HomeMy WebLinkAboutStaff Report 171-08TO:
BUDGET
’08 - ’09
City of PaSo A to
C ty Manager Report
HONORABLE CITY COUNCIL
FROM:
ATTENTION:
DATE:
SUBJECT:
CITY MANAGER DEPARTMENT: UTILITIES
FINANCE COMMITTEE
MARCH 18, 2008 CMR: 171:08
UTILITIES ADVISORY COMMISSION RECOMMENDATION TO
ADOPT A RESOLUTION ADOPTING AN ELECTRIC RATE
INCREASE AND AMENDING UTILITY RATE SCHEDULES E-l,
E-l-G, E-2, E-2-G, E-4, E-4-G, E-4-TOU, E-7, E-7-G, E-7-TOU, E-14,
E-16, E-18 AND E-18-G
RECOMMENDATION
Staff and the Utilities Advisory Commission (UAC) recommend that the City Council adopt the
attached resolution to:
(a)Approve a 14 percent increase to electric retail rates, for Fiscal Year (FY) 2008-09,
effective July 1, 2008, which will increase annual revenues by $12.8 million; and
(b)Approve the changes to the Electric Utility Rate Schedules (E-I, E-l-G, E-2, E-2-G, E-
4, E-4-G, E-4-TOU, E-7, E-7-G, E-7-TOU, E-14, E-16, E-18 and E-18-G), as attached.
BACKGROUND
In June 2007, the City Council approved a 5 percent electric revenue increase for FY 2007-08.
The FY 2008-09 Budget that was approved in-concept included a 10 percent retail rate increase
for the Electric Fund.
During the FY 07-08 budget and retail rate development process in January 2007, average hydro-
electric production for 2007 and healthy Electric Supply Rate Stabilization Reserve (E-SRSR)
levels were projected, and as a result no supply rate increase was proposed for FY 2007-08 and
the E-SRSR was budgeted for an $11 million drawdown. The FY 2007-08 revenue increase was
allocated solely to the distribution portion of the electric rates in light of higher distribution costs
and a low balance in the Electric Distribution Rate Stabilization Reserve (E-DRSR).
CMR: 171:08 Page 1 of 6
During the winter and spring of 2007, drought conditions resulted in lower-than-projected
hydroelectric production for FY 2007-08 and FY 2008-09. This situation resulted in the
requirement to buy replacement energy from the market to meet City loads. To cover these
higher costs, Council approved a mid-year budget increase of $8 million for FY 07-08 on
February 19, 2008 [CMR:151:08]. Council also was advised of the increased electric supply
costs due to the drought in January 22, 2008 [CMR: 122:08] when staff and the UAC
recommended against a FY 07-08 mid-year rate increase, but warned that the rate increase
proposal for FY 08-09 would likely be higher than the 10 percent approved in concept rate
increase.
DISCUSSION
The proposed rate increase for FY 2008-09 represents a $12.8 million annual electric revenue
increase, the main driver of which is higher commodity purchase costs. Of this, $12.5 million is
to fund supply cost and the remaining $0.3 million will fund the State-mandated Electric Public
Benefits budget. Staff also proposes to transfer an additiona! $4.4 million from the Calaveras
reserve into the E-SRSR in order to meet the risk assessment level (see discussion below).
Table 1 below shows the estimated revenues and expenses for the Electric Fund for FY 2008-09
as well as the actual revenues and expenses for FY 2006-07 and the adjusted budget revenues
and expenses for FY 2007-08.
1
14
TABLE 1 - Electric Fund Sources and Uses of Funds ($000)
% CHANGE IN TOTAL SYSTFJ~I RETAIL RATE
--’RO JECTE3 -OTAL AV_--RA-.~E RATE .’,S,~W H ?
=ROJ-__.CT-Z3 COMMSCITY CC, ST fS,K;’~H?
SALES N ’SWH
~ERQEHTA,~E OF SJ=PLY bHDER CONTRACT
=ROJECTED CHAHGE IN RE-AlL SALES REVEHJE
Ut~liges Retail Sales
Dark Fiber related revenues
Surplus Energy Sales
Service connection charges
Other Revenues plus Transfers In *
Interest plus gain or loss on investment
Total Sources of Funds
Purchases to ser~e load
CVP O&M Loan Advance
Surplus Energy Cost
Joint Venture Debt Service
Supply Operating Budget
D}stribution Operating Budget
Other Transfers Out
Capital Improvement programs
Operating Encumbrances & reconciliation
Total Uses of Funds
Fiscal Year
Into,; (Out of) Reserves
Actual
06-07
0,0%
$ 0285
$0.~49
977
85,414
2,755
5,945
1,859
6,896
7,826
! 12,725
50,078
8,135
4,196
8/.-43
4,617
17,4~4
12,732
11,420
2,~4
119,740
(t,ulU,,
Adjusted In-Concept
07-08
5.0%t0.0%
0.092 $ 0.101
S 0.063 $0o061
97%
4,376
~r’,,507 £9,902
~,~, :3 2,585
2.502
700
7,532
6,767
11~,518
84.346
5.554
!.424
6.886
14.281 t3,978
132=356
~ 1 .o3. ,~(5;781)
Proiected
08-09
t4,0%
S 0.105.
S 0.069
993
83%
I03.382
2,585
4,319
753
1 ! ,741
6,767
!29.54~
70.91~
7,200
2,140
8,892
5,397
21.958
14.150
11,525
*Other revenues includes CVP O&M loan payments
CMR: 171:08 Page 2 of 6
Reserves and Risk Assessment
Table 2 below summarizes the end of year balances for the E-SRSR, the E-DRSR and the
Calaveras Reserve, the risk assessment level and the reserve guidelines. Staff presented the
annual risk assessment of the Electric Fund to the UAC at its February 2008 meeting. Note that
the risk assessment level is determined by assessing the short-term risks to the Electric Fund.
The reserve guidelines were established to manage risks over the longer term.
The $4.4 million additional transfer from the Calaveras Reserve will reduce this reserve from the
Council approved target level, but it will still remain above the Council-approved minimum
guideline level for FY 08-09. No change in the Calaveras Reserve guidelines needs to be made
to effect this change.
With the recommended revenue increase, the FY 2008-09 E-DRSR ending balance is forecast to
be above both the risk assessment level and the minimum guideline level approved by the City
Council. The total $12.8 million revenue increase proposed for FY 2008-09, when applied to
electric supply costs, will bring the E-SRSR ending balance for FY 2008-09 up to the risk
assessment level, but below the long-term minimum guideline level approved by the City
Council.
TABLE 2: Electric Reserve Balance, Guideline Levels and Risk Assessment Level ($M)
FY 2006-07
(actual)
Electric Supply Rate Stabilization Reserve
End of Year Balance 60.6
Risk Assessment Level
Minimum Guideline Level
Maximum Guideline Level
Electric Distribution Rate Stabilization
End of Year Balance
Risk Assessment Level
Minimum Guideline Level
Maximum Guideline Level
Calaveras Reserve
End of Year Balance
Minimum Guideline Level
Maximum Guideline Level
28.5
56.9
Reserve
7.8
FY 2007-08
(estimated)
41.6
44.2
29.3
58.5
FY 2008-09
(forecast)
33.8
35.4
70.9
6.3
4.0
6.6
16.6
7.2
4.6
6.7
16.7
5.4
10.9
71.8 70.4 64.6
64.6 63.3 62.0
89.8 87.9 86.1
An updated risk assessment will be performed as part of the budget process for FY 2009-10, and
staff will evaluate the revenues, expenses and risks during the FY 2009-10 budget process to
ensure that the Electric Utility remains financially sound. This assessment will include
examination of potential modifications to the Calaveras Reserve guidelines.
CMR: 171:08 Page 3 of 6
Allocation of Proposed Revenue Increase
The proposed electric supply revenue increase of 14 percent, or $12.8 million, is to be applied
evenly to both residential and non-residential customers. The average customer’s bill will
increase 14 percent, and bills for higher users will increase more than 14 percent.
Table 3 below shows the impact of this rate proposal on a typical monthly bill for various
customer classes and consumption levels. The bill impact table does not include the bills for
those who participate in the PaloAltoGreen program.
TABLE 3: Effect of Proposed Electric Rate Increase on Customer Bills
Monthly Proposed Monthly % Bill % PA
Customer Type kWh Usage Monthly Bill Increase Increase Belmv
Bill ($)($)PG&E
Residential Small 300 $ 25.98 $ 2.29 12.0 (25.1)
Residential Average 650 69.36 8.53 14.0 (27.1)
Residential Large 1200 156.40 20.23 14.9 (39.9)
Commercial Small 500 60.68 7.47 14.0 (30.2)
Commercial Medium 200,000 21,894 2,697 14.0 (8.4)
Commercial Large 5,500,000 501,260 61,705 t4.0 (10.1)
Bill Comparison
Table 4 below compares Palo Alto’s monthly electric bills for residential customers with those of
PG&E and several other municipal electric utilities. The comparisons are for rates in effect on
January 1, 2008. Staff does not know the rate increase plans for PG&E, but is aware that many
of the municipal utilities have plans for electric rate increases this year. However, those
increases are still being developed or are not yet approved and cannot be used for comparisons.
TABLE 4 - Monthly Residential Electric Bill Comparison (rates as of January 1, 2008)
Electric Usage
Bill ($)(kWh)
Small 300 31.15
Average 650 90.49
Large 1200 191.09
Delta from Palo Alto for ’57,8% ’48.8%average residential use ,,
RosevillePaloPG&EAlto
|
Alameda Clara
30.35
77.58
168.91
-27.5%
23.19 .~9._6
60.83 96.02
136.17 250.04
5.2.~
66.90
128.66
25.75
56.90
105.85
6.5%
Delta
Benchmark (%)
-30.9%
-27.5%
-24.0%
Palo Alto’s January 2008 rates for the average residential customers are significantly below
PG&E’s rates. However, the difference was less for other municipal utilities and, in the case of
Santa Clara, Palo Alto’s rates were higher.
