HomeMy WebLinkAboutStaff Report 348-08City of Palo Alto City Manager’s Report 8 TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: SUBJECT: SEPTEMBER 8, 2008 CMR:348:08 APPROVAL OF AMENDMENT NO. 1 TO REFUSE ENTERPRISE FUND CONTRACT NO. C06115396 WITH SCS FIELD SERVICES IN THE AMOUNT OF $32,500 FOR A TOTAL AMOUNT OF $432~192 FOR SERVICES RELATED TO THE REPAIR OF FIRE-DAMAGED LANDFILL GAS AND LEACHATE COLLECTION SYSTEM COMPONENTS AND FOR PREVENTIVE MEASURES OF BURYING LANDFILL GAS WELLHEADS TO PREVENT FIRE RELATED DAMAGE IN THE CASE OF FUTURE FIRES RECOMMENDATION Staff recommends that Council approve and authorize the City Manager or his designee to execute Amendment No. 1 to Contract C06115396 with SCS Field Services (SCS) expanding the scope of work and increasing the maximum compensation by an amount of $32,500 for a total contract amount not to exceed $432,192 for the total three year term of this maintenance contract. BACKGROUND On Wednesday July 23, 2008 a fire occurred at the Palo Alto Composting Facility (located on top of a 7.5 acre section of the Palo Alto Landfill). The fire apparently originated in the stockpile of unprocessed green material that burned throughout the evening as fire crews attempted to extinguish the fire. The green material fire spread south of the facility aided by 30 mile per hour winds and caught a section of grass on fire. Before fire crews could extinguish the grass fire, several components of the above-ground landfill gas and leachate collection systems were severely damaged including sections of the 8" diameter HDPE header-pipe, several hundred feet of 1" and 4" diameter HDPE piping and two PVC wellheads as well as related fittings, hoses and other related components. The City’s environmental control systems (gas and leachate collection systems) maintenance contractor is "SCS Field Services (SCS)" based in Modesto. SCS was called the night of the fire and responded with personnel on the morning of Thursday, July 24, 2008. SCS assessed the damage and immediately began isolating the damaged gas and leachate system sections. SCS crews worked the week following the fire to replace the damaged pipelines and other components and to replace the two above-ground wellheads. SCS removed the damaged materials from the area and had completely repaired and restored the systems by Wednesday July 30, 2008. CMR:348:08 Page I of 2 In March 2006, Council approved a three-year service agreement with SCS to provide both routine and non-routine landfill gas and leaehate system~maintenance, monitoring and reporting for an amount not to exceed $131,868 for the first and second contract years and the third year increasing to $135,956. DISCUSSION SCS was directed to perform the emergency repairs under the City Manager’s emergency contract authority. It was necessary to complete these emergency repairs as soon as possible for the City to stay ".m compliance with its Title V air permit as well as to close-offpotentially explosive methane gas emissions in the vicinity of the green material .fire. This work was accomplished under the terms, conditions and unit pricing from the SCS Agreement Number C06115396, and totaled $22,500. In addition, in order to minimize the potential for fire damage in the future as well as to allow fire response equipment ftd! access to the perimeter of the facility, staffrecommends burying six landfill gas wells in the vicinity ofthe composting facility. SCS is recommended for this additional workto ensure that the buried wells and laterals will integrate properly with the existing system. The cost of this work will be $10,000. RESOURCE IIMPACT Funding for this contract amendment is available in the FY 2008-09 Refuse Enterprise Fund. PGLI[CY I1VIPLtCATI[ONS This project does not represent any change to existing City policies. ENVljRONNIENTAIL REVIEW This project is categorically exempt from California Environmental Quality Act (CEQA) review under Sections 15301 and 15302 (Class 1 and 2 exemptions). Attachment A: Amendment No. t PREPARED BYi DEPARTMENT HEAD: CITY MANAGER APPROVAL: RON ARP Manager, Environmental Control Programs GLENN S. ROBERTS Director of Public Works Cig~IVIanager CMR:348:08 Page 2 of 2 CITY OF PALO ALTO CONTRACT NO.C061153 E ~9 ATTACHM N AMENDMENT NO. 1 TO CONTRACT NO. C06115396 BETWEEN THE CITY OF PALO ALTO AND SCS FIELD SERVICES This Amendment No. 1 to contract No. C06115396 ("Contract") is entered into , 2008, by and between the CITY OF PALO ALTO, a California Charter City ("CITY"), andStearns, Conrad, Schmidt Consulting Engineers, Inc., dba: SCS Field Services, a corporation under the state of Virginia with offices located at 4707 Greenleaf Circle, Suite F, Modesto, CA 95356 ("CONSULTANT"). RECITALS: WHEREAS, the Contract was entered into between