HomeMy WebLinkAboutOct_19_GBCITY OF PALO ALTO
Memorandum
Date: October 19, 2009
To: HONORABLE CITY COUNCIL
From: KRISTIN HEINEN
Subject: Adoption of a Resolution Revising Green Building Standards for Compliance
for Private, Nonresidential and Residential Construction and Renovation, and
Review of Report on Implementation of the City's Green Building Ordinance.
The green building agenda item was originally scheduled for the August 3, 2009 City Council meetfng.
The Council voted to postpone it to a later date, October 19, 2009. There were two major changes made
to the CMR and/or attachments since the August 3, 2009 City Council meeting, outlined below.
1. With the City's Energy Efficiency Ordinance also on the agenda for consideration on October
19, 2009, staff took the opportunity to create more consistency between the two interrelated
ordinances.
a. Definitions and proj ect types found in both ordinances were simplified and made
consistent. For example, the definitions for Energy Star Portfolio Manager and Time -
Dependent Valuation. In addition, the number system was improved for easier cross-
referencing.
b. The Green Building Tables A and B were enhanced with a new column explicitly calling
out the Energy Efficiency Ordinance requirements and acceptable verification methods,
where appropriate.
c. The Energy Efficiency Ordinance developments influenced the definition of large
nonresidential or residential renovation construction. The old definition included HV AC
system, building envelope, plumbing systems, lighting systems and interior
finishes/partitions to determine the proj ects green building requirements, whereas the
new definition is more responsive to energy efficiency, dropping interior
finishes/partitions and changing plumbing systems to hot water system (Table A 3).
2. For small nonresidential renovation green building requirements to be triggered in the August 3rd
version, a project must have been greater than or equal to 500 square feet. The indicator of
$100,000 in valuation was added to the definition to ensure a project was large enough to require
the effort of obtaining an Energy STAR Portfolio Manager, Building Energy Performance Rating
(Table A 4).
f&v~
~~~ ES KEENE / J ~Manager U
KRIs11N HEINEN
Associate Planner / Sustainability Coordinator
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
j
TO: HONORABLE CITY COUNCIL
FROM: CITY MANAGER
DATE: OCTOBER 19, 2009
REPORT: ACTION
DEPARTMENT: PLANNING AND
COMMUNITY ENVIRONMENT
CMR: 332:09
SUBJECT: Adoption of a Resolution Revising Green Building Standards for Compliance
for Private, Nonresidential and Residential Construction and Renovation,
and Review of Report on Implementation of the City's Green Building
Ordinance.
EXECUTIVE SUMMARY
This report provides a first year summary of implementation of the City's Green Building
Ordinance, (Palo Alto Municipal Code (PAMC) Chapter 18.44). Over the past year, the program
covered 264 permits, valued at $8,306,638 allowing 98,275 square feet of construction. This
construction incorporated strategies that are environmentally and socially responsible, and
improved occupant health.
Staff recommends that Council adopt amendments to the tables adopted in June 2008 in
conjunction with the initial adoption of the Green Building Ordinance. The revised tables set
forth green building compliance thresholds, rating systems, and compliance verification for
private development by project type. The amendments increase requirements for existing
buildings with a particular focus on energy efficiency and adjust the covered project definitions
based on lessons learned from the first year of program implementation.
RECOMMENDATION
Staff and the Architectural Review Board recommend that the City Council review this report
describing the past year's implementation of the City's Green Building Ordinance, and adopt the
attached Resolution (Attachment A) referencing proposed amendments to Tables A & B
(Resolution Exhibits 1 and 2).
BACKGROUND
In June of 2008, the City of Palo Alto adopted a mandatory Green Building Ordinance ( PAMC
Chapter 18.44) requiring specific project types to meet minimum staridards for compliance and
verification using the appropriate u.S. Green Building Council (USGBC) Leadership in Energy
and Environmental Design (LEED) or Build It Green (BIG) Green Point Rated (GPR) green
building rating systems.
The goal of the Palo Alto Green Building Program is to design, build and operate a new
generation of efficient, environmentally responsible, and healthy buildings in the City of Palo
CMR: 332:09 Page 1 of 10
The goal of the Palo Alto Green Building Program is to design, build and operate a new
generation of efficient, environmentally responsible, and healthy buildings in the City of Palo
Alto. Building green can have a significant impact on reducing energy, water and natural
resource consumption, and can improve Palo Alto citizens' well being through improved indoor
air quality and comfort. Green building is the practice of taking an integrated approach to
building construction, building systems, and building sites to provide more environmentally
responsive, healthy, productive, economical places to work, learn and live. Green building also
goes beyond the physical buildings to consider how the site and buildings interact with the
community and transportation infrastructure.
Standards for green building compliance adopted tn conjunction with the Green Building
Ordinance include:
• . Table A, City of Palo Alto Green Building Standards for Compliance for Private,
Nonresidential Construction and Renovation, and
• Table B, City of Palo Alto Green Building Standards for Compliance for Private,
Residential Construction and Renovation.
PAMC Section 18.44.040 requires that any amendments to the standards for green building
compliance be considered and recommended by the Architectural Review Board. There is also a
need to update the Historic Resources Board and Planning and Transportation Commission on
the progress made implementing the ordinance during the first year of the Palo Alto Green
Building Program.
DISCUSSION
This report covers the first year of ordinance implementation and performance of the Palo Alto
Green Building Program, and describes proposed amendments to the green building
requirements (Tables A and B). Since the Green Building Ordinance requires staff to return to
Council one year after the effective date to report on program implementation, this report covers
program performance from July 1, 2008 -June 30, 2009. Staff anticipates that future program
reports will be provided during the annual Earth Day report in April of each year, covering the
previous year performance from January 1 -December 31.
