Loading...
HomeMy WebLinkAboutStaff Report 317-085 City of Palo Alto C ty Manager’s Report TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE:JULY 28, 2008 CMR:317:08 SUBJECT:APPROVAL OF A CONTRACT WITH O’GRADY PAVING INC. IN THE TOTAL AMOUNT NOT TO EXCEED $1,402,354 FOR THE 2008 STREET MAINTENANCE PROGRAM, PHASE 2 CAPITAL IMPROVEMENT PROGRAM PROJECT PE-86070 RECOMMENDATION Staff recommends that Council: Approve and authorize the City Manager or his designee to execute the attached contract in the amount of $1,402,354 with O’Grady Paving Inc. for the 2008 Street Maintenance Program, Phase 2 - Capital Improvement Program Project PE-86070; and Authorize the City Manager or his designee to negotiate and execute one or more change orders to the contract with O’Grady Paving Inc for related, additional but unforeseen work that may develop during the project, the total value of which shall not exceed $140,235. BACKGROUND Annually, Public Works Engineering manages the resurfacing and reconstruction of various City streets. The candidate streets are surveyed and rated biannually by a computerized pavement management system. The annual project typically encompasses about eight lane miles of asphalt concrete paving and eight lane miles of slurry sealing, with a project budget averaging $2.2 million annually for all phases of the project. Prior to 2005, projects were bid as one project consisting of slurry and cape seal (preventive maintenance work), concrete street repairs and asphalt concrete resurfacing. In 2005, staff implemented a two phase program: the first phase for preventative maintenance work utilizing cape and slurry sealing with the second phase for concrete street repairs and asphalt concrete resurfacing. This phasing proved to be more cost- effective avoiding the typical 15% markup previously included in asphalt resurfacing contracts where preventative maintenance work was subcontracted out. The proposed 2008 Street Maintenance Project includes cape sealing six (6) lane miles of collector/resident streets, overlaying six (6) lane miles of backlog streets, and slurry sealing eleven (11) lane miles of collector/resident streets. The additional lanes miles are a result of increased project funding from a State of California Prop lb grant ($807,120) and savings from the typical 15% markup for subcontracted work. CMR:317:08 Page 1 of 5 DISCUSSION Attachment B provides a list of streets to be resuffaced under the attached Phase 2 Contract. Part of the work under this contract includes related work such as lane striping and various concrete work including replacement of curb ramps, curb and gutters, driveway approaches and sidewalks. Curb ramps will be installed to comply with the guidelines of the Americans with Disabilities Act (ADA). In addition, the contract will incorporate the removal and replacement of approximately 200,000 square feet of asphalt and replace any pavement striping in Foothills Park that was not completed in the 2007 Resurfacing Project with funds from Parks CIP OS- 07000. The bids for this project were 15% below the engineer’s estimate which allows for inclusion of five add alternate bid items allowing for more streets (and 2.3 lane miles) to be included. The additional streets included in these alternates are listed at the bottom of Attachment B. The 2008 Street Maintenance Project will award the base bid and add alternates 2 through 6. Add alternate 2 is to remove and replace all of the asphalt concrete on Northampton and Southampton Streets, with three inches of new asphalt. These streets were coordinated with the Water Main Replacement CIP program to finish their street trenching within months of the anticipated resurfacing. Alternates 3 and 4 include two blocks of Bowdoin Street and one block of College Avenue, in the College Terrace neighborhood. This neighborhood is the City of Palo Alto’s second designated targeted work zone (TWZ). A TWZ is a location in which all utility work has been installed at accelerated schedules and most private development has been finalized to accommodate the paving restoration schedule of Public Works. The College Terrace street restoration schedule will be done in phases over the next four years and is expected to complete by 2011 as funding allows. The paving phase in 2011 will include College Avenue following permanent traffic circle modifications and!or improvements. Staff will update the College Terrace residents each year as this work progresses. Alternates 5 and 6 include one block of Homer