HomeMy WebLinkAboutStaff Report 145-09TO: ATTN: FROM: DATE: City of Palo Alto City Manager's Report HONORABLE CITY COUNCIL FINANCE COMMITTEE CITY MANAGER MARCH 10, 2009 DEPARTMENT: ADMINISTRATIVE SERVICES CMR: 145:09 REPORT TYPE: DISCUSSION REPORT SUBJECT: Consideration of Recommendation for City Council Adoption of the Fiscal Year. 2009 Adjusted Budget -Second Quarter (Q2) Financial Results, Midyear. Amendments, Capital Improvement Program Status, and Amendments to FY 2009 Adopted Municipal Fee Schedule EXECUTIVE SUMMARY The documents attached summarize the City's financial position and outlines changes to the fiscal year 2009 budget necessary during the normal course of business. RECOMMENDATION Staff recommends that the Finance Committee recommend to the City Council adoption of the attached Budget Amendment Ordinance (BAO) (Attachment 1) and Resolutions (Attachment 4 and Attachment 5), which includes: CMR:145:09 a. Proposed midyear adjustments to the Fiscal Year 2009 Budget for the General Fund, Enterprise Funds, Special Revenue Funds, Internal Service Funds, and Capital Improvement Projects Fund (Exhibit A). b. Fiscal Year 2009 Midyear CIP Adjustments (Exhibit B). c. Amendments to the Fiscal Year 2009 Adopted Municipal Fee Schedule (Exhibit C). d. Amendments to the Fiscal Year 2009 Table of Organization (Exhibit D). e. Amendments to the Fiscal Year 2009 Management and Professional Compensation Plan and Service Employees' International Union (SEIU) Compensation Plan (Attachment 4). f. Amendments to the Fiscal Year 2009 Service Employees' International Union (SEIU) Compensation Plan (Attachment 5). Page 1 of 16 The Fiscal Year 2009 midyear Capital Improvement Program (CIP) Projects Status Report is attached as an informational item (Attachment 2). A list of continuous projects follows this summary (Attachment 3). No action is required on these two items. Staff also recommends the Finance Committee review and comment on the preliminary financial condition of the City as of December 31,2008 (Exhibit A to BAO). BACKGROUND This report summarizes the changes to the Fiscal Year 2009 Adopted Budget necessary as part of the normal course of business through December 31, 200S. Where possible, adjustments are held until this midyear report is brought to Council in an effort to consolidate changes and streamline the Budget Amendment Ordinance (BAO) process. The discussion in this report is organized by fund with a primary focus on major changes in the General Fund. Details ofthese changes, as well as all fund summaries, are. included in Exhibit A. The midyear CIP Program Project Status Report (Attachment 2) provides the Finance Committee with information on the status of the City's CIP projectsas of December 31, 200S. Due to the effects of the current recession on key City revenues, staff is proposing expenditure reductions at midyear. The current projected deficit in the General Fund for Fiscal Year 2009 is $5.S million. This is a $3.2 million increase from the $2.6 million deficit projected in the December 2008 Long Range Financial Forecast. The deficit increase is the result of steeper declines in Sales, Transient Occupancy and Documentary Transfer taxes; decreasing plan check fees and facility rents; and the delay of impact fee revenue for the Public Safety Building. DISCUSSION . General Fund -Midyear Financial Report The following is a summary of major revenue and expenditure adjustments in the General Fund as detailed in Exhibit A. General Fund revenues have weakened considerably in Fiscal Year 2009. Consumer and business confidence has eroded and economically sensitive revenue sources such as sales and transient occupancy taxes are retreating. Staff will continue to closely monitor these revenues for the remainder of the fiscal year. Sales Tax Sales taxes are expected to drop by $2.1 million, or 9.5 percent, below the adopted budget at year end. Third quarter results for 2008, unadjusted for one-time events, showed a 9.7 percent decline. Department store, auto sales, electronic equipment, light industry, and restaurants were noticeably weak while service stations, office equipment, building materials, and apparel stores turned in stronger performances. With American consumer confidence at its lowest point in decades, consumers are scaling back their spending plans for major purchases resulting in substantial declines in this major revenue source. In the middle of March, staffwill receive high level information on total tax receipts for the fourth quarter of2008. CMR:145:09 Page 2 of16 Property Tax Property taxes are expected to increase by $1.6 million, or 6.8 percent. Although Palo Alto's assessed values remain healthy for the current fiscal year, data from the county indicates growth in assessed values is moderating. The Santa Clara Assessor recently said that the "assessment roll contains clear evidence that Silicon Valley is not immune to the national recession and economic meltdown in the residential real estate market." Palo Alto assessment valuation has weathered the housing market value decline better than most cities in the County. Transient Occupancy Tax Compared to the adopted budget, Transient Occupancy Tax (TOT) revenues are being decreased by $0.7 million to $7.7 million. Occupancy rates and daily rates began a steady descent after the first few months of the fiscal year due to the economic downturn. For example, compared to the prior year, from July to December 2008, occupied days dropped by 29,593 days and average occupancy rates declined from 74.9 percent to 68.8 percent. Documentary Transfer Tax Documentary transfer tax revenues are being decreased by $2.2 million. Starting in August 2008, . documentary transfer taxes began a steady decline. Through mid-January, this revenue source was 40 percent below prior year levels. Property transactions have dropped dramatically due to the credit and housing markets. As in prior economic downturns, residential turnover has declined as homeowners choose to wait until market conditions improve rather than sell in a buyer headwind. Other Fees and Permits Revenues for plan check and building permit fees are being decreased by $1.2 million, or 19 percent, from the adopted budget. This reflects the downward trend in housing starts and construction activity. Decreases in revenue from other fees include: parking violations -$0.3 million; facility rents . -$0.3 million; and the delay in the anticipated Public Safety impact fee revenue of $0.3 million. CMR:145:09 Page 3 of16 Expense Highlights for Fiscal Year 2009 Midyear The table below summarizes the total proposed midyear budget revenue and expenditure changes and the impact to the Budget Stabilization Reserve (BSR). Grant and Reimbursement Revenues Grant Expenditure General Fund Revenue Reductions General Fund Expenditure Decreases Salary & Benefit-Related Other Expenditures Operating Transfers Year-end Operating Transfer to CIP Year-End savings -hiring freeze Reduction -Retiree Medical Allocation Midyear change to Budget Stabilization Reserve $ 734 (504) (5,956) 2,031 446 369 1,000 1,000 880 0 City departments have provided the City Manager with expenditure reduction recommendations to offset the revenue decrease and to balance the General Fund budget for Fiscal Year 2009. Approximately 49 percent ofthe recommended reductions are salary and benefit related savings. The remaining 51 percent is the result of non-salary expenditure reductions. Staff expects that these reductions will have temporary impacts to services for the balance of Fiscal Year 2009. The City will likely need to make permanent expenditure reductions in the upcoming Fiscal Year 2010-2011 budget process that will have substantial effects on programs and services. This is necessary given an expected weaker economy and a larger, growing deficit of approximately $8 million. A detailed narrative of the departmental expenditure reductions and potential service impacts are listed below. City Attorney The City Attorney's office has identified $67 thousand in expenditure reductions for outside counsel services. This represents a 2.5 percent reduction from the Fiscal Year 2009 adopted expenditure budget. It is possible that with this reduction, the department may not be able to provide support to all of the City's Boards and Commissions as a result of staff attorneys covering work that outside counsel normally performs. City Auditor The City Auditor's office has identified $63 thousand in salary and benefit savings from vacant positions. This represents a 7.1 percent reduction from the Fiscal Year 2009 adopted budget for expenditures. CMR:145:09 Page 4 of 16 City Clerk The City Clerk's office has identified $30 thousand in salary and benefit savings from vacant positions. This represents a 2.5 percent reduction from the Fiscal Year 2009 adopted budget for expenditures. Expenditure reductions are offset with increases needed to pay for unanticipated election expenses in the amount of $60 thousand. City Manager The City Manager's Office has identified a total of$476 thousand in salary and benefit savings from vacant positions. The Planning and Community Environment department has been given credit for one-half of the salary and benefit savings realized for the vacant Assistant City Manager position in the amount of$127 thousand. This brings the net salary savings in the City Manager's Office to $349 thousand, or a 16 percent reduction, from the Fiscal Year 2009 adopted expenditure budget. Expenditure reductions are offset with increases needed for unanticipated contract and program services in the amount of $86 thousand. Administrative Services Department The Administrative Services Department has indentified $205 thousand in salary and non-salary- expenditure reductions due to staff vacancies and reductions in non-critical supplies. This represents a 3.1 percent reduction from the Fiscal Year 2009 adopted expenditure budget. Administrative Services Department -Information Technology Fund The Information Technology Internal Service Fund has identified expenditure reductions that result in a $369 thousand decrease in allocated charges to the General Fund departments. This will result in the deferral of routine computer replacements for one year. Community Services Department The Community Services Department has identified $837 thousand in salary and non-salary expenditure reductions. This represents a 5.6 percent reduction from the Fiscal Year 2009 adopted budget. Possible program and service reductions include: Fire Department • The elimination of mowing at Byxbee Hills Park • Decrease patrol and maintenance services on weekend and holidays at Rinconada and Mitchell Parks • Postponement of the Baylands conservation plan • Delays in the replacement of equipment for the Arts & Science Division and Lucie Stem center • Elimination of the seasonal worker program • Possible reduction of special interest classes offered spring and summer 2009 The Fire Department has identified $82 thousand in benefit and non-salary savings with current vacancies and the def~rral of new hires. Minimum staffing requirements and the need to cover overtime costs, hinder the identification of additional departmental savings. CMR:145:09 Page 5 ofl6 Human Resources Department The Human Resources Department has identified $69 thousand in salary and benefit savings from a vacant position. This represents a 2.6 percent reduction from the Fiscal Year 2009 adopted expenditure budget. Library Department The Library Department has identified $227 thousand in salary and non-salary expenditure reductions. The majority of the savings are from current and future staff vacancies and could potentially impact service levels. The expenditure reductions represent a 3.6 percent reduction from the Fiscal Year 2009 adopted budget for salary and non-salary expenditures. Planning and Community Environment The Planning and Community Environment Department has identified $584 thousand in salary and non-salary expenditure reductions. These