Loading...
HomeMy WebLinkAboutStaff Report 248-06City of Palo Alto City Manager’s Report TO: FROM: DATE: SUBJECT: HONORABLE CITY COUNCIL CITY MANAGER JUNE 26, 2006 AWARD OF A CONTRACT DEPARTMENT: PUBLIC WORKS CMR:248:06 WITH AMERICAN TRUCK AND TRAILER BODY COMPANY IN THE AMOUNT OF $500,000 FOR TRUCK BODY FABRICATION AND TRUCK EQUIPMENT INSTALLATION SERVICES 8A RECOMMENDATION Staff recommends that Council: Approve and authorize the City Manager or his designee to execute the attached contract with American Truck and Trailer Body Company in the amount of $500,000 for truck body fabrication and truck equipment installation services. Authorize the City Manager or his designee to exercise the option to renew the contract for the second and third years, provided the contractor is responsive to the City’s needs and the quality of the contractor’s work/product is acceptable during the first year of the contract. DISCUSSION Background One of the responsibilities of the Equipment Management Division is to replace vehicles and equipment on an established schedule. Many of the vehicles replaced are trucks that include specialized bodies and equipment for the Utilities and Public Works Departments. Truck chassis are procured from truck dealers through a Request for Quotation ~Q) process, and the truck- mounted equipment is fabricated and installed by a contractor that specializes in this type of work. Separate RFQ’s and subsequent purchase orders could be generated for each truck body project, however, given the volume (25-30 projects annually) and complexity of these projects, staff has found that establishing a relationship with a qualified contractor through a multi-year contract reduces project completion times and improves quality control as compared to purchasing each truck body individually. Project Description The work to be performed under this contract is for the fabrication and installation of mack bodies, van interiors, material racks, trailer hitches, power take-off units, cranes, hydraulic systems, electrical systems, generators, warning and work lighting, and other associated equipment and accessories. The contractor will furnish components, materials, parts and supplies as necessary to complete this work. CMR:248:06 Page 1 of 3 In addition to performing installation and fabrication work, the contractor will provide design and technical consultation services, cost estimates, project schedules and weight studies related to projects covered under this contract. Selection Process Staff sent a Request for Proposals (RFP) to eight truck body fabrication and truck equipment installation firms on February 3, 2006. The proposal period was 31 days and a non-mandatory pre-proposal meeting was held on February 14, 2006. Summary of Solicitation Process Proposal Description/Number Truck Body Fabrication and Truck Equipment Installation Services/RFP 111853 Proposed Length of Contract Twelve (12) months with option to renew Number of Proposals Mailed 8 Total Days to Respond to Proposal 31 Pre-proposal Meeting Date February 14, 2006 Number of Company Attendees at 1 Pre-proposal Meeting Number of Proposals Received:1 Company Name Location (City, State)Selected for oral interview? 1. American Truck and Trailer Tracy, CA Yes Body Company Range of Proposal Amounts $111,948 Submitted The RFP process allows the City to negotiate the price of the work upon selection of the successful firm. The RFP outlined various criteria and certifications that are needed to perform the work. Firms were asked to submit pricing, qualifications and other information in an effort to demonstrate their knowledge and experience with providing the services requested. Their submittals would be ranked accordingly. All of the certifications required by the RFP are easily obtainable by qualified technicians and are no different than those required for technical positions in Equipment Management. One firm, American Truck and Trailer Body Company, submitted a proposal for this work. Two firms (Carter Industries and Altec Industries) submitted a response. Carter stated that currently the do not have a technician that possesses all of the certifications required by the RFP and Altec was too busy to perform the work at this time. The proposal submitted by American Truck and Trailer Body was evaluated by an RFP evaluation committee consisting of two representatives from Equipment Management, one from Utilities Operations, and one from Public Works Operations. The committee also inspected a sample of the firm’s recent work products and evaluated those for compliance with quality standards outlined in the RFP. The committee found American Truck and Trailer Body’s proposal and work products in substantial compliance with the requirements of the RFP, and recommends that a contract be issued for this work. CMR:248:06 Page 2 of 3 Since it is difficult-to quantify exactly what work might be required over a three-year period, pricing was requested for 10 projects that are typical of the work that will be accomplished, during the course of this contract. American Truck and Trailer Body Company submitted a total price of $111,948 for these projects. Based on this information, Equipment Management expects to spend approximately $500,000 on the 25-30 estimat~l projects that are to be completed each year. RESOURCE IMPACT Funds have been budgeted for this contract in the FY 2005-06 Public Works Department Vehicle Replacement Budget and 2006-07 Vehicle Replacement Capital Improvement Program. POLICY IMPLICATIONS Authorization of the contract does not represent any change to the existing policy. ENVIRONMENTAL REVIEW Contractor is required to comply with all federal, state and local environmental laws and regulations applicable to track body fabrication and truck equipment installation services. ATTACHMENTS Attachment A: Contract PREPARED