HomeMy WebLinkAbout1997-11-13 City CouncilCity of Palo Alto-
City Manager’s Report
TO:HONORABLE CITY COUNCIL
ATTENTION: FINANCE COMMITTEE
FROM:CITY MANAGER DEPARTMENT: ADMINISTRATIVE
SERVICES
AGENDA DATE: NOVEMBER 13, 1997 CMR:449~’97
SUBJECT:1996-97 YEAR-END REPORT ON DEPARTMENTS’ MISSION
DRIVEN BUDGET ACCOMPLISHMENT ON KEY PLANS AND
IMPACT MEASURES
This is an. informational report and no Council action is required.
EXECUTIVE SUMMARY
Periodic performance-reporting on key plans and impact measures-by City departments is
part of the Mission Driven Budget (MDB).
Earlier this year, Council received the Midyear P~ogr~ss Repor~ (CMR: 168:97) on key plans
and impact measures, which detailed departmental progress in the firsi and second quarters
of 1996-97. City departments have again submitted information onthe stares of their key
plans and impact measures for 1996-97, which is included in the attached report.
The format of the Year-End Report differs ~om thatofthe Midyear Progress Report in order,
to provide more global information on department achievements rather than focusing only
on those exception areas where original goals were not met. The first section of the report
contains a department or fund overview, which is designed to give departments a chance to
report on those tasks accomplished which were not part of their key plans or on those key
plans which are viewed as being especially critical. The report is followed by each
department or fund’s report on key plans and impact measures. As was true in the Midyear
Progress Report, departments were asked to explain those impact measures which showed
a variance of plus or minus 20 percent (these explanations can be found below each table,
CMR:449:97 Page 1 of 2
identified by the number of the relevant impact measure). Since this report covers a full year,
departments have reported on all of their impact measures. For those departments which
adjusted impact measures at midyear, the adjusted measure is reflected in the table column,
"1996-97 Adjusted Budget." In some cases, departments have reported on impact measures
which were added to the 1997-98 Adopted Budget but for which they began tracking
information in the 1996-97 budget year.
Both the Year-End and Midyear Key Plan and Impact Measures Reports have proven to be
very labor intensive and difficult to compile. Because of the high level of work required, it
is no longer feasible to consolidate the 1997-98 Midyear Key Plans and Impact Measures
Report. In addition, the 1997-98 Year-End Report will include only key plans; impact
measures will be reported in the proposed budget document. Staff will continue to monitor
department progress on key plans and impact measures with the same criteria currently used.
If, at a future date, the reports can be automated so as to reduce the effort it takes to compile
them, staff will resume forwarding them to Council for review.
ATTACHIVIENT
1996-97 Department Overview, Key Plans and Impact Measures
(General and Utility Funds)
PREPARED BY: Myrna McCaleb, Financial Analyst
DEPARTMENT HEAD APPROVAL:
e issa t:avallo
Acting Director
S~
CITY MANAGER APPROVAL:
Manager
CC: n/a
CMR:449:9"/Page 2 of 2
DEPARTMENT OVERVIEW
In 1996-97, the City Attorney’s Office committed significant resources to respond to new state and
local legislation. On the local front, the office spent considerable time on development and
implementation of the Interim Historic Designation and Pre-1940 Demolition Ordinance. The office
represented the City in two lawsuits challenging the ordinance and its implementation.
At the State level, the City Attorney’s Office devoted significant resources to analysis and
implementation of the revenue generation restrictions enacted by the voters in November 1996 with
Proposition 218. The office also prepared local campaign spending limits in response to Proposition
208 and Council direction.
The City Attorney’s Office also had significant legislative involvement in Sacramento. Pursuant to
Council direction, the office drafted and sponsored SB 448 (Sher) to create privacy protection for City
utility customers’ personal information. Governor Wilson signed the legislation, and it will become
effective January 1, 1998. The office also devoted considerable energy to the Council-directed effort
to obtain State legislation requiring 60 days’ notice of residential rent increases (SB 682, Sher).
Governor Wilson vetoed this legislation. Finally, the City Attorney was appointed to the Advisory
Committee of the Joint Task Force on Personal Information and Privacy, a joint Senate-Assembly task
force created in 1996 by SB 1659 to study law revisions need to implement California privacy policy.
FUNCTIONAL AREA: CONSULTATION AND ADVISORY
KEY PLANS
El Provide legal review and analysis of
Comprehensive Plan update issues.
El Provide active legal support for the
Stanford West-Sand Hill Road application
Revise local CEQA guidelines to
implement Development Re;ciew proposals
and state law changes.
PROGRESS
Completed through Planning Commission
review. Pending for City Council review
of Draft Comprehensive Plan.
~ Completed. The City Attomey also
defended a lawsuit against the Measure
"O" impartial analysis and ballot
summary. _
Pending. This task has been deferred to
include State revisions to the Califomia
Code of Regulations CEQA regulations.
Major Activity: Agenda Support, Public Meetings
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Provide or manage legal services in support
of programmed activities within agreed-upon
time frames 90 percent of the time.
Provide or manage all legal services in
support ofunprogrammed activities to the
extent and in the manner agreed-upon during
each budget cycle.
80%
90%
90%
n/a
1996-97
ACTUALS
Major Activity: Council Member
IMPACT MEASURES
1.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Respond to 100 percent of Council Member
conflict of interest inquiries within 10
working days.
Provide or manage legal services for Council
Members in support of programmed activities
within agreed-upon time frames 90 percent of
the time.
100%
90%
100%
90%
1996-97
ACTUALS
Major Activity: Board/Commission Advice
IMPACT MEASURES
Respond to 70 percent of City advisory board
or commission conflict of interest inquiries
within 10 working days.
1995-96
ACTUALS
85%
1996-97 "
ADJUSTED
BUDGET
70%
1996-97
ACTUALS
Major Activity: Project Based City Staff Support
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Provide or manage legal services in support of
programmed activities within agreed-upon
time frames 90 percent of the time.
85%90%
1996-97
ACTUALS
Major Activity: Independent Investigations/Public Inquiry
IMPACT MEASURES
1. Complete 4 independent legal
investigations.
2. -Respond to 100 percent of public inquiries
within 5 Wgrking days of initial contact.
1996-97
’1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%100%
FUNCTIONAL AREA: LITIGATION AND DISPUTE RESOLUTION
KEY PLANS
El Investigate and implement a litigation
case management system with capability
to index and retrieveinformation about
City litigation (both current and closed),
and to schedule litigation calendars.
Identify City regulatory and
administrative programs where
imposition of administrative civil
penalties may be an appropriate
alternative remedy for ordinance
violation.s, and propose conforming
ordinance changes.
PROGRESS
~Several systems have been, identified, but
not detailed analysis has been done.
Potential electronic archive solutions have
been identified, but the project has not
been completed in 1996-97.
Major Activity: Claims Investigation and Administration
1995-96
IMPACT MEASURES "ACTUALS
1996-97
ADJUSTED
BUDGET
Process 100 percent of claims within
statutory time frames.
Resolve 60 percent of meritorious civil
claims within egtablished reserve levels.
100%
95%
lOO%
60%
1996-97
ACTUALS
Major Activity: Civil Litigation Defense
IMPACT MEASURES
1.Represent the City in 20 personal injury
cases.
Resolve 60 percent of civil cases within
established reserve levels.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
19
90%
20
60%
1996-97
ACTUALS
Major Activity: City Initiated Litigation
IMPACT MEASURES
1.Prepare 4 amicu~ curias (friend of the court)
participation reports.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
1996-97
ACTUALS
FUNCTIONAL AREA: OFFICIAL AND ADMINISTRATIVE DUTIES
KEY PLANS
Prepare Board and Commission
orientation program covering the Brown
Act and Political ReformAct.
Prepare departmental archival records
storage and retrieval plan, including
provisions for electronic access.
PROGRESS -
Not completed. The dep.artment was not
able to begin this plan due to
unexpected work as described in-the
overview.
Potential electronic archive solutions have
been identified, but the project has_not
-b~n-eorfipleted in 1996-97. ~-~
DEPARTMENT OVERVIEW
In 1996-97, the City Auditor’s Office continued to promote accountability and improvethe
effectiveness and efficiency.of City government by providing City management with
recommendations for improving operations as well as ens.uring establishment of proper internal
controls for the City:s programs, processes, and activities. Significant audits completed this year
including the City’s Code Enforcement Program, Building Inspection Activities, and the Contract
Change Order Process. Additionally, the highly successful sales tax audit program resulted in
significant recoveries for the City. Finally, the City Auditor issued an annual report on the status of
audit recommendations. This report reflected staff’s progress in implementing recommendations
provided in the audit reports. The achievements in this area occurred despite several vacancies
throughout the fiscal period which impacted the audit plan.
FUNCTIONAL AREA: INTEI~NAL AUDITS AND REVIEWS
KEY PLANS
Utilize progr .ares and activities described in
the City’s Mission Driven Budget in
completing the risk assessment model. This
model will be used as a tool for identi~ing
potential areas for audit.
Coordinate a peer review of the City Auditor’s
Office.
El Utilize the Internet to more fully describe
audit services provided.
Work with departments in developing control
assessment programs.
El Develop and issue a report to Council
reflecting the status of all audit
recommendations. The City Manager will
complete the current status section of this
report.
PROGRESS
The model has been completed and will be
used for the 1998-99 aud!t plan pending
development of comparable formats for
budget and actual amounts.
This has been included as a key plan for
fiscal 1997-98.
The shell has been completed. The graphics-
enhancements and links are currently being
developed
On-going. Currently working as part of the
process teams for Utilities work orders and
purchasing.
Completed. Initial report issued in January,
1997.
Major Activity: Internal Audits and Reviews
IMPACT MEASURES
1.To complete 100 percent of the audit
assignments as reflected on the Audit Plan.
To report audit issues that result in potential
savings to the City.
To report status of all recommendations for
audits issued in the prior fiscal year.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
90%
Yes
Yes
-100%
Yes
Yes
90%
Yes
Yes
FUNCTIONAL AREA: PROFESSIONAL ASSISTANCE AND SERVICES
KEY PLANS
[3 Develop and issue a Request for Proposal
(RFP) for external audit services.
PROGRESS
~ This has been included as a key Plan ~o~
. fiscal 1997-98
Major Activity: Annual External Audit
IMPACT MEASURES
’ 1996-97
" 1995-96 ADJUSTED 1996-97
ACTUALS BUDGET-ACTUALS
1.Ensure that 100 percent of the audit contract
¯ deliverables are provided within timeframes
established in the agreement.
Perform a post audit survey of City
management and staff to evaluate
performance of audit firm.
100%
100% -
100%
100%
100%
-2.Due to staff vacancies, a post audit survey of City management and staff was not performed
in 1996-97.
DEPARTMENT OVERVIEW
In 1996-97, the Office of the City Clerk continued to focus on the administration of the Cable
Television program, including, but not limited to, responding to Cable Co-op’s financial situation,
adjusting the Cable Co-op franchise fee allocations, reviewing cable legislation and its affect on the
City, and cooperating with Mid-Peninsula Access Corporation in providing community access.
Administration of the Citywide Records and Information Management Program continued to be a
priority, including potential revisions to the City departments’ records retention schedules and
destruction of records in accordance with approved records retention schedules. The Office of the
City Clerk also has continued plans for the computerized format of the Municipal Code.
FUNCTIONAL AREA: PUBLIC INFORMATION
KEY PLANS
~3 Respond to external audit of the cable
franchise.
PROGRESS
Completed. The audit found the
department in compliance with no findings
or recommendations.
Major Activity: Public Outreach
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
°
Annually review and update general
information to the Council including "Your
City Welcomes You" brochure.
Maintain 100 percent compliance with the
cable franchise .agreement.
Resolve 80 percent of cable complaints within
24 hours.
Increase new programming hours by 10
percent on the cable government channel.
100%
8O%
31%
Yes ’
100%
80%
10%
Yes
100%
85%
11%
FUNCTIONAL AREA: .COUNCIL SUPPORT SERVICES
Major Activity: Agenda/Packet Process
IMPACT MEASURES
o
Prepare and distribute 95 percent of Council
agendas and accompanying backup materials
within four days prior to the regular meeting.
Publish 100 percent of Council agenda digests
in the newspaper at least 24 hours prior to
Council regular meetings.
Ensure that no more ~han 5 percent of Council
agenda titles result in questions of
clarification from the public or removal of the
item from the agenda..
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
100%
100%
0%
95%
100%
0%
Major Activity: Board/Commission Recruitment
IMPACT MEASURES
1.Ensure 95 percent of vacancies on a
Board/Commission have at least 2
applicants.
2.Increase the total number of Boards and
Commissions applicants by 15 percent.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Ensure that 90 percent of vacancy notices are
published in the newspaper and shown on
the government channel.
100%
20%
100%
95%
15%
90%
1996-97
ACTUALS
100%
100%
0%
1996-97
ACTUALS
lOO%
17%
100%
Major Activity: Council Events
IMPACT MEASURES
Coordinate 5 Council events per~year, e.g.,
annual Council reorganization, annual
meeting with legislators, sister city functions,
retreats, State of the City, and Town Hall
meetings.
995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
Major Activity: Council Committee Meetings/Minutes
IMPACT MEASURES
1995-96
ACTUALS
Prepare 95 percent of Council legislative
actions by 11 a.m. the day succeeding the
Council meeting, with no errors.
Finalize 80 percent of minutes in six weeks
for meetings less than 3 hours and 7 weeks for
meetings that are more than 3 hours (Revised "
from 100 percent).
Ensure 95 percent of Council minutes will
have no more than 5 corrections per set:
100%
.54% "
100%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
95%
7O%
95%
95%
56%
100%
The City Clerk’s Office continues to fatl short of the stated goal given current staffing and
resources.
FUNCTIONAL AREA: ELECTIONS/CONFLICT OF INTEREST
Major Activity: Conflictof Interest Code
IMPACT MEASURES
Ensure that 95 percent of the economic
interest filings by designated employees,
including elected and appointed officials, be
filed by the official deadlines:
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
95%95%95%
Major Activity: Elections
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Have no violations of elections law.
Ensure that 95 percent of the campaign
disclosure filings for Officeholders and
candidates are filed by the official deadlines.
Increase the-number of voters by 1 percent at
all municipal elections.
o
96%
1%
0
95%
1%
1996-97
ACTUALS
rda
96%
n/a
FUNCTIONAL AREA: LEGISLATIVE RECORDS MANAGEMENT
KEY PLANS
El Provide for the Pal0 Alto Municipal Code to be
available through electronic media.
PROGRESS
Develop a Recoi’ds Emergency Recovery Plan. El
In process. A test version has been
installed in the City Clerk’s Office and
the City Attorney’s Office. The Codifier
and City Attorney are determining final
outcomes based upon the editorial review.
Completed. The Records Emergency
Recovery Plan was completed and
included in the Records and Information
Management Plan.
Major Activity: Citywide Records Management
IMPACT MEASURES
Ensure that 95 percent of retrieval requests for
inactive records be filled within three working
days.
Ensure that 95 percent of records transferred
to the inactive records center are processed
within three working days.
Provide that 95 percent of records deemed
eligible for destruction have been destroyed
by reconciliation with certificates of
destruction.
1995-96
ACTUALS
n/a
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
~n/a
95%
95%
95%
100%
100%
100%
Major Activity: Clerk Record Management
IMPACT MEASURES
1995-96-
Provide that 95 percent of records deemed
eligible for microfilming are filmed.
Provide that 95 percent of files eligible for
transfer to the inactive records center are
transferred.
Ensure that 10 percent of the files managed by
the City Clerk’s Office are audited.
ACTUALS
n!a
rl/a
rlfa
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
95%
95%
10
0%
100%
10%
Due to the limited number of records eligible for microfilming, it was not economically
prudent to undertake a microfilm project.
Major Activity: Legislative History
IMPACT MEASURES
Ensure that 95 percent of requests for current,
microfilmed, or inactive records be filled
within five working days.
°Provide that 95 percent of adopted legislative
actions are computerized within 60 days of
the City Council meeting.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
100%
95%
95%
100%
100%
Major Activity: Palo Alto Municipal Code
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Provide 95 percent of signed copies of newly
adopted ordinances to publisher for
codification within 30 days after passage by
Council.
Ensure 95 percent Of the errors are corrected
by the subsequent .supplement.
100%
100%
95%
95%
1996-97
ACTUALS
95%
95%
DEPARTMENT OVERVIEW
The City Manager:s Officefocused attention in 1996-97 on the Council’s priorities of Family, Youth
and Communities; the Comprehensive Plan; Infrastructure; and Traffic Management and Safety.
In the area of Families, Youth and Community, the City Manager’s Childcaie Advisory Task Force
was initiated; the Teen Center program initiated Awareness Workshops and conducted a Teen Job
Fair and other award=winning special events; work continued on the development of a Library
Master Plan; participation continued on the PAUSD Buildingfor Excellence Project Review
Committee; and support_c_ontinued for the City/School Liaison Committee.. ’
During 1996-97, the Draft Comprehensive Plan and Draft Environmental Impact Report were
completed and reviewed by the Planning Commission at numerous public meetings leading to
approval of a recommended Plan to be forwarded to the City Council.
An Infrastructure Work Plan was adopted for study of all the major infrastructure areas, including-
Buildings and Facflities; Traffic and Transportation; and Parks and Open Space; and the first module
was reviewed with the Planning Commission and Finance Committee, and forwarded to the Council.
The establishment 6f an Infri~structure Reserve and Debt Guidelines-were approved by Council.
In the area of Traffic Management and Safety, reports were prepared and recommendations approved
in a number of key areas, including proposals for downtown parking structures, valet parking,
residential parking permit programs; and traffic control and calming devices.
The City Manager’s Office took the lead, with the City Attorney’s Office, in negotiating the Sandhill
Road development project, working with Stanford-University on behalf of the City Council. This
involved an enormous amount of staff time, and will continue to be a priority in the upcoming year.
The study of existing boards, commissions, task forces and committees was completed and Council
has approved new policies which will be utilized to evaluate the proposal for a library commission.
in 1996-97, grantfunding for the.citywide volunteer crordinator position was obtained for an
additional two years-and a new citywide volunteer coordinator was hired, who will continue the
City’s program to expand and enhance its use of volunteers.
FUNCTIONAL AREA: CITY rvIANAGEMENT
KEY PLANS
E1 Continue the implementation of the changes
approved in the citywide Organizational
Review.
El Expand the use of volunteers throughout
City departmems by the efforts of a citywide
coordinator of volunteer services.
El Implement a master plan for the Intemet
which assures efficiem public access to
useful information and opportunities for the
electronic conduct of City business.
PROGRESS
The majority of changes were
implemented in the 1995-96 and 1996-97
budgets.
Obtained grant funding for citywide
volunteer coordinator position for two
more years and filled the vacant position.
To facilitate expanded use of volunteers,
the new citywide coordinator has formed a
citywide volunteer task force and revised
the draft citywide volunteer services
program handbook.
Reviewed by Senior Management Group
and by other key staff members in all
departments, comments from departments
were incorporated to produce the final
Internet Master Plan. The document has
been posted on the Intemet, allowing the
public to access it through the City’s
home page.
Major Activity: Oversight of City Departments
IMPACT MEASURES
Establish time frames and monitor
departments’ progress on Council
assignments to assure completion of 90
percent of assignments within time specified
to Council.
1996-9’~
1995-96 " ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
86%90%80%
Major Activity: Interdepartmental Coordination
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Assure 95 percent representation of
departments at weekly agenda planning and
post-Council meetings.
Conduct 12 monthly meetings of the Project
Review Committee, the purpose of which is
to increase the efficiency and clarity of the
City’s review of major public and/or private
development applications.
Update the Policy and Procedures Manual
and other citywide procedural guidelines
administered by the City Manager’s Office as
needed, but no less frequently than two times
a year.
97%
12
2
95%
12
2
1996-97
ACTUALS
95%
12
FUNCTIONAL AREA: CITY COUNCIL RELATIONS
KEY PLANS
Develop a recommended strategy for
financing the major programs and capital
projects that represent Council priorities.
Complete a study of existing boards,
commissions, task forces and committees
which will enable the formulation of a
Council policy on advisory bodies.
Improve access to prior years’ records, in
compliance with records management
policy, by placing City Manager’s Reports
(CMR’s) on microfilm or an equivalent
means of electronic storage.
PROGRESS
Council approved creation of an
Infrastructure Reserve and a set of Debt
Guidelines with the adoption of the 1997-
98 Budget.
The study has been completed and
recommended for approval by the Policy
and Services Committee.