reductions include credit from the City Manager's office for one-half of the salary and benefit savings ($127 thousand) realized for the Assistant City Manager vacancy. These expenditure reductions represent a 6.1 percent reduction from the Fiscal Year 2009 adopted expenditure budget. The reductions are offset by an increase of$207 thousand to· reinstate approved appropriations for the Comprehensive Plan study that were inadvertently deleted at the end of Fiscal Year 2008. Police Department The Police Department has identified $225 thousand in reimbursement revenue, which exceed expenditure reductions. Minimum staffing requirements and the need to cover overtime costs prevented the identification of additional departmental savings. Public Works Department The Public Works Department has identified $425 thousand in salary and non-salary expenditure reductions and revenue increases. This represents a 3.9 percent reduction from the Fiscal Year 2009 adopted budget. Salary and benefit reductions include credit of$56 thousand for an engineer vacancy in the Capital Fund. Potential service impacts identified by the department include: • The delay of street/encroachment permit processing • The delay in response to transportation work requests, red curb painting and traffic sign repair Other Expenditure Reductions In addition to the departmental expenditure reductions detailed above, staff has also identified additional expenditure reductions to balance the Fiscal Year 2009 General Fund Budget: CMR:145:09 • Elimination of the budgeted year end surplus transfer to the Infrastructure Reserve from the General Fund -$1 million • Suspend the General Fund contribution to the retiree medical liability -$0.9 million • Institute a hiring freeze for the balance of fiscal year 2009 -$1 million Page 6 of16 General Fund Overtime Analysis The following chart shows total overtime expenditures reaching 77 percent of the mid-year budget. Categories City Attorney City Auditor City Clerk City Council City Manager Administrative Services Community Services Library Fire Human Resources CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR FINANCIAL REPORT GENERAL FUND OVERTIME (In thousands of dollars) I Adopted I Adjusted ~ Midyear I Midyear Budget Budget Budget Changes - ------- 7 7 7 ----- 3 3 3 - 45 45 38 (7) 184 184 137 (47) 58 58 58 - 1,018 1,018 1,3~3 335 4 4 4 - Planning and Community Environment 67 67 67 - Police 1,000 1,000 1,017 17 Public Works 113 113 113 - Total Overtime 2,499 2,499 2,797 298 %of Actual Adj Budget -0% -0% -0% -0% -0% 16 42% 84 61% 26 45% 937 69% -0% 50 75% 942 93% 88 78% 2,1431 77% Although most of the General Fund departments are on track or below their overtime budget, the Fire, Police, Public Works and Planning Departments are exceeding their budgets for the reasons identified below. Excluding these departments, General Fund overtime expense is at 5 percent of budget at midyear. • The Fire Department has used 69 percent of its budget for overtime. The main factors contributing to overtime usage are Station #8 staffing ($0.2 million) and Medic-1 staffing ($0.2 million). The remaining $0.54 million resulted from backfill for the following: minimum staffing requirements, worker's compensation light duty assignments; vacation; sick leave; military leave; bereavement leave; andjury duty. Overtime also was incurred for Strike Team assignments to State wildland events (significant this year) for which the State will reimburse 'the City $350,000. Given the current State budget situation, the City expects some delays in the receipt of this reimbursement. • The Police Department has used 93 % percent of its budget for overtime. The Department's overtime use can be attributed mainly to officers being held over due to busy shifts; case writing; investigations; training; court appearances on off days; on-call pay for animal services staff; staffing shortages due to disability leave; patrol and the 9-1-1 dispatch center vacancies; and academy and field training programs ($265,000). In addition, incidents such as the investigation of a major homicide ($75,000) and the response and investigation of street robberies ($105,000) added to the departmental overtime. Traffic control services at CMR:145:09 Page 7 of16 Stanford Football games and other events ($75,000) are partially offset by reimbursements from the university and other sponsors. • The Public Works Department is at 78 percent of the adopted budget for overtime. The main factors contributing to overtime use were standby time, emergency call-outs, vacant positions and emergency weekend tree cutting. • The Planning & Community Environment Department (P&CE) is at 75 percent of the adopted budget for overtime primarily due to four factors. First, overtime for the Comprehensive Plan Amendment is necessary to ensure adequate community participation in keeping with Council expectations. Community workshops and Planning & Transportation Commission meetings to discuss the Comprehensive Plan are all scheduled in the evening to facilitate public participation. These will be ongoing through the two-year update process. Second, overtime for the Commute Coordinator was needed to develop the work program for Fiscal Year 2009 and to work with school groups prior to school opening in September. Previously, the Commute Coordinator position was a management position but was converted to a SEIU position in Fiscal Year 2008. The position is half time but work demands fluctuate with increased workload at certain periods of the year. Third, the Planning & Transportation Commission agendas have required additional meetings that· involve additional staff overtime. Finally, the budgeted overtime amount for the department has remained at the same level since Fiscal Year 2004 and has not kept pace with salary adjustment increases. Planners and Senior Planners have many night meetings to attend and are included in the Service Employees' International Union (SEIU), requiring payment of overtime for night meeting attendance. The Department is continuing to monitor the overtime budget and attempting to minimize the amount of overtime usage. Enterprise Funds Please refer to the detailed fund summaries in Exhibit A for more information on Enterprise Fund midyear changes and to the CIP section of this report. • Electric Fund (Net reserve reduction of$5.1 million) -The Electric Fund reserve is reduced by $4.4 million for increases in commodity costs due to reduced hydroelectric power, delays in landfill gas projects and replacement energy purchased at high prices. Additionally, the reserve was reduced by $607 thousand to fund various CIP projects. Capital Improvement Program Adjustments to the City's 2009 Capital Plan are noted in Exhibit A, with specific project adjustments described in Exhibit B. All of the CIP changes fall into three basic categories: projects requiring additional appropriations, projects having reductions in appropriations, and other miscellaneous adjustments such as transfer of funding between projects. Highlights ofCIP changes are as follows: General Fund • Street Maintenance -CIP PE-86070 -Increase funding by $1,010,606 and increase project cost by the same amount. This adjustment is made to reflect revenue received from the State of California Proposition 1B (Highway Safety, Traffic Reduction, Air Quality, and Port Security) and Proposition 42 (Traffic Congestion Relief Fund). (No reserve funding required.) CMR:145:09 Page 8 of16 • Street Maintenance -CIP PE-86070 -Decrease funding of$685,000 from Gas Tax Fund. The reduction is due to the State's proposal to defer payment oflocal transportation funds by seven months. The deferral of payment by the State will reduce gas tax revenue for Fiscal Year 2009. The decrease has no impact on the project since it is offset by revenues received from the State as mentioned in the previous section. However, the impact on reduced gas tax revenue will be felt in Fiscal Year 2010 and subsequent years. Unless additional revenues are identified, fewer streets will be resurfaced from what was originally planned. (No reserve funding required.) • Cubberley Tuif Renovation Project -CIP PE-O 700 7-Increase funding of $1 ,670,000 for the construction of the project. Funding of$900,000 will come from Water Fund CIP Project WS-08002 (Emergency Water Supply) while the remaining balance of $770,000 will be provided by the Developers Impact Fee Fund -Parks, a special revenue fund. This project was originally scheduled to start construction in Fiscal Year 2010 but instead moved to Fiscal Year 2009. The change in the construction date is to make the Cubberley football field available when EI Camino Park will be closed for the construction of the Emergency Water Reservoir, which is scheduled to start in Fiscal Year 2010. (Developers Impact Fees· Fund -Parks: $770,000 reserve funding; CIP Project WS-08002 Emergency Water Supply: $900,000 transfer of appropriation). • Fire Apparatus Equipment -FD-09001 -Increase funding by $166,170 to bring total appropriation to $235,170. The Federal Emergency Management Agency (FEMA) provides grant funding of $188,216, which represents eighty percent of the total project cost of $235,170. This project replaces and upgrades the equipment to be placed on six new fire engines to be purchased with scheduled vehicle replacement. (No reserve funding required) • Cubberley Mechanical and Electrical Upgrade -defer project and return balance of appropriation of $1,300,000 to the Infrastructure Reserve. The project is deferred to accommodate funding for higher priority projects. (No reserve funding required). • Baylands Field -Lighting and Fencing -defer project and return balance of appropriation of$350,000 to the Infrastructure Reserve. The project is deferred to accommodate funding for higher priority projects. (No reserve funding required). • Page MilllHanover Intersection -CIP PL-99023-close project and return balance of appropriation of $1,590,487 to the Stanford Research ParklEl Camino Impact F ee/Mitigation Fund, a special revenue fund. This is a very old CIP project. A new CIP project will be developed for a future year. (No reserve funding required). • California Avenue Improvements -CIP PE-0700S and Street Lights Improvements-CIP PO-OSOS4 -Increase funding of California Avenue Improvements project by $300,000 and decrease funding of Street Lights Improvement project by the same amount. Transfer of the appropriation is to cover the estimated cost of the street lights improvements along California Avenue. (No reserve funding required.) CMR:145:09 Page 9 of 16 • Main Library Improvements -CIP PF-07010 and Downtown Library Mechanical Upgrades -CIP PF-09001 -close projects and return total amount of $239,000 to infrastructure reserve. The amount returned will provide resources for a new CIP in Fiscal Year 2010 that will fund temporary facilities needed during the construction of the Measure N library and community center projects. Proceeds of the library bond may not be used to fund temporary facilities. '. Various Projects (See attached Exhibit B excluding projects identified in the preceding sections) -A total balance of$I,049,038 of various completed and closed CIP projects will be returned to reserve. The amount returned will be made available to other General Fund CIP projects needing funding. (No reserve funding required.) Enterprise FundslInternal Service Funds • Electric Utility GIS -CIP EL-02011 -Increase funding by $200,000. The funding will cover the cost of a consultant to identify potential solutions for managing Utility infrastructure assets. (Electric Fund Distribution RSR: $200,000 reserve funding.) • Electric Customer Connections -CIP EL-89028 -Increase funding by $500,000. The additional funding will cover the costs of transformers and other expenses for installing substructures. Approximately $100,000 is estimated reimbursements from utilities customers. (Electric Fund Distribution RSR: $400,000 reserve funding.) • Local Generation Study -CIP