BY: DEPARTMENT HEAD: Fleet Manager GLENN ROBERTS Director of Public Works CITY MANAGER APPROVAL:iON City Manager CMR:248:06 Page 3 of 3 City of Palo Alto Contract No. C07111853 GENERAL SERVICES AGREEMENT THIS AGREEMENT made and entered into on the 3rd day of July, 2006, by and between the CITY OF PALO ALTO (" CITY"), and American Truck & Trailer Body Company, Inc., a California corporation located at 100 W. Valpico Road, Bldg. "D", Tracy, CA 95376 (Phone) 800-499-8985 ("CONTRACTOR"). In consideration of their mutual covenants, the parties hereto agree as follows: 2° SERVICES. CONTRACTOR shall provide or furnish the services ("Services") described in the Scope of Services, attached as Exhibit A. EXHIBITS. The following exhibits are attached to and made a part of this Agreement: X "A"- Scope of Services X "B"- Schedule of Performance X "C" - Compensation x "D" - Insurance Requirements x "E" - Discrimination Compliance Form I-"F" - Performance and!or Payment Bond (not used) if___"G" - Liquidated Damages (not used) CONTRACT IS NOT C01~tPLETE UNLESS ALL EXHIBITS ARE A TTACHED. TERM. (a) The term of this Agreement is from July 3, 2006 to June 30, 2007, inclusive, subject to the provisions of subsection 3.(b) and Section Q of the General Terms and Conditions. (b)CITY has the right to extend the term of this Agreement for two (2) additional one year periods (the "Additional Terms"), based upon the same conditions of the initial term, subject to adjustments for compensation as set forth in Section E of the General Terms and Conditions. CITY shall notify CONTRACTOR in writing of its exercise of its option for an Additional Term not less than thirty (30) days prior to the end of the then current term. CITY’s exercise of its right to extend the term of this Agreement is not a waiver of the "time is of the essence" provision in Section 4. SCHEDULE OF PERFORMANCE. CONTRACTOR shall complete the Services within the term of this Agreement in a reasonably prompt and timely manner based upon the circumstances and direction communicated to CONTRACTOR, and if applicable, in accordance with the schedule set forth in the Schedule of Performance, attached as Exhibit B. Time is of the essence in this Agreement. COMPENSATION. CITY shall pay and CONTRACTOR agrees to accept as not to exceed compensation for the full performance of the Services and reimbursable expenses, if any: A sum calculated in accordance with the fee schedule set forth in Exhibit C; not to exceed a total maximum compensation amount of five hundred thousand dollars ($500,000.00) for the first year with an option to renew for two additional years for five hundred thousand ($500,000) for each year. CONTRACTOR agrees that it can perform the Services for an amount not to exceed the total maximum compensation set forth above. Any hours worked or services performed by CONTRACTOR for which payment would result in a total exceeding the maximum amount of compensation set forth above for performance of the Services shall be at no cost to CITY. 050809 sm 0100394 Page 1 of 16 City of Palo Alto Contract No. C07111853 INVOICING. Send all invoices to the CITY, Attention: Project Manager. The Project Manager is Keith LaHaie, Public Works Department, Equipment Management Division, at 3201 E. Bayshore Road, Palo Alto, CA 94303 (Phone) 650-496-6948. Invoices shall be submitted in arrears for Services performed. Invoices shall not be submitted more frequently than monthly. Invoices shall provide a detailed statement of Services performed during the invoice period and are subject to verification by CITY. CITY shall pay the undisputed amount of invoices within 30 days of receipt, or earlier as negotiated on each release task order. GENERAL TERMS AND CONDITIONS A.ACCEPTANCE. CONTRACTOR accepts and agrees to all terms and conditions of this Agreement. This Agreement includes and is limited to the terms and conditions set forth in sections 1 through 6 above, these general terms and conditions and the attached exhibits. Bo QUALIFICATIONS. CONTRACTOR represents and warrants that it has the expertise and qualifications to complete the services described in Section 1 of this Agreement, entitled "SERVICES," and that every individual charged with the performance of the services under this Agreement has sufficient skill and experience and is duly licensed or certified, to the extent such licensing or certification is required by taw, to perform the Services. CITY expressly relies on CONTRACTOR’s representations regarding its skills, knowledge, and certifications. CONTRACTOR shall perform all work in accordance with generally accepted business practices and performance standards of the industry, including all federal, state, and local operation and safety regulations. Do INDEPENDENT CONTRACTOR. It is understood and agreed that in the performance of this Agreement, CONTRACTOR and any person employed by CONTRACTOR shal! at all times be considered an independent CONTRACTOR and not an agent or employee of CITY. CONTRACTOR shal! be responsible for employing or engaging all persons necessary to complete the ~vork required under this Agreement. SUBCONTRACTORS. CONTRACTOR may not use subcontractors to perform any Services under this Agreement unless CONTRACTOR obtains prior written consent of CITY. CONTRACTOR shall be solely responsible for directing the work of approved subcontractors and for any compensation due to subcontractors. Eo COMPENSATION DURING ADDITIONAL TERaMS. CONTRACTOR’s compensation rates may be adjusted effective on the commencement of each Additional Term. The maximum compensation in Section 5 above, and the rates provided in Exhibit E, may be increased by an amount not to exceed the percentage increase in the Consumer Price Index for Urban Wage Earners and Clerical Workers for the San Francisco-Oakland- San Jose area, published by the United