Loading...
HomeMy WebLinkAboutStaff Report 431-08’ Alto TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: UTILITIES DATE: REPORT TYPE: SUBJECT: NOVEMBER 10, 2008 CMR: 431:08 CONSENT Adoption of a Water Fund Budget Amendment Ordinance in the Amount of $35,000 and Approval of Amendment No. 2 to Contract C07120333 with RMC Water & Environment, Inc. in the Amount of $35,000 for a Total Not to Exceed amount of $302,700 for Completion of a Recycled Water Facility Plan and Preparation of Environmental Documents for Capital Improvement Program Project WS-070Ol, (Recycled Water Distribution System Extension) RECOMMENDATION Staff recommends that Council: Adopt a Budget Amendment Ordinance (BAO) in the amount of $35,000, transferring $35,000 from the Water Fund Rate Stabilization Reserve to existing Capital Improvement Project (CIP) WS-07001, (Recycled Water Distributi~on System Extension); and Approve and authorize the City Manager or designee to execute a second amendment to the existing contract with RMC Water & Enviro~maent, Inc. (Attachment A) for a not-to- exceed amount of $35,000 for planning and engineering design services for the Recycled Water Expansion Capital Improvement Program Project (WS-07001), bringing the total not to exceed amount of the contract to $302,700. BACKGROUND On April 16, 2007, the City Council approved and authorized the City Manager to execute a contract with RMC Water & Environment, Inc. (RMC) for preparation of a Recycled Water Facility Plan and preparation of associated environmental documents for Capital Improvement Program Project WS-07001 (CMR:191:07). The original contract included $220,700 for professional services and reimbursable expenses, plus a contingency of $22,000, for a total not to exceed amount of $242,700. The original scope of work focused primarily on preparation of a Recycled Water Facility Plan and associated environmental documents that would position the project to compete for State and Federal grant funding and low interest loans. This generally included analyses of all of the essential components of a potential expanded recycled water system to serve additional users in the City of Palo Alto. CMR: 431:08 Page 1 of 3 On June 2, 2008, the City Council approved the first amendment to the existing contract. The Amendment added an additional $25,000 to the original contract to complete various unforeseen activities that were largely driven by external state requirements for both the Facility Plan and the Administrative Draft Mitigated Negative Declaration (CMR 255:08). DISCUSSION This additional project cost increase can be attributed to a variety of factors that were not contemplated in the original budget or in the first Contract Amendment. The primary drivers for this request include: Financial Planning: The State Water Resources Control Board (SWRCB) recently provided comments on the Draft Facility Plan requesting the City prepare an in-depth financial cash flow analysis for the recycled water project. While a cash flow analysis is common for grant funding applications to the SWRCB, the SWRCB request is unusual at this stage in the process. However, staff believes completion of this activity now could result in beneficial cost and time savings in the long term. This task is expected to cost an additional $3,200. Revisions to the Administrative Draft Initial Study/Mitigated Negative Declaration (IS/MND) document: The original scope of the project contemplated providing one administrative draft to the City, followed by a public draft and a final document. To date there have been two administrative draft documents provided to the City’s Planning Department. A third review of the administrative draft is now deemed necessary. In addition, two issues related to the potential impacts of recycled water use on existing landscape and greenhouse gas emissions have required additional time and resources that was not foreseen in the original Scope of Work. This task is expected to cost an additional $20,000. Preparation of Reports: The current scope of work ~contemplated a limited amount of document preparation for the Facility Plan and the MND. Based on previous reviews of the Administrative Draft MND and Draft Facility Plan, staff is anticipating the current budget is inadequate to meet the need for additional copies. This task is expected to cost an additional $1,480. Project Management: The original project schedule has been delayed to address the aforementioned issues. Further extensions of the schedule require additional project