CMR’s for years 1950-80 have been
microfilmed. CMR’s for years 1981-89 are
currently being microfilmed.
IMPACT MEASURES
1.Respond to 95 percent of Council Member
calls and inquiries within 24 hours..
Major Activity: Council and City Manager Interaction
1995-96
ACTUALS
100%
1996-97
ADJUSTED
BUDGET
95%
Major Activity: Council Agendas and Meetings
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Develop City Council agendas that facilitate
90 percent of Council meetings being
completed within a four-hour time frame.
90%
1996-97
ACTUALS
95%
1996-97.
ACTUALS
79%
Major Activity: Council/Public Communication and Correspondence
1996-97
1995-96 ADJUSTED
IMPACT MEASURES ACTUALS BUDGET
1996-97
ACTUALS -
Provide written responses to letters received
by the City Council within four weeks of
their receipt, 90 percent of the time.
82%90%78%
FUNCTIONAL AREA: COMMUNITY/INTERGOV. RELATIONS
KEY PLANS PROGRESS
Coordinate tile successful introduction and 0
enactment of one item of legislation of
specific importance to Palo Alto.
Explore opportunities with the school
district for cooperative programs, e.g.,
library services.
Pursue opportunities for cooperation with
neighboring jurisdictions in the provision
of certain fire-related services.
At Palo Alto’s request, legislation to
require landlords to give 60 days notice of
rental increase (SB 682) has been
introduced, but has not yet been enacted.
In process through participation on the
City School Liaison Committee and the
Building for Excellence Committee.
A proposal was submitted in response to
the City of Los Altos’ RFP for provision
of fare se.rvices. The proposal was
rejected.
Produce a brochure which responds to
most-frequently requested information
about the City.
On hold due to vacancies in Assistant City
Manager and Assistant to the City
Manager positions.
Major Activity: Public Relations
IMPACT MEASURES
1995-96
- ACTUALS
Provide information to the media on City
programs and activities at least 12 times a
year on a monthly basis.
24
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
16
FUNCTIONAL-AREA: ECONOMIC RESOURCES
KEY PLANS
Continue the Midtown business district
revitalizatior~ process.
PROGRESS
Conceptual Master Plan and one major
building redevelopment have been
approved by Council.
Major Activity: Business Outreach and Retention
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Conduct six meetings.for commercial
property owners/tenants and other interested
parties to identify individual needs, retail
gaps, and impediments to economic health.
6 4.
Major Activity: Process Facilitation
IMPACT MEASURES
Provide guidance for not less than 20
new/existing businesses requiring assistance
in the permit applications process.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
21 21 21
t
DEPARTMENT OVERVIEW
During 1996-97, the Administrative Services Department continued to implement and refine the
Mission Driven Budget (MDB). This included streamlining the budget process and the development
of new systems to improve the administration of MDB. The 1997-98 Budget was presented to and
approved by the City Council. It included the establishment of a debt policy, revisions to the
investment policy, the creation of a computer replacement fund to allow for long range fiscal
planning for the acquisition of computers, and a proposal for the long-term financing of the
Cubberley operation. In addition, the departrnent coordinated the development of a Infrastructure-
Management Plan, and participated in the presentation to the Planning Commission and the Finance
Committee of the overall plan and of Module I .Buildings and Facilities.
The Department continued to support and maintain existing applications, such as the Payroll .and
Human Resources System, the Finance System (IFAS), the Utility Billing System, and various
applications in Police, Fire, and Planning. Support of personal computers; local and wide area
networks (LAN/WAN); telephones, telecommunications systems, and voice mail continued. The
most significant activity occurred in the area of Utilities’ Customer Information System (CIS). This
effort was re-directed from in-house development to the acquisition of the software from an outside
vendor which has been selected. The LAN and WAN were upgraded at the Cubberley Community
Center to provide citywide access to Cubberley staff and to automate the training facility for citywide
training. An Internet Master Plan was prepared to guide the City’s Hom. e Page development and
assist in making policy decisions relative to the Intemet in the future. The telecommunication
capabilities at thirteen City sites were replaced with new systems to support the higher demand and
quantities. Several new Geographic Information System (GIS) applications, specifically for the Pubic
Works and Planning counters, were developed and implemented. The achievements in this area
occurred despite difficulties in recruiting and filling technology positions.
The department also continued to re-engineer the citywide purchasing process. A number of
programs and improvements were implemented, including the initiation of a procurement card pilot
program, streamlining the claim voucher process, improving the year-end purchasing and blanket
order process and the establishment of a single point contact for each department.
In the real estate area, the department worked to develop a management plan for the Arastra Preserge,
including the creation of a stewardship for the preserve and beginning the process to develop a
gateway for the area. Various uses for the Tower Well site were explored and ultimately not pursued.
Approvals for the Williams prope .rty option to lease were obtained, the property was dedicated as
parkland, and construction of the project has begun.
FUNCTIONAL AREA: FINANCIAL SUPPORT SERVICES
KEY PLANS PROGRESS
Pursue implementation of Automatic Payment
System (APS) for customer direct transfer.of
payments for utilities and other City services.
Begin development of an accounting policies
and procedures manual focusing on areas
critical to sound internal controls.
Conduct a physical inventory and provide
fixed asset tags for General Fund fixed assets.
Develop and conduct training sessions to
educate project managers in contract
processes, procedures and practices.
Implement automated timekeeping to support
time tracking under MDB and train users in
procedures for using the system.
Consolidate the purchasing section at a single
location to facilitate communication and
improve effectiveness within the group for a
more congenial climate for customers and
suppliers.
Review, identify and begin implementation of
recommendations of the Steering Committee
for the Purchasing Process that will provide
more efficient and effective processing of
customer requests, .and that will provide more
control and accountability in the procurement
process.
Delayed until implementation of the
Utilities Customer Information System is
implemented.
Completed draft policies and procedures
manual. Currently under internal review.
Completed physical inventory and asset
tagging.
Completion of this key plan was
dependent upon staffing vacant contract
manager positions. Two of the three
positions were vacant for a year.
Delayed until technological infrastructure
is upgraded to support client-server
technology.
Delayed.
Implemented a pilot study in Purchasing
of the use of procurement cards;
improved the claim voucher, blanket
order, and year-end closing process; and
developed a pilot program for petty cash.
Began developing single points of
contact for each City departments.
Major Activity: Accounting Services
IMPACT MEASURES
Produce and distribute 85 percent of final
monthly department reports by the 15th
calendar day of the month.
2.Pay 80 percent of invoices within 30 days
from invoice date.
o Achieve an average satisfaction rating of
greater than 4.0 (highest rating being 5) on
various accounting training class surveys.
Post 100 percent of new fixed assets to the
fixed assets inventory within 90 days of
invoice payment and record 100 percent of
retirements within 90 days of disposal to
maintain an accurate inventory of the City’s
assets.
¯ 1995-96
ACTUALS
67%
80%
4.5
100%
1996-97
ADJUSTED
BUDGET
-85%
80%
>4.0
100%
1996-97
ACTUALS
100%
73%
n/a
100%
3..Classes being re-formatted, no surveys were taken in 1996-97.
Major Activity: Financial Reports
IMPACT MEASURES
1995-96
ACTUALS
Obtain-an "unqualified" audit opinion for the
City’s annual financial statements.
Have the Comprehensive Annual Financial
Report(CAFR) ready for publication by
November 15.
Obtain awards for excellence in financial
reporting from the California Society of
Municipal Finance Officers (CSFMO) and-the
Government Financial Officers Association
(GFOA).
Submit 100 percent of extemal financial and
statistical reports by the legally required due
dates.
Yes
Yes
Yes
100%
1996-97.
ADJUSTED
BUDGET
1996-97
ACTUALS
Yes
Yes
Yes
100%
Yes
Yes
Yes
100%
Major Activity: Purchasing and Contract Administration
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED
BUDGET
Save 5 percent of the division’s annual
purchase volume through effective purchasing
techniques.
Increase customer service satisfaction by
processing 1 O0 percent of purchase requests
under $500 within one working day of receipt.
Provide 4 purchasing seminars to promote
effective purchasing procedures.
Increase inventorY turns to 3 per year to
minimize cash held in inventorY.
n/a
100%
n!a
n/a
5%
100%
-4
1996-97
ACTUALS
1%
85%
none
1 & 2 The combination of two staff vacancies and the time commitment involved in improving the
blanket order process prevented the division from achieving this goal
Completion of thi’s impact measure was dependent upon staffing vacant contract manager
positions. Two of the three positions were vacant for a year.
Due to staff vacancies, a plan to dispose of non-moving stock has not yet been developed
Plan development and negotiating items to be deleted from stock with affected customer
departments is planned for 1997-98.
Major Activity: Stores and Warehousing
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Deliver all stock and non-stock supplies
within 24 hours of a request 100 percent of
the time.
Provide an annual physical inventorY count
that is within 5 percent of related accounting
records.
100%100%
5%5%
98%
.16%
FUNCTIONAL AREA: PROPERTY MANAGEMENT
KEY PLANS
If Request For Proposal is approved, solicit,
review and select a proposal for sale or lease
of the Meadow Well site.
Assist leaseholders of Williams property and
Chuck Thompson site in obtaining necessary
City approvals and County grant funds to meet
*required conditions of leases.
If Request For Proposal (RFP) is approved,
solicit, review and select a proposal for sale or
lease of the Tower Well site.
Support City Manager’s Office in
implementation of Council direction for
Arastradero preserve structures, related
donation, and development of stewardship
concept.
PROGRESS
The Request For Proposal was approved,
proposals solicited, and the required bid
process conducted. Escrow has closed
on the sale ofthe property to the highest
bidder.
Necessary approvals and permits,
including park dedication, were obtained
for the Williams site. The lease has been
exercised and construction is in process.
Conditional use permit was appealed for
the Chuck Thompson site.. Planning
Commission has recommended the
Council approve the permit’.
The Request For Proposal was approved,
proposals solicited, reviewed and
presented to Council with a
recommendation to award an option to
purchase for a single fhrnily use. Council
-did not approve recommendation and.
rejected all proposals.
Preserve M .anagement Plan, Stewardship
Agreement and dismantling contract hage
been approved by Council.
Major Activity: Real Property Management
IMPACT MEASURES
Meet 95 percent of agreed upon deadlines for
routine property and easement acquisitions,
dispositions, and leases,.
Collect 98 percent of rental payments by the
due date.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
95%
98%
95%
98%
96%
94%
Update real property data files on 100 percent
of property acquisitions and dispositions
within 30 days of receipt of original recorded
documents.
98%98%95%
Major Activity: Cubberley Long Term Lease Management
1995-96
IMPACT MEASURES ’ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Maintain rental income equal to at least 95
percent of the rental amount paid by the City
to the School District.
98%95%95%
FUNCTIONAL AREA: MONEY MANAGEMENT
KEY PLANS
Replace the outdated automated cash
¯ receipting system in Revenue Collections and
at outlying facilities.
PROGRESS
Replacement was delayed due to two
factors. The vendor selected for the
software system went out of business
after contract discussions were almost
complete, necessitating beginning Jill
steps of software evaluation and
contract discussions with an alternative
vendor. Completion of that contract
was delayed, given Attorney’s Office
time commitments to the Sand Hill
Road project.
Define the r~quirements for a collections
management system, and begin to work with
the selected vendor On implementation.
Project will begin after the cash
receipting system is installed and
operational.
Work with Utilities staff to implement
charitable giving program for utility
customers.
Project Pledge initiated in June 1997.
Major Activity: Investments and Banking
IMPACT MEASURES
1.Earn an overall portfolio yield of 100 percent
or greater than the two year Treasury yield.
2.Maintain an average Of no more than 1
percent of the total investment portfolio in
idle cash in .the bank.
1995-96
ACTUALS
103%
1996-97 ¯
ADJUSTED
BUDGET
100%
1%
1996-97
ACTUALS
99%
1.06%
Major Activity: Parking Support
IMPACT MEASURES
1. Process 97 percent of parking citation
~ payments on the dayreceived.
1995-96
ACTUALS
97%
1996-97
ADJUSTED
BUDGET
97%
Major Activity: Utility Payments Processing
IMPACT MEASURES
Deposit 100 percent Of cash receipts received
by the Bill Processing Center on the day
received for crediting-to the customers’
utilities accounts.
Post 99 pei’cent of payments and adjustments
from Revenue Collections and Utilities
Customer Service Center on the day of
receipt.-
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
100%100%
99%
1996-97
ACTUALS
1996-97
ACTUALS
100%
99%
Major Activity: General Billing and Collections
IMPACT MEASURES
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET ¯
o
Issue 95 percent of billings within 7 working
days after receiving billing request from
departments.
Collect at least 70 percent of outstanding
accounts for paramedic receivables.
Collect at least 60 percent of outstanding
accounts for driving under the influence
receivables.
Collect at least 90 percent of outstanding
accounts for false alarms receNables.
Collect at least 75 percent of property damage
receivables.
Achieve an average satisfaction rating of 4.5
(of 5.0) on customer service surveys for the
Revenue Collection public counter.
95%
70%
60%
90%
75%
95%
70%
600./o
90%
75%
4.5 4.5
1996-97
ACTUALS
100%
54%
82%
100%
79%
4.9
2.Efforts were concentrated on paramedic audit and re-engineering process.
3.Collections were higher than anticipated
FUNCTIONAL AREA: FINANCIAL PLANNING, ANALYSIS, AND REPORTS
KEY PLANS
Review and test Community Services
Department’s impact measures to assure
accurate tracking and record keeping of the
measures, and continued appropriateness.
Develop a system to maintain the roster of
budgeted positions of the City which
integrates with the new payroll and
timekeeping systems.
Establish a computer equipment replacement
fund to allow for the ongoing replacement of
computer equipment.
PROGRESS
Due to competing priorities, will be
undertaken in 1997-98.
Integrated budgeted positions with the
new payroll system. Due to technical
constraints (new timekeeping system not
yet implemented), integrating with
timekeeping is on hold.
Computer Replacement Fund approved
with the 1997-98 Adopted Budget.
KEY PLANS
Review and automate the process for
collecting key plans and impact measures and
report to Council twice a year on status of key
plans and any changes to impact measures.
PROGRESS
Due to technical constraints, this project
has been delayed.
Major Activity: Consulting and Special Studies
IMPACT MEASURES-
1.Identify a minimum of $100,000 in potential
sa;cings through ana!ytical projects and special
studies.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
$50,000 $100,000 $89,000
Major Activity: Revenue/Expense Analysis/Monitor
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Project General Fund non-departmental
budget revenues within 6 percent of actual
year end results (excluding unforeseen
legislative or judicial rulings or impacts from
other government agencies).
Project General Fund employee services
budget expenditures within 3 percent of actual
year end results. ¯
6%
3%
6%
3%
1.5%
1.3%
Staff is pleased to report that non-departmental revenues came within 1.5% of the adjusted
budget, well within the 6. 0% target. A strong and steady economy has allowed staff to
develop a relatively accurate forecast.
Staff is, again, pleased to note that the employee services expenses were within 1.3% of
budget. This accuracy may be attributable to full staffing levels in the Public Safety area and
accurate budgeting.
Major Activity: Budget Development - Operating and Capital
¯1995-96
IMPACT MEASURES ACTUALS
1996-97-
ADJUSTED
BUDGET
,,Deliver the budget documem to Council at
least 15 working days prior to the first budget
hearing.
Obtain at least 3 budgeting awards from the
California Society of Municipal Finance
Officers (CSMFO) and the Governmental
Finance Officers Association (GFOA).
15 -15
3
1996-97
ACTUALS
15
5
FUNCTIONAL AREA: CENTRALIZED APPLICATION SUPPORT
KEY PLANS PROGRESS
In response to a recommendation from the ~
City’s external auditors, develop
procedures and adopt staridards for
computer system documentation, to
provide the necessary information for
supporting and enhancing the City’s
computer systems.
Assist in the acquisition and
implementation of an automated revenue
collection system for the City, improving
the accuracy and timeliness of the fees
collected throughout the City.
Complete the implementation of Phase I of
the Customer Information System for
Utilities, to improve access to customer
usage and billing information.
Assist in the implementation of an
automated timekeeping system to facilitate
the entry and greatly improve the accuracy
of time card data for employees.
The key processes for payroll and
t[mekeeping were documented. Developed
procedures for documentation of systems and
of changes or enhancements to systems.
These will be implemented in the first half of
1997-98.
This project was delayed due to extended
contract negotiations with the vendors of the
cash receipting modules.
in November, the Utilities Customer
Information System (CIS) was re-directed
from in-house development to purchase of
vendor software. A Request for Proposal
was issued, vendors demonstrated their
products and the SCT Banner CIS product-
was selected. The implementation effort will
take 14 months starting in October 199.7.
Due to the technical limitations and cost
factors, staff delayed the timekeeping
acquisition and implementation until the
technical infrastructure upgrade is complete
in 1997-98.
Major Activity: New Application Development
IMPACT MEASURES
[ 1.Complete 90 percent of projects schedule
]milestones according to schedule.
1995-96
ACTUALS
90%
1996-97
ADJUSTED
.BUDGET
80% [
Major Activity: Third Party Application Support
IMPACT MEASURES
199~-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Meet users computer program request
milestone 90 percent of the time for all third
party applications.
90%80%
1996-97
ACTUALS,
80%
1996-97
ACTUALS
70%
Major Activity: Data Base and Application Management
IMPACT MEASURES
1.Complete departmental requests for changes
within agreed upon time frame 90 percent of
the time.
1995-96
ACTUALS
90%
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
65%66%
FUNCTIONAL AREA: CENTRAL COMPUTER SUPPORT
KEY PLANS
Move personal computer servers into the
computer room to improve access and
availability of those servers to the computer
staff.
Acquire or develop application software to
manage access to the City’s computers,
Internet and outside resources.
PROGRESS
~Complete, the new personal computers
servers were installed in racks in the
computer room.
The Request for Proposal (RFP) has been
prepared. The RFP addresses both the
system and network management tools
required to manage access to the City’s
computers and communications
networks.
Major Activity: Operating System Support
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
100 percent of the time, planned system
maintenance shutdown will be scheduled one
week in advance.
Maintain up time on six systems during prime
time (7am to 6pm) 98 percent of scheduled
hours.
100%
98%
100%
95%
1996-97
ACTUALS
100%
99%
Major Activity: Security and Network Support
IMPACT MEASURES
Process 98 percent of authorized password
and computer access requests within 40
working hours.
Respond to 90 percent of complaints and
questions (approximately 1500 per year)
within 2 working days.
1995-96
ACTUALS
98%
90%
1996-97
ADJUSTED
BUDGET
98%
90%
1996-97
ACTUALS
100%
97%
Major Activity: Production Control
IMPACT MEASURES
1.Complete processing of 90 percent of jobs
with zero errors on daily basis.
2.Produce and print utility on schedule with 98
percent accuracy.
1995-96
ACTUALS
90%
98%
1996-97
ADJUSTED
BUDGET
90%
98%
1996-97
ACTUALS
100%
98%
FUNCTIONAL AREA: PERSONAL COMPUTER
KEY PLANS PROGRESS
Work with Finance and Budget Divisions to
develop a strategic and financial plan for the
replacement/upgrade of the City’s personal
computer hardware.
In conjunction with Accounting and
Budget Divisions, established the
Computer Replacement Internal Service
Fund. Inventoried computers, so that the
quantity of replacements could be
determined.
Install personal computer server software to
automate the inventory of PC equipment,
provide the technicians with a remote
diagnostic tool for problem solving and ability
to upgrade to new versions of the software
(e.g., new WordPerfectupgrades) by
distributing the new versions Over the
network.
The RFP and vendor selection process is
complete. The software will be installed
in the first quarter of 1997-98. Slight
delay due to extended contact
negotiations.
Implement a citywide ne.twork operating
system to improve printer and file sharing.
The system will also expand the use of
application sharing and improve the access to
applications for City staff.
Expanded and managed the use of
Windows NT file servers including the
sharing of files, creation of forms, and
print serving throughout the City.
Applications such as ESCOM for class
and facility scheduling are processing on
these servers.
Major Activity: User Support
IMPACT MEASURES
Resolve 75 percent of user request
(approximately 2500 per year) for computer
and software problems within 24 hours.
Resolve 80 percent of user requests
(approximately 300 for network connectivity
problems within 24 hours.
Install 70 percent of new or replacement pcs,
printers and software within 5 working days
of request from users. " "
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
70%
70%
50%
75%
80%
70%
85%
85%
60%
FUNCTIONAL AREA: TELECOMMUNICATIONS
KEY PLANS PROGRESS
Investigate and develop a plan to provide
Wide Area Network backup capability. This
will ensure continuous computer network
connections to systems and applications for
remote City Sites.
