HomeMy WebLinkAboutStaff Report 273-09TO: HONORABLE CITY COUNCIL
FROM: CITY MANAGER DEPARTMENT: UTILITIES
DATE: JUNE 15, 2009 CMR: 273:09
REPORT TYPE: CONSENT
SUBJECT: Approval of Amendment No. One to the Agreement Between the City
of Palo Alto and the Purissima Hills Water District for a Limited
Emergency Water Supply Intertie
RECOMMENDATION
Staff recommends that Council approve an amendment to the existing agreement with Purissima
Hills Water District for the Page Mill Road Limited Emergency Water Supply to include a
second interconnection on Page Mill Road adjacent to Foothill Park Entrance Gate 2.
BACKGROUND
In 2007, staff worked with the Purissima Hills Water District (PHWD) to install an
interconnection at Arastradero Rd. and Hillview Ave. to provide emergency water supply options
and maintenance flexibility for both the City and PHWD (CMR:417 :07). The Arastradero at
HiJJview interconnection is complete as of March 2009. Since 2008, staff also worked with the
Los Altos County Fire District (LAHCFD) on an agreement to provide enhanced mutual fire
protection benefits for both the City and LAHCFD (CMR: 109:08). LAHCFD is upgrading a
portion of the City's water distribution system along Page Mill Road, which includes the
construction of an interconnection on Page Mill Road, approximately 0.5 miles southwest of the
Foothills Park entrance. Palo Alto and PHWD want to amend their original agreement to
establish terms and conditions for maintenance and use of the Page Mill road interconnection.
DISCUSSION
Palo Alto's emergency water supply will be enhanced in the Foothills along Page Mill Road by
LAHCFD's construction of a second interconnection with PHWD at the 500,000 gallon storage
tank owned and operated by PHWD. The second interconnection with PHWD will help improve
fire protection and provide emergency water to customers in the Foothills along Page Mill Road
in the event that Palo Alto water facilities are isolated for emergency repairs or planned
maintenance preventing service to the area. The interconnection has been designed jointly. The
CMR: 273:09 Page 1 of 3
construction of the interconnection will be paid for and inspected by Pakpour Consulting Group
(PCG) through LAHCFD.
Future maintenance of the interconnection will be shared equally by Palo Alto and PHWD. The
interconnection will be metered in both directions. Any water used by either party will be paid
for at the rate the party pays San Francisco Public Utilities Commission for the water supplied.
Each party will evaluate the request of the other party for emergency water supply at the time of
the request to open the interconnection. If the party without an emergency is able to release water
from its system, it would be reimbursed for the supplied water within 30 days of billing the
receiving party. The amendment covers these terms and conditions.
Construction of the second PHWD emergency interconnection on Page Mi11 Road adjacent to
Foothill Park Entrance Gate 2 will include the following facilities: a bidirectional meter, meter
vault, flushing pipes, traffic rated covers, check valves and gate valves. The Page Mill
connection will be for emergency use only and will allow both the City and PHWD to provide
water to the other party on a limited and emergency basis if either party chooses to share their
water supply.
On April 20, 2009, PCG issued a Notice To Proceed with Ranger Pipelines to commence with
the construction work.
Staff has coordinated the project planning and construction schedule with the Community
Services Department Staff at Foothills Park to ensure that the Project will not interfere with park
access or services. Construction activity for the Project will be completed by October 2009.
Construction is planned for weekdays from 8:00 a.m. to 5 :00 p.m.
RESOURCE lMPACT
Maintenance costs are included in the Water Fund operating budget for these proposed
replacement facilities. Funding for the interconnection will be provided by LAHCFD. As
stipulated in the Amendment, PHWD and the City will share the cost of future maintenance
equally. City maintenance costs are included in the Water Fund Operations Budget.
POLICY IMPLICATIONS
The approval of this amendment is consistent with existing City policies. This recommendation
is consistent with the Council-approved Utilities Strategic Plan Key Strategy No.1, "Operate
distribution system in a cost effective manner," Strategy No.7, "Implement programs that
improve the quality of the environment" and Objective No.2, "Invest in utility infrastructure to
deliver reliable service."
