cost of wholesale power. CMR:339:06 Page 7 of 17 Natural Gas. As of June 30, 2006 the gas portfolio consisted of 160 open transactions (transactions for which commitments have been made but gas remains to be delivered) through December 2008. The City currently has purchased supplies of gas totaling 4.83 million MMBtu for delivery between July 1, 2006 and May 31, 2009. The average price for all of the fixed-price purchases was $7.02 per MMBtu, up from $6.78 last quarter. The forward purchases have been transacted with four approved counterparties: Coral Energy, Sempra Energy, ConocoPhillips and British Petroleum. Duke Energy has withdrawn from the gas market. This data is presented in Figure 5. 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 Figure 5. Forward Gas Purchase Volumes ’-"- i :. ":E]Sempra ~ ~ :[]Coral Energy 171Bp Forward prices for gas decreased marginally by the end of the quarter for delivery in Calendar Year 2007 (CY 07) and Calendar Year 2008 (Figure 6). The current MTM value of these transactions is $5.6 million, a decrease of $ 2.3 million from last quarter. The MTM value by month and by counterparty is presented in Figure 7. CMR:339:06 Page 8 of 17 Figure 6. Forward Calendar Year Gas Prices $1o.50 ~CY07 $10.00 $9.50 $9.00 $8.5o $8.00 $7.50 ............ $900,000 $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 $- $(ioo,oo $(200,000) Figure 7. Gas Mark to Market by Month CMR:339:06 Page 9 of 17 Figure 8 below presents the pool purchases made for each month over the next three years compared to estimated pool load. It illustrates the gas laddering purchasing strategy in relation-- to the total estimated load, showing the amount of volumes purchased (hedged volumes), the volume to be used by market rate customers, and the amount of the pool to be purchased on the short-term market (pool exposed to market). Under the laddering strategy, CPAU purchases up to 100% of forecasted load for the upcoming 18 months, up to 75% of load for 19 to 27 months out, and up to 50% of load for 28 to 36 months out. As a result, the amount of pool exposure to the market is low in the near term, but increases further out in the future. 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 (50,00~ Figure 8. Market Exposure [] Pool Exposed to Market 11 Market-Rate Customers [] Hedged Volumes CMR:339:06 Page 10 of 17 Value at Risk The "riskiness" of the energy portfolio is measured through the ~’vatue at risk" (or VaR). The- VaR measures the risk that adverse market conditions could force CPAU to use reserves to cover costs on future purchases over what is reflected in current rates. Specifically, VaR measures how much projected 12-month net revenue could change in one week due to a potential adverse market change. Staff use the VaR as one of the key measures of market price risk to CPAU. In compliance with the Risk Management Guidelines, the Utilities staff and the Energy Risk Manager monitor the VaR level relative to the projected end of year supply Rate Stabilization Reserve (RSR) levels for both electricity and gas. Currently, the VaR for the electricity portfolio is 0.03% of the RSR, a reduction from 0.08% last quarter. The VaR for gas remained above the 10% benchmark value, and increased from 11% to 19.2% at the end of last quarter. The historic levels of the VaR values for electricity and gas are presented in Figure 9. Figure 9. History of Gas and Electric Value at Risk 0.250 + % of Gas Supply Reserve0.200 + % of Electric Supply Reserve 0.150 0.100 0.050 0.000 ....,-- -- -:-, , , , - ........ 65,65 ......65 65 65 ¢~,. ,.- 65,,65,,,4 65, ’~ 4~’~ 65"" 65" 65 ......