Avenue, one block of Ramona Street and one block of Bryant Street all located in the South of Forest Avenue (SOFA) area, the City’s first TWZ. This work will complete 90% resurfacing of the streets in the South of Forest Area neighborhood (SOFA). Add alternate 1 was to place rubberized asphalt concrete (RAC) on Alma Street using a California Integrated Waste Management Board (CIWMB) grant in the amount of $97,000. During the time this project was out to bid, however, the City was selected for federal grant funding, from the Highway Safety Index Program (HSIP). These funds include $900,000 for Alma Street improvements from Colorado Street to the Mountain View City limits (the same limits planned under the CIWMB grant). Because the HSIP grant provides almost ten times the funding as the CIWMB grant for rubberized asphalt and covers additional work such as guard rails at select locations, staff recommends doing the Alma Street work under the HSIP grant next year and not including add alternate 1 in this contract. Staff will identify another candidate street(s) for rubberized asphalt application under the CIWMB program for the 2009-10 Street Maintenance project. CMR:317:08 Page 2 of 5 Project Coordination Staff from the Utilities Department, Public Works Department and Transportation Division, continue to meet monthly coordinating infrastructure projects city wide. The Phase 2 work in this contract was also coordinated with the Utilities Department by meeting independently with Utilities’ project managers that may have a direct impact on the project. During the coordination meetings, staff has aggressively targeted the South of Forest Area (SOFA) and the College Terrace neighborhoods. Paving the last remaining street in the SOFA area will occur with this project. Staff has developed plans and timelines to complete work in localized geographical areas for College Terrace and other neighborhoods, some of which is included in this project as described above. The targeted areas will be resurfaced over the next several years once utility work is completed in each area to prevent trenching in newly repaved streets. Streets planned for resurfacing were either postponed due to utility projects or accelerated as a result of obtaining federal/state funding. Staff has made it a priority to ensure newly paved streets are not trenched unless there is a private development project and/or emergency work which could not be scheduled in advance of street paving. Bid Process A notice inviting formal bids for the 2008 Street Maintenance Program Phase 2 was posted at City Hall on May 21, 2008 and sent to ten (10) builders’ exchanges and 11 bidders. The bidding period was thirty-five days. Bids were received from four (4) qualified contractors on June 24, 2008 as listed on the attached bid summary (Attachment A). The total for all bids, including base bid and add alternate Nos. 1-6, ranged from a low bid of $2,078,987 to a high of $2,355,777. As mentioned above the low bid is fifteen percent below the engineer’s estimate of $2,459,507. The engineer’s estimate was based on a standard rate of 5% inflation increase in costs received on the prior street maintenance project in 2007. Bid Name/Number Proposed Length of Project Number of Bids Mailed to Contractors Number of Bids Mailed to Builder’s Exchanges Total Days to Respond to Bid Pre-Bid Meeting? Number of Company Attendees at Pre-Bid Meeting Number of Bids Received: Bid Price Range (including all 5 alternates) Summary of Bid Process 2008 Street Maintenance Program Phase 2 / IFB #126732 120 calendar days 11 10 35 No N/A 4 Low bid $2,078,987 to a high of $2,355,777 The Certification of Nondiscrimination is Attachment D. CMR:317:08 Page 3 of 5 Staff recommends that the base bid, including add/alternates 2 through 6, of $1,402,353 submitted by O’Grady Paving Inc. be accepted and that O’Grady Paving Inc. be declared the lowest responsible bidder. The change order amount of $140,235 (which equals 10% of the total contract) is requested to resolve unforeseen problems and/or conflicts that may arise during the construction period. Staff checked references supplied by the contractor for previous work performed and found no significant complaints. Staff also checked with the Contractor’s State License Board and found that the contractor has an active license on file. Following the award of contract, businesses and residents affected by the project will be notified by notices describing the work on their streets. Staff will hand deliver notices to