EL-09001 -Close project and return appropriation of $350,000 to the Electric Fund Supply RSR. The City was working with a large customer who had a corporate mandate to reduce its greenhouse gas output. The customer had a good experience at another facility in using cogeneration to produce electricity and using the waste heat from the cogeneration unit to heat and cool the facility. This configuration would have shown significant greenhouse gas and money savings. However, the customer's plans changed and they will be moving most staff out of the site, so the project was stopped. A new CIP will be opened if new customers are identified that have the heat needs necessary to justify a cogeneration unit. (No reserve funding required.) • Customer Information System -CIP EL-93057 -Remove appropriation balance of $199,955 and return to Electric Fund Distribution RSR. This is an old project created for the BANNER utilities software. The implementation of SAP in Utilities billing system makes this project unnecessary. (No reserve funding required.) • Traffic Signal Controller Upgrade -CIP EL-Ol 017~ Close project and transfer remaining balance of$125,440 to the operating budget -traffic signal operations and maintenance. The additional appropriation in the operating budget will provide funds for the maintenance contract of traffic signals. (No reserve funding required.) • Fiber Optic Customer Connections -CIP EL-06006 -Increase funding by $100,000. The additional funding will cover the anticipated increase in the customer connections activities in the remaining six months ofFY 2009. (Fiber Optic Fund RSR: $100,000 reserve funding.) CMR:145:09 Page 10 of 16 • Emergency Water Supply Project -CIP WS-08002 -Transfer appropriation of$900,000 to CIP Project Cubberley Turf Renovation-PE-07007. The transfer serves as mitigation for the down time of the fields in El Camino Park during the construction of the water reservoir. Refer also to the preceding section on General Fund discussion on CIP Project Cubberley Turf Renovation -PE07007. (No reserve funding required.) • Fiber Optic Communications-CIP TE-09001 -Project is closed and completed. The balance of the appropriation of $9,140 is returned to the Technology Fund reserve. (No reserve funding required.) • Vehicle Replacement -CIP VR-09000 -Increase funding by $30,000. The additional appropriation will cover the cost to increase the capacity of the Utilities van. The increased capacity will provide additional space to load needed materials and tools. Funding is provided by Gas and Wastewater Collection Funds. (Gas Fund Distribution RSR: $10,000 reserve funding; Wastewater Collection Fund RSR: $20,000 reserve funding.) Amendments to the Fiscal Year 2009 Adopted Municipal Fee Schedule Staff is proposing to amend the Fiscal Year 2009 Municipal Fee Schedule as shown in Exhibit C. The fee changes include: • Planning -Delete Parkland Dedication Fee under Development Impact Fees. The Parkland Dedication fee was removed by City Ordinance and is included to update the municipal fee schedule. • Inspection Services -New Green Building Program Fees. New Green Building Program Fees per the Ordinance approved by City Council to Amend Title 18 (Zoning) of the Palo Alto Municipal Code, adding a new Chapter 18.44 (Green Building Regulations) in June of 2008. These fees are assessed for planning entitlement applications and building permit applications. • Inspection Services -Senate Bill (SB) 1473 Fee. SB 1473 is a newly required State mandated fee to be assessed on building permits and to partially fund education and training for green building standards. • Library -New Link Fee under Fines and Penalties. Link+ is a regional resource-sharing consortium that enables Palo Alto card holders to borrow materials from the combined collection of over 50 member libraries and over 5 million books. • Community Services -New Lawn Bowling Fee under Rentals and Reservations. This new fee recoups the City's costs of providing clean up crews/staff associated with the bookings of the Lawn Bowl. In November of2008, City Council approved a five year lease for the Palo Alto Lawn Bowl facility at 474 Embarcadero Road. Future year annual revenue increases, an estimated $50,000 will result from the new Green Building Program Fee. All other fee changes are not significant. Table of Organization Changes The proposed adjustments to the Table of Organization (Exhibit D) include Additions: 1.0 Full-Time Equivalent (FTE); Add/drop: 4.0 FTE; Reclassifications: 13.25 FTE; Reallocation: 0.33 FTE. ' CMR:145:09 Page 11 of 16 • Service Employees' International Union 521 (SEIU) Unit Determination: As discussed in the City Manager's Report to City Council dated July 21, 2008, (CMR 314:08), after several years of negotiations and grievance proceedings between the City and SEIU, a mediator issued a Stipulated Order and Award reassigning 15 job classifications from the Management and Professional Personnel group to the SEIU Unit. These reassignments were approved by Council resolution number 8658 and the following positions have title changes in the Table of Organization: • Planning Department: 1.0 FTE from Managing Arborist to Arborist • Public Works Department: 1.0 FTE from Project Engineer to Supervising Project Engineer • Utilities: 2.0 FTE from Electric Project Engineer to Supervising Electric Project Engineer • Administrative Services: Reallocation of 0.20 FTE Deputy Director, Administrative Services to Utilities for support to the Broadband project. • Administrative Services/Technology Fund: Reclassify 2.0 FTE from Senior Technologist to' Technologist to align positions with actual job duties and responsibilities. • Community Services Department: Reclassify 2.25 FTE Jr. Museum & Zoo Lead Instructor positions to Program Assistant 1. These position changes resulted from meet and confer sessions with SEIU. • Planning Department: Reclassify 1.0 FTE from Manager, Economic Resources to Manager, Economic Development & Redevelopment to accurately describe the true function of this position. • Police Department: Drop 1.0 FTE Community Service Officer -Lead and add 1.0 FTE Supervisor, Police Services to better supervise and oversee the department's TrafficlParking Services Division. • Public Works Department: Drop 1.0 FTE Tree TrimmerlLine Clearer and add 1.0 FTE Tree Maintenance Person to improve tree planting conditions on development sites. • Public Works/Refuse Fund: Add 1.0 FTE Administrator, Refuse to administer the Zero Waste Operational Plan, which includes zero waste outreach, technical assistance to commercial businesses, multi-family complexes and City departments, organics technical assistance, and advocacy for zero waste policy and legislative initiatives. • Public WorkslRefuse Fund and Storm Drain Fund: Add 0.13 FTE Business Analyst and drop 0.13 FTE Technologist to provide support and maintenance to the integrated SAP utilities billing system. CMR:145:09 Page 12 of16 • Public WorkslRefuse Fund: Reclassify 2.0 FTE Coordinator Recycling to Coordinator Zero Waste to better reflect duties performed by the two current Recycling Coordinators. • Public Works/Refuse Fund and Storm Drain Fund: Reallocate 0.13 FTE Senior Technologist from Utilities to correct the position's allocation in the Table of Organization. • Public Works/Capital Project Fund: Reclassify 1.0 FTE Engineer to Project Engineer to accommodate the increase in the size and complexity of project assigned to the Facilities Division. • Utilities Department: Add 0.87 FTE Business Analyst and drop 0.87 FTE Technologist to provide support and maintenance to the integrated SAP utilities billing system. • Utilities Department: Reclassify 1.0 FTE Senior Market Analyst to Business Analyst to support ongoing needs of the new SAP CCS system. • Utilities Department: Drop 1.0 FTE Project Manager and add 1.0 FTE Coordinator, Utilities Projects, allowing the department to alignjob responsibilities with the position title.· • Utilities Department: Reallocation of 0.20 FTE Deputy Director Administrative Services from the Administrative Services Department for support to the Broadband project. • Utilities: Reallocate 0.13 FTE Senior Technologist from Utilities to Public Works/Refuse Fund and Storm Drain Fund to correct the position's allocation in the Table of Organization. Fiscal Year 2009 Midyear Capital Improvement Program Projects Status Report This report provides the Finance Committee with information on the status of the City's Capital Improvement Program (CIP) projects as of December 31,2008. In the attached matrix (Attachment 2), all City departments have submitted information on their projects and commented on any issues that might cause a change in the scope or timing of the projects. Information in this report is intended to keep Council abreast of progress on all CIP projects that were open at the beginning of fiscal year 2009, and on those projects which were added or completed during the current year. The matrix categorizes CIP projects into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase the project was in as of December 31, 2008, to give Council a perspective oli how much progress was made on a project. Three distinct phases are defined, as follows: CMR:145:09 Page 13 of 16 Phase Activities Pre-Design • Preparation of a feasibility study • Development of a master plan • Definition of a project scope • of an Environmental Design • Hiring a design consultant • Completion of project design • bids or Construction • Acquisition of major equipment • Installation Projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. The matrix also includes information on the total budget from inception for each project, the available budget as of the beginning of the fiscal year, the fiscal year expenditures. through December 2008 including commitments (encumbrances), and the remaining balance in the project budget as of midyear. The comment section of the matrix clarifies the status of certain projects. At the inception of the 2009 Adopted CIP Budget, the General Fund labor costs associated with the projects are budgeted at the fund level and will be allocated to individual projects as part of the year-end close process. For midyear reporting, the actual labor costs incurred by each project as of the date of the report are removed from total current expenditures to make expenses align with the budget amount. The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect the continuing replacement cycles or commitments. During the first half of Fiscal Year 2009, progress was made on all of the "continuous" projects (Attachment 3). RESOURCE IMPACT Adoption ofthe attached ordinance will allow for adjustments to the Fiscal Year 2009 budget, along with amendments to the Table of Organization, the Municipal Fee Schedule and 40 General Fund CIP projects. With the approval of this ordinance, the projected ending balance of the General Fund Budget Stabilization Reserve is $20.9 million, there is no change to the BSR balance. This results in a BSR level of 14.4 percent of budgeted expenditures. Staffhas received the repayment of a housing loan from the previous Administrative Services Director in the amount of $0.7 million. This will increase the BSR balance at yearend when staff returns with a balanced General Fund Budget and a BSR level of 15 percent of budgeted expenditures. The Capital Fund Infrastructure Reserve is projected to end with a balance of $10.0 million, an increase of $0.5 million. The projected ending Rate Stabilization Reserve total for all Enterprise funds decreases by $5.4 million mainly due to additional appropriations for commodity cost increases and various capital improvement projects. CMR:145:09 Page 14 of 16 POLICY IMPLICATIONS These recommendations are consistent with existing City policies. ENVIRONMENTAL ASSESSMENT This is not a project under Section 21065 for purposes of the California Environmental Quality Act (CEQA). ATTACHMENTS Attachment 1: Budget Amendment Ordinance with the following exhibits: Exhibit A Fund Summaries and detail changes to the General Fund, Enterprise Funds, Special Revenue Funds, Internal Service Funds, and Capital Improvement Fund Exhibit B Fiscal Year 2009 Midyear CIP Adjustments Exhibit C Amendments to the Fiscal Year 2009 Adopted Municipal Fee Schedule Exhibit D Amendments to the Fiscal Year 2009 Table of Organization Attachment 2: Fiscal Year 2009 Midyear Capital Improvement Program Projects Status Attachment 3: List of Continuous Capital Projects Attachment 4: Resolution of the Council of the City of Palo Alto Amending the 2008-2009 Compensation Plan for Management and Professional Personnel Adopted by Resolution No. 8844 to Change the Title of Three Classifications and One New Classification. Exhibit A: Fiscal Year 2009 Compensation Plan Changes for Management/Professional Personnel Attachment 5: Resolution of the Council of the City of Palo Alto Amending the 2006-2009 Compensation Plan for Classified Personnel (SEIU) Adopted by Resolution No. 8658 to Change the Title of Two Classifications and Add Fourteen New Classification Titles to Reflect Status of Employees Reassigned to SEIU Unit by Resolution 8848. Exhibit A: Fiscal Year 2009 Compensation Plan Changes for Service Employees International Union CMR:145:09 Page 15 of 16 PREPARED BY: DEPARTMENT HEAD APPROVAL: LALOPE Director, Administrative Services CITY MANAGER APPROVAL: CMR:145:09 Page 16 of 16 Attachment 1 ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2009 TO ADJUST BUDGETED ACCORDANCE WITH REVENUES AND EXPENDITURES THE RECOMMENDATIONS IN IN THE MIDYEAR REPORT AND AMENDMENT TO THE MUNICIPAL FEE SCHEDULE. The City Council of the City of Palo Alto does ordain as follows: SECTION 1. The City Council of the City of Palo Alto finds and determines as follows: A. Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 9, 2008 did adopt a budget for fiscal year 2009, including a Table of Organization describing the staffing for each department and a Municipal Fee Schedule; and B. After reviewing the current budgeted revenues and expenditures for fiscal year 2009, adjustments to the budget are recommended to more accurately reflect year-end projections; and C. Various staffing adj ustments require an amendment to the Table of Organization including the reclassification of 1.0 Full Time Equivalent (FTE) Managing Arborist to Arborist in the Planning Department; the reclassification of 1.0 FTE Project Engineer to Supervising Proj ect Engineer in the Public Works Department; the reclassification of 2.0 FTE Electric Proj ect Engineer to Supervising Electric Project Engineer in the Utilities Department; the transfer of 0.20 FTE Deputy Director, Administrative Services from the Administrative Services Department to the Utilities Department; the reclassification of -2.0 FTE Senior Technologist to Technologist in the Administrative Services Department/Technology Fund; the reclassification of 2.25 FTE Jr. Museum & Zoo Lead Instructor to Program Assistant I in the Community Services Department; the reclassification of 1.0 FTE Manager, Economic Resources to Manager, Economic Deyelopment & Redevelopment in the Planning Department; drop 1.0 FTE Community Service Officer -Lead in the Police Department; add 1.0 FTE Supervisor, Police Services in the Police Department; drop 1.0 FTE Tree Trimmer/Line Clearer in the Public Works Department; add 1.0 FTE Tree Maintenance Person in the Public Works Department; the addition of 1.0 FTE Page 1 of4 Administrator, Refuse in the Public Works/Refuse Fund; add 0.13 FTE Business Analyst in the Public Work,s/Refuse Fund; drop 0.13 FTE Technologist in the Public Works/Refuse Fund; the reclassification of 2.0 FTE Coordinator Recycling to Coordinator Zero Waste in the Public Works/Refuse Fund; the transfer of 0.13 FTE Senior Technologist from Public Works/Refuse Fund and Storm Drain Fund to the Utilities Department; the reclassification of 1.0 FTE Engineer to Project Engineer in the Public Works/Capital i?roj ect Fund; add 0.87 FTE Business Analyst in the Utili ties Department; drop 0 . 87 FTE Technologist in the Utili ties Department; the reclassification of 1.0 FTE Senior Market Analyst to Business Analyst in the Utilities Department; drop 1.0 FTE Project Manager the Utilities Department; and add of 1.0 FTE Coordinator Utility Projects in the Utilities Department. , D. The fiscal year 2009 Adopted Municipal Fee Schedule requires amendment to add or increase certain fees and to implement other miscellaneous changes; and E. City Council authorization is needed to amend the fiscal year 2009 budget as hereinafter set forth. SECTION 2. The Capital Fund Infrastructure Reserve is hereby increased by the sum of Four Hundred Eighty Five Thousand Four Hundred Seventy-Six Dollars ($ 4 85,476), as described in Exhibit "A. II As a result of this change, the Infrastructure Reserve will increase from $9,559,138 to $10,044,614. SECTION 3. The Supply Rate Stabilization Electric Fund is hereby decreased by the sum Fifty Thousand Four Hundred Twenty Dollars described in Exhibit A. Reserve in the of Four Million ($4,050,420) as SECTION 4. The Distribution Rate Stabilization Reserve in the Electric Fund is hereby decreased by the sum of Six Hundred Seven Thousand One Hundred Nine Dollars (~607,109) as described in Exhibit A. SECTION 5. The Public Benefits Reserve in the Electric Fund is hereby decreased by the sum of Four Hundred Forty Thousand Dollars ($440,000) as described in Exhibit A. SECTION 6. The Rate Stabilization Reserve in the Fiber Optics fund is hereby increased by the sum of Ninety Five Thousand Three Hundred Thirty Seven Dollars ($ 95,337) as described in Exhibit A. SECTION 7. The Distribution Rate Stabilization Reserve in the Gas fund is hereby decreased by the sum of One Hundred Page 2 of4 Thirty Seven Thousand Four Hundred Thirty One Dollars ($137,431) as described in Exhibit A. SECTION 8. The Rate Stabilization Reserve in the Water Fund is hereby decreased by the sum of One Hundred Seven Thousand Five Hundred Fifty Three Dollars ($107,553) as described in Exhibit A. SECTION 9. The Rate Stabilization Reserve in the Wastewater Collection Fund is hereby decreased by the sum of Eighty Two Thousand Eighty Dollars ($82,080) as described in Exhibit A. SECTION 10. The Rate Stabilization Reserve in the Refuse Fund is hereby decreased by the sum of Two Hundred Eight One Thousand Eight Hundred Twenty Nine Dollars ($281,829) as described in Exhibit A. SECTION 11. The Rate Stabilization Reserve in the Storm Drainage Fund is hereby increased by the sum of Six Thousand One- Hundred Ninety Seven Dollars ($6,197) as described in Exhibit A. SECTION 12. The Water Treatment Fund Thousand Nine Hundred Exhibit A. Rate Stabilization Reserve in the Waste is hereby decreased by the sum of One Fifty Dollars ($1,950) as described in SECTION 13. Adjustments to other funds are made as shown in Exhibit A. These changes impact Special Revenue, Internal Service, and other Funds Reserves as indicated in Exhibit A. SECTION 14. Adjustments to decrease or increase amounts allocated to various Capital Improvement Proj ects are made as shown in Exhibit B. These changes impact the General Fund Budget Stabilization Reserve and the Infrastructure Reserve and are reflected in the adjustments as shown in Exhibit A. SECTION 15. The Municipal Fee Schedule is hereby amended to reflect the changes $hown in Exhibit C, which is attached hereto and incorporated herein by reference. SECTION 16. The Table of Organization is hereby amended to reflect the changes shown in Exhibit D, which is attached hereto and incorporated herein by reference. These changes impact Reserves and are accounted for in the changes shown in Exhibit A. SECTION 17. As specified in Section 2.28.080 of the Palo Al to Municipal Code, a two-thirds vote of the City Council is required to adopt this ordinance. Page 3 of4 SECTION 18. The Council of the City of Palo Al to hereby finds that this midyear adjustment is not a project under Section 21065 of the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. Capital improvement projects described in this ordinance will be assessed individually as appropriate. SECTION 19. As provided in Section 2.04.330 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption; provided that all new or increased Planning Department fees, more' specifically described in Exhibit "c, II shall become effective sixty (60) days from the date of adoption. INTRODUCED: PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk Mayor APPROVED AS TO FORM: APPROVED: Sr. Asst. City Attorney City Manager Director of Admin. Services Page 4 of4 Revenues & Other Sources Sales Tax Property Tax Transient Occupancy Tax Utility Users Tax Other Taxes and Fines Charges for Services Permits & Licenses Return on Investment Rental Income EXQenditures & Other Uses City Attorney City Auditor City Clerk City Council City Manager Administrative Services Community Services Fire Human Resources Library Planning and Community Environment Police Public Works % of Total Use of Funds Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR FINANCIAL REPORT GENERAL FUND (in thousands of dollars) 22,402 22,402 23,510 23,487 8,424 8,424 10,783 10,783 8,816 8,839 20,849 20,849 5,767 5,767 2,348 2,348 13,426 13,426 86 86 10,952 10,952 1 1 1 2,778 3,722 931 1,062 1,260 1,347 315 376 2,231 2,646 7,153 9,639 21,600 22,388 24,260 24,711 2,822 3,088 6,570 6,855 10,419 11,037 29,831 30,333 13,859 14,307 7980 18% 13% 14% 7,299 9,020 3,540 6,021 2,893 9,719 2,015 896 7,081 99 5,352 895 50 762 1,378 53 446 31 545 29 141 194 95 1,085 45 266 3,949 15 2,407 11,700 50 319 12,899 183 1,513 10 315 3,409 169 1,111 5,370 134 417 15,117 255 1,055 6,683 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY ELECTRIC FUND (in thousands of dollars) 81,167 1,993 10,672 3,845 160 802 112 3,536 72 3,876 3 7,512 ** Excludes encumbrances and reappropriation 144 47,108 5,490 2,150 723 58 304 1 5 471 701 1 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY FIBER OPTICS FUND (in thousands of dol/ars) *. Excludes encumbrances and reappropriation 386 163 103 1 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY GAS FUND (in thousands of dollars) 27,893 28,010 4,028 4,019 790 1,191 498 535 38 38 668 651 301 133 3,723 3,891 949 949 ** Excludes encumbrances and reappropriation 8,476 509 227 25 53 6 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY WATER FUND 26,517 1,015 977 35,000 8,701 5,221 490 439 10 249 2,005 2,908 776 .* Excludes encumbrances and reappropriation (in thousands of dollars) 2 24 1,438 4,498 2,271 216 126 201 212 4 2 2 122 4 1,013 1,063 213 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY WASTEWATER COLLECTION FUND (In thousands of dol/ars) ** Excludes encumbrances and reappropriation 6 3 3,769 829 203 114 146 95 64 78 458 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY REFUSE FUND (in thousands of dol/ars) 47 154 ** Excludes encumbrances and reappropriation 60 4,773 2,145 267 1.156 4,172 59 148 1 106 2,150 1,941 ~",(,inn,inn Reserves Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY STORM DRAINAGE FUND (In thousands of dollars) I Adopted I Adjusted I Midyear I Midyear Budget Budget Budget Changes 2 ** Excludes encumbrances and reappropriation 60 8 528 245 28 3 Exhibit A CITY OF PALO ALTO FISCAL YEAR 2009 MIDYEAR BUDGET SUMMARY WASTEWATER TREATMENT FUND (In thousands of dol/ars) 182 35 ** Excludes encumbrances and reappropriation 4,328 48% 1,040 293 50% 495 629 63% 0% 108 83% 0% 54% Exhibit 8 2008-09 CIP Mid-Year Adjustments Page 1 Exhibit B 2008-09 CIP Mid-Year Adjustments Page 2 EXHIBIT B PUBLIC' SAFETY BUILDING. (PE-98020) Description: This project which includes a Public Safety Building and associated parking garage is under design and environmental review with public hearings scheduled in December 2007 for the Final Environmental Impact Report certification. Public outreach, bond counsel, and further development of the design and cost estimates will need to be developed' prior to the anticipated issuance of the Certificates of Participation (COPs) in summer of2009. Justification: Based on standard space guidelines and current codes, the Police Department facility is operationally and technologically deficient. City Council has directed staff to have a proposed Public Safety Building project ready for a potential COPs issuance The preliminary design work will need to be completed prior to the possible issuance of the Certificates of Participation. Supplemental Information: The site and the size of the facility is based on the recommend!,ltion by the Police Building Blue Ribbon Task Force (PBBRTF). PRIOR YEARS PY Budget $2,952,233 PY Actuals as of 06/30/2008 $2,372,133 Pre-Design Costs Design Costs $3,227,701 Construction Costs Other $209,280 Revenues: CIP FACTS: • Continuing • Project Status: Design • Timeline: FY 2007-2009 • Overall Project Completion: 0% • Percent Spent: 80% • Managing Department: Public Works • Comprehensive Plan: Policy C-24,Program C- 19 • Board/Commission Review: ARB, PTC, PBBRTF IMPACT ANALYSIS: • Environmental: An EIR will be completed. • Design Elements: Review by ARB. • Operating: TBD • Telecommunications: TBD $3,227,701 $209,280 Source of Funds: Infrastructure Reserve (with reimbursements from Budget Stabilization Reserve: $3,436,981) Council Policy Direction: 2007-09 Budget 1. Project is not in planned General Fund IMP and/or does not have identified funding source. 