HomeMy WebLinkAbout1999-04-05 City Council (17)TO: City of Palo Alto City Manager’s Report HONORABLE CITY COUNCIL 1 9 FROM:CITY M~’~2~AGER DEPARTMENT: PUL~:,I_C WORK~.; DATE:APRIL 5, 1999 CMR:187:99 SUBJECT:APPROVAL OF COST-SHARING WITH THE CITY OF MENLO PARK, AND APPROVAL OF A BUDGET AMENDMENT ORDINANCE IN THE AMOUNT OF $61,836 FOR THE. SECOND PHASE OF THE SAN FRANCISQUITO CREEK BANK STABILIZATION AND REVEGETATION STUDY REPORT IN BRIEF This report requests Council’s approval for a subsequent cost-sharing agreement with the City of Menlo Park and approval of a Budget Amendment Ordinance in the amount of $61,836 for Phase 2 of the San Francisquito Creek Bank Stabilization and Revegetation Study (Study). Palo Alto contributed 50 percent of the funding for Phase 1 of the Study, which, was recently completed. The scope of work for Phase 2 of the Study includes preparation of a creek side property ownership map; development of an existing conditions report for San Francisquito Creek, summarizing the information gathered during Phase 1 of the Study; an analysis of the regulatory requirements applicable to San Francisquito Creek; and the preparation of a master plan that will contain an inventory of bank stabilization and revegetation techniques and site-specific recommendations for implementation of the techniques. The Study will be managed by Menlo Park staff and jointly funded by the cities of Palo Alto, Menlo Park, and East Palo Alto, the Santa Clara Valley Water District, and San Mateo County. Staff recommends that Palo Alto contribute 25 percent of the Phase 2 cost of the Study. It is anticipated that Phase 2 will take approximately eight months to complete. CMR:187:99 Page 1 of 5 RECOMMENDATION Staff recommends that Council: Grant approval for a subsequent cost-sharing agreement with the City of Menlo Park, which will provide a 25 percent contribution of the funding for Phase 2 of the San Francisquito Creek Bank Stabilization and Revegetation Study (Study). Approve a Budget Amendment Ordinance in the amount of $61,836 from the Storm Drainage Fund Rate Stabilization Reserve to provide the necessary funding for Phase 2 of the Study. 3.Authorize the City Manager to negotiate and execute a cost-sharing agreement with the City of Menlo Park for Phase 2 of the Study. BACKGROUND The San Francisquito Creek Coordinating Committee has been meeting regularly since the February 2-3, 1998 flood to discuss the formation of a joint powers authority (JPA) to oversee a regional flood control project and to identify opportunities to mutually address creek-related issues. Committee representatives include the city managers or senior staff members from the cities of Palo Alto, Menlo Park, East Palo Alto, Portola Valley, and Woodside; management staff from the Santa Clara Valley Water District, San Mateo County Flood Control District, and Stanford University; and Coordinated Resource Management and Planning (CRMP) representatives. The first tangible product of the Committee was a decision by Menlo Park and Palo Alto to pursue a consultant study of creek bank stabilization and vegetation guidelines for use by creek side property owners. On August 10, 1998 (CMR:347:98), Council gave its conceptual approval to a cost-sharing agreement with the City of Menlo Park to fund 50 percent of the cost of Phase 1 of the study. The agreement was subsequently negotiated and executed by the City Manager. Palo Alto’s share of the Phase 1 costs totaled $112,250. The study consultant, Royston, Hanamoto, Alley, and Abey, has completed Phase 1 of the Study. The Phase i Work consisted of project coordination, information gathering, and field surveying. The compiled information includes creek topography, profile, and cross-section data; an assessment of the extent, acreage, and species composition of native and nonnative vegetation and tree canopies; a geomorphic survey identifying existing channel characteristics, including bank slopes and vegetative cover; an assessment of bank stabilization needs; and a preliminary assessment of habitat suitability for the endangered red-legged frog and steelhead trout. CMR:187:99 Page 2 of 5 DISCUSSION Staff frol~ Palo Alto and Menlo Park and the Study consultant are prepared to conduct Phase 2 of the Study. The scop~~ ~ work for Phase 2 includes preparation of a creek side property ownership