affected residents 2 weeks prior to construction start up. "No Parking - Tow Away" signs will be posted on the affected streets three (3) days prior to construction. If the street will be closed during the construction, the contractor will also hand deliver door hanger notices seven days and 24 hours in advance of the construction work on each street.Work is expected to start in July and be complete in 120 days. RESOURCE IMPACT Due to the size of this annual maintenance project, City staffing levels are not adequate to accomplish the construction work in-house. In addition, the City does not own the type of equipment needed to perform this work and staff believes that it is cost effective to have the work performed by outside contractors. Funds for this project include the following sources: the Street Maintenance Capital Improvement Program Project PE-86070, Prop lb, and Foothills Park Road Improvements OS- 07000. Funds are budget in this project for this fiscal year. POLICY IMPLICATIONS This recommendation does not represent any change to existing City policies. ENVIRONMENTAL REVIEW This project has been determined to be categorically exempt from review under the California Environmental Quality Act (CEQA) as repair and maintenance of existing streets and similar facilities pursuant to CEQA Guidelines, Section 15301 (c). ATTACHMENTS Attachment A:Contract Attachment B:List of Streets Attachment C:Bid Summary Attachment D:Certification of Nondiscrimination PREPARED BY: ELI~BETH AMES Seni6r Engineer CMR:317:08 Page 4 of 5 DEPARTMENT HEAD: CITY MANAGER APPROVAL: GLENN S. ROBERTS Deputy City Managers CMR:317:08 Page 5 of 5 ATTACHMENT A FORh/1AL CONTRACT SECTION 500 CONTRACT No. C09126732 (Public Work) Public Works Department This Contract, number C09126732 dated is entered into by and between the City of Palo Alto, a California Charter City ("City"), and O’Gradv Paving, Inc. ("Contractor"). For and in consideration of the covenants, terms, and conditions ("the provisions") of this Contract, City and Contractor ("the parties") agree: Term. This Contract shall commence and be binding on the parties on the Date of Execution of this Contract, and shall expire on the date of recordation of the Notice of Substantial Completion, or, if no such notice is required to be filed, on the date that final payment is made hereunder, subject to the earlier termination of this Contract. General Scope of Project and Work. Contractor shall furnish labor, services, materials and equipment in connection with the construction of the Project and complete the Work in accordance with the covenants, terms and conditions of this Contract to the satisfaction of City. The Project and Work is generally described as follows: Title of Project:2008 Street i~/iaintenance Program Project, Phase 2, .Invitation for Bids (IFB) No. 126732. Bid:$1,402,353.50 (One million four hundred two thousand three hundred fifty-three and 50/100 dollars) (Total.includes base bid and Add Alternates 2 through 6 only) Contract Documents. This Contract shall consist of the documents set forth below, which are on file with the City Clerk and are hereby incorporated by reference. For the purposes of construing, interpreting and resolving inconsistencies between and among the provisions of this Contract, these documents and the provisions thereof are set forth in the following descending order of precedence. This Contract. Invitation for Bid. Project Specifications. Drawings. Change Orders. Bid. Supplementary Conditions. General Conditions. City of Palo Alto Dept. of Public Works Standard Drawings and Specifications (most current version). Certificate of Insurance, Performance Surety Bond, Labor & Materials (Payment) Surety Bond. Other Specifications, or part thereof, not expressly incorporated in the Contract Specifications or the City of Palo Alto Dept. of Public Works Standard Drawings and Specifications (most current version). Any other document not expressly mentioned herein which is issued by City or entered into by the parties. Compensation. In consideration of Contractor’s performance of its obligations hereunder, City shall pay to Contractor the amount set forth in Contractor’s Bid in accordance with the provisions of this Contract and upon the receipt of written invoices and all necessary supporting documentation within the time set forth in the Contract Specifications and the City of Palo Alto Dept. of Public Works Standard Drawings and Specifications (most current version), or, if no time is stated, within thirty (30) Days of the date of receipt of Contractor’s invoices. 