The effort was curtailed due to the City’s
investment in fiber optic cable and the
"dark fiber". The fiber will become the
primary network carrier and the coaxial
cable will become the backup.
Implementation of Citywide network
improvements to provide greater services,
more reliable connections, and management
tools to monitor the network traffic. Computer
access and network reliability will be
improved fo~ city staff.
Major Activity:- Telecommunications User Support
IMPACT MEASURES
1.Complete 80 percent-of service requests
within 5 working days.
2.Complete all communication requests within
7 working days using contract Services.
This effort was merged with the system
management RFP which has been
generated and will be issued in 1997-98.
Additional sites such as Cubberley
Community Center and Animal Services
were connected to the City’s Wide Area
Network. Remote access to the servers
has also been provided to several staff
members.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
8O%
7 days
80%
10-14 days
95%
8.75 days
Major Activity*: Telecom Planning and Administration
IMPACT MEASURES
1.Improve telecommunication systems down
...time by 15 percent due to failed equipment.
1995-96
ACTUALS
, 1996-97
ADJUSTED
BUDGET
15%
1996-97
ACTUALS
DEPARTMENT OVERVIEW
The Community Service Department completed the 1996-97 year with a broad variety of
accomplishments and achievements including receiving nine local, state and national awards.
The year also marked the start of construction of the Children’s Theater Outdoor stage facility; the
Parks and Golf Division began construction of the Golf Master Plan project and managed a number
of the Department’s Parks Capital Improvement projects; the Library Division improved community
access to information sources by introducing such innovations as an online magazine and newspaper
database; the Human Services officecompleted the successful implemeritation of a work training
program for the homeless; and the Recreation, Open Space and Sciences Division continued its
programming for the teenage population with the introduction of a job fair, awareness workshops, ~
and a teen volunteer recognition week.
Additional accomplishments include: the selection of an organization to steward the Arastra Preserve,
the replacement of playground equipment at Rinconada Park; the introduction of monthly Intemet -
training for the public co-sponsored by Yahoo !; and.the creation of a new department-wide event
showcasing children’s services, the Bubble Festival.
FUNCTIONAL AREA: ARTS AND CULTURE
KEY PLANS
[:1 Continue-to investigate community
support for a Performing Arts Center.
Support and assist the Friends of the
Children’s Theatre in its efforts to raise
ftmds for Phase II of the Golden
,Anniversary building project.
Include in the regular Children’s Theatre
season at least one play focused on
teenagers and develop further
programming for teens.
PROGRESS
~[771Arts Master Plan task force convened,
The Arts Master Plan may include
exploration of a new Performing Arts
Center.
Construction of Phase II building
project has commenced. It is planned
to be dedicated in late fall 1997.
Produced "A Funny Thing Happened
on the Way to the Forum." The Teen
Show has-become an important show
for this age group of cast and crew
who find working with and socializing
with their peer group very satisfying.
KEY PLANS PROGRESS
Explore opportunities for outside funding
to expand the Children’s Theatre Outreach
After School Play Production Program to
all Palo Alto Unified School District
elementary and middle schools.
Celebratethe Children’s Theatre 65th
Anniversary with community and alumni
events.
Develop a curriculum guide, in
conjunction with one exhibition each year,
as an outreach tool for high school
teachers to explore contemporary art with
their students.
Initiate programs for youths, teens and
families that includes: "Summer Arts", an
intensive week long program for youth;
classes, workshops, and special projects;
and Family Days in partnership with the
Palo Alto Unified School District.
Staff explored outside funding
unsuccessfully. In the interim,
through City funding, initiated rotation
program of Children’s Theatre
Outreach to- schools in order to
provide opportunities to new schools
which have not been able to be served.
Eight schools were part of the
Outreach Program this year.
To celebrate anniversary, "Snow
White and the Seven Dwarfs" was
.presented. This reprised the first
production at the Theatre. A birthday
party was held for over 500 young.
people, an anniversary performance
and reception was held for 260 people
and a reunion brunch and presentation
.was held for over 200 people. Over 60
volunteers spent over 240 hours
assisting.
A curriculum guide called "There’s no
such thing as a messed up" was
developed to be used as a summer
guide of activities based on Project
LOOK!’s exhibition projects. The
guide was a pilot and has been given
$5,000 in funding from University Art
Center for the 1997-98 edition.
Four new art classes for Teens were
developed. Eight new art mini-camps,
in collaboration with Open Space and
Sciences, were presented in March. A
Family Day in conjunction with Spirit
Objects was presented in partnership
with both the Palo Alto Unified
School District and the Ravenswood
School District. In addition four
summer arts mini-camps were
presented at the Cultural Center.
KEY PLANS PROGRESS
Explore the development and outside
funding opportunities for a Visual Artist
Mentor Program for teens.
Options are being explored. The
program is moving towards an Artist-
in-Schools program in partnership
with Cultural Kaleidoscope (non-City
funding with Cultural Center staff and
Project LOOK! support).
Major Activity: Visual Arts
IMPACT MEASURES
1. Offer 10 exhibitions each year.
2. Offer 350 classes, workshops, and tours in the
visual arts.
3.Increase total number of visitors to the
Cultural Center by 5 percent in comparison to
previous year’s attendance.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
399
5%-
10
350
5%
1996-97
ACTUALS
14
452
6%
MajorActivity: Children’s Performing Arts
IMPACT MEASURES
-1.Achieve 160 performances, classes,
workshops, and a~tivities for family
audiences.
Offer Children’s Theater participation
(hands-on) opportunities to 2,600 young
people.
Achieye 22,115 attendees/audience at
Children’s Theater productions, classes,
workshops, tours and related activities.
1996-97
"1995-96 ADJUSTED
ACTUALS BUDGET "
193
3,279
27,900
160
2,600
22,115
1996-97
ACTUALS
160
2,850
20,942
Major Activity: Adult Performing Arts
IMPACT MEASURES
1. To offer 175 performances.
2.Produce 50 (revised from 51) music and
dance concerts throughout Palo Alto.
3.Offer 100 (revised from 92) performing arts
classes.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
185 175 171
65 50 80
87 100 148
o An aggressive advertising program netted an increased response in adult performing arts
classes.
Major Activity: Arts Community Partnerships
IMPACT MEASURES
1996-97
1995- 96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Support the ASD/Real Estate Division’s
efforts to maintain 90 percent occupancy of
the Cubberley studio project.~
Provide opportunities and training for 1,000
volunteers.
100%
1,831
90%
1,000
98%
1,835
The Children’s Theater anniversary celebration increased volunteer support to the theater
(approximately 200 volunteers). In addition, about 655 volunteers in the Community Theater
were not previously budgeted. This impact measure has been revised in 1997-98.
Major Activity: Arts Facility Operations
IMPACT MEASURES
Initiate arts facilities and/or equipment
repair within 24 hours of report of
malfunctions.
1995-96
ACTUALS
24
1996-97
ADJUSTED
BUDGET
9_4
1996-97
ACTUALS
FUNCTIONAL AREA: CUBBERLEY COMMUNITY CENTER
KEY PLANS
Continue development of landscape plans
for non-landscaped and asphalt areas
between building wings and begin planting.
Implement phase two of the athletic field
irrigation-and turf improvement program.
Continue to develop promotional materials
to encourage public use of Cubberley.
El Finalize the design of the
¯ restr0orn/concession facility.
PROGRESS
Plans have been completed for planter areas.
Planting postponed until October 1997 due to
the lack of budgeted resources.
El Completed.
El Monthly events calendars continue to be
distributed on a monthly~ basis, and
advertising in the Palo Alto Weekly follows
the same schedule. A new facility rental
brochure for businesses has been completed.
El This project is presently on hold pending the
identification of a funding source.
Major Activity: Cubberley Center Services
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
97%Process 95 percent of facility rental
applications within five-working days after
initial booking.
Receive a "g6od" or better rating on 90
(revised from 80) percent of the Customer
Service Surveys received from the public,
tenants .and hourly users.
Increase hourly rentai customers by 2 percent
in 1996-97 and 3 perc6nt in 1997-98.
85%
95%
90%
2%
95%
100%
26.9%
3. A focus on customer kervice, increased marketing (see Key Plans) and dedicated efforts by staff
resulted in this significant increase.
Major Activity: Cubberley Maintenance
IMPACT MEASURES
Receive a "good" or better rating on 90
percent of the Customer Service Surveys
received from the public, tenants, and hourly
users.
Ensure that 95 percent of landscape
maintenance contract specifications are
accomplished by meeting with the contractor
at least twice monthly.
o Respond to 100 percent of complaints
regarding safety and cleanliness of facilities
within one working day.
1996-97 .
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ¯ ACTUALS
86%90%
95%
100%
100%
98%
100%
FUNCTIONAL AREA: GOLF SERVICES
KEY PLANS
Initiate Phase II of the-Golf Course Master
Improvement Plan for development of .
design and construction documents.
Implement use of credit cards for payment
of fees at the Golf Course.
Enhance revenue flows during slow
business periods through promotions and
special fee packages.
Support Junior Golf Programs for local
players, high schools, and East Palo Alto
juniors.-
El Coordinate installation of an equipment
wash facility.
PROGRESS
El Design and constructioia documents are
fully completed.
El Credit cards are in use, with favorable
customer feedback.
Implemented special twilight fees which
resulted in improved facility use during our
non peak periods..
Division participation and support with
pr6grams and fund raising has enhanced
Junior golf participation, including a 20
percent increase in funds raised compared
to last year.
El.Installation deferred. I~ will be installed as
part of Golf Course Master Improvements
Plan.
Major Activity: Golf Course Maintenance
IMPACT MEASURES
Provide playable golf turf conditions on 80
(revised from 78) percent of the .potential
playing areas of the golf course.
Ma.intain fairway mowing intervals equal to
90 percent-of comparable frequencies and
maintenance standards of regional public golf
facilities.
Maintain green mowing intervals equal to 90
percent of comparable frequencies and
maintenance stai~dards of regional golf
facilities.
On average, inspect and. repair 20 (revised
from 15) percent of the sprinkler system on a
weekly basis.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
80%
95%
95%
20%
80%
90%
90%
20%
1996-97
ACTUALS
80%
90%
90%
20%
Major Activity: Business. Operations
IMPACT MEASURES
1.Generate rbvenue to exceed expenses
(including debt service and City overhead
expense ) by 25 percent.
2.Provide 25 percent of reserved tee times for
resident use.
3.Provide a minimum of four community
forums for input regarding improvements,
maintenance .and long range planning.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
51%
25%
25%
25%
4
1996-97
ACTUALS
31%
25%
4
FUNCTIONAL AREA: PARK SERVICES
KEY PLANS
Provide, through annual renovations, Mode
I athletic field conditions at Greer, Terman,
E1 Camino parks (Mode levels I-VI are
standards determined by the National
Recreation and Park Maintenance
Association for such areas as turf care,
irrigation, litter con~trol, and pruning.
Levels range from Mode I, the highest level
of maintenance to Mode VI, the lowest
level of maintenance).
Replace and upgrade irrigation systems at
Eleanor Park, E1 Palo Alto Park, and Lucie
Stem Courtyard.
Complete installation of backflow devices
at City facilities.
Improve athletic field conditions toa Mode
II level at Jordan, JLS, and Walter Hayes
school sites in accordance with the
agreement with Palo Alto Unified School
District.
Install new playground equipment at
Cameron, Scott, and Werry parks.
Resurface tennis courts at Terman Park.
PROGRESS
[:]Annual renovation completed and
maintenance levels maintained.
Renovations completed.
Completed a three year program replacing
over 170 units.
Improvements at Jordan and Haye~
complete. JLS field improvements
deferred pending district building plans.
In-progress at three parks. Rinconada park
was completed
I~ Completedl
Major Activity: City Parks and Facilities
IMPACT MEASURES
To maintain 90 percent of the turf and
landscape at City facilities at a Mode II level
(within a range of I to III with I being state of
the art maintenance) based on NRPA
(National RecreatiOn and Park Maintenance
Standards).
Inspect 90 percent of the tennis courts (nets,
screens, fencing, gates, surfaces) on a monthly
basis (Mode IV level).
o Ensure that 80 percent of the time, litter is
picked up and collected at parks twice weekly
(Mode III level).
Prune and trim 80 percent of landscape plants
and shrubs at least twice per season (Mode II
level).
o To maintain 90 percent of the floral and
landscape plantings at these sites Mode II
level (within a range of I to VI with I being
state of the art maintenance) based on NRPA
(National Recreation and Park Maintenance
Standards).
1995-96
ACTUALS
90%
90%
90%
80%
90%
1996-97
ADJUSTED
BUDGET
90%
90%
80%
80%
90%
Major Activity: Athletic Fields
IMPACT MEASURES
o
1995-96
To maintain 90 percent of the turf at athletic
fields at a Mode I level (within a range of I to
VI with I being state of the art maintenance)
based on NRPA (National Recreationand
Park Maintenance Standards.)
Ensure that 90 percent of the !rrigation work
orders related to athletic field maintenance
activities are completed within 72 (revised
from 24) hours.
Clean 90 percent of the tennis courts on a
monthly basis.
ACTUALS
90%
90%
1996-97
ADJUSTED
BUDGET
9O%
90%
90%90%
1996-97
ACTUALS
90%
90%
80%
80%
90%
1996-97
ACTUALS
90%
90%
90%
FUNCTIONAL AREA:-HUMAN SERVICES
KEY PLANS
Assist with the implementation of approved
recommendations from the Positive
Alternatives for Youth (PAY) Master Plan
Continue progress by internal staff
committee to develop comprehensive
approaches tOthe delivery of services to
children and families.
Increase the quality of child care in Palo
Alto by promoting national accreditation
standards.
PROGRESS
IDA PAY Coordinator has been hired to
implement the Master Plan.
The committee held a department-wide
event for children and families in May 1997,
and continues to meet regularly to
coordinate services’to children and families.
During the last year, the number of child
care centers that achieved national
accreditation increased from 17 to 25. To
date, 50 percent ofPalo Alto’s 51 child care
centers are accredited
Major Activity: Human Services Contract Administration
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
B -UDGET
For 100 percent of fu.nded agencies, conduct
at least one on-site inspection to ensure funds
are spent appropriately and all contract
requirements are fulfilled.
100%100%
1996-97
ACTUALS
100%
Major Activity: Community Partnership/Public Services
IMPACT MEASURES
1995-96 "
ACTUALS
-1. Supplement General Fund resources by
..utilizing approximately 6,000 volunteer hours.
2. Provide info.rmation and educational Outreach
to approximately 3,000 citizens and
businesses in die community.
5,461
2,650
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
6,000
3,000
5,968
3,450
Major Activity: Child Care Services
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
For all 11 CityiPAUSD school age child care
programs, perform at least one evaluation to
ensure provider’s comPliance with the City’s
guidelines for extended care provision
requirements.
Conduct site visits 41times a year to City
funded child care agen.cy to ensure funds are
spent appropriately and contract requirements
are being met.
11
4
11
4
11
4
FUNCTIONAL AREA: LIBRARY SERVICES
KEY PLANS
Continue implementation of the Library
Automation Capital Improvement Program
(CIP) project, including electronic
connection of Palo Alto Unified School
District and City libraries’ catalogs.
Begin implementation of approved
elements of the Library Master Plan.
Begin plan to improve efficiency of library
staff work areas.
Coordinate rehabilitation of Children’s
Library, funded primarily through gifts.
Participate ifi implementation of Phase )- ~f
regional technology project of public
libraries in Santa Clara County to provide
county residents with better and easier
access to all library collections/resources.
PROGRESS
Major accomplishments include: enabling
City Internet connection to Main,
Children’s and Mitchell Park libraries;
providing access through library catalog to
summary and full text of 1,000 magazines,
business resources and newspapers.
Master Plan scheduled for City Council
discussion in late 1997.
Underway at Main Library; planning
begun at Mitchell Park Branch.
Project on hold pending review of Library
Master Plan.
Phase 2 ih progress~ completion
anticipated by end of 1997.
Major Activity: Library Information
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
To provide 79 percent of items requested from
libraries outside Palo Alto (interlibrary loans)
for Palo Alto residents within 21 days.
To ensure that 60 percent of individuals who
call the Main Library to request reference
assistance by telephone will be successful in
gaining access to this service.
77%
100%
79%
60%
83%
56%
Note that 44percent of the time, people who phone Main Library for reference assistance do
not succeed in directly reaching a person for help.
Major Activity: Collections Management
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
To make 75 (revised from 90) percent of new
materials available to public within 45
calendar days of receipt.
2.To check out library materials an average of
3.5 times per year (to measure effectiveness of
selecting titles relevant to users needs).
3. To shelve 7’0 (revised from 65) percent of
¯ items returned within two working days.
54%
3.6
87%
75%
3.5
70%
58%
3.6
77%
Delays in processing of new materials (caused by backlog carried over from 1995-96 and 41
percent increase in gifts added to collections) were offset by 39percent,increase in number of
items added (compared to 1995-96).
Major Activity: Library Outreach
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
1.Provide 275 enrichment activities to 20,000
children (ages 18 months to 1 t years) and
their care givers.
2.Provide library service to 45 home bound Palo
Alto residents.
274
40
275
45
294
57
o The homebound service exceeded participant target by 26percent because of increased
outreach and publicity efforts.
Major Activity: Circulation
IMPACT MEASURES
1. Collect 90 percent of the overdue fines levied.
2.Have 97 percent of items checked out, either
returned or paid for.
1995-96
ACTUALS
91%
98%
1996-97 ,
ADJUSTED
¯ BUDGET
90%
97%
1996-97
ACTUALS
88%
100%
FUNCTIONAL AREA: OPEN SPACE AND SCIENCES SERVICES
KEY PLANS
El Complete Phase I of the Foothills Park
Water Management Plan capital project.
Complete Wildhorse Valley - Buckeye
Creek repairs and restoration project, and
implement annual, maintenance .on the
sediment collection basins.
Create "PlaySpot", an interactive learning-
environment for children under five and
their care givers at the Junior Museum and
Zoo.
Draft a planning grant for the Junior
Museum and Zoo to provide funds for
enhanced programs and exhibits.
PROGRESS ¯
El Design has been completed for phases I
and II.
Repair and restoration have been completed..
Funding has been provided to establish
annual maintenance for the sediment.
collection basins.
El Completed.
El In progress. Estimated completion
December, 1997.
Major Activity: Open Space/Sciences Education Services
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Offer 1,200 interpretative and science
education activities.
Maintain an interpretive and science
activities cancellation rate of less than’l 0
percent.
Using a computerized system, formally
accept all donations to the Junior.Museum’s
permanent collection within 30 days.
1,284
16%
30
1,200
10%
30
.3.No donations to the Museum’s collection were received during the fiscal year.
1996-97
ACTUALS
1,105
11%
n/a
Major Activity: Open Space and Sciences Maintenance
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
1.Respond to 100 percent of all complaints
regarding the safety and cleanliness of
facilities within 24 hours.
100%100%100%
Major Activity.: Emergency Response/Enforcement
1995-96
I1V~PACT MEASURES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
1.Provide enforcement and emergency response
training to 100 percent of regular ranger staff
¯ within 6 months of initial employment.
2.Provide re-training opportunities for all
regular staff so that 1 O0 percent of staff is"
current in emergency response and law and
enforcement certification.
100%
100%
100%
100%
66%
100%
One new ranger.was hired during a period when specialized enforcement training at the
National PaPk Service Academy was not offered.
Major Activity: Open Space/Science Community Partnership
1995-96
IMPACT MEASi0RES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
3.
Working with other non-profit groups,
co-.sponsor 40 events of community interest
in the sdiences and humanities.
Supplement existing City resources by
maintaining an active volunteer program for
the Open Space.and Sciences, with
volunteers performing 2,600 hours of
volunteer service.
Complete the billing ~ycle for the
Community Gardens by March 31 of each
year.
38
2,500
rl/a
40
2,600
Yes
35
5,488
Yes
o Volunteer involvement in this functional area has increased substantially due to participation
from. the Friends of Foothills Pa~’k and volunteer activities on the Arastradero Preserve,
Major Activity: Wildlife/Resource Management
IMPACT MEASURES
In order to protect the endangered California
Clapper Rail, and working with State and
Federal agencies, respond to 100 percent of
the sightings of red foxes in the Palo Alto
Baylands within 7 days of notification.
Apply for all required State and Federal
permits for new animals acquired for the
Junior Museum Zoo within 30 days of receipt
of the animal.
