HomeMy WebLinkAbout2000-01-19 City CouncilTO:
ATTENTION:
FROM:’
City of Palo Alto
City Manager’s Report
HONORABLE CITY COUNCIL
FINANCE COMMITTEE
CITY MANAGER DEPARTMENT:ADMINIS~TIVE
SERVICES
DATE:JANUARY 19, 200ff CMR:436:99
SUBJECT:1998-99 YEAREND REPORT ON DEPARTMENT
ACCOMPLISHMENTS ON MISSION DRIVEN BUDGET KEY
PLANS AND IMPACT MEASURES
This is an informational report andno~Council action is required.
~ :
DISCUSSION
Periodic performance reporting on key plans and impact measures to Council by City
departments is an integral component of the Mission Driven Budget (MDB)~ It is through
these measures that staff is held accountable to use budgeted appropriations to perform the
services for which the funding was intended.
Earlier this year, Council received the Midyear Progress Report (CMR: 174:99) on key plans
and impact measures, which detailed departmental progress in the first and second quarters
of 1998-99. All City departments have again submitted information on the status of their key
plans and impact measures for 1998-99, which is included in the attached report.. As noted
at midyear, there were changes to the Chart of Accounts to better reflect services provided
to several departments.
The format of the Yearend Report differs from that of the Midyear Progress Report in order
to provide more global information on department achievements, rather than focusing only
on those exception areas where original goals were not met.
This year a new section has been added to the report. This section, .Highlights of City
Accomplishments, is intended to call out some of the significant milestones achieved by the
City during the year.
CMR:436:99 Page 1 of 2
The flrs.t section of the report contains a department or fund overview, which is designed to
~ive departments a chance to report on those tasks accomplished which are not part of their
-key plans or"on~.those key plans which are viewed as being especially critical. This is
follow, edby a department orfund report on each key plans and all impact measures. As was
true in the Midyear Progress Report, departments were asked to explain those impact
measures, which showed a variance of plus or minus 20 percent.
!n addition, the column headings for impact measures have b~en changed from prior years
to be consistentwith the 1999-01 Adopted Budget column headings. The column, 1998-99
Estimated Actuals, reflects impact measures that were either revised at midyear or remained
consistent with theAtt0pted ’Budget. In previous years, this column was titled Adjusted
Budget. The two titles, E~tim~tted~Actuals ~and Adjusted Budget, should be viewed as
synonymous.
:ATTACHMENT. :
1998-~9 Highlights of City Accomplishments
1998-99 Department Overview, Key Plans and Impact Measures
PREPARED BY: Myrna McCaleb, Senior Financial Analyst
DEPARTMENT HEAD APPROVAL:
CITY MANAGER APPROVAL:Direltor, Adfiain~ Services
CMR:436:99 Page 2 of 2
1998-99 Highlights
of City AccomplishmentS
Fi.scal Year
Ending June 30,. 1999
Inside this Issue
1 Comprehensive Plan
Y2K
Golf Course
2
2
2
3
3
3
Sand Hill Road
San Francisquito
Creek Bank
Stabilization
Infrastructure
Traffic/
Transportation
Development Center
Historic Preservation
Ordinance
Library
3 PAMF/SOFA
City of Palo Alto
Comprehensive Plan their Y2K readiness, and upgraded and
replac~,non-compliant systems.
After five years of collaborative Another component of the project
development with citizens, businesses,provides for community awareness and
advisory boards, and the Planning ~ ..~ preparation for residents.Commission,;the City Council /,-~" ~ ~ To educate the public
adopted iahe 1~98-2010 " " ~g- .’~ ~.,~~ staff held communityComprehensive Plan. The Palo k ~ "’~’-~~i~ meetings, prepared and
Alto C~mprehensive Plan ~,~ distributed
embodies the City’s vision !g[ ~ ~~ _~| informationalfliers,
for the future, and provides ~.~ ~ "~~"~ fl" and~velopedaY2K
guidance for future :~ ~~ websit~ In addition,
development of the City. Its use as an.~dd~.rneas~ of
as a planning tool is invaluable.’ assuran~ designated City
The Comprehensive Plan extends .