5.Insurance. On or before the Date of Execution, Contractor shall obtain and maintain the policies of insurance coverage described in the Invitation For Bid on terms and conditions and in amounts as may be required by the Risk Manager. City shall not be obligated to take out insurance on Contractor’s personal property or the personal property of any person performing labor or services or supplying materials or equipment under the Project. Contractor shall furnish City with the certificates of insurance and with original endorsements affecting CITY OF PALO ALTO CONTRACT C09126732 PAGE 1 OF 7 rev. 12/00 FOR~IAL CONTRACT SECTION 500 coverage required under this Contract on or before the Date of Execution. The certificates and endorsements for each insurance policy shall be signed by a person who is authorized by that insurer to bind coverage in its behalf. Proof of insurance shall be mailed to the Project Manager to the address set forth in Section 16 of this Contract. Indemnification. Contractor agrees to protect, defend, indemnify and hold City, its Council members, officers, employees, agents and representatives harmless from and against any and all claims, demands, liabilities, losses, damages, costs, expenses, liens, penalties, suits, or judgments, arising, in whole or in part, directly or indirectly, at any time from any injury to or death of persons or damage to property as a result of the willful acts or the negligent acts or omissions of Contractor, or which results from Contractor’s noncompliance with any Law respecting the condition, use, occupation or safety of the Project site, or any part thereof, or which arises from Contractor’s failure to do anything required under this Contract or for doing anything which Contractor is required not to do under this Contract, or which arises from conduct for which any Law may impose strict liability on Contractor in the performance of or failure to perform the provisions of this Contract, except as may arise from the sole willful acts or negligent acts or omissions of City or any of its Council members, officers, employees, agents or representatives. This indemnification shall extend to any and all claims, demands, or liens made or filed by reason of any work performed by Contractor under this Contract at.any time during the term of this Contract, or arising thereafter. To the extent Contractor will use hazardous materials in connection with the execution of its obligations under this Contract, Contractor further expressly agrees to protect, indemnify, hold harmless and defend City, its City Council members, officers and employees from and against any and all claims, demands, liabilities, losses, damages, costs, expenses, liens, penalties, suits, or judgments City may incur, arising, in whole or in part, in. connection with or as a result of Contractor’s willful acts or negligent acts or omissions under this Contract, under the Comprehensive Environmental Response, Compensation and Liability Act (42 U.S.C. ~9601-6975, as amended); the Resource Conservation and Recovery Act (42 U.S.C. ~6901-6992k, as amended); the Toxic Substances Control Act (15 U.S.C. ~2601-2692, as amended); the Carpenter-Presley-Tanner Hazardous Substance Account Act (Health & Safety Code, ~25300-25395, as amended); the Hazardous Waste Control Law (Health & Safety Code, ~25100-25250.25, as amended); the Safe Drinking Water and Toxic Enforcement Act (Health & Safety Code, ~25249.5-25249.13, as amended); the Underground Storage of Hazardous Substances Act (Health & Safety Code, ~25280-25299.7, as amended); or under any other local, state or federal law, statute or ordinance, or at common law. Assumption of Risk. Contractor agrees to voluntarily assume any and all risk of loss, damage, or injury to the property of Contractor which may occur in, on, or about the Project site at any time and in any manner, excepting such loss, injury, or damage as may be caused by the sole w!llful act or negligent act or omission of City or any of its Council members, officers, employees, agents or representatives. Waiver. The acceptance of any payment or performance, or any part thereof, shall not operate as a waiver by City of its rights under this Contract. A waiver by City of any breach of any part or provision of this Contract by Contractor shall not operate as a waiver or continuing waiver of any subsequent breach of the same or any other provision, nor shall any custom or practice which may arise