CMR: 171:08 Page 4 of 6
ALTERNATIVES
Staff evaluated several rate increase options. One option was to increase electric rates enough to
raise the E-SRSR to the risk assessment level without any additional transfers from the Calaveras
Reserve. This option would have required a 19% rate increase, which was deemed unacceptably
steep. Another option was to maintain the 10% approved in concept rate increase that was
projected last year. The 10% rate increase projection assumed average hydroelectric generation,
but drought conditions increased costs significantly above projections. A 10% rate increase
would have resulted in an ending year balance in the E-SRSR of much less than the risk
assessment level even with the maximum transfer from the Calaveras Reserve allowed under the
current Council-approved guidelines for the Calaveras Reserve. Instead of either of these two
alternatives, staff recommends an intermediary option, the proposed 14% rate increase.
UTILITIES ADVISORY COMMISSION REVIEW AND RECOMMENDATIONS
On March 5, 2008, the UAC voted unanimously (4-0 with one Commissioner absent), to
recommend that the City Council:
(a)Approve a 14 percent increase to electric retail rates, for FY 2008-09, effective July 1,
2008, which will increase annual revenues by $12.8 million; and
(b) Approve the changes to the Electric Utility Rate Schedules, as attached.
The UAC supported staff’s recommendation and noted that the recommendation was what the
UAC had preferred of the three scenarios presented at the February UAC meeting. One
Commissioner questioned staff’s recommendation to propose a higher increase in the residential
rate for consumption in the higher usage tiers. Staff reiterated that the proposed rate structure
was designed to encourage energy conservation.
RESOURCE IMPACT
Approval of this rate proposal will increase the Electric Fund retail sales revenues in FY 2008-09
by approximately $12.8 million. With this infusion of revenue, the balance in the E-SRSR is
projected to be at the risk assessment reserve level in FY 2008-09.
POLICY IMPLICATIONS
This recommendation is consistent with current City policies.
ENVIRONMENTAL REVIEW
An increase in rates to meet operating expenses and financial reserve needs is not subject to the
California Environmental Quality Act (CEQA), pursuant to California Public Resources Code
Sec. 21080(b)(8) and Title 14 of the California Code of Regulations Sec. 15273(a)(1) and (3).
CMR: 171:08 Page 5 of 6
ATTACHMENTS
A. Resolution
B. Electric Rate Schedules: E-!, E-l-G, E-2, E-2-G, E-4, E-4 TOU, E-4-G, E-7, E-7-TOU, E-7-
G, E-!4, E-16, E-18, E-18-G
C. Draft Minutes of the UAC meeting of March 5, 2008
PREPARED BY:
REVIEWED BY:
Eric Keniston, Utilities Rate Analyst
Ipek Connolly, Senior Resource Planner
Jane Ratchye, Assistant Director of Utilities, Resource Management
DEPARTMENT HEAD:
CITY MANAGER APPROVAL:
HARRISON
Assistant City Manager
CMR: 171:08 Page 6 of 6
NOT YET APPROVED ATT ACHMEN
RESOLUTION NO.
RESOLUTION OF THECOUNCIL OF THE CITY OF PALO
ALTO ADOPTING ANELECTRIC RATE INCREASE AND
AMENDING UTILITYRATE SCHEDULES E-I, E-I-G, E-2,
E-2-G, E-4, E-4-G, E-4-TOU, E-7, E-7-G, E-7-TOU, E-14, E-16,
E-18, AND E-18-G
WHEREAS, pursuant to Chapter 12.20.010 of the Palo Alto Municipal Code,
the Council of the City of Palo Alto may by resolution adopt rules and regulations
governing utility services and the fees and charges therefore; and
WHEREAS, the Council has considered the need for an adjustment in electric
rates to maintain the Electric Supply and Distribution Rate Stabilization Reserves above
the levels determined by the annual risk assessment.
NOW, THEREFORE, the Council of the City of Palo Alto does hereby
RESOLVE as follows:
SECTION !. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-1 (Residential Electric Service) is hereby amended to read
in accordance with sheet E-l-l, attached hereto and incorporated herein. The foregoing
Utility Rate Schedule, as amended, shall become effective July 1, 2008.
SECTION 2. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-1-G (Residential Green Power Electric Service) is hereby
amended to read in accordance with sheets E-l-G-1 and E-l-G-2, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall become
effective July 1, 2008.
SECTION 3. Pursuant to Section 12.20.0!0 of the Palo Alto Municipal
Code, Utility Rate Schedule E-2 (Small Commercial Electric Service) is hereby amended
to read in accordance with sheets E-2-1 and E-2-2, attached hereto and incorporated
herein. The foregoing Utility Rate Schedule, as amended, shall become effective July 1,
2008.
SECTION 4. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-2-G (Small Commercial Green Power Electric Service) is
hereby amended to read in accordance with sheets E-2-G-1 and E-2-G-2, attached hereto
and incorporated herein. The foregoing Utility Rate Schedule, as amended, shall become
effective July 1, 2008.
080311 syn 6050386
NOT YET APPROVED
SECTION 5. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-4 (Medium Commercial Electric Service) is hereby
amended to read in accordance with sheets E-4-1 to E-4-3, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall become
effective July 1, 2008.
SECTION 6. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-4-G (Medium Commercial Green Power Electric Service)
is hereby amended to read in accordance with sheets E-4-G, E-4-G-3 and E-4-G-4,
attached hereto and incorporated herein. The foregoing Utility Rate Schedule, as
amended, shall become effective July 1, 2008.
SECTION 7. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-4-TOU (Medium Commercial Electric Time of Use
Service) is hereby amended to read in accordance with sheets E-4-TOU-1, E-4-TOU-2,
E-4-TOU-3 and E-4-TOU-4, attached hereto and incorporated herein. The foregoing
Utility Rate Schedule, as amended, shall become effective July 1, 2008.
SECTION 8. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-7 (Large Commercial Electric Service) is hereby amended
to read in accordance with sheets E-7-1, E-7-2 E-7-3, attached hereto and incorporated
herein. The foregoing Utility Rate Schedule, as amended, shall become effective July 1,
2008.
SECTION 9. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-7-G (Large Commercial Green Power Electric Service) is
hereby amended to read in accordance with sheets E-7-G-1, E-7-G-2, E-7-G-3 and E-7-
G-4, attached hereto and incorporated herein. The foregoing Utility Rate Schedule, as
amended, shall become effective July 1, 2008.
SECTION 10. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-7-TOU (Large Commercial Electric Time of Use Service)
is hereby amended to read in accordance with sheets E-7-TOU-1, E-7-TOU-2, E-7-TOU-
3 and E-7-TOU-4, attached hereto and incorporated herein. The foregoing Utility Rate
Schedule, as amended, shall become effective July 1, 2008.
SECTION ll. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-14 (Street Lights) is hereby amended to read in accordance
with sheets E- 14-1, E- 14-2, E- 14-3 and E- 14-4, attached hereto and incorporated herein.
The foregoing Utility Rate Schedule, as amended, shall become effective July 1, 2008.
080311 syn 6050386
2
NOT YET APPROVED
SECTION 12. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-16 (Unmetered Electric Service) is hereby amended to
read in accordance with sheets E-16-1, E-16-2 and E-16-3, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall become
effective July 1,2008.
SECTION 13. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E- 18 (Municipal Electric Service) is hereby amended to read
in accordance with sheets E-18-1 and E-18-2, attached hereto and incorporated herein.
The foregoing Utility Rate Schedule, as amended, shall become effective July 1, 2008.
SECTION 14. Pursuant to Section 12.20.010 of the Palo Alto Municipal
Code, Utility Rate Schedule E-18-G (Municipal Green Power Electric Service) is hereby
amended to read in accordance with sheets E-18-G-1 and E-18-G-2, attached hereto and
incorporated herein. The foregoing Utility Rate Schedule, as amended, shall become
effective July 1, 2008.
SECTION 15. The Council finds that the revenue derived from the
authorized adoption enumerated herein shall be used only for the purpose set forth in
Article VII, Section 2, of the Charter of the City of Palo Alto.
//
//
//
//
//
//
//
//
08031 I syn 6050386
NOT YET APPROVED
SECTION 16. The Council finds that an increase in rates to meet operating
expenses and financial reserve needs is not subject to the California Environmental
Quality Act (CEQA), pursuant to California Public Resources Code Sec. 21080(b)(8) and
Title 14 of the California Code of Regulations Sec. 15273(a)(1) and (3).
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
NOT PARTICIPATING:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Mayor
APPROVED:
Deputy City Attorney City Manager
Director of Utilities
Director of Administrative
Services
080311 syn 6050386
4
ATTA(
RESIDENTIAL ELECTRIC SERVICE
UTILITY RATE SCHEDU%E E-1
A.APPLICABILITY:
This schedule applies to separately metered single-family residential dwellings receiving retail
energy services from the City of Palo Alto Utilities. A "single-family residential dwelling" is
designated as any house, cottage, flat, or apartment unit having a kitchen, bath, and sleeping
facilities.
No
Co
TERRITORY:
Within the incorporated limits of the City of Palo Alto and on land owned or leased by the City.
UNBUNDLEDRATES:
Per kilowatt-hour Commodity..Distribution Public Benefits Total
First 300 kWh $0.05448 $0.02920 $0.00292 $0.08660
Next 300 kWh 0.07654 0.03878 0.00292 0.11824
Over 600 kWh 0.10349 0.05184 0.00292 0.15825
D.SPECIAL NOTES:
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into three cost components as calculated under Section C: Commodity Charge,
Distribution Charge, and Public Benefits Charge.
Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
{End}
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-l-1 dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-l-1
RESIDENTIAL GREEN PO’WER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-1-G
A.APPLICABILITY:
This schedule applies to separately metered single-family residential dwellings receiving retail
ener~c7 services from the City of Palo Alto Utilities under the Palo Alto Green plan. A "single-family
residential dwelling" is designated as any house, cottage, flat, or apartment unit having a kitchen,
bath, and sleeping facilities. Palo Alto Green power provides for the purchase of 100% renewable
green energy for participating customers.
TERRITORY:
Co
Within the incorporated limits of the City of Palo Alto and on land owned or leased by the City.
UNBUNDLED RATES:
Pato Alto
Per kilowatt-hour Commodity Distribution Public Benefits Green Total
First 300 kwh $0.05448 $0.02920 $0.00292 $0.0!50 $0.10160
Next 300 kWh 0.07654 0.03878 0.00292 0.0150 0.13324
Over 600 kwh 0.10349 0.05184 0.00292 0.0150 0.17325
D.SPECIAL NOTES:
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into four cost components as calculated under Section C: Commodity Charge, a
Distribution Charge, a Public Benefits Charge, and a charge for Palo Alto Green.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No E-1-G-f dated 7-7-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-l-G-1
RESIDENTIAL GREEN POWER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-1-G
(Continued)
Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a quali~ing solar energy system prior to April 1,
1987.
o
o
Palo Alto Green Participation
Customers choosing to participate shall fill out a Palo Alto Green Power Pro~am application
provided by the Customer Service Center.
Notice of Schedule Change
This schedule supercedes and replaces the Residential Green Power Electric Services’
formerly designated as Utilities Rate Schedules E-l-G1, E-l-G2, and E-l-G3, effective per
adoption of this schedule.
{End}
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No E-f-G-2 dated 6-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-l-G-2
SMALL COMMERCIAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-2
No
Co
APPLICABILITY:
This schedule applies to non-demand metered electric service for small commercial customers and
master-metered multi-family facilities.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land ow~aed or leased by the City.
RATES:
Unbundled Seasonal Energy Rates:
Per kilowatt-hour Commodity Distribution Public Benefits Total
Summer $0.08219 $0.04254 $0.00292 $0.12765
Winter 0.07406 0.03810 0.00292 0.11508
D°SPECIAL NOTES:
1.Calculation of Cost Components
The actual bil! amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into three cost components as calculated under Section C: Commodity Charge,
Distribution Charge, and Public Benefits Charge.
2.Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the Summer Period and partly
in the Winter Period, the billing will be computed by prorating the total kWh usage, and the
applicable rates thereto between the two seasonal periods, according to the ratio of the
number of days in each seasonal period to the total number of days in the billing period.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-2-f dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-2-1
SMALL COMMERCIAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-2
(Continued)
o Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-2-2 dated 7-1-2001 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-2-2
SMALL COMMERCIAL GREEN POWER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-2-G
No
No
Co
APPLICABILITY:
This schedule applies to non-demand metered electric service for small commercial customers and
master-metered multi-family facilities receiving retail energy services from the City of Palo Alto
Utilities under the Palo Alto Green plan. Palo Alto Green power provides for either the purchase of
100% renewable ueen energy for participating customers, or for the purchase of 1000 kwh blocks.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and on land owned or leased by the City.
RATES:
1. Unbundled Seasonal Energy Rates (100% renewable green option):
Palo Alto
Per kilowatt-hour Commodity Distribution Public Benefits Green
Summer $0.08219 $0.04254 $0.00292 $0.0150
Total
$O.14265
Winter 0.07406 0.03810 0.00292 0.0150 0.13008
°
Per kilowatt-hour
Summer
Unbundled Seasonal Energy Rates(1000 kWh block option):
Commodi~Distribution Public Benefits
$0.08219 $0.04254 $0.00292
0.07406 0.03810 0.00292Winter
Palo Alto Green Charge (per 1000 kwh block)
Total
$0.12765
0.11508
15.00
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-2-G-f dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective %01-2008
Sheet No. E-2-G-1
SMALL COMMERCIAL GREEN POWER ELECTRIC SERVICE
Do SPECIAL NOTES:
UTILITY KATE SCHEDULE E-2-G
(Continued)
°
o
Calculation of Cost Components
The actual bil! amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into four cost components as calculated under Section C: Commodity Charge, a
Distribution Charge, a Public Benefits Charge, and a charge for Palo Alto Green.
Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the Summer Period and partly
in the Winter Period, the billing will be computed by prorating the total kWh usage, and the
applicable rates thereto between the two seasonal periods, according to the ratio of the
number of days in each seasonal period to the total number of days in the billing period.
Solar Energ~ Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
o Palo Alto Green Participation
Customers choosing to participate shall fill out a Palo Alto Green Power Pro~am application
provided by the Customer Service Center.
Notice of Schedule Change
e ° fThis schedule supercedes and replaces the Small Commercial Green Power Electric S rvlces
formerly designated as Utilities Rate Schedules E-2-G1, E-2-G2, and E-2-G3, effective per
adoption of this schedule.
[End
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-2-G-2 dated 7-07-2007 C~TY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-2-G-2
MEDIUM COMMERCIAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-4
A.APPLICABILITY:
No
This schedule applies to demand metered secondary electric service for commercial customers with a
maximum demand below 1,000 kilowatts who have waived electric direct access eligibility. This
schedule applies to three-phase electric service and may include sewice to master-metered multi-
family facilities.
TERRITORY:
Co
D°
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
Seasonal Demand and Energy Rates:
Commodity
Summer Period
Demand Charge (kW)$5.3 !
Energy Charge (kWh)0.06083
Winter Period
Demand Charge (kW)$4.80
Energy Charge (kWh)0.05281
Distribution Public Benefits Total
$11.88 $17.19
0.01378 0.00292 0.07753
$6.98 $11.78
0.01325 0.00292 0.06898
SPECIAL NOTES:
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount may be
broken down into three components as calculated under Section C: Commodity Charge,
Distribution Chmge and Public Benefit Charge.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-4-f dated 7-1-2007 CiTY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-1
MEDIUM COMMERCIAL ELECTRIC SERVICE
o
o
o
UTILITY tL4TE SCHEDULE E-4
(Continued)
Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the Summer Period and partly
in the Winter Period, the billing will be computed by prorating the total kWh usage, kW
demand, and the applicable rates thereto between the two seasonal periods, according to the
ratio of the number of days in each seasonal period to the total number of days in the billing
period.
Maximum Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a maximum demand meter will be installed as promptly as is practicable
and thereafter continued in service until the monthly use of energy has fallen below 6,000
kilowatt-hours for twelve consecutive months, whereupon, at the option of the City, it may
be removed.
The maximum demand in any month will be the maximum average power in kilowatts taken
during any 15-minute interval in the month provided that in case the load is intermittent or
subject to violent fluctuations, the City may use a 5-minute interval. A thermal-type demand
meter which does not reset after a definite time interval may be used at the City’s option.
The billins demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts for the current month. An exception is that the billing
demand for customers with Thermal Energy Storage (TES) will be based upon the actual
maximum demand of such customers between the hours of noon and 6 pm on weekdays.
Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
Po~ver Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
kilowatts for three consecutive months, the City has the option of installing volt-ampere
reactive (VARJ-hour or any other applicable metering to calculate a power factor. The City
may remove such metering from the service of a customer whose demand has been be!ow
200 kilowatts for four consecutive months.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-2 dated 8-1-2001 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-2
MEDIUM COMMERCIAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-4
(Continued)
When such metering is installed, the monthly electric bill will include a "power factor
penalty", if applicable. The penalty adjustment will be applied to a customer’s bill prior to
the computation of any primary voltage discount. The power factor penalty is applied by
increasing the total energy and demand charges for any month by 0.25 percent (0.25%) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt hours to
kilovolt-ampere_LkVA) hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shal! be the power factor coincident with the customer’s
maximum demand.
Changing Rate Schedules
Customers may request a rate schedule change at any time to any applicable City of Palo Alto
full-service rate schedule. Qualified customers may request service under E-4-G1, E-4-G2,
or E-4-G3.
Customers served under this rate schedule are not eligible for electric direct access and
cannot request a rate schedule change to a full service rate schedule applicable to customers
who are eligible for electric direct access (i.e. E-17).
Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be. supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-4-3 dated 8-1-2001 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-3
MEDIUM COMMERCIAL GREEN POWER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-4-G
No
Bo
Co
APPLICABILITY:
This schedule applies to demand metered secondary electric service for commercial customers with a
maximum demand below 1,000 kilowatts who receive power under the Palo Alto Green plan and
have waived electric direct access eligibility. This schedule applies to three-phase electric service
and may include service to master-metered multi-family facilities. Palo Alto Green power provides
for either the purchase of 1000 kWh blocks, or the purchase of 100% renewable green energy for
participating customers.
TERRITORY:
Within the incorporated limits of the City, of Pa!o Alto and land owned or leased by the City.
RATES:
1. Unbundled Seasonal Demand and Energy Rates (1000 kWh block option):
CommodiW Distribution Public Benefits Total
Summer Period
Demand Charge (kW)$5.31
Energy Charge (kWh)0.06083
Palo Alto Green Charge (per 1000 kWh block)
Winter Period
Demand Charge (kW)$4.80
Energy Charge (kWh)0.05281
Palo Alto Green Charge (per 1000 kWh block)
2.
