HomeMy WebLinkAbout1999-10-05 City CouncilTO: ATTENTION: Ci.ty of Palo Alto City Manager’s Report HONORABLE CITY COUNCIL FINANCE COMMITTEE FROM:CITY MANAGER DEPARTMENT:ADMINSTRATIVE SERVICES DATE:OCTOBER 5, 1999 CMR: 374:99 SUBJECT:INFORMATION TECHNOLOGY STRATEGIC PLAN AND PHASE ONE IMPLEMENTATION PLAN REPORT IN BRIEF In order to ensure that the City of Palo Alto continues to provide its citizens with services that are efficient, high quality, and effective, staff recognized that it was necessary to evaluate current information systems needs and organizational structure, and to develop an Information Technology (IT) Strategic Plan. To that end, staff hired The Warner Group to analyze the application and use of information technology and assist in the development of the IT Strategic Plan. Working with staff, The Warner Group has completed the development of an IT Strategic Plan for the City, consisting of findings in four key areas: hardware, network, software, and organization and staffing. Staff plans to implement the IT Strategic Plan in two phases. This report transmits the findings contained in the IT Strategic Plan, and details the first phase of the implementation plan. In addition, this report requests that the Finance Committee direct staff to return to the Council with a Budget Amendment Ordinance and any other needed actions to begin to implement Phase One of the IT Strategic Plan. CMR: 374:99 Page 1 of 9 RECOMMENDATION Staff recommends the Finance Committee: ° Review and comment on the Information Technology Strategic Plan and the proposed Phase One Implementation Plan detailed in Attachments Two through Six; Direct staff to return to the City Council with a Budget Amendment Ordinance (BAO) to amend the Table of Organization to add three new positions; effect various reclasses; and appropriate an additional $81,000 from the Utility Funds. A resolution changing the compensation plan for the implementation of Phase One of the IT Strategic Plan will accompany the BAO; and o Direct staff to return with an update on the status of Phase One of the IT Strategic Plan and the initial recommendations for the implementation of Phase Two, including proposed funding requirements, as part of the 2000-01 Budget. BACKGROUND The City of Palo Alto is well recognized in the Silicon Valley and around the world, and has earned a reputation for applying state-of-the-art technology in innovative ways to enhance the delivery of government services. For example, the City was a pioneer in developing a presence on the World Wide Web and maintains one of the most extensive and highly accurate Geographic Information Systems worldwide. To ensure services provided to its citizens are efficient, high quality, and cost-effective, the City of Palo Alto needed to evaluate its current information systems needs and organizational structure and develop an IT Strategic Plan. Such a Plan is critical to the development of a cohesive, citywide information technology strategy that fully addresses organizational, personnel, operational and technology issues. The City sought the assistance of a management consulting firm to develop the City’s IT Strategic Plan. In 1998, the City selected The Warner Group because of its information technology expertise and its experience in working with local governments in the development of strategic planning documents. For the last year, The Warner Group has worked with a citywide team to: Gather information on the City’s existing technologies, infrastructure and computing environments Identif, j and analyze the City’s information technology requirements Examine current and emerging technological products CMR: 374:99 Page 2 of 9 Make recommendations regarding the development and/or ~icquisition of software and hardware to meet the needs identified Determine staffing and organizational requirements for an effective information systems function ¯Develop management techniques for implementing major citywide projects Establish an effective information systems planning process, including a method for communicating projects, tasks, schedules and priorities with City departments DISCUSSION The efforts of staff and the consultant have culminated in the development of a comprehensive IT Strategic Plan for the City (Attachment One). The Plan has findings and recommendations that fall in four key areas: hardware, network, soft~vare, and organization and staffing strategies. The IT Strategic Plan recommendations range from those that are highly specific (e.g. how to improve backup power capacity), to broad- based recommendations regarding the consolidation of hardware, soft~vare, and staffing resources. A prioritized list of the recommendations can be found in Appendix F of the Plan. Following the completion of the IT Strategic Plan, staff developed an implementation plan. Proposed Implementation Plan The implementation plan breaks down the Strategic Plan recommendations into specific tasks and actions. Staff is proposing the Strategic Plan be implemented in two phases. Phase One covers the critical organizational and staffing components of the Plan. Phase Two addresses the hardware, network, and software components of the Plan and the remaining organizational and staffing requirements. The primary focus of Phase One is to create an information technology organization that is flexible, customer service oriented and priority-driven. This phase includes key organizational structure changes; a proposal for new staff as well as certain reclassifications of current staff; and several important increases in the level of service provided to City departments. Phase One provides an important foundation, which will be built upon during the second phase of the Plan. This report provides a proposal for the components to be included in the Phase One implementation plan. Staff plans to return with a status report regarding the implementation of Phase One and with recommendations for the implementation of Phase Two as part of the 2000-01 Proposed Budget. As a result, only a brief outline of the anticipated components of Phase Two are included in this report (Attachment Seven). CMR: 374:99 Page 3 of 9 Due to the extensive recommendations to be addressed in Phase Two, and the time it is expected to take to implement them, staff expects that there will be additional resource requests in future budget years beyond 2000-01. Some of these will represent additional expenses, while others are requests that would have been expected as part of the ongoing operations of the Information Technology function, and as such, are not driven by the IT Strategic Plan. Phase One Implementation Plan The details of the Phase One implementation plan are shown in Attachments Two through Six and provide the proposed organization of the Information Technology function and the estimated costs for Phase One. The components included in Phase One are implemented first because they address the critical needs and vulnerabilities that currently exist within the City’s information technology function. The major components of Phase One are as follows: 1.Consolidation of IT positions throughout the City into one centralized function 2.Reorganization of the City’s IT Division 3.Increase in services provided to City departments Each of these three components is discussed in detail below. Consolidation of IT Staff IT staff are currently located in three primary departments (Administrative Services, Utilities and Police). As a result, there are a number of redundant and disparate IT activities and processes in the City. For example, technical support calls (Helpdesk calls) are currently handled in three separate ways. The decentralization of resources also leaves the City with limited backup support for the City’s technical infrastructure, its mission critical systems (those systems affecting public safety and the delivery of utilities) and its business critical systems (those systems essential to City business operations). For example, the City has one staff member familiar with the existing network infrastructure. If that individual were to be unavailable (due to illness, vacation, new job) during a technical crisis, it could have a significant impact on the City’s mission and business critical operations. Finally, the fragmentation of resources makes it difficult to establish and maintain a cohesive, enterprise-wide strategic vision for technology within the City. In order to effectively address the issues caused by decentralization of the IT function, the IT Strategic Plan recommends a consolidation of resources into the IT Division of the Administrative Services Department. The Director of Administrative Services and Manager of Information Technology have worked with the Police Chief, Director of Utilities and their staff to develop an effective transition plan for the consolidation of the currently decentralized IT staff. This will require the reclassification of selected IT positions (Attachment Three) in order to reflect changes in job responsibilities and to CMR: 374:99 Page 4 of 9 ensure compensation parity. Staff is currently resolving isgues surrounding the consolidation of staffing, specifically for those positions represented by a bargaining unit. Staff proposes returning with more information when this staff report is forwarded to the City Council for final approval. Reorganization of IT: There is a critical need to reorganize the Information Technology Division. The current organizational structure was found to have deficiencies in the following areas: ¯Customer service and relationship management; ¯Program and project management; ¯Technology infrastructure development and support; and ¯Recruitment and retention. The Strategic Plan indicates that the current organizational structure lacks a needed focus on customer service and the management of customer relationships. For instance, calls for telephone support are handled through a separate point of contact from calls for personal computer support. In addition, no central responsibility has been assigned for developing, monitoring and managing departmental service level agreements. (Service level agreements identify and define the scope of services provided to each department in addition to reporting requirements, key contacts, problem resolution and review processes, performance metrics, quality of service commitments, and customer satisfaction monitoring.) Also, the current organizational structure is oriented towards application development. Today, IT organizations are evolving from a "build" software development orientation to a "buy" (i.e., implementing pre-built third party applications from software vendors) orientation. This means that more emphasis is placed on project management, needs assessment, and contract management skills. The City’s IT organization needs to acquire and develop these new skills and processes. The current organizational structure provides a fragmented approach to the development of the City’s technology infrastructure (e.g., voice, video and net~vork hardware and software). The current organizational structure is organized based upon technology rather than around the organization’s business needs. For example, voice infrastructure development and support is separate from data infrastructure development and support, and enterprise systems (e.g., email, net~vork administration, etc.) administration is fragmented into separate support based on the type of operating system technology (e.g., Unix or NT). In the future, with the convergence of infrastructure technologies, it will be critical that these efforts are coordinated and managed strategically and with a central point of focus. The City’s current approach limits knowledge transfer, increases organizational training costs and creates critical vulnerabilities in the support and maintenance of technology infrastructure. CMR: 374:99 Page 5 of 9 Finally, for the past several years the City has had difficulty r~cruiting and retaining qualified IT staff. The dramatic shortage of qualified IT staff combined with the competitive technical job market within Silicon Valley underscores the need for the flexibility in the hiring and promotion of existing staff. As a result of these organizational deficiencies, staff is proposing the reorganization of the IT Division into three key groups or "centers of excellence" as noted in Attachment Four. These three groups are IT Project Management and Application Services, Infrastructure Services and Client Services and Operations. The IT Project Management and Application Services Group will focus on project management, application consulting and support, and vendor and contract management. The Infrastructure Services Group will focus on telecommunications and net~vorking infrastructure development and support and enterprise systems administration. Client Services and Operations will focus on customer relationship management, help desk/call center activities, PC and telephone support, daily computer operations (e.g., daily system backups and printing), service level management and office automation services. The proposed staffing allocations in these functions are shown on Attachment Five. Staff also requests the ability to hire and promote bet~veen the Systems Analyst and Sr. Systems Analyst classifications. Increase Service Levels: With the recent implementation of a new computer-aided dispatch (CAD) System for Police and Fire, there is an immediate need for IT support services 24 hours a day, seven days a week (24 by 7). As additional City processes are automated and new information systems are added (e.g., Utilities Customer Information System, Fire Rostering System, etc.), the need for expanded coverage will continue to grow. The consolidation of IT resources and the reorganization of the IT Division will provide the resources necessary for the provision of 24 by 7 IT support. The Strategic Plan identifies several critical resource needs. A Senior Systems Analyst is needed to support the implementation and maintenance of new and existing public safety systems such as the Public Safety CAD System, the Police Records Management System (RMS), Fire RMS, Fire Rostering, and Police Mobile Computer Terminals. Second, a Senior Systems Analyst is necessary to implement, support and maximize the effective use of existing office automation applications such as MS Office, Exchange and Outlook, as well as planned new office systems such as imaging and document management and workflow. Finally, with the continued emphasis on "buy vs. build" (the implementation of third-party vendor software applications and systems rather than custom development by internal staff) there is a critical need for contract management oversight. This emphasis on contract management, combined with the current lack of administrative support within the IT Division creates a need for an Executive Assistant position. The implementation of Phase One provides a number of benefits for the City. These include: CMR: 374:99 Page 6 of 9 *Support for mission and business critical systems (i.e., police, fi’re, utilities systems); ¯Appropriate support for office automation systems used citywide; ¯Coordinated, efficient responses to calls for service; ¯Reduction in redundancy in staffing and skills among departments; ¯The ability to provide Twenty Four by Seven (24 by 7) coverage to the City; and ¯Clearly defined service level agreements for City departments that will allow departments to know what service levels to expect. Many of these benefits will begin to be realized very quickly and the implementation of Phase One of the Strategic Plan should result in immediate improvements in the services provided to departments. ALTERNATIVES TO STAFF RECOMMENDATIONS The IT Strategic Plan describes significant needs and potential resource allocations in order to fulfill all of the recommendations from the Plan. Council could direct staff to implement Phase One only of the Plan and return in another year with a status report detailing the accomplishments achieved with the resources allocated through Phase One. This would delay the initiation of Phase Two of the plan an additional six months. Delaying Phase Two would further delay the implementation of new City systems such as document management, GIS-enabled work management and an electronic commerce- enabled web site necessary to ensure the effective and efficient delivery of existing City services and provide the foundation for new City services in the future. In addition, critical vulnerabilities in the City’s technology infrastructure would continue to exist that have the potential to impact current City business operations. Finally, delaying Phase Two would reduce the City’s ability to support and maintain the City’s technology systems in the most effective and cost efficient manner possible. RESOURCE IMPACT The proposed staffing component for Phase One for the remainder of the 1999-00 Fiscal Year, as shown on Attachment Six, is anticipated to cost $186,000 for the General Fund and $81,000 for the Utilities Funds. The General Fund 1999-00 Adopted Budget included $200,000 for implementation of the IT Strategic Plan. Funds of $81,000 for the Utility Funds are available in the various Utility Rate Stabilization Reserves. As discussed above, staff is working on various personnel related issues related to the consolidation of three IT functions into one centralized function. As such, a BAO and specific costing for Phase One are not included at this time. Upon direction from the Finance Committee, staff would return to the Council with a BAO, amending the Table of CMR: 374:99 Page 7 of 9 Organization and if needed, a resolution amending the compensi~tion plan. The yearly ongoing costs associated with the implementation of Phase One of the Strategic Plan are approximately $445,000, of which $312,000 will be funded by the General Fund and $133,000 by the various Utility Funds. An estimated breakdown of these costs is included in Attachment Five. It should be noted that while the reporting relations for the Utility Department Information Technology personnel will change with the approval of Phase One of the IT Strategic Plan, staff recommends moving the budget from the Utilities Department to the General Fund as part of the 2000-01 Budget. There will be no change in the total costs as a result of this change, simply a change in the Table of Organization and a reallocation of funds from the Utility Funds to the General Fund. The BAO would also include minor support costs for the new positions. As discussed above, staff recommends initiating implementation of Phase Two of the Information Technology Strategic Plan be considered as part of the 2000-01 Budget. POLICY IMPLICATIONS Phase One of the IT Strategic Plan supports a number of program elements of the Comprehensive Plan. These are detailed in Attachment Eight. The elements supported are primarily in the Governance and Transportation chapters of the Comprehensive Plan and are in the areas of providing technological support and assistance to facilitate the flow of information for different issues. TIMELINE Elements of Phase One of the implementation plan will begin upon Council approval and be completed prior to June 2000. Phase Two of the implementation plan is projected to initiate with the start of the next budget year (2000-2001) and to be completed as funding permits. ATTACHMENTS Attachment One: Attachment Two: Attachment Three: Attachment Four: Attachment Five: Attachment Six: Attachment Seven: Attachment Eight: Information Technology Strategic Plan Phase One Implementation Plan Components Proposed Position Changes and Additions Proposed Functional Reorganization for the IT Division New Organization Chart for the IT Division Cost Estimate for Implementation of Phase One Outline of Phase Two Implementation Plan Components IT Program Elements Supported in the Comprehensive Plan CMR: 374:99 Page 8 of 9 PREPARED BY:Rod Massey Manager, Information Technology DEPARTMENT HEAD :@ . ~-~-- CARL,~EATS/~ ; ~Direct’r, Adm)~//~e Services CITY MANAGER APPROVAL: ~ ~~ ~~.~ pUNE FLYING ~ ~City Manager " ( ~ CNIR: 374:99 Page 9 of 9 ~T,,1999-00 INFORMATION TECHNOLOGY STRATEGIC PLAN AND PHASE ONE I MPLEM ENTA~ON PLAN CITY OF PALO AL TO INFORMATION TECHNOLOGY S TRA TE GIC PLAN FINAL D RA F I May 3, 1999 CITY OF PALO ALTO INFORMATION TECHNOLOGY STRATEGIC PLAN TABLE OF CONTENTS SECTION L II. IlL IV. V. EXECUTIVE SUMMAR Y BA CKGR 0 UND ............................................................................. STUDY GOALS AND OBJECTIVES ........................................... STUD Y APPR OA CH ..................................................................... MISSION, VISION, GOALS AND OBJECTIVES ...................... HARD WARE AND DATA CENTER ........................................... A.Current Hardware Environment .......................................... B.Year 2000 Compliance .......................................................... C.Hardware Assessment ........................................................... D.Hardware Recommendations ............................................... NETWORKING ............................................................................. A.Current Networking Environment ...........................: ........... B.Year 2000 Compliance .......................................................... C.Networking Assessment ........................................................ D.Networking Recommendations ............................................. SOFTWARE ................................................................................... A.Current Software Environment ............................................ B.Software Assessment ............................................................. C.Software Recommendations ................................................. OR GANIZA TION AND STAFFING ......................................... .. A.Current Organization and Staffing ...................................... B.Assessment of Organization and Staffing ............................ C.Recommendations for Organization and Staffing ............... PAGE I -1 H -1 III -1 IV.-1 V -1 V -1 V - 13 V - 13 V - 15 VI -1 VI -8 VI -8 VI - 10 VII -1 VII -1 VII -6 VII -17 VIII -1 VIII -1 VIII -8 VIII - 31 508-02 IT Strategic Plan - Draft 6 - i - CITY OF PALO AL TO TABLE OF CONTENTS (CONT~nVU~) SECTION IX. X. XI. XII. PAGE ITD POLICIES AND PROCEDURES ........................................IX -1 IMPLEMENTATION PLAN AND COSTS .................................X -1 COMMUNICATIONAND MAINTENANCE OF THE PLAN.. XI-1 BENEFITS TO BEACHIEVED ..................................................XII -1 APPENDICES APPENDIX A - GLOSSAR Y ............................................................................ APPENDIX B- INTER VIEW PARTICIPANTS .......................................... .. APPENDIX C- MAIN COMPUTER HARDWARE INVENTORY ................ APPENDIX D - DESKTOP HARDWARE INVENTORY. ............................... APPENDIX E- BUSINESS APPLICATION SOFTWARE INVENTORY .... APPENDIX F- RECOMMENDATIONS ....................................................... . A -1 B -1 C -1 D -1 E -1 F -1 508-02 IT Strategic Plan - Draft 6 - ii " EXECUTIVE SUMMAR Y We are pleased to present this report of our work with the City of Palo Alto on the -development of an Information Technology Strategic Plan. The City retained The Warner Group to review the current information technology (IT) organizational structure, infrastructure, and systems and to make recommendations in each of these areas. The IT Strategic Plan was developed between August 1998 and May 1999. We compiled our findings, assessments, and recommendations and reviewed them with City management and key staff in the course of developing the Plan. This report reviews the current major hardware, software, networks, and IT organizational structures of the City, assesses their effectiveness, and makes detailed recommendations for improvement. Hardware Strategies Platform Standards - The Utilities Department and ITD should standardize on the same set of hardware platforms. Server Consolidation - Utilities and ITD should standardize on a single email system and SMTP server. Server Load Assessment- A detailed assessment should be performed to anticipate and prepare for future server load. Backup and Security - The City should improve backup power capacity and assess the adequacy of fire suppression equipment and water, temperature, fire, and intrusion detection systems. 508-02 Exec Summary & Background Sections.doc The Warner Group 1 Network Strategies Network Consolidation - The Utilies Department and ITD should unify their networks under ITD standards. Network Bandwidth - Network wiring, switches, and servers should be upgraded to achieve greater network bandwidth. Power Backup - Reduce the risk of complete network failure by adding power backup and redundant power supplies. Firewall - If the City continues to operate its Web server on the City network, it should implement a ftrewall. Network Addressing- ITD should modify its approach to assigning IP addresses. Software Strategies Operating Systems - The City should standardize and reduce its use of different operating systems on servers and PCs. DBMS Systems - The City should standardize on the Oracle or SQL Server DBMS for business applications and Microsoft Access for department-specific applications. Office Automation - The City should fully migrate to Microsoft Office and Microsoft Outlook. GIS- The City should develop a GIS strategic plan. Centralized Address Database - A centralized address database needs to be developed and maintained within the Permit Tracking System and integrated into each business application throughout the City. 508-02 Exec Summary & Background Sections.doc The Warner Group 2 City Web Site - The City should emphasize Intemet transaction capability for new and existing business applications. Organization and Staffing Strategies Chief Information Officer - The City should designate a high-level City executive as Chief Information Officer (CIO), with responsibility for strategic decision-making. Centralization of IT Positions - All IT positions should be consolidated into ITD, with the exception of departmental Business Analysts. Organizational Restructuring - The ITD organization should be gradually expanded and restructured. Service-Level Agreements - To ensure that ITD is held accountable for being responsive to the ne6ds of its departmental customers, service-level agreements should be developed between ITD and each City department. ITAdvisory Bodies - The City’s IT advisory bodies serve a vital role, and changes should be made to ensure that each body has a clearly defined mission and that its members fulfill their roles. Help Desk Support - The ITD Help Desk should be expanded and changed to be more responsive to all users throughout the City, including after-hours support. Skills and Training - IT staff should be recruited based on ability to acquire new skills, and necessary skill sets should be identified on a regular bases and appropriate training provided. Structured System Development Process - The City should establish a structured process for the design, procurement, and implementation of significant systems, relying upon project teams including users, technical staff, vendors, and outside consultants. 