between the parties in the administration of any part or provision of this Contract be construed to waive or to lessen the right of City to insist upon the performance of Contractor in strict compliance with the covenants, terms and conditions of this Contract. No Exoneration By Inspection: The City has the right, but not the duty, to inspect Contractor’s Work. The right of inspection is solely for the benefit of City. Contractor has the obligation to complete the Work in a satisfactory manner in compliance with Contract requirements. The presence of a City inspector does not shift that obligation to the City or relieve Contractor from its obligations to complete the Work in a satisfactory manner in compliance with the Contract requirements. 10.Compliance with Laws. Contractor shall comply with all Laws now in force or which may hereafter be in force pertaining to the Project and Work and this Contract, with the requirement of any bid security or fire underwriters or other similar body now or hereafter constituted, with any discretionary license or permit issued pursuant to any Law of any public agency or official as well as with any provision of all recorded documents affecting the Project site, insofar as any are required by reason of the use or occupancy of the Project site, and with all Laws pertaining to nondiscrimination in employment and hazardous materials. 11.Bid Security Bonds. As a condition precedent to City’s obligation to pay compensation to Contractor, and on or CITY OF PALO ALTO CONTRACT C09126732 PAGE 2 OF 7 rev. t2/00 FORi~AL CONTRACT SECTION 500 before the Date of Execution, Contractor shall furnish to the Project Manager the Bid Security as required under the Invitation for Bids. 12.Representations and Warranties. In the supply of any materials and equipment and the rendering of labor and services during the course and scope of the Project and Work, Contractor represents and warrants: Any materials and equipment which shall be used during the course and scope of the Project and Work shall be vested in Contractor; Any materials and equipment which shall be used during the course and scope of the Project and Work shall be merchantable and fit to be used for the particular purpose for which the materials are required; do Any labor and services rendered and materials and equipment used or employed during the course and scope of the Project and Work shall be free of defects in workmanship for a period of one (1) year after the recordation of the Notice of Substantial Completion, or, if no such notice is required to be filed, on the date that final payment is made hereunder; Any manufacturer’s warranty obtained by Contractor shall be obtained or shall be deemed obtained by Contractor for and in behalf of City. Any information submitted by Contractor prior to the award of Contract, or thereafter, upon request, whether or not submitted under a continuing obligation by the terms of the Contract to do so, is true and correct at the time such information is submitted or made available to the City; Contractor has not colluded, conspired, or agreed, directly or indirectly, with any person in regard to the terms and conditions of Contractor’s Bid, except as may be permitted by the Invitation For Bid; Contractor has the power and authority to enter into this Contract with City, that the individual executing this Contract is duly authorized to do so by appropriate resolution, and that this Contract shall be executed, delivered and performed pursuant to the power and authority conferred upon the person or persons authorized to bind Contractor; Contractor has not made an attempt to exert undue influence with the Purchasing Manager or Project Manager or any other person who has directly contributed to City’s decision to award the contract to Contractor; There are no unresolved claims or disputes between Contractor and City which would materially affect Contractor’s ability to perform under the Contract; Contractor has furnished and will furnish true and accurate statements, records, reports, resolutions, certifications, and other written information as may be requested of Contractor by City from time to time during the term of this Contract; Contractor and any person performing labor and services under this Project are duly licensed by the State of California as required by California Business & Professions Code Section 7028, as amended; and Contractor has fully examined and inspected the Project site and has full knowledge of the physical conditions of the