States Department of Labor Statistics (CPI) which is published most immediately preceding the commencement of the applicable Additional Term, which sha!l be compared with the CPI published most immediately preceding the commencement date of the then expiring term. Notwithstanding the foregoing, in no event shall CONTRACTOR’s compensation rates be increased by an amount exceeding five percent of the rates effective during the immediately preceding term. Any adjustment to CONTRACTOR’s compensation rates shal! be reflected in a written amendment to this Agreement. F.TAXES AND CHARGES. CONTRACTOR shall be responsible for payment of all taxes, fees, contributions or charges applicable to the conduct of CONTRACTOR’s business. G.COMPLIANCE WITH LAWS. CONTRACTOR shall in the performance of the Services comply with all applicable federal, state and local laws, ordinances, regulations, and orders 050809 srn 0100394 Page 2of 16 City of Palo Alto Contract No. C07111853 Ko Lo DAMAGE TO PUBLIC OR PRIVATE PROPERTY. CONTRACTOR shall, at its sole expense, repair in kind, or as the City Manager or designee shall direct, any damage to public or private property that occurs in connection with CONTRACTOR’s performance of the Services. CITY may decline to approve and may withhold payment in whole or in part to such extent as may be necessary to protect CITY from loss because of defective work not remedied or other damage to the CITY occurring in connection with CONTRACTOR’s performance of the Services. CITY shall submit written documentation in support of such withholding upon CONTRACTOR’s request. When the grounds described above are removed, payment shall be made for amounts withheld because of them. WARRANTIES. CONTRACTOR expressly warrants that all services provided under this Agreement shall be performed in a professional and workmanlike manner in accordance ~vith generally accepted business practices and performance standards of the industry and the requirements of this Agreement. CONTRACTOR expressly ~varrants that all materials, goods and equipment provided by CONTRACTOR under this Agreement shall be fit for the particular purpose intended, shall be free from defects, and shall conform to the requirements of this Agreement. CONTRACTOR agrees to promptly replace or correct any material or service not in compliance with these warranties, including incomplete, inaccurate, or defective material or service, at no further cost to CITY. The warranties set forth in this section shall be in effect for a period of one (1) year from completion of the Services and shall survive the completion of the Services or termination of this Agreement. "Completion of Services" is defined as the date on. ~vhich each project covered by this agreement is completed and placed into service at the City of Palo Alto. Component manufacturer warranty coverage will be transferred to the City of Palo Alto. Copies of all applicable warranty coverage documentation will be provided at the time of delivery of each project. MONITORING OF SERVICES. CITY may monitor the Services performed under this Agreement to determine whether CONTRACTOR’s work is completed in a satisfactory manner and complies with the provisions of this Agreement. CITY’S PROPERTY. Any reports, information, data or other material (including copyright interests) developed, collected, assembled, prepared, or caused to be prepared under this Agreement will become the property of CITY without restriction or limitation upon their use and will not be made available to any individual or organization by CONTRACTOR or its subcontractors, if any, without the prior written approval of the City Manager. AUDITS. CONTRACTOR agrees to permit CITY and its authorized representatives to audit, at any reasonable time during the term of this Agreement and for three (3) years from the date of final payment, CONTRACTOR’s records pertaining to matters covered by this Agreement. CONTRACTOR agrees to maintain accurate books and records in accordance with generally accepted accounting principles for at least three (3) following the terms of this Agreement. NO IMPLIED WAIVER. No payment, partial payment, acceptance, or partial acceptance by CITY shall operate as a waiver on the part of CITY of any of its rights under this Agreement. INSURANCE. CONTRACTOR, at its sole cost, shall purchase and maintain in ful! force during the term of this Agreement, the insurance coverage described in Exhibit D. Insurance must be provided by companies with a Best’s Key rating of A-:VII or higher and which are otherwise acceptable to the Ctiy’s Risk Manager. The City’s Risk Manager must approve deductibles and self-insured retentions. In addition, all policies, endorsements, certificates and/or binders are subject to approval by the Risk Manager as to form and content. CONTRACTOR shal! obtain a policy endorsement naming the City of Palo Alto as an additional insured under any general liability or automobile policy. CONTRACTOR shall obtain an endorsement stating that the insurance is primary coverage and will not be canceled or materially reduced in coverage or limits until after providing 30 days prior written notice of the cancellation or modification to the City’s Risk Manager. CONTRACTOR shall provide certificates of such policies or other evidence of 050809 srn 0100394 Page 3of 16 City of P alo Alto Contract No. C07111853 coverage satisfactory to CITY’s Risk Manager, together with the required endorsements and evidence of payment of premiums, to CITY concurrently with the execution of this Agreement and shall throughout the term of this Agreement provide current certificates evidencing the required insurance coverages and endorsements to the CITY’s Risk Manager. CONTRACTOR shall include all subcontractors as insured under its policies or shall obtain and provide to CITY separate certificates and