5084)2 Exec Summary & Background Sections,doc The Warner Group 3 SECTION I BA CKGR 0 UND THE WARNER GR O UP I- BACKGROUND -The City of Palo Ako enjoys high name recognition in the Silicon Valley and around the world. It has earned a reputation for applying state-of-the-art technology in innovative ways to enhance the delivery of government services. For example, the City was a pioneer in developing a presence on the World Wide Web, it has installed an impressive high-bandwidth data communications infrastructure, it maintains one of the most extensive and highly accurate Geographic Information Systems in the Valley, and it is committed to using the Internet for delivering key services such as issuing building permits. To fully realize its progressive vision for using technology and to ensure that the public services provided to its citizens are supported by the most efficient, highest quality, and most cost-effective computer technology, the City of Palo Alto desired to evaluate its current information systems needs and organizational structure and to develop this Information Technology Strategic Plan. Such a Plan is important to ensure that a cohesive, City-wide management information strategy is developed that addresses organizational, personnel, operational and technology issues. The City realized that in order to fully assess all of the elements involved in such an effort as this, complex technical, operational and organizational issues must be addressed. As a first step in preparing a comprehensive design for its systems over the next five (5) years, the City sought the assistance of a highly qualified management consulting firm and selected The Warner Group to assist in the development of this plan. 50S-02 Exe¢ Summary & Background Sections,doc The Warner Group I- 2 SECTION H STUD Y GOALS AND OBJECTIVES THE WARNER GROUP H - STUD Y GOALS AND OBJECTIVES Generally, the City’s objectives for this study are to: Gather information on the City’s existing technologies, infrastructure and computing environments and identify requirements. Establish recommendations and priorities for the development and/or acquisition of software and hardware to meet the needs identified. Analyze the requirements of specific operational areas of the City to determine commercially a~,allable systems which may appropriately meet City needs. Examine currently operational and emerging technological products that may be cost-effective for the City of Palo Alto. Determine staffing and organizational requirements for an effective management information systems function, including establishing formal communications channels among staff in various departments. Formalize the methodology to establish a continuing information systems planning process, including a method for communicating projects, tasks, schedules and priorities with City departments. Facilitate discussions with City decision-makers chartered to develop strategic policies and plans for the City. Develop strategic management techniques for implementing major Citywide projects. Identify processes and practices in the IT Services Division for successfully introducing change management to the IT function. 508-02 IT Swategic Plum - Draft 6 The Warner Group H-1 SECTION III S TUD Y APPR OA CH THE WARNER GROUP III - S TUD Y APPR OA CH Our methodology and work plan for this study was as follows: PHASE 1 2. Conducted Project Kick-Off Meeting - We conducted a detailed planning meeting with the City’s project personnel, including the project coordinator, the Administrative Services Director. Gathered Information -During this step, we assessed the current environment for the IT Strategic Plan, including business requirements, management priorities, and technical requirements/issues. Our assessment consisted of the following steps: A. Identified Management Priorities - Starting with a "top-down" approach, we conducted a three-hour Technical Advisory Board (TAB) focus group to discuss the vision and priorities for citywide technology. We then conducted a series of one-on-one interviews with City management to understand "big picture" business and information technology-related requirements and priorities. We utilized these interviews and group discussions as the basis for developing an initial draft of the organizational vision, goals and priorities specifically related to Citywide technology. We then reviewed and refmed this draft during an additional TAB meeting. Based on the Citywide IT vision, goals and priorities, a mission statement for the IT function was developed through a facilitated discussion with the Technical Advisory Group (TAG). B. Assessed Current Systems and Technical Infrastructure - We became familiar with the existing hardware, software, and data communications infrastructure currently in place and assessed their effectiveness. We 508-021T Strategic Plan - Draft 6 The Warner Group 1II- 1 3. reviewed available technical documentation, such as configuration diagrams, technical specifications, hardware/software inventories, project planning documents. We interviewed key individuals from the TAG. C. Determined System and Information Needs - Based on the priorities. established in Step 2.A., we identified system and information needs in key areas such as personnel, fixed assets, fmance, public safety, planning and building services, and public works. We conducted focus groups with personnel within departments as appropriate. Conducted Analysis - We conducted an analysis of IT systems and services through the following steps: A. Analyzed Technical Alternative Approaches - We utilized the results of the earlier steps and analyzed the various technical options available to the City. We considered various approaches in each of the following areas, as appropriate: *Upgrading or replacing existing systems ¯Centralized or distributed architectures, including client/server and intranet approaches ¯Build versus buy strategies ¯Installation, maintenance and support ¯Packaged software versus application development strategies ¯Hardware and software standards ¯System interfaces ¯Database management ¯Data communications network strategies, including local and wide area networks ¯Telecommunications strategies for the Telecommunications Utility ¯Integration requirements ¯Technology partnerships with external entities 508-02 IT Strla~c Plan - Draft 6 The tgarner Group III- 2 Based on the information already collected and our experience working with similar agencies across the country, we identified the most feasible alternatives for analysis. We identified the recommended approach and developed priorities. Analyzed IT Staffing and Organizational Strategies - We analyzed- staffing and organizational requirements for the draft technical recommendations developed in the previous step. We considered the current IT staff resources and documented any issues or concems. Facilitated Strategic Planning/Policy Discussions - In this step, we facilitated discussions with the TAB to review our findings and discuss conclusions. These discussion sessions also were used to develop strategic policies and guiding principles to be applied to the City’s IT Strategic Plan. Formalized Strategic Planning Methodology - Following the strategic policy discussions, we documented the City’s current methodology used to reach decisions on priorities and planning. This methodology was used to maintain, update, modify, remake, and develop new strategic policies and plans. It included a method for identifying IT-related public concerns and communicating projects, tasks, schedules and priorities to City departments. PHASE 2 1.Prepared Implementation Plan - Based on the analysis conducted in the preceding steps, we prepared an implementation plan outlining the sequence of key projects, responsibilities, and target dates over the next three to five years. The implementation plan highlighted the recommended key IT projects/initiatives and provided the TAB and TAG with a clear understanding of the next steps for system improvements. It also included the estimated timeframe required to implement each component of the proposed improvements and the development of corresponding measures upon which to evaluate IT performance and service levels. 2.Conducted Prelim’.tnary Cost Analysis - We prepared a high-level analysis of estimated one-time and recurring costs for the implementation of the proposed changes and improvements. Estimated costs were presented for: 508-02 rr Strategic Plan - Draft 6 The Warner Group III- 3 ¯Systems development and acquisition, including software ¯Data conversion ¯Network improvements ¯Project management ¯Training and documentation ¯Recurring costs for system support and maintenance ¯Other recurring and non-recurring costs hardware and 3.Prepared IT Strategic Plan - After the preceding work was completed, we prepared, the City of Palo Alto IT Strategic Plan. This step included facilitated discussions, as needed, to finalize recommendations and policies. Finally, we presented a summary of the Strategic Plan to the Director of Administrative Services and the Manager of Information Technology and other City technology advisory groups. 508-02 IT Su-ategic Plan - Draft 6 The Warner Group III- 4 SECTION IV MISSION, VISION, GOALS AND OBJECTIVES THE WARNER GR O UP IV- MISSION, ~SION, GOALS AND OBJECTIVES Introduction In order to ensure effective information technology planning efforts within the City of Palo Alto, it is necessary to align those efforts with the business goals and objectives of the City. The City’s business goals and objectives are best expressed in the City’s Strategic Business Plan. Like most effective strategic plans, the City’s Strategic Business Plan includes the following main components: Organization Mission Statement- An organization’s mission statement should: ¯Express the organization’s purpose ¯Identify its customers, products, and/or services ¯Outline the major functions the organization performs ¯Define the areas within which the organization will operate. Organization Values Statement - An organization’s Value statement should: ¯Describe the key attributes that are most important to the organization ¯Include attributes currently possessed as well as those aspired to ¯Define the principles guiding the organization ¯Provide intrinsic significance to the organization, independent of business and political environments, management and organizational competencies. Organization Vision Statement - An organization’s Vision statement should: ¯State how an organization should see itself to successfully achieve its full potential ¯Paint a vivid picture of what the organization should look like in the future ¯Remain the same from year to year ¯Affn’m in the present an ideal and inspirational future. 508-02 IT Strategic Plan - Draft 6 The Warner Group IV- 1 Organization Goals- An organization’s Goals should: ¯Represent what the organization wants to accomplish or become over the next several years ¯Provide a measurable target that must be met to realize the mission and vision ¯Provide the basis for decisions about the nature, scope and priority of the projects undertaken. Organization Objectives for meeting each Goal- An organization’s Objectives should: ¯Be the means used to accomplish a Goal. Organization Strategies for meeting each Objective - An organization’s Strategies should: ¯Be specific activities, projects, initiatives or programs that are intended to fulfill specific organizational objectives. The Palo Alto Strategic Business Plan City of Palo Alto’s Mission Statement - The City of Palo has the following Mission Statement: "The government of the City of Palo Alto exists to promote and sustain a superior quality of life in Palo Alto. In partnership with the community, our goal is to deliver cost-effective services in a personal, responsive, and innovative manner." City Values Statement - The City’s Value Statement expresses the following values: ¯Quality - Responsive delivery of superior service ¯Courtesy - Providing service with respect and concern ¯Efficiency - Productive, effective use of resources ¯Integrity - Straight-forward, honest, and fair relations ¯Innovation - Excellence in creative thought and implementation. 508-02 IT Strategic Plan - Dra~ 6 The Warner Group IV- 2 City Vision Statement - The Strategic Business Plan describes the following vision for the City: A healthy, vibrant community with a sustainable, diverse economy, and orderly growth. Vision Elements include: ¯Quality education ¯Orderly Growth ¯Cultural and Recreational opportunities ¯Economic Development ¯Health/Human Services ¯City Infrastructure City Goals - The City has the following Goals: Goal: Improve the Community Goal: Prepare for the Future: Goal: Prepare for Deregulation of Utility Services City Strategies for meeting each goal Goal: Improve the Community Objective" Increase community services ¯Strategy: Fund Family Resource Center ¯Strategy: Fund Mid-Peninsula Access Corporation ¯Strategy: Reprinting Human Service Guide ¯Strategy: Emergency Operations Center improvements ¯Strategy: Implement Customer Response Tracking System ¯Strategy: Increase staff in Community Services Goal: Prepare for the Future: ¯Objective: Develop Computer Replacement Fund ¯ Strategy: Replace PCs, servers, and telecommunications equipment ¯Objective: Improve StaffAccess to City Information ¯ Strategy: Develop Intranet ¯Strategy: Automate Municipal Code 508-02 IT Strat~Jc Plan - Dr~t 6 The Warner Group IV- 3 ¯ Strategy: ¯Strategy: ¯Strategy: ¯Strategy: ¯Strategy: *Strategy: ¯Strategy: ¯Strategy: ¯Strategy: Upgrade electronic mail Improve Technology infrastructure Expand WAN/LAN environment Support Infrastructure Master Plan application Improve Financial System Implement Lawson System with web capability Implement new Cash Receipting System Implement new Collection Management System Increase technology staff in Information Technology Objective: Improve Public Access to City Information ¯Strategy: Improve City Web Page ¯Strategy: Provide information to the public at customer service counters ¯Strategy: Receive permit applications and documents over Internet ¯Strategy.: Automate Municipal Code ¯ Strategy: Internet enabled class registration and facilities reservations ¯Strategy: Develop Enjoy catalog on the Web ¯Strategy: Increase staffin Human Resources Objective: Ensure Year 2000 compliance ¯Strategy: Ensure Y2K compliance of hardware, software and embedded chips ¯Strategy: Consulting contract to meet department Y2K requirements Objective: Improve Permit Process ¯Strategy: Implement New Permit Tracking System ¯Strategy: Increase staffin Building/Planning ¯Strategy: Revise Zoning Ordinance Objective: Develop Spatial Analysis Capability ¯ Strategy: Develop Mapping, reporting and GIS applications Objective: Improve Public Safety Services ¯ Strategy: ¯Strategy: ¯Strategy: ¯ Strategy: ¯ Strategy: ¯ Strategy: ¯ Strategy: Implement Computer Aided Dispatch Implement new Police and Fire Records Management Systems Implement Paramedic Master Plan Implement new Fire House Alerting System Improve optical imaging system Increase staff in Fire Increase staff in Animal Control 508-02 IT Strategic Plan - Draft 6 The Warner Group IV- 4 Goal: Prepare for Deregulation of Utility Services ¯Objective: Improve City Utility Processes ¯Strategy: Enhance Utilities Customer Information System ¯Strategy: Implement Automatic Payment System Information Technology Mission, Vision, Values, and Goals The City’s IT Mission is: "Improve service delivery for the community and staff of the City through efficient and effective implementation of information technology". The City’s IT Vision is: "Within security constraints, a single logon, universal access system in which integrated information is easily available, analyzed and modified, via an integrated, uniform interface." The City’s IT Values include: ¯Quality - Responsive delivery of superior service ¯Courtesy - Providing service with respect, concern and in a timely manner ¯Efficiency - Productive, effective use of resources ¯Integrity - Straight-forward, honest, and fair relations ¯Innovation - Excellence in creative thought and implementation The City’s IT Goals include: ¯Assume a leadership role in defining the benefits of information technology ¯Define and implement a reliable, responsive, and integrated computing environment ¯Ensure continuous dialog with our customers as to status, reallocation of priorities and/or redirection of resources ¯Develop and implement an Information Technology Strategic Plan that addresses the mission, vision, values, goals and objectives of the City. The City goals, objectives, and especially many of the City strategies translate into potential projects for IT. By aligning IT projects with City strategies, a clear purpose is 50802 IT Strategic Plan - Draft 6 The Warner Group IV-5 created for each project that is traceable back to the City objectives and thus to City goals, mission, and vision. Accordingly, we will align IT projects to City strategies. 508-02 IT Strategic Plan - Draft 6 The Warner Group IV-6 SECTION V HARD WARE AND DATA CENTER THE WARNER GROUP V- HARD WARE AND DATA CENTER A.CURRENT HARDWARE ENVIRONMENT Introduction The City of Palo Alto’s computerohardware and network administration responsibility is largely divided between the Utilities Department and the Information Technology Division (ITD). Each department manages a number of servers and workstations both at the Civic Center and at remote locations. Each department also manages a portion of the total City network. Information Technology Division Microsoft NT Servers ITD maintains a single Microsoft New Technology (NT) domain for its NT services users. Domain controllers authenticate users on an NT domain and allow them to log-on. A single Primary Domain Controller (PDC) and at least one Backup Domain Controller (BDC) servers are required for each Windows NT domain. The Civic Center site houses a PDC server and two BDC servers. Originally, the Water Quality Control Plant (WQCP) site had implemented its own NT domain, but this site is being merged into the ITD NT domain. The WQCP Primary Domain Controller is being converted to a Backup Domain Controller on the ITD NT domain. The Municipal Service Cemer (MSC) site is also part of the ITD NT domain with a resident BDC. Connectivity to the site for ITD users is provided through the Utilities network. A small portion of Building C and the UCC are using Novel’s Netware as its network operating system rather than NT. There are 10 NT servers at the Civic Center. All of the servers use Windows NT Server 4.0 on Imel processors. There is one NT server at the WQCP site. This server functions as a BDC for the WQCP. There is one NT server at the MSC site. This server is a BDC and also offers file and print services. Exhibit V-1 briefly illustrates the functions of these servers. Information Technology Division NT Servers at the Civic Center SQL Server 6.5 HelpDesk application HELPDESK Backup Domain Controller (BDC) Pdnt server CD tower INFOTECH Backup Domain Controller (BDC) IIS Version 3 server Temporary storage file server INTRANET Future cash receipt database server NETFAX CA Unicenter TNG NT utilities Asset Management (ASD) Sol.are delivery (USD) SYSMGMT ADMIN Pdmary Domain Controller (PDC) Print server. File sharing ("U" drive) ADMIN2 File server - 24GB RAID5 File sharing ("H" drive and "S" drives) APPS Application server Oracle 7.2 for ESCOM application Computer Based Training (CBT) FAX server Network install of WordPerfect 7.0 Network install of Lotus 123 BACKUP ArcServe V6.0 backup software DDS3 tape changer COMM Primary WINS server DHCP server Exhibit V-1 HP Servers at the Civic Center Testing new Financial system Testing Lawson HR package Police system Computer Aided Dispatch (CAD) Records Management System (RMS) HP Desk mail server Utility Billing (HP Image database) Fire incident reporting Legislative history Building permits Pdnts utility bills PAl HP9000 K570 PA3 HP3000 / 947 PA4 HP3000 / 949 PA6 HP workstation PA7 HP9000 H40 PA8 HP9000G40 PA9 HP9000 G70 Optical imaging (informix Database) Testing new Utility Billing application Production IFAS financial application Production Lawson HR application Exhibit V-2 Information Technology Division HP Servers The HP servers are located at the Civic Center and are administered by the information Technology Division (ITD). They support non-graphical business applications. Nearly all users access the HP-3000 (MPE) and HP-9000 (UNIX) servers from their Windows machines using a Windows-based terminal emulation program. Library staff and the public still use terminals to access the Library system (Dynix) residing on the Library’s HP-9000 UN1X server. Appendix C, "Main Computer Hardware Inventory" contains additional details on main computer hardware and inventory. There are seven (7) HP servers at the Civic Center site. Exhibit V-2 briefly describes the functions of each of the HP servers. Hardware and Daut Center Section The Warner Group V- 3 The Utilities Department Servers The Utilities Department operates a variety of servers at the Civic Center site and at a number of remote sites. The Utilities ser~’ers include the following hardware platforms: ¯Intel ¯Digital Equipment Corporation (DEC) Alpha ¯Hewlett-Packard (HP) 9000 The Utilities servers include the following operating systems: ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ DEC’s Alpha OpenVMS Novell’s NetWare Microsoft’s DOS Microsoft’s Windows 3.1 Microsoft’s Windows 95 Microsoft’s Windows NT 4.0 Hewlett-Packard’s UNIX (HP-UX) Shareware Linux There are eight (8) servers at the Civic Center.Exhibit V-3 briefly describes the functions of the Utilities servers at the Civic Center. Hardware and Data Canter Section The Warner Group V- 5 Utilities Servers at the Civic Center POP3/SMTP email server Internet connectivity through ITD Dial-in server - PPP dial-in CD-ROM File server Database server Oracle V7.2 Intel Windows 95 Intel LINUX DEC Alpha Workstation DEC Alpha Open VMS Intel Nove!l V4.1 - 50 users Intel Novell V4.1 - 50 users Intel Novell V4.1 - 50 users Intel Novell V4.1 - 10 users GIS server Alpha / Intel clients connected to server File server Pdnt server File server Pdnt server File server Print server File server Pdnt server Exhibit V-3 There are nine (9) servers at the MSC site. Exhibit V-4 briefly describes the functions of the Utilities servers at the MSC. Hardwar~ ~nd Data Center Section The Warner Group V- 7 Utilities Servers at the Maintenance Service Center Water, Gas and Storm Drain SCADA Intel NT 4.0 Workstation Water, Gas and Storm Drain SCADA Intel NT 4.0 Workstation Electric SCADA system HP 9000 / D200 UNIX Electric SCADA system HP 9000 / D200 UNIX Intel Novell V4.1 - 100 users Intel DOS Intel LINUX Intel Windows 3.1 Intel NT 4.0 Workstation Meter Inventory Processing (MIPS) File server Print server MIPS maintenance server Intranet web server Intranet directory service Water, Gas and Storm Drain SCADA Exhibit V-4 Personal Computers The majority of desktop and laptop computers installed in the City are based on the Intel processor. Microsoft Windows NT Workstation 4.0 is the standard operating system on all desktop computers supported by ITD. Of the Intel-based PCs, the majority (88 %) are 586 (Pentium) class machines or higher, while (9%) of all Intel-based PCs are 486 class or lower. The remaining 3% of desktops include Macs and others. Thus, 88 percent of the existing PC’s in the City can support current versions of Microsoft Windows and office automation (OA) applications, while the remaining 9% would need to be replaced in order to standardize operating systems and OA products across City departments. Type of Device PC - 386 or lower PC - 486s PC - 586s PC - Other PC -Macs Total Desktops Laptops - 486s or lower Quantity 16 49 609 12 4 690 46 Percent of Total Devices 2% 7% 88% 2% 1% 100% 59% Laptops - 586s 27 35% Laptops - Macs 1 1% Laptops - Other 4 5% Total Laptops 78 1 O0 % Terminals 0 0 % Total Devices 768 100 % Hardware and Data Ceater Section The Warner Group V- 9 The distribution of the PCs throughout the City is shown in the following chart. Number of Percentage ofDepartment Quantity of PCs Administrative Services City Attorney City Auditor City Clerk City Counsel City Manager Employees 85.50 9.00 3.75 6.75 9.00 10.50 77 12 6 10 2 8 Community Services Fire Human Resources Police Planning Public Works Utilities Total 139.25 124100 14.00 171.00 46.00 203.00 211.50 1,033.25 109 34 13 191 50 67 111 690 PCs 11% 1.5% 1% 1% 1% 1% 16% 5% 1.5% 28% 7% 10% 16% 100% Appendix D, "PCs and Peripheral Hardware" contains additional information on the desktop devices in the City. Percent of TotalType of Printing Device Quality Devices Desk Jet - Single User 32 15% LaserJet I - Single User 30 14% Laser Jet II - Multi User 15 7% LaserJet III - Multi User 36 17% LaserJet IV - Multi User 59 27% Laser Jet V - Multi User 17 7% Color Printer 29 13% Total 218 100% Hardware and Data Center Section The Warner Group V- 10 A comparison of the above and previous table reveals that the City has approximately 3 PCs for each printer. In a typical office environment where PCs are networked and people utilize the network, a ratio of 4:1 is usually optimal. The City should look to minimize the number of single user printers and move increasingly toward networked printers in the ratio of 4 PCs for each printer. ITD System Management Backup and Security ITD uses components of Computer Associates Unicenter TNG package for system management. All of the ITD NT servers are backed up across the network to a single tape backup device. The backup device is resident on the "CH_ASD_BACKUP" server. ITD performs a full backup every other weekend and a nightly differential backup. A full backup copies all files to the backup media and generally takes a long time to accomplish. A differential backup copies only those files that have changed since the last full backup and generally takes much less time than a full backup. To recover a failed disk drive, you use the last full backup that was created along with the last differential backup. Utilities System Management Backup and Security The Utilities Department creates a backup of all server files on a nightly basis. month backup files are archived off site. End of Protection Systems Fire Suppression - A fire suppression system should provide adequate fire suppression around the processing equipment. The system must be able to suppress a fire without damage to the processing platform or any person in the area. Information regarding the manufacturer of the fire suppression equipment used to protect the City’s servers was not available during the preparation of this document. Power Protection - An uninterrupted power supply (UPS) is a device that supplies electrical power to a computer or piece of network equipment when main power from the local utility fails. A UPS may be a small standalone device rated to supply power to a single desktop computer for a short period of time (such as 5 minutes). A UPS can also be a large device capable of supplying power to an entire building for a longer period of time (such as 30 minutes). A diesel generator can provide backup to a UPS to extend the pl.ardware and Data Center Section The tVarner Group V- 11 supply of power. A generator is limited only by the amount of diesel fuel available for the generator. When a generator is paired with a kIPS, it can be configured to start automatically when utility power fails or it can be configured to be switched manually. Whether a UPS is large or small and backed-up by a generator or not, it is intended to accomplish the same basic function - to keep a computer or network operating after the loss of utility power until utility power is restored or the system is shut down in a planned manner. The decision to purchase a UPS depends on.several factors: How often do utility power failures occur How disruptive are utility power failures to the organization All of the Information Technology Division (ITD) NT servers are supported by LIPS systems. They are also attached to the City Hall power generator with