Loading...
HomeMy WebLinkAbout1999-09-27 City Council (7)TO: FROM: City of Palo Alto City Manager’s Report HONORABLE CITY COUNCIL CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SUBJECT: SEPTEMBER 27, 1999 CMR:370:99 445 BRYANT STREET (LOTS S/L) [FILE NOS. 98-ZC-11, 98-ARB- 159, 98-EIA-23, AND 98-SUB-5]: REVIEW OF AN APPLICATION BY THE CITY OF PALO ALTO PUBLIC WORKS DEPARTMENT FOR THE FOLLOWING ITEMS: 1) ZONE CHANGE FROM A PUBLIC FACILITY (PF) AND COMMERCIAL DOWNTOWN DISTRICT WITH PEDESTRIAN SHOPPING COMBINING DISTRICT (CD-C (P)) TO A PLANNED COMMUNITY (PC) ZONE AND TO ALLOW THE CONSTRUCTION OF A MULTI-LEVEL PARKING GARAGE ON EXISTING CITY OF PALO ALTO PARKING LOTS S/L; 2) TENTATIVE SUBDIVISION MAP APPROVAL TO REMOVE 19 UNDERLYING LOT LINES AND COMBINE THE LOTS INTO ONE LOT FOR THE PURPOSE OF THE ABOVE PROJECT; AND 3) CERTIFICATION OF THE FINAL ENVIRONMENTAL IMPACT REPORT (FEIR) 528 HIGH STREET (LOT R) [FILE NOS. 98-ZC-12, 98-ARB -180, 98-EIA-25 AND 98-SUB-6]: REVIEW OF AN APPLICATION BY THE CITY OF PALO ALTO PUBLIC WORKS DEPARTMENT FOR THE FOLLOWING ITEMS: 1) ZONE CHANGE FROM A PUBLIC FACILITY (PF) TO PLANNED COMMIYNITY (PC) ZONE TO ALLOW THE CONSTRUCTION OF A MULTI-LEVEL PARKING GARAGE ON AN EXISTING CITY OF PALO ALTO PARKING LOT R; 2) TENTATIVE SUBDIVISION MAP APPROVAL TO REMOVE 8 UNDERLYING LOT LINES AND COMBINE THE LOTS INTO ONE LOT FOR THE PURPOSE OF THE ABOVE PROJECT;AND 3)CERTIFICATION OF THE FINAL ENVIRONMENTAL IMPACT REPORT (FEIR) CMR:370:99 Page 1 of 9 REPORT IN BRIEF On August 9, 1999, the City Council held a public hearing on the proposed project. The Council voted to continued the proposal to September 27, 1999. The City Manager’s Report (CMR:341:99) for this item included a request made by the Public Works Department for direction on the design and massing for the parking structures, approval of buildout of Lots S/L for a Teen Center and office space, and approval of a Budget Amendment Ordinance (BAO) in the amount of $70,000 to augment the Downtown Parking Structure Feasibility Study Capital Improvement Project 19530. This report contains additional items to be reviewed and considered along with the items continued from August 9, 1999, including an application for a Planned Community Zone District (PC), and a Tentative Subdivision Map for the two proposed parking structures, along with certification of the Final Environmental Impact Report (FEIR). CMR:370:99 Page 2 of 9 RECOMENDATION Staff recommends that the Council: Adopt the attached resolution certifying the adequacy of the Environmental Impact Report (EIR) for both parking structures and making the required California Environmental Quality Act (CEQA) findings, including a Statement of Overriding Consideration for one finding of significance and potential unavoidable short term impact, that is, temporary loss of parking for both parking structures (see Attachment A). Approve the parking garage at 445 Bryant Street (Lots S/L), including: ao Adopt the attached Planned Community (PC) Ordinance, including 1) draft findings and conditions, 2) rezoning the property from (PF) Public Facilities and CD-C (P) Commercial Downtown District with Pedestrian Shopping Combining District to PC District (see Attachment B) and 3) request for a waiver of required parking for the new square footage of the proposed Teen Center; bo Approve the attached proposed staff findings for Architectural Review Standards (see Attachment C); Co Approve the Tentative Subdivision Map based on the draft findings (see Attachment D) and draft conditions (see Attachment E); and d. Approve the architectural design "Scheme B." 3.Approve the parking garage at 528 High Street (Lot R) to include the following: a°Adopt the attached PC Ordinance, including draft findings and conditions, rezoning the property from PF (Public Facilities) to PC (Planned Community) Zone (see Attachment F); bo Approve the attached proposed staff fmdings for Architectural Review Standards (see Attachm6nt G); Co Approve the Tentative Subdivision Map based on the draft f’mdings (see Attachment H) and draft conditions (see Attachment I); and d. Approve the architectural design "Scheme B." Planning Commission Recommendations The following actions were taken on the parking structures at Lots S!L and Lot R on July 28, 1999: CMR:370:99 Page 3 of 9 Denial of"Scheme B" architectural design (4-0-0-3, Commissioners Schink, Byrd and Beecham not participating). Two motions were put forth by the Planning Commission regarding the approval of the Planned Community (PC) zone: one motion to approve and one motion to deny. Both motions failed (2-2-0-3, Commissioners Schink, Byrd and Beecham not participating). o Approved the waiver of required parking in-lieu fee for new square footage of the proposed Teen Center for the parking structure on Lots S/L (4-0-0-3, Commissioners Schink, Byrd, Beecham not participating). Approved staff recommendation on the Tentative Subdivision Map with modifications to the text of the draft finding (4-0-0-3, Commissioners Schink, Byrd, Beecham not participating.) o Conditionally approve the staff recommendation finding that the Draft Environmental Impact Report (DEIR) was adequate and recommended that the Council find that the DEIR has been prepared in compliance with California Environmental Quality Act (CEQA) and adequately analyzes the potential impacts of the project and related mitigation measures. As part of its approval, the Commission suggested that the EIR consider Comprehensive Plan Policies T-3 (reduction in auto use) and L-5 (maintaining the scale and character and avoiding land uses that are unacceptable due to size and scale), and Programs T-49 (implementation of a supply and demand management strategy for downtown) and T-46 (minimizing the need for all-day employee parking in the University Avenue district.) (4-0-0-3, Commissioners Schink, Beecham and Byrd not participating). °Approved staff recommendation relative to overriding considerations, with the following wording change (underlining denotes additions) "That the City Council make a statement of overriding consideration for one fmding of significance and potential unavoidable short term impact, that is temporary loss of parking" (4-0-0- 3, Commissioners Schink, Byrd, Beecham not participating) Architectural Review Board Recommendation The following actions were taken by the Architectural Review Board on the parking structures at Lots S/L and Lot R on May 20, 1999: The Architectural Review Board (ARB) recommended to City Council certification of the DEIR with a statement of overriding consideration for one finding of significance and unavoidable short term impact and adoption of the PC Ordinance, including findings and conditions, rezoning the property at 445 Bryant Street (Lots S/L) from (PF) Public Facilities and Commercial Downtown District CMR:370:99 Page 4 of 9 with Pedestrian Shopping Combining District CD-C (P) to PC Planned Community District and the property at 528 High Street (Lot R) from PF (Public Facilities) to PC (Planned Community) Zone; and Denial on the architectural designs of the parking structure which includes both ’Scheme B" and "Scheme C" for the parking structure located at 445 Bryant Street (Lots S/L) and 528 High Street (Lot R). PROJECT DESCRIPTION The proposal is an application for two parking structures located in downtown Palo Alto. This application includes a PC Zone Application, a Tentative Subdivision Map and Certification of Final Environmental Impact Report. Planned Community Zone Application The proposed parking structures would not be permitted under the provisions of the current Public Facility (PF) zoning or Commercial Downtown Community Zoning (CD- C) because the Floor Area Ratio (FAR) of the garages exceeds the PF and CD-C limits of 1:1. The proposed PC zoning permits an increase in the minimum FAR and reduction in the setbacks. If the PC zoning is approved, the resultant FAR for 445 Bryant Street (Lots S/L) would be 2.92:1, with no minimum setback and 206,300 square feet of garage area. The FAR for 528 High Street (Lot R) would be 3:1, with a setback on the north side of the lot. Tentative Subdivision Map In order to process the zoning change, a Tentative Subdivision Map is required for each site to merge parcels. The parking structure at 445 Bryant .Street (Lots S/L) requires Tentative Subdivision Map approval to remove 19 underlying lot lines and combine the lots into one lot. The parking structure at 528 High Street (Lot R) requires a Tentative Subdivision to remove 8 underlying lot lines and combine the lots into one lot. If an assessment district is approved, a final parcel map will be presented for approval. Final Environmental Impact Report The Final Environmental Impact Report (FEIR) has been prepared by staff. It consists of responses to all oral and written comments presented during the public review period, as well as text changes made to the DEIR as a result of the staff and public review of the DEIR and Planning Commission recommendations on the DEIR. A DEIR was prepared as part of the PC zoning application and was presented to the Planning Commission and ARB. The DE1R was made available for a 30-day public review period that started on December 9, 1998 and ended on January 8, 1999. The written comment period was extended to March 10, 1999. The FEIR was made available for public review beginning September 13, 1999. Approval on the project requires that Council certify the EIR (including the DEIR and FEiR), and make the findings, including a Statement of Overriding Consideration for CMR:370:99 Page 5 of 9 one potential unavoidable short term impact, that is temporary loss of parking. Prior to the start of construction, staff will develop a plan for parking during construction. ALTERNATIVES The City Council may wish to approve the Final Environmental Impact Report, the PC Ordinances and the Tentative Subdivision Maps while directing staff to develop an additional design alternative for both parking structures. If Council requires the redesign of each parking structure, staff recommends Council complete its final action on items 1, 2a-c and 3a-c within the Staff Recommendation portion of this report. This grants approval of the EIR, PC Zone change and Tentative Subdivision Map for both parking structures. Therefore, the design would be the only item requiring further Council review and approval. If Council directs redesign, staff request that Council’s action include reaffirmation or redirection as to the intent of the parking structures. If it is Council’s intent to reaffirm its direction "to maximize the amount of parking provided to reduce the parking deficient downtown," the removal of the upper floors of either garage cannot be accommodated. If Council direction is to reduce the amount of parking provided in order to mitigate concerns regarding massing, opportunities for reducing the height of the structures could be accommodated. The redesign options available could include the new exterior architectural characteristics, addressing the ARB’s and Planning Commission’s concerns relative to the height, bulk, and scale; and the further examination of the existing surrounding architecture to ensure the new design is in context with its surroundings. However, the redesigned structures would be required to maintain the original project parameters identified in the project description of the EIR. No additional impacts outside the scope of the EIR could be allowed without the redrafting and recirculation of the EIR, which would significantly delay the completion of the project. The process for the development of another design could include the reconvening of the previously formed Downtown Parking Structure Project Study Group which includeg the following representatives: ¯Developer representative; ¯Merchant representatives; ¯Lot R tenant representative; ¯Architectural Review Board representative; ¯Public Arts Commission representative; ¯Downtown South Neighborhood representative; ¯Downtown North Neighborhood representative; ¯Palo Alto Chamber of Commerce; ¯Public Works personnel; ¯Planning Department personnel; and ¯Design consultants. CMR:370:99 Page 6 of 9 Staff would recommend both that the Planning Commission and Historic Resources Board (H) appoint one member to join the Study Group. This would provide a better connection when the design undergoes public review before each board and commission. Staff would prepare a specifid policy framework based upon Council direction, to guide the Study Group in its efforts to decide which design opportunities should be pursued.