Commercial Telecommunications Staffing Request
REQUEST
This report requests that Council approve adding one new Full Time Equivalent (FTE)
staffposition in the Electric Utility in FY 1996-97 that will assume general responsibility
for the Electric Utility’s commercial telecommunications activities. The costs associated
with this FTE were included in the Telecommunications Program report approved by
Council on August 5, 1996. Because of the need to accelerate the deployment of the
telecommunications infrastructure for interested customers and because the requested
staffing has already been conceptually approved by Council, staff recommends that this
request not be referred to the Finance Committee.
RECOMMENDATIONS
This report recommends that the City Council 1.) Approve the addition of one new Full
Time Equivalent staffposition in the Electric Utility in FY 1996-97 that will assume
general responsibility for the Electric Utility’s commercial telecommunications activities,
and 2.) Approve a Budget Amendment Ordinance requesting the transfer of $112,000
from the Electric Rate Stabilization Reserve for the salary, benefits, furniture, computer
equipment, and training for the new staff position in Commercial Telecommunications
and the reallocation of $30,000 within the Electric Fund to the Telecommunications
Program for administrative costs.
CMR:383:96 Page 1 of 4
POLICY IMPLICATIONS
On August 5, 1996, the City Council authorized the Electric Utility to implement a
positioning strategy, involving the development of fiber optic infrastructure to be co-
located in conduit and on poles with existing Utilities’ communications lines for the
purpose of leasing fibers to interested parties (CMR:361:96). As was indicated at that
time, one Full Time Equivalent (FTE) staffposition is needed in FY 1996-97 to assume
general responsibility for the Electric Utility’s commercial telecommunications activities.
No staff is available to oversee the telecommunications program and market services on a
continuing basis. These activities must be initiated as soon as possible to have a
successful program.
The report also indicated that a second FTE may be necessary for the operation and
maintenance of the system after installation has been completed (beginning in FY 1997-
98). Utilities has temporarily assigned current Engineering/Operations staff to begin the
design and construction phase. An analysis of the needed operation and maintenance
activities of the fiber system has been made and this FTE will not be requested. This
work will be absorbed by existing staff.
The fiber project is being financed by funds made available from the Electric Rate
Stabilization Reserve and the reallocation of funds within the Electric Utility budget.
Staff proposes that the costs associated with the recommended FTE also be financed
initially by funds from the Electric Rate Stabilization Reserve, as described in the Budget
Amendment Ordinance included as Attachment 1. The resulting change to the Utility
Department’s Table of Organization for 1996-1997 is presented in Exhibit A.
EXECUTIVE SUMMARY
When the City embarked on the Telecommunications Strategy Study, staff
recommended evaluating several options. These options ranged from a "do nothing"
approach, requiring no additional effort or staffmg, to the City becoming a full
telecommunications service provider, requiring extensive staffing and resource
additions. Given that, the study was considered a one-time activity that staff handled
by employing a standard approach: reassigning priorities and utilizing consultant
support.
Now that the study is completed and in order to successfully implement the commercial
CMR:383:96 Page 2 of 4
cations positioning strategy appro,v.ed by_the City Cu~.~].
~~~.W FTE staff position is needed ~trl~g~a~~f3~
te~unications activities. The-newFTE’sresponsibitities witlinclude:
Coordinate the design and construction of telecommunications facilities.
Evaluate additional telecommunications infrastructure development opportunities.
Investigate potential partnering opportunities.
Develop pricing and marketing strategies designed to limit risk exposure and make
optimal use of the Electric Utility’s telecommunications facilities.
Actively market the Electric Utility’s commercial telecommunications facilities.
Negotiate and write contracts for the lease of the Electric Utility’s
telecommunications facilities.
Coordinate joint marketing efforts directed toward end users on behalf of
telecommunications service providers leasing the Electric Utility’s
telecommunications facilities.
Keep abreast of technological, business, legislative, and regulatory developments
in the telecommunications industry.
Analyze and prepare reports on legislative and regulatory activities.
Prepare and deliver testimony to support the Electric Utility’s position at various
regulatory arenas.
Represent the Electric Utility on external agencies’ committees, task forces, and
working groups.