a capacity of 48 hours of operation without utility power. At the Civic Center, each of the Utilities Department servers has its own standalone UPS unit to sustain it during short power outages and to "gracefully" shut it down during a complete power failure. They are not attached to the build.ing generator for prolong operation in the event of a utility power failure. The DEC Alpha server that supports the GIS application was recently relocated to the A Level Communications Room. This relocation allows the UPS and the building generator to provide support to the GIS server for approximately 30 minutes in the event of a utility power failure. The MSC site has a building UPS system and a backup generator for complete power protection of all of its computer and network hardware. Detection Systems Water Detection - A water detection system is intended to provide adequate detection of water leakage around the processing equipment. Information regarding the manufacturer of the water detection equipment used to protect the City’s servers was not available during the preparation of this document. Temperature Detection - A temperature detection system is intended to provide adequate detection of ambient temperatures around the processing equipment. Information Hardware and Dam Center Section The Warner Group V- 12 regarding the manufacturer of the temperature equipment used to protect the City’s servers was not available during the preparation of this document. Fire Detection - A fire detection system is intended to provide adequate detection of extreme heat and smoke around the processing equipment. Information regarding the manufacturer of the fire detection equipment used to protect the City’s servers was not available during the preparation of this document. Intrusion Detection - An intrusion detection system is intended to provide adequate detection of intrusion. Information regarding the manufacturer of the intrusion detection equipment used to protect the City’s servers was not available during the preparation of this document. Power Failure Detection - A power failure detection system is intended to provide adequate detection of utility electrical power sags, surges, and outages in the power that supports the processing platform. ITD is upgrading the standaione UPS units to provide a pager announcement interface in case of power failure. This will allow the system administrator to be immediately alerted if computer system power fails for those machines. B.YEAR 2000 COMPLIANCE One of the HP 9000-735s (PA6) is not Year 2000 compliant and the Utility Billing printing that runs on this equipment is anticipated to be relocated to another machine. The HP 3000-949 (PA4) has not been tested to ensure it can successfully move through the Year 2000 date change. C.HARDWARE ASSESSMENT Hardware and Operating Systems - The Utilities Department has a wide assortment of computers and operating systems both at the Civic Center and at the remote sites. In contrast, ITD has standardized on a single hardware platform (Intel) and a single Network Hardware and Data Center Section The Warner Group V- 13 Operating System (NOS) -Windows NT. It is common industry practice today for an organization to standardize on a small set of operating systems and hardware, platforms. This type of standardization minimizes the system administration effort and maximizes the uses to which the system can be employed. Uninterrupted Power Supplies - There is a building UPS at the Civic Center, but it does not have enough capacity to supply power to all of.the computer and network hardware. Many servers are backed-up with small, standalone UPS units. In addition, the building UPS is not backed up by a generator. Generally, standalone UPS units do not have enough capacity to power equipment through anything except the shortest power failure. In addition, without generator backup, even large, building-wide UPS units have limited capacity. The best solution is a building UPS with a generator backup and an automated transfer switch. Fire Suppression System - The manufacturer of the fire suppression equipment needs to be identified to determine its capabilities of meeting the City’s needs. Detection Systems - The manufacturers of the water, temperature, fire, and intrusion detection systems need to be identified to determine its capabilities of meeting the City’s needs. Electronic Mail and SMTP Servers - The Utilities Department and the ITD have different email systems and separate SMTP servers, even though they share a connection to the Internet. Utilities and ITD should standardize on a single email system and SMTP server in order to minimize the email system administration effort. Backup - ITD currently backs-up all of the NT servers to a single tape backup device hosted on the CH_ASD_BACKUP server. This means that the remaining servers are backed-up over the network, creating a high network load. This will not create a problem as long as the backup occurs at night, however if ITD were required to backup or restore a server disk during the day it would cause the network to run much slower than normal. ITD should obtain more tape backup units and install them in servers that are currently being backed up over the network. In particular, all servers with large disk drives should be backed-up directly to tape devices resident in the servers and not over the network. Hardware and Data Center Section The Warner Group V- 14 Server Upgrade Strategy - The Information Technology Division (ITD) NT servers are regularly upgraded as the need arises and technology improves.. When more server capacity is required, the least capable server is replaced with a new machine and applications are migrated as appropriate. This is a good ~,~rategy for providing incremental server capacity without creating unnecessary disruptions to the departments. Server Capacity Planning - ITD is finding that the load on the NT servers is steadily increasing over time. This is largely due to the increased level of sophistication of the users. As the users receive more training and more network-resident services are made available to them, greater use is made of these services. To properly plan for this anticipated increased server load, a detailed assessment should be performed to determine what the expected future load would be so that the proper server capacity is made available. D.HARDWARE RECOMMENDATIONS Recommendation - The Utilities Department and ITD should standardize on the same set of hardware platforms in order to minimize the overall system administration effort. Recommendation - There should be sufficient building UPS capacity installed at the Civic Center to power at least the servers and network equipment through a 30-minute power failure. Ideally, some or all of the workstations should also be covered by building UPS. Recommendation - Building UPS at the Civic Center should be backed-up with generator power to allow the building to operate through power failures of indefinite length. Recommendation - Utilities and ITD should standardize on a single email system and SMTP server. Hardware and Data Center Section The Warner Group V- 15 Recommendation - ITD should obtain more tape backup units and install them in servers that are currently being backed up over the network to the single backup server. In particular, all servers with large disk drives should be backed-up directly to tape devices resident in the servers and not over the network. Recommendation - The Information Technology Division is finding that the load on the servers is steadily increasing over time. A detailed assessment should be performed to determine what the expected future load would be so that the proper server capacity is made available. Recommendation - The manufacturer of the fire suppression equipment needs to be identified and an assessment should be performed to determine its capabilities of meeting the City’s needs. Recommendation - The manufacturers of the water, temperature, fire, and intrusion detection systems need to be identified. An assessment should be performed to determine the capability of the equipment to meet the City’s needs. Recommendation - The City should look to minimize the number of single user primers and move increasingly toward networked printers in the ratio of 4 PCs for each printer. Hardware ~md Data Center Section The Warner Group V- 16 SECTION VI NETWORKING THE WARNER GR O UP VI- NETWORKING A. CURRENT NETWORKING ENVIRONMENT Overall Network Environment The overall City network is actually composed of two separate networks with a 10Mbps (million bits per second) connection between them (See Exhibit VI-1, "City of Palo Alto Network Diagram"). The Information Technology Division (ITD) network and the Utilities Department network can be viewed as separate networks. Each has its own wiring and network equipment infrastructure, each provides its own server services, and each has its own network and system management staff. The ITD network is far more advanced in its design and overall capacity and should be the foundation for network expansion in furore. The ITD network is built on a Cabletron MMAC-Plus Layer 2 switched backbone while the Utilities network is built on a Hewlett-Packard (HP) ProCurve Layer 2 switched backbone. Layer 2 switching is a technology that has superceded simple Ethernet network hubs and repeaters. The advantage of Layer 2 switches over hubs and repeaters is that switches provide greater bandwidth to the connected device using the same wiring infrastructure as hubs and repeaters. A single 10Mbps connection links the two networks. A port on one of the ITD Cabletron 2200 switches connects to a port on one of the Utilities HP ProCurve switches. This is a very narrow connection (only 10Mbps) and reflects the fact that the two networks are almost completely independent. Practically the only traffic that the two networks exchange is Intemet traffic. The ITD network has an Internet connection and provides Internet connectivity to the Utilities network. There are also a small number of ITD users on the Utilities network that gain access to IT services through this link. A majority of the cabling to the desktop computers and print servers at the Civic Center is Category 3 wiring. All new requests for wiring in the Civic Center as well as at all other City sites are specified to a Category 5 standard. The Categories of wiring specifies the speed and distance at which the wiring may be used. Category 3 wiring may be used at Networkang Section The Warner Group VI- 1 the same speeds as Category 5 wiring, but cannot also be used at the distances allowed by Category 5 wiring. Within the Civic Center, the distances allow high speeds using Category 3 wiring. Information Technology Division Network As we indicated,-the backbone of the Information Technology Division (ITD) network is the Cabletron MMAC-Plus Layer 2 switch. Ner~vorkin8 SectionThe Warner Group VI- 2 City of Paio Alto Network Diagram Utilities Information Technology Civic Center Servers: DEC Alpha - 2 DEC Channel WorksNovell - 4 BridgeWindows 95-1 I’ ~1Linux - 1 Single-Mode Fiber 100 Mbps Water Quality Control Plant Maintenance Service Center MSC Servers: Novell- 1 Windows NT - 3 Windows 3.1 - 1 Linux - 1 HP UNIX - 2 DOS - 1Elwood Court Electrical Engineering (VVatedGasNVastewater) 10 Mbps HP Procurve 101100 Switch Thin Wire Broadband Coax Cable (2nd Floor) 48-port Hub Workstations (48)Floor) 48-port Hub Workstations (48)(3rd Floor) 48-port Hub Workstations (48)(7th Floor) 48-port Hub Workstations (48) 10 Mbp~ Cabletron 2200 Switch (3rd Floor)100 Mbps 24-port Cabletron 2200 Switch (22) (Floors A,1 ,M,4,5,6,7) 24-port 10 Mbps Workstations (528) 100 Mbps Cabletron MMAC-Plus Switch 24-port 10-port 72-port Multi-Mode Fiber 100 Mbps Multi-Mode Fiber Converter (2rid Floor) Workstations (72) DEC Channel Works Bddge Mitchell Park Cultural Center Broadband Coax Cable Cabletron Smart Switch Router Single-Mode Fiber Converter Downtown Library 10 Mbps 100 Mbps HP Servers Cabletron Switch (Computer Room) 12-port 10 Mbps 100 Mbps (HP3000 - 2) (HP9000 - 4) (HP Workstation Firewall Hub Web Server NT Servers (10) T1 10 Mbps Gandalf Express Stack ISDN Router ISDN Fire stations (8) t ¯ Exhibit Vl-1 P,~Pa!o Atto.c~.caLS08-02 IT Master Plan\Table 1-Overall Network Diagram.vsd The Warner Grou~ The Cabletron MMAC-Plus switch is composed of three (3) sections. The left section comprises 24 100Mbps multi-mode fiber ports. Most of these ports go to Cabletron 2200 24-port Layer 2 switches. Each Cabletron 2200 has a 100Mbps multi-mode fiber uplink to the backbone switch and 24 10Mbps ports. connected to desktop computers and print servers. The Cabletron 2200’s are located in wiring closets on various floors in the Civic Center building serving ITD users. One of the Cabletron MMAC-Plus multi-mode fiber links goes to a Cabletron Smart Switch Router. This is a Layer 3 switch and performs all of the routing within the network. The Cabletron Smart Switch connects to the Internet firewall, to a single-mode fiber link to the Downtown Library, and to the broadband cable. The center section of the Cabletron MMAC-Plus switch contains ten 10/100Mbps ports with RJ-45 connectors attached to all of the HP-3000, HP-9000 and NT servers. The HP servers are connected directly to the switch at 10Mbps, while the NT servers are connected to an intermediate Cabletron switch and then to the MMAC-Plus. The intermediate switch also connects to an ISDN router to support the fire station links. The right section of the Cabletron MMAC-Plus switch contains 72 10Mbps ports with Amphenol connectors. These ports are connected to desktop computers and print servers on the second floor of the Civic Center. The Utilities Department has implemented a City-wide single-mode "dark" fiber optic network which they plan to market commercially. One of the first users of the new single-mode fiber is the Information Technology Division. ITD is using this fiber to connect from the Smart Switch Router to the Downtown Library Local Area Network (LAN). The Utilities Department is also using this fiber to connect the Elwell Court LAN to the Utilities Department network. The purpose of the new fiber optic network is to largely replace, and greatly enhance, the existing "broadband cable" capability. Some of the broadband cable is aerial and some is underground. Frequencies on the broadband cable are allocated in 6MHz bands. Each frequency band can accommodate a single T-1 (1.544 Mbps) digital circuit. By contrast, a single-mode fiber optic cable can support 100 Mbps and even 1,000 Mbps and thus has many more times the bandwidth than does broadband cable. Both the Information Technology Division and the Utilities Department are still using the Broadband Cable. The ITD section of the broadband cable is connected to the Smart Networking Section The Warner Group VI- 4 Switch Router using a DEC Channel Works Bridge. One frequency is used to connect to the Mitchell Park LAN while another frequency is used to connect to the Cultural Center LAN. The Utilities Department section of the broadband cable is connected to the Utilities HP .ProCurve switch using a DEC Channel Works Bridge. One frequency is used to connect the Water Quality Control Plant LAN while another frequency is used to connect the Utilities Operations LAN at the MSC. The Information Technology Division uses an ISDN Network) link to connect to each of the City fire stations. (Imegrated Services Digital Though ISDN is normally a dial-up technology, the stations never "hang up" the connection thus making these essentially dedicated circuits. Utilities Network The backbone of the Utilities Department network is a HP ProCurve Layer 2 switch with 10/100 Mbps capability. The Utilities ProCurve switch is connected to the Information Technology Division (ITD) backbone through a 10Mbps connection to an ITD Cabletron 2200 switch port. The Utilities Department expects to eventually connect to the ITD backbone via the Cabletron Smart Switch Router using a 100Mbps connection and the new single-mode fiber network. The Water Quality Control Plant (WQCP) is connected via the Broadband Cable. The WQCP site consists of 2 LANs connected by a switch. The 2 LANs at WQCP are called "Laboratory" and "Campus". All of the users at WQCP are ITD users. These users reach the ITD resources at the Civic Center via the Utilities Department network, then through the HP ProCurve switch to the ITD backbone. As mentioned earlier, the connection between the HP ProCurve and the ITD backbone switch is only 10Mbps. The MSC is connected via the Broadband Cable. The MSC site consists of 4 LANs connected by a switch. The 4 LANs at MSC are: Networking Section The Warner Group VI- 5 1.Animal Control 2.Public Works 3.Parks and Stores 4.Utilities Operations. This site has nine (9) servers are described in Section V - Computers and Data Center. There is a connection from MSC to Elwell Court using the Utilities Department single- mode fiber cable. Eventually, Elwell Court will be directly connected to the Civic Center backbone using the single-mode fiber network. An alternative redundant link is being planned between the Elwell Court, MSC, and the Civic Center. Information Technology IP Addressing Design The Information Technology Division (ITD) network uses the Intemet standard, TCP/IP (Transport Control Protocol/ Internet Protocol) protocol for all of its servers and workstations. Currently ITD is using static (assigned and fixed) IP addresses for each of the NT servers and desktop computers. The Information Technology Division is working on a conversion from static IP addresses to DHCP (Dynamic Host Configuration Protocol) in which IP addresses are assigned as needed. ITD is using a combination of registered and private IP addresses on its network. Most of these addresses are Class C, though ITD also uses some private Class A addresses. These fragmented address ranges create multiple subnets. Class A, B and C addresses are an Internet construct that determines how many computers can operate on a subnet. A Class C address allows 254 computers to operate while Class B and A addresses allow approximately 65,000 and 16,000,000 computers to operate respectively. Registered addresses are IP addresses that are officially obtained from InterNIC, the Internet agency responsible for allocating Internet addresses worldwide. Only registered address are allowed on the Internet. Today, only Class C registered addresses are generally available from InterNIC. Private addresses are IP addresses that are used on a private network behind a firewall and do not appear on the Internet. Private addresses are not obtained from InterNIC and they usually conflict with Networking Section The Warner Group I:I- 6 addresses issued by InterNIC. So long as they are not used on the Intemet, however, they cause no difficulty. Accordingly, any agency is free to use Class A, B or C private addresses. Internet Connection The City’s Internet connection is through the Cabletron Smart Switch Router. The Internet connection is a T-1 circuit. There is a Border Ware V5.0. Firewall between the City network and the Internet. The firewall is located on the A level of City Hall. The firewall rims on an Intel machine using a BDSI UNIXoperating system. The City runs a Web server outside the firewall. The Web server is located on the A level of City Hall. The Web server also runs on an Intel machine using a BDSI UNIX operating system. The City’s outside Domain Name System (DNS) is hosted by its Internet Service Provider (ISP). A Domain Name System server is a necessary function that must be provided by any agency, such as the City of Palo Alto, that has a registered Domain on the Internet. The Domain Name System translates the Domain Name portion of a Universal Record Locator (URL) (city.palo-alto.ca.us) to its defined IP address (a number in the format xxx-xxx-xxx-xxx). While an agency with a Domain on the Internet may host the required DNS on servers located at its own facilities, this function is more commonly provided by the ISP. Network Management System The Information Technology Division (ITD) licenses the Computer Associates (CA) Unicenter TNG suite that includes a Network Management System (NMS), however ITD is not using this product. ITD currently performs network management using a Simple Network Management Protocol (SNMP) product from Castle Rock Computing, SNMPC Network Manager Version 4.2.04. This product has minimal capabilities and therefore ITD has issued a Request for Proposal (RFP) for an improved Network Management System. Networking Section The Warner Group VI- 7 The Utilities Department Network Management System is composed of three (3) dedicated Inte! PCs running Windows 3.1. The Utilities Department uses a modified version of Castle Rock SNMP and Novell Administrator. B.YEAR 2000 COMPLIANCE The Year 2000 status of the network and network components was not considered within the scope of the information technology assessment performed for the City. C.NETWORKING ASSESSMENT Two Networks - The Information Technology Division (ITD) and Utilities Department networks are almost completely independent. Each has its own wiring and network equipment infrastructure, each maintains its own servers and server operating systems, each provides its own server services and each has its own network and system management staff. HP Server Connections - The seven (7) HP servers at the Civic Center are connected to the Cabletron MMAC-Plus switch via 10Mbps ports. The MMAC-Plus has 10/100Mbps capability so the limitation is the capacity of the HP server Network Interface Cards NT Server Connections - All of the Civic Center Information Technology Division NT servers (a total often) are connected to one Cabletron switch and the uplink of that switch is connected to a single 100Mbps port on the Cabletron MMAC-Plus backbone switch. That means that the aggregate traffic to all of the NT servers is funneled through a single 100Mbps connection. Switch Capacity - The Cabletron MMAC-Plus chassis is almost completely full; there is only one vacant slot in the chassis with room for just one more card. Network Switch Dependency - The Cabletron MMAC-Plus backbone switch is a potential single point of failure that could bring the entire network down. There is no ability to completely eliminate this single point of failure since some device has to be the network Networking Seeuon The Warner Group VI- 8 backbone, however, it is possible to reduce the possibility of failure by utilizing dual power supplies in the backbone switch chassis, providing a dedicated Uninterrupted Power Supply (UPS) for the switch, and keeping spare cards on site. Station Wiring - All of the cabling to the desktop computers and print servers at the Civic Center is Category 3 (CAT3). Since all of these devices are connected to 10Mbps switched ports, the CAT3 cabling is adequate. lnternet Connection - The City’s Internet connection is only a single T-1 circuit. This is approximately 1/8th of the bandwidth of the minimal 10 Mbps bandwidth used throughout the City’s LAN. City Web Server - The City currently operates a Web server at the Civic Center site. The City should consider placing their Web server at the ISP. In this way traffic to the Web server from the Intemet would not have to go across the City’s T-1 link. That link should be reserved for City users getting out to the Intemet. If the City were to post some popular information on their Web server and experience a high "hit" rate, the City users might not be able to access the Intemet in a timely fashion. Demilitarized Zone (DMZ) - A DMZ is a logical space that is protected from the Intemet but which is also isolated from the City’s internal Intranet. The City’s Web server is completely outside the City’s existing firewall an is thus exposed to the Internet. If the City wishes to continue to operate its Web server on the City network, it should implement a firewall that allows the construction of a Demilitarized Zone (DMZ) and place the Web server inside the DMZ. lnternet Protocol Addressing- The physical architecture of the of the Information Technology Division (ITD) TCP/IP network is essentially a very large, flat, Layer 2 switched network. Superimposed on this fiat network are dozens oflP subnets. ITD uses a combination of registered and unregistered IP addresses, and private IP addresses on their network. Most of these addresses are class C, though ITD also uses some private Networking Section The Warner Group VI- 9 class A addresses. These fragmented address ranges are the cause of the multiple IP subnets. Traffic Management - While the physical architecture of the ITD network is flat, the logical network is subnetted into many small IP subnets. In particular, desktop computers are on one set of subnets and servers are on another set of subnets. This means that packets travelling between desk-top computers and servers have to be routed. The Cabletron Smart Switch Router is configured as the default gateway for all desktop and server computers. Consequently, all packets traversing the Layer 2 backbone (Cabletron MMAC-Plus switch, Cabletron 2200 switches and others) will have to go though the Smart Switch Router. This is inefficient. One solution is to eliminate the large amount of subnetting behind the firewall by using a class B private IP address range - an address in the 172.16.0.0 through 172.31.255.255 range. This would completely flatten the network and allow complete switching at Layer 2. This has its downside, however in that large, flat networks have large broadcast domains that require significant bandwidth and are hard to manage. Another solution is careful use of subnetting that breaks up large broadcast domains. There are two methods to subnet. One is to introduce a Layer 3 switch in the center of the network and the other way is to continue switching at layer 2, but use VLANs to break up the large broadcast domains. Which alternative is best for the City would depend on the capability of its equipment. Whether the MMAC-Plus switch has VLAN capability and the Cabletron Smart Switch Router can be moved to the center of the network. D.NETWORKING RECOMMENDATIONS Recommendation - The ITD and Utilities networks should be unified under the standards established by ITD. There should be one server hardware platform (Intel), one Network Operating System (Windows NT), one Network Protocol (TCP/IP), one IP addressing scheme, and centralized network administration. Networking Section The Warner Group VI- 10 Recommendation - A priority for the Space Planning Project should be to replace the existing Category 3 wiring with Category 5 (CATS). Upgrading to Category 5 wiring will become more critical as applications (such as video) are installed that will need 100Mbps bandwidth. Recommendation - The HP servers at the Civic Center should be upgraded with 1001Vlbps Network Interface Cards (NICs) in order to achieve greater network bandwidth to the servers. Recommendation -.The Information Technology Division NT servers at the Civic Center should be connected directly to the backbone Cabletron MMAC-Plus switch in order to achieve greater network bandwidth to the servers. Recommendation - Subnet the network by introducing a Layer 3 switch in the center of the network or continue switching at .layer 2, but use VLANs to break up the large broadcast domains. Recommendation - Reduce the possibility of complete network failure by utilizing dual power supplies in the Cabletron backbone switch chassis, providing a dedicated UPS for the switch, and keeping on hand spare cards. Recommendation - The City should consider placing their Web server at the ISP rather than operating it on