~ 65 65 65" "" Date The 10% VaR limit set by the Risk Manager in conjunction with the Risk Oversight Committee represents a benchmark to monitor the potential risk to which the City is exposed as a result of possible variability in the cost of supplies not yet purchased. In some instances, exceeding the 10% benchmark would indicate the need for the City to purchase additional forward supplies. CMR:339:06 Page 11 of 17 The risk represented by the VaR number is the result of the increases in energy prices during last fall and winter and the continuing reduction of the Gas Supply Stabilization Reserve. Staff does-- not recommend additional purchases in order to reduce VaR levels. Staff is, however, working on a recommendation for a strategy regarding the long term need to increase the gas SRSR. Credit Risk To manage credit risk, staff reports on major credit rating agency’s (S&P and Moody’s) scores, and, in addition, the "estimated default frequency" (EDF) using the Moody’s KMV CreditEdge© system. The EDF is an estimated probability that a counterparty will default in the next 12 months. For example, a 0.2 EDF indicates a chance of 2 in 1000 that the firm will be in default in the time period. Thus a higher EDF represents a higher credit risk for the City. While the current risk management practices do not set a specific EDF upper limit, any counterparty with a value over 0.50 warrants careful and regular monitoring of its financial condition and outlook. Electricity. CPAU’s electric supplier counterparty credit exposure and the supplier credit ratings are presented below. CPAU’s largest exposure, in excess of $14.2 million, is with Coral, a company rated A- by Standard and Poor’s. Coral is a wholly owed subsidiary of Royal Dutch Shell which is rated AAA, the highest rating given. Table 1. Electricity Suppliers - Credit Exposure and Credit Ratings as of June 30, 2006. Counter party BP Corala Duke4 Sempra Total Credit Exposure $658,056 $14,254,454 $0 $74,170 $14,986,680 s&P Ranking AA÷ A- BBB BBB+ 1 Coral is wholly owned by ShellPLC. Previous Quarter Expected Default Frequency .02 .053 .05 .08 Current Expected Default Frequency .02 .05 .02 .06 Expected "Loss’’2 $ 131 $7,127 $0 $45 $7,303 2 Expectedloss represents theproduct of the default rate in the next 12 months andcredit exposure. As such it provides an estimate of the 12-month average risk being carried by CPA U as a result of its forward contracts. Default frequencies are independently calculated, and eross-default probabilities (that chance the one firm ’s default will increase the chances of another firm defaulting) are not included. 3 This estimate is based on the credit ratings, and not the KMVmodel results. ! The City’s current exposure to Coral is a reflection of a 5 year contract for electricity supplies at a cost of $37 per MWh. The current long term price trends continue to render this contract very valuable, and therefore a credit risk. For this reason, staff will continue to monitor Coral’s credit condition very closely on an on-going basis. CMR:339:06 Page 12 of 17 Renewable Electrici _ty. Palo Alto’s contracts for renewable "green"..energy include Jooth wind-- contracts with Pacificorp Power Marketing (PPM), discussed above, as well as contracts to convert landfill gas to electricity with Ameresco, Inc. Neither PPM (owned by Scottish Power) nor Ameresco are publicly traded and therefore KMV Credit Edge does not include them in its default reporting. The Risk Manager has used financial information provided confidentially by each of the two counterparties to estimate an Expected Default Frequency, which is statistically comparable to the EDFs reported for the other counterparties. The credit exposure and EDF ratings for these counterparties are presented below. Table 2. Green Energy Credit Exposure and Credit Ratings as of June 30, 2006. Counterparty Ameresco, Inc. Pacificorp Power Marketing Credit Exposure $145,000 $0 Previous Quarter Calculated Expected Default Frequency 0.50 0.40 Current Calculated Expected Default Frequency 0.50 0.4 Expected "Loss" $ 725 $0 Natural Gas. As the Table 3 shows, the City has exposure to five counterparties totaling $7.9 million over the next 36 months, a decrease of over 50% since the last quarter. As with electricity, this large jump in market exposure is the result of the rapid rise in the forward energy prices. The highest exposure with a single supplier is $2.5 million with Coral, an A- rated company, with the second highest exposure being with AA+ rated BP at $0.7 