$11.88 $17.19
0.01378 0.00292 0.07753
15.00
$6.98 $11.78
0.01325 0.00292 0.06898
15.00
Unbundled Seasonal Demand and Energy Rates (100% renewable green option):
Public Palo Alto
Commodity_Distribution Benefits Green Total
$5.31 $11.88 $17.19
0.06083 0.01378 0.00292 0.0150 0.09253
Summer Period
Demand Charge (kW)
Energy Charge (kWh)
Winter Period
Demand Charge (kW)
Energy Charge (kWh)
$4.80 $6.98 $11.78
0.05281 0.01325 0.00292 0.0150 0.08398
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-G-’I dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-4-G-1
MEDIUM COMMERCIAL GREEN POWER ELECTRIC SERVICE
Do SPECIAL NOTES:
UTILITY RATE SCHEDULE E-4-G
(Continued)
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount may
be broken down into four cost components as calculated under Section C: Commodity
Charge, Distribution Charge, Public Benefits Charge and a charge for Palo Alto Green
blocks.
o
Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April _30. When the billing period is partly in the Summer Period and partly
in the Winter Period, the billing will be computed by prorating the total kWh usage, kW
demand, and the applicable rates thereto between the two seasonal periods, according to the
ratio of the number of days in each seasonal period to the total number of days in the billing
period.
Maximum Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a maximum demand meter will be installed as promptly as is practicable
and thereafter continued in service until the monthly use of energy has dropped below 6,000
kilowatt-hours for twelve consecutive months, whereupon, at the option of the City, it may
be removed.
The maximum demand in any month will be the maximum average power in kilowatts taken
during any 15-minute interval in the month provided that in case the load is intermittent or
subject to violent fluctuations, the City may use a 5-minute interval. A thermal-type demand
meter, which does not reset after a definite time interval may be used at the City’s option.
The billing demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts for the current month. An exception is that the billing
demand for customers with Thermal Energy Storage (TES) will be based upon the actual
maximum demand of such customers between the hours of noon and 6 PM on weekdays.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-G-2 dated 6-%2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-4-G-2
MEDIUM COMMERCIAL GREEN POWER ELECTRIC SERVICE
o
UTILITY RATE SCHEDULE E-4-G
(Continued)
Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
Power Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
kilowatts for three consecutive months, the City has the option of installing volt-ampere
reactive (VAR)-hour or any other applicable metering to calculate a power factor. The City
may remove such metering from the service of a customer whose demand has dropped belo~v
200 kilowatts for four consecutive months.
When such metering is installed, the monthly electric bill will include a "power factor
penalty"’, if applicable. The penalty adjustment will be applied to a customer’s bill prior to
the computation of any primary voltage discount. The power factor penalty is applied by
increasing the total energy and demand charges for any month by 0.25 percent or (1/4) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt-hours to
kilovolt-ampere (kVA) hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shall be the power factor coincident with the customer’s
maximum demand.
Changing Rate Schedules
Customers choosing to participate shall fill out a Palo Alto Green Power Program application
provided by the Customer Service Center. Customers may request at any time, in writing, a
change to the number of blocks they wish to purchase under the Palo Alto Green plan.
Customers may request a rate schedule change at any time to any applicable full-service rate
schedule. Qualified customers may elect E-4 or E-4-TOU.
Customers served under this rate schedule are not eligible for electric direct access and
cannot request a rate schedule change to a full service rate schedule applicable to customers
who are eligible for electric direct access (i.e. E-17).
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-G-3 dated 6-’/-2003 CiTY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-4-G-3
MEDIUM COMMERCIAL GREEN POWER ELECTRIC SERVICE
o
UTILITY RATE SCHEDULE E-4-G
(Continued)
Notice of Schedule Change
This schedule supercedes and replaces the Medium Commercial Green Power Electric
Services’ formerly designated as Utilities Rate Schedules E-4-G1, E-4-G2, and E-4-G3,
effective per adoption of this schedule.
Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2.5 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change the
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-G-4 dated 6-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-4-G-4
MEDIUM COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-4 TOU
Ao
Bo
Co
APPLICABILITY:
This schedule applies to demand metered secondary electric service for commercial customers with a
demand between 500 and 1,000 kilowatts per month, who have sustained this level of usage for at
least three consecutive months during the most recent 12 month period, and who have waived
electric direct access eligibility. This schedule applies to three-phase electric service and may
include service to master-metered multi-family facilities. In addition, this rate schedule is applicable
for customers who did not pay power factor penalties during the last 12 months.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
Seasonal Demand and Energy Rates:Per Meter
Per Month
Summer Period
CommodiW Distribution Public Benefits Total
Demand Charge (kW)
Peak $3.12 $6.99 $10.11
Mid Peak 1.99 4.41 6.40
Off-Peak 1.13 2.54 3.67
Energy Charge(kWh)
Peak $0.10963 $0.02529 $0.00292 $0.13784
Mid Peak 0.05617 0.01266 0.00292 0.07175
Off-Peak 0.04298 0.00950 0.00292 0.05540
Winter Period
Demand Charge (kW)
Peak $2.77 $3.94 $6.71
Mid Peak
Off-Peak 1.49 2.27 3.76
Energy Charge(kWh)
Peak $0.07003 $0.01773 $0.00292 $0.09068
Mid Peak
Off-Peak 0.04088 0.01014 0.00292 0.05394
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-TOU-1 dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-TOU-1
MEDIUM COMMERCIAL ELECTRIC TIME OF USE SERVICE
Do SPECIAL .NOTES:
UTILITY RATE SCHEDULE E-4 TOU
(Continued)
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount may be
broken down into appropriate components as calculated under Section C.
Definition of Time Periods
SUMMER (Service from May 1 to October 31):
Peak:12:00 noon to 6:00 p.m.Monday through Friday (except holidays)
Mid Peak:8:00 a.m. to 12:00 noon
6:00 p.m. to 9:00 p.m.
Monday through Friday (except holidays)
Off-Peak:9:00 p.m. to 8:00 a.m.
All day
Monday through Friday (except holidays)
Saturday, Sunday, and holidays
WINTER (Service from November 1 to April 30):
Peak:8:00 a.m. to 9:00 p.m.Monday through Friday (except holidays)
Off-Peak:9:00 p.m. to 8:00 a.m.
All day
Monday through Friday (except holidays)
Saturday, Sunday, and holidays
HOLIDAYS: "Holidays" for the purposes of this rate schedule are New Years Day,
President’s Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving
Day, and Christmas Day. The dates will be those on which the holidays are legally observed.
SEASONAL RATE CHANGE: When the billing period is partly in the summer period and
partly in the winter period, the billing will be computed by prorating the total kWh usage,
kW demand, and the applicable rates thereto between the two seasonal periods, according to
the ratio of the number of days in each seasonal period to the total number of days in the
billing period.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-TOU-2 dated 7-1-2002 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-TOU-2
MEDIUM COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-4 TOU
(Continued)
o Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a demand meter will be installed as promptly as is practicable and
thereafter continued in service until the monthly use of energy has fallen below 6,000
ki!owatt-hours for twelve consecutive months, whereupon, at the option of the City, it
may be removed.
The billin~ demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts taken during any 15-minute interval in each of the desig-nated
Time periods as defined under Section D.2.
Solar Energy Discount
Upon approval by the City, a 10 percent (10%) discount will be applied to a customer’s
electric bill if such customer has installed a qualifying solar energy system prior to April 1,
1987.
Power Factor Penalty
Time of Use customers must not have had a power factor penalty assessed on their service
for at least 12 months. Power factor is calculated based on the ratio of kilowatt hours to
kilovolt-ampere_~kVA) hours consumed during the month, and must not have fallen below
95% to avoid the power factor penalty.
Should the City of Palo Alto Utilities Department find that the customer’s service should be
subject to power factor penalties, the customer will be removed from the E-4-TOU rate
schedule and placed on another applicable rate schedule as is suitable to their kilowatt
demand and kilowatt-hour usage.
Changing Rate Schedules
Customers electing to be served under E-4 TOU must remain on said schedule for a
minimum of 12 months. Should the customer so wish, at the end of 12 months, the customer
may request a rate schedule change to any applicable City of Pa!o Alto full-service rate
schedule. Qualified customers may request service under E-4, E-4-G1, E-4-G2, or E-4-G3.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-TOU-3 dated 1-1-2002 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-TOU-3
MEDIUM COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-4 TOU
(Continued)
o Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-4-TOU-4 dated 1-7-2002 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-4-TOU-4
LARGE COMMERCIAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-7
A.APPLICABILITY:
Uo
This schedule applies to demand metered secondary service for large commercial customers with a
maximum demand of at least 1,000KW per month per site, who have sustained this demand level at
least 3 consecutive months during the last twelve months, and who have waived electric direct access
eligibility.
TERRITORY:
Co
Do
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
Seasonal Demand and Energy Rates:
Commodity
Summer Period
Demand Charge (kW)$6.42
Energy Charge (kWh)0.05662
Winter Period
Demand Charge (kW)$5.50
Energy Charge (kWh)0.04990
SPECIAL NOTES:
Distribution Public Benefits Total
$9.54 $15.96
0.01388 0.00292 0.07342
$4.39 $9.89
0.01379 0.00292 0.06661
Calculation of Charges
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount may be
broken down into th~’ee components as calculated under Section C: Commodity Charge,
Distribution Charge and Public Benefit Charge.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7-1 dated 7-’1-2007 CiTY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-1
LARGE COMMERCIAL ELECTRIC SERVICE
o
o
UTILITY RATE SCHEDULE E-7
(Continued)
Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the summer period and partly in
the winter period, the billing will be computed by prorating the total kWh usage, kW
demand, and the applicable rates thereto between the two seasonal periods, according to the
ratio of the number of days in each seasonal period to the total number of days in the billing
period.