the City network at the Civic Center. Recommendation - If the City wishes to continue to operate its Web server on the City network, it should implement a firewall that allows the construction of a DMZ and place the Web server inside the DMZ. Recommendation - The Information Technology Division should use only private addresses on their network (behind the firewall), use DHCP to allocate these addresses, and use a proxy server at their Internet connection with registered IP addresses. Networking Section The Warner Group VI- 11 Recommendation - The City should investigate the use of City owned fiber optic cable for network connection. Recommendation - An analysis should be performed to determine if the current single circuit T-1 for Internet access is adequate for the current and anticipated user load. N~,vorkang Section The Warner Group VI- 12 SECTION VII SOFTWARE THE WARNER GR O UP VII-SOFTWARE A. CURRENT SOFTWARE ENVIRONMENT The software environment can be divided into four broad areas: operating systems, database management systems, office automation applications, and business applications. Operating Systems (OS) - Operating systems are a set of programs that manage, control, and provide security for the computer environment. Operating systems common in today’s environment include: ¯UNIX ¯Microsoft’s Windows New Technology (NT) ¯Intemational Business Machine’s Multiple Virtual Storage (MVS) ¯Digital Equipment Corporation’s Virtual Memory System (VMS) ¯Hewlett-Packard’s Multi-Programming Executive (MPE) Database Management Systems (DBMS) - A DBMS is a set of programs that control the structure for the storage and retrieval of data. Data storage techniques can be categorized ¯Fiat-file ¯Index-Sequential ¯Hierarchical ¯Relational The more modem databases on the market today are relational databases such as those offered by Oracle, Informix, Sybase, and others. Office Automation Applications (OA) - OA applications are those that perform business functions that are invariant across industries, i.e. they do not vary because of the particular industry of the organization. Typical OA applications are word processing, spreadsheets, business graphics, and electronic mail. Business Application - Those applications that are specific to an industry. For a government organization these would include Accounting, Geographic Information System (GIS), Human Resources~ayroll, Police/Fire Records Management System, etc. S~fl’w~e Section The Warner Group VII- 1 Operating Systems - Servers In traditional main computer systems, the brand (Hewlett Packard) and model (HP-3000) defined the capabilities and interoperability of the computer. That is because they specified the operating system which ran on the computer and which controlled the environment of all computer applications operating on the designated computer. This arrangement, known as proprietary operating systems, was prevalent in the computer industry through the 1980’s. Most vendors adopted the Open System philosophy in the late 1980’s and promoted UNIX as the universal, vendor independent, operating system of choice. Many vendors continue to promote their specific version of UNIX, though frequently, Windows NT has been added as an alternative operating system. Windows NT has been the emerging operating system within the last two to three years and this trend will likely continue, as the market demands. The City of Palo Alto has two HP-3000 servers that utilize the MPE proprietary operating system from Hewlett Packard. Other servers operating in the City utilize the following operating systems: Windows NT, Novell, HP/UNIX, DOS, OperdVMS, and Linux. Exhibit vii - 1 represents the various operating systems installed throughout the City. Server Operating System Number of Installations Windows NT 18 Nowll 10 HP/UNIX 8 DOS 4 Open/VMS 1 Linux 4 Total 45 Operating Systems - Desktop The City has recently standardized on Windows NT for its desktop operating system. A majority of the desktops in the City are running the Windows NT operating system on the desktop. There are several DOS applications within the Utilities Department that will not Soflw~ Section The Warner Group VII- 2 run under the NT operating system and therefore the majority of PCs in the Utilities Department are nmning under Windows ’95. The current distribution of desktop operating systems is shown in Exhibit VII - 2. Desktop Operating @stem Number of PCs Installed Windows NT 460 Windows 95 104 Windows 3.1 64 DOS 59 MAC/OS 3 Total 690 Database Management Systems (DBMS) The City has a variety of DBMS systems installed to support small and large business applications. In some instances, the selection of the DBMS was dependent upon the computer hardware upon which it was installed. This is the situation with the HP-3000 and its Image/3000 DBMS. Image/3000 is a hierarchical database and will only run on the HP-3000 computer hardware. On the other hand, other database systems installed in the City are independent of the hardware (e.g., Oracle, Informix, MS-Access, etc.). A representation of the total number of installations of database management systems throughout the City is shown in Exhibit VII - 3. Database Management Systems Number of Installations Image 2 Informix 2 Oracle 3 Access Numerous client applications Btrieve 1 GDS proprietary database 1 SQL Server 1 Total 10 Software S ~-~ion The Warner Group VII- 3 Office Automation Applications The City’s adherence to a common OA standard for word processing, spreadsheets, project scheduling and presentation software increases the compatibility and productivity of the City’s employees. City employees can easily create and share files with other City employees without the need to convert files from product to another or from one version of a product to another version of the same product. One standard also reduces the amount of effort and time that needs to be spent on the maintenance of software. Although the City has standardized on Microsoft Office, all departments have not migrated to the standard. Exhibit VII - 4 illustrates the various OA applications utilized throughout the City. ’Application Description Application Name Spreadsheets MS-Excel Lotus 123 Word Processing WordPerfect MS-Word Project Scheduling Timeline MS-project Email Client MS-Mail Internet Browser Netscape Navigator Presentations MS-PowerPoint HP-OpenDesk is the City’s standard for email, which was designed for the HP-3000 environment. It does not have many of the enterprise features of the leading industry products. The City is planning for the installation of Microsoft Exchange and Outlook for group collaboration features such as scheduling and calendaring, electronic mail, forms, and automated document routing. Major Business Applications Details of all non-office automation computer applications are listed in Appendix D. Some of the more significant applications are listed in Exhibit VII - 5 below: Sotb,v-.re Section The Warner Group VII- 4 Major Administrative Applications Function Product Vendor Accounting Interactive Fund Accounting System Bi-Tech Software, Inc. (WAS) Budget Documents Budget D~cument Publication PublishWrite Cash Receipting Cash Receipting and Revenue CORE Accounting Geographic Information Geographic Information System (GIS)GDSC Human Resources and Payroll Human Resources and Payroll Lawson Legislative History Legislative History In-house Optical Imaging System Optical Image Scanning, Indexing,CDB Info Tek and Retrieval Revenue Collection Revenue Collection System In negotiations Customer Reporting System Customer Reporting System Integrated Information Solutions (IIS) Major Police and Fire Applications Function Product Vendor Animal Control Animal Control (BARKS)In-house Citywide Telephone Management Call Accounting System Fire Hazardous Materials Hazardous Materials Inventory and In-houseReporting Fire Incident Reporting Fire Incident Tracking System (FIRE)In-house Police Records Management Police Operations Support System Public Safety Systems, Inc. Elementary (POSSE)(PSSI) being implemented Police Records Management Vision Technology Records Public Safety Systems, Inc. Management System (VT PRISM)(PSSI) being implemented Major Community Service and Public Works Applications Function Product Vendor Facility and Activity Class, Activity, and Facility ESCOM Registration Reservation System (CLASS) Fleet Management Equipment Management System Prototype Infrastructure Management Lifecycle information for City structures Library Automation Library Public Access (DYNIX)Ameritech Library Services Pavement Management Public Works Pavement Management In-house System Permit Tracking Building Inspection and Permit In-house System Tree Inventory and Tree Inventory and Management In-house Management System Software Se~--5on The Warner Group VII- 5 Major Utilities Applications Function Product Vendor Elecl~ic Load Research Electric Consumption Monitoring ~i’iity Translation Systems (MV-90)inc. Electric SCADA Control and Monitoring Electric Advanced Control Systems, Distribution Inc. Fiber Network Management Manage Installation of Fiber Anixter, Inc Communications Infrastructure Meter Inventory Meter (electric, gas, and water)In-house Inventory Sewer Information Sewer Information Management ....... Management System (SIMMS) Traffic Signal Monitoring Monitor and Synchronize Traffic System Signal System Utility information & Billing Customer Information System (CIS) SCT Water-Gas-Storm SCADA Control and’Monitoring Water, Gas, Intellution FIX and Storm Drain System (intellution FIX) B.SOFTWA~ ASSESSMENT Assessment of Office Automation Software Word Processing, Spreadsheets, and Presentation Graphics - There are several versions of Microsoft Office currently in use in the City. The adherence to a common OA standard increases the compatibility and productivity of the City’s employees. One standard also reduces the amount of effort and money spent on maintenance of the software. The City has made a good choice standardizing on the Microsoft Office Suite. Electronic Mail - The City has been principally using HP-OpenDesk as its email server software and MS-mail as its email client software. The City has been evaluating alternative electronic mail systems available on the market and has established a standard. At this time, the City has determined that Microsoft Exchange would meet its needs as an email server software to replace OpenDesk and the City is planning to utilize MS-Outlook as its email client software. lnternet Browser - The City has standardized on Netscape Navigator as its Intemet browser of choice. Netscape Navigator is considered to be one of the industry leaders in this area of technology and a strong competitor for Microsoft’s Internet Explorer product. Software Section The Warner Group VII- 6 Web Page - City is currently using Apaqhe as its Web Page application development tool. Apache is widely used in the industry for Web Page development and is considered a commercial grade tool. The Apache Group, a group of volunteers that communicate over the Intemet and coordinate the changes to the source code, provide the software free of charge. Assessment of Major Internal Support Applications Accounting System -The City’s financial information system was licensed from Bi-Tech Software, Inc. in 1987. The system was installed on a HP-9000 computer, utilizing the UNIX operating system and an Informix DBMS. The system is written in COBOL (Common Business Oriented Language) and Triad (a proprietary fourth generation language developed by Bi-Tech) and is accessed through a character-mode interface. The City is evaluating Bi-Tech products that allow access to the financial information through a graphical user interface (GUI) and the Internet. The proprietary report writing tool "Click, Drag, and Drill" (CDD) is currently being implemented to allow departments to develop custom reports. This application has been renovated for the Year 2000. Integration of new and emerging technologies has not occurred very rapidly with the current accounting system. This is particularly evident in the areas of database management systems, web-enabled applications and industry standard report writing capabilities. Although the accounting system uses Informix, a relational database management system, this is not considered an industry leader and has been losing market share over the last couple of years. The financial system has not been web-enabled and as such does not allow for the entry of information over the Internet or a City Intranet. A proprietary product (IFAS Net) was recently released by the vendor to allow for the selection and posting of reports on the Intranet. The City is currently in the process of planning the implementation of is product. Sofi’~v~e Sec~on The Warner Group VI1- 7 Human Resources/Payroll System - The City’s Human Resources/Payroll System (the Lawson Systems) was purchased approximately four ago. The system is installed on a HP-9000 computer, utilizing the UNIX operating system and an Informix database. The system is written in COBOL and utilizes a proprietary report writing tool for customized reports. At this time, all of the modules in the Human Resources!Payroll System have not been fully implemented (e.g., applicant tracking benefits administration, employee relations, employment contracts, employee history, etc.). Although the Lawson System has a timekeeping module, the City has decided to forego implementing this module and to develop a custom application. The Human Resources!Payroll system is separate from the accounting system and requires an interface of bi-weekly payroll information to update the general ledger and the labor distribution. This system has been renovated for the Year 2000. Legislative History - The Legislative History application tracks the full history of City Council legislative actions (e.g., documents associated with an action, cross-referenced to minutes, actions taken, and other information). This application was developed by the Information Technology Division (ITD) and maintains approximately ten years of historical data. This system is not Year 2000 compliant and needs to be renovated. Geographic Information System -GIS is an enabling foundation technology, much like electronic mail. GIS is most useful when it is implemented Citywide and becomes a sort of utility to the conduct of business. GIS, however, is different than most computer applications in a number of respects: ¯It requires standardization of data across many systems and departments ¯It involves the integration of graphical geographic information and database information (attributes) uniting two different automation disciplines ¯It should depend upon operational data stored and maintained in many other systems Accordingly, a GIS system needs to be built upon other, prior automation systems and not developed in a vacuum relative to other City automation efforts. Some of the automation that should precede the development of GIS includes: ¯A central database of address information - This database should include standard address names, valid address ranges, valid address number, direction, name, suffix Soft’~v~e S~-’don The Warner Group VII- 8 combinations, and authorized addresses combinations. This central database of addresses should be integrated into each City application such that only addresses residing in the address database can be entered into any City business application. This will enable GIS (and generic report writers) to cross reference address related information in different City systems. The lack of such a database and suck integration with City business applications is a major source of difficulty and cost in the development of GIS systems. Automated Work Order systems for each City maintained infrastructure - City infrastructure includes water, sewer, storm drain, street lighting, signs and striping, tree maintenance, park maintenance, building maintenance, and others. Much of the information which is needed for infrastructure automated mapping, is information which is a product of the maintenance of the infrastructure. This information involves such items as what part was installed, its size/capacity/composition, where it was installed, when it was installed, what it cost to install it, and who installed it. All too often, as is largely the case in the City of Palo Alto, this information is kept manually. There are Commercial Off The Shelf (COTS) software packages for nearly all municipal infrastructure work order processes, including systems from CassWorks, Maximo, and Hansen. Both of these vendors provide automated interfaces to GIS systems. The Graphic Design Systems Corporation (GDSC) Geographical Information System has been operated in the City since 1989. A comprehensive set of data is available in the current GIS that include information regarding water, gas, sewer, and electric systems. With the evolution of technology, many enhancements have been made to the system to increase its functionality for the City. In 1997, the vendor announced its decision to discontinue its investment in research and development in the current application. The City will however continue to receive support, system maintenance, bug fixes, operating system, and database upgrades for a minimum of three years. A strategy has been developed by the City to reduce its dependence on GDS. The element to this strategy was to move away from the proprietary GDS spatial data file format to the use of a relational database management system for spatial data. The City selected the Oracle Spatial Cartridge Option as the standard database for the GIS spatial information. Currently, the City is replicating its spatial data in the GDS to the Oracle Spatial Cartridge Option with plans to eliminate the need to replicate data with industry standard applications. Sol%rare Section The Warner Group VII- 9 GIS Issues: Map Area and Accuracy- The current City map for the GIS system encompasses the area within the City limits. Police and Fire Departments have a requirement for maps for the surrounding jurisdictions. The Fire Department responds to calls on the Stanford University campus and needs information related to this jurisdiction. The City has evaluated other alternatives for acquiring this information. There is little confidence in the accuracy and reliability of the data maintained by the County or that could be obtained by commercial packages. The original aerial photography was captured in 1983. There is a need to update this information and to provide color photographs. Application Support after Year 2000 - GDS will no longer provide upgrades and fixes to the application after January 1, 2000. Helpdesk support from GDS will end on April 2000. Report Writing - Microsoft Access databases are created as a mirror of the Oracle database and are used to store GIS information for specific department applications. The Access database is then used to report information from GIS. This configuration allows the distribution of GIS information to multiple users in the City. The data could be manipulated using standard Windows products with limited cost to the City for software and training. Data Standardization - There are several data standards issues to be considered since GIS should depend upon operational business applications such as Work Order processes, permits processes, inspection processes, police and fire incidents and similar geographically related City processes. Accordingly, not only is address standardization required, but many others standards needed such as place names, street segment designations (for pavement, lighting, and utilities), and others. These standards are needed in the business application that automates those City processes. That is not always possible but the creation of a standard Data Warehouse can assist the process. Data Maintenance - As with data acquisition and input, data maintenance issues will be resolved when most of the information feeding GIS is derived from operational systems in which the input of data is an integral part of doing maintenance work. This is a key factor in the successful and cost-effective implementation of GIS systems. ¯Prioritization of Applications - GIS is a technology that unites graphical representations with traditional database information. It is not, of itself, a business Soft.re Section The Warner Group VII- 10 application. Accordingly, it is important to establish what the application of GIS will encompass and what will be the priority of its development. ¯Year 2000 Compliance - The system has been renovated to meet the Year 2000 compliance standards. Document Imaging System - The City installed a Document Imaging System by CDB Infotek in 1992 to support the needs Of the Police, Planning, and Building Departments. In the Police Department, information related to police reports is scanned and indexed on optical disks. The CDB Infotek is installed on the HP-9000 and the vendor provides support and upgrades for the software. The application running in the City is the character-based version, however, a newer version that runs under Windows ’95 is being tested by the Police Department for implementation. This application has been renovated to meet Year 2000 compliance standards. At the present time, only three City deparmaents are utilizing the document imaging application, but the need to implement such an application City-wide was identified by other departments (e.g., City Clerk, City Attorney, Fire Department, Human Resources, etc.). There is a need to standardize on one document imaging system that would be used by all departments throughout the City. Assessment of the City’s Web Site The City has a well-designed, first generation, traditional municipal Web site. Municipal Web sites are rapidly moving in the direction of direct database linkage to City records and provide much more detailed information on City processes and procedures. Internet transactions, though identified in each of the various business applications as planned enhancements, have not been done. There are essentially three types of Internet transactions: ¯Requests for information or forms and applications ¯Transactions requiring confirmed identification of customer ¯Transactions involving the exchange of money Softw~e So.ion The Warner Group VII- 11 Few cities have implemented the fn’st type of transactions and few, if any have implemented the second or third types of transaction. Still, this remains the great potential for better service delivery and is currently being pursued intently by cities in the Silicon Valley. Assessment of Major Police and Fire Business Applications Computer Aided Dispatch (CAD) - The Police and Fire Departments are not currently using an automated application to dispatch services throughout the City. This is currently being accomplished through the maintenance of manual address and manual "run" cards. The two departments have recently selected the Public Safety Systems, Inc. (PSSI) CAD system and are in the process of negotiating a contract for the City. This application is available on the NT platform and includes a Records Management module. The PSSI application runs on the NT platform but, at present, has few installed clients. To eliminate the risk of a new operating system, the City has elected to install the CAD system on the HP-3000. Police Records Management System -The Police Department is currently using the Vision Technology (VT) Prism Records Management System (KMS) that was implemented in 1987. All modules of the application were not originally implemented and the Police Department used their old RMS (e.g., POSSE) to supplement the lack of functionality and to provide access to historical data. In 1993, all modules of the VT Prism application were implemented and use of the POSSE system was discontinued. Support for the application is not provided by an outside vendor but by the systems management personnel within the Police Department. The POSSE system is not Year 2000 compliant and is scheduled to be replaced with PSSI in 1999. Many of the currently mandated reporting features and functions do not exist in the current RMS and plans have been developed to replace the current system with the PSSI Records Management System in FY 1998 - 99. The CAD and RMS systems will be funded by Capital Improvement Project (CIP) funds. Software Section The Warner Group VII- 12 Fire Records Management System - The Fire Department is currently maintaining information on an assortment of manual and stand-None PC applications. The Fire Department lacks an integrated system to manage its activities. The Department is currently evaluating RMS applications to be implemented on an NT platform. The Sunpro RMS application has been given serious consideration and has been found suitable to Palo Alto’s specific needs. These needs include tracking of employee training and certification, and paramedic transportation and billing. Assessment of MajorCommunity Services Business Applications Library System -The Library maintains six branches located throughout the City. The Library’s CUlTent system is the Dynix product provided by AmeriTech. The AmeriTech System is written in PICK Basic and is running on the HP-9000, utilizing a UNIX operating system (HP-UX). Access to the system is performed through emulation software running on Wyse terminals. These terminals are connected throughout the City by coaxial cable. Library staff has access to approximately 100 terminalsiPCs and 34 terminals are available for public use. Public access to the catalog is provided to patrons through a telnet session to the HP-9000. A new release of the Dynix application will be available to allow for access to the catalog over the Internet using a browser and a graphical user interface (GUI) for internal Library use. This system has been renovated to meet the Year 2000 compliance standards. The Dynix application is not written in an industry standard language (e.g., PICK Basic) and the vendor has not indicated that a version will be available in the near future. The Library has engaged a consulting firm, Joseph Ford and Associates, Inc., to develop a strategic plan for the direction of technology in the Library for the next two to three years. Class, Activity, and Facility Registration System -The Class, Activity, and Facility Registration System (CLASS) supports approximately 15 users and is running on an NT Software Section The Warner Group VII- 13 server under an Oracle database. The application has a graphical user interface and is considered by the Community Services Department a~, meeting their needs for registration functions. A future capability required by the department will be a web enabled application that will provide the ability for residents to schedule classes and reserve facilities over the Interact. The CLASS system has been renovated to meet Year 2000 compliance standards. Permit Tracking System -Building inspection and permit tracking is accomplished through the Building Information and Processing System (BIPS), installed in 1978. This application runs on the HP-3000 and is based on old technology that lacks many of the modem capabilities of newer permit systems. Many functions provided in a modem permit system are accomplished manually throughout the City (e,g., plan checking, fire and building inspections, code enforcement, fee calculations, etc.). The City is in the process of selecting a new permit system to replace the existing application. The BIPS is not Year 2000 compliant and is scheduled to be replaced with OpenData Systems in 1999. In an effort to streamline the permit process a pilot project to accept online plan submission and checking is being conducted with three companies. These companies are allowed to