- Staffwould also recommend retaining a local architectural firm to assist the Study Group in the design of the structures. Staff has discussed the estimated costs for such services with various local architectural firms. Estimated costs range up to $60,000 for both garages. These services include a three-dimensional mass model and possible use of computer three-dimensional modeling to assist in the redesign. This could be a local firm retained directly by the Watry Group. The timeline for the completion of the redesign of both structures would be approximately six to eight months. If use of an outside architectural firm were pursued, staff would need to return to Council for a Budget Amendment Ordinance. This time frame would include the following: the time required to solicit further input from the Study Group; review of the policy framework; suggestion of possible design solutions; creation of alternatives; review of the alternatives; preparation of scenarios or models; and finalizing an acceptable alternative. Upon completion of a design by the Study Group, the Study Group would provide a recommendation to the HRB, ARB and Planning Commission. This review would include informational review by the HRB, and formal public hearing review by the ARB, and Planning Commission.These recommendations would then be presented to Council for final approval. STEPS FOLLOWING APPROVAL After City Council approval of the Tentative Parcel Map (Subdivision Ordinance), a Final Map would be required to be prepared. The Final Map would require the approval of the Council, prior to recordation with the County of Santa Clara. ATTACHMENTS Attachment A: Resolution certifying the adequacy of the EIR Attachment B: Planned Community (PC) Ordinance including Draft Findings and Conditions of Approval for PC Zone Change at 445 Bryant Street (Lots S/L) Attachment C: Proposed Staff Findings for Architectural Review Standards at 445 Bryant Street (Lots S/L) Attachment D: Draft Findings for the Tentative Subdivision Map at 445 Bryant Street (Lots S/L) Attachment E: Draft Conditibns of Approval for the Tentative Subdivision Map at 445 Bryant Street (Lots S/L) Attachment ,F: Planned Community (PC) Ordinance including Draft Findings and Conditions of Approval for a PC Zone Change at 528 High Street (Lot R) CMR:370:99 Page 7 of 9 Attachment G: Proposed Staff Findings for Architectural Review Standards at 528 High Street (Lot R) Attachment H: Draft Findings for the Tentative Subdivision Map at 528 High Street (Lot R) ¯ Attachment I:Draft Conditions of Approval for the Tentative Subdivision Map at 528 High Street (Lot R) Final E1R (Council Members only) PREPARED BY: Phillip Woods, Senior Planner DEPARTMENT HEAD REVIEW C’~~ G EDWARD GAWF Director of Planning and Community Environment GLENN S. ROBE!~S Director of Public Works CITY MANAGER APPROVAL: Manager COURTESY COPIES: The Watry Design Group, 815 Hamilton Street, Redwood City, CA 94063 Greg Smith, Consulting Engineer, 353 Sacramento Street, San Francisco, CA 94111 Thomas Towey, Komorous-Towey Architects, 1355 Market Street, Suite 326, San Francisco, CA 94103 City of Menlo Park, Don de la Pefia, Director of Community Development, 701 Laurel Street, Menlo Park, CA 94025 Downtown Marketing Committee, c/o Palo Alto Chamber of Commerce, 325A Forest Avenue, Palo Alto, CA 94301 Crescent Park Neighborhood Association, Attn: Catherine Lehrberg, 1085 University Avenue, Palo Alto, CA 94301 CMR:370:99 Page 8 of 9 Roxy Rapp, P.O. Box 1762, Palo Alto, CA 94302 Chop Keenan, Keenan Land Company, 700 Emerson Street, Palo Alto, CA 94301 Georgie Gleim, Gleim Jewelers, 322 University Avenue, Palo Alto, CA 94301 Rick Tipton, P.O. Box 1281, Palo Alto, CA 94301 Lot R Tenant Representative: Joseph Bellomo, 102 University Avenue, Palo Alto, CA 94301 Architectural Review Board Representative: Bob Peterson, 57 E1 Camino Real, Menlo Park, CA 94025 Public Arts Commission Representative: Judith Wasserman, 751 Southampton, Palo Alto, CA 94303 University South Representative: Yoriko Kishimoto, 251 Embarcadero Road, Palo Alto, CA 94301 Downtown North Representative: Mark Nanewicz, 228 Waverley Street, Palo Alto, CA 94303 Downtown North Alternate: Michael Griffin, 344 Poe Street, Palo Alto, CA 94303 Downtown North Alternate: Sally Ann Rudd, 204 CowPer Street, Palo Alto, CA 94301 John S. Ervin, 420 Palm Street, Palo Alto, CA 94301 Earl Nicholas Selby, Attorney at Law, 418 Florence Street, Palo Alto, CA 94301 Mr. Michael Weed, Aufmuth, Fox, Weed & LeBlanc, 314 Lytton, Suite 200, Palo Alto, CA, 94301 M. Wagner and R. Ferguson, Attn: Rich Ferguson (Lot S/L), 301 University Avenue, #480, Palo Alto, CA 94301 Herb McLaughlin (property at 124 University Avenue), c/o Kaplan McLaughlin Diaz, 222 Vallejo Street, San Francisco, CA 94111 Susan Frank, Chamber of Commerce, 325 Forest Avenue, Palo Alto, CA 94301 Comine Campbell, Aredrdas, 450 Bryant, Palo Alto CA 94301 Shulamith Rubinfien, 501 Kingsley Avenue, Palo Alto, CA 94301 Elaine Meyer, 609 Kingsley Avenue, Palo Alto, CA 94301 JeffBrown, 660 Lincoln Avenue, Palo Alto, CA 94301 Dorothy Bender, 591 Military Way, Palo Alto, CA 94306 Pria Graves, 2130 Yale Avenue, Palo Alto CA 94306 Lorilee Houston, 520 CowPer Avenue, Palo Alto, CA 94301 Karen Holman, 725 Homer Avenue, Palo Alto, CA 94301 Katherine Pering, 388 Everett Avenue, Palo Alto, CA 94301 Phyllis Munsey, 2361 Santa Ana, Palo Alto, CA 94303 John Hackmann, 235 Embarcadero Road, Palo Alto, CA 94301 Kathy Jordan, 685 High Street, #5C, Palo Alto, CA 94301 Bill McCann, President Palo Alto Plaza Homeowners Association, 685 High Street, #2F, Palo Alto, CA 94301 Sylvia Star-Lack, VTA Congestion Management Program, 3331 N. First Street, Bldg. B, San Jose, CA 95134 CMR:370:99 Page 9 of 9 Attachment A RESOLUTION NO. -RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO CERTIFYING THE ENVIRONMENTAL IMPACT REPORT FOR THE DOWNTOWN LOTS S/L AND R PARKING GARAGE PROJECTS, AND MAKING CERTAIN FINDINGS The Council of the City of Palo Alto does RESOLVE as follows: SECTION I. Background. The City Council finds, determines and declares as follows: A. In July 1986, the City Council approved the Downtown Study that made significant changes to the policies and regulations for the Commercial Downtown area for the purpose of moderating future traffic-generating growth. Included in those changes, the Council: established more restrictive floor area ratios (FAR’s) in the downtown area, with FAR and parking exemptions for seismic and historic structures; established a maximum 350,000 square foot cap on the development of new square footage in the downtown; established a blended parking rate of one space per 250 square feet of floor area; formally acknowledged and set the parking deficit in the downtown area at 1,600 spaces, and approved an obligation to evaluate the downtown FAR and parking exemption regulations if the unmet need reached one-half (225) of the 450 spaces necessary for a new parking structure; created a Ground Floor (GF) Combining zoning district, allowing only uses, such as retail, eating and drinking and other service-oriented commercial development uses on the ground floor, which would be less likely than other uses, such as office use, to generate peak hour traffic; directed staff to undertake a site and feasibility study to evaluate an additional public parking structure downtown; approved PC-Planned Community zoning as an approp}iate zone for parking structures; 990921 sdl 0032247 adopted a Twelve-Point Parking Program to ease congestion and increase the efficiency of existing parking; prohibited new traffic signals on portions of Alma Street and Middlefield Road and prohibited a direct connection from Sand Hill Road to Palo Alto/Alma Street; directed staff and the Architectural Review Board (ARB) to consider the possibility of an Urban Design Plan for downtown; and established a temporary Design and Amenities Committee to develop an incentive program for private developers to provide public amenities in the downtown area. B. In October 1993, the City Council adopted the Downtown Urban Design Guide, which addresses a variety of transportation, pedestrian and parking issues, including consideration of Lots S/L and Lot R as sites for potential parking structures. C. In March 1994, the City Council approved a comprehensive parking plan for downtown including consideration of one or more new parking structures within the University Avenue Parking Assessment District. Subsequently, the City Council approved a Capital Improvement Program for fiscal year 1994-95 for purposes of undertaking a Downtown Parking Structure Feasibility Study. In July 1996, the Planning Commission and ARB reviewed and commented on the results of the Feasibility Study and the preliminary design concepts for the two recommended structures. In July 1997, the City Council directed staff to proceed with additional steps leading to construction of two parking structures. In January 1998, the City Council authorized the design of two parking structures to a 50% completion stage, for purposes of submitting the projects to assessment proceedings for funding of the projects. D. In September 1998, the Department of Public Works submitted applications for approval of the Lots S/L garage project(File Nos. 98-ZC-II, 98-ARB-159, 98-EIA-23, and 98-SUB-5) and the Lot R garage project (File Nos. 98-ZC-12, 98-ARB-180, 98- EIA-25, and 98-SUB-6). E. The City issued a Notice of Preparation for the Environmental Impact Report for the Downtown Parking Garages projects in August 1998, and duly filed the Notice of Preparation with the State Clearinghouse on August 3, 1998. Comments on the NOP were received from interested public agencies for a 30-day period. Copies of this notice were duly mailed to all identified responsible agencies, trustee agencies and other public agencies known to’ be interested in the projects. 990921 sdl 0032247 F. The DEIR was released for public review on November 25, 1998. A notice of the availability of the Draft EIR was published in the Palo Alto Weekly on November 25, 1998. Notices of availability and/or copies of the DEIR were also mailed to the State Clearinghouse, to all responsible agencies and to all other persons who requested notice of the DEIR. A 60-day period ~or public review and comments on the DEIR was also commenced on December 9, 1998, and closed on March i0, 1999. Copies of the DEIR were also made available for public review at the Palo Alto Planning Department, Palo Alto Public Libraries, and the Palo Alto Public Works Department. G. The City Planning Commission conducted a public hearing to review the Draft EIR and to receive public comments on the DEIR on January 13, 1999. The Planning Commission conducted further deliberations on the proposed projects and on the DEIR on July 14 and July 28, 1999. At the recommendation of the Planning Commission the subsequently prepared Final EIR ("FEIR") was expanded to include further evaluation of possible alternatives and other information concerning the projects. H. During the public comment period the City received written and oral comments on the DEIR and on the projects. The City prepared written responses to all written and oral comments received during the public comment period on the Draft EIR.. These written responses appear in the FEIR. These responses to comments address and fully respond to all significant environmental issues raised in comments on the DEIR. I. The FEIR was completed and released for public review on September 13, 1999. Pursuant to Public Resources Code section 21092.5, the City provided copies of the City’s responses to comments to each public agency which commented on the DEIR. J. The City Council held a duly noticed public hearing on the projects and on the EIR on September 27, 1999.The Counci! received oral testimony and written comments. SECTION 2. Certification Having fully reviewed the information contained in the EIR and considered the EIR in light of all additional information received during public hearings on the proposed projects, including staff reports, oral and written testimony received from other public agencies and members of the public, additional information known from reports, studies, proceedings and other matters of record included or referenced in the administrative record of these proceedings, the Council hereby finds, declares and certifies that: A. The Final EIR ("EIR") consists of and includes the following documents: 990921 sdl 0032247 I. The focused Draft Environmental Impact Report (DEIR), dated November 1998, which consists of the analysis of earth and geotechnical; biological resources; transportation, parking and circulation; air quality; noise; and aesthetics and light and glare Impacts and Mitigations; and 2. The Final Environmental Impact Report (FEIR), dated September 1999, which consists of text changes to the DEIR, a list of individuals, agencies and commissions commenting on the DEIR, and responses to all relevant oral and written comments on the DEIR. A. The EIR is intended to and does constitute the full and complete EIR for each of the two individual projects evaluated in the EIR, including: Lots S/L, and Parking Structure located on City owned Parking Lot R. o Parking Structure located on City owned Parking B. The EIR is intended for use in all discretionary approvals granted by the City of Pa!o Alto and any other agency having regulatory jurisdiction over the projects. C. The Draft and Final EIR were prepared by City staff and City consultants and have at all times reflected the independent review and judgment of the City on all matters stated in the Draft EIR and Final EIR. D. The EIR has been completed in compliance with all applicable provisions of the California Environmental Quality Act. SECTION 3. Consideration of Environmental Impacts, Mitigation Measures and Alternatives. I. Review and Consideration of Impacts. The Council has considered all information contained in the EIR, as wel! as all other relevant information received in the course of evaluation and review of the proposed projects, concerning all significant and potentially significant environmental impacts and cumulative impacts of the two proposed downtown parking garage projects. 