1995-96
ACTUALS
100%
1996-97
ADJUSTED
BUDGET ’
100%
30 30
1996-97
ACTUALS
100%
2.No new animals were acquired during the past fiscal year.
FUNCTIONAL AREA: RECREATIONAL SERVICES
KEY PLANS PROGRESS
Replace the decking around both pools and
repair pipes as needed at Rinconada Pool
facility.
Hire a professional events management
firm to conduct the Palo Alto Run Series to
produce an increase in net revenue, quality,
and participation.
Increase participation in Teen programs 173
through expanded activities and
collaboration with community groups.
Increase participation in the Adult Sports
program through added diversity of
offerings and promotion to the business
community.
The discovery of structural problems
changed the scope of the project and
necessitated major revisions. Construction
is expected to begin in Spdng, 1998.
Completed. Staff has resumed production
of runs in Spring, 1997 with contractors
performing a limited role.
Participation has increased by 12 percent,
primarily because the Teen Center has
now been open for one full year and has
enhanced programs.
Three softball leagues were successfully
added, drop-in sports continue to draw
consistent participation, and the overall
number of teams participating has
increased by 23 teams, or 80 percent.
Major Activity: Adult Programs
IMPACT MEASURES
1.Offer programs that attract 120,000 adult
participants.
2.Recover 90 (revised from 75) percent of direct
program costs.
1996-97 .
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
118,000
108%
120,000
90%
88,542
107%
o
Real atteridance is increasing significantly, particularly for adult sports. However, this
statistic is now calculated measuring unduplicated participants, creating a false
impression that participat.ion has declined
Revenue for adult sports programs increased significantly this year. This improvement is
due to increased marketing and operational efficiencies.
Major Activity: Youth and Teen Programs
IMPACT MEASURES
1.Offer programs that attract 50,000 youth and
teen participants.
2.Recover 25 percent of youth and teen activity
program costs, excluding the skateboard
facility.
1996-97
¯ 1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
57,000
94%
5O,OO0
25%
53,291
134%
o Previously, this impact measure has been measured without accounting for youth classes
and summer sports camps. Each year, siJmmer camp re~,eaues are accrued in the spring
and the corresponding expenditures are not accrued until summer. Because of this, the 20
percent annual enrollment growth experienced in sports camps over the past two years
causes cost recovery statistics to be distorted
Major Activity: Programs for Persons with Special Needs
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED
BUDGET
°
Offer programs for special populations that
attract 400 participants, including 70 percent
Palo Alto residents.
Recover 25 percent of direct program costs
for persons with special needs.
Supplement City resources by generating
4000 (revised from 750) hours of volunteer
assistance in programs for persons with
special needs.
900/80
24.8%
3,700
400/70
25%
4,000
1996-97
ACTUALS
722/85
32%
5,611
This program area has experienced increased demand The resident yield increase reflects
a significantparticipation increase by residents in the Special Olympics program.
One-time donations totaling $6,500 account forthe increased level of cost recovery. Had
these donations not been received, cost. recovery would have been 26. 8percent.
Staff placed added emphasis on volunteer support this year, reJulting in this gain.
Major Activity: Recreation Facilities
IMPACT MEASURES
°
Ensure that facilities are maintained so that
City resources are protected and the number
of rentals is increased by 3 percent.
Gerierate 2 percent (revised ~rom 4 percent)
increased program revenue through impr09ed
marketing and increased user fees.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
-1%3%
-6%2%
-5%
12%
It is not incongruous for revenue to increase while the number of bookings decreases as a’
minority of bookings bring in the majority of revenue. Rentals for rec.eptions and parties
have increased, while use by non-profits and community groups has declined due to.
insurance requirements.
Demand for major facility rentals of four hours or more has. indreased significantly. The
growth of meetings, receptions, and athletic field rentals booked is expected to be
sustainable for the immediate future.
Major ActiviW; Special Events
IMPACT MEASURES
1.Produce and/or support at least 40 annual
special events at different venues throughout
the City.
2.Produce four issues of the ENJOY! catalog of
class and program information.
46
4
1996-97
ADJUSTED
BUDGET
40
4
1996-97
ACTUALS
42
DEPARTMENT OVERVIEW
In 1996-97, one of the department accomplishments .was the implementation-of agreements with
Service Employees International Union (SEIU) and Palo Alto Police Officers Association (PAPOA).
Concurrently, the Management and Hourly compensation plans were reviewed and updated. In
addition, there was a successful completion of classification studies in both Information Technology
Division and Utilities Department. A new contract with the International Association of Firefighters
(IAFF) is still being negotiated. A cost reduction was achieved in alternative retirement coverage for
hourly employees.
Another major program was the development of a policy for a new record retention system which was
approved by Council in March 1996. The policy has been implemented for all regular active
employees, retirees, hourly employees and applicants. Workers Compensation and Safety programs
have continued to be successful in reducing injuries which result in lost time for the second
consecutive year and holding claim costs under industry averages. A claims tracking system was
developed and implemented to monitor all open claims. In addition, a safety glass program has been
implemented for all employees at risk of eye injury While performing the duties of the job.
Training and development continued at a high level, especially for computer software application
training. The number of employees trained in computer and supervisory skills exceeded goals by
more than 200 percent. A total of 120 classes were offered with attendance of 2157 employees.
Transportation Demand Management efforts continued, resulting in a reduction of the vehicle
employee ratio by five percent.
FUNCTIONAL AREA:.EMPLOYEE COMPENSATION AND BENEFITS
KEY PLANS
~1 Implement and communicate any employee
benefit plan or mandated regulation changes.
Prepare bid specifications and seek
competitive bids for the City’s Life, Long
Term Disability and Dental Plans.
Negotiate agreement with Palo Alto
Professional Fire Fighters, Local 1319 within
60 days of expiration of contracts.
PROGRESS
Completed for all legislation including
Health Insurance Accountability Act,
Family Medical Leave Act, Consolidated
Omnibus Budget Reconciliation Act
revisions, and Public Employee Retirement
System regulations.
Dental Plan Request for Proposal (RFP)
process completed and First Health was
selected due to the best services and prices
with agreed upon three year contract. Life
Insurance and Long Term Disability RFP to
be completed in October, 1997.
Currently negotiating with Intemational
Association of Fire Fighters. Tentative
agreement achieved subject to union
ratification vote.
Major Activity: Classification and Salary Administration
IMPACT MEASURES
1.Assure Classification system is current by
reviewing 20 perdent of position descriptions
annually.
1995-96
ACTUALS
Survey on an annual basis 75 percent of all
of benchmark classifications to determine
competitive rates ofpay.
33%
lOO%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
20%
75%
33%
50%
2.All Management, confidential, and fire benchmark classifications were surveyed; Police and SEIU
were not renegot.iated during 1996-97, therefore resulting in no surveying during the fiscal year.
Major Activity: Labor Contract Negotiation/Management
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Negotiate agreements according to Council
authorization with all three representation.
units within 60 days of expiration of
contracts.
suec~essfully resolve 90 percent of
grievances before -arbitration.
70 days
95%
1. Currently negotiating with International Association of Firefighters.
pending.
60 days
90%
1 O0 days
82%
Tentative agreement
Majol~ Activity: Employee Benefit Plans
IMPACT MEASURES
1995-96
ACTUALS
1.Handle 90 percent of all benefit requests
within 24 hours.
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
98%
[ 90%
100%
FUNCTIONAL AREA.’. WORKFORCE RECRUITMENT AND SELECTION
KEY PLANS
Develop and implement standards for
personnel:files, incorporating security .
measures, new legislative requirements and
review/purging schedules.
PROGRESS
Policies and procedures developed and
implemented for Human Resources
Department Records and Information
Management System program.
Complete file revision and update
scheduled for completion October,
1997.
Major Activity: CandidateOutreach
IMPACT MEASURES-
1996-97
1995-96’ADJUSTED 1996-97
ACTUALS BUDGET"ACTUALS
Participate in diversity and/or community-
based outreach activities for .100 percent of
external recruitment.
Track 100 percent of applicants interviewed
for source of job/position information.
100%
98%
100%
100%
100%
100%
Major Activity: Employee Selection
IMPACT MEASURES
1.Maintain number of employees satisfactorily
completing their probationary period at 90
percent or greater.
2.Fill 90 percent of positions within 90 days of
job posting.
3.Have zero sustained discrimation complaints
or claims per year.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
97%
74%
90%
75%
0
1996-97
ACTUALS
95%
69%
0
2. Current labor market has negatively impacted this target.
Major Activity: Employment Records Maintenance
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
°
Ensure that 100 percent of all personnel files
are updated within 10 days of receipt of
status changes or other pertinent data.
Review/revise 100 percent of employment
procedures/forms within 10 working of
effective date of new regulations.
30%
9O%
50%
10o%
1996-97
ACTUALS
85%
100%
FUNCTIONAL AREA: EMPLOYEE DEVELOPMENT/WORKLIFE
KEY PLANS
Expand computer training progr:~ m to include
additional software applications and the use of
self-paced video training for smaller groups.
PROGRESS
Expanded computer training program
with the addition of WPIII, MSMail,
Access and Timeline. Developed video
lending library consisting of six different
software applications covering three to
four different skill levels.
Major Activity: Training Programs
IMPACT MEASURES
Certify 10 percent of
management/prospective management
employees as Management Academy
graduates each year.
AnnUally train 200 employees in supervisory
and skills training courses.
Receive an average rating of 4.5 out of 5
rating on course evaluations measuring the
usefulness.and effectiveness of the training
courses.
4. Provide at least 150 spaces in computer
¯ training classes.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
13%
1,400
10%
285
4.5
399
4.5
500
13%
741
4.5
600
2. and 4.Due to demand and addition of new computer training programs, the number trained
exceeded goals more than 200percent. Targets for 1997-98 have been adjusted to
reflect increased hours of training:
Major Activity: Worklife-Enhancement/Recognition
IMPACT MEASURES
1995-96 1996-97
ACTUALS ACTUALS
Provide classes that address worklife
enhancement issues in 20 percent of the
Training Center’s course offerings.
31%
1996-97 "
ADJUSTED "
BUDGET
I
" 20%
27%
FUNCTIONAL AREA: .TRANSPORTATION DEMAND MANAGEMENT
KEY PLANS
Increase public transit use among employees
by implementing and m_arketing the shuttle
service between East Bayshore City facilities
and the Motmtain View CalTrain Station.
PROGRESS
The shuttle service was discontinued
shortly after implementation due to not
receiving grant funding to support the
program.
Major Activity: Commute Alternatives Programs
IMPACT MEASURES
1996-~97
1995-96 ADJUST-ED 1996-97
ACTUALS BUDGET ACTUALS
Reduce Vehicle Employee Ratio (VER) by 4
percent between 6 a.m. and 10 a.m. Monday
through Friday.
Increase use of public transit 10 percent by
June 1997.
4%
10.4%
4%
10%
5%
13%
2.Due to continued effort in the Commute Alternatives Program, the use of pubBc trans#
increased despite discontinuation of the shuttle service.
FUNCTIONAL AREA: RISK MANAGEMENT
KEY PLANS
Implement the Lawson Human Resources
Information System module for worker’s
compensation management and medical work
restrictions. This will integrate with the
Occupational Safety and Health
Administration (OSHA) 200 module, also to
be implemented.
Evaluate the City’s volunteer accident policy
with the new Volunteer Coordinator position.
Possible selection of a new policy to coincide
with the new program and position ....
Develop and implement all new mandated
regulations, including Family and Medical
Leave Act, California Family Rights Act and
Department of Transportation (DOT).
Alcohol/Drug Testing.
PROGRESS
Implemented the Lawson HRIS work
restrictions module for all injuries
(industrial and non-industrial). The
OSHA 200 module has been
implemented and is updated to produce
the OSHA log.
Reviewed the volunteer accident polic.y.
Current policy is mostcost effective
option at the present time.
The Family Medical Leave Act and
California Family Rights Act policy and
procedure were drafted and submitted to
be included in the Policy and Procedure
Manual. The DOT Drug/Alcohol
Testing Program is being managed as
mandated by the Federal Highway
Association.
Major Activity: Injury/Illness Prevention
IMPACT MEASURES
Assist departments in limiting the number of
employee injuries where work time is lost to
40 injuries per year.
1995-96
ACTUALS
33
1996-97
ADJUSTED
BUDGET
40
1996-97
ACTUALS
32
Major Activity: Worker’s Compensation Program
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Limit claim costs to 95 percent of the
industry standard for governmental entities
as published by State of California
Department of Industrial Relations.
Limit total number of open claims to 300 per
year.
95%
185
95%
190
1996-97
ACTUALS
98%
177
2. Open claims have been steadily decreasing over the past five years.
Major Activity: Loss Control
IMPACT MEASURES
1995-96
ACTUALS
o
Resolve loss control and insurance issues
within 24 hours for 75 percent of all
requests.
Investigate and provide risk control
recommendations on 100 percent of
incidents which may result in liability to the
City.
98%
100%
1996-97 ’
ADJUSTED
BUDGET
95%
100%
1996-97
ACTUALS
85%
100%
DEPARTMENT OVERVIEW
Fiscal year 1996-97 was one of the busiest years in recent memory for the Fire Department. The fiscal
year brought with it retirements, promotions, and subsequently 5 new hires. The department also co-
sponsored two entry-level firefighter academies for the training of new recruits. Other personnel changes
included sending two fire. personnel to paramedic school. Personnel have been involved in a variety of
specialized training, including specialized rescue training, hazardous materials training, wildland training,
and Standard Emergency Management Systems (SEMS) training.
This has been a period of cooperative efforts between the Fire Department and other City and County
agencies. The department assumed the lead role in disaster preparedness and disaster preparedness
education at the Stanford Linear Accelerator Center, worked with Stanford University to streamline
their fire inspection process, joined with other agencies in the county to develop a participative
partnership agreement regard!ng the management of hazardous materials reporting (Certified Unified
Program Agency - CUPA), entered into an automatic aid agreement with the Los Altos Hills Fire
District for fire protection services in the Los Altos Hills/Palo Altos Hills area, began work through
the County Fire Prevention Officers’ Committee to develop guidelines for a policy on residential
window bars, and began efforts, with the City’s Building Department, to institute a Permit
Streamlining Process for building permits.
In addition to the work on the Permit Streamlining Process, the Fire Prevention Bureau has Updated
the fire alarm system/evacuation plan write-up for the Civic Center and conducted classes on the
system/evacuation plan. The Bureau has updated the Fire Department-customer service survey and
developed a feedback and tracking mechanism which is slated for implementation in early 1998. The
Bureau also conducted the annual pre-fire season fire prevention awareness/safety inspections for
residents of the Foothills. Part of the inspection process included updating addresses, and providing
homeowners with information regarding wildland fire safety and vegetation clearance.
This ’past fiscal year has also seen the drafting of the Foothill Master Plan and completion of the
Emergency Master Plan. Both documents are currently being reviewed by other City departments
prior to publication.
The Fire Stations have also seen some change in the past year. The Fire Department completed the
first of a multi-year facility upgrade plan beginning with the remodel of the kitchen at Fire Station #5.
Office upgrades were also done at Fire Stations # 1 and 3. An improved diesel exhaust removal
System, and wash pad were installed at Fire Station #3. The wash pad includes an oil/water separator
which prevents contaminated vehicle wash water from entering the storm drain system.
Finally, Palo Alto Fire Department responded to approximately 6,400 calls for assistance.
FUNCTIONAL AREA: EMERGENCY RESPONSE
KEY PLANS
Develop and implement a fire station
alerting system, and make appropriate
operational changes to reduce response
times.
Based on Council direction, implement
Paramedic Master Plan operational
measures and revise quality improvement
plan.
Evaluate mutual aid potential with
neighboring jurisdictions for emergency
medical responses.
Review Foothills Park Fire Management
Plan.
PROGRESS
Awarded bid for system needs assessment
and design phase. Targeted completion
estimated in December 1997.
Bid specifications for transport engines
completed. Bid process has started.
Targeted completion in August 1998.
Explored the capability of reciprocity of
response with neighboring paramedic
services.
Presentation made to Senior Management
Group (SMG). Work continues.
Major Activity: Basic Emergency Medical services
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
To respond 90 percent of the time to
emergency medical requests for service with
EMT-D trained personnel within 4 minutes or
less in the urban areas of Palo Alto and
Stanford.
To treat 90 percent ofpulseless, non-breathing
patients, with EMT-Defibrillation within 6
minutes.
93%
100%
90%
90%
100%
100%
Major Activity: Advance Emergency Medical-Paramedic
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED
BUDGET
o
To respond to paramedic requests for service
with appropriately-trained personnel within 6
minutes or less, 90 percent of the time in the
urban areas of Palo Alto and Stanford.
Recover 100 percem of the cost of emergency
paramedic services, while providing the
h!ghest quality service to the customer.
90%
100%
90%
100%
1996-97
ACTUALS
100%
100%
Major Activity: Fire Suppression Services
IMPACT MEASURES
To respond 90 percem of the time to fire
emergencies (front.ramp 0ffire stations to
scene), within 4 minutes or less for the urban
areas of Pal0 Alto and Stanford.
To confine structure fires to.the room or area
of origin. 90 percent of the time.
3.Limit property loss to $ 0.15 per $1000
market value of property protected.
4.Receive 90 percent favorable ratings on
customer service survey.
o Limit the incidence of fires in buildings to2
or less per 1,000 people.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
90%
96%
$0:09
98%
.47
90%
90%
so.is
90%
2
1996-97
ACTUALS
100%
100%
$0.176
100%
Major Activity: Special Rescue Services
IMPACT MEASURES
Be prepared, trained, and equipped to respond
to and mitigate 95 perc~m of special rescue
(vehicle, industrial, water~ confined space)
emergency requests for service annually.
1995-96
ACTUALS
99%
1996-97
ADJUSTED
BUDGET
95%
1996-97
ACTUALS
100%
Major Activity: Hazardous Materials Response
IMPACT MEASURES
1.To confine incidents to the room or area of
origin 80 percent of the time.
1996-97 .
1995-96 ADJUSTED
ACTUALS BUDGET
Major Activity: Emergency Services-Readiness
IMPACT MEASURES’
Perform fire hydrant tests and servicings on .
one third (33.3%) of the City’s.fire hydrants
annually.
Ensure that 25 percent of Fire Department
personnel have undergone physical fitness
testing annually.
1996-97
ACTUALS
100%
" 1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
33.3%34%
23%25%
FUNCTIONAL AREA: ENVIRONMENTAL AND SAFETY MANAGEMENT
33.3%
25%
KEY PLANS
Coordinate countywide efforts to
streamline hazardous waste regulations
created as a result of passage of
SB- 10_82.
Implement Emergency Preparedness
Plan adopted by Council and provide
training to City employees as needed.
PROGRESS -
[]Participating agency agreement worked
out with county as of June 30, 1997..
Final review is being conducted by City
Attorney. City Council to consider
proposal in 1997-98. Employee training
will be implemented after Council
approval.
Major Activity: Fire Code Research, Development and Enforcement
1996-97
1995-96 ADJUSTED
IMPACT MEASURES ACTUALS BUDGET
1996-97
ACTUALS
o
Inspect 80 percent of all applicable high
hazard occupancies every six months.
Inspect 90 percent of all applicable ordinary
hazard occupancies every twelve month~.
Inspect 100 per.ce.nt of all applicable light
hazard occupancies every 36 months.
Review building project plans, consult with
developers, and issue permits within 28
days, 90 percent of the time,
Review plans for City special events for all
applicable fire safety conditions within 14
days of submittal.
Evaluate principal causes of 80 percent of
commercial fires .and propose reasonable
fire code solutions to reduce the likelihood
of repetitive fires.
Research appropriate codes for enforcement
,and correctly apply them in the plan review
and inspection process 100 percent of the
time.
84%
92%
100%
100%
14
93%
100%
80%
90%
100%
90%
14
80%
lOO%
93%
86%
99%
100%
14
100%
t00%
Major Activity: Environmental Coordination
IMPACT MEASURES
Provide staff review of 90 percent of major
development projects requiring
environmental coordination within requested
timelines.
Provide a newsletter and public meeting
about hazardous materials incidents and
hazardous materials permits to the public 4
times a year.
o Respond to 90 percent of inquiries from the
public about sites affected by groundwater
contamination within 2 working days.
Review and respond appropriately to reports
related to groundwater contamination that
affect City neighborhoods and their residents
within 20 working days of receipt 90 percent
of the time.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS.BUDGET ACTUALS
100%
-4
100%
94%
90%
90%
90%
100%
2
100%
100%
Regularly scheduled meetings discontinued due to !ack of public participation. Quarterly
newsletters will continue in 1997-98, and_meetings will be held when appropriate to public .
interest.