Over the past year, the Palo Alto Green Building Program was created both to implement the
Green Building Ordinance, and to address implementation of and interaction with the City's
Energy Efficiency Ordinance and Construction and Demolition Debris Diversion (C&D)
Ordinance. Staff has implemented several key Green Building measures over the last year, and
has gained insight into areas where the program could be better optimized, as described below.
Green Building Implementation Activities
The following are staff and community building activities that were undertaken and completed
during the past fiscal year to implement the Green Building Ordinance:
• Hiring of Experienced Staff and Training of Existing Staff -In early October 2008, the City
filled the vacant C&D position (funded by Public Works Operations budget) with a qualified
staff member who is a LEED Accredited Professional, with BIG's Green Point Rater (GPR)
CMR: 332:09 Page 2 of 10
Training, and experience in green building policy, and development project review.
Additional staff members in the Planning and Community Environment, Public Works, and
Utilities Departments have undergone training and/or have become accredited/certified under
the USGBC LEED/BIG GPR programs, respectively.
• Developing the Palo Alto Green Building Program Guide (Guide) -The Guide was
developed as a tool to assist the community in understanding the City's program and to
provide information on why green building is important. The Guide describes the City's
proj ect requirements and submittal and review processes, as well as presents financial
incentives and h~lpful outside resources to assist with compliance.
• Developing a New Green Building Website -The Planning and Community Environment
Department website added a new green building section that allows applicants to view
successful green projects in the City, the goals and purpose of the green building program,
links to financial incentives for building green, and outside resources. From the site, users
can download the Palo Alto Green Building Guide to find specific information regarding the
proj ect type the user is undertaking, at
http://www .cityofpaloalto .org/ depts/plnl green building/ default. asp.
• Streamlining the C&D and Energy Ordinance Compliance Reviews -C&D and building
energy efficiency are a subset of the broader practice of green building; therefore, the
requirements for both were merged into one program and application process, ease of
implementation by the City and community. The C&D Debris Diversion Ordinance requires
covered projects to achieve a 75% diversion rate and requires applicants to bring all debris to
an approved facility. The Energy Efficiency Ordinance requires covered projects to achieve
energy savings 15% beyond the California State Energy Code.
• Integrating Green Building into the Permit and Inspection Process -Staff established new
review and enforcement protocol through the planning and building application processes,
including updating existing forms, project checklists, and the Accela building permit tracking
system to account for green building review and inspection.
• Achieving Greater Cost Recovery -Staff assessed the fiscal and staffing needs to run the
green building program to ensure greater cost recovery. The FY 2010 budget passed in June
2009 includes new fees ranging from approximately $100 -$800 for projects covered under
the Green Building Ordinance to fund staff time to review projects and enforce the
requirements. Project fees were determined by the size of the project, and whether the City
was providing verification in house, or through the Build It Green or the Green Building
Certification Institute.
• Adding New Enforcement Options -The Ordinance requires compliance as its primary
enforcement mechanism. Final building inspections are delayed until the project can show an
adequate level of compliance. In order to expand compliance options, in July 2009, the
administrative penalty schedule was updated to allow fines for non-compliant green building
projects at $500 per day of non-compliance. Rebates are offered for building green through
the Utilities and Public Works Departments.
CMR: 332:09 Page 3 of 10
• Creating a Performance Database -Staff established performance indicators for determining
the effectiveness of the program including number of projects by type, number of occupants
in green buildings, square footage, points achieved, water reduction, energy savings, waste
diverted, greenhouse gas emission reductions, and dollars spent on environmentally
preferable materials. In addition, the system tracks review time to ensure green building
review and inspection are not responsible for prolonging the building process.
• Participating in City, Regional and National Events and Efforts -City staff presented a
session regarding the Green Building Ordinance and program implementation at the AlA
(American Institute for Architects) International Conference and at the Bay Area City
Attorney's Association, participated on the Energy and Climate Taskforce to develop green
building indicators for cities nationally through ICLEI (Local Governments for
Sustainability), participated in the Build It Green Public Agency Council and in the Santa
Clara County Cities Association Green Building Collaborative to develop policy
recommendations for use throughout the county (Attachment E). In addition, the City's
ordinance was recognized as a model ordinance by the International Municipal Lawyers
Association.
Looking Forward
The following are some of the green building activities planned for the coming years:
• Increase Staff Review Capacity -Reducing reliance on certifying bodies such as the Green
Building Certification Institute and Build It Green by increasing capacity for staff reviews
and on-site inspections of covered green building projects could reduce costs and time for
applicants and can prepare the department for future code requirements for green building at
the state level. In particular, staff proposes to increase training and certification in energy
efficiency plan review and on-site compliance inspections. It will be necessary, however, to
ensure that City review, inspection and costs are not duplicative of those done by outside
bodies.
• Develop a Recognition Program -Establishing a recognition program to acknowledge all
covered projects that have achieved compliance with mandatory green building requirements
is particularly valuable for projects that are verified by the City rather than by an outside
agency.
• Improve Performance of Existing Buildings -Focusing efforts on understanding the current
performance of the existing building stock will result in the greatest environmental and
performance improvements. These efforts are further outlined in the discussion on the
proposed Ordinance amendments.
• Continue to Track Rating Systems, Code and Policy Development and Integrate into the
Green Building Program -It is important for staff to stay current on green building rating
system changes, technology and strategy innovations, and green building codes and policies
at both regional and national levels. Staff is particularly interested in finding innovative ways
to incorporate the LEED for Neighborhood Development (LEED-ND) program into large
projects and within broad City planning strategies and integrating new requirements
proposed for the CA Green Building Code changes.