endorsements for each subcontractor that meet all the requirements of this section. The procuring of such required policies of insurance shall not operate to limit CONTRACTOR’s liability or obligation to indemnify CITY under this Agreement. N. HOLD HARMLESS. To the fullest extent permitted by law and without limitation by the provisions of section F. relating to insurance, CONTRACTOR shall indemnify, defend and hold harmless CITY, its Council members, officers, employees and agents from and against any and all demands, claims, injuries, losses, or liabilities of any nature, including death or injury to any person, property damage or any other loss and including without limitation all damages, penalties, fines and judgments, associated investigation and administrative expenses and defense costs, including, but not limited to reasonable attorney’s fees, courts costs and costs of alternative dispute resolution), , arising out of, or resulting in any way from or in connection with the performance of this Agreement. The CONTRACTOR’s obligations under this Section apply regardless of whether or not a liability is caused or contributed to by any negligent (passive or active) act or omission of CITY, except that the CONTRACTOR shall not be obligated to indemnify for liability arising from the sole negligence or willful misconduct of the CITY. The acceptance of the Services by CITY shall not operate as a waiver of the right of indemnification. The provisions of this Section survive the completion of the Services or termination of this Contract. Oo NON-DISCRIMINATION. In the performance of this Contract, CONTRACTOR shall not discriminate against any employee or applicant for employment because of race, skin color, gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, marital status, familial status, weight or height of such person. CONTRACTOR agrees to meet all requirements of Palo Alto Municipal Code, Chapter 2.30 pertaining to nondiscrimination in employment, including completing the Non-Discrimination Compliance Form, attached hereto as Exhibit D, and incorporated herein by this reference. WORKERS’ COlVIPENSATION. CONSULTANT, by executing this Agreement, certifies that it is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that Code, and certifies that it will comply with such provisions, as applicable, before commencing and during the performance of the Services. TERMINATION. The City Manager may terminate this Agreement without cause by giving ten (10) days’ prior ,~Titten notice thereof to CONTRACTOR. If CONTRACTOR fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, the City Manager may terminate this Agreement immediately upon written notice of termination. Upon receipt of such notice of termination, CONTRACTOR shall immediately discontinue performance. CITY, CITY shall pay CONTRACTOR for services satisfactorily performed up to the effective date of termination. If the termination if for cause, CITY may deduct from such payment the amount of actual damage, if any, sustained by CITY due to Contractor’s failure to perform its material obligations under this Agreement. Upon termination, CONTRACTOR shall immediately deliver to the City Manager any and all copies of studies, sketches, drawings, computations, and other material or products, whether or not completed, prepared by CONTRACTOR or given to CONTRACTOR, in connection with this Agreement. Such materials shall become the property of CITY. R.ASSIGNMENTS/CHANGES. This Agreement binds the parties and their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred 050809 sm 0100394 Page 4 of 16 City of Palo Alto Contract No. C07111853 without the prior written consent of the CITY. No amendments, changes or variations of any kind are authorized without the written consent of the CITY. So CONFLICT OF INTEREST. In accepting this Agreement, CONTRACTOR covenants that it presently has no interest, and will not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of this Contract. CONTRACTOR further covenants that, in the performance of this Contract, it will not employ any person having such an interest. CONTRACTOR certifies that no City Officer, employee, or authorized representative has any financial interest in the business of CONTRACTOR and that no person associated with contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Contract. CONTRACTOR agrees to advise CITY if any conflict arises. T.GOVERNING LAW. This contract shall be governed and interpreted by the laws of the state of California. Uo ENTIRE AGREEMENT. This Agreement, including all exhibits, represents the entire agreement between the parties with respect to the services that may be the subject of this Agreement. Any variance in the exhibits does not affect the validity of the Agreement and the Agreement itself controls over any conflicting provisions in the exhibits. This Agreement supersedes all prior agreements, representations, statements, negotiations and undertakings whether oral or written. go NON-APPROPRIATION. This Agreement is subject to the fiscal provisions of the Charter of the City of Palo Alto and the Palo Alto Municipal Code. This Agreement will terminate without any penalty (a) at the end of any fiscal year in the event that funds are not appropriated for the following fiscal year, or (b) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Contract are no longer available. This Section shall take precedence in the event of a conflict with any other covenant, term, condition, or provision of this Contract. 