transmit these documents electronically (using FTP Protocol) to be reviewed and ’redlined’ by City staff. FTP does not allow the kind of security that will be necessary to accomplish this on a wide scale. Similar functionality with appropriate security, however, will need to be available in the system selected by the City to replace the existing system. Software SectionThe Warner Group VII- 14 Assessment of Major Public Works Business Applications Work Order Management System - The City of Palo Alto has considerable investment in infrastructure such as City roads, signs and striping, street lights, curbs and gutters, street- trees, park grounds, and City buildings. All of these assets must be maintained in order to protect their value and usefulness. The total investment in traditional infrastructure would be difficult to calculate but would undoubtedly be very substantial. Much of the record keeping of the maintenance of these assets, however, is currently kept manually or is kept in stand-alone applications. Information maintained in manual and stand-alone systems is generally inaccessible for analysis and projections of optimal maintenance strategies. Without automated analysis, maintenance efforts tend to be compliant-driven, which is not only minimally responsive to the needs of the community strategy, but is also often not the optimum maintenance schedule. This can translate into greater cost of maintenance, which at the values of the assets involved, are costs that could immediately pay for the cost of comprehensive automated work order systems. In addition, manual and isolated work order systems make the information about each infrastructure difficult to integrate with information about related infrastructures. Further, it makes it difficult to make this information, in total, available to the City’s GIS system. The results are systems that are difficult and very expensive to maintain. The Public Works Department is currently utilizing a number of applications that have no consistent operating system, DBMS, or hardware platform. Each system is basically stand-alone and requires some degree of data manipulation to be used by other systems in the City. The Infrastructure Management System is not Year 2000 compliant. The other Public Works applications are Year 2000 compliant. Fleet Management System - The City has a fleet of approximately 550 vehicles located at the Municipal Service Center. The Equipment Management Division is currently managing these vehicles using the Prototype Equipment Management System (EMS) running on a Novell server located in the depamnent. The application is not the most So~,~"= S,~io n The Warner Group VII- 15 current version available from the vendor. Plans are currently underway to replace the application with the latest version, Fleet AnyWhere. The newer application will allow the department to produce reports using Microsoft Access. The EMS system is not Year 2000 compliant. There are also approximately five (5) to six (6) fueling stations that are used by City employees requiring fuel for vehicles. The consumption information is downloaded into the fleet system for reporting. The Fleet Data Systems is currently providing fueling consumption and authorization information. This system lacks adequate integration with the Prototype fleet management system. Consumption information downloaded into the fleet system is often inaccurate. Assessment of Major Utilities Business Applications Utilities Management Information System - The Customer Utility Billing Information System (CUBIS) was installed in 1978 on the HP-3000 equipment. The system is based on an obsolete operating system and has been targeted for replacement. Selection of the Barmer Customer Information System (CIS), provided by SCT, has been completed and the project is currently underway for implementation during 1999. This application will provide the major stakeholders (e.g., Administrative Services Division, Public Works, and Utilities) with invaluable information to manage the utilities resource. The system will provide consolidated and online billing, work_flow, and meter information to other electric service providers. The CUBIS system is not Year 2000 compliant and is scheduled to be replaced in 1999. Utilities Job Cost System - The Utilities Department has a requirement for a robust job/cost accounting application to improve the methods for tracking and reporting construction, operation, and maintenance expenditures. Currently this information is tracked in a number of independent databases and is not integrated with the City’s fmance, payroll, and budgeting systems. Software Section The Warner Group VII- 16 C.RECOMMENDATIONS Recommendations on Operating Systems - Servers Recommendation - The City needs to reduce the total number of server operating systems to NT and UNIX. When replacing the existing business applications consideration should be given to those vendors that can provide products in accordance with the City standards. Recommendations on Operating Systems - Desktops Recommendation - The City needs to reduce the total number of desk-top operating systems installed at the various locations. The City has standardized on Windows NT at the desktop and every effort should be made to replace the operating systems that do not adhere to the City standard. Recommendations on DBMS Recommendation - A variety of DBMS systems are installed to support small and large business applications. The City should standardize on the Oracle or SQL Server DBMS for the business applications and Microsoft Access for department specific applications. Recommendations on Office Automation Applications Recommendation - Although the City has adopted a standard suite of office automation products many departments have not migrated to the new standard. Every effort should be made to assist departments in this migration. Recommendation - The City needs to migrate to the email standard of Microsoft Exchange running on the server and MS Outlook running on the client workstation. Recommendation - The City has standardized on Netscape Navigator as its Intemet browser and should continue to use this product. Consideration could be given to Microsoft Explorer in those instances dictated by the business application. Soil,rare Section The Warner Group VII- 17 Recommendations on Major Administrative Business Applications Accounting System - Recommendation - The City should replace the existing Bi-Tech accounting system with a new system based on modern client/server technology. A selection of a new system should ensure other City departments would have the ability to generate ad hoc reports and is web enabled. Additional functionality would include an inventory module, contract management, purchase requisitions, etc. Payroll/Human Resources - Recommendation - As the City evaluates altematives for a new accounting system consideration should be given to replacing the Lawson Payroll/Human Resource System with an integrated solution. The new system ideally would integrate with the City’s accounting system for information related to the chart of accounts, project/cost accounting, accounts payable, and accounts receivable. A new payrolL/human resources system would have an integrated time collection system that would meet the needs of all City departments. Legislative History- Recommendation - The current Legislative History System needs to be renovated to meet the Year 2000 compliance standards. Once this has been accomplished, an assessment needs to be performed to identify the criteria for a replacement application from the vendor community (i.e. ISYS - Odyssey Development, Inc.) GIS- Recommendation - The City map for the GIS system needs to be updated to include the surrounding jurisdictions and color photographs. Recommendation - A data warehouse needs to be developed to information derived from other business applications (i.e. work inspections, police and fire incidents, etc.). standardize the order, permits, Software Section The Warner Group VII- 18 Recommendation - The City needs to establish what the GIS application will encompass and what will be the priority of it development. A strategic plan needs to be developed to prioritize the integration and deployment of GIS information. Imaging System - Recommendation - There are a number of offices in the City that must retain important documents and have a need to retrieve them and share them among workgroups across departments. Most of these documents are currently kept on paper in file folders, where they can be lost and mis-filed. The City needs to standardize on a single document imaging system that would ideally be available to all City departments (e.g., City Attorney, Police, Fire, Utilities, etc.). City’s Web Site - Recommendation - Municipal web sites are rapidly moving in the direction of direct database linkage to City records and provide much more detailed information on City processes and procedures. The City needs to identify Internet transactions as a priority with new and existing business applications. This type of business transaction has a great deal of potential for better service delivery and should be pursued intently. Utilities Job Cost Accounting System Recommendation - The Utilities Department has a need to improve the methods for tracking and reporting construction, operation, and maintenance expenditures in the Electric, Gas, Water, and Wastewater Funds. This system will enable staff to monitor projects more efficiently to determine full cost recovery. The Job Cost system needs to be evaluated as a part of an overall cost accounting solution for the City since this application will require integration with the finance, payroll, and budgeting systems. Software Section The Warner Group VII- 19 Recommendations for Major Police and Fire Business Applications Computer Aided Dispatch (CAD) - Recommendation - The Police Department is currently negotiating a contract with Public Safety Systems, Inc. &SSI) for the installation of a CAD system. Although the product is available of the NT operating system there are few installed clients. The City should install on the HP-3000 to eliminate the risk of nmning the software under a new operating system with the plan to migrate within a specific timeframe. Police Records Management System (RMS) - Recommendation -The Police Department is currently negotiating a contract with Public Safety Systems, Inc. (PSSI) for the installation of new RMS. The installation is planned to occur in the 1998 - 99 fiscal year. The current RMS is not Year 2000 compliant and there is no contingency plan in the event the new system is not operational in advance of the current system event horizon. A priority needs to be given to resolving the Year 2000 issues with the current system as a contingency plan. Fire Records Management System (RMS) - Recommendation - The Fire Department is currently evaluating a Fire RMS to provide the ability to track employee training and certification, and paramedic transportation and billing information. There needs to be an emphasis on the integration with the CAD system. Fire Rostering - Recommendation - The Fire Department has been evaluating the Principle Decision System International (PDSI) Fire Rostering System. This system would assist the Fire Department in the scheduling staff to provide support 24 hours a day, seven days a week. There is an interface with the Payroll system that should be planned to eliminate the duplication of time collection data entry. Software Section The Warner Group VII- 20 Recommendations for Major Community Services Business Applications Library System - Recommendation - The enhancements made by the library vendor will allow the City to provide Intemet and graphical capabilities to the patrons. This will allow the City additional time to evaluate the progress of the vendor in developing a client/server application. The City should closely monitor the progress of the vendor over the next year and establish a timeframe for the assessment of a new system. Class, Activity, and Facility Registration System (CLASS) - Recommendation - The City needs to pursue the web enabled version of the CLASS software to allow residents to schedule classes and reserve facilities over the Interact. Permit Tracking System - Recommendation - A Permit Tracking System needs to be installed to bring together the permits generated by Planning, Building, Fire, Public Works, and other entities in the City. Since the current system is not Year 2000 compliant, consideration should be given to a contingency plan in the event an application cannot be selected and installed prior to the event horizons for the current application. Recommendation - A centralized address database needs to be developed and maintained within the Permit Tracking System. The centralized database should be integrated into each business application to ensure standardization throughout the City. This level of integration will allow for accurate reporting of information for GIS. Recommendations for Major Public Works Business Applications Work Order Management System - Recommendation - An application needs to be selected and implemented to automate the City infrastructure including water, sewer, storm drain, street lighting, signs and striping, tree maintenance, park maintenance, building maintenance, and others. Integration with the GIS, accounting, and payroll needs to be given a priority with the system that is purchased. The current Infrastructure Management System is not Year Software Section The Warner Group VII- 21 2000 compliant and an immediate replacement needs to be identified. In the event a system cannot be selected and implemented prior to the event horizons of the current system a contingency plan should be developed. Fleet Management System - Recommendation - The City should continue to pursue the upgrade of the current Fleet Management System with the newer version. Recommendation - The City should begin the evaluation of alternative fuel systems to interface into the Fleet Management System. A priority should be given to selecting a vendor with the ability to integration to the Prototype Fleet AnyWhere application. Recommendations for Major Utilities Business Applications Utilities Management Information System - Recommendation - The City is in the process of implementing the Banner Customer Information System (CIS) to replace the Utility Billing System. The application is planned for implementation in the 1999 calendar year. The current Utility Billing System (CUBIS) is not Year 2000 compliant. The City needs to establish a date to renovate the current system to make it Year 2000 compliant. In the event the new application does not meet its target implementation date the City would still be capability of producing utility bills. SO f~ware Se~’fion The Warner Group VII- 22 SECTION VIII OR GANIZA TION AND STAFFING THE WARNER GROUP VIII- OR GANIZA TION AND STAFFING This section provides a broad assessment of the City’s organizational structure, business .processes, and staffmg issues related to its Information Technology (IT) functions. First, the City’s current organization and staffing environment is described. Second, an assessment of the City’s IT organization and staffing is provided, including a general discussion of relevant organizational issues and alternative approaches. Finally, specific recommendations and oppommities for improvement are presented. A.CURRENT OR GANIZA TION AND STAFFING Information Technology Services Division Central IT support is provided by the City’s Information Technology Services Division (ITD). The Division is part of the Administrative Services Department (ASD), and the Manager of Information Technology reports to the ASD Director. ITD provides services in the areas of planning, project management, application support, PC technical support, network operations, and telecommunications operations. Exhibit VIII-1 depicts the current ITD organizational structure. There are currently 22 approved staff positions within ITD. Two of these positions are currently vacant. A new management position, Manager of Communications and PCs, has been approved but remains unfilled. The former Supervisor of Data Processing Systems position (now a Systems Analyst II position) is vacant. As a result of these vacancies, the IT Manager has eight direct reports; when these positions are filled, in accordance with Exhibit VIII-1 there will be only five direct reports. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 1 Three ITD positions are filled by contract employees: the Administrative Assistant, one Systems Analyst, and one PC Technician. These contract positions represent nearly three full-time equivalent (FTE) positions. ITD is currently organized into the following four main groups, which report to the IT Manager: Computer Applications - The Computer Applications group consists of Systems Analysts who primarily support business applications used in City departments. With the exception of one General Projects Systems Analyst, the Systems Analysts specialize in particular applications and/or departments. The Systems Analyst supporting the Utilities Customer Information System (CIS) is a contract employee. An additional Systems Analyst position for Police Systems was recommended in the July 1997 IT Services Evaluation Study. Help Desk - The Help Desk currently comprises only one position. The Help Desk Programmer/Analyst answers telephone calls from end-users and provides a first-line of technical support, referring problems to technicians or Systems Analysts when necessary. Computer Operations - The Computer Operations group operates and maintains seven HP minicomputers that reside in the Civic Center, divided between HP MPE and HP UNIX operating systems. The lead position for this group, a Systems Analyst position specializing in UNIX systems administration, is vacant. Communication and PCs - The Communications and PCs group includes several functions: technical support for PCs, NT ~systems administration, network engineering and support, and communications support (including telephone). The Manager position for the group is currently vacant. One PC Technician specializes in supporting the Police Department; the remaining PC Technicians are generalists. A contract employee fills one PC Technician position. An additional PC Technician position specializing in Office Automation applications (word processing, spreadsheets, business graphics, etc.) was recommended in the July 1997 IT Services Evaluation Study. The NT Systems Administrator/Systems Analyst position is currently not budgeted; it was filled using funding for the UNIX Systems Administrator/Systems Analyst position in the Computer Operations group. 508-02 IT Strategic Plan - Draft 6 The !garner Group Fill- 2 "6 I I I I Ex_,== Departmental IT Functions A wide variety of systems support and planning activities occur outside of the Information Technology Services Division. These activities are officially performed by a combination of IT Business Analysts and other department staff whose job responsibilities are partially or entirely IT-oriented. The City has a total of 8.5 Full-time Equivalent (FTE) IT staff, including Business Analysts, reporting outside of ITD. In addition, some departments have other staff who also perform technical functions on an informal basis in addition to their regular job responsibilities. Key formal and informal IT positions in City departments are summarized in Exhibit VIII-2, below. 508-02 1T Strate~c Plan - Draft 6 The Warner Group VIII- 4 Department!Division UTILITIES DEPARTMENT Administrative Services Division, Utilities Information Systems Manager Systems Analyst Systems Administrator PC Technician CIS Business Analyst GIS Business Analyst SUBTOTAL F. T.E. COMMUNITY SERVICES DEPARTMENT Palo Alto City Library System Administrator Main Library Manager provides workstation support Proposed: IT Manager and System Administrator/Support Coordinator SUBTOTAL F. T.E. PUBLIC WORKS DEPARTMENT Equipment Management Division Fleet Manager performs variety of IT functions SUBTOTAL F. T.E. Regional Water Quality Control Plant Assistant Manager of Operations performs variety of IT functions SUBTOTAL F.T.E. POLICE DEPARTMENT Business Analyst PC Technician (contract 0.5 FTE) SUBTOTAL F. T.E. HUMAN RESOURCES DEPARTMENT Business Analyst SUBTOTAL F. T.E. TOTAL F.T.E. 1.0 1.0 1.0 1.0 1.0 1.0 6.0 0.5 0.5 0 0 1.0 1.0 1.0 1.0 8.5 Exhibit VIII-2 508432 IT Strategic Plan - Draft 6 The Warner Group VIII- 5 The Utilities Department has by far the largest number of IT staff outside of ITD. These staff provide planning and support for seventeen (17) servers running a wide’variety of operating systems. Utilities staff also support a large number of PCs and applications and maintain a substantial portion of the City’s network. Other departments have minimal IT staff. The remaining positions and functions include the following: City Library - The City Library has a half-time Systems Administrator, and the Main Library Manager provides some workstation support on an informal basis. The draft Library Strategic Plan proposes two additional IT positions: an IT Manager and a Systems Administrator/Support Coordinator. Public Works - The Public Works Department has no formal IT staff. In the Equipment Management Division, the Fleet Manager supports a variety of applications. In the Regional Water Quality Control Plant, the Assistant Manager of Operations performs miscellaneous IT support functions. Police Department - The Police Department has one Business Analyst who provides planning and support for a variety of business applications. The Department also currently employs a contract PC Technician at approximately 0.5 F.T.E. The Department has requested fimding for this position to be extended to full-time in its current budget proposal. ¯Human Resources - The Human Resources Department has one Business Analyst to identify and support the Department’s business needs. IT Committees Several City committees have been formed to provide advice and promote communication on technology issues. These committees are described below. Executive Staff - The Executive Staff, formerly known as the Senior Management Group (SMG), includes the eight department heads, the Assistant City Manager and its chair, the City Manager. The Executive Staff sets overall policy goals for City IT. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 6 Technology Advisory Board - The Technology Advisory Board (TAB) is composed of approximately 14 department heads and other high-level managers. The IT Manager is the chair. TAB’s stated purpose is to identify departmental needs a~d, based upon these needs, recommend strategic technology priorities for the City. Technology Advisory Group - The Technology Advisory Group (TAG) includes approximately 16 people--managers, technical staff, and end users--from throughout the City. The chair is the IT Technical Support Manager. TAG is designed to establish technology-related standards and goals for the City.TAG’s recommendations focus on PC hardware and office automation sof~vare. Web Task Force - The Web Task Force is a large, diverse group including over 20 technical and non-technical staff from different levels in many departments. The City’s Internet Coordinator, who reports to ITD, chairs the Task Force. The Task Force provides input from the department and user perspective on issues related to both the Interact and the City’s intranet, focusing on strategy (i.e., the Internet Master Plan), content, and policies and procedures. GIS Technical Advisory Committee - The GIS Technical Advisory Committee (TAC) is comprised of 10 managers and staff from ITD, Public Works, Utilities, Fire, Police, and Planning. The City’s GIS Coordinator is the committee chair. TAC provides advice on all aspects of the City’s Geographic Information System (GIS), which is being expanded and updated to become a true enterprise system serving users in all departments. Permit Streamlining Task Force - The Permit Streamlining Task Force develops strategy and goals related to the implementation of a new Permit Tracking system. The chair is the Assistant City Manager. The Task Force includes representatives from ITD, Building, Planning, and Fire. The Economic Resources Planner from the City Manager’s Office also participates, and an employee from a large Palo Alto- based corporation provides a user perspective. Strategic Planning Functions Currently in the City of Palo Alto, IT strategic planning is performed to varying degrees by the ITD Manager, the Utilities Information Systems Manager, various members of the IT advisory bodies, and the Director of the Administrative Services Department. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIH- 7 Outsourced IT Functions At the time of the April 1997 IT Services Evaluation Study, the City had approximately 57 hardware and software maintenance contracts with third-party vendors. At that time, the City purchased PCs from various suppliers on a low-bid basis and contracted with- Hewlett-Packard (HP) and other vendors for installation and maintenance. Since July 1997, the City has contracted with a single third-party vendor, Inacom, to provide installation and maintenance of the City’s PCs (which are manufactured by HP). Inacom uses a City-supplied "gold disk" to install standard City software applications. Incacom provides a telephone number for limited 24-hour technical support. The City continues to maintain a large number of software maintenance contracts for most of its business applications and hardware maintenance contracts for servers, disk arrays, etc. B.ASSESSMENT OF OR GANIZA TION AND STAFFING This subsection begins with a general discussion of IT organizational issues and alternative approaches. Based upon this conceptual framework, the City’s IT organizational structure, business processes, and staffing issues are assessed and suggestions for improvements are described. Specific recommendations are summarized in the following subsection. Distribution of lT Staff and Functions In considering the distribution of IT staff and functions within an organization, a key question is: "What is the appropriate allocation of IT functions among the executives, central IT, departments, and third-party vendors, factoring in the disparate sizes and needs of the departments?" 508-02 IT Strategic Plan - Draft 6 The Warner Group A reasonable answer can be derived from the establishment of some criteria for determining this allocation. Criteria For Outsourcing IT Functions - IT functions that may be outsourced to third- party vendors include functions that: ¯Axe well-defined, repetitive and easily measured ¯Require skills readily available in the market ¯Require one-time, specialized skills ¯Axe "remote from" the industry-specific business of the organization. Criteria for Retaining IT Functions In-House - IT functions that should be retained in- house include fi.mctions that: ¯Set strategic direction for IT ¯Set IT Use policies ¯Set IT Standards ¯Perform Contract Administration on outsourced IT functions ¯Axe "close to" the industry-specific business of the organization. Criteria for Allocating IT Functions to Departments - IT functions that should be performed by individual departments rather than central IT include functions that: ¯Require knowledge of the industry-specific business process of the department ¯Require relatively low level of expertise and high level of service timeliness ¯Require knowledge of the specific roles and responsibilities of department personnel. Criteria for Assigning 1T Functions to Executives - IT functions that should be performed by executives include functions that: ¯Set strategic direction ¯Establish organization-wide policy ¯Provide oversight on major initiatives. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 9 Based upon these criteria, we can make fundamental recommendations for the City of Palo Alto regarding the allocation of IT functions: IT Functions To Be Outsourced- The City of Palo Alto should outsc~,.rce the following functions Some needs assessment, selection, contract negotiation, and project management, especially for projects that are non-routine, large, complex, or would benefit from an independent perspective. ¯All business application development, except requirements definition, contract administration, acceptance testing, operation, and diagnostics. ¯Some network administration functions such as network design and re-design, some network diagnostics, and network installation and implementation. ¯All operating systems and utilities functions, except requirements definition, contract administration, acceptance testing, operation, and diagnostics. ¯All voice and data communications functions, except requirements definition, contract administration, acceptance testing, oper.ation, and diagnostics. ¯All hardware administration, except requirements definition, contract administration, acceptance testing, operation, and diagnostics. IT Functions to be Retained by Central IT - The following functions should be retained by central IT (ITD): ¯All Help Desk functions. All network administration functions except those allocated to third party contractors. All network administration third-party contracts should be administered by central IT. ¯All operating system and utilities functions except those allocated to third party contractors. All operating system third-party contracts should be administered by central IT. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 10 All voice and data communications functions except those allocated to third party contractors. All voice and data communications third-party contracts’ should be administered by central IT. This would include desktop devices such as telephones, cellular phones, pagers, etc. All hardware functions except those allocated to third party contractors. All. hardware third-party contracts should be administered by central IT. This would include desktop hardware such as PCs and printers. IT Functions To Be Performed by Departments - Departments should perform the following functions: Certain business application acquisition and implementation functions, such as requirements definition, project management, acceptance testing, operation, and first-level support/diagnostics. ¯Certain office automation functions, such as requirements definition, project management, acceptance testing, operation, and first-level support/diagnostics. IT Functions to be Performed by Advisory Bodies - Advisory bodies serve an important role in fostering communication between central IT and other parts ot~ the organization. They also provide a vehicle for stakeholders to become involved in IT planning and take some responsibility for ensuring their needs are effectively met through the successful completion of projects. IT Functions to be Performed by a CIO - The following functions should be performed by an executive officer such as a Chief Information Officer (CIO): ¯Establishment of IT strategic direction ¯Establishment of IT security policy ¯Research into new technology oppommities ¯Oversight on the development of enterprise process models and data models 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 11 Oversight on major IT projects. These functions are often performed by a CIO who is removed from the direct delivery of central IT services, is knowledgeable about IT but has more allegiance to the overall organization than to central IT. Information technology strategic direction should: ¯Come from within the organization ¯Be developed by staff familiar with both the business and technology ¯Not be too closely aligned with staff engaged in the development, implementation and production of IT systems. Organizational Location of CIO-Related Functions - Chief Information Officer-related functions should be located near the top of an organization in order to ensure an appropriate view of the organization and to ensure appropriate attention to technology- related issues and directions. Moreover, the CIO-related functions cannot be housed within the traditional IT department; they should be independent of the current efforts of that organization for the following reasons: The CIO should evaluate current IT efforts and be ready to make difficult decisions about them for the overall good of the organization. To do this, the CIO should not be too closely tied to those efforts. The CIO should be constantly evaluating new business and technology oppommities for the organization and be ready to propose and promote those that are in the best interest of the organization. In some cases, these may include initiatives that might not arise from the IT organization. The CIO needs to be evaluated on the organization-wide application of IT technology and the degree to which it meets the organization’s mission. 508-02 IT Strategic Plan - Drafl 6 The Warner Group VIII- 12 Improving the Ci~’s IT Organization To improve the planning and delivery of IT services, the City of Palo Alto should modify its IT organizational structure, based upon the guidelines presented above.Specific recommendations for the City of Palo Alto include: The consolidation within central IT (ITD) of the following functions: ¯All City hardware support functions. ¯All City voice and data communications support functions. ¯All City Operating System support functions. ¯All City Network Administration functions. ¯All City second-level Office Automation support functions. ¯All City second-level Help Desk support functions. ¯All City business application control (Operations) functions. The retention and expansion of Business Analysts "close to" the business units of the City as first-level business application support and the establishment of a liaison relationship between these analysts and ITD. The retention and expansion of Office Automation (OA) Analysts "close to" the business units of the City as first-level OA support and the establishment of a liaison relationship between the OA Analysts and ITD. In Palo Alto, OA Analyst functions could be performed by Business Analysts or by other departmental staff who have the requisite skills and knowledge. The establishment of a CIO or CIO-like position responsible for setting strategic direction, developing organization-wide policy, providing oversight on major IT initiatives, and evaluating emerging technologies with strategic implications. Given the City’s current staffing configuration, the following changes are required: ¯The consolidation of technical analysts (Systems Analysts) and support positions (e.g., PC Technicians) into ITD. 50S-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 13 ¯The expansion of the Help Desk function within lTD. The expansion of technical PC and application support within ITD. The development of a CIO position. Exhibit VIII-4 provides an organizational chart depicting the first phase of suggested changes to the City’s organizational structure (to be implemented over the next one to two years). There is one completely new position, indicated with a heavy black border: the Help Desk Support Supervisor. There are three positions which are similar to positions currently filled by contract employees. These are shown with dotted black borders and comprise the following: ¯Administrative Assistant PC Technician, Office Automation Systems Analyst, Public Safety. Three positions are relocated from the Utilities Department and are shown with a dashed black border. They are: ¯Systems Analyst, Utilities (Computer Applications group) ¯Systems Analyst, Utilities System Administration (Operations & System Administration group) ¯PC Technician, Utilities. The CIS Business Analyst and the GIS Business Analyst should continue to report to the Utilities Department. In accordance with the reductions in Utilities IT staff and the consolidation of functions in ITD, the City should review the responsibilities and job class assigned to the current Information Systems Manager position and consider using this budgeted position to fill a managerial position in ITD. 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII - 14 Business Analysts should be the only IT positions that continue to report to the user departments directly. The Business Analyst positions should provide first-leVel PC and application support to users in their respective departments. The core function of Business Analysts is to understand the business requirements of the department and assist in the planning, implementation, and support of departmental business applications. Bui Business Analysts should also have sufficient technical knowledge to diagnose simple software and hardware problems and to act as liaisons with ITD technical support staff when ITD assistance is required. Beyond this first-level of support, all technical IT support City-wide should be provided by or at least managed by the ITD Help Desk, Communication and PCs group, and Computer Applications group. In a more centralized model, the ITD Help Desk, Communication and PCs, and Computer Applications groups become critical in determining the quality of services provided to users. Systems Analyst positions in the Computer Applications group and PC Technician positions should be allocated to particular applications and/or deparmaents--either individually or in combination. For example, one Systems Analyst should specialize in Public Works applications and in GIS. Another Systems Analyst might specialize in the business applications used in two smaller departments. Departments that lack a Business Analyst should be ensured access to the same Systems Analyst consistently. 508-02 IT Strategic Plan - Dra~ 6 The Warner Group VIII- 15 I I I These specializations should be rotated among staff members every one or two years. This rotation provides several benefits: ¯Staff members are able to develop expertise and experience in new areas The City is less dependent on particular individuals to maintain effective. operations Support staff are more likely to understand and support Citywide strategies and policies A mechanism for peer review among support staff is provided. After the first phase of organizational change is completed, the City should continue to develop the ITD organization toward the configuration depicted in Exhibit VIII-5. This organization chart serves to illustrate the general directions in which ITD should evolve, rather than to mandate future changes precisely. The key trends illustrated are increasing the capacity of the Help Desk (providing increased support during business hours and non-business hours) and adding Business Analysts to support remaining large departments and the City Library. An additional Systems Analyst specializing in Rapid Application Development has been added. This position would provide a dedicated resource to improve the development of custom reports and the use of data query tools to meet users’ needs for accessing data residing in large applications. Without such a dedicated resource, the following problems tend to occur: ¯Many different staff members, both technical and non-technical, develop reports for their individual needs. Consequently redundant reports are created, and common reports which might benefit many users not developed. ¯Reports may be generated that are incorrect due to misunderstanding of data structures. ¯Individuals not thoroughly familiar with the software tools create reports. ¯Reports are not tested or documented thoroughly. 50~-02 IT Strategic Plan - Dr’aft 6 The Warner Group VIII- 17 ¯When the business application is modified or replaced, many of the reports will no longer function. ¯No single individual is familiar with all the reports, their .~urposes, and whether they are currently used or obsolete. 508-021T Strategic P|~ - ~ 6 The Warner Group VIII- 18 Help Desk As the primary, point of contact between users throughout the City and ITD, the Help Desk is particularly important. The Help Desk should perform the following functions: ¯Answer telephone calls from users who have a technical issue to report ¯Provide solutions to simple and common issues ¯Perform triage by ranking problems based on urgency and extent of resources required for resolution ¯Determine appropriate staff or outside resources needed to resolve the issue (PC Technicians, Systems Analysts, Network Engineers, vendors, etc.) and delegate to them ¯Manage the escalation of the issue from first-line support staff to more technically advanced specialists as required ¯Coordinate other support staff and!or extemal resources working on the issue ¯Track the status of the issue from the initial report to complete resolution Maintain communications with departments and end-users regarding common technical problems and other issues that affect many users, such as system outages and configuration changes ¯Maintain an accurate inventory of IT assets ¯Provide feedback to ITD and City management regarding ITD performance. The Help Desk typically provides three levels of support: 1st Level - Immediate assistance with routine and relatively easy problems. Problems that cannot be resolved quickly at 1 st Level support are referred to 2nd Level support. 2nd Level - These problems require significant expertise to resolve and may require some research. Problems that cannot be resolved in a reasonable time frame at 2nd Level support are referred to 3rd Level support. 508-02 IT Stramgie Plan - Draft 6 The Warner Group VIII- 20 3rd Level - These problems are generally very difficult and require a thorough knowledge of the systems involved. The developer of the system generally performs 3rd level support. One critical function of the Help Desk is to provide IT managers with data in key areas such as productivity, problem resolution cycle time, and technical problem trends. The software application currently used by ITD technical support staff, Remedy, is a powerful application providing many features that should be used to track performance metrics. Additionally, Remedy should be used to improve configuration management--the coordination of system configuration changes which can affect many users if not properly planned, communicated, and executed. In accordance with the Help Desk’s central role, a Manager of Help Desk Support should be assigned and the group should be substantially enlarged. It should be kept distinct from the other functional groups within ITD, including Technical Support, to improve its ability to coordinate problem resolutions effectively and to provide independent performance feedback to ITD management about the overall performance of ITD. ITD Responsiveness to Departmental Customers Increased centralization, if not properly planned and executed, can resuk in reduced end- user service delivery. To ensure that the benefits of increased centralization are obtained without any decrease in the responsiveness of those services, the City must take effective measures to ensure ITD is and remains responsive to the needs of its departmental customers. These measures are explained below. They fall into two areas: ¯Hours of IT Support - Synchronization of IT hours of support with the departments’ hours of operation ¯Service-Level Agreements - The development of written, measurable Service- Level Agreements (SLAs) between ITD and its customer departments. Hours of IT Support 508-02 1T Strat~-%,ic Plan - Draft 6 The Warner Group VIII- 21 The traditional role of ITD has been to support the central business applications of the City such as Budgeting, Accounting, Payroll, and Human Resources. This role of ITD has been evolving and will increasingly need to change to a broader role, one that involves supporting all departments in a manner that meets their needs in concert with their timeframes for provision of services to their ultimate customer, the public. In the traditional role, operation of ITD during business hours was sufficient. Now many departments have a critical need for 24/7 support: Police, Fire, Public Works, and, increasingly, the Library. In the future, as many City services are delivered on a 24-hour basis via the Internet, after-hours support for the City web site and web-enabled applications may be desirable. Types of support that may be required include network administration, desktop PC support, and business application support. The following table summarizes the probable demand for after-hours support by department: Department Police Fire Public Works Utilities Library After-Hours Support Needs 24/7 Additional response capacity during peak periods. 24/7 24/7 24/7 24/7 Additional support during evenings and weekends when libraries are open. Comments Peak activity periods (e.g., Friday, Saturday evenings) require more rapid response for critical applications. After RMS implementation completed on 7/1/99, ITD has committed to providing 1-hour response time on 24/7 basis. Sufficient technical resources must be available on reserve to meet peak needs during a large disaster. Sufficient technical resources must be available on reserve to meet peak needs during a large disaster or construction/maintenance project. Sufficient technical resources must be available on reserve to meet peak needs during a large disaster or construction/maintenance project. In addition to Library operating hours, public access via Web, Telnet, and modem is 24/7. Community Services After hours/weekend on Facility reservations and class enrolknents are irregular basis,examples of occasional after-hours activities 508-02 IT Strategic Plan - Dra~ 6 The Warner Group VIll- 22 requiring use of IT infrastructure There are three fundamental altematives for providing after-hours support: On-Site City Staff- Sufficient suppoh staff are employed to provide 24/7 coverage. This approach generally ensures the highest level of support and the fastest response time, and therefore it is the optimal approach for mission-critical applications. However, because it requires a total of 168 hours of work per week per position--more than four times the standard 40-hour work week it is very expensive, and it is usually only practical for very large organizations with substantial after-hours demand and economy of scale. On-Call City Staff- Designated City staff that normally work during business hours are available on-call for after-hours support. Typically, this involves a rotating schedule specifying which individuals are on-call on particular evenings and weekends. On-call staff should receive two levels of supplemental compensation: the first level is based on the number of hours the employee is simply available on-call, and the second level is based on the number of hours during the on-call periods when the employee actually provides support. Third-Party Remote Monitoring and Notification - An independent vendor is retained to remotely monitor the operational status of key systems such as networks. If the vendor detects a technical problem, it contacts the appropriate City staff. The vendor continues to track the problem status until the system is fully operational, including escalating the level of support to other staff or vendors as necessary, based upon procedures pre- determined by the City. A growing number of companies specialize in providing such off-site monitoring services. This approach may be a cost-effective combination of the other two approaches. 508-02 IT Strate~c Plan - Draft 6 The gFarner Group VIII- 23 Service-Level Agreements Service-Level Agreements (SLAs) are an effective tool to ensure a central IT organization is responsive to the needs of its customers. The City should develop Service-Level Agreements between ITD and its customer departments mandating that ITD performance will be measured on a regular basis, based on both subjective and objective criteria. The subjective criteria should include user surveys (a sample survey is provided in Exhibit VIII-6). The objective criteria should include quantitative metrics such as network uptime, telephone hold time, problem resolution cycle time, etc. The SLAs should state that ITD management would be held accountable for the performance of ITD. The subjective measures (user feedback) should be the primary criteria for assessing ITD performance; if these measures suggest poor performance, the objective data should be examined to identify problem areas precisely and target them for improvement. A typical SLA document addresses the following topics: INTRODUCTION Statement of Intent Scope of the Agreement Measurement of Objectives Summary of Responsibilities ADMINISTRATION ¯ ¯ ¯ 0 ¯ Reporting Contacts Costs and Billing Service Consequences, Defaults, Remedies and Resolution of Disputes Amendment Process ¯Audits 508-02 1T Strategic Plan - Draft 6 The Warner Group VIII- 24 Compliance and Certifications Continuous Improvement SER VICE REQ UI~MENTS ¯ ¯ ¯ ¯ ¯ ¯ ¯ Availability and Performance Capacity Management Data Management System Administration and Operations Support Technical Support Information Security Support Services EXHIBITS ¯ ¯ ¯ ¯ Systems Availability and Performance Batch Job Performance Data Management Objectives Application Recovery Timetable A TTA CHMENTS ¯IT Department Holiday Schedule ¯Key Contacts ¯Change Control Procedures 508-021T Swategi¢ Plan - Draft 6 The Warner Group VIII - 25 IT SERVICES DIVISION QUARTERLY PERFORMANCE EVALUATION FOR ~ QUARTER OF ~ 1.How would you rate the overall network response time? Response time is the time that it takes for the network to respond when you prompt for a login. Excellent Good Average Fair < 3 sec 3-4 sec 4-6 sec 7-8 sec ....The system always The system responds The system makes me The system makes responds quickly,quickly most of the time.wait some of the time.me wait often. Poor >8see The system makes me wait all of the time. 2. How would you rate the over-all network uptime? Network uptime means the time that the network/system is ._up and available for use. This excludes the time that systems may be down for repair. Excellent Good Average Fair Poor ........ The system is always The system is almost The system is available The system is not available The system is often available to me.always available,most of the time.from time to time.not available. 3.How would you rate Production of the System? Production is the nightly processing and printing of forms and reports. Excellent Good Average It is always timely It is almost always timely It is timely and accurate and accurate,and accurate,most of the time. Fair Poor It is sometimes not It is ’~ever timely timely and accurate,and accurate. 4.How would you rate ITD Operation of System? Operation includes application availability, application response time, and security and parameter configuration for the system. Excellent Good Average Fair Poor It is always timely It is usually timely and It is timely and accurate It is usually not timely It is never timely and and accurate,accurate,most of the time.and accurate,accurate. 5. How would you rate ITD Personal Computer Support? Excellent Good Average .... it is always timely It is usually always timely It is timely and accurate and accurate,and accurate,most of the time. Fair It is usually not timely and accurate. Poor It is never timely and accurate. 6. How would you rate ITD’s service overall? Excellent Good I am always happy I am happy with their service with their service,almost all of the time. Average I am satisfied with their service. Fair I think the service could be improved Poor I am always dissatisfied with their service. Comments: Evaluator Name: Evaluator Signature: City Manager Review: IT Manager Review: Evaluation Quarter/Year:/ Date: // Date: // Date: / / Exhibit VIII-5 5084)2 IT Swategie Plan - Draft 6 The Warner Group VIII- 26 Employee Attraction and Retention At the time of the April 1997 IT Services Evaluation Study, the City was experiencing difficulty attracting and retaining qualified employees for technical positions, largely due to the strong demand for technical workers in the Silicon Valley. The City continues to have difficulty attracting and retaining highly qualified employees. Some of the vacant positions in ITD have been unfilled for over a year: a Systems Analyst/Database Administrator position, for example, has been vacant since May, 1997, and the Supervisor of Data Processing position has been vacant since May, 1998. Employee retention and remover are important because effectiveness of application support is a combination of technical expertise and familiarity with the business of the applications. Moreover, a high rate of remover of staff makes it difficult to retain continuity and unique expertise. Application expertise is usually developed on the job over time, and application programmers who understand the applications can be invaluable in rendering quality service to the departments. High turnover and inadequate staffing levels also make long-term planning difficult or impossible. In its procedures for evaluating job applicants and determining compensation and benefits for strong employees, the City should focus on the importance of retaining individuals who are likely to continue employment with the City for a substantial period of time (approximately five years). Skills and Training To develop and maintain an IT organization that can adapt to the rapid pace of technology change and that fosters responsive customer service, innovation, and continuous improvement, the City should strive to recruit and retain individuals who posses the ability to continuously learn new skills. This characteristic is more important than pre-existing skills, which have traditionally been emphasized. In addition to technical skills, "soft skills" such as project management, strategic planning, relationship 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 27 management, service management, business analysis, and communication skills are becoming increasingly important for IT workers. The City should develop a process to identify required skill sets for all IT positions. The City should also develop a process to provide training on a regular (e.g., annual) basis foi .staff to develop skills in needed areas. Training should be seen as an important part of job responsibility, and sufficient staff time should be allocated to it. Information Technology Budgeting The Information Technology Services Division budget should fund support and maintenance activities. The cost of support and maintenance services provided by ITD to Enterprise Fund departments should be fully charged back to these departments. The cost of providing ITD support and maintenance services to General Fund departments should be estimated and allocated based on the number and level of systems/users in each department. An IT Capital and Development Projects Fund should be created for multiyear funding of hardware and software acquisition and large IT projects. The Technical Advisory Board (TAB) should posses the authority to approve fund expenditures after studying and ranking IT proposals. Internet Internet technology and use have developed very rapidly, even in the context of the fast- paced world of high technology. Just a few years ago it was appropriate for planning purposes to view the Intemet as a distinct area of technology. However, the Intemet’s impact is quickly expanding to encompass most IT practices and technologies. Consequently, Internet-related oppommities and requirements must be taken into account for all IT projects during each phase of planning. 