2. Project will require an Environmental Impact Review. 3. Project may require voter and/or property owner approval. 4. Project is a Council Top 4 priority. City of Palo Alto 67 EXHIBIT C Class I -City Use: Priority is given for official City activities and programs. No charge for facility rental, equipment, or special uses. II -Governmental Agency and City-Sponsored Activities: No charge for facility rental for events or activities, however, fees for lattendallts, equipment rental, and special uses may apply. (Note: City facility use for City co-sponsored groups will be considered on a case case basis.) III -Non-Profit Organizations: IRS recognized non-profit organizations may receive a 50 percent reduction on basic facility rental upon verification. Only facility rental rates may be reduced and all other fees, such as staffmg and equipment, are charged at the full Non-profit organizations charging or collecting fees or raising funds are not eligible for reduced rates and basic fees will apply. This not apply to class registrationfees. IV -Individuals, Groups, Organizations, and Businesses not charging fees: Basic rental fees apply. Upon verification, Palo Alto Iresldent:s, groups, organizations, and businesses may receive a 33 percent discount on basic facility rental rates. Only facility rental rates may reduced and all other fees, such as staffing and equipment, are charged at the full rate. V -Business or Commercial Use: Individuals, groups, organizations, and businesses charging, collecting, or raising funds may rent .a"H1Ll"~ and equipment at the basic rate plus 75 percent. The Art Center is not available for CLASS V usage. Reservations are set by facility managers at respective facilities. The Director of Community Services or designee. may authorize rental discounts up to 25 percent. Park, Mitchell Park Field House- * * Arastradero Gateway Educational Facility rental limited to educational usage. City of Palo Alto 2008-09 Municipal Fee Schedule 8-1 EXHIBIT C * Customers enrolled in Library's Homebound program exempted from these fees. ** Fee is charged once the customer exceeds the free 2 hour limit by a IS-minute grace period. *** Customers with disabilities and those enrolled in Library's Homebound program exempted from this fee. City of Palo Alto 2008-09 Municipal Fee Schedule 15-1 EXHIBIT C City of Palo Alto 2007-08 Municipal Fee Schedule 16-1 EXHIBIT C City of Palo Alto 2007-08 Municipal Fee Schedule 16-2 EXHIBIT C City of Palo Alto 2008-09 Municipal Fee Schedule 17-1 Compostable Materials (per landfill acceptance list) EXHIBIT C .OO/permit refuse rates can be found in Utility Rate Schedules R. 5.00/permit .... .. .............. . City of Palo Alto 2008-09 Municipal Fee Schedule 21-1 GENERAL FUND Administrative Services Department Accounting Specialist Accounting Specialist -Lead Administrative Assistant Administrative Associate II Administrative Associate III Asst. Director, Administrative Services Business Analyst Buyer Contracts Administrator '.DEiputYDit~foi/.Admiriisfrative.SerVices(1)· •• ·· Director, Administrative Services Graphic Designer Manager, Accounting Manager, Budget Manager, Purchasing/Contract Admin. Manager, Real Property Payroll Analyst Senior Accountant Senior Business Analyst Senior Financial Analyst Staff Accountant Staff Secretary Storekeeper Storekeeper -Lead Warehouse Supervisor Footnote: Exhibit D FY 2007 Adjusted Budget 12.00 5.00 0.93 0.65 0.10 1.95 2.00 ·>f.oo 0.55 1.00 1.00 1.00 1.00 1.00 2.00 4.00 0.10 8.41 3.00 0.96 1.00 1.00 1.00 (1) Transfer of 0.20 FTE Deputy Director, Administrative Services to Utilities. FY2008 Adjusted Budget 12.00 5.00 0.93 0.96 FY 2009 Adopted Budget 11.00 5.00 0.93 0.96 0.60 0.60 0.10 0.10 1.95 1.95 2.00 2.00 FY2009 Mid-Year Budget Change FY 2009 Adjusted Budget 11.00 5.00 0.93 0.96 0.60 0.10 1.95 2.00 ":~:'j.qQ:': .', ·,tOO .. >"( .. >{)0.2o;:i':', )~,f2Q; 0.50 1.00 1.00 1.00 1.00 1.00 2.00 4.00 0.20 7.91 3.00 0.55 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 4.00 4.00 0.20 0.20 8.18 7.91 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 GENERAL FUND Community Services Department Administrative Assistant Administrative Associate I Administrator Special Events Arts and Culture Division Manager Building Serviceperson Building Serviceperson-Lead Coordinator, Child Care Coordinator, Recreation Programs Cubberley Center and Human Services Division Manager Director, Community Services Division Manager, Recreation & Golf Golf and Parks Division Manager Golf Course Equipment Mechanic Golf Course Maintenance Person Inspector, Field Services ;JfEM~$~tllTl,.&zoolead'.I,nstrudorc:(1 ) Management Assistant Manager, Arts Office Specialist Open Space Division Manager Open Space and Parks Division Manager Park Maintenance Lead Park Maintenance Person Park Ranger Parks and Open Space Assistant Parks Crew -Lead Producer Arts/Science Programs :prQg!ilrn.Ass,ist~nt:J~l1r -, ' , Program Assistant II Recreation and youth Sciences Div Mgr Senior Administrator Senior Ranger Sprinkler System Repairer Staff Secretary Superintendent, Golf Course Superintendent, Parks Supervisor, Junior Museum Supervisor, Open Space Supervisor, Parks Supervisor, Recreation Program Theater Specialist Volunteer Coordinator Footnote: Exhibit D FY 2007 Adjusted Budget 1.00 1.00 1.00 4.00 2.00 1.00 3.00 1.00 1.00 1.00 1.00 5.00 2.00 --: ,;:-'~-/"'''' 1.00 2.00 5.50 1.00 1.00 11.00 5.00 0.75 3.00 12.25 '/9:09'- 1.00 1.00 1.00 5.00 3.00 ,1.00 1.00 1.00 1.00 2.00 5.00 1.00 0.75 FY 2008 Adjusted Budget 1.00 2.50 1.00 4.00 2.00 1.00 5.00 1.00 1.00 1.00 1.00 5.00 2.00 -2;2~ 1.00 2.00 1.00 1.00 11.00 5.00 0.75 3.00 12.25 :'~L75 3.00 1.00 1.00 5.00 1.00 ' 1.00 1.00 1.00 1.00 4.00 1.00 0.75 (1) Reclassication of 2.25 FTE's from Jr. Museum & Zoo Lead Instructor to Program Assistant I. FY 2009 Adopted Budget 1.00 2.50 1.00 4.00 2.00 1.00 5.00 1.00 1.00 1.00 1.00 5.00 2.00 '2:25' 1.00 2.00 1.00 1.00 11.00 5.00 3.00 12.25 9,75, 3.00 1.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00 4.00 1.00 0.75 FY2009 Mid-Year Budget Change FY 2009 Adjusted Budget 1.00 2.50 1.00 4.00 2.00 1.00 5.00 1.00 1.00 1.00 1.00 5.00 2.00 (i25r:;~": .' ~'\:-.;.,:~.> 1.00 2.00 1.00 1.00 11.00 5.00 3.00 12.25 ~.25 ,,;,):~ J2:00 .. 3.00 1.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00 4.00 1.00 0.75 Exhibit D GENERAL FUND Planning Department Administrative Assistant Administrative Associate I Administrative Associate II Administrative Associate III Administrator, Planning & Comm. Env. A~borl~t(f)"~:',,-(;:;;( ..•... . ". Assistant Building Official Assistant Director, PCE Associate Engineer Building Inspector Building Inspector Specialist Building/Planning Technician Chief Building Official Chief Planning and Transportation Official Code Enforcement Officer Coordinator, Transp. System Mgmt. Director, Planning and Comm. Env. Engineer Engineering Technician II Executive Secretary ~:R~~:~:~~~~~~:§:~~~g~~~~)~"~~~~ve;dpM~ht (2), .... Manager, Planning MI:I~~9IfigAY~2flsf(1) Office Specialist Permit Specialist Planner Plan Checking Engineer Project Engineer Senior Planner Staff Secretary Supervisor, Building Inspection Transportation Manager IT@1Al!P·LANNI"'G'AND,COII/IMUNI"f~ENVIRONMENr Footnotes: (1) Reclassification of 1.0 FTE from Managing Arborist to Arborist. FY 2007 Adjusted Budget 1.00 1.00 1.00 1.00 4.00 3.00 4.00 1.00 1.00 2.00 0.50 1.00 2.00 1.00 1.00 2.00 .{Oo 2.00 7.00 3.00 6.00 4.80 1.00 1.00 FY 2008 Adjusted Budget 1.00 2.00 4.80 1.00 1.00 1.00 1.00 1.00 4.00 3.00 4.00 1.00 1.00 2.00 0.50 1.00 2.00 1.00 HiD , ~;·_~,>,-·~t> ~;.'-.-.. 2.00 ":~J·OO··· 7.00 3.00 5.00 1.00 1.00 FY 2009 Adopted Budget 1.00 2.00 4.80 1.00 1.00 1.00 1.00 1.00 4.00 3.00 3.00 1.00 1.00 2.00 0.50 1.00 1.00 1.00 2.00 '1.00 1.00 6.00 3.00 1.00 6.00 1.00 1.00 FY 2009 Mid-Year Budget Change "1.00" .·.p.og) " .. -::;;.< 1:00' (1:QQ) (2) Reclassification of 1.0 FTE from Manager, Economic Resources to Manager, Economic Development & Redevelopment. FY 2009 Adjusted Budget 1.00 2.00 4.80 1.00 1.00 . ~ ;<': '~~'. ':WOO 1.00 1.00 1.00 4.00 3.00 3.00 1.00 1.00 2.00 0.50 1.00 1.00. 1.00 2.00 1.00 6.00 3.00 1.00 6.00 1.00 1.00 GENERAL FUND Police Department Administrative Assistant Administrative Associate II Animal Control Officer Animal Services Specialist Animal Services Specialist II Assistant Chief of Police Business Analyst Code Enforcement Officer Communication Technician Community Service Officer :,C(?mmuriiW $~i:\iiCeibfti~er~ te~a( 1) Coordinator, Police Technical Services Court Liaison Officer Crime Analyst Police Agent Police Captain Police Chief Police Lieutenant Police Officer Police Records Specialist Police Records Specialist II Police Records Specialist -Lead Police Sergeant Program Assistant I Program Assistant II Property and Evidence Technician Public Safety Dispatcher I Public Safety Dispatcher II Public Safety Dispatcher -Lead Senior Administrator Staff Secretary Superintendent, Animal Services Supervisor, Animal Services .$!JP~ryisoriipoliqe'Ser;vic~s (2);" Veterinarian Veterinarian Technician Volunteer Coordinator Footnote: (1) Drop 1.0 FTE Community Service Officer -Lead. (2) Add 1.0 FTE Supervisor, Police Services. Exhibit D FY 2007 Adjusted Budget 1.00 4.50 1.00 1.00 1.00 1.50 1.00 3.00 1.00 1.00 1.00 19.00 2.00 1.00 6.00 51.00 10.00 14.00 1.00 2.00 16.00 5.00 1.00 3.00 1.00 1.00 '2:0P 1.00 2.00 1.00 FY 2008 Adjusted Budget 1.00 3.00 4.50 1.00 1.00 1.00 1.00 1.50 1.00 9.00 :rOPi 1.00 1.00 1.00 19.00 2.00 1.00 5.00 51.00 9.00 1.00 14.00 1.00 2.00 2.00 14.00 5.00 1.00 1.00 1.00 2.00rc 1.00 2.00 1.00 FY 2009 Adopted Budget 1.00 3.00 4.50 1.00 1.00 1.00 1.00 1.50 1.00 9.00 "foO,~ 1.00 1.00 1.00 19.00 2.00 . 1.00 5.00 51.00 9.00 1.00 14.00 1.00 1.00 2.00 2.00 14.00 5.00 1.00 1.00 1.00 /2.0tr. 1.00 2.00 1.00 FY2009 Mid-Year Budget Change ,,'c' (1.00) 1.00'" FY 2009 Adjusted Budget 1.00 3.00 4.50 1.00 1.00 1.00 1.00 1.50 1.00 9.00 .. . ~.-- 1,00 1.00 1.00 19.00 2.00 1.00 5.00 51.00 9.00 1.00 14.00 1.00 1.00 2.00 2.00 14.00 5.00 1.00 1.00 1.00 ",:<.~, 3·00~ 1.00 2.00 1.00 GENERAL FUND Public Works Department Administrative Assistant Administrative Associate I Administrative Associate II Administrative Associate III Administrator, Public Works Assistant Director Public Works Associate Engineer Building Serviceperson Building Serviceperson -Lead Deputy Director, PW Operations Director, Public Works/City Engineer Electrician Engineer Engineering Technician III Equipment Operator Facilities Carpenter Facilities Maintenance -Lead Facilities Mechanic Facilities Painter Heavy Equipment Operator Heavy Equipment Operator -Lead Inspector, Field Services Manager, Facilities Maintenance Manager, Maintenance Operations Managing Arborist Office Specialist pf()J~gL~figlr'le:er {1 )<). Project Manager Senior Administrator Senior Engineer Senior Project Manager Staff Secretary Superintendent, PW Operations 's;qp~r:vlsing Project,Erigil'leer (1) •. Supervisor, Building Services Supervisor, Facilities Management Supervisor, Inspection/Surveying, PW Surveying Assistant Surveyor, Public Works Traffic Control Maintainer-Lead Traffic Control Maintenance I Traffic Control Maintenance II '+~:~.