After three consecutive years of reducing staff and the budget, the Utilities Department
concluded that there is no available authorized staffto perform these duties on a
continuing basis. Any shift of personnel to avoid adding the FTE will be harmful to the
operation of other assignments in the organization. To facilitate the necessary staffing,
Human Resources recommends that the current classification of Senior Resource Planner
be utilized at this time. Human Resources will examine the need for a reclassification and
CMR:383:96 Page 3 of 4
POLICY IMPLICATIONS
On August 5, 1996, the City Council authorized the Electric Utility to implement a
positioning strategy, involving the development of fiber optic infrastructure to be co-
located in conduit and on poles with existing Utilities’ communications lines for the
purpose of leasing fibers to interested parties (CMR:361:96). As was indicated at that
time, one Full Time Equivalent (FTE) staff position is needed in FY 1996-97 to assume
general responsibility for the Electric Utility’s commercial telecommunications activities.
No staff is available to oversee the telecommunications program and market services on a
continuing basis. These activities must be initiated as soon as possible to have a
successful program.
The report also indicated that a second FTE may be necessary for the operation and
maintenance of the system after installation has been completed (beginning in FY 1997-
98). Utilities has temporarily assigned current Engineering/Operations staff to begin the
design and construction phase. An analysis of the needed operation and maintenance
activities of the fiber system has been made and this FTE will not be requested. This
work will be absorbed by existing staff.
The fiber project is being financed by funds made available from the Electric Rate
Stabilization Reserve and the reallocation of funds within the Electric Utility budget.
Staff proposes that the costs associated with the recommended FTE also be financed
initially by funds from the Electric Rate Stabilization Reserve, as described in the Budget
Amendment Ordinance included as Attachment 1. The resulting change to the Utility
Department’s Table of Organization for 1996-1997 is presented in Exhibit A.
EXECUTIVE SUMMARY
When the City embarked on the Telecommunications Strategy Study, staff
recommended evaluating several options. These options ranged from a "do nothing"
approach, requiring no additional effort or staffing, to the City becoming a full
telecommunications service provider, requiring extensive staffing and resource
additions. Given that, the study wasconsidered a one-time activity that staff handled
by employing a standard approach: reassigning priorities and utilizing consultant
support.
Now that the study is completed and in order to successfully implement the commercial
CMR:383:96 Page 2 of 4
ORDINANCE NO.
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING THE BUDGET FOR THE FISCAL YEAR 1996-97 TO
PROVIDE AN ADDITIONAL APPROPRIATION FOR THE
TELECOMMI!NICATIONS PROGRAM AND INCREASE THE LOAN FROM THE
ELECTRIC FUND
WHEREAS, pursuant Go the provisions of Section 12 of Article
III of the Charter of the City of Palo Alto, the Council on June
24, 1996 did adopt a budget for fiscal year 1996-97; and
WHEREAS, on August 5, 1996 Council approved funding for a new
Telecommunications Program to promote the formation of a competitive
market for commercial telecommunications activities in Palo Alto;
and
WHEREAS, the addition of one new, regular full time equivalent
staff position is required to assume responsibility for the success
of commercial telecommunications activities; and
WHEREAS, to fund this position, an increase in the loan from
the Electric Fund to the telecommunications program is required; and
WHEREAS, some of the needed funds come from the Electric Rate
Stabilization Reserve and some will be reallocated from other
Electric Utility operations accounts to the telecommunications
program; and
WHEREAS, City Council authorization is required to amend the
1996-97 budget and the 1996-97 Table of Organization as hereinafter
set forth.
NOW, THEREFORE, the Council of the City of Palo Alto does
ORDAIN as follows:
SECTION i. The sum of One Hundred and Forty Two Thousand
Dollars ($142,000) is hereby appropriated to the functional area
Commercial Telecommunications in the Telecommunications Program.
This appropriation includes a $103,000 appropriation to salaries,
a $9,000 appropriation to non-salaries, and a $30,000 appropriation
to allocated charges. This appropriation shall be funded as
follows:
a. The sum of One Hundred and Twelve Thousand Dollars(S112,000)
is hereby transferred from the Electric Rate Stabilization Reserve
to the appropriation for the functional area Commercial
.Telecommunications; and
b. The sum of Thirty Thousand Dollars ($30,000) is hereby
reallocated within the Electric Fund to the functional area
Commercial Telecommunications.