2. Mitigation Measures. In reviewing the proposed downtown parking garage projects and granting discretionary approvals for each project the Council has also fully considered and adopted each of the mitigation 990921 sdl 0032247 measures identified for the significant and potentially environmental impacts of the projects and has considered each of the project alternatives identified in the EIR. Pursuant to Public Resources Code section 21081(a), the Council hereby makes specific findings concerning the mitigation measures, which have all been incorporated into or imposed as conditions of approval on the projects. Earth and Geotechnical 4.1.1 Short term soil erosion. Construction of the proposed projects could result in significant quantities of soil being eroded off of the sites. Mitigation Measure 4.1.1 requires implementation of an erosion and sedimentation plan and use of Best Management Practices (BMP’s) during construction to reduce the potential for soil erosion and secondary water quality degradation. The Council finds that adoption of this measure will reduce the impacts to less than significant. 4.1.2 Soil disturbance. Construction of the project would result in soil disturbance and excavation of approximately 30,000 cubic yards of earthen material.Some amount of fill material is also anticipated to be needed. Mitigation Measure 4.1.2 requires the contractor for the projects to follow all specific excavation and shoring requirements contained in the "Geotechnical Investigation" report prepared by Lowney Associates and attached as an Appendix to the DEIR. The Council finds that adoption of this measure will reduce the potential impacts to less than significant. Transportation, Parking and Circulation 4.3.1 Short term parking loss. A parking shortage of approximately 180 public parking spaces would occur during the time required to construct the proposed structures on both project sites. Mitigation Measure 4.3.1 requires the City Engineer to develop and implement, for each of the garages, a short-term parking management plan for reducing the impacts of loss of the existing surface parking on Lots R and S/L during construction. Such plan could include, but not be limited to, identification of alternate sites for parking, shuttle buses, and construction phasing. The Council finds that, although the best possible mitigation would be to find available alternative parking during construction of the projects, the availability of alternative parking locations at the time the projects are constructed is 990921 sdl 0032247 5 uncertain and speculative, due to the rapidly changing real estate market in downtown Palo Alto and elsewhere. Therefore, the Council cannot find with certainty that the identified mitigation measure will fully mitigate this potential impact, and finds that it remains significant. A statement of overriding considerations has been prepared for this impact. See paragraph 4 of this Section 3. 4.3.2 Pedestrian crossing (S/L Project). Construction of the proposed garage S/L could increase the amount of pedestrian traffic between the proposed garage and the City’s Senior Center immediately west of the site and across Bryant Street. A larger than average percentage of these pedestrians could be expected to be physically handicapped, requiring a longer than normal length of time to cross Bryant Street. Mitigation Measure 4.3.2 requires that traffic calming devices, such as bulbouts, special pavement treatments, speed humps, or some combination of these be installed at the crosswalk on Bryant Street between Garage S/L and the Senior Center. The mitigation measure requires that the Public Works Department do a more refined engineering analysis based on the final configuration of the garage structure, and from that analysis, determine which specific traffic calming device would be more appropriate. The Counci! finds that implementation of traffic calming devices will lessen the effect of this potential impact to less than significant. 4.4 Air Quality. 4.4.1 The construction of the projects could increase dust and locally elevate levels of PMI0 downwind of construction activity. Construction dust could create a nuisance at nearby properties. Mitigation Measure 4.4.1 requires the incorporation of nine specifically identified measures into the project, which the Council finds will mitigate the potential impact to less than significant. 4.5 Noise. 4.5.1 Mechanical noise. Significant noise levels could be generated from mechanical equipment from the parking structures, including vent blowers and similar equipment. Impacts could be most significant to office and retail occupants of the two commercial buildings located northeast of Lot S/L. Mitigation Measure 4.5.1 requires that final construction documents, including plans and specifications, be reviewed and approved by a qualified acoustical engineer to certify that future noise levels from vents and mechanical equipment comply with City 990921 sdl 0032247 6 noise standards. The Council finds that implementation of this measure will reduce the effects of this potential impact to less than significant. 4.5.2 Operational Noise. Significant noise levels could.be generated from cleaning and operational activities of the two garages, especially since both facilities are planned to be open to the public on a 24-hour-a-day basis. Mitigation Measure 4.5.2 requires that maintenance and cleaning equipment used in the constructed garages be limited to a maximum noise exposure level of 75dB at a distance of 25 feet between the hours of I0:00 p.m. and 7:00 a.m. Monday to Friday. The Council finds that this will protect the nearby residents from unreasonable noise from maintenance of the garages, and wil! reduce the effects of this potential impact to less than significant. Aesthetics and Light and Glare. 4.6.2 Views and Vistas. Construction of Garage S/L would impact the two existing office and commercial buildings immediately northeast of the project site by blocking existing views, reducing the amount of light entering the buildings and creating shade-and shadow patterns over these buildings. Mitigation Measure 4.6.2 requires that the Garage S/L design incorporate certain identified architectur~l features and building materials in order to provide a human scale to the structure. The Counci! finds that such features will reduce the effects of the impact to less than significant. 4.6.3 Light and Glare. Construction of both parking structures could increase the amount of light and glare generated on both sites. Mitigation 4.6.3 requires that all lighting be in conformance with the recommendations of the Illuminating Engineering Society, to enhance security inside the structures, without having the inside lighting spill unreasonably on the outside. The Council finds that implementation of this measure will reduce the effects of this potential impact to less than significant. The Council finds that the mitigation measures and conditions of ipproval adopted in connection with the approved projects avoid or mitigate the adverse environmental impacts of each of the projects to the maximum extent feasible. 99092| s41 0032247 3. Alt@rnative$ tQnsidered. The Council also finds that the EIR has evaluated a reasonable range of alternatives for the proposed downtown parking garage projects. The Council has considered the information~in Section 5 of the DEIR, comments on the Draft EIR and the responses to those comments contained in the FEIR, and additional information received during City review and evaluation of the proposed projects or known from reports, studies, proceedings and other matters of record included or referenced in the administrative record of these proceedings. The Council concludes that the EIR evaluates a range of reasonable alternatives to the projects, or the location of the projects, which would feasibly accomplish most of the basic objectives of the projects. The Council further finds that there are no additional feasible alternatives to any of the proposed projects which were unreasonably excluded from consideration in the EIR. With regard, specifically, to the "No Project" alternative, the Council finds that it is not environmentally superior to the projects. As identified in Section 1 of this resolution, the City of Palo Alto has, for many years, studied the issue of downtown and near-downtown traffic congestion, as exemplified by the parking deficit, and has implemented policies in furtherance of reducing that deficit. The studies uniformly conclude that additional parking structures are needed as one part of the solution, along with other measures identified in the EIR, such as appointment of a downtown commute coordinator, neighborhood permit .parking, and a downtown shuttle bus. The Council finds that other alternatives alone, such as a TDM Program, cannot feasibly reduce the downtown parking deficit, but should be encouraged in conjunction with the parking garages. 4. Statement of Overriding CDnsideration$. Pursuant to Public Resources Code section 21081(b), the Council has further considered the potentially significant environmental impact of the projects, Impact 4.3.1, loss of short term parking during construction, which cannot be reduced to less than a significant level by the mitigation measures and conditions of approval adopted in connection with the projects. The Council has further balanced this remaining significant adverse impact of each project against the potential public, social, economic and other benefits of the project and determined that the significant environmental effect is acceptable in light of specific overriding benefits which justify approval of each of the projects on the terms and conditions approved by the Council. As stated in paragraph 3 above, the projects were identified by the City Council several years ago, as a result of continuing studies on the matter, and identified in the recently adopted Comprehensive Plan, to be ¯ necessary and desirable components of a comprehensive 990921 sdl 0032247 8 transportation program for the City. Unfortunately, because the sites determined to be the most feasible for constructing the parking structures are currently used for surface parking} the temporary loss of parking during construction of each garage is unavoidable. And because the availability of land that could.be used for temporary alternate parking at the time of construction is presently unknown, and speculative, no feasible mitigation measure is available to fully mitigate this potential short term loss. However, the Council finds that the construction of the projects will be as short as reasonably possible and will ultimately result in an increase in the number of available spaces, which outweighs the temporary reduction in spaces during construction. The Council further finds, declares and certifies that this finding is based on substantial evidence contained or referenced in the administrative record and reflects the considered judgment of the Council. 