Major Activity: Hazmat Code Research, Development and Enforcement
1996-97
1995-96 ADJUSTED
IMPACT MEASURES ACTUALS BUDGET
Inspect 90 percent of all facilities requiring
hazardous materials permits every twelve
months.
Re;ciew 90 percent of plans for hazardous
materials projects for completeness and notify
applicant by telephone or fax of approval or
deficiencies within 10 working days of
receipt.
Return project plans for hazardous materials
projects to referring department with approval
or denial within 15 working days of receiving
a complete application 90 percent of the time.
Review hazardous materials business plans
within 10 working days of receipt of submittal
for updating permit and occupancy
classifications 90 percent of the time.
Research appropriate codes for enforcement
and correctly apply them in the plan review
and inspection process 98 percent of the time.
Incorporate hazardous waste, tiered
permitting, and spill prevention controls and
countermeasures into inspection and
permitting processes for 90 percent of affected
facilities with the first inspection scheduled
under CCR Title 27 requirements.
92%
100%
95%
92%
100%
90%
90%
90%
90%
98%
rl]a
1996-97
¯ ACTUALS
86%
98%
100%
100%
100%
CAL-EPA denied authority to City to conduct these programs as part of Unified Hazardous
Materials Program. Staff is pursuing alternative approaches.
Major Activity: Fire Cause Investigation
IMPACT MEASURES
Determine fire cause in 80 percent of all
fires investigated by Fire Prevention
Bureau.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET . ACTUALS
92%80%88%
1.Target was exceeded Cause of fire was determined in 88percent of all fires investigated.
Major Activity: Public Education
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
To conduct public education on bicycle
safety for 70 percent of the PAUSD 5th
and 6th grade school children.
To conduct annual community training and
education on fire safety issues for 5,000
people in the community.
To conduct 30 public-safety talks and/or
meetings annually. -
To respond 90 percent of the time to callers
about the management of common
household hazardous materials within 3
working days of the inquiry.
95%
8,470
104
98%
70%
5,000
50
90%
1.Extra classes were held due to the addition of two instructors.
100%
5,000
50.
100%
Major Activity: Disaster Preparedness
IMPACT MEASURES
1.
1996-97
¯ 1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
To conduct City employee training on disaster
management for 20 percent of all employees
annually.
To conduct 6 community training classes on
disaster survival techniques annually.
To conduct 6 emergency planning meetings in
the community annually.
2%
0
2O%
6
6
18%
o Training has not been completed for Fire personnel at ?his time. Therefore, no training was
provided to the community.
FUNCTIONAL AREA: TRAINING AND PERSONNEL MANAGEMENT
KEY PLANS
UI Develop and implement automated
employee evaluation tracking system.
Provide training to supervisors on
employee evaluations.
PROGRESS
Tracking system has been developed and
is in use. Automated system options are
under review.
All management and supervisory staff
completed workshop on employee
evaluations conducted by the Fire Chief.
Major Activity: Training/Technical Development
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
.1.Provide 95 percent of personnel with the
mandatory training requirements of City,
County, State, and Federal governments.
98%95%100%
Major Activity: Recruitment and Selection
IMPACT MEASURES
1.Ensure 98 percent of Fire Department
authorized staffing level is maintained.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
96%98%100%
FUNCTIONAL AREA: RECORD AND INFORMATION MANAGEMENT
KEY PLANS
[=1 Develop arid implement an optical imaging
records filing and management system.
PROGRESS
Optical imaging system-has been
implemented. Scanning of past and
current records is ongoing.
Major-Activity: Required Reporting Systems Maintenance
IMPACT MEASURE
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Ensure 70 percent o~ Fire Department
personnel have access and proper training to
input data into the Fire Department Data
Management System:
File and maintain records in updated manner
by ensuring 90 percent of new records are
filed within 10 days.
65%
80%
70%
90%
1996-97
ACTUALS
70%
100%
Major Activity: Public Information
IMPACT MEASURES
1.
o
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Answer.telephones within 3 rings 90 percent
of the time.-
Respond to requests for fire department
records information 90 percent of the time,
within 10 days.
Receive a positive response from 95 percent
of callers surveyed, that their request was
answered satisfactorily or appropriately by
Department office staff.
85%
100%
90%
90%
98%95%
1996-97
ACTUALS
100%
100%
100%
DEPARTMENT OVERVIEW
In 1996-97 the Police Department continued with its emphasis on Problem Solving Policing.
The department formalized the problem solving policing concept, provided training to all department
employees, and developed a City-wide committee to address problems that involve multiple
departments. Efforts were directed at nightclubs, bars, auto burglaries, and a prostitution sting in the
south end of town. The department arrested six suspects in connection with a brutal homicide.
The department continued the pilot program associated with the Downtown Health and Safety
Program, which increased police presence and enforcement efforts associated With criminal behavior
in the downtown area. The pilot program used civilian personnel to handle calls for service and cold
reports, allowing police officers to dedicate more time to the downtown.
The department fully implemented the motorcycle enforcement and "community traffic officer"
programs aimed at r.educing speeds and accidents. Speeding citations issued by the department
increased while injury accidents and complaints from neighborhood groups were reduced over the
previous year. The department successfully implemented the Gang Resistance and Education
Training (GREAT) program and continued with the Adopt-A-School program. The Positive
Alternatives For Youth (PAY) program, with assistance from Community Services, was
implemented. The program is aimed at providing a safe environment and positive alternatives that
will reduce crime involving young people.
The department continued with plans to implement a computer aided dispatch system (CAD) in 1997-
98. Utilizing donated funds, the department implemented the Technology for Abducted Kids
(TRAK) system. This system allowsofficers and others to create and transmit flyers of missing
children, wanted suspects, and other information electronically to law enforcement agencies,
businesses, and community groups.
In response to security concerns, the department completed a major remodeJing of the public front
desk area and installed a security access system. In conjunction with the Fire Department, the
department completed a preliminary needs analysis for a new public safety building.
FUNCTIONAL AREA: REQUESTS FOR SERVICE
KEY PLANS
[:l Implement an automated scheduling system
to maximize the use of available staffing.
Assist in the implementation of the City
wide disaster preparedness plan.
PROGRESS
Pilot program implemented and staff
trained. Evaluation of program to occur
in 1997-98.
Assisted the Fire Department in planning,
identified ’initial training requirements,
assessed current available resources,
managers trainedand stocked Ventura
Substation with emergency supplies.
Major Activity: Requests for Service
IMPACT MEASURES
1.Respond to 95 percent of .emergency calls
within 3 minutes or less.
2.Respond to 85 percent of non-emergency calls
within 30 minutes or less.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
94%
97%
95%
85%
92%
96%
Major Activity: Critical Incident Resolution
IMPACT MEASURES
After the initial police response, respond
with specially trained units to the scene of a
critical incident within 1.5 hours after
request.
1996-97
1995-96 ’ADJUSTED 1996-97
ACTUALS .~ BUDGET ACTUALS
1.4 1.5 .6
Actuals based on only three incidents. Incidents occurred when most SWAT members were on
duty.
Major Activity: Regional Assistance Response
IMPACT MEASURES
Respond with officers to the requesting
agency 90 percent of the time, while
maintaining appropriate staffing levels within
Palo Alto.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
99%90%i00%
FUNCTIONAL AREA: COMMUNICATIONS SERVICES
KEY PLANS
Research and identify the cost/benefit
comparison of the development of an
in-house Computer Aided Dispatch (CAD)
system to the purchase of a predeveloped
system.
Investigate the feasibility and costs
associated with the implementation of an
Emergency Medical Dispatch program.
PROGRESS
Research completed. Received
approval to proceed with an RFP to
purchase a CAD system.
Implemenfation expected in 1998.
Work still in progress. Several issues
surround the delivery of this program,
including cost, liability, and labor
relations..
Major Activity: Police Dispatching Services
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Dispatch 99 percent of emergency calls within
60 seconds of the initial receipt of the call.
Dispatch 95 percent of non-emergency calls
within 30 minutes of the initial receipt of the
call.
Maintain a ratio of sus.tained complaints to
calls for service of less than 1 to 10,000.
99%
99%
1.3
99%
95%
0
-99%
100%
.3
3.Only one sustained complaint based on 30, 942 police calls for service.
Major Activity: Fire Dispatching Services
IMPACT MEASURES
1996-97
.1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Dispatch 99 percent of all emergency calls
by within 90 seconds of the initial receipt
of the call.
2.Maintain a ratio 0fsustained complaints to
calls for service at le~s than 1 to 10,000.
100%
1.6
99%’100%
2.No sustained complaints based on 6, 391fire and parainedic calls for service.
Major Activity: Utilities Dispatching Services
IMPACT MEASURES
1.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Coordinate 95 percent of joint department
responses within ten minutes of the request.
Dispatch 99 percent of emergency requests
for service to customer service personnel
within ten minutes.
86%
87%
95%
99%
1996-97
ACTUALS
99%
99%
Major Activity: General Fund Dispatch Services
IMPACT MEASURES
1.Return to service 99 percent of all system
support equipment within 24 hours.
Return to service 90 percent of all mobile
radio equipment within 3 days.
Return to service 90 percent of all portable
radio equipment within 5 days.
1995-96
ACTUALS
93%
90%
79%
1996-97
ADJUSTED
BUDGET
99%
90%
90%
1996-97
ACTUALS
99%
97%
96%
Major Activity: Stanford Dispatching Services
IMPACT MEASURES
1.
1995-96
ACTUALS
1996-97
ADJUSTED
- BUDGET
Dispatch 99 percent of emergency calls
within 60 seconds of the initial receipt of the
call.
Dispatch 95 percent of non-emergency calls
within 30 minutes of the initial receipt of the
call.
98%
99%
99%
95%
1996-97
ACTUALS
100%
, 100%
FUNCTIONAL AREA: INVESTIGATION AND DISPOSITION
KEY PLANS
ZI Ensure case writing quality through
enhanced supervisory review and spot
checks by the watch commanders.
Direct resources toward the mitigation Of
fraud incidents by placing a greater
emphasis on criminal investigation and
education efforts involving the public and
merchants.
PROGRESS
A comprehensi-~e report writing
reformatting was completed. Supervisory
review at both the patrol and investigative
level shows far fewer errors despite the
increasing numbers of new officers and
their lack of experience. Less than 3% of
cases are being returned due to
deficiencies in the initial investigation.
Emphasis placed on fraud incidents
through the "Downtown Detail" for street
scams. Reallocated existing resources
and enlisted community volunteers to
assist fraud investigator. As part of the
Downtown Health and Safety Program
and other targeted efforts, advised
merchants and citizens of popular fraud
scams and measures to mitigate them.-
Major Activity: Investigations
IMPACT MEASURES
1.Clear/close 65 percent of cases assigned by
the supervisor to the investigator.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Return less than 10 percent of cases to patrol
officers for follow-up due to deficiencies
and/or incompleteness in the initial
investigation.
Ensure that of all cases for which felony
charges are requested, at least 75 percent
have charges filed for prosecution by the
District Attorneys’ Office.
73%
3.6%
92%
65%
5%
90%
78%
3%
94%
Higher than normal rate in the fourth quarter can be attributed in part to the anticipated
transfer of six detectives from investigation back to patrol, and their additional effort to bring
resolution to open investigations.
Utilization of the new report form and an organizational emphasis on enhanced supervisory
review has resulted in better quality case work.
Higher than anticipated rate is due in part to a lack of statistical experience in setting the
original goal and PAPD’s higher than normal standard of case investigation.
Major Activity: Property and Evidence
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Maintain a property/evidence loss rate of 0
percent for all items handled by the police
departrnent.
Ensure that all evidence necessary to
criminal investigations is collected at all
crime scenes.
0%
100%
0%
100%
0%
100%
1.Figures based on the collection of 6,424 pieces of property and evidence.
FUNCTIONAL AREA: TRAFFIC SERVICES
KEY PLANS
Formalize implementation of’"community
traffic officer" program with an emphasis in
speed reduction.
Formalize and expand the North County
DUI strike force.
Reduce repeat DUI offenders tfirough
location and apprehension of individuals
wanted for outstanding DUI warrants.
PROGRESS
Traffic Officers were assigned to specific
areas including Downtown
North/University Ave., Embarcadero,
Midtown, Barton Park, San Antonio
Road., Ventura area, and Alma/Railroad
corridor. Speeding citations issued by the
department increased 86% over last year.
Program appears to be a success as fewer
repeat complaints have been received ’
from the neighborhood groups. Plans for
continuing with the "traffic officer
program" will occur into 1997-98.
Coordinated two strike force nights with
the majority of law enforceme.nt agencies
in Santa Clara County during the Avoid
the 13 program. As a result, 53 arrests
were made and no DUI fatal accidents
occurred during the campaign.
Four of sixteen DUI warrants investigated
for service back to 1990 have been served.
Most of the suspects have moved out of
the area with no forwarding address.
Major Activity: Traffic Enforcement
IMPACT MEASURES
1. Reduce injury accidents by 3 percent.
2. Achieve 80 percent compliance rate of
-commercialvehicles- inspected.
3.Maintain alcohol-related accidents 50
percent below national averages.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUAL
-14.8%
86%
41%
5%
80%
45%
6%
98%
50%
Although injury accidents were reduced from 418 to 392 over last year, they are still’8
percent higher than 1994-95.
Past acti~;e enforcement in the program has resulted in greater awareness by commercial
vehicle drivers and greater compliance.
Major Activity: Traffic Complaint Resolution
IMPACT MEASURES
1.Respond to 100 percent ofnew traffic
complaints within two working days.
Assess 100 percent of new traffic-related
complaints.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
100%
100%
100%
100%
100%
Major Activity: School Safety
IMPACT MEASURES
1.Achieve a 0 percent accident rate at crossing
guard controlled intersections.
Achieve a 0 percent accident rate involving
students wal.king or bicycling to and from
school. (New)
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
0%
0%
0%
1
0%
2.Student r.iding home.from school was hit by a car. Rider deemed at fault.
FUNCTIONAL AREA: PROACTIVE POLICING SERVICES
KEY PLANS
Complete transition from the Drug
Awareness Resistance Education training
program to the Gang Resistance Education
And Training program in order to effect a
more comprehensive drug and gang
prevention effort.
Enhance participation in the community
outreach to the Ventura neighborhood by
staffing the police substation.
Increase police presence and enforcement
efforts associated with criminal behavior in
the downtown area through the
implementation of the "Downtown Health
and Safety Enhancement Program".
Expand the current job placement pilot
program involving high school students and
Palo Alto business owners to address
recommendations of the Positive
Alternatives for Youth Committee.
PROGRESS
~1 Transition completed.
completed program.
700 students
Initiated bic~,cle licencing program for
neighborhood school areas. Assigned
School Resource Officer to the substation
two afternoons each week. The substation
has been used for volunteer meetings and
by the police officers assigned to the area.
The PAUSD has used the substation for
ESL classes.
Program implemented. Over 8,000
contacts with citizens and merchants.
Over 200 arrests performed. Incorporated
annual "Christmas Detail" into program.
Sit/Lie ordinance in effect and enforced.
The pilot program of utilizing Community
Service Officers (CSO’s) in the field to. ¯
free up police officers to implement the
Downtown Health and Safety Program
seems to be successful. CSOs generated
356 police reports for the year and
assisted in other areas including some
minor photography, abandoned bikes, and
traffic control. A complete evaluation of
the program will be performed in the first
quarter of 1997-98.
Secured AB 3229 funds. PAY
Coordinator hired. Secured eight
employment positions with two area
businesses. Presented job placement
component to students of Alta Vista
continuation school.
Major Activity: Crime Suppression
IMPACT MEASURES
1996-97 .
¯ 1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Ensure Palo Alto’s violent crime rate remains
within the lowest 7 percent of all California
cities between 50,000 and 100,000
population.
Minimize vice, crime and other related
activities by reviewing 100 percent of all
applications pertaining to regulated
businesses for code enforcement.
8.75%
100%
-7%
100%
6.5%
100%
Palo Alto ranked fifih out of 77 cities. Violent crim~ (murder, rape, robbery and aggravated
assaulO decreased 15percent from 1995-96.
Major Activity: Youth Services
IMPACT MEASURES
1.Increase participation by youth in the
Explorer program by 25 percent
Reach 700 students through the Gang
Resistance Education and Training program.
Ensure identified police officers visit each
adopte.d school once a week.
¯1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
36%
350
.8
-3%
70O
-13%
7OO
.5
o
Recruiting efforts have failed to produce desired results. Program to be evaluated in 1997-
98.
Higher than normal vacancy rate of sworn Officers, the concentration on an enhanced avoid
the 13 campaign and the implementation of the Downtown Health and Safety program has
limiied the number of visits to schools.
Major Activity: Community Policing and Education
IMPACT MEASURES
1995-96
ACTUALS
1996-9"~
ADJUSTED 1996-9~
BUDGET ACTUALS
Assist in the reduction of crime by 3 percent
in targeted areas through Neighborhood
Watch, community meetings and home
security inspections.
-240%n/a
Notify affected businesses and residences of
identified violent crime trends within 48
hours after identification .of trend.
Notify affected businesses and residences of
identified non-violent crime trends within
three days after identification of trend.
Resolve 80 percent of identified problems in
areas having disproportional requests frr
service by enlisting community
participation.
34.6 hours
2.5
86%
48 hours
80%
5 hours
1.7
89%
Accurate figures were not kept earlier in the year due to vacancies and a transition in
program leadership. Neighborhood watch meetings increased 25 percent and home security
inspections conducted have increased 219percent over. the same period last year.
2.Actuals based on only one identified violent crime trend
3.Actuals based on only three identified non-violent crime trends.
FUNCTIONAL AREA: POLICE PERSONNEL SERVICES
KEY PLANS
O Implement and validate the annual
Agent/Sergeant promotional examination.
Validate and implement a revised entry level
dispatcher recruiting, testing and hiring
process.
Identify and develop an enhanced problem.
solving policing model and the
corresponding required training.
PROGRESS-
Job analysis for Sergeant and Agent
completed. Promotional exam developed-
and presented. Three sergeants and two
agents promoted.
Completed review of existing recruiting,
testing, and hiring process. Implemented
various recruiting strategies. Will seek
Council authorization to include
dispatchers in state POST hiring and
certification program.
Developed and field tested a problem
solving policing model. Developed
staffing plan without increasing
department staffing levels. Department
training conducted. Implemented City-
wide problem solving committee to
address issues and problems effectively
and efficiently.
KEY PLANS PROGRESS ¯
Develop and implement a new Community
Assistant position to supplement the
reserves at special events and Stanford
football games.
Program developed and implemented.
Problems encountered with recruiting
qualified candidates. Due to the difficulty
in hiring and maintaining Community
Assistants, the future of this program will
be evaluated in 1997-98.
Major Activity: Personnel Records Management
IMPACT MEASURES
1996-97
19~5-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Investigate and notify 80 percent of
complainants of outcome within 30 days.
Ensure 100 percent compliance with the
Police Officers Standards Training audit for
police personnel records management.
61%
100%
80%
100%
73%
100%
Major Activity: Hiring and Retention
IMPACT MEASURES
1.Maintain a vacancy rate of no more than 4
percent for sworn personnel.
Ensure 80 percent of newly hired police
officers successfully complete the basic
police academy and field training program.
Maintain a vacancy rate of no more than 4
percent for non-sworn personnel.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
1.6%
75%
3.7%
7%
80%
3%
9.6%
84%
3.7%
Higher than estimated vacancy rate can be attributed to planned retirements, unplanned
medical retirements, and a diminishing qualified applicant pool.
Thirteen out of sixteen newly hired police officers successfully completed the basic academy
and field training program.
Major Activity: Mandatory Training
IMPACT MEASURES
1996-97 ¯
t 995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
2~
Maintain 95 percent of personnel compliance
with State-mandated training hours.
Provide training on 1 O0 percent on new
legislation and regulations to all officers
within three months of the effective date.
100%
100%
95%
100%
100%
100%
Major Activity: Non-Mandatory Training
IMPACT MEASURES
1.Provide diversity training each year to all
Police Department personnel.
Provide defensive tactics and legal update
training each year to 95 percent of all sworn
personnel.
1996-97
1995-96 ~,DJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
÷÷
95%
79% "
100% -
69%
95%
Diversity training provided to all patrol personnel. Will complete training ta detectives, desk
personnel and animal services personnel in the second quarte~" of 1997-98.