SECTION 2. The transactions described in section 1 will
reduce the Electric Rate Stabilization Reserve from $14,881,600.to
$14,769,600.
SECTION 3. The sum of One Hundred and Forty Two Thousand
Dollars ($142,000) is hereby reserved in the retained earnings of
the Electric Fund for the Telecommunications Program.
SECTION 4. The attached Table of Organization as amended to
reflect changes shown in Exhibit A is hereby approved.
SECTION 5. As specified in Section 2.28.080(a) of the Palo
Alto Municipal Code, a two-thirds vote of the City Council is
required to adopt this ordinance.
SECTION 6. The Council finds that the appropriation of funds
does not constitute a project under the California Environmental
Quality Act. Environmental review for the Capital Improvement
Project has not been completed at this time. This Council action
makes expenditure of funds expressly contingent upon completion of
an environmental review.
SECTION 7. As provided in Section 2.04.350 of the Palo Alto
Municipal Code, this ordinance shall become effective upon adoption.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
ATTEST:APPROVED:
City Clerk Mayor
APPROVED AS TO FORM:City Manager
Senior Asst. City Attorney Deputy City
Administrative
Department
Manager,
Services
Director of Utilities
a. The sum of One Hundred and Twelve Thousand Dollars(S112,000)
is hereby transferred from the Electric Rate Stabilization Reserve
to the appropriation for the functional area Commercial
Telecommunications; and
b. The sum of Thirty Thousand Dollars ($30,000) is hereby
reallocated within the Electric Fund to the functional area
Commercial Telecommunications.
SECTION 2. The transactions described in section 1 will
reduce the Electric Rate Stabilization Reserve from $14,881,600.to
$14,769,600.
SECTIQN 3. The sum of One Hundred and Forty Two Thousand
Dollars ($142,000) is hereby reserved in the retained earnings of
the Electric Fund for the Telecommunications Program.
SECTION 4. The attached Table of Organization as amended to
reflect changes shown in Exhibit A is hereby approved.
SECTION 5. As specified in Section 2.28.080(a) of the Palo
Alto Municipal Code, a two-thirds vote of the City Council is
required to adopt this ordinance.
SECTION 6. The Council finds that the appropriation of funds
does not constitute a project under the California Environmental
Quality Act. Environmental review for the Capital Improvement
Project has not been completed at this time. This Council action
makes expenditur9 of funds expressly contingent upon completion of
an environmental review.
SECTION 7. As provided in Section 2.04.350 of the Palo Alto
Municipa! Code, this ordinance shall become effective upon adoption.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
EXHIBIT A
TABLE OF ORGANIZATION - UTILITY FUNDS
Adopted Budget 1996-97 Changes
Equipment Operator
Executive Secretary
Field Serviceperson, W-G-W
Gas System Shop & Field Repairer
Gas System Technician
Heavy Equipment Operator
Industrial Advisor, Utility Marketing Services
Inspector, PW/WGW
Instrumentation Electrician
Lineperson/Cable Splicer
Lin.eperson/Cable Splicer-Apprentice
Lineperson/Cable Splicer-Lead
Manager, Competitive Assessment
Manager, Electric Operations
Manager, Utility Marketing Services
Manager, Resource Conservation
Manager, Resource Planning
Manager, Supply Resources
Manager, Utilities Operations W-G-W
Manager, Utility Rates
Mechanical Unit Repairer
Meter Reader
Meter Reader, Lead
Office Specialist
Power Engineer
Program Coordinator, Resource Conservation
Residential Advisor, Utility Marketing Services
Resource Conservation Field Representative
Resource Conservation Field Specialist
Resource Conservation Representative
Resource Planner
2.00
2.00
0.00
0.00
3.00
9.00
0.00
3.00
1.00
10.00
0.00
4.00
1.00
1.00
1.00
0.00
0.00
1.00
1.00
1.00
2.00
6.00
1.00
0.50
3.00
0.00
1.00
0.00
0.00
0.00
7.00
Adjusted Budget 1996-97
2.00
2.00
0.00
0.00
3.00
9.00
0.00
3.00
1.00
10.00
0.00
4.00
1.00
1.00
1.00
0.00
0.00
1.00
1.00
1.00
2.00
6.OO
1.00
0.50
3.00
0.00
1.00
,0.00
0.00
0.00
7.00
EXHIBIT A
TABLE OF ORGANIZATION - UTILITY FUNDS
Adopted Budget 1996-97 Changes
Resource Conservation Technical Specialist
Senior Engineer
Senior Power Engineer
Senior Programmer Analyst
Senior Resource Planner
Staff Secretary
Supervisor, Electric Operations Projects
Supervisor, Electric Systems
Superwsor, Shop & Field Services W-G-W
Superwsor, Systems Operations/Scheduling
Superwsor, Utilities Computer Services
Supervisor, Utilities Customer Service Center
Supervisor, Utilities Meter Reader & Field Serv.