5. Environmental Effects Found Less Than Significant. The Council has also considered the information contained in the EIR and all other information received during evaluation and consideration of the projects with respect to any asserted additional environmental effects of the projects not evaluated in the EIR. The Council finds that based on all evidence received, there are no additional significant or potentially significant adverse environmental effects which may result from any of the projects which have not been identified and evaiuated in the EIR. The Council has further considered the evaluation in the EIR of additional potential environmental impacts which were determined not to be significant or potentially significant, and finds that these impacts were correctly analyzed and determined to beless than significant in the EIR. The Council has’not received any substantial evidence warranting a change in the conclusions stated in the EIR with respect to any of the impacts identified as less than significant in the EIR. In particular, the Council has considered comments concerning various old and historic buildings located in the vicinity of the projects, and the historic context of the project sites. The Council finds that the projects will not significantly affect any historic structure nor any historic district. Although there are, indeed, historic structures in the vicinity of the projects, some quite close by, the eclectic mix of architectural styles and new and old buildings throughout the downtown area allows the proposed parking garages to fit compatibly in their urban context. 990921 sdl 0032247 9 .SECTION 4. Review Process. New Information Received During the Public In the course of continuing environmental review of the proposed projects, the City has been presented with various information which was not contained in the DEIR for the proposed projects and which has been contended by some commentors to constitute significant new information constituting grounds for revising and recirculating the EIR for further public review and comment pursuant to Public Resources Code section 21092.1 and CEQA Guidelines section 15088.5. The Council has considered all new or additional information, and all information alleged to be significant new information received since preparation and circulation of the DEIR, including all comments and responses to comments on the DEIR, various changes made to the projects, and all comments and other information since release of the responses to comments, and finds that none of the new or allegedly new information warrants further revision of the EIR or recirculation of the EIR for further public review and comment. None of the new or additional information appearing after preparation of the DEIR indicates that: (I) new significant environmental impacts not previously considered in the DEIR would result from any of the projects; (2) there will be a substantial increase in severity of any impact previously evaluated in the DEIR; (3) new feasible mitigation measures or alternatives considerably different than those analyzed in the DEIR has become available and has not been adopted by the applicant; or (4) the DEIR was so fundamentally inadequate or conclusory that meaningful publi.c comment was precluded. SECTION 5. Comprehensive Plan Consistency. This Council has reviewed and considered the information and evidence in the record relating to the consistency of the projects with the goals, policies and other provisions of the Comprehensive Plan, including, but not limited to, the discussion of consistency issues set forth in the EIR, the written and oral reports provided by staff, and written and oral comments on the issue, and having also considered the contents of the Comprehensive Plan, and the reports, studies and proceedings related thereto, this Council, as the body charged with adopting, interpreting and applying the goals, policies and provisions of the Comprehensive Plan, finds that each project as conditioned and approved is fully consistent with all applicable goals, policies and other provisions of the Comprehensive Plan as amended. SECTION 6. Record of Proceedings. The documents comprising the record of proceedings in this matter are located in the offices of the City of Palo Alto Department of Planning and Community Environment. The custodian of these documents is the Director of Planning and Community 990921 sdl 0032247 10 Environment, 250 Hamilton Avenue, 5th Floor, Palo Alto, California, or his designee. SECTION 7. Mitigation Monitoring. The Council hereby directs that the mitigation measuies identified in the EIR and adopted by this Council shall be monitored by appropriate staff to ensure their implementation and inclusion in the approved projects. The Council further directs staff to publish in a separate document for final Council approval, a list of all mitigation measures and the departments or staff position(s) so identified to monitor each measure and ensure its implementation. SECTION 8. This resolution shall be effective upon the date of its adoption. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST:APPROVED: City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney Mayor City Manager Director of Planning and Community Environment 990921 sdl 0032247 il Attachment B ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING SECTION 18.08.040 OF THE PALO ALTO MUNICIPAL CODE (THE ZONING MAP) TO CHANGE THE CLASSIFICATION OF PROPERTY KNOWN AS 445 BRYANT STREET (PARKING LOTS S/L) FROM PF AND CD-C(P)TO PC The Council of the City of Palo Alto does ORDAIN as follows: SECTION I. (a) The Planning Commission, after duly noticed public hearing, and the Architectural Review Board, after duly noticed public hearing, have recommended that Section 18.08.040 (the Zoning Map) of the Palo Alto Municipa! Code be amended as hereinafter set forth. (b) The City Council, after duly noticed public hearing, and upon due consideration of the recommendations and of all testimony offered upon the matter, finds that the proposed amendment is in the public interest and will promote the public health, safety and welfare, as hereinafter set forth; SECTION 2. Section 18.08.040 of the Palo Alto Municipal Code, the "Zoning Map," is hereby amended by changing the zoning of certain property known as 445 Bryant Street (the "subject property") from "PF Public Facility" and ~CD-C(P)Commercial District (Community), Pedestrian Combining" to "PC Planned Community." The subject property is shown on the map labeled Exhibit "A," attached hereto and incorporated herein by reference. SECTION 3. The City Council hereby finds with respect to the subject property that: (a)The site is so situated, and the use proposed fgr the site is of such a characteristic that the application of genera! districts or combining districts will not provide sufficient flexibility to allow the proposed development. The proposed use is a multistory parking garage, which has been identified as a major public need in the downtown area, and such a use cannot be feasibly constructed within the available space under any other existing zoning classification. 1 990708 sdl 0032195 (b)Development of the site under the provisions of the PC Planned Community district will result in public benefits not otherwise attainable by application of the regulations of genera! districts or combining districts. The primary purpose and the major public benefit of the deve!opment is to provide much needed public parking, which will reduce the current parking deficit in the downtown area. Other public benefits of the project include a landscape plaza on Bryant Street, electrical connections for electric vehicles and incorporation of public art. (c)The use permitted and the site development regulations applicable within the district are consistent with the Palo Alto Comprehensive Plan, as detailed in the Staff Report to the Planning Commission for the Agenda of July 14, 1999. The permitted uses and site development regulations are compatible with existing and potential uses on adjoining sites or in the general vicinity, as follows: I) the parking structure wil! provide public parking to support commercia! uses in the area; 2) the leased space will be one or more of the following: (i) a ground f!oor retail or other pedestrian-oriented use; (ii) a teen center; and (iii) office use. Either a retail or other pedestrian-oriented use would be-similar to other ground floor uses in the vicinity, and a teen center would merely replace an existing teen center use, which has operated compatibly with surrounding uses. Office use above the ground f!oor is also similar to many surrounding uses. SECTION 4 Those certain plans entitled ~445 Bryant Street (parking lots S/L)" prepared by The Watry Design Group and Komorous-Towey Architects, dated March 5, 1999, a copy of which is on file in the Planning Division office, and to which copy reference is hereby made, are hereby approved as the Development Plan for the subject property, pursuant to Palo Alto Municipal Code section 18.68.120. Said Development Plan is approved for the following uses, and subject to the following conditions: (a) Permit.ted Uses. The permitted uses shall be limited to a multistory parking facility, with auto and pedestrian circulation, auto and bicycle parking, landscaping, lighting and 2 990708 sdl 0032195 accessory uses, including bathrooms and storage. Other uses that may be made from space deemed unusable for parking, include one or more of the following uses in addition to parking: (a) retai! or other pedestrian-oriented ground floor use; a teen center; and office use above the ground floor. (b) permitted. Conditional Uses.No conditional uses shall be (c) Site Development Regulations. All improvements and development shall be substantially in accordance with the approved Deve!opment Plan, which shall be amended as required to comply with the Special Requirements set forth in subparagraph (e), and with all applicable codes and ordinances, and with the requirements of the Director of Public Works, the Director of Utilities, and the Fire Chief. (d) Parking and Loading Requirements. The parking governing the subject property shall be in accordance with the Development Plan, which shall be amended as required to comply with the Special Requirements set forth in subparagraph (e). (e) Special Reauirements. The Conditions of Approval adopted by the City Council in approving this ordinance, attached hereto as Exhibit "B" and incorporated herein by reference, are hereby approved as the specia! requirements of the PC zone established by this ordinance, as are the Mitigation Measures described in the Summary of Environmental Impacts and Mitigations, Draft Environmental Impact Report (98-EIA-23), prepared by Jerry Haag, dated November, 1998. To the extent of a conflict between the Development Plan and these special requirements, these special requirements shall apply. (f) Development Schedule. Construction shall commence on or before January i, 2001 and shall be completed and ready for occupancy on or before January I, 2008. SECTION 5. The City Council adopts- this ordinance in accordance with the California Environmental Quality Act ("CEQA") findings adopted by Resolution No. // // // 990708 sdl 0032195 3 SECTION 6. This ordinance shall be effective upon the thirty-first day after the date of its adoption. INTRODUCED: PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney Mayor City Manager Director of Planning and Community Environment 4 990708 sdl 0032195 PF EXHIBIT Project: 445 Bryant Street (lot S/L) PF Graphic Attachment to Staff Report Date: 7-14-99 File #: 98-ZC-11;98-ARB-159;98-EIA-23;98-SUB-5 Scale: 1"= 300’ North EXHIBIT "B" DRAFT CONDITIONS OF APPROVAL FOR PC ZONE CHANGE 445 Bryant Street (Lots S/L) File Nos. 98-ZC-I1, 98-ARB-159, 98-EIA-23 and 98-SUB-5 Prior to Demolition 1. Construction plans shall include specific steps in recovering recyclable " materials through: ¯Recovery of concrete, asphalt, and other inert solids; ¯Rec.overy of scrap metals; ¯Siting container at the construction site for cardboard, beverage container, wood, and other recylable materials. ¯Recovery of concrete, asphalt, and other inert solids; 2.Tree Protection Statement: A written statement shall be provided to the Building Department verifying that protective fencing for the trees is in place before demolition or grading or building permit will be issued, unless otherxvise approved by the City Planning Arborist. Protective Tree Fencing: All trees to be retained, as shown on the approved plans shall be protected during construction to the satisfaction of the City Planning Arborist. The following tree preservation measures apply to all trees to be retained. ao All existing trees to be retained shall be protected with five-foot high chain link fences enclosing the entire dripline under the trees.