Major Activity: Volunteer Program
IMPACT.MEASURES
1996-97
1995-96 " ADJUSTED-1996-97 "
ACTUALS BUDGET ACTUALS
1.Oversee 9,000 hours of volunteer service.
Increase the numberof active volunteers-by
5 percent.
8,475 9,000
15%
10,153
17%
o .
Higher than anticipated increase is due ta interest through the Citizen’s Academy and
revitalization in the recruitment and utilization of volunteers in numerous programs within "
the Police Department. The department is currently staffed with 145 active volunteers.
FUNCTIONAL AREA:. ANIMAL SERVICES
KEY PLANS
In light of the pending retirement of the
City’s veterinarian, complete assessment of
the position and begin recruitment for a new
City veterinarian.
Implement staffing changes to accommodate
the increase in services generated by the
contract agencies of Mountain View, Los
Altos, and Los Altos Hills and complete the
transitionto a new superintendent.
in light of improved time tracking measures
under MDB, investigate the feasibility of
increasing direct cost recovery of the Spay
and Neuter Clinic by more than 94 percent.
PROGRESS
~1 Reviewed sPaYand neuter operations.
Updated job description for Veterinarian.
City Veterinarian hired in fourth quarter.
Staffing changes implemented with the
hiring of a new superintendent, a
temporary animal control officer, and an
animal services specialist.
Conducted periodic review of program
cost recovery. Introduced new services to
increase revenue potential. Realized 101
percent direct cost recovery for 1996-97.
Major Activity: Pet Recovery/Adoption Services
IMPACT MEASURES
1996-97.
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Maintain the rate of a.dopted animals
returned to the Shelter at less than 5 percent.
Present a humane education program to 100
children via tours of the animal shelter.
Increase the number of animals at the shelter
that are reunited with their owners by 5
percent.
3.7%
1,038
-1.4%
5%
100
-8%
6%
156
-3.2%
More than anticipated number of children receiving humane education due the promotion of
tours of the animal shelter in the third and fourth quarter..
Lower than antibipated percentage due to a decrease in the total number of stray "animals
handled by the animal shelter.
Major Activity! Animal Care
IMPACT MEASURES
1.Exercise/socialize adoptable dogs and cats
300 hours per month.
2. " Provide a shelter hygiene program to keep
disease outbreak at the shelter at less than 5
percent of.the total animals handled.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
294
1.6%
300
1%
283
.7%
Lower than anticipated rate is due in part to a lack of statistical experience in setting the
or~,gmaI goal and staffs commitment to separate and isolate animals, especially if any sign of
illness is detected.
Major Activity: Animal Heaith and Welfare
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
23,172Prevent 24,000 births of dogs and cats per
year through low-cost spay and neuter
surgeries.
Quarantine 90 percent.of domestic animals
involved in abite Within 36 hours of
receiving the bite report.
91%
24,000
90%
22,008
92%
Major Acti~,ity: Regional Animal Services
1996-97
1995-96 ADJUSTED
IMPACT MEASURES ACTUALS BUDGET
I 1" Resp°nd t° 85 percent °frequests f°r service Iwithin 45 minutes,
64%
180%-
1996-97
ACTUALS
59%
Lower than estimated timely responses due in part to vacancies in temporary personnel
earlier in the year. Theaverage response time for the year was 46 minutes.
FUNCTIONAL AREA: PARKING SERVICES
KEY PLANS
UI Evaluate security services provided at Lots
Q and J for possible modification.
Conduct follow-up evaluation of attendant
parking for Lot S.
PROGRESS
Evaluation completed. Altered hours of
security services at Lot J and Q to
address auto burglaries and other
problems.
Evaluation of attendant lot conducted.
Added one hour free parking. Lot
revenue and usage increased. Received
approval to continue operation
indefinitely.
Major Activity: Parking Enforcement
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Achieve a 95 percent compliance rate for
parking time limits in the downtown district
area.
Ensure a 50 percent compliance rate for
newly identified habitual offenders within 90
days.
Resolve overnight parking issues within 5
working days of receipt of the complaint.
97%
72%
2
95%
50%
5
97%
75%
o Active enforcement, including towing of vehicle has produced an awareness among habitual
offenders, resulting in greater compliance.
3.Internal process of handling the initial complaint has been streamlined.
Major Activity: Parking Citations/Adjudication
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Complete initial investigations on 1 O0
percent of all contested parking citations
received by the Police Department within 20
working days.
ProVide final disposition on 100 percent of
all contested parking citations within 10
working days of the adjudication hearing.
99%
100%
100%
100%
99%
96%
Major Activity: Abandoned Vehicle Abatement
IMPACT MEASURES-
Respondto 90 percent Of abandoned and
stored vehicle requests within 5 work days of
the receipt of the compliant.
2.Resolve 90 percent of all abandoned and
stored vehicle issues withinl 0 work days.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
100%
90%
90%
100%
99%
FUNCTIONAL AREA: SPECIAL EVENTS
KEY PLANS
Formalize the use of the Incident Command
System in the coordination of large scale
special events.
Assist in coordination of a spring music
festival.
Assist in the plamfing of 10 non-City
sponsored events.
PROGRESS
Scaled down version of system
implemented for the Critical Mass
Bicycle ride and two Word Cup Soccer
Matches at Stanford.
Assisted Community Services in the
planning and coordination of three
Twilight Concert Series events.
El Assisted in the planning of twenty-three "
events including President Clinton’s visit,
the Bloomingdales Grand Opening Gala,
Critical Mass Bicycle Ride, Prince
Andrew’s visit, and the California Avenue
Street Fair.
Major Activity: City Sponsored Events
IMPACT MEASURES
1995-96
¯ ACTUALS
1.Maintain an attendee/calls-for-service ratio of
less than 1 percent at City sponsored events.
.3%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
- .2%
I .02%
Attendee/calls for service ratio is less than anticipated due in part to a lack of statistical
experience in setting the original goal and the coordinated planning efforts of the
part!cipating departments. Approximately 129,000 attendees participated in 14 City
sponsored events.
Major Activity: Non-City Sponsored Events
IMPACT MEASURES
I1 .Maintain an attendee/calls-for-service ratio of
1 percent at special events.
1995-.96
ACTUALS
1996-97
ADJUSTED
BUDGET
.20%
1996-97
ACTUALS
Attendee/calls for service ratio is less than anticipated due in part to a lack of statistical
¯ experience in setting the original goal and the coordinatedplanning efforts of the¯participating departments. Approximately 18,000 attendeesparticipated in 23 non-City
sponsored events.
Major Activity: Stanford Sponsored Events
IMPACT ME~SURE
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
1.Maintain an attendee/calls-for-service ratio of...
one percent at Stanford University special
events.
0%0%
1996-97
¯ ACTUALS
. .1 .01%
Attendee/calls for service ratio is less than anticipated due in part to a lack of statistical
experience in setting the original goal and the coordinated planning efforts of the participating
departments. Approximately 290,000 attendees participated in nine Stanford University
sponsored events.
FUNCTIONAL AREA: POLICE INFORMATION MANAGEMENT
KEY PLANS PROGRESS
Research and identify the cost/benefit
comparison of the development of an
in-house Computer Aided Dispatch system
to the purchase of a predesigned system.
Revise customer service procedures to
accommodate security remodel Of the front
desk area.
Implement informational requirements for
Animal Services, including a local and
wide area network, automated case
reporting, and revenue collection software.
Research completed. Received approval to
proceed with an RFP to purchase a CAD
system. Implementation expected in 1997-
98.
Customer service procedures revised
including staffing the front desk with two
Police Desk Specialists during business
hours and answering all phones within
three rings.
Installed PCS, wired for Local Area
Network. Installed hub and new modems
for City Hall access. Trenching and
cabling for access to the WAN completed.
Connected to the WAN. Individual
connections, program and application
upgrades, and training to be completed in
the first quarter of 1997-98.
Major Activity: Information Processing
IMPACT MEASURES
1996-97
1995-96 .ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
1.Process 95 percent of warrants received within
one working day.
2.Process 80 percent of police reports within 2
working days.
3.Process 90 percent of mail-in requests for .
police reports within 4 working days.
100%
58%
93%
95%
80%
90%
100%
63%
97%
2.Lower than anticipated percentage of processing police reports is due to unplanned vacancies
earlier in the year and a lack of ~tatistical experience in setting the original goal.
Major Activity: Computer Systems Services
IMPACT MEASURES
1.Resolve 80 percent of computer service
requests within 24 hours.
1995-96
ACTUALS
85%
1996-97
ADJUSTED
BUDGET
80%
1.Handled 873 computer service requests of varying length and difficulty.
1996-97
ACTUALS
82%
DEPARTMENT OVERVIEW
The major focus of the Department in 1996-97 was on continuing workon the Comprehensive Plan
Update. The Draft Comprehensive Plan and Draft Environmental Impact report were published and
distributed for public review in December 1996. Review of the documents by the Planning
Commission and other City boards and committees continued throughout the second half of the year.
City Council review is scheduled to begin in Fall, 1997.
The department also completed the’ Environmental Impact Report and entitlement process for the
Stanford/Sand Hill Corridor Projects. The Draft Environmental Impact Report was completed in
January and Council completed approval of the entitlements in June 1997. The development
proposal for the Palo Alto Medical Foundation (PAMF) relocation and related extension of Urban
Lane to University Circle were approved in early 1996-97, and the project moved into the
construction phase.
¯ With the substantial involvement of the City Attomey, the Planning Department developed the
Historic Interim Regulations governing the designation, demolition and alteration of residential
structures constructed prior to 1940. These regulations, which were not anticipated at the beginning
of 1996-97, will be in effect until development of an Historic Protection Ordinance and Historic
Inventory are completed in 1997-98. Development and implementation of these regulations has
required substantial department staff resources.
The department experienced greatly increased levels of development review applications, including a
number of major applications, and building permit applications, which particularly impacted the
workload in the Planning and Inspection Services Divisions. In addition, the department also had the
lead in the preparation of the Permit Streamlining Implementation Plan, which Council approved in
early 1997.
Transportation-related projects included the completion of the Downtown Parking Structure
Feasibility.Study, evaluation of the six-month trial of the Lytton Neighborhood Traffic Management
Plan and Council approval of a permanent plan; and continued progress on the Embarcadero Bridge
and Bike Path project.
FUNCTIONAL AREA: PUBLIC INVOLVEMENT, EDUCATION, ASSISTANCE
KEY PLANS PROGRESS
Revise building code-related handout
materials to conform with new model code
editions.
Update customer handbooks for
subdivisions and certificates of compliance.
.Increase the use of the Intemet to distribute
permit information.
All building code-related handout
materials have been updated for new
model code edition. This includes those
on the Intemet.
No handbook updates completed so far
due to heavy workload and high
developrhent review activity..
Residential construction guide and plan
review status are now available on the
Intemet.
Major Activity: Education, Information, and Assistance
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Incorporate code changes into 100 percent of
written information materials and publications
within thirty days of-approval date.
Update 2 public handouts p.er year in a user
friendly format to incorporate submittal
requirements and standard conditions of
approval for all City Departments.
on 90 percent of working days, persons
seeking general planning assistance at the
walk-in counter will wait no more than 15
minutes to be helped.
100%
2
99%
100%
2
90%
1996-97
ACTUALS
100%
100%
2.Staff made an.extra effort, to update handouts.
Major Activity: Board, Committee, Commission Support
¯1995-96
IMPACT MEASURES ACTUALS
1996-97 _
ADJUSTED
BUDGET
Implement 50 percent of the
recommendations for operational
improvements identified at the Board and
Commission annual retreats within one year.
For each standing Board and Commission,
hold one annual retreat, one joint meeting
with the City Council and, when applicable,
orientation session for each new member, 100
’percent of the time.
Packet reproduction deadlines and accurate
advertisements will be achieved 95 percent of
the time.
50%
100-%
97%
50%
100%
95%
1996-97
ACTUALS
n/a
33%
99%
The Architectural Review Board held a retreat in May 1997, jus~ prior to the end of the year.,
so this measure will continue to be tracked in 1997-98. No other board retreats were held.
An annual retreat was held by the Architectural Review Board, but not by the Planning
Commission or Historic Resources Board, due to their respecti_ve meeting demands associated
with the review of the Draft Comprehensive Plan and lnterim Historic Regulations. All new
board members received orientation training. "
FUNCTIONAL AREA: LIAISON, COORDINATOR AND TECHNICAL ADVICE
KEY¯PLANS -PROGRESS-
¯ 0 Utilizing the Town.Architect and E1
coordination with Utilities, conduct an
architectural and indus~ial design
workshop for padmount transformer covers.
Enhance the Santa Clara Valley Water
District bridge design at the South El
Camino Gateway.
Workshop took place in March and
Utilities will be forwarding results and
recommendations to Council in Fall,
1997.
The source of funding for this project, the -
Hyatt Cabana residential redevelopment,
withdrew their applieation. The new
Hyatt redevelopment project includes a
lesser gateway enhancement, but does not
include the Santa Clara Valley Water
District bridge~
KEY PLANS PROGRESS
In 1996-97 and 1997-98, continue to
participate in the Silicon Valley uniform
building code interpretation committee.
The department is actively participating in
the Silicon Valley uniform building code
interpretation committee; several uniform
interpretations have been published.
Major Activity: Local and Interdepartmental Activities
IMPACT MEASURES"
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Dedicate 10 percent ’of Project Review
Committee agenda time to discussion and
coordination of current environmental issues
or problems.
Convert 75 percent of all proposals for creek
flood protection from concrete solutions to
more natural solutions.
Perform 100 percent of initial studies and
environmental determinations within two
weeks for all annually scheduled CIP projects
and meet or exceed all legal timelines for 100
percent of unscheduled projects.
10%
75%
100%
10%
75%
100%
Major Activity: Sub-Regional Activities
Two of three creekproposals were converted to natural solutions.
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Attend 75 percent of regularly scheduled
interagency meetings which offer significant
opportunities for coordination (Stanford,
Menlo Park, SantaClara County Association
of Planning Officials, Congestion
Management Agency).
75%75%
1996-97
ACTUALS
10%
67%
100%
1996-97
ACTUALS
75%
Major Activity: Regional/State/Fed Activities
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
1.Review, and comment on 1.00 percent of
national, state, and local proposals to amend
the Uniform. Codes and Standards.
Provide r~view and technical comment to
appropriate agencies within the published
deadline 70 percent of the time for proposed
or enacted CEQA, land use, environmental
and transportation regulations, legislation, or
policies that are referred by the City Manager
or City Attorney.
100%
100%
100%
70%
100%
100%
Staff was able to respond to review and comment on all referrals by other agencies within the
published deadline.
FUNCTIONAL AREA: DEVELOPMENT REVIEW
KEY PLANS
Complete the entitlement process for the
Sand Hill Corridor projects, includingthe
Final Environmental Impact Report.
PROGRESS
Final Environmental Impact Report
completed in January 1997; City Council
completed action in Jtme 1997.
~Implement the Palo Alto Medical
Foundation entitlement approvals and
assure compliance with all conditions ...
through the building permit and
construction pha~e.
Major Activity: Pre-Application Consultations
iMPACT MEASURES
Underway. Tentative map approval by
Council; building permit application filed
in February. 1997. Project under
¯construction.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Meet at least once with 75 percent of all
applicants for planning entitlements prior to
project submittal.
Have 75 percent of all applications be
completed upon first submittal.
92%
96%
75%
75%
82%
97%
o This is the result of clear communication with applicants during pre-application meetings.
Major Activity: Application Review and Processing
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
°
Process 85 percent of all complete
applications within the Planning Division’s
published application schedule.
Receive 1 O0 percent of all applicable
departmental comments within 10 days of a
project’s submittal date.
97%
92%
85%
100%~
97%
68%
o This measure is out of the control of Planning Department staff and will be dropped as an
impact measure in 1997-98.
Major Activity: Public Participation/Decision Making
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED ¯ 1996-97
BUDGET ACTUALS
o
50 percent of all applicants for major
development proposals will have received
neighborhood review or input prior to the
required public hearing for the project.
Planning staff will attend neighborhood
meetings regarding major development
proposals 75 percent of the time requested.
Planning staff will attend neighborhood
meetings regarding minor development
proposals 50 percent oft he time requested.
86%
100%
100%
50%
75%
50%
80%
Staff has encouraged applicants to obtain neighborhood input on major projects.
No meetings were scheduled
FUNCTIONAL AREA: CONSTRUCTION REVIEW/PROJECT MONITOR
KEY PLANS PROGRESS
Implement streamlining strategies
identified in 1995-96 streamlining project
after funding and project are approved by
Council.
Council approved permit streamlining
program in February. and staff is proceeding
to implement..
KEY PLANS
Begin transition for inspectors from 2-way
radios to cellular telephones.
Implement intemal audit recommendations
identified in the 1996 Audit of Code
Enforcement and Building Inspection
activities.
PROGRESS
ZI All inspectors now utilize cellular phones.
Many of the staff-recommended audit
recommendations have already been
implemented. The Policy and Procedures
Manual will be completed in 1997-98.
Major Activity: Construction Permit Process
IMPACT MEASURES
1.Log in and distribute 100 percent of submitted
plans within three days.
Issue subperm!ts (plumbing, mechanical,
electrical), within one day of receiving a
complete application 100 percent of the time.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
100%
100%
I00%
100%
100%
Major Activity: Plan Review
IMPACT MEASURES
1.Process 95 percent of express plan checks
within 10 working days.
Process 75 percent of non-express residential
plans first. Checked within thirty calendar
days.
Process 90 percent of non-express commercial
plans first checked within fifty calendar days.
1996-97
1995-96 ADJUSTED 1996"-97
ACTUALS BUDGET ACTUALS
99%
37%
83%
95%
75%
90%
97%
64%
95%
Major Activity: Field Inspection
IMPACT MEASURES
1.Respond to 90 percent-of inspection requests
for permitted work within one working day.
2. Respond to 90 percent of complaints relating
to substandard dwellings and improper use or
occupancy within 2 working days.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
97%
94%
90%
90%
99%
100%
Major Activity: Condition Monitoring
IMPACT MEASURES
1996-97
¯ 1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
,.
Provide inspection response for conditions of
approval within two working days for 90
percent of requests.
Respond to 90 percent of complaints
regarding.violations of conditions of approval
for existing projects within two working days.
Obtain resolution of 75 percent of complaints
within the Department’s authority and
responsibilities within two months.
100%
100%
92%
9.0%
90%
75%
98%
96%
70%
FUNCTIONAL AREA: ADVANCE PLANNING
KEY PLANS
El Complete the Draft Comprehensive Plan and
Draft Environmental Impact Report.
Prepare a Cal/Ventur~ a Coordinated Area
Plan, after receiving Council approval.
PROGRESS
Draft Comprehensive Plan and Draft
Environmental Impact Report completed
and distributed for public review in
December 1996. Planning Commission
completed review and forwarded to City
Council in August 1997.
The Cal/Ventura Area Plan has been
postponed indefinitely and the South of
Forest Avenue/Palo Alto Medical
Foundation (SOFA/PAMF) plan moved
to 1997-98. The SOFA/PAMF plan will
be underway in the next several months.
Major Activity: Policy And Ordinance Development
IMPACT MEASURES
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
Prepare a Work Program for Council adoption
and respond to Council within the specified
time limits established by the Work program
80 percent of the time.
62%80%
1996-97
ACTUALS
78%
Major Activity: Planning for Federal Funds
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Prepare and submit Housing and Urban
Development (HUD) required plans on time
and gain app.roval 100 percent of the time.
’100%100%
FUNCTIONAL AREA: TRANSPORATION AND PARKING MANAGEMENT
100%
KEY PLANS
~Complete the traffic signal system
evaluation and upgrade study.
Complete City Council review and
approval of the Downtown Parking
Structure feasibility study.
PROGRESS
This project has been delayed as staff is
first pursuing the traffic signal timing
study, which is currently underway. The
traffic signal system evaluation study will
be undertaken in 1997-98.
The Feasibility Study was completed and
approved by Council. Staff is currently
proceeding with design of two downtown
parking structures..
Major Activity: Traffic Signals Management
IMPACT MEASURES
1.Review t~affic signal timings at 10 locations
annually.
2.Modify/install traffic signals within 1 year of
funding approval:
3.Respond to 100 percent of requests for
traffic signal studies within 90 days.
1996-97 .-
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
10
1 year
lOO%
10
1 year
100%
0
80%
o The signal.improvement at Middlefield/Embarcadero was modified to include
Newell/Embarcadero, necessitating the purchase of additional equipment, which delayed the
project. ¯
Eight of t.en requests were .completed within 90 days.