508-02 IT Swategi¢ Plan - Draft 6 The Warner Group !2111- 28 A single group cannot realistically be expected to posses sufficient knowledge about the implications of the Internet for a diverse range of systems. Instead, Internet-reiated issues should be identified and addressed by the same team that is responsible for planning and managing each system. Internet experts with particular Internet-related skills and expertise should continue to be consulted as necessary. Similarly, the City’s Intemet Master Plan has probably outlived its usefulness. It should be superseded by an expressed City vision concerning Internet-related opportunities, together with prioritized goals and a set of policies governing Internet use. The vision and goals, in turn, should serve as the foundation for developing specific strategies for aggressively migrating City applications to Intemet-compatible, Web-enabled platforms whenever possible and for redesigning business processes to take advantage of this vital new communications medium. City Library IT Needs As discussed above, the IT needs of the City Library are increasing rapidly. To better manage the revolutionary changes affecting libraries’ delivery of services, the City recently conducted a Library Automation Plan. The Library Plan recommends that the City create two new IT positions within the City Library: an Information Systems Manager and an Information Systems Support Technician. The Library Plan also calls for IT training for all Library staff. The importance of information technology to the Library’s operations can hardly be overstated. There are also great advantages to the City of IT centralization and consistency among departments, and a centralized approach to IT services City-wide need not result in a lower level of service. The new Library Business Analyst position depicted in Exhibit VIII-5 should be the primary IT position within the Library, and this individual should become expert in the unique business applications useful to the Library. All Library staff should receive IT training on a regular basis, and some staff may continue to specialize in certain applications and become informal "experts." These staff 508-02 IT Strategic Plan - Draft 6 The Warner Group VIII- 29 and the Business Analyst may provide first-level technical support, but additional support, when required, should be provided by the appropriate group within ITD. As described in the above subsection, Hours of IT Support, adequate support should be made available to the Library both during its extended operating hours and on a 24-hour basis for systems supporting public online access. A Service-Level Agreement between the Library and ITD should be developed which specifies the level of service to be maintained by ITD. 508..02 IT Strategic Plan - Draft 6 The Warner Group VIII- 30 C. RECOMMENDATIONS FOR OR GANIZA TION AND STAFFING IT Leadership and Strategic Decision-Making Recommendation - Increase the authority and visibility of ITD within the Administrative Services Department and the City. Recommendation - Designate a high-level City executive as CIO. Recommendation - Improve communication with departments by conducting regular meetings with department heads. Organizational Structure Recommendation - Consolidate .all IT positions throughout the City, with the exception of Business Analysts, into ITD. Recommendation - Implement the organizational and staffing changes depicted in Exhibits VIII-4 and VIII-5. Recommendation -Develop service level agreements between ITD and user departments. These agreements should contain mechanisms holding ITD management accountable for ITD performance, based on specified measures. Recommendation - Establish Citywide policy requiring users to call ITD Help Desk for support. Recommendation - Assign a dual responsibility to each Systems Analyst for one or more departments and applications. They are key liaisons between ITD and departments. Ensure that all important enterprise applications are assigned to a Systems Analyst. Also, ensure that all departments that lack a Business Analyst have a Systems Analyst assigned to them. 508-021T Strategic Plan - Draft 6 The Warner Group VIII - 31 Recommendation - Retain the services of outside contractors when particular expertise, including project management skills, would be beneficial. Recommendation - The City should continue to outsource certain activities and consider additional outsourcing oppommities~ The City should continue to retain experienced consultants for needs assessment, selection, contract negotiation, and project management of new systems that are large or complex. In addition, the City could continue to retain some additional contract PC technicians when required--for example, immediately following rollout of new applications. Also, an outside vendor could provide network and systems monitoring, perform triage when problems are detected, and call in City staff as required IT Advisory Bodies Recommendation - Departments should be held accountable for ensuring their delegates to the advisory bodies fulfill their responsibilities in this important role. Recommendation - Department representatives should attend meetings regularly in their respective departments to provide status updates and gather input. Recommendation - The mission and structure of each of the IT advisory bodies should be re-examined and clarified based upon the guidelines and changes recommended in this report. Some recommendations for specific advisory bodies are provided: Executive Staff Address policy issues, with support from the CIO. Technical Advisor~ Board Develop a technology business plan which describes needs, identifies potential solutions, establishes priorities based upon urgency and resource availability, and specifies a timeframe for implementation of projects. Administer the IT Capital and Development Projects Fund. Technical Advisol~ Group 508~2 IT Stralegic Plan - Draft 6 The Warner Group VIII- 32 ¯Develop a TAG charter. ¯Develop and maintain IT goals and objectives. ¯Help develop ITD service-level agreements with departments. GIS Technical Advisory_ Committee Given the importance of geographic information to many departments, the GIS Technical Advisory Committee should include appropriate representation from all stakeholder departments. The Committee should direct the implementation of citywide GIS applications in terms of priorities, integration and standards. Web Task Force The Web Task Force should be restructured and refocused. Issues related to the web-enabling of business applications should be addressed by project teams focusing on those particular applications. The Web Task Force should be a smaller group consisting of selected individuals from most City departments with a strong understanding of the City’s vision and strategic goals regarding the delivery of information and services over the Internet and electronic commerce implementation. The Task Force should develop standards and policies governing the design and maintenance of the City’s web site. Help Desk Support Recommendation - Improve after-hours availability of critical IT support functions, based on departmental needs described above. Also ensure adequate and timely support for systems physically residing at facilities away from City Hall. Recommendation - Improve accountability of technical support services. Problem resolution statistics should be provided to TAG. Use Remedy system extensively to prioritize calls, manage problem escalation, identify technical problem trends, manage configuration changes, and provide metrics in areas such as productivity and problem resolution time. IT Staffing 508-02 IT Su-ategic Plan - Draft 6 The Warner Group VIII- 33 Recommendation - Recruit IT staff based primarily on probable tenure and ability to acquire new skills. Recommendation - Develop a process to identify necessary skill sets on a regular basis, and develop mechanisms to provide necessary training. Recommendation - Increase compensation for the Business Analyst classification. The Business Analysts play a critical role by understanding the business needs of departments in depth and serving as liaisons with central IT resources. They should be compensated comparably to the Systems Analyst II position. Recommendation - Provide ITD management with flexibility to hire Systems Analysts at the senior (Systems Analyst II) level. Due to the shortage of technical talent in general and the high demand for technical jobs in Silicon Valley in particular, to attract and retain qualified technical staff the City must offer compensation packages that are more competitive with private-sector employers. Recommendation - Establish structured system design, procurement and implementation process. New IT strategies require greater emphasis on design, needs assessment, selection and implementation activities. A formal methodology shot~ld be adopted to address these complex areas. A project team approach should be adopted for implementing each major system/project. The following guidelines should be adopted: ¯Project team members should include representatives from involved departments, vendors, technical support staff and an independent consultant as needed. Project team responsibilities should include requirements definition, vendor selection, project management and coordination of system implementation activities within the affected departments, management of project budgets and costs, routine vendor matters and ongoing management of the system. Users should be primarily responsible for the project management and operations of departmental systems, and technical support should function in a support role with primary responsibility for network operations and integration of various departmental systems. 50802 IT Strat~i¢ Plum - Dra~ 6 The [Farner Group VIII- 34 A Project Manager should be designated to direct each ad-hoc team. The Project Manager will report project status and pending issues on a regular basis. Each Project Manager should be knowledgeable of the system or application and have appropriate authority to direct and manage the efforts of project team members. Project teams should meet at least bi-weekly during the active phases of a project to discuss project status, tasks accomplished, tasks outstanding and develtping issues. Minutes or notes should be taken at each meeting and a status meeting memorandum should be distributed that clearly communicates the follow-up responsibilities of project team participants. Following system selection, the vendor’s project manager also should participate on the project teams. Their responsibility should include coordinating the delivery of required products and services, communicating and updating the vendor schedule and assisting in the resolution of technical, administrative and other issues. An independent information systems consultant also may be a key member of the project team. The role of the consultant should be to provide technical and project management expertise and assistance. Tasks could include maintaining the project schedule, documenting project status, identifying potential issues, overseeing vendor performance, contributing the experiences of other agencies, providing independent and objective analysis of design, and contract performance and acceptance tests, and troubleshooting technical issues. Budgeting Recommendation - Separate funding for IT support and maintenance from funding for capital purchases and projects. Recommendation - The Technical Advisory Board should administer the IT Capital and Development Projects Fund. Recommendation - ITD should estimate the cost of providing support to individual City departments. ITD should charge its support costs back to Enterprise Fund departments. Recommendation - The costs of hardware and software should be fully depreciated and the costs recovered in the CIP to finance future replacement. 508-02 rl" Strategic Plan - Draft 6 The Warner Group VIII- 35 Critical Success Factors Certain factors are critical if the Organization and Staffing portion of the Plan is to be successful: ¯Obtain the ongoing support of the Executive Staff advisory group for technology- initiatives ¯Require active participation in the Executive Staff by department heads and representatives Appoint project teams with department representation that have a stake in the successful implementation of the system(s) and the necessary time to devote the to project ¯Expeditiously obtain early management approval of the major elements of the Plan to avoid major changes in the environment and priorities ¯Retain independent consultants where appropriate to supplement City staff and to avoid a "trial and error" approach ¯Communicate openly and frequently the status and progress towards achieving the City IT goals ¯Keep users involved through planning, business area analysis and implementation phases ¯Supply initial and ongoing training and support to ensure that personnel can effectively use IT tools provided. 508432 IT Strategic Plan - Draft 6 The Warner Group VIII- 36 SECTION IX ITD POLICIES AND PR OCED URES THE WARNER GROUP IX- ITD POLICIES AND PROCEDURES A UTOMA TION POLICY Notification and Penalties The development and use of automation technology is important to the successful operation of the City of Palo Alto. These policies are to be read, understood and signed by every City employee and are to be followed. Disregard for these policies could result in disciplinary actions against the employee, by the City, up to and including suspension, and dismissal. Disregard for these policies may also be a violation of existing State or Federal laws including, but not limited to, laws regarding software copyrights and licensing in which cases, the courts may impose civil or criminal sanctions. Hardware and Software Procurement Policy A. Information Technology Division (ITD) Responsibilities 1.ITD shall inform the Administrative Services Department Director of any violations of this procurement policy. B.City Staff Responsibilities 1.All computer hardware, software, cabling or related acquisitions shall be: (ASD) automation a)In conformance with the City Information Technology Strategic Plan. b)Prepared and reviewed by ITD. c)Reviewed and approved (or denied) by the ASD Director. IlL Software Virus Policy A.ITD Responsibilities 1.ITD shall ensure the prevention and detection of the presence of viruses on City computers and networks. This may include the automatic execution of virus detection programs upon boot up. ITD shall update quarterly all City virus protection programs with the current release of known virus records. 508-021T Strat~c Plan - Dr~ 6 The Warner Group IX- 1 3.ITD shall scan for viruses all programs intended to be loaded or executed on City computers. No city I. Staff Responsibilities All programs that are to be loaded or executed on any City computer shall first be submitted to ITD for virus scanning. 2.City employees shall not load or execute software programs on any City computer (including laptops) that have not been scanned for viruses by ITD. IV.Hardware and Software Tampering Policy No No ITD Responsibilities 1.ITD shall notify the ASD Director of any instances of suspected tampering with City computer hardware and software. City Staff Responsibilities 1.City employees shall not move, alter, connect, disconnect, install or uninstall or otherwise tamper with City computer hardware, software or cabling. Software Copying Policy A.ITD Responsibilities 1.ITD shall not copy any computer program except within the limits authorized by license agreement or by letter from an authorized representative of the owner of any software copyright. B.City Staff Responsibilities City employees shall not copy any computer program from any City computer for the purpose of executing it on any other computer, unless authorized to do so by the ASD Director. °City employees shall not copy any computer program from any City computer for the purpose of executing it on any other (City or non-City) computer if such copying infringes any copyright, software license or intellectual property rights of the developer, distributor, or owner of the software. 508-02 IT Strategic PI~,~ - Draft 6 The Warner Group IX- 2 VI.Use of City Hardware and Software for Personal Business A.ITD Responsibilities 1.None Bo City 1. Staff Responsibilities City employees shall not use City computer hardware or software: a) At home for any purpose, without explicit authorization. b) At any location for personal or non-City business, except for modest uses related to their job such as letters for professional organizations and course homework. VII. Use of Personal Hardware and Software for City Business A.ITD Responsibilities 1.None No city 1. Staff Responsibilities City employees shall not use personal computer hardware or software a) On City property for any reason. b) At any location for City business, unless authorized to do so. City is not obligated to fix or replace personal computer hardware or software that is damaged in the course of perfomaing City business even if such use is authorized. VIII. Security Ao ITD 1. Responsibilities ITD shall ensure that System passwords are known by no more than three ITD employees. Exceptions shall be approved by the ASD Director. I~TD shall maintain a list (updated Quarterly) of the owner of each computer application and shall obtain approval from the owner before granting access (of any kind) to the information in the system to anyone. ITD shall review the list of terminations, new hires and contract employees following each payroll and shall grant or revoke accesses to City Systems as appropriate. 508-02 1T Strategic Plan - Draft 6 The Warner Group IX- 3 B.City Staff Responsibilities 1.All System (or Root) passwords for equipment used for City production purposes shall be established by ITD and a copy of them shall be given to the ASD Director. City employees shall not disclose, or allow to be disclosed, their personal (or City Email) passwords as assigned by ITD to anyone. Each employee may be held personally liable for any actions taken under the use of their personal passwords if they have not followed this policy. 3.Personal passwords not assigned by ITD (those that control access to a microcomputer) shall not be permitted and shall be removed by City staff. City staff shall password protect (if software has capability) individual files which contain information which, by law, are not matters of public record. These include personnel issues, negotiation material and matters of litigation. These passwords shall not be given to ITD. Personnel shall provide ITD with a list of terminations, new hires and contract employees following each City payroll, to enable ITD to grant or revoke accesses to CITY Systems. CITY Email Use Policy No ITD 1. Responsibilities ITD shall ensure that no copy of the City Email database that is older than 90 days, shall exist in any form. ITD shall not have access, of any kind, to the Email messages of any City staff and breach of this is grounds for immediate removal from City employment. B.City Staff Responsibilities City Email is not private and is for the exclusive propose of conducting CITY business. City staff shall not use City Email for personal or non-City business purposes. o City staff shall not include remarks, words or symbols in City Email which discriminate against any person on the basis of sex, age, race, color, national origin, ancestry, disability, medical condition, religion, marital status, or sexual orientation. 508-02 IT S~’ategic Plan - Draft 6 The Warner Group City staff shall not include remarks, words or symbols in City Email, which constitute sexual harassment. City staff shall not use CITY Email for illegal activities of any kind including gambling. City staff shall not retain in their Email, copies of messages sent or received for longer than one year. The CITY Email data base is not intended asa permanent repository of City business as City Email is not intended to constitute a public record and the use of Email as a permanent repository would be cost prohibitive. Any Email messages that should be kept permanently, should be printed out, without modification, and filed in the official permanent folder of that project or activity. City Email messages are to be considered informal conversations, unless they are designated as Inter-Office Memorandum, by the following heading inserted at the beginning of the Email message: CITY OF PALO ALTO INTER-OFFICE MEMORANDUM o Email, including Email Inter-Office Memorandum, are deemed to be preliminary drafts, notes or other information which is not retained by the public agency in the ordinary course of business. Use of Games ITD 1. Responsibilities ITD shall remove any games on new microcomputers th~it are pre- installed before the machines are delivered to the end user. Bo City 1. 2.ITD shall notify the ASD Director of any instances in which games have been installed on CITY microcomputers. Staff Responsibilities Games, such as Minesweep or Solitaire, shall not be installed or operated on City computers, except as approved by the ASD Director. 2.Games shall not be played by City employees on City computers or through City computers via dial-out services or any service on the Internet. City staff should remove any existing games from microcomputers assigned to them. 508-02 IT Strategic Plan - Drat~ 6 The Warner Group IX- 5 XI.Use of the Internet and Commercial On-line Services Access to worldwide communications network, such as the Internet, CompuServe or America On-line, may be made available to City staff, but because of their openness, lack of security, and complexity, the City needs to restrict and structure access to them by City employees. ITD Responsibilities 1. None at this time B.City Staff Responsibilities City employees must obtain written Department Head and ITD approval in order to access the Internet or Commercial On-line Services with City equipment. Access approval shall be granted to employees who would make frequent substantive use of the Internet as a necessary part of their jobs. Employees making only occasional use of the Internet or Commercial On-line Services should be supported through other authorized users. Department requests to establish access should be in the form of a memorandum from the Department Head to the ITD. The memorandum should contain the following: a)Name and title of the person requiring access b)Department and location of the person requiring access c)The supporting LAN Administrator’s name d)Specific business reason for the access e)Expected duration of need for access f)The specific information or host access desired g)Requester signature h)Department Head signature o If approved, ITD will arrange for the requested access and will provide training materials on how to gain access and how to check downloaded files for viruses. It is expected that users will develop their own proficiency in using the Internet to search for information. 508-02 IT Strategic Plan - Dr~ 6 The Warner Group IX- 6 As with all other City resources, this access is for business purposes only. All City security guidelines, internet etiquette, and ITD software management policies will apply. Specifically, software is .not to be downloaded unless ownership or licensing requirements can be determined, and it is scanned for viruses. The downloading of files larger than 10 megabytes must be coordinated with ITD to avoid impacting network response times. Telecommunications Usage Policy THE INTENT of this telecommunications policy is to ensure that the City telephone, cellular phone, calling card, pager and voice mail systems are used in accordance with City policy and the public interest. The City respects the individual privacy of its employees; however, employee privacy does not extend to the employee’s, work-related conduct or the use of City-provided equipment, or supplies. Ao THE OBJECTIVES of this policy are to: 1. Ensure that City telecommunications facilities are used for City business 2.Minimize the use of staff time for other than City business ° Protect the public’s interest through ensuring public funds are not expended for private purposes, intentionally or otherwise. Reserve the City’s right to monitor and retrieve, for legitimate business pttrposes and justified to the satisfaction of the ASD Director (or his/her designee), messages left on voice mail, pagers or other telecommunications devices. A request for such monitoring shall be made to, and approved in writing by, the ASD Director (or his/her designee). B.THE POLICY 1.City telecommunications use: City telecommunications systems are provided to City staff for the conduct of City business. They are not intended to be used for the personal business of employees and employees should minimize such use. b)The grant or revocation of telephone, cellular phone, calling card, pager or voice mail privileges shall be requested in writing and approved by the department head (ITD service request form); approved by the ASD Director (or designee); and submitted to ITD. ITD is to confirm the grant or revocation or privileges in writing to the requester showing date and time of action. 508-02 IT S~xatcgie Plan - Draft 6 The Warner Group 1X- 7 c) d) If it is necessary to make non-City related business chargeable calls on City telephones, cellular phones, or calling cards; "employees should use personal credit cards to make these calls or reimburse the City monthly. City management may request to monitor and retrieve, for legitimate business purposes - as justified to the satisfaction of th~ ASD Director (or his/her designee) - messages left on pagers or other telecommunications devices. This request shall be made to, and approved in writing by, the ASD Director. City voice mail use a)City voice mail is provided to City staff for the conduct of City business. It is not to be used for personal business and employees should minLrnize such use. b)City voice mail will be made available, subject to technical constraints, to all City employees whose job, in the estimation of the Department Head, and approved by the ASD Director (or his/her designee), warrants access to such facilities. In general, this is to be determined by the department’s needs, but should minimally include all professional! analyst level staff or higher, as well as all inspectors and others who have professional level contact with the public. 1) 2) Keep their greeting message current at all times Access and review voice mail messages on a regular basis, so as to maintain continuity of business and customer service standards 3)Delete messages as soon as possible to avoid unnecessarily over-taxing hard disk storage capacity 4)City management may request to monitor and retrieve, for legitimate business purposes - as justified to the satisfaction of the ASD Director (or his/her designee) - messages left on voice mail. This request shall be made to, and approved in writing by, the ASD Director (or his/her designee). 3.City Telephone, Cellular Phone, and Calling Card Charges ~ ITD: 1)Shall provide each department head with a billing detail of telephone calls made by each City telephone in their respective departments. Billing is to be directed to the department for 508-02 IT S~rategic Plan - Draft 6 The Warner Group IX- 8 cellular phones, and calling cards, for review, reimbursement and coding. b)Department Heads: 1)Shall ensure monthly distribution of the billing detail of calls, to individuals responsible for the assigned telephones, cellular phones, or calling cards. Supervisors shall be responsible for telephones assigned to common areas (e.g., public counters, fire stations). 