million. Note that contracts with Duke were assigned to Coral during the quarter and henceforth will be captured in the Coral exposure information. The remainder of the exposure is with Sempra. The Table 3 below calculates the loss which the City would suffer should one of its gas counterparties default. This loss is calculated as the product of Estimated Default Frequency and the MTM value. CMR:339:06 Page 13 of 17 Table 3. Credit Exposure and Default Ratings of Natural Gas Suppliers (March 31, 2006) Counter party BP ConocoPhillips Coral~ Duke4 Sempra ~ Credit Exposure $703,556 $ 0 $ 1,519,756 1,015,313 s&P Ranking AA+ Previous Expected Default Frequency .02 .02 ¯ 053 Current Expected Default Frequency .02 .03 .053 BBB .05 .O2 Expected Loss2 $140 $0 $760 $507 $4,670,658 BBB+.11 .08 $3,737 Total $7,909,283 $5,144 1 Coral is wholly owned by ShellPLC. 2 Expected loss represents theproduct of the default rate in the next 12 months and credit exposure. Itprovides an estimate of the 12-month average risk being carried by CPAU as a result of its forward contracts. Default frequencies are independently calculated, and cross-default probabilities (that change the one firm’s default will increase the chances of another firm defaulting) are not included. 3 This estimate is basedfinaneiaI analysis of confidential data, and not the KMVmodel results. 4. In the beginning of this quarter, the gas transactions with Duke were transferred to Coral under an "Assignment and Novation ’" agreement. Credit Quality of Suppliers. Overall, the City’s suppliers have continued to improve their credit quality. Figure 10 shows how the expected default frequency of CPAU’s current suppliers has declined (i.e., improved credit) over the past three years. As mentioned previously, Pacificorp Power Marketers is privately held and therefore an EDF is not issued by Moody’s KMV. The firm’s sole owner, Scottish Power, is used as a surrogate EDF. Similarly, Coral is the wholly owned subsidiary of Shell. The Coral EDF is calculated manually on a quarterly basis based on confidential financial information provided by the company. The estimate is also adjusted after consultation with credit analysts at Standard and Poor’s and Moody’s Investor Services. The staff-calculated EDF point estimates for Pacificorp Power Marketers, Coral and Ameresco are included on the Figure 10. Council should be aware of changes in the guarantor for the Pacificorp Power Marketer’s wind power purchase. While the guarantor is currently Pacificorp Holdings Inc. (PHI), purchases of portions of PHI by Mid-American are necessitating changes in the guarantor. The new guarantor CMR:339:06 Page 14 of 17 will be Scottish Power Financial (SPFUS) an A- rated company. Staff is currently in the process of negotiating a new guarantee with SPFUS but this was not consummated by the ~nd of the-- quarter. Figure 10. Expected Default Frequencies for CPAU Counterparties over last 6 months 2z°-Mar-08 03-M~’,/-08 17-Ma’,/-08 31-May-08 14-Jun-08 "rime EDF ~ .O -COG A Plot: Values Period: Custom From: March 20, 2006 Currenm~. U.£. DOLLAR[USD] To: June 30, 2006 Description =DUKE ENERGY CORP [DUK] EDF =£EMPRA ENERGY [SIRE] EDF 8OOFII£H POWER PLC [£PW] EDF =CONOCOPHILLIP£ [COP] EDF =BP PLC [BPL] EDF --CPAU PORTFOLIO [..MYPORTJ EDF - Median Value As Of 0.02 20-Jul-06 0.06 20-Jul-06 0.05 20-Jul-06 0.04 20-Jul-06 0.02 20-Jul-06 0.03 21-Jul-06 Note: The Pacificorp, Coral and Ameresco EDF values shown above are point estimates calculated by staff from confidential financial information. As such, tracking is done on a ’"point in time" basis and is not continuous. CMR:339:06 Page 15 of 17 Reserve Adequacy A key premise to the -City’s risk management practices centers on the adequacy of supply reserves with respect to the risks undertaken as a result of purchases of gas and electricity commodities. Table 4 below summarizes the current and projected supply reserve levels for gas and electricity as of June 30, 2006. The methodologies for calculating minimum and maximum reserve levels were approved by Council in 2003 (CMR 