* Each tree shall be mounted on two-inch diameter galvanized iron posts, driven into the ground every 10 feet to a depth of at least 2-feet. The fences shall be erected before construction begins and shall remain in place until final inspection, except during work specifically required in the approved plans to be done under the trees to be protected. (As shown on Public Works Standard Specification Detail #505, which shall appear on the plans.) For trees situated within a narrow planting strip, only the planting strip should be enclosed with the required protective fencing in order to keep the sidewalk and street open for public use. Trees situated in a small tree well or sidewalk planter pit, shall be wrapped with 2-inches of orange plastic fencing f’om the ground to the first branch with 2-inch thick wooden slats bound securely with additional orange plastic fencing (which shall not be allowed to dig into the bark). During installation of the plastic fencing, caution shall be used to avoid damaging any branches. Major scaffold limbs may also require plastic fencing as directed by the City Planning Arborist. bo ~: A "Warning" sign shall be prominently displayed on each tree protection fence. The sign shall be a minimum of 18-inches square and shall state: "PROTECTIVE TREE FENCING - This fence shall not be removed without approval. Violators will be prosecuted and are subject t6 fine pursuant Section 8.10.110 of the PAMC." Prior to Assessment District Preceedings 4. Preliminary review and comments by the Public Arts Commission on the pr.oposed public art. Final design plans for Architectural Review Board reviexv and approval including: Exterior lighting plan designed to eliminate glare and spillover beyond the perimeter of the development. Lighting shall be in conformance with recommendations of the Illuminating Engineering Society. All street lighting must be as previously approved by ARB for street light poles and fixtures; ¯Longitudinal and cross sections for the site and structures including sections through the ramps indicating that the ramp slope does not exceed 7 percent; ¯Final design details including exterior walls, axvnings, railings, rain leaders, trellises, etc.; ¯Initial proposal for the public art proposed within the project; ¯Final building materials and colors including a color and materials board; Detailed landscape and irrigation plans encompassing on- and off-site plantable areas out to the curb. A Landscape Water Use statement, water use calculations and a statement of design intent. These plans should be prepared by a licensed landscape architect and qualified irrigation consultant. Landscape and irrigation plans shall take into consideration all elements included on: 1) the .City.. o.fPalo Alto Landscape Plan Checklist; and 2) the Water-Conservation Guidelines. The plan shall include: a.All existing trees identified both to be retained and removed b.Complete plant list indicating tree and plant species, quantity, size, and locations c.Irrigation schedule and plan including locations and screening of backflow preventers. d.A dedicated irrigation water meter is required, and a Maximum Water Allowance will be applied. Minimum sight distance triangles must be provided at each vehicular exit from each garage, in accordance with PAMC 18.83.110, Figure 6. Proposed plans must provide a detail for each exit to show that this requirement is met; Minimum sight distance triangles must be provided at each end of the alley on the south east side of the parking structure; Final plans must show the interface between the public alley and the structure, especially ~vhere the alley meets Florence and Bryant; Provide pedestrian entrances on Bryant and Florence to serve people heading to/from the north (Lytton Avenue area); The bicycle parking location shall be relocated or redesigned to eliminate the exposure to vehicular movements and direct pedestrian access provided without using the vehicular entry; and Details must be provided for the curb extensions (bulbouts) for Bryant Street midblock crosswalk. o o All sidewalks bordering the project shall be replaced in accordance with Public works approved standards. Complete and submit an electric load sheet along with a single line diagram and a site plan to Utilities Engineering for determination of service needs and if required, the size of transformers needed to provide the service. The site plan must indicate adequate space to accommodate the recyclables generated by the proposed retail and!or office space or Teen Center uses. Revised plans should show enclosure with space for: 2-cubic yard container for cardboard; two, 95-gallon bins for newspaper and white paper; four, 64- gallon containers for glass, plastic bottles, aluminum cans, mixed paper; and a trash container. A Solid Waste Management and Recycling Plan must also be submitted, which shows plans to recover demolition and construction materials. Prior to Issuance of Buildin~ Permit 9. As part of the approval of detailed construction plans, plans shall have to be " prepared for the modification of the parking T’s and parking signage along the full block face on both frontages. 10.A storm water pollution prevention plan (SWPPP) shall be incorporated into the project plans. The SWPPP shall include both temporary Best Management Practices (BMP’s) to be implemented during construction and permanent BMP’s to be incorporated into the project to protect storm water quality. 11.A construction logistics plan shall be provided, addressing at a minimum parking, truck routes and staging, materials delivery and storage, and the provision for pedestrian and vehicular traffic adjacent to the construction site. All truck routes shall conform with the City ofPalo Alto’s Truck Route Ordinance, and the route map which outlines truck routes available throughout the City of Palo Alto. 12.Automatic fire sprinklers shall be provided in accordance with NFPA 13 (1996 Ed.) and Chapter 9 of the California Building Code. Fire Department access, water supply and hydrants shall be accordance with Article 9 of the California Fire Code. Class 1 stand pipes shall be provided with connections within 300 feet of any interior portion of the structure. The elevators shall be gurney-accessible. Fire hydrant(s) shall be placed in accordance with Chapter 15 of the PAMC. 13.Finalization of the proposed public art feature(s),as approved by the Public Arts Commission and the ARB. During Construction 14. The applicant shall be responsible for the repair or replacement of any publicly owned trees that are damaged during the course of construction, pursuant to Section 8.04.070 of the Palo Alto Municipal Code. 15.The following tree preservation measures apply to all trees to be retained (See Public Works Tree Protection Drawing #505): ao No storage of material, topsoil, vehicles or equipment shall be permitted within the tree enclosure area. b. The ground under and around the tree canopy area shall not be altered. c.Trees to be retained shall be irrigated, aerated and maintained as necessary to ensure survival. 16.All new trees shall be planted as per Public Works Standard Tree Well Diagram #504 and have the tree pit dug at least twice the diameter of the root ball. This diagram shall be shown on the landscape plan. Attachment C PROPOSED STAFF FINDINGS FOR ARCHITECTURAL REVIEW STANDARDS 445 Bryant Street (Lots S/L), File Nos. 98-ZC-11, 98-ARB-159, 98-EIA-23 and 98-SUB-5 Architectural Review Standards per Chapter 16.48.120 of the PAMC. The design is consistent and compatible with applicable elements of the city’s comprehensive plan (Standard #al) The proposed project is consistent and compatible with the applicable elements of the City’s Comprehensive Plan in that the proposed development conforms to the development standards for the Planned Community designation. The project is consistent with the Policies and Programs of the adopted 1998-2010 Comprehensive Plan specifically: Policy T-45: Provide sufficient parking in the University Avenue/Downtown and California Avenue business districts to address long-range needs; Program T-50: Continue working with merchants, the Chamber of Commerce, neighbors, and a parking consultant to explore options for constructing new parking facilities or using existing parking more efficiently," and point 10 of the adopted 13-Point Parking Program: Pursue a new parking structure for Lots S and L and any other feasible sites (including consideration of removing the former Palo Alto Board of Realtors structure in order to facilitate construction on Lots S and L). The design is compatible with the immediate environment of the site (Standard #a2) The project design and proposed improvements are compatible with the immediate environment and the surrounding environment in that the proposal is similar in scope and scale to existing development in the Downtown Area of University Avenue and High Street, is consistent with the proposed zoning and addresses a need for additional parking for the surrounding environment. The design is appropriate to the function of the project (Standard #a3) The proposed design is appropriate to the function of the project in that it incorporates features to reduce the impacts of the parking structures, provides pedestrian amenities and incorporates a landscaped plaza. Whether the design is compatible with character in areas that have a unified design character or historical character (Standard #a4). The site is not located in an area which has a unified design or historical character. The design promotes harmonious transitions in scale and character in areas between different designated land uses (Standard #a5). The proposed project design promotes harmonious transitions in scale between the differently designated land uses in that the structure have been designed to provide setbacks, notches in upper floors, articulation of facades and building height variations. The design is compatible with improvements both on and off the site (Standard #a6) The design is compatible with approved improvements both on- and off-site in that the architectural improvements are generally consistent with the scale and design of buildings in the vicinity, and the access is appropriately located. The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a desirable environment for occupants, visitors and the general community (Standard #a7). The planning and siting of the proposed parking garage creates an internal sense of order and provides a desirable environment for users, visitors, and the community in that the project includes exterior architectural features that compliment a commercial/office look, a landscaped plaza of outdoor public space that would provide opportunities for socialization, increased parking in the downtown, and an improved pedestrian environment through the block. The amount and arrangement of open space are appropriate to the design and the function of the structures (Standard #a8). The proposed amount and arrangement of open space provided by the landscaped plaza, the pedestrian connection through the block and ancillary landscaped areas is appropriate to the design and function of the project and consistent with requirements in the zone district. Sufficient ancillary functions are provided to support the main functions of the project and whether the same are compatible with the project’s design concept (Standard #a9). The proposed project will improve the ancillary functions of the project vicinity by providing increased off-street parking spaces and bicycle parking in the downtown. The access to the property and circulation theron are safe and convenient for pedestrians, cyclist and vehicles. (Standard #alO). Access to the property and circulation for both drivers and pedestrians would be provided in a safe and convenient manner. Natural features are appropriately preserved and integrated with the pFoject (Standard #al 1). Natural features are appropriately integrated into the project in that the landscape plan provides for a total of 13 street trees along