Request for Service
Qualifying customers may request service under this schedule for more than one account or
one meter if the accounts are on one site. A site shall be defined as one or more utility
accounts serving contiguous parcels of land with no intervening public right-of-ways (e.g.
streets) and have a common billing address.
Maximum Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a maximum demand meter will be installed as promptly as is practicable
and thereafter continued in service until the monthly use of energy has fallen below 6,000
kilowatt-hours for twelve consecutive months, whereupon, at the option of the City, it may
be removed.
o
The maximum demand in any month will be the maximum average power in kilowatts taken
during any 15-minute interval in the month provided that in case the load is intermittent or
subject to violent fluctuations, the City may use a 5-minute interval. A thermal-type demand
meter which does not reset after a definite time interval may be used at the City’s option.
The billing demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts for the current month. An exception is that the billing
demand for customers with Thermal Energy Storage (TES) will be based upon the actual
maximum demand of such customers between the hours of noon and 6 pm on weekdays.
Power Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-7-2 dated 8-1-2001 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-2
LARGE COMMERCIAL ELECT~C SERVICE
UTILITY KATE SCHEDULE E-7
(Continued)
kilowatts for three consecutive months, the City has the option to install volt-mnpere reactive
LVAR)-hour or any other applicable metering to calculate a power factor. The City may
remove such metering from the service of a customer whose demand has been below- 200
kilowatts for four consecutive months.
W-hen such metering is installed, the monthly electric bill shall include a "power factor
penalty", if applicable. The penalty adjustment shall be applied to a customer’s bill prior to
the computation of any primary" voltage discount. The power factor penalty is applied by
increasing the total energy and demand charges for any month by 0.25 percent (0.25%) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt hours to
kilovolt-ampere (kVA! hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shall be the power factor coincident with the customer’s
maximum demand.
Changing Rate Schedules
Customers may request a rate schedule change at any time to any applicable full service rate
schedule. Customers served under this rate schedule are not eligible for electric direct access
and cannot request a rate schedule change to the full service rate schedule(s) applicable to
customers who are eligible for direct access (E-8). Qualified customers may request service
under E-7-G 1, E-7-G2, or E-7-G3.
Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-7-3 dated 8-1-200"1 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-3
Bo
Co
LARGE COMMERCIAL GREEN POWER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-7-G
APPLICABILITY:
This schedule applies to demand metered service for large commercial customers who choose
service under the Palo Alto Green plan. A customer may qualify for this rate schedule if the
customer’s maximum demand is at least 1,000KW per month per site, who have sustained this
demand level at least 3 consecutive months during the last twelve months, and who have waived
direct access eligibility. Palo Alto Green power provides for the either the purchase of 1000 kWh
blocks, or the purchase of 100% renewable green energy for participating customers.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land o~vned or leased by the City.
RATES:
Unbundled Seasonal Demand and Energy Rates (1000 kWh block option):
CommodiW Distribution Public Benefits
Summer Period
Demand Charge (kW)
Energy Charge (kWh)
$6.42 $9.54
0.05562 0.01388
Palo Alto Green Charge (per 1000 kwh block)
0.00292
Winter Period
Demand Charge (kW)$5.50
Energy Charge (kWh)0.04990
Palo Alto Green Charge (per 1000 kwh block)
$4.39
0.01379 0.00292
Total
$15.96
0.07342
15.00
$9.89
0.06661
15.00
Unbundled Seasonal Demand and Energy Rates (100% renewable green option):
Public Palo Alto
Commodity Distribution Benefits Green
Summer Period
Demand Charge (kW)
Energy Charge (kWh)
Winter Period
Demand Charge (kW)
Energy Charge (kWh)
$6.42 $9.54
0.05562 0.01388 0.00292 0.0150
$5.50 $4.39
0.04990 0.01379 0.00292 0.0150
Total
$15.96
0.08842
$9.89
0.08161
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7-G-1 dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-7-G-1
LARGE COMMERCIAL GREEN POWER ELECTRIC SERVICE
Do
UTILITY RATE SCHEDULE E-7-G
(Continued)
SPECIAL NOTES:
1.Calculation of Charges
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bil! statement, the bill amount may be
broken down into four components as calculated under Section C: Commodity Charge,
Distribution Charge, Public Benefit Charge and a charge for Palo Alto Green blocks.
2.Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the Summer Period and partly
in the Winter Period, the billing will be computed by prorating the total kwh usage, kW
demand, and the applicable rates thereto between the two seasonal periods, according to the
ratio of the number of days in each seasonal period to the total number of days in the billing
period.
3.Maximum Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a maximum demand meter will be installed as promptly as is practicable
and thereafter continued in service until the monthly use of energy has dropped below 6,000
kilowatt-hours for twelve consecutive months, whereupon, at the option of the City, it may
be removed.
The maximum demand in any month will be the maximum average power in kilowatts taken
during any 15-minute interval in the month provided that in case the load is intermittent or
subject to violent fluctuations, the City may use a 5-minute interval. A thermal-type demand
meter, which does not reset after a definite time interval may be used at the City’s option.
The billing demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts for the current month. An exception is that the billing
demand for customers with Thermal Energy Storage (TES) will be based upon the actual
maximum demand of such customers between the hours of noon and 6 PM on weekdays.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7-G-2 dated 6-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-7-G-2
LARGE COMMERCIAL GREEN POWER ELECTRIC SERVICE
o
o
UTILITY RATE SCHEDULE E-7-G
(Continued)
Request for Service
Qualifying customers may request service under this schedule for more than one account or
one meter if the accounts are at one site. A site shall be defined as one or more utility
accounts serving contiguous parcels of land with no intervening public right-of-ways (e.g.
streets) and have a common billing address.
Po~ver Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
kilowatts for three consecutive months, the City has the option to install volt-ampere reactive
(VARJ-hour or any other applicable metering to calculate a power factor. The City may
remove such metering from the service of a customer whose demand has dropped below 200
kilowatts for four consecutive months.
When such metering is installed, the monthly electric bill shall include a "power factor
penalty", if applicable. The penalty adjustment shall be applied to a customer’s bill prior to
the computation of any primary voltage discount. The power factor penalty is applied by
increasing the total energy and demand charges for any month by 0.25 percent or (1/4) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt-hours to
kilovolt-ampere_(kVA) hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shall be the power factor coincident with the customer’s
maximum demand.
Changing Rate Schedules
a.Customers choosing to participate shall fill out a Green Power Program application
provided by the Customer Service Center.
b.Customers may request at any time, in writing, a change to the nmnber of Palo Alto
Green blocks they wish to purchase under the Palo Alto Green plan.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7-G-3 dated 6-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-7-G-3
LARGE COMMERCIAL GREEN POWER ELECTRIC SERVICE
o
UTILITY RATE SCHEDULE E-7-G
(Continued)
Co If a customer account discontinues to qualify %r this service for an account(s) on
Utility Rate Schedule E-7-G, such account(s) may be charged under Utility Rate
Schedule E-4-G or any other applicable rate schedule.
do Customers may request a rate schedule change at any time to any applicable full
service rate schedule. Customers served under this rate schedule are not eligible for
electric direct access and cannot request a rate schedule change to the full service rate
schedule(s) applicable to customers who are eligible for direct access (E-8).
Qualified customers may request service under E-7 or E-7-TOU.
Notice of Schedule Change
This schedule supercedes and replaces the Large Commercial Green Power Electric Services’
formerly designated as Utilities Rate Schedules E-7-G1, E-7-G2, and E-7-G3, effective per
adoption of this schedule.
Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed; provided, however, the City is not required to supply service at a qualified line
voltage where it has, or will install, ample facilities for supplying at another voltage equally
or better suited to the customer’s electrical requirements. The City retains the right to change
its line voltage at any time after providing reasonable advance notice to any customer
receiving a discount hereunder and affected by such change. The customer then has the
option to change the system so as to receive service at the new line voltage or to accept
service (without voltage discount) through transformers to be supplied by the City subject to
a maximum kVA size limitation.
{End}
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7-G-4 dated 6-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-7-G-4
LARGE COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-7 TOU
A.APPLICABILITY:
Bo
This schedule applies to demand metered secondary service for large commercial customers with a
maximum demand of at least 1,000KW per month per site, who have sustained this demand level at
least 3 consecutive months during the last twelve months, and who have waived electric direct access
eligibility. In addition, this rate schedule is applicable for customers who did not pay power factor
penalties during the last 12 months.
TERRITORY:
Co
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
Seasonal Demand and Energy Rates:Per Meter
Per Month
Summer Period
CommodiW Distribution Public Benefits Total
Demand Charge (kW)
Peak $4.24 $6.27
Mid Peak 2.06 3.14
Off-Peak 1.17 1.57
Energy Charge (kWh)
Peak
Mid Peak
Off-Peak
Winter Period
$10.51
5.20
2.74
$0.07029 $0.01746 $0.00292 $0.09067
0.05867 0.01446 0.00292 0.07605
0.04870 0.01192 0.00292 0.06354
Demand Charge (kW)
Peak $3.04 $2.46
Mid Peak -
Off-Peak 1.59 1.22
$5.50
2.81
Energy Charge(kWh)
Peak $0.05617
Mid Peak -
Off-Peak 0.04663
$0.01557 $0.00292 $0.07466
0.01284 0.00292 0.06239
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-7-TOU-1 dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-TOU-1
LARGE COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-7 TOU
(Continued)
D.SPECIAL NOTES:
o
Calculation of Charges
The actua! bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount may be
broken down into appropriate components as calculated under Section C.
Definition of Time Periods
SUMMER (Service from May 1 to October 31):
Peak:12:00 noon to 6:00 p.m.Monday through Friday (except holidays)
Mid Peak:8:00 a.m. to 12:00 noon
6:00 p.m. to 9:00 p.m.