Major Activity: Traffic Engineering
IMPACT MEASURES
1996-97
1995-96 ADJUSTED.1996-97
ACTUALS BUDGET ACTUALS
Respond to 90 percent of all striping and
signing complaints within 90 days of receipt
of request.
Prepare annual report to identify high accident
locations and recommendations for
improvements.
Review 90 percent of traffic control plans for
public and private construction within ten
days.
69%
Annual
100%
90%
Annual
90%
68%
Annual
10o%
Inadvertently a stack of citizen requests was misfiled, delaying staff’s timely response.
Staff has since modified procedures to improve tracking of requests.
Major Activity: Parking Management
IMPACT MEASURES
1.Respond to 90 percent of all parking requests
within thirty days of receipt of request.
conduct review of 5 locations (e.g.,
blockfaces, parking lots, etc.) in Downtown
and California Avenue business districts
annually to attempt to gain additional parking
spaces.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
71%
10
90%65%
Inadvertently a stack of citizen requests was misfiled, delaying staffs timely response.
Staff has since modified procedures to improve tracking of requests
Major Activity: Bicycle Programs
IMPACT MEASURES
1.Achieve 75 percent occupancy rate for City
bike locker rentals.
Hold 8 meetings of the Palo Alto Bicycle
Advisory Committee annually to discuss,
review and evaluate bicycle related issues.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
61%
11
75%
8
51%
13
1.Bike locker rentals are less in demand in the business districts than at the Caltrain stations.
o A number of special committee meetings were scheduled to review the Draft Comprehensive
Plan and Draft Environmenta! Report.
FUNCTIONAL AREA: NEIGHBORHOOD SERVICES AND PROGRAMS
KEY PLANS
UI Complete Phase 2 Of the Citywide School
Commute Safety Study.
Implement condition monitoring program
on existing projects.
Complete the evaluation of the Lytton
neighborhood traffic management plan and
develop final implementation plans.
PROGRESS
Funding for Phase 2 was included in the
1996-97 budget, but the project has been
delayed pending resolution of the PAUSD
Building for Excellence construction
program.
Condition monitoring program has been
included in the Code Enforcement officer
work program since November 1996.
Council approved a permanent traffic
management plan for the Lytton
neighborhood in January 1997. Staff will
pursue funding for the implementation of
the permanent improvements through the
CIP process.
Major Activity: School _Safety Activities
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Complete 90 percent of all adult crossing
guard evaluations within 30 days of receipt
of request from the City/School Traffic
Safety Committee.
Complete evaluation of 90 percent of minor
school traffic safety study requests wi~ain
thirty days of receipt of request.
Arrange and co-chair a minimum of 8
City/School Traffic Safety Committee
meetings annually.
33%
90%
10
-90%
90 %
1996-97
ACTUALS
100%
100%
10
3. Additional meetings were held before and after the school year.
Major Activity: Property Maintenance
IMPACT MEASURES
1.Respond to 90 percent of complaints within
two working days..
Obtain resolution for 80 percent of
complaints within three months of
notification to the responsible party.
Initiate enforcement actions for 90 percent of
valid complaints within five working days.
1995-96
ACTUALS
95%
99%
92%
1996-97
ADJUSTED
BUDGET
9O%
80%
90 %
1996-97
ACTUALS
99%
98%
93%
Major Activity: Traffic and Planning Studies
IMPACT MEASURES
1.Complete 1 neighborhood traffic study
annually.
Implement traffic control measures approved
by the City Council for each neighborhood
study within one year of funding approval.
Review and analyze all road bump requests
consistent with the approved Council
guidelines and prepare an annual status
report to the Council on the Road Bump
Program.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
0
1 Year
0
1 Year
Annual
0
0
0
Staff completed the 6-month evaluation of the Lytton neighborhood traffic management plan
and the Ross Road road bump study.
Council approved a permanent traffic management plan for the Lytton neighborhood in
January, 1997. Staff will pursue funding for the implementation of the permanent
improvements through the CIP process.
Staff only received one road bump request (Ross Road) which became a Council assignment.
A separate staff.report wasprepared on this issue.
Major Activity: ADA Compliance
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Respond to all staff and public ADA calls
within 24 hours 90 percent of the time. -~
Resolve valid ADA issues within 10
working days 90 percent of the time.
93%
91%
90%
90%
95%
95%
FUNCTIONAL AREA: AFFORDABLE HOUSING AND CDBG
KEY PLANS
In 1996-97 and 1997-98, revamp and
update the City’s Below Market Rate
(BMR) program, including legislative
authority, implementation mechanisms and
administration.
Complete purchase and contractual
arrangements with the Palo Alto Housing
Corporation for the Alma Street Single
Room Occupancy (SRO) project.
PROGRESS
El Updates are occurring as projects are
approved; consideration of need for overall
review is being revised.
Purchase and contractual arrangements
completed. Construction underway since
January 1997. Ongoing monitoring during
construction.
Major Activity: Affordable Housing Development
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
o
Increase the number of permanently
affordable, low income rental housing units
by an average annual increase of 25 units
over a five year period (1995-2000).
Complete 1 application for housing subsidy
funds per two year budget cycle.
Negotiate a desirable Below Market Rate
component into 100% of proposed housing
projects by the first public hearing.
4
100%
25
lOO%100%
This measure will be achieved with the completion of the Alma Street SRO.
This year staff did not have a project that met the criteria for a successful grant application.
Staff negotiated Below Market Rate (BMR) components in all five proposed housing projects,
but Council modified one BMR project.
Major Activity: Housing Advocacy
IMPACT MEASURES
Review and comment on 100 percent of Real
Estate Division lease and disposal activities
and the CIP recommendations and actions
where they potentially affect housing supply
or the availability of sites for housing
development.
1995-96
ACTUALS
100%
1996-97
ADJUSTED
BUDGET
100%
1996-97
ACTUALS
100%
Major Activity: Community Development Projects
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
Access performance and compliance with
federal requirements of 100 percent of
CDBG funded agencies~ by analyzing
progress reports and conducting on-site
monitoring visits.
Finalize 100 percent of the CDBG public
service contracts in the year allocated.
Finalize 60 percent of the physical
improvement projects (such as rehabilitation,
or housing projects) in the year allocated.
100%
100%
25%
100%
100%
60%
100%
100%
40%
The work is slightly more than current staffing can handle. Staff is pursuing contract
assistance to supplement staff resources.
Major Activity: Federal and State Grant Management
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Have zero audit findings from any federal or
state agency.
Submit 100 percent of required HUD/State
reports by the date they are due.-
Respond to 100 percentof audit requests for
information within 30 days.
0
100%
100%
100%
100%
0
100%
100%
FUNCTIONAL AREA: INFORMATION MANAGEMENT
KEY PLANS
Develop strategies to transfer existing
permit data from existing Building
Inspection Permit system to new data base.
Implement a permit processing tracking
system fofPlanning and Building, and
coordinate implementation with other City
permitting departments.
Major Activity: Automated Systems
IMPACT MEASURES
PROGRESS
~Existing data will be incorporated into the
new database system.
Project delayed due to Planning Division
Work Program adjustments, including
additional assignments for Interim
Historic Ordinance and Inventory Update,
additional resources needed for Sand Hill
Corridor entitlement process and
Comprehensive Plan DEIR and high
permit activity in the Development
Review section. However, the department
is currently monitoring and participating
in the Joint Venture (SMART permitting)
project.
Develop 10 new graphic 0r desktop
publishing products annually which
improvecommunication with the public
and decision-makers.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
10 4
1. Staff resources were diverted to work on the Comprehensive Plan.
Major Activity: Records and Map Management
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Transfer 80 percent of records from hard
copy to permanent storage media within 90
days of project completion.
Update zoning map~ within 30 days of
Council adoption of rezoning 100 percent
of the time
100%
100%
100%
100%
1996-97
ACTUALS
100%
50%
2.Two zoning changes required map updates; one was completed within 30 days, the other was
not.
Major Activity: Data Collection and Reporting
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Provide construction statistics to local, state
- and federal agencies within five days of the
close of each month 1 O0 percent of the
time.
Maintain land use projections, census,
downtown monitoring and other similar
data in such a manner that up to date
information can be provided within 3 days
of a request 90 percent of the time, or by the
due date.
100%
100%,
100%
90%
1996-97
ACTUALS
100%
100%
DEPARTMENT OVERVIEW
In 1996-97, the Public Works Department focused on completion of a number of key projects that
included: design of the Golf Course Improvements; Modules 1 and 2 of the Infrastructure
Management Program; the restoration of a major portion of the seven ac~es Harbor Marsh;
resurfacing of Alma Street from the Oregon Expressway to Addison Street; Alma Street Bike Bridge
installation; remodeled the Police Department front counter and support services area; exterior
painting at the Rinconada Pool Facility and Fire Stations 2 and 5; reroofing Council Chamber/Police
Department, .Cubbedey Wings D and I, and the Ventura Administrationand Child care Wing;
construction of a storage shed at the Children’s Theatre; recarpeting of the Main and Downtown
Libraries; and the design of the Civic Center Chiller replacement.
Other accomplishments included the conversion of the Graffiti Programfrom temporary to
permanent; support of the newly created tree group CANOPY’s planting of over 100 trees utilizing
neighborhood volunteers; implementation of the Tree Task Force recommendation to increase
contract services for tree trimming; and completion .of the demolition and recycling of the
Arastradero Preserve structures. In addition, staff from the Operations Division worked with the
Human Resources Department to administer a pilot Wellness Program for City emPloyees.
Work will continue in 1997-98 toward the completion of the remaining 20 percent conversion of the
Harbor Marsh to a natural habitat; the upgrade of the Rinconada Pool Facility; and the replacement
of the Children’s Pool.
FUNCTIONAL AREA: STREETS,
KEY PLANS PROGRESS
Complete design of bicycle and vehicular
improvements at the Page Mill Road and
Foothill Expressway intersection.
Construct a permanent traffic barrier at the
Bryant Street and A~ldison Ayenue
intersection.
Award a contract to resurface streets in the
University Avenue Business District.
Upgrade double yellow lines with raised
pavement markers in high traffic areas.
Design~ delayed due to negotiations with
Stanford on the Right of Entry agreement.
Began 50 percent of design plans.
Held meeting with neighborhood to
determine landscaping plan. Began in-
house design.
Delayed until 1997-98 due to conflicting
Utilities Department project scheduled for
1996-97.
Completed University Avenue and Alma
Resurfacing Project.
Major Activity: Streets Contract Maintenance
IMPACT MEASURES
1.Design and bid contracts to repave 9 miles of
streets per year.
For 90 percent of projects, limit the amount of
construction change orders to the amount
authorized by Council at the time of award.
Bid 100 percent of all projedts in the year they
are budgeted for construction.
1995-96
ACTUALS
9
lOO%
100%
1996-97-
ADJUSTED
BUDGET
90%
100%-
Major Activity: Street Computer Mapping
IMPACT MEASURES
Every two years survey the condition of 95
percent of streets within the City and update
the Pavement Maintenance Management
System (PMMS) data base.
2.Complete 85 percent of updates to the
Geographic Information System (GIS)
basemap within 4 weeks of receiving as-built
drawings for City infrastructure
-improvements.
1995-96
ACTUALS
100%
100%
1996-97
ADJUSTED
- BUDGET
0%
85%
1996-97
ACTUALS
9
100%
100%
1996-97
ACTUALS
0%
95%
Major Activity: In-House Maintenance
IMPACT MEASURES
Repair. 85 percent of potholes within 5
working days of notification.
Respond to 95 percent of all bicycle path
maintenance requests within 5 working days.
1995-96
ACTUALS
88%
100%
1996-97
ADJUSTED
BUDGET
85%
95%
1996-97
ACTUALS
80%
100% -
Major Activity: In-House Traffic Control
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
o
Paint 100 percent of school crosswalks prior
to the start of each school year.
Respond to missing stop sign reports within 8
hours.
Replace 90 percent of missing street signs
within 5 working days.
100%
lOO%
lOO%
lOO%
100%
90%
100%
100%
85%
Major Activity: Emergency Response
IMPACT MEASURES
1.Clear roadway of mud, rocks and other debris
within 4 hours of report..
2.Restore access to main arterial streets within 8
hours.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%
100%
100%
100%
100%
100%
Major Activity: Street - CIP Support
IMPACT MEASURES
1.Bid 80 percent of all projects in the year they
are budgeted for construction.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
I 100%1 100%
]100%
FUNCTIONAL AREA: SIDEWALKS
KEY PLANS
~Reduce existing backlog of "hot spot"
sidewalk replacement by nine months.
PROGRESS
~1 Backlog reduced to six months, even though
the crew team experienced vacancies.
Major Activity: Sidewalks Contract Maintenance
IMPACT MEASURES
1995-96
ACTUALS
1996-97 -
ADJUSTED
BUDGET
Limit staff costs for design and construction
services on 80 percent of sidewalk projects
designed in-house to 20 percent of the project
construction cost.
Limit the amount of construction change
orders on 80 percent of projects to 15 percent
of the amount of the contract awarded by
Council.
100%
100%
80%
80%
1996-97
ACTUALS
100%
Major Activity: In-House Maintenance
IMPACT MEASURES
1.Inspect 80 percent of requests for sidewalk
repair within 3 working days.
Provide 75 percent of temporary repairs to
sidewalks within 10 working days of initial
inspection.
1995-96
ACTUALS
100%
98%
1996-97
ADJUSTED
BUDGET
8O%
75%
1996-97
ACTUALS -
85%
75%
Major Activity: Sidewalks Cip Support
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Reconstruct or repair 75,000 square feet of
sidewalks annually.
Bid 100 percent of all-projects in the year they
are budgeted for construction.
75,000
100%-
75,000
100%
1996-97
ACTUALS
80,000
100%
FUNCTIONAL AREA:-TREES
KEY PLANS PROGRESS
Implement industry standard 5-year tree trim
cycle.
Completed with addition of contract
funding.
Implement Tree Task Force
recommendations funded in the budget.
Major Activity: Tree Inventory Management
IMPACT MEASURES
The Public Works Project Coordinator
position recommended by the Tree Task
Force was added to the budget; additional
contract tree trim funds were also added;
and Tree Section staff worked closely with
the Tree Task Force toward the
establishment of the non-profit CANOPY
group.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
1.Annually identify for replacement 2 percent of
the trees to improve location and tree species.
2. For 90 Percent of Requests from Residents
and Contractors, Pro~vid~e City Specifications
for Trimming of City Trees Within 10 Days.
2%
90%
2%
90%
1%
100%
The Public Works Coordinator position was not hired and trained until approximately
midyear, hindering ability to complete all planned work. - ~
Major Activity: In-House Street Tree Maintenance
IMPACT MEASURES
1996-97
1995-96 .ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Annually trim, prune, raise, and remove
deadwood from 10 percent of City street trees.
For 80 percent of i.ncidents, respond to
emergency reqiaests for tree maintenance
within 8 hours.
Provide containment of controllable
infestations which threaten tO significantly
degrade the condition of the urban forest
within 90 days Of discovery.
8%
80%
80%
10%
90%
100%
4%
100%
100%
1.Parks crew was.not fully staffed for the majority of the year.
Major Activity: In-House Park Tree Maintenance
IMPACT MEASURES
1995-96
ACTUALS’
1996-97
ADJUSTED
BUDGET
Annually trim, prune, raise, and remove
deadwood from 20 percent of City park
trees.
Respond to 80 percent of emergency
requests for park .tree maintenance service
within 8 hours..
Provide 80 percent containment of
controllable infestations which threaten to
significantly degrade the condition of the
park forest Within 90 days of discovery.
17%
100%
100%
20%
90%
80%
1996-97
ACTUALS
¯ 4%
100%
80%
1.Parks crew. was not fully staffed for the majority of the year.
Major Activity: Contract Street Tree Maintenance
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS’
Remove dead trees Within or~e year of
assessment.
Remove and replant2 percent of the urban
forest on an annual basis.
99%
1%
100%
2%
100%
1%
¯ The Public Works Coodinator position was not hired and trained until approximately
midyear. Staff also contributed significant time supporting the first "Canopy"planting
project. "
Major Activity: Contract Utility Line Clearing
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Trim, prune or r.ernove 15 percent of all front
or rear easement trees on an annual basis, to
minimize electrical service disruption.
Respond to 90 percent of emergency
requests for tree service within 8 hours.
20%
90%
15%
90%
19%
95%
FUNCTIONAL AREA: STRUCTURES AND GROUNDS
KEY PLANS PROGRESS
Implement the second phase of the
Infrastructure Management Study.
Complete construction of the Alma Street
bicycle bridge CIP improvements.
Implement a newspaper rack improvement
project in the University Avenue Business
District, contingent on Council approval.
El Replace roofs on the Municipal Service
Center Buildings A & B.
El
Complete design and construction of the
Civic Center chiller replacement.
Remodel the front desk and entry doors of
the Police Department for increased.
security.
Complete Phase I (Fire stations and Police
Department) of the facility rekeying project.
El Completed Phase II (Transportation2rraffic
portion of the study.
Completed the bridge construction portion
of the project.
El Improvement plans approved by Council
August 11, 1997. Ordinance currently in
review.
El Due to significant rain damage, this work
was moved up and completed at the close of
1995-96.
El Design complete, replacement will be done
during the Winter 1997-98.
El Completed in the Spring, 1997.
El Not complete. Phases 1 and 2 will be
combined. Project will be done in 1997-98.
Major Activity: Contract Maintenance Projects
IMPACT MEASURES
2,,
Perform 30 hours weekly inspecting all City
facilities serviced by contract custodial
support.
Bid 80 percent of all projects in the year they
are budgeted for construction.
Resolve 90 percent of reported custodial
deficiency ~alls within one scheduled
servicing.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
30
77%
89%
30
80%
90%
30
73%
92%
Major Activity: Structures and Grounds In-House
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
o
Resolve 90 percent of reported custodial
deficiency calls within one scheduled
servicing.
Through an established Preventive
Maintenance program perform 90 percent of
the manufacturer’s recommended maintenance
for all operating equipment.
Complete 90 percent of service calls within
three weeks of request.
100%
90%
80%
90%
90%
90%
1996-97
ACTUALS
100%
95%
¯ Major Activity: Structures/Grounds CIP Support
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Limit staff costs for design and construction
services to 20 percent of the construction
cost. -
Bid 70 percent of all projects in the year they
are budgeted for construction.
20%
70%
20%
70%
1996-97
ACTUALS
12%
67%
1. Estimated goal was ~oo high. These numbers were based on Hughes-Heiss projection.
Actuals reflect a30% improvement over the Hughes-Heiss numbees.
FUNCTIONAL AREA: PRIVATE DEVELOPMENT
KEY PLANS
[71 Provide timely plan review and input to the
proposed Stanford West and Palo Alto
Medical Clinic developments.
Participate in implementing improvements
to the one stop counter on the 5th floor of
the Civic Cemer.
Consolidate the encroachment and street
work permits to facilitate private
development projects.
PROGRESS
Timely l~lan review resulted in PAMF
commencing earthworks in April 1997 and
Council approval of Stanford project in July
1997.
Council approved recommendations for
permit streamlining in December 1996.
Ministerial changes made to process.
Further changes to Ordinance anticipated in
1997-98.
KEY PLANS
El Participate in the final development of a
streamlined permit tracking system.
PROGRESS
E!Permit tracking system delayed by Planning
Department pending replacement of key
staff due to attrition.
Major Activity: Private Develop/Project Review
IMPACT MEASURES
1996-97
1995-96 ¯ADJUSTED 1996-97 -
ACTUALS BUDGET ACTUALS
Review plans and submit written comments to
the Planning Department for 85 percent of
private development applications within 10
working days from receipt.
Process and approve 85 percent of Certificates
of Compliance within 25 working days from
initial application date.
83%85%
85%
Major Activity: Private Development Permitting/Inspect
1995-96
IMPACT MEASURES ACTUALS
88%
Review and approve 90 percent of Street
Opening Work Permits within 15 working
days from initial application date.
Respond to 90 p~rcent of inspection requests
for Street Opening Work Permits within one
working day ....
86%
100%
88%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
9O%
90%
91%
91%
FUND OVERVIEW
1996-97 was a year of great change for the Electric Fund. Federal and Siate regulatory agencies
continued their drive to deregulate the electric supply business in Califomia. The State agency, the
Califomia Public Utilities Commission ordered investor owned utilities tO allow their customers to
access the supplier of their choice beginning January i, 1998. In March, 1997 the City Council
approved three policy statements to prepare for the deregulation of the electric utility industry. These
policies will permit Palo Alto customers to choose their supplier beginning January 1, 1998,
guarantee that the electric utility will recover stranded investments in generating resources that are no
longer economical, and explore the feasibility of selling electricity beyond the City borders. To
implement these policies, the Utility Department initiated several changes to the way electric supplies
are acquired, priced and marketed.