CMR: 332:09 Page 4 of 10
Program Performance
Over the past year, 264 permits were issued for projects covered under the green building
compliance standards with the following distribution:
• Residential vs Nonresidential Permits -100 permits, or 38%, were nonresidential and 164
permits, or 62%, were residential;
• Mandatory Requirements vs Voluntary -72 permits, or 27%, had mandatory green
building requirements and 192, or 63 % had construction and demolition debris diversion
andlor voluntary requirements such as checklist submittal only;
• Mandatory Requirement Permits by Project Type -22 permits, or close to 30% of those
with mandatory green building requirements were for nonresidential existing buildings,
and 50 permits or close to 70% were for new construction;
• Voluntary Permits by Project Type -114 permits, or 43%, of the total number of permits
were for residential renovations or small additions.
The mandatory requirements resulted in construction of 666,500 square feet of space valued at
$80,412.694. Only five (5) of the 72 permits with mandatory green building requirements have
successfully completed the green building program.
These projects:
• totaled project valuations of $8,306,638 and 98,275 square feet of construction;
• include 750 employees in Palo Alto;
• achieved on average 24% energy efficiency savings;
• reduced indoor water use by 69,500 gallons per year;
• reduced outdoor water use by 50,000 gallons per year;
• expended $635,174 on environmentally preferable building materials;
• diverted 704.98 tons of waste from landfill; and
• reduced CO2 emissions by over 200 tons;
It is important to note that projects with mandatory green building requirements are also typically
those that have a longer construction period; therefore, many projects that were covered under
the requirements when the program started, on July 1, 2008, have not yet completed
construction. In addition, while only five projects have successfully completed the green building
program, there are many other proj ects that predate the mandatory requirements and are
voluntarily meeting the City's requirements. All completed projects achieved the exact number
of points, or slightly exceeded the minimum number of green building points required for the
project. However, staff is seeing (on average) more recent applicants striving for point targets
30-40% higher than the City minimum points.
CMR: 332:09 Page 5 of 10
compliance requirements, are consistent with the Green Building Ordinance adopted in June of
2008, which added Chapter 18.44 to the Palo Alto Municipal Code. The amendments are also
consistent with the Energy Efficiency Ordinance, which added chapter 16.18 to the Palo Alto
Municipal Code establishing local energy efficiency' standards based on the 2005 California
Energy Code.
The Green Building Program also promotes the City's Climate Protection Plan (CPP) and Zero
Waste goals. In 2007, the City Council approved the Climate Protection Plan (CPP) that
provided direction to reduce green house gas emissions associated with buildings as one method
to reduce Palo Alto's impact on climate change. The plan proposed implementing specific
requirements for green building and adopting the 2005 California Energy Code to achieve
emission reduction goals.
Finally, the amendments support the City's Comprehensive Plan and Sustainability Plan, which
identify several green building strategies as key categories of sustainability.
RESOURCE IMPACT
If the proposed amendments are adopted, relevant resource impacts would include increased staff
workload. The amendments are unlikely to cause an increase in the applications submitted under
the green building program, but are likely to increase the time necessary to review an individual
application. The review time depends greatly upon whether a project with mandatory
requirements chooses to use the City for verification instead of using GBCI or BIG. Applicants'
motivation to choose one verification method over another may include recognition, time, cost
and convenience. Staff is confident, based on the data derived over the past year that a
manageable number of non-residential project applicants will choose City verification and the
majority of residential projects will choose BIG verification. However, the City may need to
adjust its permit fees to ensure cost recovery in the event that residential projects choose City
verification.
ENVIRONMENTAL REVIEW
The adoption of the proposed amendments is categorically exempt from the provisions of the
California Environmental Quality Act (CEQA) per Section 15308 of CEQA Guidelines.
PREPARED BY:
DEPARTMENT HEAD:
~~~.~~ing and Community Environment
CITY MANAGER APPROVAL:
CMR: 332:09 Page 9 of 10
ATTACHMENTS
Attachment A.
Attachment B.
Attachment C.
Attachment D.
CMR: 332:09
Resolution
Table A. City of Palo Alto Green Building Standards for Compliance for
Private Nonresidential Construction and Renovation (Not Redlined /
Redlined)
Table B. City of Palo Alto Green Building Standards for Compliance for
Private Residential Construction and Renovation (Not Redlined /
Redlined)
Letter from Silicon Valley Leadership Group dated June 16,2009
Page 10 of 10
ATTACHMENT A
NOT YET APPROVED
Resolution No. ---
Resolution of the City Council of the City of Palo Alto
Revising Green Building Standards for Compliance for
Private Nonresidential and Residential Construction and
Renovation
WHEREAS, on May 12, 2008, the City Council considered regulations for
the incorporation of green building techniques and materials in private nonresidential and
nonresidential development projects and adopted Ordinance No. 5006; and
WHEREAS, Ordinance No. 5006 specifies that green building standards for
compliance shall be set forth by resolution of the City Council after recommendation
from the Director of Planning and Community Environment and the Architectural
Review Board. Such standards for compliance shall include the types of projects subject
to regulation, green building rating systems to be applied to various types of projects,
minimum thresholds for compliance and timing and methods of verification of
compliance with green building regulations; and
WHEREAS, on May 12, 2008 the City Council adopted green building
standards for compliance for private development projects set forth in two tables that
were attached to Resolution No. 8825; and
WHEREAS, Ordinance No. 5006 also specifies that not later than one year
after its effective date, a report shall be prepared for presentation to the Architectural
Review Board, Historic Resources Board, Planning and Transportation Commission, and
City Council regarding the results of implementation of the Ordinance.