Monday through Friday (except holidays)
Off-Peak:9:00 p.m. to 8:00 a.m.
All day
Monday through Friday
Saturday, Sunday, and holidays
WINTER (Service from November 1 to April 30):
Peak:8:00 a.m. to 9:00 p.m.Monday through Friday (except holidays)
Off-Peak:9:00 p.m. to 8:00 a.m.
All day
Monday through Friday (except holidays)
Saturday, Sunday, and holidays
HOLIDAYS: "Holidays" for the purposes of this rate schedule are New Years Day,
President’s Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving
Day, and Christmas Day. The dates will be those on which the holidays are legally observed.
SEASONAL RATE CHANGE: When the billing period is partly in the summer period and
partly in the winter period, the billing will be computed by prorating the total kWh usage,
kW demand, and the applicable rates thereto between the two seasonal periods, according to
the ratio of the number of days in each seasonal period to the total number of days in the
billing period.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-7- TOU-2 dated 1-’/-2002 CITY OF PALQ ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-TOU-2
o
o
o
LARGE COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-7 TOU
(Continued)
Request for Service
Qualifying customers may request service under this schedule for more than one account or
one meter if the accounts are on one site. A site shall be defined as one or more utility
accounts serving contiguous parcels of land with no intervening public right-of-ways (e.g.
streets) and have a common billing address.
Demand Meter
Whenever the monthly use of energy has exceeded 8,000 kilowatt-hours for three
consecutive months, a demand meter will be installed as promptly as is practicable and
thereafter continued in service until the monthly use of energy has fallen below 6,000
kilowatt-hours for twelve consecutive months, whereupon, at the option of the City, it may
be removed.
The billing demand to be used in computing charges under this schedule will be the actual
maximum demand in kilowatts taken during any 15-minute interval in each of the designated
Time periods as defined under Section D.2.
Power Factor Penalty
Time of Use customers must not have had a power factor penalty assessed on their service
for at least 12 months. Power factor is calculated based on the ratio of kilowatt hours to
kilovolt-ampere(kVA) hours consumed during the month, and must not have fallen below
95% to avoid the power factor penalty.
Should the City of Palo Alto Utilities Department find that the customer’s service should be
subject to power factor penalties, the customer will be removed from the E-7-TOU rate
schedule and placed on another applicable rate schedule as is suitable to their kilowatt
demand and kilowatt-hour usage.
Changing Rate Schedules
Customers electing to be served under E-7 TOU must remain on said schedule for a
minimum of 12 months. Should the customer so wish, at the end of 12 months, the customer
may request a rate schedule change to any applicable City of Palo Alto full-service rate
schedule. Qualified customers may request service under E-7, E-7-G1, E-7-G2, or E-7-G3.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-7-TOU-3 dated 1-7-2002 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-TOU-3
LARGE COMMERCIAL ELECTRIC TIME OF USE SERVICE
UTILITY RATE SCHEDULE E-7 TOU
(Continued)
o Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
{End}
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-7-TOU-4 dated 1-1-2002 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-7-TOU-4
STREET LIGHTS
UTILITY RATE SCHEDULE E-14
Ao APPLICABILITY:
This schedule applies to street and highway lighting installations owned by any governmental agency
other than the City of Palo Alto.
B. TERRITORY:
Within the incorporated limits of the City of Pato Alto and land owned or leased by the City.
-C. RATES:
Buming Schedule:
kWh’s Per Month
All Night/Midnight
Per Lamp Per Month - Class A
Utility supplies energy and
switching service only.
All Night Midnight
Lamp Rating:
Mercury-Vapor Lamps
100 watts 42/20 $10.98 $ 8.11
175 watts 68/35 13.10 10.21
400 watts 154/71 26.96 20.79
High Pressure Sodium Vapor Lamps
120 volts
70 watts
100 watts
150 watts
240 volts
29/15 9.63 6.75
41/20 12.90 9.42
60/30 16.75 14.07
70 watts 34/17 10.77 8.11
100 watts 49/25 14.07 10.21
150 watts 70/35 16.75 1 ! .56
200 watts 90/45 18.68 14-.83
250 watts 110/55 21.20 15.01
310 watts 134/167 24.84 19.64
400 watts 167/84 30.43 22.53
Fluorescent Lamps
40 watts 15/8 4.05 3.27
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-14-1 dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-14-1
Burning Schedule:
kWh’s Per Month
All Night/Midnight
Lamp Rating:
Merculw-Vapor Lamps
100 watts
175 watts
250 watts
400 watts
Incandescent Lamps
189 watts (2,500 L)
295 watts (4,000 L)
405 watts (6,000 L)
620 watts (10,000 L)
Fluorescent Lamps
25 watts
40 watts
55 watts
STREET LIGHTS
UTILITY RATE SCHEDULE E-14
(Continued)
Per Lamp Per Month - Class C
Utility supplies energy and switching
service and maintains entire system,
including lamps and glassware.
All Night Midnight
42/20 $12.33 $ 9.42
68/35 14.83 11.74
97/49 18.47 14.27
154/71 27.54 21.20
65/32 13.10 10.42
10!/5 16.75 13.10
139/70 21.20 17.52
212/106 29.47 24.44
12/6 4.82 3.67
15/8 4.99 4.05
18/9 5.78 4.25
Hiah Pressure Sodium Vapor Lamps
120 volts
70 watts 29/15 10.02 7.13
100 watts 41/20 13.47 9.83
150 watts 60/30 17.33 14.46
240 volts
70 watts 34/17 11.17 8.48
100 watts 49/25 ! 4.63 10.77
150 watts 70/35 17.33 12.14
200 watts 90145 ! 9.25 15.40
250 watts 110/55 21.58 15.80
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-14-2 dated 7-01-2007
CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-14-2
STREET LIGHTS
UTILITY RATE SCHEDULE E- 14
(Continued)
D.SPECIAL CONDITIONS:
Type of Service: This schedule is applicable to series circuit and multiple street lighting systems
to which the Utility will deliver current at secondary voltage. Unless otherwise agreed, multiple
current will be delivered at 120/240 volts, three-wire, single-phase. In certain localities the
Utility may supply service from 120/208 volt star-connected poly-phase lines in place of 240-volt
service. Single phase service from 480-volt sources will be available in certain areas at the
option of the Utility when this type of service is practical from the Utility’s engineering
standpoint. All currents and voltages stated herein are nominal, reasonable variations being
permitted. New lights will normally be supplied as multiple systems.
Point of Delivery: Delivery will be made to the customer’s system at a point or at points mutually
agreed upon. The Utility will furnish the service connection to one point for each group of
lamps, provided the customer has arranged his system for the least practicable number of points
of delivery. All underground connections will be made by the customer or at the customer’s
expense.
Switching: Switching will be performed by the Utility (on the Utility’s side of points of delivery)
and no charge will be made for switching provided there are at least 10 kilowatts of lamp load on
each circuit separately switched, including all lamps on the circuit whether served under this
schedule or not; otherwise, an extra charge of $2.50 per month will be made for each circuit
separately switched unless such switching installation is made for the Utility’s convenience or the
customer furnishes the switching facilities and, if installed on the Utility’s equipment, reimburses
the Utility for installing and maintaining them.
Annual Burnin~ Schedule: The above rates apply to lamps which will be turned on and off once
each night in accordance with a regular burning schedule agreeable to the customer but not
exceeding 4,100 hours per year for all-night service and 2,050 hours per year for midnight
service.
Maintenance: The rates under Class C include all labor necessary for replacement of glassware
and for inspection and cleaning of the same. Maintenance of glassware by the Utility is limited
to standard glassware such as is commonly used and manufactured in reasonably large quantities.
A suitable charge will be made for maintenance of glassware of a type entailing unusual expense.
Under Class C, the rates include maintenance of circuits between lamp posts and of circuits and
equipment in and on the posts, provided these are all of good standard construction; otherwise,
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-’14-3 dated 7-1-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-14-3
STREET LIGHTS
UTILITY RATE SCHEDULE E- 14
(Continued)
the Utility may decline to grant Class C rates. Class C rates applied to any agency other than the
City of Palo Alto also include painting of posts with one coat of good ordinary paint as required
to maintain good appearance but do not include replacement of posts broken by traffic accidents
or otherwise.
10.
11.
Multilamp Electroliers: The above charges are made on per-lamp basis. For posts supporting
one or more lamps, where the lamps are less than nine feet apart, the above charges for Class C
will be reduced by 6 percent (6%) computed to the nearest whole cent, for all lamps other than
the first one.
Operatin~ Schedules Other Than All-Night and Midnight: Rates for regular operating schedules
other than all-night and midnight-will be the midnight rates plus or minus one-eleventh of the
difference between the midnight and the all-night rate, computed to the nearest whole cent, for
each half hour per night more or less than midnight service. This adjustment will apply only to
lamps on regular operating schedules which do not exceed 4,500 hours per year.
Street Light Lamps, Standard and Nonstandard Ratings: The rates for incandescent lamps under
Class A are applicable for service to regular street lamps only and must be increased by 6
percent, computed to the nearest whole cent, for service to group-replacement street lamps. The
rates under Class C are applicable to both regular and group-replacement street lamps.
Continuous Operation: The rate for continuous 24-hour operation under Class A service will be
twice the all-night rate.
System O~vned In-Part by UtiliW : Where, at customer’s request, the Utility installs, owns, and
maintains any portion of the lighting fixtures, supports, and/or interconnecting circuits, an extra
monthly charge of one and one-fourth percent of the Utility’s estimate of additional investment
shall be made.