Project site. 13.Assi.qnment. This Contract and the performance required hereunder is personal to Contractor, and it shall not be assigned by Contractor. Any attempted assignment shall be null and void. 14.Claims of Contractor. All claims pertaining to extra work, additional charges, or delays within the ContractTime or other disputes arising out of the Contract shall be submitted by Contractor td City in writing by certified or registered mail within ten (10) Days after the claim arose or within such other time as may be permitted or .required by law, and shall be described in sufficient detail to give adequate notice of the substance of the claim to City. CITY OF PALO ALTO rev. 12/00 CONTRACT C09126732 PAGE 3 OF 7 FORMAL CONTRACT SECTION 500 15.Audits by City. During the term of this Contract and for a period of not less than three (3) years after the expiration or earlier termination of this Contract, City shall have the right to audit Contractor’s Project-related and Work-related writings and business records, as such terms are defined in California Evidence Code Sections 250 and 1271, as amended, during the regular business hours of Contractor, or, if Contractor has no such hours, during the regular business hours of City. 16.Notices. All agreements, appointments, approvals, authorizations, claims, demands, Change Orders, consents, designations, notices, offers, requests and statements given by either party to the other shall be in writing and shall be sufficiently given and served upon the other party if (1) personally served, (2) sent by the United States mail, postage prepaid, (3) sent by private express delivery service, or (4) in the case of a facsimile transmission, if sent to the telephone FAX number set forth below during regular business hours of the receiving party and followed within two (2) Days by delivery of a hard copy of the material sent by facsimile transmission, in accordance with (1), (2) or (3) above. Personal service shall include, without limitation, service by delivery and service by facsimile transmission. To City:City of Palo Alto City Clerk 250 Hamilton Avenue P.O. Box 10250 Palo Alto, CA 94303 Copy to:City of Palo Alto Public Works Department Engineering Division P.O. Box 10250 Palo Alto, CA 94303 Elizabeth Ames, Project Manager To Contractor:O’Grady Paving, Inc. 2513 Wyandotte Street Mountain View, Ca 94043 Attn: Craig E. Young 17.Appropriation of City Funds. This Contract is subject to the fiscal pro~/isions of Article III, Section 12 of the Charter of the City of Palo Alto. Any charges hereunder for labor, services, materials and equipment may accrue only after such expenditures have been approved in advance in writing in accordance with applicable Laws. This Contract shall terminate without penalty (I) at the end of any fiscal year in the event that funds are not appropriated for the following fiscal year, or (ii) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Contract are no longer available. This Section 17 shall control in the event df a conflict with any other provision of this Contract. 18.Miscellaneous. Bailee Disclaimer. The parties understand and agree that City does not purport to be Contractor’s bailee, and City is, therefore, not responsible for any damage to the personal property of Contractor. Consent. Whenever in this Contract the approval or consent of a party is required, such approval or consent shall be in writing and shall be executed by a person having the express authority to grant such approval or consent. Controlling Law. The parties agree that this Contract shall be governed and construed by and in accordance with the Laws of the State of California. Definitions. The definitions and terms set forth in Section 1 of the City of Palo Alto Dept. of Public Works Standard Drawings and Specifications (most current version) of this Contract are incorporated herein by reference. CITY OF PALO ALTO rev. 12/00 CONTRACT C09126732 PAGE 4 OF 7 FOR:MAL CONTRACT SECTION 500 ’ Force Majeure. Neither party shall be deemed to be in default on account of_any delay or failure to perform its obligations under this Contract which directly results from an Act of God or an act of a superior governmental authority. Headings. The paragraph headings a~e not a part of this Contract and shall have no effect upon the construction or interpretation of any part of this Contract. Incorporation of Documents. All documents constituting the Contract documents described in Section 3 hereof and all documents which may, from time to