HomeMy WebLinkAbout1999-12-06 City Council (14)City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE:DECEMBER 6, 1999 CMR:434:99 SUBJECT:USE OF CITY MANAGER’S EMERGENCY CONTRACTING AUTHORITY FOR REPAIR WORK ON A 60-INCH PRIMARY INFLUENT PIPE AT THE WATER QUALITY CONTROL PLANT This is an informational report and no Council action is required. BACKGROUND This report provides information on the use of the City Manager’s emergency contracting authority to repair a broken raw sewage pipe. The breakage of the 60-inch primary influent pipe was discovered on the eve of October 6, 1999. This pipe carries all of the plant raw sewage from the influent structure to the primary treatment area. It was extremely critical that the pipe be repaired immediately. Monterey Mechanical Co. was working on a project at the plant at the time of the incident. Its work crew and equipment were available to provide immediate assistance. Staff obtained authorization from the City Manager and directed Monterey Mechanical Co. to start the repair work immediately. DISCUSSION The repair work started the night of October 6, 1999. Staff and the contractor entered the 60- inch sewer to inspect and determine the extent of the failure. It was found that a pipe joint has separated. Internal repair was not feasible. Hence, the pipe had to be exposed, supported, and repaired externally. During the course of the excavation, unstable ground was encountered. Shoring was provided along the excavation to ensure safety of the workers and nearby structures. To maintain uninterrupted treatment of the incoming sewage, and to minimize impact on the process, portions of the repair work were performed during night time over many nights. The cost of the repair totaled $90,793.48. Use of the emergency authority of the City Manager was necessary to expedite the repair and protect the public’s safety. RESOURCE IMPACT Funds for the project are available in the Wastewater Fund maintenance budget. CMR:434:99 Page 1 of 2 POLICY IMPLICATIONS This action was taken in accordance with the authority granted to the City Manager by Palo Alto Municipal Code Sections 2.30.020(b) and 2.30.090. ENVIRONMENTAL REVIEW This project is categorically exempt from CEQA. ATTACHMENT Attachment A: Invoice PREPARED BY: Bill Miks, Manager RWQCP LEGAL REVIEW: Ariel Calonne, City Attomey DEPARTMENT HEAD: CITY MANAGER APPROVAL: GLENN S. ~OBERTS Director of Pu~i,c Works JUNE FLEMING / City Man CMR:434:99 Page 2 of 2 M O N "1" ~= I=1 E~ Y MECHANICA~ 8275 S~n Leendr~ Sz~eet, Oakland, CA 94621 510/632-3173 FAX ~10/r::~32-0732 ATTACHMENT A November 30, 1999 City of Palo Alto Regional Water Quality Control Plant 2501 Embarcadero Way Palo Alto, CA 94303 Altn: Ms. Daisy Stark ***INVOICE *** PURCHASE ORDER NO. P0002711 Description. Emergency Repair of a 60" Primary Influent Pipe Labor Materials and Rented Equipment Owned Equipment Subcontractors MARK-UP ~ PERCENTAGE $23,570.77 33% 15,666.47 15% 7,765.59 15% , :~0,950, _00 5% Total Cost of Work $77,952.82 TOTAL MARK-Up ~ $7,778.35 $31,349.12 2,349.97 18,0!6.44 1,164.84 8,930,42 1.547,~)32.497.5Q_ $12,840.66 $90,793.48 TOTAL DUE THIS INVOICE: Terms: Net 30 Days $90,793.48 Attachments - City of Pato Alto P.O. No. P0002711 MMC Job Invoice Summary and Documentation Note: MMC Job #14-7014