483:03). The current formula for calculating maximum reserve balances are 103% and 75% of purchase costs for electric and gas respectively. The minimum reserve levels are 50% of the maximum levels for both gas and electricity. Table 4. Supply Reserve Levels for Electricity and Gas ($ Millions) Commodity Beginning Reserve Balance as of 6/30/05 FY 04/05 Budgeted Reserve Guideline Range for FY 05/06 Min Max $ 27.4 $ 54.8 $ 7.6 $15.2 Unaudited Actual Reserve Balance as of 06/30/06 FY (05-06)* Electricity $ 44.2 $ 58.4 Gas $ 3.8 $ 2.0 Accounting activity figures to date reflect what has been booked into the City’s accounting system (SAP). These figures are preliminary until outside auditors have completed their review and the CAFR is produced. There could be significant changes to the RSR balances based on year end adjustments that have not as yet been booked. Those adjustments could include additional revenue or expense, the calculation of gain or loss on investment and the accrual of previously unrecognized liabilities for worker compensation, general liability and retiree medical benefits. The amount of these adjustmentsis unknown at the time of this report. The current reserves for electricity are well above the minimum and well above credit, regulatory and other risks for the 12 months moving forward. Total risks associated with the electric supply reserve for the next 12 months includes $7.1 million for credit reserves (using best practice of 50% of largest single exposure), $22.9 million for hydro risk, $1.4 million for market risk of the short positions in the next 12 months, and $4.3 million for possible regulatory and other risks. These risks total $35.7 million. With regard to gas, the current reserve levels of $2.0 million are below the minimum level of $7.8 million as set by current policy and are continuing in a downward trend. Current reserve levels are not fully adequate for the risks they are intended to mitigate. Total risks associated with the gas supply reserve include $2.3 million for credit reserves, $1.9 million for unlaedged commodities in the next 12 months, and $0.5 million for possible regulatory and other risks, for a total of $4.7 million. Staff is particularly concerned with the continuing erosion in gas reserve levels especially during this time of high gas prices and volatility. CMR:339:06 Page 16 of 17 Perhaps more fundamentally, the manner in which the budgeted reserve ranges are calculated is not up to industry standards. Staff, including the Risk Manager and Utilities, are-reviewing-- alternatives for developing reserve range methodology which are more tightly aligned with the risks that those reserves need to cover. It should be noted that changing market dynamics, international politics and other factors fully outside the City’s control can have a significant and adverse impact on the adequacy of reserves for both gas and electricity over a short timeframe. As a result, formal reserve adequacy assessments will be a regular component of the risk management quarterly reports from this time forward. ~~/~~~~ . PREPARED BY: KARL VAN ORSDOL DEPARTMENT HEAD APPROVAL: CITY MANAGER APPROVAL: Energy Risk Manager CARL YEAT)~" Director, Adininistrative Services EMI’IPi~HA1Jd~I-gi3N Assistant City Manager ATTACHMENTS A) Consolidated Mark to Market Report of All Open Gas Transactions as of June 30, 2006 B) Consolidated Mark to Market Report of All Open Electric.Transactions as of June 30, 2006 CMR:339:06 Page 17 of 17 ~ x x x x!~ x x x x~x × xix x x x x x x x x x × x × x x × x × x x x x ooo ooo oooo oo ,ooooo~ooOOOoOO OoOoOOOooooooo oooo oooo o o~ ooo o o ooio I ~X X X X X X X~X X X X~~~i~~ix x x x x x xlx x x x x x x x x x x x x x’x o 0 0 0 0 0 0 0 00iO 0 0 0 0 0 0 0 ixxxxxxxxxxxxxxxxxxxx, xxxxxxxxxxxxxx ~ ~iO 0 0 0 ~ ~ 0 ~ 0 0 ~ ~ 0 0 ~ 0 ~ 0 0 0 0 0 0 00iO oio 0 0 0 ~ L 0 0 0 0 0 0 0 (b 0 0 0 0 0 0 0 0 0 0 (P 0 0t--t" t" " r"C" 0 0 0 0 rl 0 tl I~. 0 0 1~. 0 0 0 0 Oi 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 010 0 0 000 O~o o o ~io o o~o o o 0 0 0 00i 0 0 0 0 0 0 0 0 0o8ooooi~oo~o~8~o,oo~00088