twelve years into Palo Alto’s future,
and addresses elements related to
housing, transportation, community
facilities and services, the natural
environment, land use and community
design, business and economics, and
governance. In 1998-99, staff
completed an implementation plan that
was added to the Comprehensive Plan
by amendment. In 1999430, for the
first time staff integrated the
Comprehensive Plan into the City’s
Budget and Capital Improvement
Program.
Y2K
Since 1996, the City of Palo Alto has
been working to minimize the effects of
the Year 2000 (Y2K) problem on City
services and the citizens and businesses
of Palo Alto. This year, staff has
worked hard to ensure a smooth
transition to the new millennium. Staff
has conducted extensive Y2K
compliance testing, obtained
certification from vendors concerning
staff including Eire and Police
personnel will been dirty January i,
2000, to respond tO potential public
health and safety emergencies and
answer resident inquiries.
Goff Course
To undertake the Golf Course Master
Plan Improvements, Council approved
the sale of $8.6 million in Revenue
Bonds. Proceeds were used to fund
general golf course
improvements
and to
finance
infrastructure
upgrades to the
irrigation and
drainage systems.
These
improvements
were completed
in July 1999. Customer reactions to
renovations at the Golf Course have
been very favorable.
oooooooooooooooooooooooooo
Sand Hill Road
City staff has been extensively
involved in working with Stanford
University to accomplish the
objectives set fourth in the August
1997 Devel6pment Agreement
between Stanford University and the
City of Palo Alto. While major
construction is scheduled for 1999-
00 and beyond, City staff assisted
with several major 1998-99 ¯
activities such as, providing
assistance with processing final
Architectural Review Board
approvals for the new shopping
center parking projects, Stanford
West Apartments, and roadway
projects including the Sand Hill
Road widening and extension. The
City Attorney’s Office played a key
role in the ruling to uphold the
validity of the Sand Hill Corridor
Environmental Impact Report.
Public Works, Utility and Planning
staff provided oversight and
inspection of the initiation of utility
and roadway construction fo~ the
Stanford West Aparmaents, the Palo
Road and Stock Farm Road
construction, and the Stanford
Shopping Center Parking Garage.
San Francisquito Creek
In response to the winter storm of February 1998, the San Francisquito Creek Coordinating
Committee, comprised of representatives from local communities, sought approval to form a Joint
Powers Authority (;JPA) to mutually address creek-related issues. The JPA of which Palo Alto is a
member, serves as a review board for projects that might have an impact on the creek, and works to
develop and institute environmentally acceptable guidelines for use by all local creek bank
communities.
To adequately access the condition of the creek the City of Palo Alto joined Menlo Park in
developing a scope of work for the San Francisquito Creek Bank Stabilization and Revegetation
Study. The focus of the study is to develop creek bank stabilization and revegetation guidelines
that can be used by creek side property owners to repair storm damage and to prevent future creek
bank failure during winter rains. The study is also designed to address environmentally acceptable creek bank
restorations and assist policy makers in making decisions for future creek policies and procedures.
Infrastructure
In response to City Council
concerns regarding the condition
of the City’s aging infrastructure
and the level of funding required
for rehabilitation, an
interdepartmental task force was
formed to report on the condition
of the City’s existing infrastructure.
The task force identified and
reported on the infrastructure
backlog, analyzed current funding
levels, and developed a long-term
infrastructure plan to identify and
fund future needs. As a result of
task force efforts Council
established an Infrastructure
Reserve in fiscal year 1997-98.