the parties for the provision of services to perform maintenanne, monitoring and reporting related~to the Landfill’s gas and leachate control systems ("Project"); and WHEREAS, the parties wish to amend the Contract to increase the scope of services and compensation; NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the parties agree: ¯ SECTION I. Section I, SCOPE OF SERVICES, is hereby amended to add the following: "CONSULTANT shall perform the Services described in Exhibit ~A" and Exhibit ~A-I" for additional scope of services in accordance with the terms and conditions contained in this Agreement. The performance of all Services shall be to the reasonable satisfaction of CITY." SECTION 2. to read as follows: Section 4, COMPENSATION, is hereby amended "The compensation to be paid to CONSULTANT for performance of the Services described in Exhibit "A" and Exhibit "A-I" for additional scope of services, including both payment for professional services and reimbursable expenses, which includes funds allocated for all three years of the contract plus the additional scope of services in Exhibit .~A-I" and shall not exceed three hundred eighty-five thousand eight hundred sixty-six Dollars ($385,866.00). In the event Additional Services are authorized, the total c.ompensation for services and reimbursable expenses shall not exceed four hundred thirty-two thousand one hundred ninety-two Dollars ($432,192.00). The applicable rates and schedule of payment are set out in Exhibit "C" and Exhibit "C-!" for additional scope of services, entitled ~COMPENSATION," which is attached to and made a 1 S:ATT/USERS/OFFICE FORMS/City Approved Contracts 3/20/07 (REV) CITY OF PALO ALTO CONTRACT NO. C06115396 part of this Agreement. Additional Services, if any, shall be authorized in accordance with and subject to the provisions of Exhibit "C" and Exhibit "C-I" for additional scope of services..CONSULTANT shall not receive any compensation for Additional Services performed without the prior written authorization of CITY. Additional Services shall mean any work that is determined by CITY to be necessary for the proper completion of the Project, but which is not included within the Scope of Services described in Exhibit "A" and Exhibit ~A-I" for additional scope of services." SECTION 3. The following exhibit(s) co the Contract are hereby set forth as attachment(s) to this Amendment, which are incorporated in full by this reference: EXHIBIT "A-I": ADDITIONAL SCOPE OF SERVICES EXHIBIT "C-I": COMPENSATION 2 S :ATT/USERS/OFFICE FORMS/City Approved Contracts 3/20/07 (REV) SECTION 4. Except as herein ~..~---~ied;,Lt~ all amendments thereto, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have by their duly authorized representatives executed this Amendment on the date first above written~ APPROVED AS TO FORM~CITY OF PALO A_LTO Senior Asst. City Attorney City Manager Director of Administrative Services By : Name :__A Titie: BV: _ ~ . ,, Name: Taxpayer Identification No. (Compliance with Corp. Code S 313 is required if the entity on whose behalf this contract ~s signed is a corporation. In the alternative, a certified corporate r~so!ution attesting to the signatory_ authority of the individ~als signing in their respective capacities is acceptable). 3 @:ATT!U~F-RS!OFF[CE FORM,q!C~.ty Approved Contracts 9/20/07 (RE"J) CXTY OF PALO ALTO CONTRACT NOo C06115396 EXHIBIT "A-!" ADDfTIONAL SCOPE OF SERVICES Task i This work provided for emergency repairs to the City’s landfill gas system related to the July 23rd compost facility fire: Provided labor, materials and equipment to repair the fire damaged portion of the above-grade LFG, Condensate and Leachate Collection Systems° This task included approximately 200 feet of 8-inch HDPE, 300 feet of 4-inch HDPE, 60 feet of 2-inch HDPE, 400 feet of 1-inch HDPE and miscellaneous associated HDPE and PVC pipe fitting and flexhoseso Also, modified/placed LFG Extraction Well No. W- 85R belowgrade and modified/buried associated lateral pipeline~ Task 2 This following work is recommended to minimize the possibility of future fire damage to these components: Provide labor, materials and equipment to place six additional existing above-grade LFG Extraction Wells and associated lateral pipelines below-grade. This task includes burying approximately 400 feet of 4-inch HDPE, six flush-mount well/valve boxes, modifications to six existing LFG Extraction Wells and miscellaneous associated HDPE and PVC pipe fittings and flexho~es. Contract C06115396 Amendment One Page 1 of I CITY OF PALO ALTO CONTRACT NO. C06115396 EXHIBIT ~’C-I" COMPENSATION ADDITIONAL SCOPE OF SERVICES Task 1 $22,500 (Emergency work performed July 23, 2008) Task 2 (Recommended additional work) $I0,000 Contract C06115396 Amendment One Page i of i