050809 sm 0100394 Page 5 of 16 City of Palo Alto Contract No. C07111853 THIS AGREEMENT SHALL BECOME EFFECTIVE UPON ITS APPROVAL AND EXECUTION BY CITY. IN WITNESS WHEREOF, THE PARTIES HAVE EXECLFrED THIS AGREEMENT THE DAY, MONTIt, AND YEAR FLRST WRITI~N ABOVE. APPROVED AS TO FORaM:CITY OF PALO ALTO Senior Asst City Attorney Assistant City Manager APPROVED: Director of Administrative Services AaMERICAN TRUCK & TR~ILER BODY COMPANY, INC. Taxpayer Identification No. f (Compliance with Corp. Code § 313 is required ff thc entity on ,*’hose behalf this contract is signed is a corporation. In the alternative, a certified corporate resolution attiring to the signatory authority of the individuals signing in their respective capacities is acceptable) 050809 sm 0100394 Page 6 of 16 City of Palo Alto Contract No. C07111853 EXHIBIT A SCOPE OF SERVICES The City undertakes between 20 and 40 truck and trailer upfitting projects annually. Projects range from light-duty service bodies, to ten-yard dump trucks, specialized platform bodies, crane trucks, workshop trailers, etc. A.SUMMARY Contractor shall furnish, fabricate and install truck bodies, van interiors, materia! racks, trailer hitches, power take-off units, hydraulic systems, electrical systems, generators, warning and work lighting, and other associated equipment and accessories. The Contractor shall perform truck frame modifications, driveshaft modifications, and other related services as required to successfully complete truck body upfitting projects. In addition to performing installation and fabrication work, the Contractor shall provide design and technical consultation services, cost estimates, project schedules and weight studies. B.PROJECT REQUESTS City staff will initiate upfitting projects via a "project request." Each project request shall be identified by a City-assigned project number that will be referenced throughout the life of the project. Project requests shall generally be accompanied by a set of general specifications, and occasionally, layout drawings. C.PROJECT MANAGER The Contractor shall assign a Project Manager to act as a single point of contact for all City projects. The Project Manager shall be able to provide and maintain project schedules, provide cost information, and respond to questions posed by the City staff. D.DESIGN SERVICES Contractor shall provide design services. Design services shall be provided on an as-needed basis. Contractor shall employ a qualified automotive or mechanical engineer, or have access to the services of an engineering firm. City-provided layout drawings and specifications will need to be revie~ved thoroughly by the Contractor to confirm the feasibility and cost-effectiveness of each project. The Contractor shall recommend alternatives to the proposed specifications as necessary to insure a successful project outcome. Contractor shall prepare engineering and approval drawings via an Autocad® compatible computer-aided drafting (CAD) application. When necessary, the Contractor shall conduct weight studies utilizing appropriate software applications. 050809 sm 0100394 Page 7 of 1 6 City of Palo Alto Contract No. C07111853 o UPDATES AND COMMIYNICATIONS Contractor shall provide weekly updates to the City’s Project Manager for all projects currently in progress. Updates may be provided via electronic mail. If questions arise during the course of work on any project, Contractor shall contact the City Project Manager. Contractor shall provide high-resolution digital photographs of projects in progress upon request, and transmit them via electronic mail. FACILITIES. EQUIPMENT AND PERSONNEL Contractor shall perform, at their facility, all metal fabrication, mechanical, hydraulic, pneumatic, electrical and paint work required to complete a given project. All work shall be performed by journey-level trades people in their area of expertise. In order to successfully complete the projects described in this Scope of Services, Contractor shall possess a fully-equipped fabrication and installation facility, and employ a staff of qualified and certified technicians. o FABRICATION AND MECHANICAL WORK All parts, components, equipment and accessories, whether supplied by the Contractor or the City, must be completely installed, assembled and/or adjusted as required by manufacturer’s specifications and/or the specifications provided by City for each project. All items must conform in strength, quality of material and workmanship to recognized industry standards. Metal Fabrication Work a.General Contractor shall perform precision metal fabrication work using aluminum, mild steel, abrasion-resistant steel, and stainless steel. b.At a minimum, Contractor shall: ¯Machine bend and shear steel sheet up to ¼" thickness. ¯Machine punch, radius, roll and form all types of sheet metal. ¯Machine bend tubing, fiat bar and round stock ¯Fabricate rings, hooks and other common shapes. WELDING WORK All xvelding xvork shall be performed in accordance with American Welding Society Standard D14.4-97 (Specification for Welded Joints in Machinery and Equipment), and any other AWS, ANSI or SAE standards applicable to welding practices, materials, and quality control procedures. All weld beads shall be even and continuous, without excessive splatter. All weld beads shall exhibit full penetration, and any weld splatter shall be removed prior to finishing. All fabricated parts shall be ground smooth, and all holes shall be de-burred. The edges of all flame-cut parts shall be ground flat and smooth. 050809 sm 0100394 Page 8 of 1 6 City of Palo Alto Contract No. C07111853 Jo 10. 11. 12. 13. 14. 15. 