HomeMy WebLinkAboutStaff Report 283-08City of Palo Alto
C ty Manager’s Report
TO:
FROM:
HONORABLE CITY COUNCIL
CITY MANAGER DEPARTMENT: UTILITIES
ATTENTION:
DATE:
-SUBJECT:
FINANCE COMMITTEE
JUNE 17, 2008 CMR: 283:08
RECOMMENDATION TO ADOPT A RESOLUTION AMENDING
UTILITY RATE SCHEDULES EDF-1 AND EDF-2 OF THE CITY
OF PALO ALTO RATES AND CHARGES PERTAINING TO
FIBER OPTIC RATES
RECOMMENDATION
Staff recommends that the Finance Committee recommend that the City Council adopt the
attached resolution to:
(a)Approve a 3.3 percent increase to commercial fiber optic rates EDF-1 and EDF-2, for
Fiscal Year (FY) 2008-09, effective July 1, 2008, which will increase annual revenues
by $48,500; and,
(b)Approve the changes to the Fiber Optic Rate Schedules (EDF-1 and EDF-2), as
attached.
BACKGROUND
The Utilities Department provides commercial dark fiber optic services within the boundaries of
Palo Alto. For customers having fiber optic leases beginning prior to September 18, 2006, rates
for service are published in Dark Fiber Licensing Services Rate Schedule EDF-1. Customer
expenses for engineering, construction and connection to the fiber optic backbone are charged
under Dark Fiber Licensing Services Rate Schedule EDF-2. The Council-approved Dark Fiber
Licensing Agreement (CMR 177:97) allows the commercial fiber optic fees charged under the
EDF-1 and EDF-2 rate schedules to be adjusted annually in accordance with the Consumer Price
Index (CPI), which is calculated by the United States Bureau of Labor Statistics.
CMR: 283:08 Page 1 of 3
DISCUSSION
For 2008, the CPI adjustment factor results in a 3.3 percent increase to the EDF-1 and EDF-2
rate schedules. Table 1 below outlines the adjustmentsproposed to the EDF-1 and EDF-2
Commercial Fiber Optic rates:
TABLE 1 - Proposed Rate Increases
EDF-1 (Section C-I): Dark Fiber Backbone License Fees (fiber miles/month)
Fiber Price
Quantity discount
Buffer tube discount
Route length discount
Ring topology discount
Length of term discount
$281.00
56.18
56.18
73.04
22.45
43,95
$290.20
58.04
58.04
75.45
23.20
45.39
EDF-1 (Section C-2): Dark Fiber Lateral Connection Fees (ft/month)
Drop Cable Mgmt. Fees $0.01-$0.05 0.02-0.05
Custom Cable Mgmt Fees 0.27 0.28
Fees for additional fiber 0.05 0.05
EDF-2 (Section C-l): Advance Engineering Fees (AER)
Commercial/Industrial
AER min. fee $671 $693
* Calculations have been rounded to the nearest cent.
** The proposed rate matches existing rates when rounded.
$9.20
1.86
1.86
2.41
0.75
1.44
3.3
3.3
3.3
3.3
3.3
3.3
0.01-0.00"*3.3
0.01 3.3
0.00 **3.3
$22
3.3
RESOURCE IMPACT
The additional Commercial Fiber Optic revenues resulting from the CPI increase to Dark Fiber
Licensing Services Rate Schedule EDF-1 are projected to be approximately $48,500 for FY
2008-09. As the Dark Fiber Licensing Services Rate Schedule EDF-2 applies to customer-driven
expansions and upgrades to the City’s Dark Fiber network, and the fee represents the minimum
fee, the increase in projected revenue due to this rate increase is negligible and impossible to
predict.
POLICY IMPLICATIONS
These recommendations do not represent a change in current City policies.
ENVIRONMENTAL REVIEW
The adoption of this resolution does not meet the California Environmental Quality Act’s
definition of a project, pursuant to California Public Resources Code Section 21065, therefore no
environmental assessment is required.
CMR: 283:08 Page 2 of 3
ATTACHMENTS
A:Resolution
B:Fiber Optic Rate Schedules EDF-1 and EDF-2
PREPARED BY:Eric Keniston, Utilities Rate Analyst
Ipek Connolly, Senior Resource Planner
REVIEWED BY:
O. RATCHYE
,sistant Director of Utilities, Resource Management
DEPARTMENT HEAD:
CITY MANAGER APPROVAL:
O. FONG
Director of Utilities l
STEVE EMSLIE/KELLY MORARIU
Deputy City Managers
CMR: 283:08 Page 3 of 3
NOT YET APPROVED ATTACHM
RESOLUTION NO
RESOLUTION OF THE COUNCIL OF THE CITY OF PALO
ALTO AMENDING UTILITY RATE SCHEDULES EDF-1 AND
EDF-2 OF THE CITY OF PALO ALTO UTILITIES RATES AND
CHARGES PERTAINING TO FIBER OPTIC RATES
The Council of the City of Palo Alto does hereby RESOLVE as follows:
SECTION 1 Pursuant to Section 12.20.010 of the Palo Alto
Municipal Code, Utility Rate Schedule EDF-1 (Dark Fiber Licensing Services) is
hereby amended to read in accordance with sheet EDF-I-1, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall
become effective July 1, 2008.
SECTION2 Pursuant to Section 12.20.0i0 of the Palo Alto
Municipal Code, Utility Rate Schedule EDF-2 (Dark Fiber Connection Fees) is
hereby amended to read in accordance with sheet EDF-2-1, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall
become effective July 1, 2008.