~r~~g~rj~B1~~~~~(tJt Tree Trimmer/Line Clearer -Lead Truck Driver Footnote: Exhibit D FY2007 Adjusted Budget 1.00 1.00 0.85 0.10 4.00 2.00 0.25 1.00 1.00 1.20 4.20 2,55 1.00 2.00 5.00 2.00 1.90 0.85 1,00 0.80 0.12 1.00. 3.50 :"'1·20 1.75 0,90 0.30 1.00 2.67 0.60 .00 0.95 0.80 0.78 0.78 1.00 1,94 3.00 :9:00'" 1.00 0.91 FY2008 Adjusted Budget 1.00 3.50 2.00 1.00 1.00 0,85 0.10 4.00 2.00 0,25 1,00 1.00 1.20 4.20 3.46 1.00 2,00 5.00 2.00 1.90 0.85 1.00 0.80 0.12 1.00 1.20 1.75 0.90 0.30 1.00 0.60 -1,00 0.95 0.80 0.78 0.78 1.00 1.94 3.00 ~:~g;. 1.00 (1) Reclassification of 1.0 FTE from Project Engineer to SuperviSing Project Engineer. (2) Add 1.0 FTE Tree Maintenance Person. (3) Drop 1.0 FTE Tree Trimmer/Line Clearer. FY2009 Adopted Budget 1,00 3.50 2.00 1.00 1.00 1.10 0.10 4.00 2.00 1,00 1.00 1.20 4.20 3.46 1.00 2.00 6.00 2.00 1.90 0.85 1.00 0.80 0.12 1.00 1:20 1.75 0.90 0.30 1.00 0,60 1.95 0.80 0.78 0.78 1.00 1,94 3.00 1.00 8,00 1.00 FY2009 Mid-Year Budget Change FY2009 Adjusted Budget 1.00 3.50 2.00 1.00 1.00 1.10 0.10 4.00 2.00 1.00 1.00 1.20 4.20 3.46 1.00 2.00 6.00 2.00 1.90 0.85 1.00 0.80 0.12 1.00 . ).;{1,00) ,,'(>\:,:;, i;p;io 1.75 0.90 0.30 1.00 0,60 >1·00····· ";' ,,;:1,00. 1.95 0.80 0.78 0.78 1.00 1.94 3.00 1.00 . ... ~:g~; (1;00) 1.00 ENTERPRISE FUNDS Public Works Department Refuse, Storm Drainage and Wastewater Treatment A~I1j[~lstrator,~ R~fuse( 1 );,. Assistant Director, Public Works Administrative Associate II Assistant Manager, WQCP Associate Engineer Associate Planner Bq~ini3~(A~~IY~tr·(2).··· Buyer Chemist dR:~f41~~~~~;~~~~~J~6~~~~k." ..':,1' ..•....... . Coorqifla~9riZero Wa~te:(3) •... Deputy Fire Chief/Fire Marshal Deputy Director Public Works Operations Electrician Electrician -Lead Engineer Engineering Technician I Engineering Technician III Environmental Specialist Equipment Operator Executive Assistant Hazardous Materials Inspector Hazardous Materials Specialist Heavy Equipment Operator Heavy Equipment Operator -Lead Industrial Waste Inspector Industrial Waste Investigator Laboratory Technician, WQCP Landfill Technician Maintenance Mechanic Manager, Environmental Compliance Manager, Environmental Control Program Manager, Laboratory Services Manager, Maintenance Operations Manager, Solid Waste Manager, WQC Plant Office SpeCialist Program Assistant I Program Assistant II Programmer Analyst Project Engineer Refuse Disposal Attendant Senior Administrator Senior Chemist Senior Engineer Senior Mechanic, Water Quality Control Senior Operator, Water Quality Control -SehiorT~~hnoiogist(4) . Staff Secretary Exhibit D FY 2007 Adjusted Budget 0,15 1.00 3.30 1.00 1.00 3.00 0.60 3.00 2.00 1.10 0.50 1.50 2.00 0.45 2.00 6.10 2.95 1.00 2.00 2.50 1.00 7.00 1.00 3.00 1.00 1.38 1.00 1.00 2.00 1.00 1.00 2.00 4.00 0.10 1.00 2.45 1.00 6.00 3.00 FY 2008 Adjusted Budget - 0,15 3,00 1.00 3.30 1.00 1:0q 1.00 0.60 3.00 2.00 1.10 0.50 1.50 1.75 0.54 2.00 5.90 3.15 1.00 2.00 2.50 1.00 7.00 1.00 3.00 1.00 1.38 1.00 1.00 2.00 1.00 2.00 4.00 0.10 1.00 2.45 1.00 6.00 FY 2009 Adopted Budget 0.75 3.00 1.00 3.30 1.00 1:06: 1.00 3.00 0.08 3.00 2.00 1.10 1.00 1.50 2.00 0.54 2.00 0.04 0.02 5.90 3.15 1.00 2.00 2.50 1.00 7.00 1.00 3.00 1.00 1.38 1.00 1.00 2.00 1.00 2.00 4.00 0.10 1.00 2.45 1.00 6.00 FY 2009 Mid·Year Budget Change ···~t,QO . '<,~Q~13):, 0:13 FY 2009 Adjusted Budget "''1;00. 0.75 3.00 1.00 3.30 1.00 ;+:'h ~"-, .. 1.00 3.00 0.08 3'.00 2.00 1.10 1.00 1.50 2.00 0.54 2.00 0.04 0.02 5.90 3.15 1.00 2.00 2.50 1.00 7.00 1.00 3.00 1.00 1.38 1.00 1.00 2.00 1.00 2.00 4.00 0.10 1.00 2.45 1.00 6.00 0.13 (continued) ENTERPRISE FUNDS Public Works Department Refuse, Storm Drainage and Wastewater Treatment Storekeeper Street Maintenance Assistant Street Sweeper Operator Superintendent, Public Works Operations Supervisor, Public Works Supervisor, Water Quality Control Operations Surveying Assistant Surveyor, Public Works I$pf{hQI99!$(~)CF'·,';~";:' Traffic Control Maintenance I Truck Driver Water Quality Control Plant Operator" Footnotes: Exhibit 0 FY 2007 Adjusted Budget 2.00 2.00 7.00 0.20 1.00 5.00 0.11 0.11 0.06 0.09 16.00 FY 2008 Adjusted Budget 1.00 2.00 7.00 0.20 1.00 5.00 0.11 0.11 0.06 16.00 (1) Addition of 1.0 FTE Administrator, Refuse for the Zero Waste Operational Plan. (2) Add 0.13 FTE Business Analyst. (3) Reclassification of 2.0 FTE from Coordinator Recycling to Coordinator Zero Waste. (4) Transfer of 0.13 FTE Senior Technologist from Utilities. (5) Drop 0.13 FTE Technologist. FY 2009 Adopted Budget 1.00 2.00 7.00 0.20 1.00 5.00 0.11 0.11 ·"o:1i' 0.06 16.00 FY2009 Mid·Year Budget Change ,;,:;,;;nQX1~)"" FY 2009 Adjusted Budget 1.00 2.00 7.00 0.20 1.00 5.00 0.11 0.11 0.06 16.00 ENTERPRISE FUNDS Utilities Department Exhibit D FY 2007 Adjusted Budget FY 2008 Adjusted Budget Administration, Electric, Gas, Wastewater Collection and Water Account Representatives Accounting Specialist Administrative Assistant Administrative Associate I Administrative Associate II Associate Resource Planner Asst. Director Customer Support Services Asst. Director Utilities/Engineering Asst. Director Utilities/Operations Asst. Director Utilities/Resource Management :~i(sM~ssAn~IY~iH);'(2)'······ . Cathodic Technician Cement Finisher Communications Specialist Contracts Administrator Coordinator, Utils. Safety & Security pqQf(ijHaic:l(J)Dtilitfp[dj~'~t$h} .. Customer Service Representative Customer Service Specialist Customer Service Specialist-Lead •• D~abiyDir~btb;'~A'dthi6i~{rative.SerVices. (5) Deputy Fire Chief/Fire Marshal Director, Administrative Services Director, Utilities Ele6~r6~icij~t(E~gin~e .. (iF Electric Underground Inspector Electric Underground Inspector Lead Electrical Assistant I Electrician Electrician-Lead Engineer Engineering Manager, Electric Engineering Manager, WGW Engineering Technician III Equipment Operator Gas System Technician Hazardous Materials Inspector Hazardous Materials Specialist Heavy Equipment Operator Inspector, Field Services Lineperson/Cable Splicer Lineperson/Cable Splicer-Lead Maintenance Mechanic Maintenance Mechanic -Welding Manager Utilities Telecommunication Manager, Communications Manager, Electric Operations Manager, Energy Risk 3.00 3.00 1.00 1.00 1.00 1.00 3.00 7.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ··'··<.:~3,O(i;~ 5.00 5.00 2.00 2.00 1.00 1.00 0.15 0.15 1.00 1.00 /fOQ>' '0 ".3.00· 2.00 2.00 1.00 4.00 4.00 14.00 14.00 7.00 6.00 4.00 4.00 1.00 1.00 1.00 1.00 3.00 3.00 2.00 2.00 2.00 2.00 10.00 10.00 4.00 4.00 10.00 10.00 5.00 4.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.75 FY 2009 Adopted Budget 3.00 1.00 1.00 2.00 7.00 1.00 1.00 1.00 1.00 FY 2009 Mid-Year Budget Change FY 2009 Adjusted Budget :;1 3.00 1.00 1.00 2.00 7.00 1.00 1.00 1.00 1.00 1.00 1.00 ';.:j,PO' "'1;87 ,.(",.:~;J;·2:87 1.00 1.00 1.00 1.00 1.00 1.00' 1.00 1.00 ··\~:oi:)', ' .... , ,j;bp' ;<,.,'<';},;4:PP'( 5.00 2.00 1.00 0.08 0.15 1.00 3~OO 2.00 1.00 5.00 14.00 6.00 4.00 1.00 1.00 3.00 2.00 2.00 0.06 0.03 10.00 4.00 11.00 4.00 1.00 1.00 1.00 1.00 1.00 5.00 '2.00 1.00 0.2d.: . '·~:0.20 0.08 0.15 1.00 .' '(2.60) ·.·.;.~,b,o 2.00 1.00 5.00 14.00 6.00 4.00 1.00 1.00 3.00 2.00 2.00 0.06 0.03 10.00 4.00 11.00 4.00 1.00 1.00 1.00 1.00 1.00 (continued) ENTERPRISE FUNDS Utilities Department Exhibit D FY2007 Adjusted Budget Administration, Electric, Gas, Wastewater Collection and Water Manager, Field and Customer Service Manager, Supply Resources Manager, Utilities Marketing Services Manager, Utilities Operations WGW Manager, Utilities Rates Marketing Engineer Meter Reader Meter Reader-Lead Office Specialist Power Engineer Program Assistant I Project Engineer flr6JegfM~l1ag~lj4) _ Resource Planner Senior Administrator Senior Business Analyst Senior Electric Project Engineer Senior Utilities Field Services Representative S:~~-i()ij0~rk~rAnalY$t'(2) -- Senior Mechanic Senior Project Engineer Senior Resource Originator Senior Resource Planner §eiJi9h7f&q~n()logisr (6), Senior Water System Operator Staff Secretary Storekeeper -SuperVising:FI~triC'PfojectErigineer (7) Supervisor Electric Systems Supervisor, Utility Construction Supervisor, Water, Gas, Wastewater Supervisor, Water Transmission TecbriQli:iQist (8); -, .-- Tree Maintenance Person Truck Driver Utilities Accounting Technician Utilities Credit/Collection Specialist Utilities Engineer Estimator Utilities Engineer Estimator -Lead Utilities Field Service Representative Utilities Installer/Repairer Utilities Installer/Repairer Assistant Utilities Installer/Repairer -Welding Utilities Installer/Repairer-Lead Utilities Installer/Repairer-Lead Welding Utilities Key Account Representative Utilities Locator Utilities Rate Analyst Utilities System Operator Utility Compliance Technician Utility Compliance Tech.-Lead Water Meter/Cross Connection Technician Water System Operator II 1.00 1.00 1.00 1.00 1.00 1.00 5.00 1.00 3.00 2.00 4.00 6.00 0,75: 3.00 1.00 1.00 4.00 1.00 .-;-3:()()[~ 1.00 4.00 1.00 4.00 2.00 7.00 1.00 5.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00 5.00 1.00 7.00 15.00 1.00 5.00 3.00 3.00 1.00 5.00 2.00 1.00 2.00 5.00 FY 2008 Adjusted Budget 1.00 1.00 1.00 1.00 6.00 1.00 2.00 3.00 6.00 <_\75 3.00 1.00 1.00 4.00 1.00 3;00;)'.- 1.00 4.00 1.00 6.00 2.00 2.00 5.00 5.00 1.00 1.00 1.00 1.00 5.00 1.00 7.00 11.00 1.00 3.00 5.00 2.00 3.00 3.00 1.00 5.00 2.00 1.00 2.00 5.00 FY2009 Adopted Budget 1.00 1.00 1.00 1.00 6.00 1.00 2.00 3.00 6.00 1:75\ 4.00 1.00 1.00 4.00 1.00 2.00 1.00 4.00 1.00 6.00 1:00,- 2.00 2.00 5.00 5.00 1.00 0.87· - 1.00 1.00 5.00 1.00 7.00 11.00 1.00 3.00 5.00 2.00 3.00 3.00 5.00 2.00 1.00 2.00 5.00 FY 2009 Mid-Year Budget Change -(1.00)- {1·00) (0.13) -2.00 (0.87)_ FY 2009 Adjusted Budget 1.00 1.00 1.00 1.00 6.00 1.00 2.00 3.00 6.00 --;';d);,"7!:)-_ 4.00 1.00 1.00 4.00 1.00 -"1;ocL 1.00 4.00 1.00 6.00 0.81'- 2.00 2.00 ;-2;00 5.00 5.00 1.00 1.00 1.00 5.00 1.00 7.00 11.00 1.00 3.00 5.00 2.00 3.00 3.00 5.00 2.00 1.00 2.00 5.00 (continued) · I ENTERPRISE FUNDS Utilities Department Exhibit D FY 2007 Adjusted Budget Administration, Electric, Gas, Wastewater Collection and Water Footnotes: (1) Add 0.87 FTE Business Analyst. (2) Reclassification of 1.0 FTE Senior Market Analyst to Business Analyst. (3) Add 1.0 FTE Coordinator Utility Projects. (4) Drop 1.0 FTE Project Manager. FY 2008 Adjusted Budget (5) Transfer of 0.20 FTE Deputy Director, Administraive Services from General Fund. (6) Transfer of 0.13 FTE Senior Technologist to Public Works -Enterprise. FY 2009 Adopted Budget (7) Reclassification of 2.0 FTE Electric Project Engineer to Supervising Electric Project Engineer. (8) Drop 0.87 FTE Technologist. FY2009 Mid-Year Budget Change FY 2009 Adjusted Budget OTHER FUNDS Technology Administrative Assistant Administrative Associate II Administrative Associate III Asst. Director, Administrative Services Business Analyst Chief Information Officer Desktop Technician Director, Administrative Services Manager, Information Technology Senior Business Analyst ;S~iilorTe~Mplo9i~r (1)'; Senior Financial Analyst Staff Secretary ~f~phndI9gi~H1Yc.· •• ,' Capital Assistant Director, Public Works Administrative Associate I Associate Engineer Cement Finisher Cement Finisher-Lead Deputy Director, PW Operations EngilJ~r (2)'Y" Engineering Technician III Heavy Equipment Operator Heavy Equipment Operator -Lead Manager, Facilities Maintenance Manager, Maintenance Operations Landscape Architect Park Planner Program Assistant I PfOJ6gt I5n9ip~~r~(2) Project Manager Senior Engineer Staff Secretary Superintendent, PW Operations Supervisor, Facilities Management Supervisor, Inspection/Surv PW Surveying Assistant Surveyor, Public Works Footnotes: Exhibit D FY 2007 Adjusted Budget FY 2008 Adjusted Budget 0.07 0.30 0.90 1.00 5.00 0.25 2.30 1.90 , ,15:00;' .' 