ENVIRONMENTAL REVIEW
This project is categorically exempt from the California Environmental Quality Act (CEQA)
pursuant to CEQA Guidelines Sections 15301 (repair, maintenance or minor altercation of
existing facilities) and 15302 (replacement or reconstruction of existing facilities located on the
CMR: 273:09 Page 2 of3
same site as the structure replaced). Under the tenus of the First Amendment to the Agreement,
LAHCFD is responsible for any environmental review ofthe project.
ATTACHMENTS
A: Amendment No. One to the Agreement between the City of Palo Alto and the Purissima
Hills Water District for a Limited Emergency Water Supply Second Interconnection on
Page Mill Road.
B: Location Map and Layout
PREPARED BY:
DEPARTMENT APPROVAL:
CITY MANAGER APPROVAL:
CMR: 273:09
~EL ANTONIO, Sr. Project Engineer, WGW
GREG SCOBY, Engineering Manager WGW
M MARSHALL, Assistant Director Utilities
Z~A
City Manager
Page 3 of3
AMENDMENT NO. ONE TO AGREEMENT
BETWEEN THE CITY OF PALO ALTO AND
ATTACHMENT A
THE PURISSIMA HILLS WATER DISTRICT FOR LIMITED EMERGENCY
WATER SUPPLY INTERTIE
This Amendment No. One ("First Amendment") is entered into this day of
___ ,2009, ("Effective Date") by and between the CITY OF PALO ALTO, California, a
chartered California municipal corporation with its primary business address at 250 Hamilton
Avenue, Palo Alto California 94301 ("CITY"), and the PURlS SIMA HILLS WATER
DISTRICT, a county water district, with its primary business address at 26375 Fremont Road,
Los Altos Hills, California 94022 ("DISTRICT"). CITY and DISTRICT may each be referred to
individually as a "Party," or collectively as the "Parties," or the "Parties to this First
Amendment."
RECITALS
WHEREAS, on November 19, 2007, the DISTRICT and CITY entered into an
Agreement titled, "Agreement Between the City of Palo Alto and the Purissima Hills Water
District for Limited Emergency Water Supply Intertie" ("Original Agreement"), which provided
the terms and conditions for a two-way mutual relief connection between the Parties' respective
water systems so that each Party can provide the other with water in an emergency, if water is
otherwise available;
WHEREAS, the Los Altos Hills County Fire District ("Fire District") is upgrading the
water pipelines for the CITY along Page Mill Road, and as part of this project, the Fire District
will construct an interconnection at Page Mill Road, approximately 0.5 miles Southwest of the
entrance to Foothill Park ("Page Mill Road Connection");
WHEREAS, the Page Mill Road Connection will benefit both the DISTRICT and the
CITY; and
WHEREAS, the Parties to this First Amendment desire to amend the Original Agreement
to establish the terms and conditions for the maintenance and use of the Page Mill Road
Connection, after construction has been completed and the Page Mill Road Connection has been
accepted by the Parties.
AGREEMENT PROVISIONS
NOW, THEREFORE, the Parties to this First Amendment agree to amend the Original
Agreement as follows:
Section 1. Incorporation of Preamble and Recitals. The Parties agree to, and attest
to the truth and accuracy of, the provisions contained in the Preamble and Recitals of this First
Amendment as set forth above. The provisions of the Preamble and Recitals are hereby
incorporated into, and made a part of, the terms of this First Amendment by this reference. The
Parties agree that this First Amendment has been entered into, at least in part, in consideration of
1
090601 syn 6050739
the provlSlons contained in the Preamble and Recitals, III addition to all of the following
provisions of this First Amendment.
Section 2. Interconnection. All references to the term "Interconnection" in the
Original Agreement refer to both the Arastradero Road Connection and the Page Mill Road
Connection.
Section 3. Paragraph 1 of the Original Agreement titled, Interconnection Location,
is deleted and replaced with the following language:
1. Interconnection Location. The Arastradero Road Connection is generally
described as follows and is shown on the drawings attached as Exhibit A. The
Arastradero Road Connection is anticipated to be located at Arastradero Road and
Hillview Avenue, and is anticipated to be constructed in 2008. The Arastradero
Road Connection will include the following facilities: a bidirectional meter, meter
vaults, flushing pipes, traffic rated covers, check valves and gate valves.