Superwsor, W-G-W
Superwsor, Water Meter Cross Connection
Superwsor, Water Transmission
Systems Operator/Scheduler
Truck Driver
Utilities Accounting Technician
Utilities Credit & Collection Specialist
Utilities Engineering Estimator
Utilities Field Service Representative
Utilities Installer Repairer
Utilities Installer Repairer, Assistant
Utilities Installer Repairer, Lead
Utilities Rate Analyst
Utilities Locator
Utilities Market Specialist
Utilities Market Analyst
Utilities Systems Technician
Utilities Key Account Representative
0.00
5.00
3.00
1.00
1.00
8.00
0.00
5.00
1.00
0.00
1.00
1.00
1.00
4.00
1.00
1.00
0,00
1.00
1.00
1.00
3.00
6.00
14.00
2.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
Adjusted Budget 1996-97
0.00
5.00
3.00
1.00
2.00
8.00
0.00
5.00
1.00
0.00
1.00
1.00
1.00
4.00
1o00
1.00
0.00
1.00
1.00
1.00
3.00
6.00
14.00
2.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
EXHIBIT A
TABLE OF ORGANIZATION - UTILITY FUNDS
Adopted Budget 1996-97 Changes
Water Meter/Cross-Connection Technician
Water Transmission Operator
Water Transmission Operator, Lead
Water Transmission Specialist
Water Transmission Specialist-Lead
Total Utilities Department
2.00
0.00
0.00
2.00
1.00
206.50 1.00
Adjusted Budget 1996-97
2.00
0.00
0.00
2.00
1.00
207.50
4
EXHIBIT A
TABLE OF ORGANIZATION - UTILITY FUNDS
Resource Conservation Technical Specialist
Senior Engineer
Senior Power Engineer
Senior Programmer Analyst
Senior Resource Planner
Staff Secretary
Supervisor, Electric Operations Projects
Superwsor, Electric Systems
Supervisor, Shop & Field Services W-G-W
Supervisor, Systems Operations/Scheduling
Superwsor, Utilities Computer Services
Superwsor, Utilities Customer Service Center
Supervisor, Utilities Meter Reader & Field Serv.
Supervisor, W-G-W
Superwsor, Water Meter Cross Connection
Supervisor, Water Transmission
Systems Operator/Scheduler
Truck Driver
Utilities Accounting Technician
Utilities Credit & Collection Specialist
Utilities Engineering Estimator
Utilities Field Service Representative
Utilities Installer Repairer
Utilities Installer Repairer, Assistant
Utilities Installer Repairer, Lead
Utilities Rate Analyst
Utilities Locator
Utilities Market Specialist
Utilities Market Analyst
Utilities Systems Technician
Utilities Key Account Representative
Adopted Budget 1996-97
0.00
5.00
3.00
1.00
1.00
8.00
0.00
5.00
1.00
0.00
1.00
1.00
1.00
4.00
1.00
1.00
0,00
1.00
1.00
1.00
3.00
6.00
14.00
2.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
Changes
1.00
Adjusted Budget 1996-97
0.00
5.00
3.00
1.00
2.00
8.00
0.00
5.00
1.00
0.00
1.00
1.00
1.00
4.00
1.00
1.00
0.00
1.00
1.00
1.00
3.00
6.00
14.00
2.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00