WHEREAS, on October 19, 2009, the City Council received the report
regarding the initial year of the Green Building program and considered revisions to the
green building standards for compliance associated with Ordinance No. 5006; and
WHEREAS, the Director of Planning and Community Environment and the
Architectural Review Board do hereby recommend that the City Council approve the
proposed revisions to the green building standards for compliance for private
nonresidential and residential construction and renovation set forth in Table A and Table
B and attached to this resolution.
NOW, THEREFORE, the Council of the City of Palo Alto does hereby
RESOLVE as follows:
1
091009 syn 6050919
NOT YET APPROVED
SECTION 1. The Council hereby approves the revised green building
standards for compliance for private nonresidential and residential construction and
renovation as set forth in Table A and Table B attached to this resolution.
SECTION 2. This resolution shall take effect on January 1, 2010, or upon
the date that the 2008 edition of the California Energy Code becomes effective,
whichever is later; provided that the City's Ordinance establishing local energy efficiency
standards for certain buildings and improvements covered by the 2008 California Energy
Code has been approved by the City Council and the California Energy Commission.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST: APPROVED:
City Clerk Mayor
APPROVED AS TO FORM:
City Manager
Deputy City Attorney
Director of Planning and Community
2
091009 syn 6050919
Attachment B
Note: Applicants are advised to use this table only in conjunction with the entirety of requirements in Chapter 18.44 (Green Building Regulations)
I TRACK CHANGED - -EFFECTIVE JANUARY 2010
Table A. City of Palo Alto Green Building Standards for Compliance for Private DevelapmeBt Nonresidential Construction and
Renovation
Type of Project
N9RFesiEleRtiai C9Rstmeti9R aREl ReR9vati9R
1. New construction:::.. 45,000 sf
(including additions to existing buildings)
New esaswetisa::: S,QQQ sf aBe < 2S,QQQ sf
Rating System. Code or
Program
USGBC LEED ~tC Cheeklist
LEED ~JG. G.l:!eskliFOt
LNew Construction ~ 500 sf and < 5,000 sf I USGBC LEED ~JG. G.l:!eskHFOt
(including additions to existing buildings)
3. Tenant improvements. renovations. or alterations> I USGBC LEED MG. G.l:!eskliFOt
5,000 sf that include replacement or alteration of at least
two of the following: HV AC system. building envelope.
hot water system. or lighting system. ane > SQ% sf
prejeet sf ~ 2: $Q,QQQe valHafisa~
BuilEliRg ImpF9veIBeRts Minimum
Threshold Required
LEED Silver (33 points)
LeeD Silvef
LEED PfS fatee psints Prerequisites
+ 5 points (round up) required for
every 500 sf ilfS Fatee fSffBl::lla
(Bew e9aswefisa s~/S,QQQ) J( 33
psiBts, but Bet less than 17 psiBts
LEED Certified (2~ 1=-lAl1=-ltFO)
Requirement to
Exceed CA Title
24 Part 6 (15%)*
YES
YES
NO
4. Tenant improvements. renovations or alterations>
500 sf and> $100.000 in valuation that don't fall under
Project Type 3. above.
USGBC LEED I LEED Checklist I NO
Other feasvafisa ::: $1 QQ,QQQe valuatisa
NetN esastfl:letisa < SQQ sf aBe Feasvafisa < $lQQ,QQQe
sf valuafisa
AND
Energy STAR Portfolio Manager I Building Energy Performance Rating
LeeD CI Cheeklist Submit eheel r . ~ ,1St; laell:iee sa builQiBg
~tS fe€ll::lifemeBt
* The requirement to exceed CA Title 24 Part 6 by 15% is also referenced for these project types in the applicable green building rating system, and the City's Energy Efficiency Ordinance.
Verification**
LeeD/USG~C
GBClorCPA
Th~FOl:!A1A
veFiHeafisa by
LeeDAP
Tl:!Fe!'lRsle
veFiHeafisa by
LeeDAPGBCI
or CPA
GBClorCPA
CPA
~elf"'erifisatiA1=-l
** For project types 1) and 2), if CPA is chosen for verification performance 15% beyond California Energy Code Title 24 Part 6 is an acceptable compliance equivalent to the LEED energy prerequisite. The project will not be
reauired to do additional modeling bevond state reauirements.
Snecial Considerations & Definitions ,~4ixeEl Use 9F OtheF l>evel9pIBeRt Csmmsreial aBe fesieeafialeriteria as applieable4
Mixed Use Developments
Historic Structures
Multi Year Cumulative
Mixed use orojects must comply with the anplicable project type requirements based on the scope of the project. Table aoolicability is to be determined by the Planning Director; generally
the provisions of Table A will apply to the commercial portion of the development, and the provisions of Table B will apply to the residential portions of the development.
Exemptions may be available for historic structures, pursuant to ~18.44.070 eftae eRiiaaB:6e Palo Alto Municipal Code. Tae CelHBlianee Oft.'ieial me alleVi' the ase efalte~ e
6aeelElists fer lHsteFi6 eailEiiags er fer eailaiags that rewa er re ase S1:1l3staatial flertieas eftae eJEistiag stra6Rlre.
Cumulative new construction or renovations over any 2-year period felle .'lfiag aaefltiea ef these FeEj:wremeats shall be considered as a single project, subject to the highest level of green
Construction
Unusual Projects
USGBCLEED
GBCI
CPA
Energy STAR Portfolio
Manager
Buildin!! Envelone
Prereauisites
building requirements for that project, unless exempted by the Planning Director as impractical for compliance.