16. ELECTRICAL WORK The minimum standard applicable to all City projects shall be Society of Automotive Engineers Standard J1292 (Automobile, Truck, Truck-Tractor, Trailer, and Motor Coach Wiring). Wire and cable used in City projects shall be appropriate for the application, in accordance with SAE Jl128 (Low Tension Primary Cable). All low voltage DC wiring shall be GXL grade or higher. Contractor shall properly route, secure and protect all wiring and wire harnesses. The use of adhesive-backed tie anchors, "Scotchlock" devices and electrica! tape in any installation is strictly prohibited. Open, "crimp" type connectors are not acceptable for exterior connections. All electrical components, including wiring, shall be rated at 125% of maximum intended load. All wiring shall be color-coded and/or numbered; and shall terminate in sealed, weatherproof connections. All wiring used for stop, turn, tail and clearance lights on truck bodies shall consist of modular harnesses, with integrated, weatherproof connectors. Chassis wiring harnesses shall not be cut, tapped or spliced. Any connections to the chassis harness shall be made via connectors supplied by the chassis OEM. All exposed exterior wiring, and any wiring running inside compartments shall be protected by a raceway, channel or conduit. In all areas where wiring is not protected by conduit, it shall be protected by heat-resistant (300°) loom. Hard plastic (snap-in or glue-in) or rubber grommets shall be installed wherever wiring passes through walls or partitions. All wiring shall be secured with plastic cable ties and/or rubber-coated aluminum or steel cable clamps. Self-adhesive tie mounts or wire clips are not acceptable. Wherever practical, wiring looms shall be tied together, and clamped to bulkheads and fi:ame members to insure maximum security and vibration resistance. Wire !ooms shall not be attached to hose bundles. All continuous runs of wiring shall be securely supported at intervals of t 6 inches or less. All AC wiring shall be enclosed in liquid-tight flexible non-metallic conduit, unless otherwise noted. All stop, turn, tail and clearance light assemblies (other than those installed by chassis OEM) shall be Truck-Lite® LEDSelectTM (or approved equal). PAINTING AND FINISHING 050809 sm 0100394 Page 9 of 16 City of Palo Alto Contract No. C07111853 o o 4° Contractor shall perform high-quality, automotive paint work using industry-standard two- component acrylic urethane finishes. All paint finishing work shall be accomplished in an appropriately-sized paint booth. Paint finishes shall be expected to last the life of the vehicle (average 10 years) in most cases, assuming normal wear and tear. High-quality metal preparation procedures shall be employed to prevent peeling, bubbling and flaking of finish paint. High quality finish paint products shall be used, to prevent fading and chalking. Finish paint shall not be applied to unprimed surfaces. All exposed bare metal surfaces shall be covered. All items that are finish painted by the manufacturer shall retain their original finish unless otherwise specified. Any paint finish that is damaged during the installation of a component shall be restored using the original color(s) and paint processes at no cost to the City. "Spray can" touchups are unacceptable. All filters, identification tags and nameplates shall be masked before painting. All fabricated brackets and loose parts shall be finished prior to installation, to insure full coverage. All interior spaces and voids shall be primed and painted, to insure maximum corrosion resistance. Utility bodies shall be prepared and prime-painted by the manufacturer in accordance with the requirements noted in section "L", item 5 below. The underside of all mack bodies shall be coated with an automotive underseal compound. All bodies, painted parts and accessories shall be finished with two (2) coats of acrylic methane. Contractor shall provide, either themselves, or through a subcontractor: ¯Electrostatic powder-coat painting ¯"Line-X" or "Rhino-Lining" spray on mack bedliners MATERIALS AND PRODUCTS Contractor shall furnish all mack bodies, equipment, supplies and materials required to complete each project request, unless otherwise noted. All materials used on City projects must be new, in undamaged condition, and of the highest quality and appropriate for the application. No used, recycled, or waste materials shall be used without the express permission of City Project Manager. Contractor shall furnish the following products - listed by manufacturer: ¯Adrian Steel - Van interiors, truck toolboxes and accessories ¯Autocrane - Track-mounted cranes ¯Hannay - Hose and cable reels ¯Heil - Dump bodies and accessories 050809 sm 0100394 Page 10 of 1 6 City of Palo Alto Contract No. C07111853 ¯Holland - Hitches and couplers ¯Honda - Generators and power equipment ¯Knapheide - Service and platform bodies and accessories (up to 132") ¯Kwik-Raze - Floodlights and poles ¯Muncie - Power take-off units ¯Tommy Lift - Liftgates ¯Transfer Flo~v - Auxiliary fuel tanks ¯Vanair - Underdeck and underhood air compressors ¯Warn - Winches and mounting kits ¯Weatherguard - Truck toolboxes, van interiors and accessories ¯Whelen - Emergency and warning lighting ¯Wired-Rite - Switch panels The above-listed items represent product lines in general use by the City. If contractor proposes source similar products from manufacturers other than those listed above, those product lines and manufacturers should be listed as part of the proposal when a project is being quoted. Provide manufacturer specifications or other documentation showing that the products offered meet or exceed the specifications of the products listed above. Utility Bodies - General Specifications: a.All utility, line, platform and dump bodies shall be Knapheide or an ~ equal. Locally-fabricated bodies are not acceptable. b.Contractor shall provide with their proposal a manufacturer’s full catalog of products, including brochures, feature lists, photographs and dimensional drawings of all bodies, components, options and accessories to the City. Electronic catalogs (via website, e-mail or CD) are preferable but not required. c.After assembly, completed utility bodies shall be cleaned via high-pressure spraying and immersion in an alkaline cleaning solution. After cleaning, utility bodies shall be pre- treated by immersion in a zinc phosphate and sealer bath. Epoxy primer shall then be applied to the body via immersion in a positively-charged immersion bath. The primed utility body shall then be cured at a minimum of 340° for 40 minutes. d.The underside of all bodies shall be undercoated. e.Utility bodies 132" in length and under shall include the following features: 1.14 gauge A40 galvanneal (both sides) steel body shell. 