HomeMy WebLinkAbout1999-03-16 City Council (9)C ty City of Palo Alto Manager’s Report TO: ATTN: HONORABLE CITY COUNCIL FINANCE COMMITTEE :’ROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE:MARCH 16, 1999 CMR:176:99 SUBJECT:THIRD FLOOR RENOVATION AND RELOCATION OF UTILITIES STAFF This is an informational report and no Council action is required. BACKGROUND This report provides information on the Renovation of the Third Floor - Civic Center Capital Improvement Project, (CIP) # 19922. The project, description and budget are included in the Midyear Financial Summary and Budget Amendment Ordinance staff report. This relocation of Utilities staff is the third phase in the larger, citywide effort to alleviate overcrowded staff conditions. The first project relocated Utilities Engineering staff from the Civic Center third floor to 1007 Elwell Court. The second phase, currently nearing completion, relocates staff from various departments and locations to 285 Hamilton Avenue, creating the Development Center. DISCUSSION This project includes the renovation of the third floor, the acquisition of modular work stations, and the relocation of Utilities staff from the eighth floor and mezzanine level to the third floor. Ceiling tile and light fixtures which are original to the building (30 years old) will be replaced. The new light fixtures will be energy efficient florescent fixtures. The typical payback period for this type of lighting upgrade is less than two years. Interior partition walls will be removed to provide an open office layout consistent with other floors in the building. Minor modifications to the heating, ventilation and air conditioning system as well as the life/fire safety system will be required. Renovation work will als0 include new finishes (paint and carpet) which ar.e due for upgrade. In addition to the renovation costs, the project provides for new modular furniture throughout the floor and moving costs. The modular furniture currently used by Utilities staff on the eighth floor and mezzanine will be reused by General Fund departments in future phases of the project. With the completion of the third floor renovation, Utilities will occupy 1.5 floors in the Civic Center, 1.0 resulting from this project. CMR:176:99 Page 1 of 2 RESOURCE IMPACT Project costs of $460,000 will be charged to the Rate Stabilization Reserves for the Water, Gas, Electric, and Wastewater Collection funds. The Utilities Fund will receive a credit against its annual rend paid to the General Fund the portion of the project that improves the third floor of the Civic Center building ($240,000), spread over eight years. The project description for CIP # 19922 and budget are included in the Midyear Financial Summary and Budget Amendment Ordinance staff report. POLICY IMPLICATIONS This report does not represent a change to existing City policies. ENVIRONMENTAL REVIEW This project is exempt from CEQA under Section 1530 of the CEQA guidelines. ATTACHMENTS Attachment A: Project Schedule PREPARED BY: Karen Smith, Facilities Manager DEPARTMENT HEAD: GLENN S. ROBERTS Director of Public Works DEPARTMENT HEAD: CITY MANAGER APPROVAL: EDWARD MRIZEK Director of Utilities Assistant City Manager CMR: 176:99 Page 2 of 2 ATTACHMENT A