portions of the three street frontages, and two additional trees and hardscape in the landscaped plaza. Landscaping in elevated planters are also shown near the vehicular entrances. The materials, texture, colors, and details construction and plant material are appropriate expression to the design and function (Standard#a12). The proposed architecture and building materials are appropriate for the building type and are compatible with the mix of architecture styles found in the downtown area. The landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors create a desirable and functional environment and the landscape concept depicts an appropriate unity with the various building on the site (Standard #a13). The proposed landscape design offers visual relief from the building fagade, adds visual interest, and helps by providing some human scale along the project perimeter. The plaza on the west side adds visual interest, and is an aesthetically pleasing place. The project will incorporate public artwork, all of which adds to the desirability and functionality of the projects’ environment. Whether plant material is suitable and adaptable to the site, capable of being properly maintain on the site, and is of a variety w.hich would tend to be drought-resistant and to reduce consumption of water in its installation and maintenance (Standard #a14). The proposed plant material is suitable and adaptable to the region and the site and can be properly maintained on the site. The proposed plantings are appropriate for outdoor use and include a mix of trees and box plantings, suitable for commercial developments in the downtown area. The design is energy efficient and incorporates renewable energy design elements (Standard #a 15). The proposed structure is designed to be energy efficient by using an open plan and preclude mechanical ventilation on upper floors, will include energy efficient lighting and include features to meet building code requirements for energy efficiency. Attachment D DRAFT FINDINGS FOR TENTATIVE SUBDIVISION MAP 445 Bryant Street (Lots S/L) File Nos. 98-ZC-11, 98-ARB-159, 98-EIA-23 and 98-SUB-5 The proposed Tentative Map, design and improvements of the subdivision is consistent with the applicable general and specific plan. The proposed subdivision and development of a parking structure on the site is consistent with the Policies and Programs of the adopted 1998- 2010 Comprehensive Plan, specifically: Policy T-45: Provide sufficient parking in the University Avenue/Downtown and California Avenue business districts to address long-range needs; Program T-50: Continue working with merchants, the Chamber of Commerce, neighbors, and a parking consultant to explore options for constructing new parking facilities or using existing parking more efficiently; point 10 of the adopted 13-Point Parking Program: Pursue a new parking structure for Lots S and L and any other feasible sites (including consideration of removing the former Palo Alto Board of Realtors structure in order to facilitate construction on Lots S and L); and Program L-78: Encourage the use of Planned Community (PC) zoning for parking structures Downtown and in the California Avenue area. The site is physically suitable for the type of development. The site is physically suitable for the project parking structure because the site was identified in the Palo Alto Comprehensive Plan 1998-2010 as a potential parcel for the construction of a parking structure. The site is physically suitable for the proposed density of the development. The proposed density of the development is consistent with the Palo Alto Comprehensive Plan Program L-78: Encourage the use of Planned Community (PC) zoning for parking structures Downtown and in the California Avenue area. This program recognizes that parking structures located in downtown would not conform to existing zoning. The proposal will be rezoned as a PC Planned Community District that allows flexibility in height, setbacks and other typical development regulations. The specific regulations required for the proposed parking structure are substantially similar to those of other developments in a PC Zone District. The design of the subdivision and the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. There are environmental impacts associated with the project, but all can be mitigated except the unavoidable temporary loss of parking spaces. Refer to the EIR for further analysis. The design of the subdivision or improvement will cause serious health problems. The design of the new subdivision and proposed parking structure will not result in serious public health problems, in that, all necessary public services including public utilities are available and will be provided to the site. The design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. The new lot pattern and proposed parking structure do not conflict with existing public easement for access through the use of the property. The resulting lot has access to a public street and the required cross-access easement will assure access to the parking structure and driveways for the life of the use. Attachment E DRAFT CONDITIONS OF APPROVAL FOR TENTATIVE SUBDIVISION MAP 445 Bryant Street (Lots S/L) File Nos. 98-ZC-11, 98-ARB-159, 98-EIA-23 and 98-SUB-5 All conditions of approval as listed below shall be incorporated as a part of this approval. The applicant shall apply for a Tract Map Number from the County Recording office. The applicant shall submit a final grading and drainage plan to Public Works Engineering, including drainage patterns on site and from adjacent properties. The plan shall demonstrate that pre-existing drainage patterns to and from adjacent properties are not altered. Permittee must obtain a grading permit from the City of Palo Alto Building Inspection Division if excavation exceeds 100 cubic yards. The property owner shall obtain an encroachment permit or temporary lease from Public Works Engineering for a structure, awning, or other features constructed in the public right-of-way, easement or on property in which the City holds an interest. PAMC, Section 12.12.010. A construction logistics plan shall be provided, addressing at minimum parking, truck routes and staging, materials storage, and provision of pedestrian and vehicular traffic adjacent to the construction site. All truck routes shall conform with the City of Palo Alto’s Trucks and Truck Route Ordinance, Chapter 10.48, and the attached route map which outlines truck routes available throughout the City of Palo Alto. The applicant shall obtain a permit for Construction in a Public Street from Public Works Engineering for construction proposed in the City right-of-way. Sec. 12.08.010. The applicant shall obtain an encroachment permit from Public Works Engineering for pedestrian protection on the public sidewalk during construction. A detailed site-specific soil report must be submitted which includes information on water-table and basement construction issues. 10.To reduce dust levels, it shall be required that exposed earth surfaces be watered as necessary. Spillage resulting from hauling operations along or across any public or private property shall be removed immediately and paid for by the contractor. Dust nuisances originating from the contractor’s operations, either inside or outside of the right-of-way shall be controlled at the contractor’s expense. 11.The Contractor must contact the CPA Public Works Inspector at 496- 6929 prior to any work performed in the public right-of-way. Sectionl2.08.060. 12.No storage of construction materials is permitted in the street or on the sidewalk, without prior approval of Public Works Engineering. 13.The developer shall require its contractor to incorporate best management practices (BMP’s) for stormwater pollution prevention in all construction operations, in conformance with the Santa Clara Valley Nonpoint Source Pollution Control Program. The Inspection Services Division shall monitor BMP’s with respect to the developer’s construction activities on private property; and the Public Works department shall monitor BMP’s with respect to the developer’s construction activities on public property. It is unlawful to discharge any construction debris (soil, asphalt, sawcut slurry, paint, chemicals, etc.) or other waste materials into gutters or storm drains. 14.All construction within the City right-of-way, easements or other property under City jurisdiction shall conform to Standard Specifications of the Public Works and Utility Departments. 15.All sidewalks bordering the project shall be repaired and/or removed and replaced in compliance with the Public Works approved standards. 16.The Public Works Inspector shall sign off the building permit prior to the finalization of this permit. All off-site improvement shall be finished prior to this sign-off. Prior to submittal of final Map 17. The applicant shall arrange a meeting to discuss the improvement plans necessary for the project with Public Works Engineering, Planning, Fire and Transportation departments. These improvement plans must be completed and approved by the City prior to submittal of a final map. 18.All construction within the City right-or-way, easements or other property under the City’s jurisdiction shall conform to standard specifications of the Public Works and Utility Departments. Attachment F ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING SECTION 18.08.040 OF THE PALO ALTO MUNICIPAL CODE (THE ZONING MAP)TO CHANGE THE CLASSIFICATION OF PROPERTY KNOWN AS 528 HIGH STREET (PARKING LOT R)-FROM PF TO PC The Council of the City of Palo Alto does ORDAIN as fol!ows: SECTION ..!. (a) The Planning Commission, after duly noticed public hearing, and the Architectura! Review Board, after duly noticed public hearing, have recommended that Section 18.08.040 (the Zoning Map) of the Palo Alto Municipal Code be amended as hereinafter set forth. (b) The City Council, after duly noticed public hearing, and upon due consideration of the recommendations and of all testimony offered upon the matter, finds that the proposed amendment is in the public interest and will promote the public health, safety and welfare, as hereinafter set forth; SECTION 2 Section 18.08.040 of the Palo Alto Municipal Code, the "Zoning Map," is hereby amended by changing the zoning of certain property known as 528 High Street (the "subject property) from "PF Public Facility" to "PC Planned Community." The subject property is shown on the map labeled Exhibit "A," attached hereto and incorporated herein by reference. SECTION 3. The City Council hereby finds with respect to the subject property that: (a)The site is so situated, and the use proposed for the site is of such a characteristic that the application of general districts or combining districts will not provide sufficient flexibility to allow the proposed development. The proposed use is a multistory parking garage, which has been identified as a major public need in the downtown area, and such a use cannot be feasibly constructed within the available space under any other existing zoning classification. (b)Development of the site under the provisions of the PC Planned Community~district will result in public benefits not otherwise attainable by application of the regulations of general districts or combining 1 990708 sdl 0032t94 districts. The primary purpose and the major public benefit of the development is to provide much~needed public parking, which wil! reduce the current parking deficit in the downtown area. Other public benefits of the project include a landscape plaza and pedestrian access through the block; electrical connections for electric vehicles; and incorporation of public art. (c)The use permitted and the site development regulations applicable within the district are consistent with the Palo Alto Comprehensive Plan, as detailed in the Staff Report to the Planning Commission for the Agenda of July 14, 1999. The permitted use and site development regulations are compatible with existing and potential uses on adjoining sites or in the general vicinity, because it will provide public parking to support the commercial uses in the area. SECTION 4. Those certain plans for Scheme "B", entitled "528 High Street (Lot R)" prepared by The Watry Design Group and Komorous-Towey Architects, dated March 5, 1999 a copy of which is on file in the Planning Division office, and to which copy reference is hereby made, are hereby approved as the Development Plan for the subject property, pursuant to Palo Alto Municipal Code section 18.68.120. Said Deve!opment Plan is app[oved for the following uses, and subject to the following conditions: (a) Permitted Uses. The permitted uses shall be limited to a multistory public parking facility that includes auto and bicycle parking; auto and pedestrian circulation; landscaping and lighting; and accessory uses, such as bathrooms and storage. (b) permitted. Conditiona! Uses.No conditional uses shall be (c)Site Development R@.gu!ations. All improvements and development shall be substantially in accordance with the approved Development Plan, which shall be amended as required to comply with the Special Requirements set forth in subparagraph (e), and with all applicable codes and ordinances, and with the requirements of the Director of Public Works, the Director of Utilities and the Fire Chief. (d) Parkin~ and Loading ..Req~..irements. The parking governing the subject property shall be in accordance with the Development Plan, which shall be amended as required to comply with the Specia! Requirements set forth in subparagraph (e). 