The Page Mill Road Connection is generally described as follows and is shown on
the drawings attached to this Amendment as Attachment A. The Page Mill Road
Connection is anticipated to be located along Page Mill Road, approximately 0.5
miles southwest of the entrance to Foothill Park and is anticipated to be
constructed in May 2009. The Page Mill Road Connection will include the
following facilities: a bidirectional meter, meter vaults, flushing pipes, traffic
rated covers, check valves, and gate valves.
In the event either Party requires supplemental water for a limited period of time
due to an emergency or disaster, such Party shall have the right to obtain
supplemental water from the other Party via the Page Mill Road Connection or
the Arastradero Road Connection pursuant to Section 5 of this Agreement. When
the Interconnection is activated, it shall operate only when the supplying Party is
capable of providing supplemental water above and beyond that which is required
to service its needs.
Section 4. Paragraph 3 of the Original Agreement titled, Construction of
Arastradero Road Connection, is deleted and replaced with the following language:
3. Construction of Connections.
090601 syn 6050739
A. Arastradero Road
1. The estimated current cost to design, purchase and construct the
Arastradero Road Connection is $50,000. The DISTRICT will
assume primary responsibility for the design, purchase, and
construction of the Arastradero Road Connection. More
specifically, the DISTRICT will complete, to the reasonable
satisfaction of CITY, the following tasks:
a. Prepare contract specifications and drawings;
2
090601 syn 6050739
b. Conduct the environmental review and obtain all necessary
permits and approvals;
c. Solicit bids, evaluate bids, and award the contract to the
lowest responsible and responsive bidder;
d. Perform inspection and construction oversight; and
e. Test and accept the completed work.
2. DISTRICT will pay for all costs pertaining to the design, purchase,
and construction of the Arastradero Road Connection. DISTRICT
will connect the Arastradero Road Connection to the CITY
distribution system in accordance with CITY standard
specifications and to DISTRICT distribution system in accordance
with DISTRICT standard specifications. Upon completion of
construction, DISTRICT shall transfer ownership of the facilities
to the CITY up to the CITY side of the Interconnection meter.
DISTRICT will retain ownership of the facilities up to and
including the Interconnection meter.
B. Page Mill Road
1. In accordance with the January 20, 2009, Agreement for
Construction of Page Mill Road Interconnection between the
DISTRICT and Fire District, the Fire District will:
a. design and construct a second interconnection between the
DISTRICT and the CITY, the Page Mill Road Connection,
which includes the connection of the Page Mill Road
Connection to the CITY and DISTRICT water distribution
systems; and
b. obtain all required pennits and complete all environmental
reviews for the Page Mill Road Connection.
2. DISTRICT and the CITY will inspect the Page Mill Road
Connection prior to determining that the Page Mill Road
Connection may be put into use. After acceptance of the Page Mill
Road Connection by the DISTRICT and the CITY, the Fire
District will:
a. transfer ownership of the facilities from the CITY's
existing system up to the CITY side of the Page Mill Road
Connection meter to the CITY; and
3
b. transfer ownership of the facilities from the DISTRICT's
existing system up to and including the Page Mill Road
Connection meter to the DISTRICT.
Section 5 Effect on the Original Agreement. Except for the modifications to the
Original Agreement expressly set forth in this First Amendment, the terms and conditions of the
Original Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, the Parties have entered into this First Amendment to the
Original Agreement by their duly authorized representatives as of the Effective Date first written
above.
PURISSIMA HILLS WATER DISTRICT, a
county water district
By: _____________ _
General Manager
ATIEST:
District Secretary
090601 syn 6050739
4
CITY OF PALO ALTO, a chartered California
municipal corporation
By: _____________ _
Assistant City Manager
APPROVED AS TO FORM:
Deputy City Attorney
APPROVED:
Director of Utilities
Director of Administrative Services
PROJECT LOCATION MAP
NOT TO SCAlE
ATTACHMENT B