management time and effort by the consultant. This task is expected to cost an additional $2,400. Completion of the additional work will require an expenditm-e of approximately $27,080. To ensure that there will be sufficient budget to complete all tasks, staff requests an additional $7,920 for a total not to exceed amount of $35,000. NEXT STEPS After the facility plan and environmental documents are complete, staff will pursue potential grant funding opportunities and develop a recommendation on whether to proceed towards construction of the required facilities.The recommendation will then be submitted to the Council for consideration. CMR: 431:08 Page 2 of 3 RESOURCE IMPACT A BAO is required in the amount of $35,000 to add funds to the existing recycled water CIP (WS-07001). With the additio.n of the $35,000, the amended budget for the project of $280,000 increases to $315,000, with $302,700 for the RMC contract and $12,300 for staff costs. To fund this amendment, $35,000 will be transferred from the Water Rate Stabilization Reserve (WRSR). The FY 08-09 WRSR Adopted Budget is $6,918,000, well within the minimum and maximum guidelines of $5,321,000 and $13,303,000. The requested contract amendment will have no material impact on budgeted reserve levels. The FY 07-08 Budget contained an expected grant from the SWRCB for this project of $75,000. Due.to the extensive project delay, the grant disbursement is not anticipated until the middle of the current fiscal year. The grant will result in a net project cost of $240,000. This project has no impact on the General Fund. POLICY IMPLICATIONS Amending the contract is consistent with Council policy. This project is consistent with the Council-adopted Water Integrated Resource Plan Guideline 3: "Actively participate in development of cost effective regional recycled water plans." The project is also consistent with Council direction to seek to reduce imported water supplies and limit or reduce diversions from the Tuolumne River. ENVIRONMENTAL REVIEW As part of this project, RMC is preparing an Initial Study and Mitigated Negative Declaration for this project. ATTACHMENTS A: BAO B: Amendment No. Two to Contract No. C07120333 C: RMC Cost estimate for Amendment No. Two PREPARED BY: REVIEWED BY: DEPARTMENT APPROVAL: CITY MANAGER APPROVAL: NICOLAS PROCOS Senior Resource Planner " JANE O. RATCHYE Assistant Director, ~~S~a@erEN~~/~ Management CMR: 431:08 Page 3 of 3 ATTACHMENT ORDINANCE NO, ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2008-09 TO PROVIDE AN ADDITIONAL APPROPRIATION OF $35,000 TO CAPITAL IMPROVEMENT PROGRAM (CIP] PROJECT WS-07001, RECYCLED WATER DISTRIBUTION SYSTEM EXTENSION The Council of the City of Palo Alto does ordain as follows: SECTION i, The Council of the City of Palo Alto finds and determines as follows: A, Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 9, 2008 did adopt a budget for fiscal year 2008-09; and B, In fiscal year 2006-07, the City Council appropriated S250,000 for cIP Project WS-07001, Recycled Water Distribution System Extension (Project], and in fiscal year 2007-08 City Council increased the appropriation by $30,000 bringing the total appropriation to $280,000; and C, In April 2007, the City Council awarded a contract to RMC Water Environment, Inc, (RMC) to prepare a recycled water facility plan and the associated environmental documents for the Project, and in June 2008, the City Council approved the first amendment to the contract as discussed in CMR:255:08; and D, Since the approval of the origina~ scope of work of RMC in April 2007 and the changes in the scope of work in June 2008, the scope of work had expanded due to various factors discussed in CMR:431:08; and E, An additional appropriation of $35,000 will be needed to provide the necessary resources for the additional scope of work The Water Fund Rate Stabilization Reserve will provide the funds and F, The appropriation of funds for CIP Project WS-07001 Recycled Water Distribution System Extension, is a one-time event and in future years maintenance and replacement costs will be included in the Water Fund budget; and G, City Council authorization is needed to amend the 2008-09 budget to make available the funds required for the additional scope of work of CIP Project WS-07001, Recycled Water Distribution System Extension, SECTION 2, The sum of Thirty-Five Thousand Dollars ($35,000) is hereby appropriated to CIP Project WS-07001, Recycled Water Distribution System Extension. SECTION 3. The Water Fund Rate Stabilization Reserve