Projects with an unusual scope of work or with unique circumstances may apply for an exemption to the green building requirements to be determined by the Planning Director, pursuant to
Palo Alto Municipal Code Section 18.44.070.
USGBC LEED stands for the U.S. Green Building Council Leadership in Energy and Environmental Design. Projects must comply with the applicable and current. Camplianse i'lcith atheF
LEED® rating system sReslelistsiesh:leieg ht eat limiteel ta bee];) C (CaFe &; gReIl), bee];) CI (CammeFsial. IeteFiaFS), aF bee];) e8 (e~Eistieg 8l:lileiags). An alternative equivalent
rating system or program may be substituted feF tae elesigaateel Fatiag system w~eFe eleemeel appF9pFiate as approved by the Planning Director, after recommendation by the applicant or
Architectural Review Board (if ARB review is required).
The Green Building Certification Institute provides 3rd party verification services for the LEED rating system.
City of Palo Alto staffwith expertise in green building will providein-h9J.lSe review similar in structure andustrin~ncy to that of the GBCI.
Energy STAR Portfolio Manager (Portfolio Manager) shall mean the program managed by the U.S. Environmental Protection Agency that offers an energy management tool that allows an
applicant to track and assess energy and water consumption of a building project. Tracked projects receive an energy performance rating on a scale of 1-100 relative to similar buildings
nationwide. The applicant is not reauired to achieve a set rating.
The building envelope is the ensemble of exterior and demisinjUlartitions of an building that enclose conditioned soace. (Defined by California Energy Code Title 24 Part 6)
Prereauisites are green building strategies reauired bv the LEED rating system before pointsIDllY be claimedfQr any project type. They are mandatory measures, not option.
Te he aeijl:lsteEi atlflaal1;'te Fetleet ehanges te the City's valaatiea ~er sEJ:l:lare feet efaeY! eeastFUetiea.
Page 2
Note: Applicants are advised to use this table only in conjunction with the entirety of requirements in Chapter 18.44 (Green Building Regulations)
I TRACK CHANGES ACCEPTED -EFFECTIVE JANUARY 2010
~ ----------.1 --~ --------------------,.. ~ ----------------.... ---------~ --. ----. ---------------------~--_. ---
Typc·ofProject Rating System, Code or Minimum Threshold Required Requirement to Verification **
Program Exceed CA Title
24 Part 6 (15%)*
1. New construction 2:.5,000 sf USGBCLEED LEED Silver (33 points) YES GBClorCPA
(including additions to existing buildings)
2. New Construction 2: 500 sf and < 5,000 sf USGBCLEED LEED Prerequisites + 5 points YES GBClorCPA
(including additions to existing buildings) (round up) required for every 500 sf
3. Tenant improvements, renovations, or alterations 2: USGBCLEED LEED Certified NO GBClorCPA
5,000 sf that include replacement or alteration of at least
two of the following: HV AC system, building envelope,
hot water system, or lighting system.
4~ Tenant improvements, renovations or alterations 2: USGBCLEED LEED Checklist NO CPA
500 sf and 2:.$100,000 in valuation that don't fall under AND
Project Type 3, above. Energy STAR Portfolio Manager Building Energy Performance Rating
* The requirement to exceed CA Title 24 Part 6 by 15% is also referenced for these project types in the applicable green building rating system, and the City's Energy Efficiency Ordinance.
** For project types 1) and 2), if CPA is chosen for verification, performance 15% beyond California Energy Code, Title 24, Part 6 is an acceptable compliance equivalent to the LEED energy prerequisite. The project will not be
required to do additional modeling beyond state requirements.
Special Considerations & Definitions
Mixed Use Developments Mixed use projects must comply with the applicable project type requirements based on the scope of the project. Table applicability is to be determined by the Planning Director; generally
the provisions of Table A will apply to the commercial portion of the development, and the provisions of Table B will apply to the residential portions of the development.
Historic Structures Exemptions may be available for historic structures, pursuant to 18.44.070 Palo Alto Municipal Code.
Multi Year Cumulative Cumulative new construction or renovations over any 2-year period s shall be considered as a single project, subject to the highest level of green building requirements for that project, unless
COJ;lstruction exempted by the Planning Director as impractical for compliance.
Unusual Projects Projects with an unusual scope of work or with unique circumstances may apply for an exemption to the green building requirements to be determined by the Planning Director, pursuant to
Palo Alto Municipal Code Section 18.44.070.
USGBC LEED stands for the U.S. Green Building Council Leadership in Energy and Environmental Design. Projects must comply with the applicable and current LEED® rating system.
USGBCLEED An alternative, equivalent rating system or program may be substituted as approved by the Planning Director, after recommendation by the applicant or Architectural Review Board (if ARB
review is required).
GBCI The Green Building Certification Institute provides 3rd party verification services for the LEED rating system.
CPA City of Palo Alto staffwith expertise in green building will provide in-house review similar in structure and stringency to that of the GBCI.
Energy STAR Portfolio Energy STAR Portfolio Manager (Portfolio Manager) shall mean the program managed by the U.S. Environmental Protection Agency that offers an energy management tool that allows an
Manager applicant to track and assess energy and water consumption of a building project. Tracked projects receive an energy performance rating on a scale of 1-100 relative to similar buildings
nationwide. The applicant is not required to achieve a set rating.
Building Envelope The building envelope is the ensemble of exterior and demising partitions of a building that enclose conditioned space. (Defined by California Energy Code Title 24, Part 6)
Prerequisites Prerequisites are green building strategies required by the LEED rating system before points may be claimed for any project type. They are mandatory measures, not option.