Rates For Lamps Not on Schedule: In the event a customer installs a lamp which is not presently
represented on this schedule, the Utility will prepare an interim rate reflecting the Utility’s
estimated costs associated with the specific lamp size. This interim rate will serve as the
effective rate for billing purposes until the new lamp rating is added to Schedule E-14.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-14-4 dated 7-1-2003
CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-14-4
UNMETERED ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-16
A.APPLICABILITY:
This schedule applies to unmetered electric service and other miscellaneous Electric Utility fees to
various public agencies and private entities.
B.TERRITORY:
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
C.RATES:
Service Description Customer Rate *
Automatic Irrigation Systems:
Hwy 101 & Embarcadero,
Sand Hill Road
State of
California,
Public Works
$ 6.71 ea
Highway Lighting & Sign
Illumination
State of
California
(A)Highway Lighting
Electrolier (20,000 L)
Electrolier (4000 L) & (7000 L)
@ 23.36 ea
@ 11.75 ea
(B)Sign Lighting
Sign (1,910 W)
Signs (1,572 W)
Signs (786 W)
@ 78.00 ea
@ 64.10 ea
@ 32.05 ea
Page Mill Expressway and
El Camino Park & Ride Lot
Lighting and Signal
Santa Clara
County
72.96
Automatic sprinklers at Oregon
& Page Mill Expressway
Public Works 35.57
* Rates are monthly unless otherwise indicated.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E- 16-1 dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-16-1
UNMETERED ELECTRIC SERVICE
Service Description
Traffic Signal
(A)Controller
(B)8" Lamp
(C)12" & PVH Lamp
(D)Pedestrian Head
(E)Vehicle, System and
Bike Sensor Loop
Electric Service for Cathodic
Protection Station
UTILITY RATE SCHEDULE E- 16
(Continued’
Customer Rate
PG&E
$498.89ea
5.84 ea
7.49ea
9.99ea
19.97 ea
13.59
13.
Cable TV Power Supply/Service
Permit Fee for Electric Conduit Usage
(A)Exclusive use
(B)Non-Exclusive use
Processing Fee for Electric Conduit Usage
Permit Fee for Utility Pole Attachments
(A)1 ft. of usable space
(B)2 ft. of usable space
(C)3 ft. of usable space
(D)4 ft. of usable space
Processing Fee for Utility Pole Attachments
Utilities Broadband Local Area Network
(A) Bandwidth Assignment
(B) Carrier Usage
Power supply to
Groundwater Treatment Service
Comcast
Permittee
Permittee
Permit-tee
Permittee
City Departments
City Departments
45.38
1.10/ft/yr
0.55/ft!yr
Actual Cost
$18.08/pole/yr
$19.98/pole/yr
$21.87/pole/yr
$23.77/pole/yr
$47.00/pole
210.80/MHZ
52.70/carrier
130.32
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-f6-2 dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No.E-16-2
UNMETERED ELECTRIC SERVICE
UTILITY RATE SCHEDULE E- 16
(Continued)
D.SPECIAL PROVISIONS:
In the event a customer requests an electric service which the Utility determines will be an unmetered
service, or miscellaneous fee, the Utility will charge an interim rate reflecting the Utility’s estimated
costs associated with the specific service. The Utility may charge an existing rate contained on this
Rate Schedule for an identical or similar type service, or prepare a new rate. This interim rate will
serve as the effective rate for billing purposes until the service type is added to Rate Schedule E-16.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No.E-f6-3 dated 7-01-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No.E-16-3
MUNICIPAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-18
Ao
B°
Co
APPLICABILITY:
This schedule applies to service for buildings and facilities ow~aed and/or operated by the City of
Palo Alto.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
Unbundled Seasonal Energy Rates:
Per kilowatt-hour Commodity Distribution Public Benefits Total
Summer $0.06686 $0.03456 $0.00292 $0.10434
Winter 0.05369 0.02750 0.00292 0.08411
Do SPECIAL NOTES:
1.Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into three cost components as calculated under Section C: Commodity Charge,
Distribution Charge, and Public Benefits Charge.
2.Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective fi’om
November 1 to April 30. When the billing period is partly in the summer period and partly in
the winter period, the billing will be computed by prorating the total kwh usage, and the
applicable rates thereto between the two seasonal periods, according to the ratio of the
number of days in each seasonal period to the total number of days in the billing period.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-’18-1 dated 7-1-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No. E-18-1
MUNICIPAL ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-18
(Continued)
o Power Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
kilowatts for three consecutive months, the City has the option to install volt-ampere reactive
(VAR_)-hour or any other applicable metering to calculate a power factor. The City may
remove such metering from the service of a customer whose demand has been below- 200
kilowatts for four consecutive months.
When such metering is installed, the monthly electric bill shall include a "power factor
penalty", if applicable. The penalty adjustment shall be applied to a customer’s bill prior to
the computation of any primary voltage discount. The power factor penalty is applied by
increasing the total energ~ and demand charges for any month by 0.25 percent (0.25%) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt hours to
kilovolt_-ampere(kVA) hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shall be the power factor coincident with the customer’s
maximum demand.
o Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying-at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-18-2 dated 3-1-2002 CITY OF PALQ ALTO
UTILITIES
Proposed Effective 7-1-2008
Sheet No. E-18-2
MUNICIPAL GREEN POWER ELECTRIC SERVICE
UTILITY RATE SCHEDULE E-18-G
No
No
Co
Do
APPLICABILITY:
This schedule applies to service for buildings and facilities owned and/or operated by the City of
Palo Alto receiving power under the Palo Alto Green plan. Palo Alto Green power provides for
either the purchase of 1000 kwh blocks, or the purchase of 100% renewable green energy for
participating customers.
TERRITORY:
Within the incorporated limits of the City of Palo Alto and land owned or leased by the City.
RATES:
1. Unbundled Seasonal Energy Rates (100% renewable green option):
Palo Alto
Per kilowatt-hour Commodity_Distribution Public Benefits Green
Summer $0.06686 $0.03456 $0.00292 $0.0150
Winter 0.05369 0.02750 0.00292 0.0150
Total
$0.11934
0.09911
°
Per kilowatt-hour Commodity Distribution
Summer $0.06686 $0.03456
Winter 0.05369 0.02750
Palo Alto Green Charge (per 1000 kWh block
SPECIAL NOTES:
Unbundled Seasonal Energy Rates(lO00 kWh block option):
Public Benefits
$0.O0292
0.00292
Total
$0.10434
0.08411
15.00
Calculation of Cost Components
The actual bill amount is calculated based on the applicable rates in Section C above and
adjusted for any applicable discounts. On a customer’s bill statement, the bill amount is
broken down into four cost components as calculated under Section C: Commodity Charge,
Distribution Charge, Public Benefits Charge, and a charge for Palo Alto Green blocks.
°Seasonal Rate Changes
The Summer Period is effective May 1 to October 31 and the Winter Period is effective from
November 1 to April 30. When the billing period is partly in the summer period and partly in
the winter period, the billing will be computed by prorating the total kWh usage, and the
applicable rates thereto between the two seasonal periods, according to the ratio of the
number of days in each seasonal period to the total number of days in the billing period.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-18-G-1 dated 7-01-2007 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-18-G-1
o
o
MUNICIPAL GREEN POWER ELECTRIC SERVICE
UTILITY P~_TE SCHEDULE E-18-G
(Continued)
Power Factor
For new or existing customers whose demand is expected to exceed or has exceeded 300
kilowatts for three consecutive months, the City has the option to install volt-ampere reactive
(VAR_l-hour or any other applicable metering to calculate a power factor. The City may
remove such metering from the service of a customer whose demand has been below 200
kilowatts for four consecutive months.
When such metering is installed, the monthly electric bill shall include a "power factor
penalty", if applicable. The penalty adjustment shall be applied to a customer’s bill prior to
the computation of any primary voltage discount. The power factor penalty is applied by
increasing the total energy and demand charges for any month by 0.25 percent (0.25%) for
each one percent (1%) that the monthly power factor of the customer’s load was less than
95%.
The monthly power factor is the average power factor based on the ratio of kilowatt hours to
kilovolt-ampere (kVA) hours consumed during the month. Where time-of-day metering is
installed, the monthly power factor shall be the power factor coincident with the customer’s
maximum demand.
Changing Rate Schedules
Customers choosing to participate shall fill out a Palo Alto Green Power Program application
provided by the Customer Service Center. Customers may request at any time, in writing, a
change to the number of blocks they wish to purchase under the Palo Alto Green plan.
Primary Voltage Discount
Where delivery is made at the same voltage as that of the line from which the service is
supplied, a discount of 2 1/2 percent for available line voltages above 2 kilovolts will be
allowed provided the City is not required to supply service at a particular line voltage where
it has, or will install, ample facilities for supplying at another voltage equally or better suited
to the customer’s electrical requirements. The City retains the right to change its line voltage
at any time after providing reasonable advance notice to any customer receiving a discount
hereunder and affected by such change. The customer then has the option to change his
system so as to receive service at the new line voltage or to accept service (without voltage
discount) through transformers to be supplied by the City subject to a maximum kVA size
limitation.
CITY OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. E-18-G-2 dated 6-01-2003 CITY OF PALO ALTO
UTILITIES
Proposed Effective 7-01-2008
Sheet No. E-18-G-2
ATTACHMENT C
DRAFT
UTILITIES ADVISORY COMMISSION
MINUTES OF MARCH 5, 2008
CALL TO ORDER
Chairman Rosenbaum called to order at 7:00 P.M. the scheduled meeting of the Utilities Advisory Commission
(UAC).
Present: Commissioners George Bechtel, Dexter Dawes, John Melton, Dick Rosenbaum, and Council Liaison
Yiaway Yeh
Absent: Commissioner Marilyn Keller
ORAL COMMUNICATIONS
NONE
APPROVAL OF THE MINUTES
Commissioner Bechtel expressed his approval as to the quality of the minutes for February. The minutes from
the February 6, 2008, were unanimously approved.