2.Cargo floor: 050809sm0100394 Page 11 of 16 City of Palo Alto Contract No. C07111853 Mo No Single rear wheel applications 12-gauge steel sheet Dual rear wheel applications 1/8" steel sheet Cargo floor will employ a return flange that interlocks with side compartments and eliminates the exposed seam between floor and side compartments Double-shell, 20 gauge A40 galvanneal (both sides) steel hat section reinforced doors. 5. 6. 7. Full-length, all stainless-steel continuous door hinges. Paddle-actuated, rotary style door latches, with adjustable strikers. Spring actuated "over-center" door closures on all vertical doors. The body mounting system will allow quick, safe remounting of the body from one chassis to another. System will meet FMVSS301 requirements. TRANSPORTATION Generally, projects will be planned such that truck chassis and trailers can be drop-shipped from the suppliers directly to the Contractor’s facility. However, when this is not feasible, Contractor shall arrange transportation of chassis units from the City’s Municipal Services Center (MSC) to their facility. Contractor shall be responsible for transporting completed vehicles from their facility to the MSC. Contractor shall comply with all applicable insurance requirements during the term of the contract for this work. INSPECTIONS/ACCEPTANCE The City of Palo Alto shall have the right to inspect projects at any time during construction. Scheduled inspections will generally occur just prior to fmal painting, and occasionally, prior to delivery. Contractor shall provide three (3) working days notice to City prior to scheduled inspections. Contractor shall make every effort to coordinate inspections so that several projects may be inspected at one time. Approval or disapproval of final engineering design, quality of workmanship and adherence to specifications shall be confirmed in writing by City. Completed projects shall be delivered within five (5) working days of acceptance or such other time as City’s Project Manager authorizes. TRAINING From time to time, projects may include equipment, components or devices with which City staff may be unfamiliar. Upon request, Contractor shall provide training on these components, or make arrangements for the training through the manufacturer or distributor of the component. All training shall be conducted within 15 working days of request by City INVOICING City-assigned project numbers shall referenced on all invoices submitted by the Contractor. 050809 sm 0100394 Page 12 of 1 6 City of Palo Alto Contract No. C07111853 o No Contractor shall submit a final invoice for each project within 10 working days of project completion. Final invoices shall be itemized, in a format identical to that used for the cost estimates. The manufacturer and model number of each major component wil! be noted, and each installation shall be described in detail. The cost of shop supplies and generic items such as wire, cable, fasteners, and plumbing components may be shown in a single category. PROGRESS PAYMENTS Construction of the projects covered in this Scope of Services will require the purchase of many expensive components or accessories. The Contractor may submit invoices for these items upon their receipt. All invoices must be verifiable, and the City-assigned project number must be noted on each invoice. All progress payments shall be shown as credits on the final invoice. CITY STAFF CONTACTS The following City staff will be managing and coordinating projects under this contract: Name Keith LaHaie Title Fleet Manager Telephone 650.496.6948 Responsibilities Project budgets, specifications, scheduling Scheduling, inspections Transportation, parts sourcing Payments Marc Muzzi Assistant Fleet Manager 650.496.6935 Tom Schroyer Fleet Services Coordinator 650.496.6909 Bev Woods Program Assistant 650.496.6922 050809 sm 0100394 Page 13 of 16 City of Palo Alto Contract No. C07111853 EXHIBIT B SCHEDULE OF PERFORMANCE The Contractor shall be required to provide an itemized cost estimate (see Exhibit "C") and a project schedule within 15 working days of receiving a project request unless extended by the City’s Project Manager. Cost estimates wilt be used by City staff to insure that there is an adequate budget for each project, and to insure that the proposed project is cost-effective. Estimates shall show the total price (including installation and paint if applicable) of all major components; including, but not limited to: utility bodies, cranes, generators, liftgates, winches, and warning light systems. The cost of shop supplies and generic items such as wire, cable, fasteners, and plumbing components may be shown in a single category. Project schedules shall show the production start date, significant milestones, pre-paint inspection date, and delivery date. Schedules may be adjusted, as mutually agreed upon by the Contractor and the City, to accommodate delays in the receipt of track chassis. City staff will review the cost estimate and project schedule prior to giving approval to proceed. project specifications may be changed after the cost estimate is reviewed by City staff. Changes may be made based on the available project budget, and other factors, and shall be approved by the City’s Project Manager. Changes exceeding ten (10) percent of the original task order price, and every order after that shall be approved by the Director of Public Works. If significant changes are required during the course of