Attachment C
Note: Applicants are advised to use this table only in conjunction with the entirety of requirements in Chapter 18.44 (Green Building Regulations)
I TRACK CHANGED_-EFFECTivE JANUARY 2010
Table B. City of Palo Alto Green Building Standards for Compliance for Private De: .. Residential Construction and Renovation
Requirement to
Type of Project4 IlYihIiR9' hRRFAVQRlQR~ Cheeklist ReEluiFedRating System. Code or
Program Minimum Threshold Required Exceed CA Title Verification
Multi-Family Residential
LNew construction of 3 or more fattached~ units~ BIG GPR Multifamily Maltifamily GFeeaPeiftt 70 points4
Cheek:list I<er ·aay malti family resiaefttial
prejeet with
> 30 er mere ftew units prapesea, complete thea
LEED-ND (Neighborhood Development)
checklist shall alse he eempletea aBa sahmittea
with the applieatieft, fer iftfermatieft eftly.
2. Renovations or alterations> 50% of the BIG GPR Multifamily 50 points
existing unit sf and that include replacement or
alteration of at least two of the following: HV AC
system. building envelope, hot water system, or
lighting sYstem.
3. Renovations, Agdditions. and/or rebuilds to
individual units anEl,ler reftevatieftS with permit>
. 250 sf and valuation ~ $100,000 in a single unit~
Aaaitiefts aaEl,ler reaevatiefts with permit
valaatieft < $1 QQ,QQQ~
Single-Family and Two-Family Residential
~New construction of~ 1.250 sf2,55Q sf
}:Tew eeftSfFHetieft ef!:;: 1,25Q sfaaa < 2,55Q sf
BIG GPR }.{altifamily GreeaPeiat Cheeklist
HERS II
}:Te re~airemeftt
BIG GPR Single-Family a1=l"ll"l'R"llAi'Rt C:~l"l~kli~t
Siftgle I<amily GreenPeiat Cheeklist
~B. Existing home additions or rebuilds ~ 1,250 sf Chose one of the following two options:
Option 1: BIG GPR Single Family or Existing
Home
Checklist Sahmit eheek:list;
iftelaae aft hailEliag plaas
HERS Rating (requirement
effective Januarv 2011)
70 points
+ 1 point per additional 70 sf
over 2,550 (150 points
maximum)4
7Q peiftts4
50 points
24 Part 6 (15%)*
YES
Follow the BIG
GPRminimum
energy
requirements.
NO
YES
YES
Use of the"Existing
Alterations
GreenPoint
Rated
lferif.ieatieft~
nd/or CPA
GreenPoint
Rated and/or
CPA
CPA~
verifisatisFl
GreenPoint
Rated and/or
CPA~
eiat R:atea
lferif.ieatieft
Gree~aiat
&ateEl
verif.ieatieft
GreenPoint
Rated and/or
CPA
OR The whole house must Performance HERS II
012tion 2: CA Energy Code T-24 Part 6 and demonstrate that the TDV Approach" as Rater and
HERS II Energy of the building is at least outlined under CA CPA
15% less than the TDV energy Title 24 Part 6 is
of the standard building based on acceptable.
the proto!ypical house of its
vintage and receive a HERS II
rating. (reguirement effective
Janu~ 2011)
6. Existing home renovations= rebuilds and/or Hsme RemsEleliag Greea "B1.iilEliag Caeeklist Checklist S1.iamit eaeekiist; NO CPASelf
¥\dditions totaling> 250 sf and < 1,250 sf andfei: BIG GPR Existing Home iael1.iEle sa a1.iilEliBg plaBS ¥erifieatisa
reas¥atisas > $1 O~,OOO valuation:5 AND
HERS II HERS II Rating (reguirement HERS II
effective Janu~ 2011) Rater and
CPA
* The reguirement to exceed CA Title 24 Part 6 by 15% is referenced for these Qroject t!Qes in the aQQlicable green building rating system and the Ci!y's Energy Efficiency Ordinance.
1<\EiEiitieas aas,leF £eae I atieas ef ':::;;$+§,QQQ~ flefitiit "Ialaatiea ~~e £eEtl%iFeffiem
Snecial Considerations l:\'Iil:eEi tlse OF Q~heF De¥elo'lBeB~ CSHlHlefeial aBEl fesiEleatial estesa as aj9plieal91e:l
Mixed Use Developments Mixed use projects must comply with the applicable project type requirements based on the scope of the project. Table aoolicabili!y is to be determined by the
Planning Director; generally the provisions of Table A will apply to the commercial portion of the development, and the provisions of Table B will apply to the
residential portions efd.e Eie eleflfftem.
Historic Structures Exemptions may be available for historic structures, pursuant to ~18.44.070 of the eFEHaaaee Palo Alto MuniciQal Code. The Compliance Official may allow
the use of alternative checklists for historic buildings or for buildings that retain or re-use substantial portions of the existing structure, and may reduce the minimum
threshold (points) required as outlined in Section 18.44.050.
Multi Year Cumulative Construction Cumulative new construction or renovations over any 2-year period fene .. iag aEiefltiea ef these £eEtai£efftems shall be considered as a single project and subject to
the highest level of green building requirements for that project, unless exempted by the Planning Director as impractical for compliance.
Unusual Projects Projects with an unusual scope of work or with unique circumstances may apply for an exemption to the green building requirements to be determined by the
Planning Director, pursuant to Palo Alto Municipal Code Section 18.44.070.