map; develoi~ment of an existing conditions report for San Francisquito Creek, summarizing the irfformation gathered during Phase 1 of the Study; an analysis of the regulatory requirements applicable to San Francisquito Creek; and the preparation of a master plan that will contain an inventory of bank stabilization and revegetation techniques and site-specific recommendations for implementation of the techniques (AttaclLment A). In addition, the consultant will develop a five to ten page brochure outlining creek bank stabilization alternatives, permitting requirements, and creek bank revegetation techniques. The brochure will be targeted at local residents and conservation organizations within the San Francisquit0 Creek watershed. The scope of work also includes presentation of the existing conditions report and the master plan to the City Councils in Palo Alto and Menlo Park. It is anticipated that Phase 2 will take approximately eight months to complete. A not-to-exceed fee of $247,345 has been negotiated with the consultant for Phase 2 of the Study. Phase 1 costs were shared equally by Palo Alto and Menlo Park. Staff believes, however, that the benefits of the Study extend beyond these two cities. The Study will provide a wealth of information that can be used to support a future comprehensive flood and erosion control study for the creek. It will also assist local policy makers in joint discussions and decision making for future creek policies and improvements. Therefore, staff asked the Santa Clara Valley Water District (District) to assist Palo Alto in funding Santa Clara County’s 50 percent share of the Phase 2 costs. At its March 16, 1999 meeting, the District Board approved a contribution of $61,836 toward the Study (25 percent of the Phase 2 costs). Staff recommends that Palo Alto match the District’s 25 percent contribution. The remaining 50 percent of the funding wil! be provided by the Cities of Menlo Park and East Palo Alto, and San Mateo County. RESOURCE IMPACT A Budget Amendment Ordinance in the amount of $61,836 is requested to provide 25 percent of the funding for Phase 2 of the San Francisquito Creek Bank Stabilization and Revegetation Study. This project will be funded from the Storm Drainage Fund Rate Stabilization Reserve. Phase 1 of this project ($112,250) was funded by the General Fund. Since the expenditures for this project belong in the Storm Drainage Fund, staff plans to move the Phase 1 costs from the General Fund to the Storm Drainage Fund during the 1998-99 year-end closing process. The expenditures for this Study will reduce the Storm Drainage Fund Rate Stabilization Reserve. As staff reported to the Finance Committee i~ March 1999 (CMR: 147:99), without a rate increase, the Storm Drainage Fund will not have the ability to fund any new projects (e.g., capital work, future San Francisquito CMR: 187:99 Page 3 of 5 Creek studies). The staff proposal for a storm drainage fee increase is scheduled to go to the full Council in May 1999. POLICY IMPLICATIONS Approval of the joint funding is consistent with prior Council direction to participate in the San Francisquito Creek Coordinating Committee~and to provide funding for Phase 1 of the Study. While the dollar amount of this phase of the study ($61,836) is less than the City Manager’s authority level of $65,000, it is appropriate for the City Council to approve the work due to the intra-agency and multi phase aspects of the Study. The Manager will subsequently negotiate the specific agreement language and execute the document itself. TIMELINE Phase 2 of the Study will be completed approximately, eight months following the approval of funding from all participating agencies and the issuance of the Notice to Proceed to the consultant. ENVIRONMENTAL REVIEW Council approval of the cost-sharing agreement with the City of Menlo Park and approval of a Budget Amendment Ordinance do not require California Environmental Quality Act (CEQA) review. However, future individual projects for creek bank stabilization or revegetation will require CEQA review. ATTACHMENTS Attachment A: Consultant’s Scope of Work and Cost Breakdown for Phase 2 of the San Francisquito Creek Bank Stabilization and Revegetation Study Attachment B: Budget Amendment Ordinance PREPARED BY: Joe Teresi, Senior Engineer DEPARTMENT HEAD: GLENN S. RObeRTS