time, be referred to in any duly executed amendment hereto are by such reference incorporated in this Contract and shall be deemed to be part of this Contract. Integration. This Contract and any amendments hereto between the parties constitute the entire agreement between the parties concerning the Project and Work, and there are no other prior oral or written agreements between the parties that are not incorporated in this Contract. Modification of Agreement. This Contract shall not be modified or be binding upon the parties, unless such modification is agreed to in writing and signed by the parties. Provision. Any agreement, covenant, condition, clause, qualification, restriction, reservation, term or other stipulation in the Contract shall define or otherwise control, establish, or limit the performance required or permitted or to be required of or permitted by either party. All provisions, whether covenants or conditions, shall be deemed to be both covenants and conditions. Resolution. Contractor shall submit with its Bid a copy of any corporate or partnership resolution or other writing, which authorizes any director, officer or other employee or partner to act for or in behalf of Contractor or which authorizes Contractor to enter into this Contract. Severability. If a court of competent jurisdiction finds or rules that any provision of this Contract is void or unenforceable, the provisions of this Contract not so affected shall remain in full force and effect. Status of Contractor. In the exercise of rights and obligations under this Contract, Contractor acts as an independent contractor and not as an agent or employee of City. Contractor shall not be entitled to any rights and benefits accorded or accruing to the City Council members, officers or employees of City, and Contractor expressly waives any and all claims to such rights and benefits. Successors and Assigns. The provisions of this Contract shall inure to the benefit of, and shall apply to and bind, the successors and assigns of the parties. Time of the Essence. Time is of the essence of this Contract and each of its provisions. In the calculation of time hereunder, the time in which an act is to be performed shall be computed by excluding the first Day and including the last. If the time in which an act is to be performed falls on a Saturday, Sunday, or any Day observed as a legal holiday by City, the time for performance shall be extended to the following Business Day. Alternative Dispute Resolution. The parties shall endeavor to resolve any disputes or claims arising out of or relating to this Contract by mediation, which, unless the parties agree otherwise, shall be conducted under the auspices of the Judicial Arbitration and Mediation Service (JAMS), San Jose, California. The intent of the parties is that the mediation shall proceed in advance of litigation; however, if any party should commence litigation before the conclusion of mediation, such litigation, including discovery, shall be stayed pending completion of mediation, and by executing this Contract the parties stipulate to mediation in accordance with Santa Clara County Superior Court Local Rule 1.15 or Rule 2-3(b) of the ADR Local Rules of the U.S. District Court for the Northern District of California, as such rules may be amended from time to time. The parties shall share the cost of the mediation, including the mediator’s fee, equally. Any written agreement reached in mediation shall be enforceable pursuant to California Code of Civil Procedure § 664.6, as amended. q.Venue. Unless the parties mutually agree otherwise, mediation shall take place in San Jose, CITY OF PALO ALTO . rev. 12/00 CONTRACT C09126732 PAGE 5 OF 7 FORIV1AL CONTRACT SECTION 500 California. In the event that litigation is commenced by any party hereunder, the parties agree that such action shall be vested exclusively in the state courts of California in the County of Santa Clara or in the United States District Court for the Northern District of California. Recovery of Costs. Each Party shall bear its own costs, including attorney’s fees, through the completion of mediation. If the claim or dispute is not resolved through mediation, or if litigation is necessary to enforce a settlement reached at mediation pursuant to California Code of Civil Procedure § 664.6, as amended, then the prevailing party in any subsequent litigation may recover its reasonable costs, including attorney’s fees, incurred subsequent to conclusion of the mediation. Flow-down. Contractor