Definitions
BIGGPR BIG GPR stands for the Build It Green Green Point Rated system. Projects must comQly with the aQQlicable and current GPR rating system including, but not
limited to Single Family Multi Family and Existing Home. An alternative eguivalent rating system or Qrogram may be substituted as aQQroved by the Planning
Director, after recommendation by the aQQlicant or Architectural Review Board (if ARB review is reguired}.
CPA Ci!y of Palo Alto staff with eXQertise in green building will Qrovide in house review similar in structure and at least as stringent to that of Build It Green.
HERS II Rating HERS shall mean the California Home Energy Rating System a statewide Qro!m!!!! for residential dwellings administered by the California Energy Commission and
defined in the 2008 California Building Energy Efficiency Standards. HERS Phase I Qrovides field verification and diagnostic testing to show comQliance with Title
24 Part 6, of the 2008 California Building Energy Efficiency Standards. HERS Phase II includes whole-house home energy efficiency ratings for existing and
newly constructed homes. The aQQlicant is not reguired to achieve a set rating.
Rebuild Rebuild shall mean home imQrovements, or minor additions to an existing structure that do not maintain 75% of the existing roof and exterior walls.
TDV Time-DeQendent Valuation (TDV} accounts for the value of electrici!y differences deQending on time-of-use (hourly, daily, seasonal} and the value of natural gas
differences deQending on season. TDV is based on the cost for utilities to Qrovide the energy at different times. Refer to the Ci!y of Palo Alto Energy Efficiency
Ordinance or the California Energy Efficiency Code Title 24, Part 6 for more a more detailed descriQtion.
Building Envelope The building enveloQe is the ensemble of exterior and demising Qartitions of a building that enclose conditioned sQace. (Defined by California Energy Code Title 24,
Part 6).
Renovations Renovations are anv work to an existing building needing a oermit as defined bv the California Building Code.
'Fe ae atljusteslHHiuallj te Fefleet ehaages te the Ci~ 's • alliatiee fleF sEluaFe feet efee¥> eeestruetiee.
Note: Applicants are advised to use this table only in conjunction with the entirety of requirements in Chapter 18.44 (Green Building Regulations)
I TRACK CHANGES ACCEPTED -EFFECTIVE JANUARY 2010
----------.1 ----------------------,.. ---------------..... ------,,-.-. _ ... "'---..... _-_ ... _-_ ... _---_ ..... _-_ ... _ ..... _ .......................... " ... _ .............
Requirement to
Type of Project Rating System, Code or Program Minimum Threshold Required Exceed CA Title Verification
24 Part 6 (15%)*
Multi-Family Residential
1. New construction of3 or more attached units BIG GPR Multifamily 70 points YES GreenPoint
2:,.30 units complete the LEED-ND Rated and/or
(Neighborhood Development) checklist CPA
2. Renovations or alterations 2: 50% of the BIG GPR Multifamily 50 points Follow the BIG GreenPoint
existing unit sf and that include replacement or GPRminimum Rated and/or
alteration of at least two of the following: HV AC energy CPA
system, building envelope, hot water system, or requirements.
lighting system
3. Renovations, additions, and/or rebuilds to BIGGPR Checklist NO CPA
individual units 2: 250 sf and valuation 2: HERS II HERS Rating (requirement effective
$100,000 in a single unit January 2011)
Single-Family and Two-Family Residential
4. New construction of2: 1,250 sf BIG GPR Single-Family 70 points YES GreenPoint
+ I point per additional 70 sf over Rated and/or
2,550 (150 points maximum) CPA
5. Existing home additions or rebuilds 2: 1,250 sf Chose one of the following two options: YES GreenPoint
Option I: BIG GPR Single Family or 50 points Use of the Rated and/or
Existing Home "Existing CPA
OR The whole house must demonstrate that Alterations HERS II Performance
Option 2: CA Energy Code T -24 Part 6 the TDV Energy of the building is at Approach" as Rater and
and HERS II least 15% less than the TDV energy of outlined under CA CPA
the standard building based on the Title 24 Part 6 is prototypical house of its vintage and acceptable. receive a HERS II rating. (requirement
effective January 2011)
6. Existing home renovations, rebuilds and/or BIG GPR Existing Home Checklist NO CPA
additions totaling 2: 250 sf and < 1,250 sf and 2: AND
$100,000 valuation
HERS II HERS II Rating (requirement effective HERS II
January 2011) Rater and
CPA
* The requirement to exceed CA Title 24 Part 6 by 15% is referenced for these project types in the applicable green building rating system, and the City's Energy Efficiency Ordinance.
Special Considerations
Mixed Use Developments
Historic Structures
Multi Year Cumulative Construction
Unusual Projects
Defmitions
BIGGPR
CPA
HERS II Rating
Rebuild
TDV
Building Envelope
Renovations
Mixed use projects must comply with the applicable project type requirements based on the scope of the project. Table applicability is to be determined by the
Planning Director; generally the provisions of Table A will apply to the commercial portion of the development, and the provisions of Table B will apply to the
residential portions.
Exemptions may be available for historic structures, pursuant to 18.44.070 of the Palo Alto Municipal Code. The Compliance Official may allow the use of
alternative checklists for historic buildings or for buildings that retain or re-use substantial portions of the existing structure, and may reduce the minimum threshold
(points) required as outlined in Section 18.44.050.
Cumulative new construction or renovations over any 2-year period shall be considered as a single project and subject to the highest level of green building
requirements for that project, unless exempted by the Planning Director as impractical for compliance.
Projects with an unusual scope of work or with unique circumstances may apply for an exemption to the green building requirements to be determined by the
Planning Director, pursuant to Palo Alto Municipal Code Section 18.44.070.