is hereby reduced by Thirty-Five Thousand Dollars ($35,000) to Six Million Eight Hundred Eighty Eight Thousand Dollars ($6,883,000). SECTION 4, The transactions above will have no impact on the General Fund Budget Stabilization Reserve, SECTION 5. As specified in Section 2,28.080(a) of the Palo Alto Municipal Code, a two-thirds vote of the City Council is required to adopt this ordinance, SECTION 6. As provided in Section 2.04.330 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. SECTION ?. The Project is currently undergoing an environmental review consisting of an Initial Study and Mitigated Negative Declaration, as required by the California Environmental Quality Act, INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED’ City Clerk Mayor APPROVED AS TO FORM: City Manager Deputy City Attorney Director of Utilities Department Director of Administrative Services CityWorks RECYCLED WATER DISTRIBUTION SYSTEM EXTENSION (WSo0700’[) Description: This project extends the existing recycled water distribution system to serve customers in Palo Alto. The primary new infrastructure will be a pipeline to deliver recycled water for irrigation and other nonpotable uses such as for processes and cooling towers to City-owned. facilities and commercial customers. The target service area is the Stanford Research Park and the project will serve City parks and other users along the pipeline route. Justification: Recycled water is a locally controlled water resource that is available even in water shortages such as droughts. Water resources are constrained in the Bay Area and there are ongoing pressures to maximize the use of locally available supplies. There are adequate supplies of recycled water produced at the Palo Alto Regional Water Quality Control Plant to meet this project’s needs. In addition, the cost of imported water supplies from San Francisco is projected to triple in the next 10 years. Consultant Services Scope: Completion of a Recycled Water Facilities Plan and preparation of environmental documents before June 30, 2009. Supplemental Information: This project does not look financially feasible if viewed only from the City of Palo Alto perspective. State grant funds are available for recycled water projects. In addition, funds may be available from the Santa Clara Valley Water District and the San Francisco Public Utilities Commission. Since the proj ect must receive outside funds to be feasible, getting the project in the "ready to go" stage is vital. For state grant funds, being "ready to go" means having completed a facilities plan and environmental review. ClP FACTS: ¯Project Status: Continuing ¯Timeline: FY 2008-2012 ¯ Managing Department: Utiliites ¯ Comprehensive Plan: Supports Comprehen- sive Plan Policy N-20 - Maximize the conserva- tion and efficient use of water in and existing residences, businesses, and industries. ¯ Board/Commission Review: PTC, UAC IMPACT ANALYSIS: ¯ Environmental: Project will require environ- mental review. ¯ Design Elements: Any above ground struc- tures will go through the appropriate review pro- cess. ¯ Operating: Project will increase utilities operat- ing costs. PY Budget PY Actuals as of 10/21/2008 $280,000 $273,035 Pre-Design Costs Design Costs Construction Costs Other Total Budget Request $35,000 $35,000 $35,000 $35,000 Revenues: Source of Funds:Water Rate Stabilization Reserve Consistent with the Water Integrated Resource Plan Guidelines, adopted by Council inCouncil Policy Direction:December 2003. 2008~09 Budget AMENDMENT NO. TWO TO CONTRACT NO. C07120333 BETWEEN THE CITY OF PALO ALTO A~ND RMC WATER AND ENVIRONMENT, INC. This Amendment No. Two to Contract No. C07120333 ("Contract") is entered into November I0, 2008, by and between the CITY OF PALO ALTO, a charter city and a municipal corporation of the State of California (~CITY"), and RMC Water and Environment, Inc., a California corporation, located at 2290 North First Street Suite 212, San Jose, CA 95131("CONSULTANT") . RECITALS: WHEREAS, the Contract was entered into between the parties for the provision of Recycled Water Facility Plan and Preparation of Environmental Documents; and WHEREAS, the parties wish to amend the Agreement to increase the compensation by an additional$35,000 for provision of financial planning, revisions to the environmental reports, preparation of environmental reports, and project management; NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the parties agree: SECTION i. to read as follows: Section 2 entitled "TERM" is hereby~ amended "TERM". The