In June 1998, Council approved an
Infrastructure Management Plan
that establishes a methodology for
prioritizing and financing projects
to rehabilitate existing
infrastructure. Council has
approved a funding plan for $74
million of the $95 million needed
to finance the infrastructure
projects. To meet all of the needs
identified in the Infrastructure
Management Plan, staff will
continue to explore ways to
supplement the infrastructure
reserves with other funding
options. The 1999-01 Adopted
Budget includes funding for the
first year of infrastructure projects.
Traffic/
Transportation
As the local and regional
economies continue to flourish
both residents and the City Council
recognize the need to place an
emphasis on traffic management
and transportation. Traffic projects
completed during fiscal year 1998-
99, include a plan for a community
based shuttle bus service and
completion of an Embarcadero
Road traffic calming study. To
provide education through
community outreach the City
sponsored a day-long workshop on
"Walkable Communities".
Additionally, the City Council
expanded the role of the Planning
Commission to create a Planning
and Transportation Commission.
The Commission will recommend
measures to make Palo Alto
transportation safer, more
effective, environmentally
friendly, and a
contributor to
community
quality of life.
Development Center
In response to demands for
improved customer service the City
Council assigned staff to explore
options for streamlining the permit
process for residents and businesses
seeking to build in Palo Alto.
Over a two-year study period the
task force identified 60 potential
action items which included,
Historic
Preservation
Issues related to historic
preservation were of great
interest to Palo Alto residents
this year.. On June 28, 1999,.
the City Council adopted an
ordinance, which outlines rules
related to historic properties in
Palo Alto. A referendum
petition to repeal the ordinance
has been certified by the City
Clerk and the outcome of its
status will be determined on
March 7, 2000. Pending this
outcome, the interim historic
regulations remain in effect.
PAMF/SOFA
As a result of the Palo Alto Medical
Foundation’s (PAMF) move to its
new campus on E1 Camino Real,
the south of Forest Avenue
significant improvements in
customer service and process
standardization. In order to
implement many of the objectives
identified by the task force, the need
for a development center was
identified.
In 1998, Council authorized staff to
implement a development center.
The Development Center located at
285 Hamilton, opened its doors on
March 15, 1999. It provides users
with a convenient single point of
contact for building permits, general
planning and zoning information,
and other development services. The
Development Center serves
approximately 1500 customers
monthly. Customer satisfaction
surveys indicate a strong positive
reaction to Development Center
operations.
Library
The draft Library Master Plan was
completed in March 1998. It was
developed as a tool to guide Palo
Alto libraries into a new century.
The plan incorporates input from
community focus groups,
comparisons with other libraries,
and national public library research.
The plan highlights state-of-the-art
technology, improved customer
service, and an expansiye and
improved library collections system.
Discussion and action on the draft
Library Master Plan was deferred
until formation of the Library
Commission was instituted. The
Commission was formed in March
1998, and is expected to make a
recommendation in 1999-00.
City of Palo Alto
Credit Rating
In 1998-99, the City of Palo Alto
received the highest general city
credit rating possible (AAA) from
both Standard and Poor’s (S&P) and
Moody’s Investor Services. Palo
Alto is the first city in California to
obtain an AAA rating from S&P
since the passage of Proposition 13
in 1978. Moody’s has issued only
one other AAA general city credit
rating recently.
These changes will affect future housing
construction, open space utilization, and the
historic preservation of homes and resources,
while encouraging private investment and
cultural and economic diversity in the area.
To maximize potential development options(SOFA) neighborhood is
changing. Local residents ~
and City officials have
seized a dynamic opportunity
to re-engineer the area
landscape and promote
vitality in the neighborhood, by establishing
policies that will direct a wide range of compatible
land use changes.
City staff worked in conjunction
with a Council-appointed 14
member SOFA Working Group
and various City boards and
commissions to present a
shared vision for the area. The
PAMF/SOFA Area Coordinated Area Plan is in the
process of City Council review.
THIS ITEM WAS PACKETED EARLY. COPIES OF THE COMPLETE
REPORT ARE AVAILABLE IN THE ADMINISTRATIVE SERVICES
DEPARTMENT