2 990708 sdl 0032194 (e) Special Requirements. The Conditions of Approval adopted by the City Council in approving this ordinance, attached hereto as Exhibit "B" and incorporated herein by reference, are hereby approved as the special requirements of the PC zone established by this ordinance as are the Mitigation Measures identified in the Summary of Environmental Impacts and Mitigations, Draft Environmental Impact Report (98-EIA-23), prepared by Jerry Haag, dated November, 1998. These requirements shall be reflected in amendments made to the development plan and approved by the Director of Planning and Community Environment prior to issuance of building permits. To the extent of a conflict between the Development Plan and these special requirements, these specia! requirements shall apply. (f) Deve!omment Schedule Construction shall commence on or before January i, 2001 and shal! be completed and ready for occupancy on or before January I, 2008. SECTION 5. The City Council adopts this ordinance in accordance with the California Environmental Quality Act ("CEQA") findings adopted by Resolution No. SECTION 6. This ordinance shall be effective upon the thirty-first day after the date of its adoption. INTRODUCED: PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney Mayor City Manager Director of Planning and Community Environment 3 990708 sdl 0032194 EXHIBIT PF Project: 528 High Street (lot R) Graphic Attachment File #: 98-ZC-12;98-ARB-180;98-EIA-25;98-SUB-6 Scale: 1" = 300’ EXHIBIT "B" DRAFT CONDITIONS OF APPROVAL FOR A PC ZONE CHANGE 528 High Street (Lot R) File Nos. 98-ZC-12, 98-ARB-180, 98-EIA-25 Prior to Demolition 1. Construction plans shall include specific steps in recovering recyclable materials through: ¯Recovery of concrete, asphalt, and other inert solids; ¯Recovery of scrap metals; ¯Salvage of building fixtures and other re-useable items; and ¯Siting containers at the construction site for cardboard, beverage containers, wood, and other recyclable materials. o Tree Protection Statement: A written statement shall be provided to the Building Department verifying that protective fencing for the trees is in place before demolition or grading or building permit will be issued, unless otherwise approved by the City Planning Arborist. Protective Tree Fencing: All trees to be retained, as shown on the approved plans shall be protected during construction to the satisfaction of the City Planning Arborist. The following tree preservation measures apply to all trees to be retained. All existing trees to be retained shall be protected with five-foot high chain link fences enclosing the entire dripline under the trees.* Each tree shall be mounted on two-inch diameter galvanized iron posts, driven into the ground every I0 feet to a depth of at least 2-feet. The fences shall be erected before construction begins and shall remain in place until final inspection, except during work specifically required in the approved plans to be done under the trees to be protected. (As shown on Public Works Standard Specification Detail #505, which shall appear on the plans.) For trees situated within a narrow planting strip, only the planting strip should be enclosed with the required protective fencing in order to keep the sidewalk and street open for public use. Trees situated in a small tree well or sidewalk planter pitl shall be wrapped with 2-inches of orange plastic fencing from the ground to the jqrst branch with 2-inch thick wooden slats bound securely with additional orange plastic fencing (which shall not be allowed to dig into tlTe bark). During installation of the plastic fencing, caution shall be used to avoid damaging any branches. Major scaffold limbs may also require plastic fencing as directed by the City Planning Arborist. S_jg.~: A "Warning" sign shall be prominently displayed on each tree protection fence. The sign shall be a minimum of 18- inches square and shall state: "PROTECTIVE TREE FENCING - This fence shall not be removed without approval. Violators will be prosecuted and are subject to fine pursuant Section 8.10.110 of the PAMC." Prior to Assessment District ProceedingA 4. Formal’Review and comments by the Public Arts Commission on the proposed public art. 5.Final design plans for Architectural Reviexv Board review and approval including: ¯Exterior lighting plan designed to eliminate glare and spillover beyond the perimeter of the development. Lighting shall be in conformance with recommendations of the Illuminating Engineering Society. All street lighting must be as previously approved by ARB for street light poles and fixtures; ¯Final design details including exterior walls, awnings, railings, rain leaders, trellises, etc.; ¯Final building materials and colors including a color and materials board; ¯Initial proposal for the public art proposed within the project; ¯Detailed landscape and irrigation plans encompassing on- and off- site plantable areas out to the curb. A Landscape Water Use statement, water use calculations and a statement of design intent. These plans should be prepared by a licensed landscape architect and qualified irrigation consultant. Landscape and irrigation plans shall take into consideration all elements included on: 1) the City of Pal0 Alto Landscape Plan Checklist; and 2) the .Water-Conservation Guidelines. The plan shall include: All existing trees identified both to be retained and removed No Co Complete plant list indicating tree and plant species, quantity, size, and locations Irrigation schedule and plan including locations and screening of backflo~v preventers. do A dedicated irrigation water meter is required, and a Maximum Water Allowance will be applied. Minimum sight distance triangles must be provided at each vehicular exit, in accordance ~vith PAMC 18.83.110, Figure 6. Proposed plans must provide a detail for each exit to show that this requirement is met; 7. Provide pedestrian entrances on Alma and High Streets to serve people heading to/from the south (Hamilton Avenue area); Show the Blockbuster installed bike rack on the plans. Some of the project bike racks should be relocated to the northeasterly side of the project, preferably near the plaza; and The design and interface of the storage area and bicycle parking location shall be clarified or redesigned to eliminate the conflict between vehicular and pedestrian movements. All sidewalks bordering the project shall be replaced in accordance with Public ~vorks approved standards. Complete and submit an electric load sheet along with a single line diagam and a site plan to Utilities Engineering for determination of service needs and if required, the size of transformers needed to provide the service. o The site plan must indicate adequate space to accommodate the recyclables generated by the proposed retail and/or office space or Teen Center uses. Revised plans should show enclosure with space for: 2-cubic yard container for cardboard; two, 95-gallon bins for newspaper and white paper; four 64- gallon containers for glass, plastic bottles, aluminum cans, mixed paper; " and a trash container. A Solid Waster Management and Recycling Plan must also be submitted, which shows plans to recover demolition and construction materials. Prior to Issuance of Building Permit 9. As part of the approval of detailed construction plans, plans will have to be prepared for the modification of the parking T’s and parking signage along the full block face on both frontages. 10.A storm water pollution prevention plan (SWPPP) shall be incorporated into the project plans. The SWPPP shall include both temporary Best Management Practices (BMP’s) to be implemented during construction and permanent BMP’s to be incorporated into the project to protect storm water quality. 11.A construction logistics plan shall be provided, addressing at a minimum parking, truck routes and staging, materials delivery and storage, and the provision for pedestrian and vehicular traffic adjacent to the construction site. All truck routes shall conform xvith the City ofPalo Alto’s Truck Route Ordinance, Chapter 1048, and the route map which outlines truck routes available throughout the City of Palo Alto. 12.Automatic fire sprinklers shall be provided in accordance with NFPA 13 (1996 Ed.) and Chapter 9 of the California Building Code. Fire Department access, water supply and hydrants shall be accordance with Article 9 of the California Fire Code. Class 1 stand pipes shall be provided with connections within 300 feet of any interior portion of the structure. The elevators shall be gurney-accessible. Fire hydrant(s) shall be placed in accordance with Chapter 15 of the PAMC. 13.Finalization of the proposed public art feature(s) as approved by the Public Arts Commission and the ARB. During,,Construction 14. All neighbors trees that overhang the project site shall be protected from impact of any kind. 15.The applicant shall be responsible for the repair or replacement of any publicly owned trees that are damaged during the course of construction, pursuant to Section 8.04.070 of the Palo Alto Municipal Code. 16.The following tree preservation measures apply to all trees to be retained (See Public Works Tree Protection Drawing #505): No storage of material, topsoil, vehicles or equipment shall be permitted within the tree enclosure area. go The ground under and around the tree canopy area shall not be altered. 17. Co Trees to be retained shall be irrigated, aerated and maintained as necessary to ensure survival. All new trees shall be planted as per Public Works Standard Tree Well Diagram #504 and have the tree pit dug at least twice the diameter of the root ball. This diagram shall be sho~vn on the landscape plan. Attachment G PROPOSED STAFF FINDINGS FOR ARCHITECTURAL REVIEW STANDARDS 528 High Street (Lot R) File Nos. 98-ZC-12, 98-ARB-180, 98-EIA-25 and 98-SUB-6 ARB Standards per Chapter 16.48.120 of the PAMC. The design is consistent and compatible with applicable elements of the city "s "comprehensive plan (Standard #al) The proposed project is consistent and compatible with the applicable elements of the City’s Comprehensive Plan in that the proposed development conforms to the development standards for the Planned Community designation. The project is consistent with the Policies and Programs of the adopted 1998-2010 Comprehensive Plan specifically: Policy T-45: Provide sufficient parking in the University Avenue/Downtown and California Avenue business districts to address long-range needs; Program T-50: Continue working with merchants, the Chamber of Commerce, neighbors, and a parking consultant to explore options for constructing new parking facilities or using existing parking more efficiently," and point 10 of the adopted 13-Point Parking Program: Pursue a new parking structure for Lots S and L and any other feasible sites (including consideration of removing the former Palo Alto Board of Realtors structure in order to facilitate construction on Lots S and L). The design is compatible with the immediate environment of the site (Standard #a2) The project design and proposed improvements are compatible with the immediate environment and the surrounding environment in that the proposal is similar in scope and scale to existing development in the Downtown Area of University Avenue and High Street, is consistent with the proposed zoning and addresses a need for additional parking for the surrounding environment. The design is appropriate to the function of the project (Standard #a3) The proposed design is appropriate to the function of the project in that it incorporates features to reduce the impacts of the parking structures, provides pedestrian amenities and incorporates a landscaped plaza. Whether the design is compatible with character in areas that have a unified design character or historical character (Standard #a4). The site is not located in an area which has a unified design or historical character. The design promotes harmonious transitions in scale and character in areas between different designated land uses (Standard #a5). The proposed project design promotes harmonious transitions in scale between the differently designated land uses in that the structure have been designed to provide setbacks, notches in upper floors, articulation of facades and building height variations. ¯The design is compatible with improvements both on and offthe site (Standard #a6) The design is not compatible with approved improvements both on- and off-site in that the architectural improvements are generally consistent with the scale and design of buildings in the vicinity, and the access is appropriately located. The planning and siting of the various functions and buildings on the site create an internal sense of order and provide a desirable environment for occupants, visitors and the general community (Standard #a7). The planning and siting of the proposed parking garage creates an internal sense of order and provides a desirable environment for users, visitors, and the community in that the project includes exterior architectural features that compliment a commercial/office look, increased parking in the downtown, a landscaped plaza of outdoor public space that would provide opportunities for socialization, and an improved pedestrian environment through the block. The amount and arrangement of open space are appropriate to the design and the function of the structures (Standard #a8). The proposed amount and arrangement of open space provided by the landscaped plaza, the pedestrian connection through the block and ancillary landscaped areas is appropriate to the design and function of the project and consistent with requirements in the zone district. The sufficient ancillary functions are provided to support the main functions of the project and whether the same are compatible with the project’s design concept (Standard #a9). The proposed project will improve the ancillary ftmctions of the project vicinity by providing increased off-street parking spaces and bicycle parking in the downtown. The access to the property and circulation theron are safe and convenient for pedestrians, cyclist and vehicles. (Standard #alO). Access to the property and circulation for both drivers and pedestrians would be provided in a safe and convenient manner. That natural features area appropriately preserved and integrated with the project (Standard #a11). Natural features are appropriately integrated into the project in that the landscape plan provides for a total of 4 street trees along portions of the two street frontages, and two additional trees and hardscape in the landscaped plaza. Landscaping in elevated planters are also shown near the vehicular entrances on Alma and High Streets. The materials, texture, colors, and details construction and plant material are appropriate expression to the design and function (Standard#a12). The proposed architecture and building materials are appropriate for the building type and are compatible with the mix of architecture styles found in the downtown area. Whether the landscape design concept for the site, as shown by the relationship of plant masses, open space, scale, plant forms and foliage textures and colors create a desirable and functional environment and whether the landscape concept depicts an appropriate unity with the various building on the site (Standard #a13). The proposed landscape design offers visual relief from the building fagade, adds visual interest, and helps by providing some human scale along the project perimeter. The plaza on the north side adds visual interest, provides access through the block and is an aesthetically pleasing place. The project will incorporate public artwork, all of which adds to the desirability and functionality of the projects’ environment. Whether plant material is suitable and adaptable to the site, capable of being properly maintain on the site, and is of a variety which would tend to be drought-resistant and to reduce consumption of water in its installation and maintenance (Standard #a14). The proposed plant material is suitable and adaptable to the region and the site and can be properly maintained on the site. The proposed plantings are appropriate for outdoor use and include a mix of trees and box plantings, suitable for commercial developments in the downtown area. The design is energy efficient and incorporates renewable energy design elements (Standard #a 15). The proposed structure is designed to be energy efficient by using an open plan and preclude mechanical ventilation on upper floors, will include energy efficient lighting and include features to meet building code requirements for energy efficiency. Attachment H DRAFT FINDINGS FOR TENTATIVE SUBDIVISION MAP 528 High Street (Lot R) File Nos. 98-ZC-12, 98-ARB-180, 98-EIA-25 and 98-SUB-6 The proposed Tentative Map, design and improvements of the subdivision is consistent with the applicable general and specific plan. The proposed subdivision and development of a parking structure on the site is consistent with the Policies and Programs of the adopted 1998-2010 Comprehensive Plan, specifically: Policy T-45: Provide sufficient parking in the University Avenue/Downtown and California Avenue business districts to address long- range needs; Program T-50: Continue working with merchants, the Chamber of Commerce, neighbors, and a parking consultant to explore options for constructing new parking facilities or using existing parking more efficiently," point 10 of the adopted 13-Point Parking Program: Pursue a new parking structure for Lots S and L and any other feasible sites (including consideration of removing the former Palo Alto Board of Realtors structure in order to facilitate construction on Lots S and L); and Program L-78: Encourage the use of Planned Community (PC) zoning for parking structures Downtown and in the California Avenue area. The site is physically suitable for the type of development. The site is physically suitable for the project parking structure because the site was identified in the Palo Alto Comprehensive Plan 1998-2010 as a potential parcel for the construction of a parking structure. The site is physically suitable for the proposed density of the development. The proposed density of the development is consistent with the Palo Alto Comprehensive Plan Program L-78: Encourage the use of Planned Community (PC) zoning for parking structures Downtown and in the California Avenue area. This program recognizes that parking structures located in downtown would not conform to existing zoning. The proposal will be rezoned as a PC Planned Community District that allows flexibility in height, setbacks and other typical development regulations. The specific regulations required for the proposed parking structure are substantially similar to those of other developments in a PC Zone District. 4.The design of the subdivision and the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. There are environmental impacts associated with the project, but all can be mitigated except the unavoidable temporary loss of parking spaces. Refer to the EIR for further analysis. The design of the subdivision or improvement will cause serious health problems. The design of the new subdivision and proposed parking structure will not result in serious public health problems, in that, all necessary public services including public utilities are available and will be provided to the site. The design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. The new lot pattern and proposed parking structure do not conflict with existing public easement for access through the use of the property. The resulting lot has access to a public street and the required cross-access easement will assure access to the parking structure and driveways for the life of the use. Attachment I DRAFT CONDITIONS OF APPROVAL OF TENTATIVE SUBDIVISION MAP 528 High Street (Lot R) File Nos. 98-ZC-12, 98-ARB-180, 98-EIA-25 and 98-SUB-6 All conditions of approval as listed below shall be incorporated as a part of this approval. The applicant shall apply for a Tract Map Number from the County Recording office. The applicant shall submit a final grading and drainage plan to Public Works Engineering, including drainage patterns on site and from adjacent properties. The plan shall demonstrate that pre-existing drainage patterns to and from adjacent properties are not altered. Permittee must obtain a grading permit from the City of Palo Alto Building Inspection Division if excavation exceeds 100 cubic yards. The property owner shall obtain an encroachment permit or temporary lease from Public Works Engineering for a structure, awning, or other features constructed in the public right-of-way, easement or on property in which the City holds an interest. PAMC, Section 12.12.010. A construction logistics plan shall be provided, addressing at minimum parking, truck routes and staging, materials storage, and provision of pedestrian and vehicular traffic adjacent to the construction site. All truck routes shall conform with the City of Palo Alto’s Trucks and Truck Route Ordinance, Chapter 10.48, and the attached route map which outlines truck routes available throughout the City of Palo Alto. The applicant shall obtain a permit for Construction in a Public Street from Public Works Engineering for construction proposed in the City right-of-way. Sec. 12.08.010. The applicant shall obtain an encroachment permit from Public Works Engineering for pedestrian protection on the public sidewalk during construction. A detailed site-specific soil report must be submitted which includes information on water-table and basement construction issues. 10.To reduce dust levels, it shall be required that exposed earth surfaces be watered as necessary. Spillage resulting from hauling operations along or across any public or private property shall be removed immediately and paid for by the contractor. Dust nuisances originating t~om the contractor’s operations, either inside or outside of the right-of-way shall be controlled at the contractor’s expense. 11.The Contractor must contact the CPA Public Works Inspector at 496-6929 prior to any work performed in the public right-of-way. Sectionl2.08.060. 12.No storage of construction materials is permitted in the street or on the sidewalk, without prior approval of Public Works Engineering. 13.The developer shall require its contractor to incorporate best management practices (BMP’s) for stormwater pollution prevention in all construction operations, in conformance with the Santa Clara Valley Nonpoint Source Pollution Control Program. The Inspection Services Division shall monitor BMP’s with respect to the developer’s construction activities on private property; and the Public Works department shall monitor BMP’s with respect to the developer’s construction activities on public property. It is unlawful to discharge any construction debris (soil, asphalt, sawcut slurry, paint, chemicals, etc.) or other waste materials into gutters or storm drains. 14.All construction within the City right-of-way, easements or other property under City jurisdiction shall conform to Standard Specifications of the Public Works and Utility Departments. 15.All sidewalks bordering the project shall be repaired and/or removed and replaced in compliance with the Public Works approved standards. 16.The Public Works Inspector shall sign offthe building permit prior to the finalization of this permit. All off-site improvement shall be finished prior to this sign-off. Prior to submittal of final Map 17. The applicant shall arrange a meeting to discuss the improvement plans necessary for the project with Public Works Engineering, Planning, Fire and Transportation departments. These improvement plans must be completed and approved by the City prior to submittal of a final map. 18.All construction within the City right-or-way, easements or other property under the City’s jurisdiction shall conform to standard specifications of the Public Works and Utility Departments.