services and/or materials furnished under the Agreement shall commence on April 17, 2007 and shall be completed before June I, 2009. SECTION 2. Section 4 entitled "NOT COMPENSATION" is hereby amended to read as follows: TO EXCEED "SECTION 4. NOT TO EXCEED COMPENSATION". The compensation to be paid to CONSULTANT for performance of the Services described in Exhibit ~A", including both payment for professional services and reimbursable expenses, shall not exceed Two Hundred Seventy Two Thousand Seven Hundred Eighty Dollars ($272,780). In the event Additional Services are authorized, the total compensation for services and reimbursable expenses shall not exceed Twenty Nine Thousand Nine Hundred Twenty dollars ($29,920). The applicable rates and schedule of payment are set out in Exhibit "C", entitled ~COMPENSATION," which is attached to and made a part of this agreement. Additional Services, if any, shall be authorized in accordance with and subject to the provisions of Exhibit "C". CONSULTANT shal! not receive any compensation for Additional Services performed without the prior written authorization of CITY. Additional Services shall mean any work that is determined by CITY to be necessary for the proper completion of the Project, but which is not included within the Scope of Services described in Exhibit ~a". SECTION 3. Exhibit ~A" to the Agreement is hereby amended to include additional work required for financial planning, revisions to the mitigated negative declaration, preparation of reports, and project management. SECTION 4. Except as herein modified, all other provisions of the Agreement, including any exhibits and subsequent amendments thereto, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have by their d~ly authorized representatives executed this Amendment on the date first above written. CITY OF PALO ALTO: Deputy City Manager APPROVED AS TO FORM: Senior Asst. City Attorney RMC WATER AND ENVIRONMENT, INC. By ~ Name:,, Director of Administrative Services Attachments: Exhibit A - Scope of Services Exhibit B - Project Schedule Exhibit C - Compensation 08]029 srn 010 Scope of Services Exhibit A The additional scope and cost increase can be attributed to a variety of factors that were not contemplated in tile original budget or in Amendment Number One. The additional scope includes; Financial Planning: The State Water Resources Control Board (SWRCB) recently provided comments on the Draft Facility Plan requesting the City prepare an in-depth financial cash flow analysis for the recycled water project. While a cash flow analysis is cormnon for grant funding applications to the SWRCB, the SWRCB request is unusual at this stage in the process. However, staff believes completion of this activity at this time could result in beneficial cost and time savings in the long term. This task is expected to cost an additional $3,200. Revisions to the Administrative Draft Initial Study/Mitigated Negative Declaration (IS/MND) document: The original scope of the project contemplated providing one administrative draft to the City, followed by a public draft and a final document. To date there have been two administrative draft documents provided to the City’s Planning Department. A third review of the administrative draft is now deemed necessary. In addition, two issues related to the potential impacts of recycled water use on existing landscape and greenhouse gas emissidns have required additional time and resources that was not foreseen in the original Scope of Work. This task is expected to cost an additional $20,000. Preparation of Reports: The current Scope of Work contemplated a limited amount of document preparation for the Facility Plan and the MND. Based on previous reviews of the Administrative Draft MND and Draft Facility Plan, staff is anticipating the current budget is inadequate to meet the need for additional copies. This Task is expected to cost an additional $1,480. ®Project Management: The original project schedule has been delayed to address the aforementioned issues. Further extensions of the schedule are requiring additional project management time and effort by the consultant. This Task is expected to cost an additional $2,400.- Project Schedule Exhibit B The term of the contract is extended to June 1, 2009 Compensation Exhibit C Amendment 2 Task I - Financial Planning $ 3,200 Task 2 - IS/MND Documentation $20,000 Task 3 -Preparation of Reports $ 1,480 Task 4 - Project Management $ 2,400 Total $27,080 Additional Services $ 7,920 Total $35,000 ATTACHMENT C