agrees to include provisions of this Contract relating to Alternative Dispute Resolution, Venue. and Recovery of Costs in any subcontracts or major material purchase agreements which it enters into in connection with this Contract, and to require its subcontractors to include those provisions in any sub-contracts or major material purchase agreements, such that any mediation or litigation of any claim or dispute asserted by a.subcontractor or major material supplier will be consolidated with any related claim or dispute between the Contractor and the City. Should the Contractor fail to do so, such that the City is required to defend an action brought by a subcontractor or material supplier inconsistent with the Alternative Dispute and Venue provisions of this Contract, Contractor shall indemnify City for City’s costs of defense, including reasonable attorney’s fees. IN WITNESS WHEREOF, the parties have by their duty appointed representatives executed this Contract in the city of Palo Alto, County of Santa Clara, State of California on the date first stated above. APPROVED AS TO FORM:CITY OF PALO ALTO Senior Assistant City Attorney City Manager APPROVED:CONTRACTOR: Director of Administrative Services Director of Public Works By:. Name: Title: By: Name: Title: (Compliance with California Corporations Code ~ 313 is required if the entity on whose behalf this cont[act is signed is a corporation. In the alternative, a certified corporate resolution attesting to the signatory authority of the individuals signing in their respective capacities is acceptable) CITY OF PALO ALTO CONTRACT C09126732 PAGE 6 OF 7rev. 12/00 FORiVIAL CONTRACT SECTION 500 CERTIFICATE OF ACKNOWLEDGMENT (Civil Code ~ 1189) STATE OF COUNTY OF .) .) On , before me,a notary public in and for said County, personally appeared , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Signature (Seal) CITY OF PALO ALTO CONTRACT C09126732 PAGE 7 OF 7rev. 12/00 .ATTACHMENT E~ 2008 Street Maintenance Program Phase 2 List of Streets 2 10 11 12 13 14 15 16 17 Bowdoin Street Bryant Street College Avenue Dartmouth Street Foothills Park Guinda Street Guinda Street Guinda Avenue Hamilton Avenue Hamilton Avenue Hamilton Avenue Hamilton Avenue Homer Avenue Northampton Drive Ramona Avenue Seneca Street Seneca Street Stanford Avenue Homer Avenue Amherst Street N. California Avenue as marked by Engineer University Avenue Hamilton Avenue Forest Avenue Middlefield Road Fulton Street Guinda Street Seneca Street Ramona Street Portal Place Forest Street University Avenue Hamilton Avenue California Avenue Channing Avenue Bowdoin Street End Hamilton Avenue :orest Avenue Homer Avenue Fulton Street Guinda Street Seneca Street Hale Street Bryant Street Southampton Drive Homer Avenue Hamilton Avenue Forest Avenue Seneca Street Forest Avenue Homer Avenue18 Southampton Drive Portal Place Northampton Drive19 ~o! ooo~dd~odddddd~d~@ddddwCd~dd oooooooooooooooooooooo~o i .........o ~ ~o ~ ~ ~ o o’o m o olm ~ o o ~ o o o o o oo ~1~d~dd~d;~’dNdd~dM~dd~i ~:~dodd~d~ddod~d~ddddddd~ddd 888ooooooooooooooooooooo~ooo dd~dd@~dNddddgWd~Nddd@ddNddd I N N N o oio o o o o o o o o o o o o o o o!o o e o~o oo ~dddddlddddd~@@@ddddddcdlddd ~ ~ ~ ~ olo~o o olo m o o o o o:ojo o o Oo o o ~ o o o o~ooi .... ~ ....... , ....... o .... oo 3 ~m cw w~~ ~< ~ ~--~zw- >~o~~0 z-~ 8 8 i ~N~’~ddd ~dd’d ~ ~ ~ o o o o~o oo oo~ .....,ooo d~ g’d;ddd’dddd’d d ~dd’odd~odddddd~ddd dddd’dddN dddd!dd~ddd d~d~dld~dddN~dNddd o o o o o o0°000088o°°°°8 oooooo oo~o~o oooo8~Od~d~dd ddddd~ idddd~’dddd z 88,o 888 o o o o o oo 0 z d 6’d~d~’dff4~ddddd~d4565 q q q,o f! ~ h qlq q q q q q q q q q oo~d~’d,~oodddddNodd d ,< ATTACHMENT D CERTIFICATION OF NONDISCRIMINATION FORM 410 PROJECT:2008 Street Maintenance Program Project, Phase 2 Certification of Nondiscrimination: As suppliers of goods and/or services to the City of Palo Alto in excess of $5,000, the firm, contractor or individual(s) listed below certify that: they do not and in the performance of this contract they will not discriminate in employment of any person because of race, skin color, gender, age, religion, disability, national origin, ancestrY, sexual orientation, housing status, marital status, familial status, weight or height of such person; and further certify that they are in compliance with all Federal, State and local directives and executive orders regarding nondiscrimination in employment. Firm: O’Q,~O.a~._} q~Ok~J’~~_-.DATE: Title of Officer signing:C\~-J[q."~"- Signature: CITY OF PALO ALTO- IFB 126732 PAGE 1 OF 1