BIG GPR stands for the Build It Green, Green Point Rated system. Projects must comply with the applicable, and current, GPR rating system, including, but not
limited to Single Family, Multi Family and Existing Home. An alternative, equivalent rating system or program may be substituted as approved by the Planning
Director, after recommendation by the applicant or Architectural Review Board (if ARB review is required).
City of Palo Alto staff with expertise in green building will provide in house review similar in structure and at least as stringent to that of Build It Green.
HERS shall mean the California Home Energy Rating System, a statewide program for residential dwellings administered by the California Energy Commission and
defined in the 2008 California Building Energy Efficiency Standards. HERS Phase I provides field verification and diagnostic testing to show compliance with Title
24, Part 6, of the 2008 California Building Energy Efficiency Standards. HERS Phase II includes whole-house home energy efficiency ratings for existing and
newly constructed homes. The applicant is not required to achieve a set rating.
Rebuild shall mean home improvements, or minor additions to an existing structure that do not maintain 75% of the existing roof and exterior walls.
Time-Dependent Valuation (TDV) accounts for the value of electricity differences depending on time-of-use (hourly, daily, seasonal), and the value of natural gas
differences depending on season. TDV is based on the cost for utilities to provide the energy at different times. Refer to the City of Palo Alto Energy Efficiency
Ordinance or the California Energy Efficiency Code Title 24, Part 6 for more a more detailed description.
The building envelope is the ensemble of exterior and demising partitions of a building that enclose conditioned space. (Defmed by California Energy Code Title 24,
Part 6).
Renovations are any work to an existing building needing a permit as defined by the California Building Code.
~ Silican \ ~Va1181 ,leadersblp
Graul ~ 224 Airport Parkway, Suite 620
San Jose, california 95110
(408)501-7884 Fax (408)501-7861
www.svlg.net
CARL GUARDINO
President & CEO
Board Officers:
AART DE GEUS, Chair
Synopsys
TOM WERNER, Vice Chair
SunPower
MICHAEL SPLINTER, Past Chair
Applied Materials, Inc.
WILLIAM T. COLEMAN III, Past Chair
Cassatt Corporation
ROBERT SHOFFNER, Secretaryffreasurer
Cltibank
Board Members:
JOHN ADAMS
Wells Fargo Bank
SHELL YE ARCHAMBEAU
MetricStream, Inc.
, RICHARD BAIRD '
IBM Corporation
MARY ANN BARNES
Kaiser Permanente
NED BARNHOLT
KLA-Tencor
GEORGE BLUMENTHAL
University of Califomia" Santa Cruz
TOM BOTTORFF
Pacific Gas & Electric
RAMI BRANITZKY
SAP Labs North America
TORY BRUNO
Lockheed Martin Space Systems Company
DAVID DEWALT
McAfee, Inc.
RAQUEL GONZALEZ
Bank of America
TIM GUERTIN
Varian Medical Systems
JON HOAK
Hewlett-Packard Company
MIKEKLAYKO
Brocade Communications Systems
PAUL LOCATELLI, S.J.
Santa Clara University
TARKAN MANER
Wyse Technology
LEN PERHAM
Monolithic Systems
KIM POL ESE
SplkeSource, Inc.
WILLIAM E. RHODES III
BD Blosclences
ABHI TALWALKAR
, LSI Logic
MAC TULLY
San Jose Mercury News
DAN WARMENHOVEN
NetApp, Inc.
KENNETH WILCOX
~VB Financial Group
Working Council Chair
VICTOR ARRAfJAGA, JR.
Applied Materials
Established in 1978 by
DAVID PACKARD
June 16, 2009
City Manager, James Keene
250 Hamilton Ave
City of Palo Alto, CA 94301
Dear James,
Attachment D
On behalf of the Silicon Valley Leadership Group, I wanted to thank you for
your staff's participation in the Santa Clara County Cities Association Green
Building Collaborative'.
As you likely 'know, in June of 2007, the Cities Association and Leadership
Group partnered together to form the Green Building Collaborative. The
intent of the group was to develop green building policy recommendations
that ,would spur a more rapid adoption of green building practices. One of the
underlying goals was to facilitate the, adoption of like-minded green building
policies by Santa 'Clara County jurisdictions, helping to ensure the easy
adoption of new building techniques by the private sector.
Since'the formation of the group, we have had two major milestones. First,
as you know, every city and the County in Santa Clara County adopt~d the
Near Term Green Building Policy Recommendations in some form. As of last
week, Phase II of the Green Building Collaborative's work was formally
adopted by the Cities Association., This next phase of green building policy
recommendations is i~tended to slightly raise the bar, transitioning
jurisdictions from a voluntary approach to a modest set of private sector
requirements. Many cities are already moving beyond these
recommendations, which is fantastic. Their'pioneering efforts have been a
source of valuable information to the Green Building Collaborative. For those
jurisdictions just starting to move beyond the initial Near Term Green Building
Policy Recommendati~ns, we hope the GBC's work can be of. assistance.
Again, I want to thank you and your staff, (Kristen Heinen and Amy French),
, for helping to develop these recommendations. Their expertise, information,
sharing and thoughtful exchange of ideas has been invaluable throughout this
process.
Please do not hesitate to call on the Leadership Group for assistance as your
city moves forward in raising the bar on green building policy.' We look
forward to continuing to work with you and the Cities Association on this
important solution to meeting our climate change goals.
Sincerely,
8~1J1j
Shiloh Ballard
Vice President, Housing & Community Development
Silicon Valley Leadership Group