Director of~ Works CITY MANAGER APPROVAL: / / ~JUNE FL~MIN/(~ .... ~// City Manager ( / cc: Dianne Dryer, City of Menlo Park CMR: 187:99 Page 4 of 5 Pat Showalter, CRMP Coordinator Randy Talley, Santa Clara Valley Water District Walt Callahan, San Mateo County Monika Hudson, City of East Palo Alto CMR: 187:99 Page 5 of 5 ATTACHMENT A Scope of Work- Phase II San Francisquito Creek Bank Stabilization and Revegetation December 7, 1998 Client Group The term ’Client Group’ as used in this scope of work refers to the staff assigned to this study by the Cities of Menlo Park and Palo Alto. Project Area The project are will consist of the riparian corridor of San Francisquito Creek from Junipero Serra to Highway 101. Task A - General 1.0 The project manager and other team members (as needed) will attend biweekly meetings (up to 18 meetings in both Phase I and Phase II) with Client Group to discuss progress and project tracking. Meetings may be more or less frequent as appropriate, up to the maximum number of meetings. The project manager will prepare and distribute a meeting summary after each meeting. The project manager and principal-in-charge will coordinate and communicate with the Client Group and the consultant team to ensure that all work is accomplished in an efficient manner. Task 3.0 3.9 C (continued from Phase I) - Assessment of Existing Conditions Survey of Creek Corridor The Consultant Surveyor will prepare a map, within the project limits, of all adjacent property owners and ownership. For each parcel the following information shall be shown: name of owner, address of owner contact, address of parcel, county assessor’s parcel number, source document reference data relating to ownership or easements. Data may be presented in tabular form and referenced on the map. Information presented on the map shall be based on available recorded data. On-site Investigations Information on cultural, historical and archaeological issues relating to the Creek will be researched and presented utilizing both text and graphic formats. The existing landscape setting, urban edges, and Creek access will be classified and mapped. 4.5 Mapping will be put into AutoCAD R14 format for storage with the City’s GIS system. Scope of Work- Phase II December 7, 1998 5.0 5.1 Complete Environmental Regulatory Analysis Meetings will be held with the environmental and regulatory agencies that have ~ jurisdiction over the Creek, once existing conditions are known, to establish concerns to be addressed in the master plan. 6.0 Existing Conditions Report 6.1 6.2 6.3 6.4 6.5 The Consultant Team will prepare an Existing Conditions Report that includes a summary of findings from the vegetative conditions survey, geomorphic conditions survey, habitat suitability, and landscape setting. The Consultant Team will present the Existing Conditions Report to participating cities and agencies. The Consultant Team will revise the Existing Conditions Report based on comments from the participating cities and agencies. The Consultant Team will present the revised Existing Conditions Report to the Menlo Park and Palo Alto City Councils. The Consultants will prepare a newsletter discussing the Existing Conditions Report for distribution by the Cities. Newsletter will be produced in standard word processing format, with conversion to Web Page being done by the City. Task D - Master Plan 1.0 Preliminary Master Plan Alternative solutions for revegetation and bank stabilization will be added to information in the ExiSting Conditions Report to create a Preliminary Master Plan. The solutions will include and integrate both structural and biological (vegetation) stabilization alternatives. Opportunities for Public access to the Creek will be identified. The Preliminary Master Plan will contain the following: 1.1 The Consultant Team will prepare an inventory of bank stabilization alternatives and an explanation of which alternatives would be appropriate for specific sections of the Creek based on slope stability information and geomorphic mapping from the existing conditions report. Findings from the geomorphic mapping will be summarized. 