HomeMy WebLinkAbout1997-11-13 City Council (8)City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL ATTENTION: FINANCE COMMITTEE FROM: AGENDA DATE: CITY MANAGER NOVEMBER 13, 1997 DEPARTMENT: ADMINISTRATIVE SERVICES CMR:451:97 SUBJECT:1996-97 YEAR-END CAPITAL IMPROVEMENT PROJECTS STATUS REPORT This is an informational report and no Council action is required. EXECUTIVE SUMMARY This report provides the Finance Committee with information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of the fiscal year 1996-97. In the attached matrix (Attachment A), all City departments have submitted -information on their projects and commented on any issues which might cause a change in the scope or timing of the projects. Information in this report will keep Council abreast of progress on all CIP projects open as of the beginning of the fiscal year and on those projects which have been added or completed during the fiscal year. The attached matrix categorizes CIP’s into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase the project is in-at year-end. Information on phases gives Council a perspective on how much progress has been made on a project. Three distinct phases have been utilized, as follows: CMR:451:97 Page 1 of 3 Phase: Pre-Design Design Construction Activities: o Preparation of feasibility study o Development of a master plan o Definition of project scope o Preparation of Environmental Impact Report o Hiring a design consultant o Completionofproject design o Soliciting bids or proposals o Acquisition of major equipment o Installation o Implementation of a project The comments section of the matrix provides Council with information clarifying the status of certain projects. In general, the comments column will be blank for projects which are on- track and progressing as planned. In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. Within each department or fund, the projects are ordered by project number, which includes the year of Council approval (year of approval is shown by the second two digits of the 5-digit project number or the first two digits 0f4- digit project numbers). The matrix also includes information on the total or accumulated budget for projects, the remaining budget as of the beginning of the fiscal year, and the fiscal year expenditures, through June 1997, including commitments (encumbrances). It is important to note that the total or accumulated budget was not readily available for a number of multi-year Enterprise Fund projects. The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. During fiscal 1996-97, progress has been made on all of the City’s "continuous" projects; a listing of the projects is provided for Council’s reference (Attachment B). At year-end, all completed CIP’s.were closed and the remaining balances transferred to the Budget Stabilization Reserve for General Fund projects; and for Utility Fund projects, to the appropriate Rate Stabilization Reserves. CMR:451:97 Page 2 of 3 ATTACHMENTS Attachment A: Year-end Capital Improvement Projects Status Matrix Attachment B: List of Continuous Projects PREPARED BY: Tony Sandhu, Senior Accountant DEPARTMENT HEAD APPROVAL: Me~-is~a Cavallo Acting Director - Administrative Services CITY MANAGER APPROVAL: Emil} Harrison Assistant CRy Manager CC: n/a CMR:451:97 Page 3 of 3 E 0 O-n >~ 0 ~0 Z o 0 ~P 0 000 o ~ 0 0 0 b.- o 0 00 Z ~u. l-Z E 00 000 ~0 000 00 00 000 0 0 ~ . o ~o o.o.o.o o~o o o o o o"o oo 0 0 00 0 o ~5 "5 ~(J Z Z Z Z C:)C)~0 ~:)0 000.o" 0 (~0 0 0 o o.o.o c:,~o ,.o o ,.o-o C) <n U~ o o~ LU 0 (J uj <: LU o 8 ,o ~8 8 o 8 ~~0 0 0 0 0 0 0 -0 0 0Q - 0 0 ATTACHMENT B List of Continuous Projects Administrative Services 18614 19618 Financial Database Upgrade GIS Application Community Services 18617 19415 Art in Public Places Park Facilities Improvements Public Works Gen~mlFund 18903 18971 18670 18822 19018 19101 19309 Sidewalk Improvements Street Improvements (Utility Users Tax) Street Improvements (Street Improvement Fund) Computer Aided Map Cubberly Building Code Modification Tank Investigation and Removal ADA Compliance Storm Drainage Fund 8870 Collection System Improvements Utilities Electrical Fund 8928 8930 8931 8938 8944 9354 Underground Improvements, customer design and connection services Traffic Signals Communications System Improvements Substation Protection Improvements Substation Facility Improvements Street Light Replacements Water Fund 8013 8014 8015 8016 Water System Extensions Service & Hydrant Replacements Water Meters Water Main Replacements Wastewater Collection 8O20 8021 8022 9173 Sewer System Extension RWQCP Plant Equipment Replacement RWQCP System Flow Metering Sewer System Rehabilitation and Augmentation Gas Fund 8047 8018 8019 Gas System Extensions Gas Main Replacements Gas Meters & Regulators