a project due to change(s) requested by the City or suggested by the Contractor, the Contractor shall provide a revised cost estimate and a schedule (if necessary) reflecting the changes to the City’s Project Manager for approval. A task order shall be made in the form the City’s release purchase order and shall serve as the notice to proceed for each project. The task order will be issued incorporating project schedules and fmal cost estimates. Failure by the Contractor to adhere to the project schedules they submit shall be a factor during consideration for any future contract renewal. If the Contractor is delayed or obstructed in completing a project for reasons beyond their control, the delivery date may be extended for a period mutually agreed upon in writing by the Contractor and the City. 050809 sm 010039"4 Page 14 of 16 City of Palo Alto Contract No. C07111853 EXHIBIT C SCHEDULE OF FEES All Payments a.re based upon City’s acceptance of Contractor’s performance of each project as evidenced by successfifl completion of the Deliverable for that project. City shall have no obligation to pay unless Contractor has successfully completed and City has approved the Project for which payment is due. PRICING, RATES AND FEES A.TRUCK BODIES AND ACCESSORIES Pricing shall include, but not be limited to: ¯Installation of the body and any listed accessories ¯Body preparation and finish painting ¯Round-trip transportation of the chassis to/from the vendor’s facility to/from the City of Palo Alto All utility bodies and dump bodies shall meet the requirements of the Scope of Services Unless otherwise noted, all utility bodies shall include the following features and accessories: ¯Interior strip lighting, appropriately protected, (National Specialty Lighting "Brite Strip #BL-3-100) in each compartment. ¯Stop, turn, tail and clearance lights as in the Scope of Services ¯.100" satin-finish aluminum treadplate on top of each compartment ¯Chrome grab handles at the rear of body (one each side) ¯Treadplate bumper, with pintle hook recess B.GENERAL ACCESSORIES The pricing in the original request for proposal shall serve a basis for the pricing for the individual projects to be completed during the term of the contact. A price list of accessories shall be kept current and maintained with the City of Palo Alto during the term of the contract. Pricing shall include the cost of vehicles being picked up from the City’s Municipal Service Center (MSC) and returned to the MSC after completion. C.FEES Hourly Rates Service Type Hourly Rate $75.0ODesign and technical consultation services $75.00 Fabrication and installation services $75.00 Repairs 050809sm0100394 Page 15 of 16 City of Palo Alto Contract No. C07111853 MATERIALS AND PARTS I. Product Line (List other items available) System Edstrom Autocrane Hannay Heil Holland Honda Knapheide Kwik-Raze Muncie Star-Beam Tommy Lift Transfer Flow Vanair Warn Weatherguard Whelen Wired-Rite Discount/Markup (from price list noted in right- hand column) Price List Type None List None List None List None List None List None List None List None List None List None List None List None List None List None List None List None List None List City shall be given complete product literature and specification information by American Truck & Trailer Body Co., Inc. for the brands specified above. This information shall be kept current and maintained with the City during the term of the contract. 050809 sm 0100394 Page 1 6 of 16 ~IT D ~___C ORD. Copk, Disl"~.roon & Greathouso P~"O. Box 12909 Oakland CA 94604- Phone~510-437-1900 -,,, CERTIFICATE OF LIABILITY INSURANCE THIS C’~RTIFICATE IS 18SUED A~ A MATTER OF_ iNFORMATION -- ONLY ~J~ID CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE D~ES NOT A~END, EXTEND OR ALTER THE COVERAGE, AFFORDED By,,,,THE POLICIES BELOW. NAIC#INSURERS AFFORDING COVER~GI= INSURF--R ~ ~NSURER 8; INBURP~R C~ INSURER ~: HARTFORD INS. GROUP Berkshire ~athaway .... U, MIT$ $1,000,000 $300,000 s I0,000 s I, 0.00,000 $ I, 000,000 s I, 000,000_ $1,000,000- SS00.D~D SS31,V0S. CERTIFICATE HOLDER CITYPAL CITY O~ PALO ALTO PUrCHASiNG & CONTRACT A~MINI STRATZON P. O. BOX 110250 PAL0 ALTO CA 94,303 ACORD 25 (200110B) CANCELLATION .... DATE THERe, TH~ ~MG ~SURER ~ ~~L N~CE TO ~E C~F~TE HO~ER ~ TO THE L~. IMPO~ ~ O~N OR L~ OF ~Y ~O UPON TH~ ~ ACORD CORPO~ON EXHIBIT E Certification of Nondiscrimination As suppliers of goods or services to the City of Pale Alto, the firm and individuals listed below certify that they do not discriminate in employment of any person because of race, skin color, gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, madtal status, familial status, weight or height of such person; that they are in compliance with all Federal, State and local directives and executive orders regarding nondiscrimination in employment. 1.If Proposer is INDIVIDUAL, sign here: Date: Proposer’s Signature Proposer’s typed name and title If Proposer is PARTNERSHIP or JOINT VENTURE, at least (2) Partners or each of the Joint Venturers shall sign here: Partnership or Joint Venture Name (type or pdnt) Date: Member of the Partnership or Joint Venture signature Member of the Partnership or Joint Venture signature ¯ Date: 3.If Proposer Is a CORPORATION, the duly authorized officer(s) shall sign as follows: The undersigned certify that they are respectively: ("~T-~,& t ~.~ ,~.. v~ ~"and Title Title Of the corporation named belo~r, that they are designated to sign the Proposal Cost Form by resolution (attach a certified copy, with corporate seal, if applicable, notarized as to its authenticity or Secretary’s certificate of authorization) for and on behalf of the below named CORPORATION, and that they are authorized to execute same for and on behalf of said CORPORATION. Corporation N~~dnt) B Date: Z- Titl~ Date: Title: _., E ~. City of Palo Alto - RFP 111853