0.09 0.79 '\2;00·'" 0.60 3.00 1.00 0.15 · .. ··.3;.70:·. 2.30 0.20 0.20 0.50 1.00 1.00 \;130' 1.50 2.25 0.33 0.20 0.05 0.20 0.11 0.11 0.07 0,79 0.40 0.90 1.00 5.00 0.25 2.50 1.80 " <15,:00} . 0.09 ":i2:QOii 0.60 3.00 1.00 0.15 <HO' 2.30 0.20 0.20 0.50 1.00 1.00 " .1,7,(); 1.50 2.15 0.20 0.05 0.20 0.11 0.11 (1) Reclassification of 2.0 FTE from Sr. Technologist to Technologist. (2) Drop 1.0 FTE Engineer. (3) Add 1.0 FTE Project Engineer. FY 2009 Adopted Budget 0.07 1.00 0.04 0.40 0.90 1.00 5.00 0.35 3.00 1.80 15.00"··.· 0.09 FY 2009 Mid-Year Budget Change FY 2009 Adjusted Budget 0.07 1.00 0.04 0.40 0.90 1:00 5.00 0.35 3.00 1.80 '(2.00).' " .,1:£90 0.09 2.00}<' . 0.15 0.60 3.00 1.00 c.3]O 2.30 0.20 0.20 0.50 1.00 1.00 ',2.70; 1.50 2.15 0.20 0.05 0.20 0.11 0.11 '. (1.00) '1.00 0.15 1.80 9.00 3.00 0.30 10i10; 6.90 0.20 0.40 0.60 1.50 3.00 3.00 (7.20 4.50 6.55 0.33 0.60 0.15 0.60 0.33 0.33 FY 08-09 MlD-YEAR CAPn AL IMPROVEMENT PROGRAM PRO.JECTS STATUS GENERAL .FUND ADMINISTRATIVE SERVICES DEPARTMENT Attachment 2 FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT $267,572 $24,026 $559,086 $47,165 OS-07002 $2,302 $0 $0 $0 $0 $0 $0 $0 $0 Attachment 2 $0 $0 $24,026 $0 $47,165 $0 $0 $0 $0 1,994 $0 Mar 09 $0 TBD FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL .FUND COMMUNITY SERVICES DEPARTMENT $1,070,000 I $278,645 I $3,960 I & I Multi-Year $1.549.933 I $182,375 I $93,1691 Space Lakes & Multi-Year $250,449 $18,987 $15,202 Ponds Maintenance Park Facilities Multi-Year $1,838,811 $1,208 $0 Improvements Immunity Services Multi-Year $461,866 $150,389 $3,663 Facilities Lighting Enhancements Tennis & Basketball Multi-Year $436,115 $250,399 $49,780 Court Resurfacing $0 I $01 $0 $0 $0 $0 Attachment 2 $0 I $14,760 I $259,925 I 76%IDesign I Aug 09 :d. Design in progress School. Bids delayed Feb 09 due to changes in Construction for both and Addison will mce in Summer 09. $0 1 $40,9321 $48,2741 $0 $1 $3,784 $0 $1,208 $0 I 100% I Complete $0 $1 $146,725 $0 $21,359 $179,260 59% Ongoing and replacement of both Gunn tennis courts to in Spring 09. Terman courts to be resurfaced FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT $252,976 I $70,032 I $27,202 I $375,000 $150,000 $25,000 $100,000 $100,000 $0 $75,000 $75,000 $50,245 Emergency Repairs $0 I $0 I $30,501 I $12,329 I I $0 $0 $0 $125,000 $0 $0 $0 $100,000 I $0 $0 $8,362 $16,393 I Attachment 2 95%1 Ongoing ~un for the signage portion CIP. The signage sites that being developed Bowden Park, El Palo Timotby Hopkins Park, Mayfield Park, Terrace Library, Peers gateway signage. Site at Scott Park is to be and replaced with new Fencing at Peers removed and replaced witb fencing. J J 1 O%ITBD 78% I Ongoing FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL .FUND FIRE DEPARTMENT $60,000 $0 Improvements FD-09001 I Fire Apparatus 1 Minor I $138,000 I $69,000 I $0 I Equipment Replacement FD-09002 IJaws of Life !Minor ! $65,000! $65,000 I $0 I Hurst Tool Replacement $69,301 $62,650 $0 $0 I $0 I $0 $0 $0 $60,000 $0 I $15,939 I $53,061 I $0 I $0 I $65,000 I $0 $1,186 $5,465 0% I Design 62% 1 Design 0%1 Design 100% I Complete Mar 09 ISep 10 IJul09 Attachment 2 University's project Imanae:er is working with the FY 08-09 MJD-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND LIBRARY DEPARTMENT Automation Service Attachment 2 FY 08-09 MIO-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUNO PLANNING DEPARTMENT Traffic Signal Minor $289,497 $231,014 $44,483 PL-OS002 Minor $1,209,545 $428,761 $0 $0 $10,960 175,571 $0 $2 $428,759 Sep09 Attachment 2 Boulevard trial was completed in Aug 07 together the Maybell Street resurfacing The trial evaluation began in Spring 08. Evaluation report will be completed in the fIrst quarter of2009. In 2009, staff will initiate the Park Blvd. bicycle boulevard project as well. City Council approved the funding plan for the trial implementation of the Charleston! Arastradero Corridor Plan in 05. Installation of the Phase 1 trial (Gunn High School signal and m lane and Charleston Corridor I re~triping) was completed in Aug 06. City Council approved the permanent retention of the Charleston Phase I plan in April 08. Phase 2 (Arastradero Road striping) has been delayed until Summer 09. Staff will report to Council on Irecommended striping plan for Arastradero Road in early 2009. FY 08-09 M£D-YEAR CAPn AL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING DEPARTMENT $50,000 I $50,000 I $0 I $94,900 I $40,828 I $412 I Ticket Machines Downtown North Minor $60,000 $60,000 $0 Traffic Circle Hardscape Intermodal Transit Minor $837,380 $837,800 $0 Center Camino ReaV Minor $155,000 $155,000 $0 Stanford Intersection Palo Alto Caltrain IMinor I $30,000 $30,000 $0 Station Connectivity $1,465 $0 $0 I $0 I $0 I $0 I $0 $0 $0 $0 $0 $0 $0 $0 96% $0 I $50,000 I 0% I Construction I Sep 09 r $8,694 I $31,722 $0 $60,000 0% Pre-design TBD $0 $837,800 0% Pre-design Ongoing $0 $155,000 0% Design Dec 10 $0· $30,000 0% Pre-design TBD Attachment 2 Council approved traffic calming in Nov 04. Installation of the trial traffic calming measures was Icompleted in Nov 06, including 6 speed and 5 traffic circles. Traffic data I City of Los Altos is lead agency for this project. Construction been rescheduled to Spring 09. Project will be implemented in 2009 in conjunction with Public Works sidewalk replacement project. The initial technical studies and work program/implementation plan for the next phases of the project were completed in Nov 07. The Implementation Plan will be forwarded the City Council in 2009. Council accepted grant funding from the VTA for this project in Apr 07. Funding agreements with Caltrans were executed in Apr 08. RFP for the design and environmental consultant services was issued and proposals received in Dec 08. Consultant selection and project initiation in early 2009. No activity to date. FY 08-09 MlD-YEAR CAPlT AL IMPROVEMENT )'ROGRAM PRO.JECTS STATUS GENERAL FUND PLANNING DE.PARTM.ENT $150,000 $111,149 $0 $1 $0 $920,000 I $431,502 I $0 I $475,000 $471,000 $38,278 11,149 1,590,487 $0 I $0 I $0 I $431,502 I $0 $0 $14,282 $418,440 53%IConstruction ITBD 12% Construction Jun09 Attachment 2 from this project will be used as match funding for the Stanford I ,<venue! EI Camino Real Streetscape the preferred design I alternative was developed. Further work project will be pursued in FY IThe Planning and Transportation recommended and the approved the retention of the Pepper traffic calming trial in Jan 08. for Lincoln Avenue was initiated 07 and recommended trial traffic plan will be installed in Jan 09. for projects on North California Greer Road will begin in 2009. Bid documents complet Contract awarded in JUI of color zone signs to be completed by 08. Further signage, kiosks etc. will be pursued in 2009. FY 08-09 MIJ)-YEAR CAPITAL IMPROVEMENT PROGRAM prW,JECTS STATUS GENERAL FUND POLICE DEPARTMENT $400,000 $400,000 $211,950 $8,757 SIOO,OOO $531,288 $0 so $0 $0 $0 $0 $526,435 $6,028 $6,028 Management $0 $0 $0 $0 $0 $0 Attachment 2 $0 $0 SI $3,930 invoice for final payment. $0 $400,000 $0 $0 $8,757 $0 $0 $100,000 $0 $0 FY 08-09 MID-YEAR CAPIT AL IMPROVEMENT PROGRAM PROJ.ECTS ST A Tl)S GENERAL FUND PUBLIC WORKS DEPARTMENT San Antonio Bridge Structural Repairs & California Avenue Improvements Minor Minor Plaza Renovation IMinor Minor Exterior Paint $201,996 $26,859 $275,000 $72,252 $250,606 $212,791 $266,057 I $232,830 $36,757 $96,468 $91,249 $289,963 $224,978 $350,000 $350,000 $80,000 $80,000 $0 $0 $8,800 $0 $1,478 $0 $11,324 $0 $0 Attachment 2 $0 $0 $0 $26,859 $0 $0 $0 $72,252 $0 $0 $203,620 $371 $0 $0 $15,355 $217,475 18% On-holq Jun09 Project on hold. $0 $0 $35,278 $1 $0 $0 $4,184 I $87,065 $0 $0 $19,239 $194,415 $0 $0 $0 $350,000 $0 $0 $0 I'Y 08-09 MID-YEAR eAPIT AL IMPROVEMENT PROGRAM PRO.JECTS STATUS GENERAL FUND PUBLIC WORKS .DEPARTMENT $501,984 $30,502 $126,502 $2,973 Improvements El Camino Median Minor $531,820 $91,855 Landscape Foothills Park -Vista Hill Minor $55,225 $2,060 Park Minor $835,576 $100,295 Improvements Ramos Park Minor $614,967 $118,785 Improvements Boulware Park Minor $335,849 $11,612 Improvements I $0 $0 $4,106 $0 $37,561 $0 $3.799 $0 $537,115 $286,493 $262,017 $1,851,134 $1,850,000 $66,640 $100,000 $100,000 I Attachment 2 $0 $0 $0 $30,502 $0 $0 $0 $2,973 $0 $193 $9,228 $78,328 $0 $0 $0 $2.060 96% Comolete Proiect to be closed in mid $0 $29.492 $677 I $0 $0 I $19,910 $0 $0 I $0 I $8,782 $0 $0 $8,056 100% Complete $0 $0 $0 $4,312 100% Complete $0 $22,165 $2,311 $0 $0 $0 $122,977 $0 $0 $61 $0 contract - FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT $1,598,089 I $1,598,089 $709,768 $321,606 $147,707 Art Center Electrical & 1 Multi-Year 1 $1,748,471 1 $1,696,408 1 $10,934 1 Mechanical Upgrades Multi-Year $33,414,137 $383,406 $108 Multi-Year $3,058,304 $121,000 $24,962 Design and Multi-Year $3,615,536 $440,720 $252,765 $4,713,511 $4,348,350 $62,678 I Multi-Year I $550,293 $537,251 $4,837 $121,545 $2,054 $0 PF-06003 ICubberiev Community I Multi-Year I $745,448 I $71,406 $6,456 $0 $01 $0 $0 $0 $0 $0 $0 $0 $0 $492,537 $395,784 $01 $246,408 1 $1,439,066 1 18%IDeSign $0 $0 $383,298 $28,951 $11,840 $377,668 $3,896,164 90% Design $0 $865 $33,573 80% Construction $0 $320 $532,094 3% Design $0 $0 $2,054 980/. On hold $64,493 IJun 09 Dec 09 Jun 09 Ongoing Jun 10 Attachment 2 2 to commence Jan 09 Project bid open in early 09. 1 Design development complete. Construction documents to be completed by end of FY 2009. Consultant agreement will awarded in Jan 09. Contract awarded, construction has begun Public outreach in progress Project funding deferred to FY2010. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO,JECTS STATUS GENERAL FUND PUBLIC WORKS .DEPARTMENT Budget Available Current Current Current Total I I Project Project Project From Budget Fiscal Year Labor Fiscal Year Fiscal Year Remaining I Perceut Project Estimated Numher Title Category Inception FY 2008-091 Expenditures Adjustments Contingencies Commitments Balance Complete St'atlls Comp, Date PF-00020 Office Space Renovation Multi-Year $883,020 $1,393 $0 $0 $0 $0 $1,393 100% Complete and Reallocation PE-OOI04 San Antonio Medians Minor $1,119,074 $779,524 $6,250 $0 $109 $765,594 $7,571 99% Construction Jun 09 PF-OIOO2 CCOB Infrastructure Multi-Year $6,973,030 $6,973,030 $419,631 $0 $0 $6,117,178 $436,221 94% Construction Aug 09 Construction PF-OIOO4 Fire Station Multi-Year $2,527,854 $806,563 $18,750 $0 $0 $544,360 $243,453 100% Construction Jun 09 Improvements PF-OIOO5 Lucie Stern Community Multi-Year $612,598 $53,503 $0 $0 $0 $0 $53,503 91% Complete Center Improvements PE-04010 Children's Library Multi-Year $4,361,571 $36,769 $27,348 $0 $4,993 $1,038 $3,390 100% Complete Improvements & Expansion PE-04012 Mitchell Park Library & Multi-Year $1,726,458 $342,346 $105,206 $0 $0 $215,686 $21,454 100"10 Community Center Improvements PE-04014 Animal Shelter Multi-Year $1,160,500 $1,015,887 $83,540 $0 $0 $729,491 $202,856 ' 10% Construction Jun09 Expansion & Renovation PF-04010 Cubberley Mechanical & Multi-Year $2,914,695 $1,351,149 $5,218 $0 $0 $14,528 $1,331,403 54% On-hold Electrical Upgrades ----------- Attachment 2 Construction to begin Jan 09, Phase one of the major renovations will be completed in Aug 09. Phase 2 scheduled for FY 2010. Current phase includes upgrades to Stations 5 and 8. Fountain work to be coordinated with Friends of Library. Measure N bond passed - This CIP will be closed after midyear and separate library CIPS will be created for each site. Construction started. Public Works Facilities (PWF) project. Project on hold. ) FY 08-09 MID-YEAR CAPITAL IMPROVE.MENT PROGRAM PRO.JECTS STATUS GENERA.L FUND PUBLIC WORKS DEPARTMENT $330,000 $330,000 $0 $0 Attachment 2 to be bid in Feb $0 $0 $330,000 FY 08-09 M.ID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INT.ERNAL SERVICE FUND TECHNOLOGY FUND ADMINISTRATIVE SERVICES