1.2 The Consultant Team will prepare a revegetation plan and plant list. Included in this section will be the following: 2 Scope of Work - Phase II December 7, 1998 Descriptions of proposed methods for removal of invasive non-native species (note: these will be generic techniques, not site specific plans). A list of recommended priority areas for non-native vegetation removal, and discussions of phasing to avoid extensive denuding of the area. A list of suitable plant species for use in revegetation along the Creek and a description of the appropriate position for their placement within the riparian corridor, their soil preferences, and water and maintenance requirements. Recommendations for priority revegetation areas along the Creek. Explanation of techniques for plant establishment in the revegetation and stabilization areas. Cost estimates for typical plantings that would be used both in revegetation areas and in bank stabilization areas. 1.3 The Consultant Team will make recommendations for wildlife and fisheries protection and enhancement. The purpose of this component is twofold: first, to ensure that revegetation and bank stabilization have no negative impacts on protected species; and second, to integrate habitat requirements for these species into revegetation and stabilization design, so that the project has a net beneficial effect on aquatic and terrestrial wildlife. This will facilitate the complex permitting requirements for this project. 1.4 The Consultant Team will assess and map public access opportunities and cultural amenities to be protected along the Creek. It will produce a summary of findings with regard to cultural, historical and archaeological investigations. This will include a discussion of how issues arising from these investigations might impact the restoration project. The summary will examine how opportunities might be created to allow these aspects to enrich the value of the Creek for the community. 1.5 A Preliminary Environmental Checklist will be prepared. 1.6 The Consultant Team will prepare a Preliminary Master Plan Report that incorporates the bank stabilization recommendations and all the findings of the mapping and site investigations from the entire consultant team into one concise document. This Report will contain the following: Table of Contents Introduction Goals Context Vegetation Restoration Guidelines and Plans Creek Restoration Treatments and Plans Fisheries and Wildlife Protection and Enhancement Guidelines and Plans Landscape Setting, Urban Edges and Creek Access Guidelines and Plans Plan showing Synthesis of Consultants Findings and Recommendations Appendices Credits List of Figures List of Tables Scope of Work - Phase II December 7, 1998 1.7 1.8 The Consultant Team will provide 10 copies of the Preliminary Master Plan Report to the Client Group for review and comment. The Consultant Team will present Preliminary Master Plan to participating agencies for review and comment. 2.0 2.1 Creek Bank Stabilization Brochure and Permitting Guide Creek Stabilization Brochure: A 5- to 10-page brochure will be developed on the topic of bank stabilization alternatives based on findings from the Master Planning Process. Permit requirements and procedures for stabilization alternatives will be explained. This brochure will build on information provided during the Community Workshop and will incorporate findings and recommendations of the Master Plan. 3.0 Revised Master Plan 3.1 3.4 3.5 Based on comments received from the respective reviews, the Master Plan will be revised accordingly. The Revised Master Plan will be presented to the Client Group for review and comment. The Master Plan will be presented to the City Councils (two presentations to each City Council). A Newsletter with regard to the Public Workshop for Master Plan Presentation will be prepared for distribution by City. Newsletter will be produced in standard word processing format,, with conversion to Web Page being done by City. The Consultant Team will conduct a Public Workshop to present the Master Plan. 4.0 Final Master Plan 4.1 The Consultant Team will prepare the Final Master Plan and submit 20 copies and a reproducible, camera-ready copy to the City. Summary Scope of Services and Costs San Francisquito Creek Phase II December 7, 1998 A. General 1.0 Biweekly Coordination Meetings 2.0 Preparation of Meeting Summary Memoraridum and Distribution 3.0 Project Coordination TASK A SUBTOTAL FEES $27,250 C. Assessment of Existing Conditions (continued from Phase 1): 3.0 Survey of Creek Corridor $6,408 3.9 Prepare Creek Ownership Map 4.0 On-site Investigations $14,160 4.4 Landscape Structure, Existing Urban Edge and Creek Access 4.5 Compile Information into AutoCAD R14 format S.0 Complete Initial Environmental Regulatory Analysis $1,840 5. I Contact environmental and regulatory agencies 6.0 Existing Conditions Report:$44,785 6.1 Prepare Report of Existing Conditions 6.2 Present Existing Conditions Report to Cities and Agencies 6.3 Revise Existing Conditions Report 6.4 Present Revised Report to Menlo Park and Palo Alto City Councils 6.5 Newsletter re: Existing Conditions Report TASK C (PHASE II) SUBTOTAL FEES $67,193 D. Master Plan 1.0 Preliminary Master Plan:$59,292 1.1 Inventory of Bank Stabilization Alternatives and Identification of Conditions under which Stabilization Alternatives would be appropiate 1.2 Prepare Revegetation Plan and Plant List 1.3 Wildlife and Fisheries Protection and Enhancement 1.4 Public Access Opportunities 1.5 Preliminary Environmental Checklist 1.6 Coordination of Revegetafion and Bank Stabilization Recommendations and Prepare Preliminary Master Plan Report 1.7 Provide Preliminary Master Plan to Staff and Cities for Review 1.8 Presentation of Preliminary Master Plan toAgeneies for Review 2.0 Creek Bank Stabilization Brochure and Permitting Guide 3.0 Revised Master Plan: 3.1 Revise Preliminary Master Plan 3.2 Presentation of Revised Master Plan to Staffand Cities for Review 3.3 Presentation of Revised Master Plan to City Councils 3.4 Prepare Newsletter for Distribution by City for Public Workshop 3.5 Public Workshop for Revised Master Plan 4.0 Final Master Plan: 4. I Prepare Final Master Plan and Submit 20 Copies and camera-ready copy $18,830 $28,095 $12,685 TASK D SUBTOTAL FEES $118,902 PHASE II FIRM EXPENSES $34,000 PHASE II TOTAL FEES AND EXPENSES $247,345 ATTACHMENT B ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 1998-99 TO PROVIDE AN ADDITIONAL APPROPRIATION. OF $61,836 FOR PHASE 2 - SAN FRANCISQUITO CREEK BANK STABILIZATION AND REVEGETATION STUDY WHEREAS, pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 22, 1998 did adopt a budget for fiscal year 1998-99; and WHEREAS, on May ii, 1998, Council directed staff to continue working through the San Francisquito Creek Coordinating Committee to form a joint powers authority with other agencies affected to address c.reek-related issues of mutual interest to all San Francisquito Creek stakeholders; and WHEREAS, on August I0, 1998 Council gave its conceptual approval to a cost-sharing agreement with the City of Menlo Park to fund 50.percent of the cost of Phase 1 of the San Francisquito Creek Bank Stabilization and Revegetation Study; and WHEREAS, Phase 1 of the study has been completed, and the cities of Palo Alto and Menlo Park and the Santa Clara Valley Water District desire to proceed with Phase 2 of the Study, with Palo Alto contributing 25 percent of the Phase 2 costs; and WHEREAS, the City of Palo Alto’s share of the cost for Phase 2 of the study is $61,836; and WHEREAS, City Council authorization is needed to amend the 1998-99 budget as hereinafter set forth. NOW, THEREFORE, the Council of the City of Palo Alto does ORDAIN as follows: SECTION I. The sum of Sixty One Thousand Eight Hundred Thirty Six Dollars ($61,836) is hereby appropriated to non-salary expenses in the Storm Drainage System Improvement Functional Area in the Storm Drainage Fund, and the Storm Drainage Fund Rate Stabilization Reserve is correspondingly reduced. SECTION 2. This transaction will reduce the Storm Drainage Fund Rate Stabilization Reserve from $292,000 to $230,164. SECTION 3. As specified in Section 2.28.080(a) of the Palo Alto Municipal Code, a two-thirds vote of the City Council is required to adopt this ordinance. SECTION 4. The Council of the City of Palo Alto hereby finds that approval of this Budget Amendment Ordinance does not require a California Environmental Quality Act (CEQA)review. However, individual projects in the future for implementation of the creek stabilization methods will require CEQA review. SECTION 5. As provided in Section 2.04.350 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk Mayor APPROVED AS TO FORM:City Manager Senior Asst. City Attorney Director of Services Administrative Director of Public Works S : \ASD \ BUDGET \ 9 8 9 9 BU- 1 \ 9 9 BAO- 1 \WORDPERF \ SFCREEK2. WPD