2)The Department Head shall periodically review the monthly detail sheets for irregularities and notify employees to provide an explanation for calls that appear to be non-business related, or reimbursement to the City for calls that are non-business related. c)Employees: 1)Shall review, monthly, the list of calls made on their designated telephone, cellular phone, or calling card and provide reimbursement to the City for all non-City business calls made in excess of $2.00 each for desk telephones, or any personal call totals for cellular and calling cards; or, upon request, provide an explanation of calls which appear to be non-City business related. (Calling home to inform of an employee working late is considered a business call). 508-02 IT S~xategic Plan - Draft 6 The Warner Group IX- 9 SE C TI ON X IMPLEMENTATION PLAN AND COSTS THE WARNER GROUP 0 0 0 0 0CO0~0 0 0 0 0 0 00000 0 0 00000 L~ 0 e- o o o o oooooo~o o"~" oo ooo ooo o 0 0 0 0 0 0 0 0 0 0 000000000000014301431.0 O4 0 0 0 0 1.0 0 0 0 0 0 0 0 0 0 0 0000~0 0 0 0 0 0 00~’3 0 04 0.1 t,.O 0 0 ~0 O0 0 0 0 0 0 0 0 0 0 0 000000000000000000000 0 0 ~¢0 03 ’~-~0 0 LO 0 04 oo o r- 0 0 0 0 0 0 0 0 0 0~0 ~~0 0 0 0 0o.o o o o o 0 0 0~~ 0 00 0 0 0 0 0 0 0 0 0~ 0 ~~0 0 0 0 0oooo.~o o 0 0 0 0 0 0 0 0 0 0 00~ ~" ~ ~- 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SECTION XI COMMUNICATION AND MAINTENANCE OF THE PLAN THE WARNER GR O UP XI-COMMUNICA TION AND MAINTENANCE OF THE PLAN Communication Of The Plan Electronic Distribution - The Information Technology Strategic Plan should be made available to all stakeholders. Ideally, it should be hosted in HTML on the City’s Intranet and Internet Web sites to ensure its ready availability to all City staff and residents. Hard Copy Distribution - The City should distribute multiple hard copies of the Plan to each Department and major City office location. Maintenance Of The Plan A feedback and control program for the Plan is necessary to ensure that the City’s technology planning process is a continuous one. The program consists of two distinct review mechanisms. 1TD Review - The first review will be facilitated by ITD and should take place at least semi-annually. It consists of a straightforward update of the implementation plan to adjust time frames and responsibilities as appropriate, and to add new steps or delete completed steps as needed. Technical Advisor~ Board Review - The second review mechanism will be led by the Technical Advisory Board annually during the budget cycle of each fiscal year. This review will be an assessment of the progress toward the City’s IT Vision and Goals. ITD will report on progress made on the IT Strategic Plan to the TAB. The TAB will review this report, assess performance, and determine whether any adjustments need to be made to the IT direction set forth in the Plan. If the TAB deems that changes are necessary, it can request an update to this plan, or it can initiate a new planning process. 508-02 IT Sta’ategic Plan - Dra~ 6 The Warner Group XI- 1 In this way, the City’s IT Strategic Plan will remain a "living, working" document. 508-021T S~rat~g~c Plan - Dr~ 6 The Warner Group XI- 2 SECTION XII BENEFITS TO BE ACHIEVED THE WARNER GROUP XII- BENEFITS TO BE ACHIEVED We believe that significant benefits should be realized by the City of Palo Alto as a result of implementing our recommendations: Adoption of the IT Strategic Plan provides an organized, methodical and priority-driven approach to implementing modem information systems throughout the City over the next three to five years. The recommended information systems and projects should enable the City to support its business objectives of providing improved services to the community in a cost-effective manner. The phased and team-oriented approach to application implementation and system improvements allows for timely realization of the most significant benefits while leveraging the City’s investment in current systems and resources. Providing improved connectivity via networking (both Wide Area Network (WAN) and Local Area Networks (LANs)) and information systems standards should provide increased access by City staff and the public to local, regional and other information systems. Reorganization and staffmg of information services support functions should help ensure proper coordination and integration of systems within and among departments. It should also ensure that new systems are implemented and managed effectively, and that users receive the support required to maximize the City’s investment in information technology. Improved productivity, service and morale should be achieved by enhancing current systems, automating current manual processes, providing increased access to citywide systems and providing increased training and support. 508-02 IT St~c Plan - Dra~ 6 The Warner Group XII- 1 APPENDIX A GL OSSAR Y THE WARNER GR O UP APPENDIX A - GLOSSAR Y Arithmetic Logic Unit (ALU) - The high-speed CPU circuit that does calculating and comparing. Numbers are transferred from memory into the ALU for calculation, and the results are sent back into memory. Central Data Processing (CDP) - Central Data Processing integrates data from all the departments it serves and provides operations and management with the information systems they utilize. Central Processing Unit (CPU) - The computing part of the computer. Also called the processor, it is made up of the control unit and ALU. A personal computer CPU is a single microprocessor chip. A minicomputer CPU is contained on one or more printed circuit boards. A maln~ame CPU is made up of several boards. Client/Server Architecture - An architecture in which the client (personal computer or workstation) is the requesting machine and the server is the supplying machine. Servers can be high-speed microcomputers, minicomputers or even mainframes. The client provides the user interface and performs some or all of the application processing. The server maintains the databases and processes requests from the client to extract data from or update the database. Client/server architecture is not using a file server as a remote disk drive to hold programs and databases. It implies that processing is done in the server. For example, in a database query, the server performs the search and returns the results to the requesting client machine. If the server were only storing the database, all the records in the database file would have to be transmitted over the network to the client machine doing the search. Client/Server Network - A communications network that uses dedicated servers for all clients in the network. Desktop Computer - A computer that is small enough to reside on a desk-top, but too large to reside on a lap (laptop). It either refers to personal computers (15Cs, Macs, Amigas, PowerPCs, etc.) or to workstations from Sun, IBM, HP, Digital and others. Graphical User Interface (GUI) - A graphics-based user interface that incorporates icons, pull-down menus and a mouse. Macintosh and Microsoft Windows are examples. Hierarchical Database - In non-relational systems (hierarchical, network), records in one file point to the locations of records in another, such as customers to orders and vendors to purchases. These are fixed links set up ahead of time to speed up daily processing. Information Services (IS) - The formal title for a data processing, Management Information Systems, or Information Systems department. Other titles are Data Processing, Information Processing and Management Information Services. Local Area Network (LAN) - A communications network that serves users within a confined geographical area, usually a floor of a building. It is made up of servers, workstations, a network operating system and a communications link that does not involve a common carrier. Legacy System - A mainframe or minicomputer based information system that uses a "dumb" terminal]main computer design. Mainframe - A large computer. In the mid 1960s, all computers were mainframes, since the term referred to the main CPU cabinet. Today, it refers to a large computer system. There are small, medium and large-scale mainframes, handling from a handful to several thousand online terminals. Large-scale mainframes can have hundreds of megabytes of main memory and terabytes of disk storage. Large mainframes use smaller computers as front-end processors that connect to the communications networks. Minicomputer - A medium-scale computer that functions as a single workstation, or a multi-user system with up to several hundred terminals. A minicomputer system cost roughly from $20,000 to $250,000. Today, the term "midrange" has become popular for medium-sized computers. High-end microcomputers and low-end mainframes overlap in the minicomputer price and performance. 50g*02 1T Strategic Plan - Draft 6 The Warner Group A - 2 MPE (MultiProgramming Executive) - The multitasking operating system of the Hewlett Packard 3000 series. Network Operating System (NOS) - A multi-user operating system that manages network resources. It manages multiple requ.ests (inputs) concurrently and provides the security necessary in a multi-user environment. It may be a completely self-contained operating system, such as NetWare or it may require an existing operating system in order to function. A portion of the network operating system, or NOS, resides in each client machine and each server. It handles request by clients for data and applications from the client machine and each server. It handles requests by clients for data and applications from the server as well as input and output to shared network devices, such as printers, faxes and modems. Open System - A vendor-independent system that is designed to interconnect with a variety of products. It implies that standards are determined by a consensus of interested parties rather than by one or two vendors. "Open systems" generally refers to UNIX-based computer systems, since UNIX machines are the most universal operating environment. UNIX runs on more different kinds of hardware than any other operating system. Sometimes, the PC is called an open system, but it is more an open architecture than an open system, because Intel and Microsoft have strong control over the hardware and system software. Platform - The hardware architecture of a particular model or computer family. The term also often refers to just.the operating system, which implies the particular hardware architecture that it runs on; for example, "the XYZ program runs on the Microsoft Windows platform." Protocol- Hardware and software standards that govem transmission between two stations. On personal computers, communications programs offer a variety of protocols to transfer files via modem. 508-02 IT Strategic Pla~- Draft 6 The Warner Group A-3 On LANs, data link protocols such as Ethemet, Token Ring and FDDI provide the access method that moves packets from station to station, and higher level transpol~ protocols, such as NetBIOS, IPX and TCP/IP control and the route information packets. Relational Database - A database organization, method that links files together as required. In a relational database, relationships between files are created by comparing data, such as account numbers and names. A relational system has the flexibility to take any two or more files and generate a new file from the records that meet the matching criteria. TCP/IP (Transmission Control Protocol/lnternet Protocol) - A transport protocol developed under contract from the U.S. Department of Defense to intemetwork dissimilar systems. It is a de facto UNIX standard, but is supported on almost all computer systems. TCP/IP is the protocol of the Intemet. Terminal - An I/O device for a computer that usually has a keyboard for input and a video screen or printer for output. UNIX- A multi-user, multitasking operating system originally developed by AT&T. AT&T got out of the UNIX business in 1993, and its System V version of UNIX was acquired by Novell. UNIX is written in C, also developed by AT&T, which can be compiled into many different machine languages, causing UNIX to run in a wider variety of hardware than any other operating system. UNIX has thus become synonymous with "open systems." Wide Area Network (WAN) - A communications network that covers a wide geographic area, such as region, city or state. It requires the network facilities of common carriers. Windows NT (New Technology) - An advanced 32-bit network operating system from Microsoft that runs DOS and Windows applications. 508-02 IT Suategic Plan - Draft 6 The Warner Group A - 4 APPENDIX B INTER VIE W PAR TICIPANTS THE WARNER GR O UP APPENDIX B - INTER VIEW PAR TICIPANTS During preparation of the Strategic Plan, The Warner Group met with members of the Technology Advisory Board, the Technology Advisory Group, the Web Task Force, the- GIS Technical Advisory Committee, and the Permit Streamlining Task Force. In addition, The Warner Group interviewed a cross-section of staff in various departments to collect information about perceived strengths, weaknesses, and oppommities for improvement in the City’s IT systems and practices. These staff members included the following: City Manager’s Office ¯June Fleming, City Manager ¯Emily Harrison, Assistant City Manager City Auditor’s Office ¯Bill Vinson, City Auditor ¯K.B. Paige, Senior Auditor City Clerk’s Office ¯Kathi Hamilton, Assistant City Clerk ¯Beverly Kline, Assistant City Clerk, Records Management Administrative Service Department ¯Carl Yeats, Director ¯Melissa Cavallo, Assistant Director ¯Rob Pound, IT Services Director Utilities Department ¯Ed Mrizek, Director ¯Tom Habashi, Assistant Director, Resource Management Division ¯Randy Baldschun, Assistant Director, Administrative Services Division ¯Larry Start, Manager, Engineering and Operations Division ¯Glenn Loo, Manager, Utilities Information Systems ¯Van Hiemke, Telecommunications Manager ¯Girish Balachandran, Manager, Supply Resources Human Resources Department ¯Jay Rounds, Director 508-02 App B Interview Participants The Warner Group B-1 Planning and Community Environmem Department ¯Anne Moore, Acting Director ¯Eric Riel, Chief Planning Official ¯Fred Herman, Chief Building Official .¯Ashok Aggarwal, City Traffic Engineer Police Department ¯Pat Dwyer, Chief ¯Lynne Johnson, Assistant Chief ¯Evelyn Espinosa, Business Analyst Fire Departmem ¯Ruben Grijalva, Chief ¯Judy Jewell, Support Services ¯Dan Firth, Environmental Coordinator ¯Nick Marinaro, Fire Marshall Public Works Department ¯Glenn Roberts, Director ¯Alice Stoner, Assistant Director, Engineering Division ¯Michael Jackson, Maintenance Division ¯Keith LaHaie, Fleet Manager (MSC) ¯Karen Smith, Facilities (MSC) ¯Sherry Reynolds, Administration (MSC) ¯Bill Miks, Manager, Regional Water Quality Control Plant (MSC) ¯Richard Wetzel, Assistant Manager, Regional Water Quality Control Plant (MSC) ¯Javad Ghaffari, Manager, Industrial Waste Program (MSC) Community Services Departmem ¯Paul Thiltgen, Director ¯Richard James, Administration ¯Mary Jo Levy, Library Director ¯Kathy Espinoza-Howard, Human Services ¯Peggy Twinn, Secretary to Director ¯Leon Kaplan, Arts and Culture ¯Paul Diaz, Parks and Golf Course 508-02 App B Interview Participants The Warner Group B- 2 Library ¯Mary Jo Levy, Director ¯Diane Jennings, Manager, Main Library Services ¯Joseph Ford, Consultant, Joseph Ford & Associates 508-02 App B Interciew Pard¢ipants The Warner Group B - 3 APPENDIX C MAIN COMPUTER HARD WARE INVENTOR Y THE WARNER GR O UP x !~o _._.~- APPENDIX D DESKTOP HARD WARE INVENTOR Y THE WARNER GR O UP UJ EEEEEEE E EE0000000000 I I .8 8 . >1>1>1= =1=1=1~ ~ ~1~1 o o il EEEEo o o~o APPENDIX E BUSINESS APPLICATION SOFTWARE INVENTOR Y THE WARNER GROUP EEEE E EE E E....~ ~ ~..~ .~ ,~ .~ .~ .~ Z ZZ Z Z IX !X uJ X ~Z --E Z 0 LU Z E m E m 0 E w w0.o.. "r w IE w W W E ~oEc 8~>o o E w w LU uJ z LU E Z E Z Z E ~Z >~-~ o ~ ~E APPENDIX F RE COMMENDATIONS THE WARNER GR O UP APPENDIX F- RECOMMENDATIONS Section Priority Hardware High High Network Description of Recommendation The Utilities Department and ITD should standardize on the same set of hardware platforms There should be sufficient building LIPS capacity installed at the Civic Center to power at least the servers and network equipment through a 30-minute power failure Building LIPS at the Civic Center should be backed- up with generator power to allow the building to operate through power failures of indefinite length Utilities and ITD should standardize on a single email system and SMTP server ITD should obtain more tape backup units and install them in servers that are currently being backed up over the network to the single backup server A detailed assessment should be performed on the servers to determine what the expected future load would be so that the proper capacity is made available The manufacturer of the fire suppression equipment needs to be identified and an assessment should be performed to determine its capabilities of meeting the City’s needs The manufacturers of the water, temperature, fire, and intrusion detection systems need to be identified The City should look to minimize the number of single user printers and move increasingly toward networked printers in the ratio of 4 PCs for each printer The ITD and Utilities networks should be unified under the standards established by ITD A priority for the Space Planning Project should be to replace the existing Category 3 wiring with Category 5 (CAT5) The HP servers at the Civic Center should be upgraded with 100Mbps Network Interface Cards The Information Technology Division NT servers at the Civic Center should be connected directly to the backbone Cabletron MMAC-Plus switch High High High High Medium Medium Low High High High High 501t-02 App F Recommendations Table.doe The Warner Group F- 1 Section Priority High Description of Recommendation Subnet the network by introducing a Layer 3 switch in the center of the network or continue switching at layer 2, but use VLANs to break up the large broadcast domains Reduce the possibility of c~mplete network failure by utilizing dual power supplies in the Cabletron backbone switch chassis, providing a dedicated UPS for the switch, and keeping on hand spare cards The City should consider placing their Web server at the ISP rather than operating it on the City network Implement a firewall that allows the construction of a DMZ and place the Web server inside the DMZ The ’Information Technology Division should use only private addresses on their network (behind the ftrewall) The City should investigate the use of City owned fiber optic cable for network connection An analysis should be performed to determine if the current single circuit T-1 for Internet access is adequate for the current and anticipated user load The City needs to reduce the total number of server operating systems to NT and UNIX The City needs to reduce the total number of desktop operating systems installed at the various locations The City needs to standardize on a DBMS to support small and large business applications Complete the migration to the City standard suite of office automation products The City needs to migrate to the email standard of Microsoft Exchange running on the server and MS Outlook nmning on the client workstation The City has standardized on Netscape Navigator as its Internet browser and should continue to use this product The City ~hould replace the existing Bi-Tech accounting system with a new system As the City evaluates alternatives for a new accounting system consideration should be given to replacing the Lawson Payroll/Human Resource System with an integrated solution The current Legislative History System needs to be renovated to meet the Year 2000 compliance standards High Medium Medium Medium Medium Medium Software High High Medium High High Medium High High High 508-02 App F Recommendations Table doc The Warner Group F- 2 Section Priority Medium Medium Description of Recommendation The City map for the GIS system needs to be updated to include the surrounding jurisdictions and color photographs A data warehouse needs to be developed to standardize the information derived from other business applications (i.e. work order, permits, inspections, police and fire incidents, etc.) The City needs to establish what the GIS application will encompass and what will be the priority of it development. A strategic plan needs to be developed to prioritize the integration and deployment of GIS information The-City needs to standardize on a single document imaging system that would ideally be available to all City departments (e.g., City Attorney, Police, Fire, Utilities, etc.) The City needs to identify Internet transactions as a priority with new and existing business applications A job cost system should be evaluated as a part of an overall cost accounting solution for the City since this application will require integration with the f’mance, payroll, and budgeting systems The Police CAD should be installed on the HP-3000 to eliminate the risk of running the software under a new operating system with the plan to migrate within a specific timeframe The current Police RMS Year 2000 issues need to be addressed as a contingency plan The Fire Department is currently evaluating a Fire RMS to provide the ability to track employee training and certification, and paramedic transportation and billing information. An emphasis needs to be given to the integration with the Police CAD system. Integration of the Fire Rostering System with the Lawson Payroll to reduce duplication of time entry information The City should closely monitor the progress of the Library vendor over the next year and establish a timeframe for the assessment of a new system The City needs to pursue the web enabled version of the CLASS software High Medium Medium High High High High Low Medium Low 508-02 App F Recommendations Table doc The Warner Group F- 3 Section Priority High Description of Recommendation A Permit Tracking System needs to be installed to bring together the permits generated by Planning, Building, Fire, Public Works, and other entities in the City and to meet the Year 2000 requirements A centralized address database needs to be developed and maintained within the Permit Tracking System An application needs to be selected and implemented to automate the City infrastructure including water, sewer, storm drain, street lighting, signs and striping, tree maintenance, park maintenance, building maintenance, and others The City should continue to pursue the upgrade of the current Fleet Management System with the newer version The City should begin the evaluation of alternative fuel systems to interface into the Fleet Management System The City is in the process of implementing the Banner Customer Information System (CIS) to replace the Utility Billing System. The City needs to establish a date to renovate the current system to make it Year 2000 compliant Increase the authority and visibility of ITD within the Administrative Services Department and the City Designate a high-level City executive as CIO Improve communication with departments by conducting regular meetings with department heads Consolidate all IT positions throughout the City, with the exception of Business Analysts, into ITD Implement the organizational and staffmg changes depicted in Exhibits VIII-4 Implement the organizational and stuffing changes depicted in Exhibits VIII-5 Develop service level agreements between ITD and user departments Establish Citywide policy requiring users to call ITD Help Desk for support Assign a dual responsibility to each Systems Analyst for one or more departments and applications Retain the services of outside contractors when particular expertise, including project management skills High High High Medium High Organization High and Staffing High High Medium High Low High Medium Medium Medium 508-02 App F Recommendations Table.doe The Warner Group F- 4 Section Priority N/A Description of Recommendation The City should continue to retain experienced consultants for needs assessment, selection, contract negotiation, and project management of new systems that are large or complex The City should consider additional outsourcing opportunities Departments should be held accountable for ensuring their delegates to the advisory bodies fulfill their responsibilities in this important role Department representatives should attend meetings regularly in their respective departments to provide status updates and gather input The mission and structure of each of the IT advisory bodies should be re-examined and clarified Improve after-hours availability of critical IT support functions, based on departmental needs Improve accountability of technical support services Recruit IT staff based primarily on probable tenure and ability to acquire new skills Develop a process to identify necessary skill sets on a regular basis, and develop mechanisms to provide necessary training Increase compensation for the Business Analyst classification Provide ITD management with flexibility to hire Systems Analysts at the senior (Systems Analyst II) level Establish structured system design, procurement and implementation process Separate funding for IT support and maintenance from funding for capital purchases and projects The Technical Advisory Board should administer the IT Capital and Development Projects Fund ITD should estimate the cost of providing support to individual City departments. ITD should charge its support costs back to Enterprise Fund departments The costs of hardware and software should be fully depreciated and the costs recovered in the CIP to finance future replacement Medium High High High High High High Medium Medium High Medium Medium Medium Low Medium 508-02 App F Recommendations Table doc The Warner Group F- 5 ATTACHMENT THREE Proposed Position Changes and Additions New Positions Senior Systems Analyst (Public Safety) Senior Systems Analyst (Office Automation) Executive Assistant (1FTE) (1FTE) (1FTE) Position Changes and Additions Systems Analyst to Senior Systems Analyst Programmer Analyst to Systems Analyst Computer Operator to IT Technician Manager, Technical Support to Senior Systems Analyst Telephone Technician to IT Technician PC Technician to IT Technician Supervisor Data Processing to Senior Systems Analyst Manager, Data Comm. & Telephone Services to Manager Infrastructure Services Reclasses as Part of Consolidation (3FTE) (2FTE) (1FTE) (1FTE) (1FTE) (2FTE) (1FTE) (1FTE) PC Technician, Police to IT Technician Utilities Systems Technician to IT Technician Sr. Utilities Systems Technician to Systems Analyst Systems Analyst - Utilities to Senior Systems Analyst Business Analyst to Systems Analyst (1FTE) (1FTE) (1FTE) (1FTE) (1FTE) No Changes Manager, IT Manager, Applications Systems Analyst Senior Systems Analyst Manager, Utilities Information Systems Manager Communications and PC’s (1FTE) (1FTE) (2FTE) (3FTE) (1FTE) (1FTE) ATTACHMENT SIX Cost Estimate for Implementation of Phase One 1999-00 Costs (Prorated Costs) * Ongoing Cost, Future Years) New Position Costs - Two Senior Systems Analysts - salary - Executive Assistant - salary -Non Salary Costs $108,000 $216,000 $44,000 $88,000 $33,000 $11,000 Reclassification Costs -Various Reclasses for 11 FTE -Consolidation Reclasses $60,000 $96,000 $22,000 $34,000 Total Costs for Phase One $267,000 $445,000 Direct Costs Funded By Utility Funds Costs Allocated to Utility Funds ** General Fund Costs - Phase 1 $22,000 $34,000 $59,000 $99,000 $186,000 $312,000 Amount Remaining In Placeholder -$14,000 *Prorated Costs assume reclasses are effective November 15, 1999 and new positions are effective January, 2000 ** Allocation to Utility Funds is based on the current allocation of costs from Information Technology to the Utility Funds [i,, I EEE > ! ~ o~ o o E~E~o o