HomeMy WebLinkAboutStaff Report 248-09TO: HONORABLE CITY COUNCIL ATTN: FINANCE COMMITTEE FROM: CITY MANAGER DATE: MAY 26, 2009 DEPARTMENT: ADMINISTRATIVE SERVICES CMR: 248:09 SUBJECT: Approval of Fiscal Years 2010 and 2011 Contract Scopes of Con suit ant Services Agreements Greater than $85,000 RECOMMENDATION Staff recommends that the Finance Committee review and approve the scopes of service for Fiscal Years 2010 and 2011 consultant services agreements greater than $85,000 as part of Fiscal Years 2010 and 20 II Budget process. (Attachment I) DISCUSSION The Purchasing Manual provides that as pmt of the budget process, the Finance Committee shall review and approve the scope of services for Capital Improvement Program (CIP) consultants over $85,000. This requirement applies to feasibility studies and design or engineering services for a General Fund capital improvement program project. The report excludes recurring, routine service-related agreements such as testing or maintenance contracts, environmental assessments paid by developers, construction contracts, contract agreements for legal service, and Enterprise Fund and Internal Service Fund capital projects. Detailed descriptions of the proposed projects are attached as exhibits to this report to allow the Finance Committee the opportunity to review and raise questions before commencement of any work on the proposed projects. Once Council approves the scope of work of a project, staff will not materially change the scope unless it returns to Council for approval. RESOURCE IMPACT SECTION Approval of this recommendation will have no fiscal impact to the City since funding for the consultant contracts of these projects is included in the Fiscal Years 2010 and 2011 budget. CMR: 248:09 Page 1 of2 POLICY Il\-IPLICATIONS This recommendation does not represent any change to City policies. ENVIRONMENTAL REVIEW The actions recommended in this report do not constitute a project under the Califomia Environmental Quality Act (CEQA). Each project will continue to undergo the appropriate environmentall'eview as required for design and construction of facilities. PREPARED BY: APPROVED BY: Director, Administrative Services CITY MANAGER APPROV AL: ATTACHMENTS Attachment 1 2010 and 2011 Summary of Consultant Agreements Greater than $85,000 Exhibit A -Municipal Services Center Improvements (PF-05002) Exhibit B -Ventura Building Improvements (PF-06002) Exhibit C -Art Center Electrical and Mechanical Upgrades (PF-07000) Exhibit D -Children's Theatre Improvements (PF-09000) Exhibit E -Highway 101 PedestrianlBicycle OverpasslUnderpass Project (PL-II 000) CMR: 248:09 Page 2 of2 Attachment 1 SUMMARY OF CONSULTANT AGREEMENTS GREATER THAN $85,000 CAPITAL IMPROVEMENT PROGRAM PROJECTS 2010--2014 CIP Plan Page 1 of 1 all necessary design services which may include architectural, mechanical, electrical, and Consultant shall provide conceptual design, final design. construction documents and administration services. (Exhibit AI may' Consultant shall provide conceptual design. final design, construction documents and administration services. (Exhibit B) engineering, landscape architecture, and green building design. (Exhibit C) conditions, provide design, and produce construction documents. Consultant shall also provide construdion administration Services shall indude architectural, strudural, mechanical and eledrical engineering. (Exhibit D) prepare cost estimates and eStablish right of way availability. (Exhibit E) Exhibit A Review of Scope of Services For Consultant Contracts Greater Than $85,000 Municipal Service Center Improvements (PE-05002) Project Description: This project provides for the replacement of original mechanical and electrical systems and lighting installed in 1966 at buildings A, B, and C of the Municipal Service Center. The use of many areas has changed over the years without adequate upgrades to building systems, leaving them outdated and inefficient. Project Justification: Lighting, mechanical, and electrical equipment at the Municipal Service Center is outdated and inefficient. Various remodels have occurred in the administrative aud shop areas with added load to the mechanical and electrical systems. The use of many areas has changed over the years without adequate upgrades to the building systems. The systems no longer support the current operation at this site. Consultant Scope of Services: Consultant shall provide all necessary design services which may include architectural, mechanical, electrical, and structural engineering. Consultant shall provide conceptual design, final design, construction documents and construction administration services. Project Documentation: Construction Documents (Plans and specifications) PURCHASING GUIDE -ApPENDIX A PAGE10F1 Exhibit B Review of Seope of Services For Consultant Contracts Greater Than $85,000 Ventura Building Improvements (PE-06002) IntroductiolllBackground: The City of Palo Alto owns the Ventura Building but is leasing it out to the Palo Alto Community Child Care (PACCC). As the owner, the City is responsible for the capital maintenance of the building systems. Project Description: This pl'Oject will replace/upgrade mechanical and electrical systems that are beyond their uscfullives, and will provide accessibility improvements to this facility. Radiant heat systems will