SECTION 3 The Council finds that the revenue derived from the
authorized adoption enumerated herein shall be used only for the purpose set forth
in Article VII, Section 2, of the Charter of the City of Palo Alto.
1/
//
//
//
//
//
//
11
//
080604syn 6050387
ATTACHMENT B
DARK FIBER LICENSING SERVICES
UTILITY RATE SCHEDULE EDF-1
Uo
Co
APPLICABILITY:
This rate schedule applies to customer accounts established prior to September 18, 2006, unless the customer elects
to apply the EDF-3 rate to the entire customer account. This rate applies to Fiber Optic services from the City of
Palo Alto Utilities (CPAU) pertaining to the City’s network (Backbone and associated connections).
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
FEES:
1.DARK FIBER BACKBONE LICENSE FEES:
The values or ranges for each of these price components are shown below:
(1) Fiber Price ....: ....................................................................$290.20/FM/month
(2) Quantity discount ...............................................................$0 to $58.04/FM/month
(3) Buffer tube discount .................................................................$0 to $58.04/FM/month
(4) Route length discount ..............................................................$0 to $75.45/FM/month
(5) Ring topology discount ........................ ........................................$0 to $23.20/FM/month
(6) Length of term discount ............................................................$0 to $45.39/FM/month
(7) Per ProjeCt Minimum Annual Backbone License Fee .................................................$425/month
Project Minimum Backbone Fees apply to any project proposal signed after September 18, 2006 in which
the project connects with the Backbone.
Description for Discounts:
Quantity discount: based on an array of discounts for quantities of fiber licensed on a specific path.
Buffer tube discount: discount for numbers of full buffer tubes licensed on a specific path.
Route length discount: based on the route length licensed on a specific project.
Ring topology discount: The ring topology discount for customers contracting for complete rings.
Term discount: based on an array of discounts for contracts greater than one and less than ten years.
DARK FIBER LATERAL CONNECTION FEES:
Customer responsibilities and fees for drop and custom cable construction are described in the CPAU Rules
and Regulations, Rate Schedule EDF-2, project proposals and other associated documents. In all cases, the
Licensee shall pay an annual Drop/Custom Cable Management Fee based on the follow per foot fees:
(1) Drop Cable Management Fees (for the first 12-Fibers) .................................$0.02-$0.05/ft/month
(2) Custom Cable Management Fees (for the first 12-Fibers) .............................$0.28/ft/month
(3) Fees for additional Drop or Custom Cable fibers (each additional set of 12-Fibers) $0.05/ft/month
(4) Per Project Minimum Drop or Custom Cable Management Fees .................. $210/month
Project Minimum Drop Cable Management Fees apply to any proj ect proposal signed after September 18,
2006.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.EDF-I-1 dated 7-01-2007
Proposed Effective 07-01-2008
CITY OF PALO ALTO Sheet No.EDF-I-1UTILITIES
DARK FIBER LICENSING SERVICES
UTILITY RATE SCHEDULE EDF-1
Do
3.EARLY TERMINATION FEES:
If the Licensee chooses to terminate for convenience the License Agreement or the term of any project
under the License Agreement, then the Licensee shall pay the applicable termination payment as specified
in this schedule or in the License Agreement, as provided below.
Unless otherwise provided in the License Agreement, the Licensee shall pay a termination fee in one of the
following amounts, whichever is less:
Annual fee of the contract year that the Licensee chooses to terminates in full without term
discounts, or
Remaining fees of the project term as indicated in the License Agreement.
SPECIAL NOTES:
1.All fees must be paid to the City according to the specifics in the Dark Fiber License Agreement, the
cugtomer’s project proposals and all the applicable Utilities Rates, Rules, and Regulations.
2.All fees are subject to consumer price index (CPI) adjustments, to be applied at the City’s discretion but not
more l~equently than an annual basis.
{End}
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. EDF- 1-2 dated 9-18-2006
Proposed Effective 07-01-2008
CITY OF PALO ALTO
U T I L I T I E S Sheet No.EDF-1-2
DARK FIBER SERVICE CONNECTION FEES
UTILITY RATE SCHEDULE EDF-2
APPLICABILITY:
This.schedule applies to all connections, expansions, and upgrades to the City’s Dark Fiber network (Backbone).
TERRITORY:
All territory within the incorporated limits of the City and land owned or leased by the City.
FEES:
ADVANCE ENGINEERING FEES:
Advance engineering (AER) fees must be paid to start the engineering process and are non-refundable. The
fees will be credited against the estimated project cost prior to the collection of the project construction
fees.
°
(1) Service connection (Interconnection) fee ......................................................
(2) Reconfiguration Fees .....................................................................................
Labor rates are subject to change as stated in the Utility Rate Schedule C-1.
NOTES:
(1) Commercial/Industrial AER minimum fee ......................................................................$693.00
(2) Special conditions (requiring expert assessment) ............................................................By Estimate
ESTIMATED SERVICE CONNECTION AND RECONFIGURATION FEES
All estimated service connection and reconfiguration fees must be paid prior to the scheduling of any
construction or reconnections to the City’s Dark Fiber network.
By Estimate
By Estimate
1.The Customer is responsible for the installation and maintenance of all ducts and pathways from the facility to
the property line in compliance with City of Palo Alto Utilities Rules and Regulations and contract agreements.
2.The City shall not be held liable for delays or interruptions in service, but will make reasonable efforts to
provide timely continuous service.
3.All fees are subject to consumer price index (CPI) adjustments, to be applied at the City’s discretion, but not
more frequently than an annual basis.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes sheet No. EDF-2-1 dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 07-01-2008
Sheet No.EDF-2-1