HomeMy WebLinkAboutStaff Report 358-08TO:
FROM:
DATE:
SUBJECT:
HONORABLE CITY COUNCIL
CITY MANAGER
SEPTEMBER 8, 2008
DEPARTMENT: PLANNING AND
COMMUNITY ENVIRONMENT
CMR: 358:08
STUDY SESSION ON A 35-UNIT AFFORDABLE HOUSING PROJECT
LOCATED AT 488 W. CHARLESTON ROAD (TREE HOUSE)
PURPOSE/RECOMMENDATION
The key purpose of this study session is to discuss this affordable housing project proposed by
the Palo Alto Housing Corp, also known as the "Tree House" project, prior to the beginning of
the rezoning process for the site and the Architectural Review Board (ARB) review of the
development. Staff recommends that the City Council receive the presentation from staff and
applicant, and provide comments and input to the project.
DISCUSSION
The proposed project is a 35-unit 100% affordable housing project proposed by the Palo Alto
Housing Corporation (PAHC) to be located at the site currently occupied by Recording for the
Blind and Dyslexic, at 488 W Charleston Road. Two land use entitlements, rezoning and
architectural review, are required for this project. The proposed rezoning will change the
property from the existing Planned Community (PC) zoning designation to a High Density
Multiple-Family Residence District (RM-40). This rezoning will require that an environmental
evaluation be prepared, as discussed in the environmental review section below. Both the
rezoning and environmental review will initially be reviewed by the Planning & Transportation
Commission (PTC) for its recommendation and then by the City Council for a decision. The
architectural review will begin with a preliminary review of the development by the ARB at its
meeting of September 18, 2008, and will include a future application for Major Architectural
Review to the ARB, subsequent to the re-zoning, and a recommendation to the Director of
Planning and Community Environment.
The project description (Attachment A) also includes a discussion of concessions requested for
this project, pursuant to SB 1818 (State housing density law). The applicant is allowed a
maximum of three concessions under State law since greater than 30% of the total units are for
lower income households. The concessions currently requested are the following two:
1.Provision of no covered parking, where one is currently required per dwelling unit
CMR: 358:08 Page 1 of 3
2.Reduction in the required front setback (25 feet) to allow a 5-foot encroachment
These concessions are primarily requested so that the proposed development can be placed on
the site in a way that is sensitive to the many large oak trees to be retained. The reduction in the
number of parking spaces by 40% as described in the applicant’s project description letter as a
concession is allowed by in the Palo Alto Municipal Code (PAMC Section 18.52.050 Table 4).
The applicant, Palo Alto Housing Corp, and the project architect, Pyatok Architects Inc.
(designer of Oak Court Apartments), will provide a preview of the design concept for the project
at the study session and concept plans are attached.
RESOURCE IMPACTS
The City has allocated a total of $2,538,577 to the Palo Alto Housing Corporation (PAHC) for
site acquisition, of which $1,538,577 and $1,000,000 will come from the Community
Development Block Grant (CDBG) and the City Residential Housing Fund, respectively. The
total acquisition cost is estimated to be approximately $3,000,000. PAHC estimates the overall
development cost for the Tree House project to be $13.5 million. PAHC is currently
investigating other sources of financing for site acquisition and development in addition to the
City’s funding, including but not limited to, Low-Income Housing Tax Credits, the State Multi-
Family Housing Program, Proposition 1C Fund and the Santa Clara County Housing Trust Fund.
The PAHC will need to close escrow on the property by March 2009 in order to ensure that the
City meets the Department of Housing and Urban Development’s (HUD) standards for the
timely expenditure of CDBG funds. This March 2009 deadline therefore sets the timeline for the
required entitlements, described above.
POLICY IMPLICATIONS
The proposed project substantially supports housing policies to develop affordable rental housing
and is consistent with the Comprehensive Plan designation for the site.
ENVIRONMENTAL REVIEW
This project is subject to both National Environmental Policy Act (NEPA) and the California
Environmental Quality Act (CEQA) requirements. HUD environmental regulations require for
projects using CDBG money to prepare NEPA document. At present, the City has completed
preparation of the Section 106 Evaluation (Historic Resources Evaluation in compliance with the
National Historic Preservation Act of 1976) for the proposed project, which concluded that the
project would not affect significant historic resources. The findings from that evaluation were
sent to the State Historic Preservation Officer (SHPO); the City has received a letter from SHPO
concurring with the City’s findings. Staff is working with a consultant to prepare the Initial
Study and Environmental Assessment for the project. A completed document is anticipated to be
ready by the end of September and ready for public circulation by October 2008.
STATUS OF 801 ALMA AFFORDABLE HOUSING PROJECT
The Planned Community rezoning application for the Palo Alto Family and Senior Housing, an
affordable housing project with two mixed use buildings proposed at 801, 853, 875 Alma, has
been filed with the City. The applicant met with City’s Development Review Committee on
August 20, 2008 and heard initial feedback from the various departments. The applicant also
received preliminary comments on the design of the project at a preliminary Architectural
CMR: 358:08 Page 2 of 3
Review Board public hearing on September 4, 2008. The City has contracted with David J.
Powers and Associates to prepare an Environmental Impact Report (EIR) to comply with the
California Environmental Quality Act. Staff anticipates that a minimum of six months will be
needed to prepare the EIR for public circulation. An amendment to the City’s pre-development
agreement will be scheduled for Council before the end of September to address pending
schedule and title transfer issues.
PREPARED BY:
JENNIFER CUTLER
Planner
DEPARTMENT HEAD:
CURTIS WILLIAMS
Interim Director of Planning and Community Environment
CITY MANAGER APPROVAL:
JAMES KEENE
City Manager
ATTACHMENTS:
Attachment A: Project Summary
Attachment B: Project Timeline
Attachment C: Project Plans (Council Members only)
CMR: 358:08 Page 3 of 3