AGENDA REVIEW
No changes to the agenda were requested.
REPORT FROM COMMISSION MEETINGS/EVENTS
There were no reports.
Utilities Advisory Commission Minutes Approved on:Page 1 of 7
UTILITIES DIRECTOR REPORT
Utilities Director Valerie Fong gave the following updates:
Hydro Conditions: Northern Sierra precipitation is at 90% of average to date and reservoir levels are
about 80% of average. As a result, hydro electric generation is expected to be below average if
precipitation resumes median levels for the rest of the season.
Local Cogen: The project proponent, a key customer, has retained an energy consultant io assist
with project feasibility and development, however, neither firm is interested in owning the project and
ownership interest was proposed to the City. The preliminary project design is for a 20 MW plant, with
an initial capital cost of approximately $47M.
COTP Transmission Asset Lay-off: Staff will be sending a formal offer letter to other owners of
COTP transmission expressing the City’s interest to lay-off all 50 MW of City’s ownership share for 20
years at cost. Continuing updates will be provided to the UAC, and the offer and final contract will be
subject to final Council approval.
Western Geo Power: On 2/19 Council approved participation in an NCPA 3fd phase agreement to
purchase up to 5 Average MW of a new Geysers area geothermal powerplant being developed by
Western GeoPower. The City’s share of output will range from 2 to 4% of the City’s electric load
depending on plant output and other member participation levels. Power flow is expected starting in
2010 and running through 2030.
CIP: In response to Vice Chair Dawes question at last month’s UAC meeting, an update on the gas
main replacement CIP was provided. The gas main replacement projects are an on-going expense of
running the gas utility. Over the last 15 years or so the gas mains have been replaced at an
accelerated rate due to the deterioration of ABS main pipelines. The replacement of the ABS mains is
expected to be completed in 2012-13 timeframe. Once this is completed the ABS services will be
replaced along with the on-going replacement of steel mains. Expenditures for pipeline replacement
are expected to begin decreasing after the all ABS mains are replaced and then level out at a level
that sustains the condition of the infrastructure.
Utilities Advisory Commission Minutes Approved on:Page 2 of 7
The following upcoming meetings were noted:
March 10, 2008 - Council Meeting (to establish UUD 45 and to approve the PPA with Ameresco for
the Keller Canyon landfill gas to energy)
March 17, 2008 - Council Joint Meeting with Senator Simitian
March 18, 2008 - Finance Committee - Water, Gas and Electric Rate Increase
April 2, 2008 - Next UAC Meeting
UNFINISHED BUSINESS
NONE
NEW BUSINESS
ITEM 1: ACTION ITEM: Proposed Water Rate Increase Effective July 1, 2008
Valerie Fong, Utilities Director, stated that no presentation was prepared, but that staff was available to answer
questions on the report. As a prefatory comment, for residential customers, the 8 percent proposed increase
was geared more towards higher tier water users, primarily as a conservation signal.
Commissioner Melton questioned why the customer charge was not increasing at this time, and if it was staff’s
intention to bring this charge up to cost-of-service study levels for residential customers gradually. Fong stated
that all increases were on volumetric charges only this time for conservation reasons. Jane Ratchye, Assistant
Director for Resource Management, clarified that, with conservation goals growing in importance, widening the
price gap between residential tiers was a staff’s recommendation this year. This emphasis will be re-
evaluated on an ongoing basis.
Commissioner Dawes questioned the capital expenditures in Fiscal Year 2007-08 and the return of previously
encumbered Capital Improvement Program (CIP) funds to the Rate Stabilization Reserve (RSR), and
specifically whether the Emergency Water Supply and Storage project would be worked on this fiscal year.
Utilities Advisory Commission Minutes Approved on:Page 3 of 7
Fong clarified that it would be, and that well rehabilitation and pump station upgrades could go forward
independent of reservoir siting issues. Commissioner Dawes asked if the FY 07-08 ClP figures were for funds
spent or funds committed, and Fong clarified they were committed funds.
Commissioner Rosenbaum questioned the first sentence on page four, which appears to give reasons as to
why water rates have been higher than surrounding areas. Commissioner Rosenbaum stated that the reasons
given imply that Palo Alto has higher relative costs than others cities, and questioned whether that has been
studied. Ratchye agreed that the sentence related more to cost drivers rather than cost comparisons with
other cities. Commissioner Rosenbaum asked specifically about the level of allocated charges and general
fund transfers in other cities. Ratchye posited that allocated charges were unknown, and transfers were
probably very low. Commissioner Rosenbaum posited whether rate-payers would enjoy paying for such
transfers, along with rents to the City, as they account for roughly $0.80 per one hundred cubic feet of water,
and were "significant." Commissioner Rosenbaum suggested the charges may be too high, and perhaps a
comparison study should be done to surrounding cities.
Commissioner Dawes stated that the Auditors report shows Palo Alto’s water department costs have
increased rapidly over the last few years and are now higher than the next highest city utility, which was
"worrisome." Asked whether charges by the city to the water utility could be reduced, Fong commented these
were not within her scope to modify or make recommendations on, and if the UAC wanted to not increase
rates due to these costs, staff’s only recourse would be to drop CIP projects. Commissioner Dawes
commented that perhaps the chair or vice-chair of the UAC should present to Council the problems they see
with costs.
Utilities Advisory Commission Minutes Approved on:Page 4 of 7
Commissioner Rosenbaum asked for a motion. Commissioner Dawes moved and Commissioner Bechtel
seconded the water rate proposal. No further discussions were presented. Commissioner Rosenbaum asked
for those in favor, and the motion passed unanimously.
ITEM 2: ACTION ITEM: Proposed Natural Gas Rate Increase Effective July 1, 2008
Fong again stated that no presentation was prepared, but that staff was available to answer questions on the
report. She noted that there were no proposed increases to the customer charge for gas.
Commissioner Dawes questioned whether, based on projections of stable gas supply costs over the next few
years, whether the proposed increase should be spread over multiple years. Commissioner Melton countered
that a lower increase would take the RSR below the risk assessment level. Commissioner Rosenbaum asked
if staff had comment, and Fong expressed staff’s agreement with Commissioner Melton, and added that there
were no additional reserves to "back-up" the gas funds, unlike the electric fund (Calaveras).
Commissioner Bechtel expressed concern for future projections showing no increases, and questioned
whether staff would look at debt financing more projects to spread costs over time and keep rates down,
perhaps having annual inflationary increases instead of large changes. Fong confirmed that staff was serious
about pursuing debt financing for large projects, and may finance gas projects along with larger projects
should the need arise. Commissioner Rosenbaum stated that normal maintenance operations should be
funded through rates, and that larger maintenance programs or ClP spending explains why Palo Alto’s
distribution costs were higher than Pacific Gas & Electric.
Utilities Advisory Commission Minutes Approved on:Page 5 of 7
Commissioner Rosenbaum asked for a motion. Commissioner Dawes moved and Commissioner Melton
seconded the gas rate proposal. No further discussions were presented. Commissioner Rosenbaum asked
for those in favor, and the motion passed unanimously.
ITEM 3: ACTION ITEM: Proposed Electric Rate Increase Effective July 1,2008
Fong again stated that no presentation was prepared, but that staff was available to answer questions on the
report. Commenting that, as the February UAC meeting regarding electric scenarios indicated that the "middle
of the road" option was what seemed to resonate with the UAC, this was what staff was proposing. Ratchye
added that, in order to ensure that reserves will end at the risk assessment value for FY 08-09, additional
funds are planned to be drawn from the Calaveras Reserve, but that the Cataveras Reserve fund balance
would still be within Council approved guideline levels.
Commissioner Dawes sought clarification as to whether staff could make such a transfer, and Commissioner
Melton confirmed that, within a particular fund, staff can move money between RSR’s.
Commissioner Melton commented that the discussion on this increase was really done last month, and the
current proposal was exactly what the UAC asked for the last time. Commissioner Melton moved and
Commissioner Bechtel seconded the electric rate proposal.
Commissioner Rosenbaum asked why the higher residential tiers would see larger increases than the lower
tiers, and what fraction of residential usage was in tier 3. Staff commented that it was quite a bit less than half,
but the exact figures were not immediately in front of them. Commissioner Rosenbaum commented that a two
tier pricing system may be more appropriate, and requested staff to look into that in the future. Fong
commented that, as shown on Table 3, the impact to larger users was not that dramatic.
Utilities Advisory Commission Minutes Approved on:Page 6 of 7
Commissioner Bechtel asked if there were any instances of a neighborhood needing a service change on the
distribution side due to household consumption levels increasing, or whether there has been a significant
increase in residential usage in general. Fong stated that she would have to ask the engineering department
for confirmation, but generally that the system is sized to take growth into account. Ratchye stated that
average usage has not increased dramatically over the last few years.
Commissioner Rosenbaum, seeing no requests for further discussion, asked for those in favor, and the motion
passed unanimously.
Resident Lois Nisbet, at the conclusion of New Business, asked to address a question to the UAC: "Is there
any ethical consideration for the fact that you charge for utilities when in fact you spend it on something else?"
Commissioner Dawes asked if this was in regard to transfers, and Ms. Nisbet stated, "1 guess so."
Commissioner Dawes stated that question should be brought before the City Council regarding this issue, as
they set the policy regarding transfers. Commissioner Rosenbaum clarified that the transfer has been going
on since the inception of the utility, although it was capped at a growth rate of 3 percent several years ago.
The next schedule meeting is April 2, with everyone present.
The May 7 meeting is set for a day meeting.
Meeting adjourned at 8:00 P.M.
Respectfully submitted,
Marites Ward
City of Palo Alto Utilities
Utilities Advisory Commission Minutes Approved on:Page 7 of 7