be replaced with above-floor systems. The new systems will be designed for energy efficiency and to meet current code requirements and occupant need. Project Justification: Consultant Scope of Services: Consultant shall pl'Ovide all necessary design services which may include architectural, mechanical, electrical, and structural engineering. Consultant shall. provide conceptual design, final design, construction documents and construction administration services. Project Documentation: Construction Documents (Plans and specifications) PURCHASING GUIDE -ApPENDIX A PAGE 1 oF1 Exhibit C Review of Scope of Services For Consultant Contracts Greater Than $85,000 Art Center Electrical and Mechanical Upgrades (PF-07000) Introduction/Background: This project is proposed to be completed as a public/private pattnership in coordination with a pattial building and garden renovation project funded by the Art Center Foundation. Design development and construction documents are currently in progress, and are expected to complete by the end ofFY 2009. Project Description: This project will replace original mechanical and electrical equipment and systems to meet current occupant need, provide code compliance, and optimize operation and energy efficiency. Disabled access and structural improvements will also be made to bring the facility into compliance with current code requirements. Work funded by the Foundation will include some upgrades to the gallery and kitchen, create a children's wing, and provide exterior improvements to the courtyard and site. Project Justification: Many components of the mechanical and electrical systems arc original and have reached the end of their useful lives. Deficiencies in the heating and ventilation systems, structural system, and building access are required to maintain occupant health and safety, and/or to comply with code requirements. Consultant Scope of Services: Consultant shall provide bid and construction phase services including architectural, civil, structural, mechanical, and electrical engineering; landscape architecture, and green building design. Project Documentation: Record Documents PURCHASING GUIDE -AWWDlXA PAGE10F1 Project Description: Exhibit D Review of Scope of Services For Consultant Contracts Greater Than $85,000 Children's Theatre Improvements (PF-09000) This project will replace or upgrade mechanical and electrical systems that are beyond their useful lives, and will replace finishes as necessary. The systems will be designed to meet current code requirements and user need, and optimize operational and energy efficiency. Project Justification: The elements included in this project are due for replacement or upgrade based on their age andlor condition. These improvements provide for ongoing rehabilitation of the building structure and systems to meet the needs of thc theatre staff. Consultant Scope of Sel"Vices: Consultant shall provide all necessary design services to evaluate existing systems and conditions, provide conceptual and final design, and produce construction documents. Consultant shall also provide construction administration services. Services shall include architectural, structural, mechanical and electrical engineering. Project Documentation: Construction Documents (Plans and specifications) PURCHASING GUIDE -APPENDIX A PAGE 1 OF 1 Exhibit E Review of Scope of Services For Consultant Contracts Greater Than $85,000 Highway 101 Pedestrian/BicycIe Overpass/Underpass Project (PL-llOOO) Introduction/Background: The need for a new year-round pedestrian/bicycle crossing of Highway 10 I in south Palo Alto was identified in the Bicycle Transportation Plan and the updated Baylands Master Plan. The existing Adobe Creek undercrossing is a seasonal facility that is only available six months during the year CApril IS to October IS). The overcrossing would provide year round connectivity between the south Palo Alto residential areas and the Baylands recreational and employment areas. This project was moved forward by one year, from FY 20 II to FY 20 I 0, by the Finance Committee. Project Description: This project will conduct a feasibility study for a year-round pedestrian/bicycle grade separated crossing of Highway 101 in Palo Alto to provide connectivity from residential and commercial areas in south Palo Alto to the Palo Alto Baylands Nature Preserve, East Bayshore and San Antonio businesses, and the regional Bay Trail network of bike trails. The project will be located in Palo Alto in the Highway 101 corridor north of the San Antonio Road interchange. Project Justification: The need for a new year-round pedestrian/bicycle crossing of Highway 10 I in south Palo Alto was identified in the Bicycle TranspOitationPlan and the updated Baylands Master Plan. The existing current Adobe Creek undercrossing is a seasonal facility that is only available 6 months during the year CAprill5 to October IS). The grade separation will provide connectivity between the south Palo Alto residential areas and the Baylands recreational and employment areas. Consultant Scope of Services: The Consultant selected for this project will prepare a feasibility study of conceptual overcrossing design options, preliminary cost estimates and establish right of way availability. Project Documentation: Feasibility Study PURCHASING GUIDE -ApPENDIX A PAG,10Fl