DEPARTMENT $139,512 $69,512 $0 Minor $840,000 I $509,897 I $0 I TE-OSOO3 I Internet Site I Minor $240,000 I $80,340 I $6,233 1 Upgrade Minor $324,000 1 $38,996 1 $11,723 1 System Upgrade mergency Minor $150,000 $100,000 $50,000 Notification System $0 $0 I $0 I $0 I $0 $0 $0 I $0 I $509,897 I 39% I Construction $0 I $39,620 I $34,487 1 86% I Construction $0 I $21 $27,271 I 92% I Construction $0 $0 $50,000 67% Complete lJun 08 IDee 09 IDee 08 Attachment 2 IDraft disaster recovery plan has been completed and is being reviewed. I Implementation of the internet site upgrade is complete. A portion of the contract was to upgrade the existing intranet--this portion is 15% complete. IThe installation of the upgrade is complete and the project will be City GIS system integrated with Emergency System. Project remains open for ongoing maintenance of the system. "{.I ~ ... FY 08-09 M.ID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUND TECHNOLOGY FUND ADMINISTRATIVE SERVICES D.EPARTMENT $125,000 $1 $0 Library Minor $75,000 $75,000 $24,809 Technology Plan Fire Radio Minor $102,000 $7,179 $0 Communications Equipment TE-08004 $178,300 1,300,000 Sites $0 $0 $0 $0 Attachment 2 $0 $125,000 $0 are currently being $0 $36,591 $13,600 I 82% I Construction IDec 08 I Consultant has been selected and is currently meeting with staff. $0 $4,742 $2,437 $71,700 $0 1,300,000 Dec 10 $0 140 94%iComplete FY 08-09 MID-YEAR CAPITAL .IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUND TECHNOLOGY FUND ADMINISTRATIVE SERVICES DEPARTMENT TE- 00021 SAP Continuous I Multi-Year Improvement Project ITelephone System Replacement Citywide GIS Data, Infrastructure and Applications (RFlD) Iinplementation Multi-Year Multi-Year Multi-Year $980,050 $1,000,000 I $5,018,476 I I $7,000,000 I $1,130,000 $1,511,690 $262,952 $14,275 $913,453 I $43,750 I $106,879 I $4,353 I $5,979,210 I $3,693,456 I $0 $1,123,969 $0 $767,953 $109,038 ,1371 $38,9621 ,600 $0 $0 I $0 I $54,486 I $815,217 I $0 1 $0 1 $0 1 $102,5261 $0 I $0 I $2,469,633 I ($183,879)1 $0 $0 $0 $2,000 $1,121,969 I $0 $0 $104,546 $554,369 $01 $01 $13,7151 $534,460 18% I Construction IDee 09 103% Dec 09 1 % I Pre-design IDee 09 Attachment 2 I All major facilities in the City have nnected via fiber optic cable. is continuing to provide to other City sites. This is an ongoing project for the acquisition of new computers. I RFP is being prepared to solicit a Project is on hold--pending completion ofthe Library Technology Plan. FY 08-09 MID-YEAR CAPITAL .IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUND TECHNOLOGY FUND ADMINISTRATIVE S.ERVICES DEPARTMENT $0 $0 $0 Attachment 2 $4,767 $24,728 and are being scheduled for FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT MSC Fuel Storage Tank /Svc Island Replacement Replace City-Wide Fuel Transaction and Invento!), Management System Motor Pool Reservation and Vehicle Key Management System Vehicles (2) For Utility Operations Minor Minor Minor Minor Minor Minor Mmor $681,394 $200,000 $80,000 $3,784,000 S70,000 $464,916 $0 $0 $200,000 $0 $71,326 $10,848 $2,288,134 $2,622,416 $741,258 $24,035 $0 Attachment 2 $0 $0 $0 $0 On hold pending fimding. $0 $0 $157.319 $42,681 $0 $0 $5,510 $54,968 ($4,245) $0 $791,606 $1,032,248 $0 $0 S18,270 $1,862,888 Jun09 $0 $0 so $24,035 Complete FY 08-09 MID-YEAR CAPlT AL IMPROVEMENT PROGRAM PROJECTS STATUS INTE.RNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT Truck Engine Emissions Retrofits '~. I Multi-Year $325,000 I $341,000 I . $36,655 $154,749 I $1,057 I $0 I $94,150 Attachment 2 $0 I $1.363 I $152.329 I 53%IOngoing IDee 09 I Ongoing~ retrofit of next group or vehicles scheduled to begin Jan 2009. Foothill Park Fueling station, currently in plan check. Estimated bid date Spring 2009 dependant upon funding FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS ENTERPRISE FUND ELECTRIC FUND UTILITIES DEPARTMENT EL-09004 I W. Charleston/Wilkie Way to South City Limit 4/12 kV EL-02011 EL-03001 EL-03005 EL-03013 District 41 IShermanlEI CaminolPage UG Conversion #39 Estimating System omplete Attachment 2 Ideveloped. Additional funding will be contract will involves Supervisory Control and Acquisitions (SCADA) computer and software. It is being done and in conjunction with EL- Upgrading Utilities Control (UCC). completed and the electric been removed and the poles topped the telephone lines. AT&T will be the poles once they have Itransferred the telephone services. installed. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENT.ERPRISE FUND ELECTRIC FUND UTILITIES DEPARTMENT Multi-Year EL-04012 Multi-Year EL-04014 I Automated Meter Reading I Multi-Year System $1 Construction completed. Phase III is on hold until we return to Council in Mar 09. Jun 09 Attachment 2 design started. II of the Automated Meter (AMR) pilot project is A total of3,740 AMR meters fixed radio network and 669 AMR for a meter reading route was successfully used to bill customers for gas, and water usage. The as expected and this portion of the has been successfully implemented. Nov 07, CMR: 419:07, AMR Pilot Project Update, was presented to Council, providing them an update on status of the project. Staff is returning to Council in early 2009 with an updated report on the pilot project, I recommendation on whether to move and if necessary, next steps. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS ENTERPRISE FUND ELECTRIC FUND UTILITlES DEPARTMENT EL-OSOOI IColorado Switch Station 115kV Bus Installation EL-OS003 I Relocation -Alma Substation EL-06000 IPark Blvd. 41l2kV Conversion EL-0600l KV Electric Intertie EL-06002 I Underground District 45 $3, $184,51 Attachment 2 The project has been divided into phases. Phase I construction is completed and Phase 2 construction is in progress and engineering on phases 3-6 are completed. The remaining phases of the project are being coordinated with the development projects at Elks Lodge and PA Bowl. This project is being engineered and I constructed in concurrence with the Park 1.4/12 kV Conversion (EL-06000) W. Charleston/Wilkie Way 4112 kV I Conversion (EL-09004) projects. Engineers estimated project cost million for substation. work plus $1 In forPG&E 115 kV line \ rearrangement work. Costlbenefit ratio nf"nrnM<DA work is not favorable and for about 40% and study completed. Consultant making intertie via Stanford Accelerator Center (SLAC). formed. Design started. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS ENTERPRISE FUND ELECTRIC FUND UTTLlTlES DEPARTMENT EL-0800Z Meadow/ Alrna/Loma Attachment 2 Iconstruction is in progress. Remaining 1 progress and construction is for completion by Jun 09. design work started. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS ENTERPRISE FUND GAS FUND UTILITIES DEPARTMENT GS-08000 I Gas Station 2 Rebuild GS-09000 I Gas Station I Rebuild GS-OI019 I Global Positioning System GS-08011 IGMR -Project 18 GS-09002 IGMR -Project 19 Attachment 2 work in progress work in progress in progress held Roving data collection are being purchased. Staff continues. is in design planning stage. FY 08-09 MID-YEAR CAPITAL IMPROVEM.ENT PROGRAM PROJECTS STATUS ENTERPRISE FUND WATER FUND UTILITIES D.EPARTMENT Minor Minor 09 Attachment 2 IAdditional appropriations requested for $4 K pending approval by Council. Project consolidated into the Emergency Water Supply Project WS-08002. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS ST A TlIS ENTERPRISE FUND WATER FUND UTILITIES DEPARTMENT WS-07001 WS-07004 WS-0800t WS-08002 Water Supply WS-08017 WS-09001 I WMR -Project 23 Feb 09 10 Attachment 2 for recoating all steel reservoirs be released in Feb 09. I Construction in Spring and Summer continue for Park site. Test wells FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PRO.JECTS STATUS ENTERPRISE FUND WASTEWATER COLLECTION FUND UTILITIES DEPARTMENT ~ , l Attachment 2 This is for the purchase of a roll- off dewatering container. FY 08-09 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND REFUSE FUND PUBLIC WORKS DEPARTMENT RF-I0003 Beds, Material Storage Transfer Area Systems Upgrade RF-09003lRecycling in Business District I Minor RF-09004ILATP Site Development I Minor Preparation RF-I0002IFIare Relocation Project Minor Dec 10 TBD Attachment 2 relocation of the Recycling Center a pennanent Household Hazardous (HHW) facility are included in the IreaslOilitv Study for the fonner Los Plant (LATP) site. A Group 4 Architects was on Aug 08 using some monies this project. The study is in and partially funded by this are included in the IFeasibility Study for the fonner Los Treatment Plant (LA TP) site. A with Group 4 Architects was on Aug 08 using some monies this project. The study is in and partially funded by this RFP out for design and pennitting consulting services. Have requested an additional $200,000 for construction in FY 2010. Water Fund WS-80013 WS-80014 WS-80015 WS-02014 WS-02003/WS-03004 WS-0500 I1WS-06002 WS-07003 Attachment 3 LIST OF CONTINUOUS PROJECTS Water System Extensions Service and Hydrant Replacements Water Meters Water -Gas Wastewater Utilities GIS Data Water Main Replacements, WMR-Project 17 Water Main Replacements, WMR-Project 20 Water Main Replacements, WMR-Project 21 ATTACHMENT 4 NOT YET APPROVED Resolution No. Resolution of the Council of the City of Palo Alto Amending the 2008-2009 Compensation Plan for Management and Professional Personnel Adopted by Resolution No. 8844 to Change the Title of Three Classifications and One New Classification The Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Compensation Plan for Management and Professional Personnel and Council Appointees adopted by Resolution No .. 8844, is hereby amended to change the title of three classifications and add one new classification as set forth in Exhibit A, attached hereto and incorporated herein by reference, effective with the pay period including July 1,2008. SECTION 2. The Director of Administrative Services IS authorized to implement the amended compensation plan as set forth in Section 1. SECTION 3. The Council finds that this is not a project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk Mayor APPROVED AS TO FORM: APPROVED: Deputy City Attorney City Manager Director of Administrative Services Director of Human Resources 090224 rob 8260963 NOT YET APPROVED EXHIBIT A 2008-2009 Mid-Year ManagementlProfessional Compensation Plan Changes 63 28 10,744 128,933 61.99 28 36 8,769 105,225 50.59 40 7,920 95,036 45.69 27 34 9,224 110,687 53.22 090224 mb 8260963 ATTACHMENT 5 NOT YET APPROVED Resolution No. Resolution of the Council of the City of Palo Alto Amending the 2006-2009 Compensation Plan for Classified Personnel (SEIU) Adopted by Resolution No. 8658 To Change the Title of Two Classifications and Add Fourteen New Classification Titles to Reflect Status of Employees Reassigned to SEIU Unit by Resolution 8848 The Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Compensation Plan for Classified Personnel (SEIU), adopted by Resolution No. 8658, is hereby amended to change the title of two classifications and . add fourteen new classification titles to reflect the status of employees reassigned from the Management and Professional Personnel Group to the SEIU Unit by Resolution as set forth in Exhibit A, attached hereto and incorporated herein by reference, effective with the pay period including July 1,2008. SECTION 2. The Director of Administrative Services IS authorized to implement the amended compensation plan as set forth in Section 1. SECTION 3. The Council finds that this is not a project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk Mayor APPROVED AS TO FORM: APPROVED: Deputy City Attorney City Manager Director of Administrative Services Director of Human Resources 090224 mb 8260955 NOT YET APPROVED EXHIBIT A 2008-2009 Mid-Year SEIU Compensation Plan Changes Arborist -8 3470 (Title Change from Managing Arborist based on 5 7,921 95,046 45.70 SEIU unit detennination 242 Zero Waste Coordinator 5 6,531 78,369 37.67 5 090224 mb 8260955 I I I I I I I I I I I I I I I I