In 1996-97, the electric fund completed a $2.0 million overhead to underground conversion in
District 35 and 36, replaced a substation to transformer at Alma Substation, completed the conversion
of the street lighting system to high pressure sodium fixtures, designed and installed 40 percent of the
Fiber Optic Network and the 4/12 kV conversion work in the College Terrace area. In addition the
design work for the replacement of cables and equipment along E1 Camino Real was initiated.
The Utilities Customer Information system (CIS) changed directionfrom design and development of
an in-house system to the acquisition of the software from an outside vendor which has been selected:
At the direction of Council a charitable giving program for utilities customers, Project PLEDGE, was
introduced as a one-year pilot program. This program is designed to operate with minimal staff
resources and cost.
Electric rates did not change in 1996-97, however, the Council approved a financial policy related to
the Calaveras Reserve. The reserve policy established funding a target level, to be reviewed annually,
that is sufficient to offset potential stranded costs associated with the Calaveras Hydroelectric Project.
FUNCTIONAL AREA: GENERAL SERVICES
KEY PLANS
Continue the redesign and installationof
substructures to convert all of the remaining
series incandescent street lights to
high-pressure sodium lights.
Modify traffic signals at
University/Middlefield and implement
traffic signal changes and improvements as
required by system needs.
PROGRESS
Replace 6 obsolete traffic light controllers.
All the remaining series incandescent
and mercury vaper street lights in the
program have converted to high-
pressure sodium lights.
Materials on order. Construction will
occu~ in 1997-98.
Traffic controler replacement has been
delayed pending completion of the
traffic timing study
Major Activity: Street Lights Operations/Maintenance
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Have zero instancesof when more than 6
street lights (of 6,000) remain non-
operational in a 24 hour period.
Respond to 100 percent of street light failure
reports within 2 working days.
2 days 2 days
1996-97
ACTUALS
0
2 days
Major Activity: Traffic Signals Operations/Maintenance
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
°
Respond to all traffic signal system problems
within 1 hour.
Perform periodic lamp replacements to
maintain a 1 percent or less unscheduled
replacement rate.
22 minutes
1.3%
1 hour
1%
1996-97
ACTUALS
33.8 minutes
1%
Implementation of standby program for traffic signals/communications reduced the response
time more than anticipated during this time period
Major Activity: Communications Operations/Maintenance
IMPACT MEASURES
I1. Restore service to all system users within 4
hours of an unscheduled system failure.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
39 minutes
[
2hours
1996-97
ACTUALS
1.25 hours
Major Activity: Street Lights - CIP
IMPACT MEASURES
1. Replace 30 deteriorated poles and fixtures.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
38 [ 30
1996-97
ACTUALS
Staff is working with the Planning Department to develop standards for street light pole
replacement.
Major Activity: Communications - CIP
IMPACT MEASURES
1. Install 100 percent of newly funded requests.
2.Limit communication system outages to less
than a system-wide average of 4 hours per
customer per year.
Eliminated in 1997-98.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
100%100%100%
54 minutes 30 minutes 6 minutes
2.In 1997-98, this impact measure has been revised to 1 hour per customer per year.
FUNCTIONAL AREA:- RESOURCE MANAGEMENT
KEY PLANS
’Conduct a feasibility study to analyze the.
cost and benefits of building the necessary
infrastructure required to recharge electric
vehicles.
Coordinate the implementation of
guidelines for protecting confidemiality of
utility, supplier and customer information.
PROGRESS
This key plan was postponed due to
activities related to preparation for the
restructuring of the energy utility industry.
Completed. Policy Guidelines have been
written and presented to the Utility
Advisory Commission. Workshops were
conducted with City staff.
Develop plans to address the need for a
diverse portfolio of supply resources to
meet increasing competitive pressures.
Develop methodology to benchmark,
against potential competitors, Palo Alto’s
cost of providing supply resources and
demand-side management progfam
services.
Develop custom tailored marketing plans
for each customer market segment.
Developed a supply portfolio management
plan which idemifies risks due to market
price volatility. Negotiated contracts with
two suppliers for power beginning in April
1997 for 12 months which allow Palo Alto
the flexibility to purchase at fixed or
variable prices.
Trained two staff members in
benchmarking methodologies.
Developed marketing plans for key.
accounts. Initiated work for large
commercial. Postponed small commercial
and residential:
Major Activity: Competitive Assessment
IMPACT MEASURES
1.Forecast customer.electric usage within 5
percent of actual consumption.
Complete 20 percent 6.f-a detailed customer
database of Palo Alto’s major customers per
year.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
.9%
n/a
5%
20%
2.5%
20%
Major Activity: Supply Resources
IMPACT MEASURES
Procure new electric supplies for a delivered
cost of less than 110% of published indices
(such as Dow Jones California Oregon Border
Index, Power Market Week) adjusted for
reliability and delivery to the City.
Manage electric supplies for a delivered cost
of less than 110 percent of the average cost of
all other competitor suppliers in the Bay Area.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
101%<110%94.7%
55%<100%21%
1..The actual and adjusted budgets were calculated for total load,, market purchases were not
budgeted separately.
2.Unable to obtain the cost of electric supplies from competitors and do not expect to obtain this_
information in the future. Therefore, this impact measure will be discontinued
Major Activity: Demand-Side Management Programs
IMPACT MEASURES
1995-96
ACTUALS
Achieve 90 percent of the Utilities’ annual
resource goals identified and approved by
Utilities Advisory Commission and Council.
100%
1996-97
ADJUSTED
BUDGET
[.~90%
1996-97
ACTUALS
90%
Major Activity: Market Programs
IMPACT MEASURES
Coordinate production.lof packages of utility
programs, services and supply resources for
100 percent of key customers who may seek
resources for Utilities’ competitors.
Achieve 100 percent of the strategies
identified in the annual Utili.ty Marketing
Services Communication Plan.
Obtain greater than 95 percent overall
customer satisfaction with Utility Marketing
Services’ products and services.
1995-96
ACTUALS
100%
100%
Postponed.
1996-97
ADJUSTED
BUDGET
100%
100%-
>95%
1996-97
ACTUALS
100%
100%
n/a
Due to electric deregulation and the preparation for direct access, the emphasis has changed to
identify overall customer attitudes and interests.
FUNCTIONAL AREA: SUPPORT SERVICES AND RATES
KEY PLANS PROGRESS
Coordinate the design of application
software for users of the Customer
Information System (CIS) Project and
provide for expanded billing capabilities
which will become necessary under retail
wheeling.
Work with Administrative Services
Department staff to implement a Charitable
Giving Program for Utilities customers.
Implement and evaluate effectiveness of the
automatic meter reading pilot project to
increase customer satisfaction and achieve
timely billing under a restructured electric
industry.
Introduce new electric rates to separately
price electric distribution, generation, and
transmission services.
During 1996-97,the Customer
Information System (CIS) project
changed direction from an in-house
development to the acquisition of the
software from an outside vendor.
Consequently, staff focused during the
year on the RFP evaluation process rather
that continuing design and development
in-house.
In June 1997, the City implemented
Project PLEDGE program.
A Request for Proposal (RFP) was issued
and responses received. The changing
landscape of electric restructuring led the
Automatic Meter Reading (AMR)
Committee to select 2 vendors to run
head-to-head trials rather than attempt to
define needs too specifically. Meeting
were scheduled with both vendors to
finalize pricing, etc., and occurred after
the end of the fiscal year.
In June 1997, the City Council Approved
new electric rates effective July 1, 1997.
Major Activity: Customer Services
IMPACT MEASURES
1.
1996-97.
1995-96 ADJUSTED
ACTUALS BUDGET
Answer 74 percent of all incoming customer
calls before the call is placed on hold.
Maintain uncollectible charges per revenue
dollar at least 75 percent below the Public
Power Systems average.
Maintain an average time under 20 seconds
for customer calls placed on hold.
77%
80%
18 seconds
-74%
75%
20 seconds
1996-97
ACTUALS
75%
89%
15 seconds
Major Activity: Meter Reading
IMPACT MEASURES
1.Exceed industry standard for meter reader
performance by at least 4 percent.
Read 96 percent of electric meters every
27-33 days.
Maintain a meter reading accuracy of at least
98.8 percent for the year.
1996-97
1995-96 ADJUSTED
ACTUALS -" BUDGET
4.6%
98.1%
99.5%
8.3%
96%
98.8%
1: Revised impact measure in 1997-98 to reflect actual and increased pr.oductivity.
Major Activity: Rates and Reserves
IMPACT MEASURES
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
"2.
Maintain residential rates 55 percent below
rates charged in nearby communities.
Maintain non-residential rates 26 percent .
below rates charged in nearby communities.
60%
30%
-55%
-26%
1996-97
ACTUALS
15%
97.8%
99.7%
1996-97
ACTUALS
-59.3%
-30.6%
FUNCTIONAL AREA: DISTRIBUTION SYSTEM
KEY PLANS
Continue the conversion of Overhead
(OH) facilities to Underground (UG)
facilities by completing construction
work on District #36 (Commercial Street
/Corporation Way) and completing the
planning and design on District #37
(Embarcadero/Seale/Middlefield)..
Improve system reliability and increase
system capacity by continuing
construction on the replacement of the
first transformer at Hanover Substation.
In addition, design and complete
construction on a second transformer
re_placement at Hanover Substation.
Replace deteriorated dfi’ect buried cable
installed on Wilmar, Donald, and Georgia
streets.
Complete the system capacity increase at
Alma Substation by replacing a
transformer and constructing an
architectural facade along Alma Street.
PROGRESS
All of the substructure and 70 percent of
the electric construction was completed
on District #36. The initial planning
including formation of District #37 was
completed. Design is 50 percent
complete.
The first Hanover transformer
replacement and design for the
transformer pad for the second
transformer are completed. Transformer
replacement on the second transformer
will occur in 1997-98.
Cable replacement work has been
reevaluated and new priorities have been
established. Initial replacement will occur
on El Camino Real. Initial design work
was completed this year.
Capacity increase at Alma Substation is
95 percent complete. The architectural
¯ facade along Alma Street has been
delayed until i 997-98.
Replace old and unreliable 4 kV
equipment by converting the College
Park Area to 12 kV.
~ 40 percent of conversion was completed.
Major Activity: Distribution Operations/Maintenance
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED
BUDGET .
°
Limit power outages to less than a
system-wide average of 60 minutes per
customer per year.
Begin field restoration and repairs for
unscheduled outages within 1 hour.
Respond to customer inquiries or problems
within 4 hours..
36 minutes
35 minutes
1 hour 25
minutes
<60 minutes
1 hour
4 hours
1996-97
ACTUALS
49.6 min.
31.6 min
43 min
Major Activity: Customer Design/Connection-CIP
IMPACT MEASURES
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
°
Provide service to 95 percent of applicants by
the scheduled date requested..
Review plan~ for new Service requests within
12 working days.
Respond to customer inquiries within 1
working day.
95%
n/a
95%
.12
1996-97
ACTUALS
97%
10 days
1 day
Major Activity: System Improvement - CIP
IMPACT MEASURES
I.Replace or remove 150poles per fiscal year.
o
Expand substation and subtransmission
capacity to assure that no customer outages
occur as a direct result of a single substation
or subtransmission system failure.
Convert overhead facilities to underground at
a capital expenditure rate of 2 percent of
annual gross, electric revenues.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
211
1
2%
150
0
2%
1996-97
ACTUALS
150
0
3%
3. Variance is due to project delay in previous year. Work done in 1996-97. Overall
percentage is still at 2 percent as established by the Public Utilities Commission.
FUNCTIONAL AREA: COMMERCIAL TELECOMMUNICATION
KEY PLANS PROGRESS
Design and construct a fiber optic ring
around Palo Alto by the end of the first
quarter of 1997-98.
Negotiate "Early Market Entrant" El
agreements with telecommunications
network developers and service providers
prior to the completion of the fiber ring
construction.
Evaluate additional fiber optic cable El
deployment opportunities that would
support the needs of network developers and
service providers.
Coordinate and implement a marketing
effort on behalf of all companies that have
"Early Market Entrant" agreements with the
Electric Utility.
Design was completed in
December 1996. Construction is
on target for completion by the end
of the first quarter of 1997-98.
One agreement was signed with
Brooks Fiber Communications in
May 1997. Discussions are
underway with two other
telecommunications carriers, two
Inteme~ service-providers, and
three end users.
Withoutincreasing the budget, the
original concept(a 15-mile ring
with two cables containing a total
of 240 fibers) was modified to a
design consisting of a series of 7
rings with 144-288 fibers spanning
a 28 mile route. The new design
.will more effectively meet
cu.stomer demand.
Coordinated a joint press release
with Brooks Fiber
Communications announcing the
City’s first fiber license agreement.
More extensive marketing
activities will be pursued in 1997-
98 as more license agreements are
signed.
. Major Activity: Planning/Marketing/Contract Negotiations
IMPACT MEASURES
1.Negotiate agreements for the lease of at least
15 percent of the fibers installed.
Negotiate agreements that will recover at "
least 15 percent of construction costs
annually.
1995-96
ACTUALS
n/a
1996-97
ADJUSTED
BUDGET-
0%
0%
1996-97
ACTUALS
0.3%
1.9%
Major Activity: Operations/Maintenance
IMPACT MEASURES,
’,’ 1.
Respond to 100 percent of outages within 4
hours of notification.,
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
100%
Major Activity: Design/Construction-CIP
IMPACT MEASURES
1.Finalize fiber ring design within 4 months of
project approval.
2.Complete construction of the fiber ring
within 15 months of project approval.
3.Complete construction at or below budgeted
cost.
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
lffa
laJa
4
15
on target
1996-97
ACTUALS
100%
1996-97
ACTUALS
4
11
on target
FUND OVERVIEW
Pacific Gas and Electric (PG&E), the largest gas retailer in the State, has secured the California
Public Utilities Commission’s approval of the Gas Accord, to which Palo Alto was a party. This
Accord settles a large fiumber of disputes which have arisen since the beginning of the deregulation
of the gas utility industry. The Accord will fundamentally change Palo Alto’s acquisition strategy
of the natural gas supply and transportation for years to come.
Crews completed the construction of 20,000 linear feet of new polyethylene gas main, and
engineering staff completed the design and award of construction contract of an additional 20,000
linear feet of gas mains in Gas Main Replacement Project Phases VII, prepared specifications,
prepared bid and purchased a new bore rig which will introduce trencless technology into the
installationprocedures for City crews, completed the installation of a Gas Supervisory Control and
Data Acquisition (SCADA)system and completed the design of Gas Station Improvements for Gas
Station Number 2.
In 1996-97, the Utilities Customer Information system (CIS) changed direction from design and
development of an in-house system to the acquisition of the software from an outside vendor which
has been selected. At the direction of Council a charitable giving program for utilities customers,-
ProjectPLEDGE, was introduced as a one-year pilot program. This program is designed to operate
with minimal staff resources and costs.
FUNCTIONAL AREA: RESOURCE MANAGEMENT
KEY PLANS PROGRESS
Conduct a feasibility study to analyze the.
costs and benefits associated with building
the citywide infrastructure necessary to
fuel Compressed Natural Gas vehicles.
Coordinate implementation of guidelines
for protecting confidentiality of utility,
supplier and customer information.
Evaluate 10 Demand Side Management
programs and begin implementation of the
selected programs.
Postponed due to activities related to
preparation for the restructuring of the
energy utility industry.
Completed. Policy Guidelines have been
written and presented to the .Utility
Advisory Commission. Workshops were
conducted with City staff.
Completed. Canceled one program and
initiated implementation of remainder.
KEY PLANS
Develop methodology to benchmark,
against potential competitors, Palo Alto’s
cost of providing supply resources and
demand-side management programs
services.
Develop custom tailored marketing plans
for each customer market segment.
Coordinate activities to offer a competitive
service package to customers who would
choose to seek other suppliers.
PROGRESS
~i Preliminary research work to select a tool
has been completed.
Completed for key accounts. Initiated
work for large commercial accounts.
Postponed for residential.
Made a successful offer to one large
customer.
Major Activity: Competitive Assessment
IMPACT MEASURES
1.Forecast the City’s natural gas usage within 5
percent of actual consumption.
Collect and maintain detailed customer data
on 20 percent of Palo Alto’s major Customers.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
7%
80%
5%
20%
1%
20%
Major Activity: Supply Resources
IMPACT MEASURES
1996-97 1996-97
1995-96 ADJUSTED-ACTUALS
ACTUALS BUDGET
Procure natural gas commodity and
transportation for a cost of less than what
PG&E would charge Palo Alto to supply the
same commodity.
21% less 5%
Major Activity: Demand-Side Management Programs
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Achieve 95 percent of the Utilities’ annual
resource goals approved by the Utilities
Advisory Commission and Council.
0%90%
13.5%
1996-97
ACTUALS
95%
Major Activity: Market Programs
IMPACT MEASURES
Coordinate the production of packages of
utility programs, services and supply
resources for key Customers who may seek
resources from Utilities’ competitors.
Achieve 100 percent of the strategies in the
annual Utility Marketing Services
Communication Plan.
Obtain greater than 95 percent overall
customer satisfaction with Utility Marketing
Services’ products and services.
Coordinate activities to offer a competitive
service package to 100 percent of the
customers who would choose to seek other
suppliers.. "
1995-96
ACTUALS
100%
100%
Postponed
100%
1996-97
ADJUSTED
BUDGET
100%
100%
>95%
100%
1996-97
ACTUALS
Ongoing.
100%
n/a
100%
Due to electric deregulation, the emphasis has changed to identify overall customer
attitudes and interests.
FUNCTIONAL AREA: SUPPORT SERVICES AND RATES
KEY PLKNS
~Support.the design of application software
for users of the Customer Information
System (CIS) Project.
Implement operational changes and
business process improvements identified
by the Utilities Business Process
Reengineering Study.
PROGRESS
The Customer Information System (CIS)
project changed direction from an in-house
development to the acquisition of the
software from an outside vendor which has
been selected. Consequently, staff focused
during the year on the RFP evaluation
process rather than continuing design and
development in-house.
Postal bar coding was added to utilities
bills to lower postage costs. Master card of
Visa card payments of utilitie~ bills are
now accepted at City Hall. A new phone
system was installed in the Customer
Service Center with voice messaging
capabilities.
KEY PLANS PROGRESS
Implement and evaluate effectiveness of the
automatic meter reading pilot project to
increase customer satisfaction and achieve
timely billing.
Work with Administrative Services
Department staff to implement a Charitable
Giving Program for Utility customers.
A Request for Proposal (RFP) was issued
and responses received. The changing
landscape of electric restructuring led to
the selection 2 vendors, to run head-to-head
trials, rather than attempt to define AMR
needs too specifically. Meeting were
scheduled with both Vendors to finalize
pricing, etc. and occurred after the end of
the fiscal year.
In June 1997, the City implemented Project
PLEDGE program.
Major Activity: Customer Services
IMPACT MEASURES
1.Respond to 95 percent of reported gas leaks
within 30 minutes.
Process at least 80 percent of service orders
(turn-ons, tum-offs and reads) within 2
working days of the scheduled date.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
97%
84%
95%
80%
96.7%
82%
Major Activity: Meter Reading
IMPACT MEASURES
1.Maintain a meter reading accuracy of at least
98.8 percent for the year.
2.Read 98 percent of gas meters every 27-33
days.
1996-97
1995-96 ,ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
99.6%
98.6%
98.8%
98%
99.6%
97.8%
Major Activity: Rates and Reserves
IMPACT MEASURES
1.Maintain residential rates 28 percent below
rates charged in nearby communities.
2.Maintain non-residential core rates 11
percent below rates charged in nearby
communities.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
-24%
-7%
-28%
-11%
-30.4%
-14.5%
FUNCTIONAL AREA: DISTRIBUTION SYSTEM
KEY PLANS
Design and construct mandated Department
of Transportation (DOT) and National
Electrical Code (NEC) safety
improvements for Gas Station Number 3,
located near Page Mill Road and Foothill
Expressway.
Design and construct Phase 7 Gas Main
Replacement Project that will be replace
mains on sections of the following streets:
Greer, Feme, Briarwood, San Antonio, Ely,
Lundy, Alma, Hamilton, E1 Camino Real,
Fabian, East Meadow, Porter, Hanbver.
These. locations are subject to change based
on system emergency and maintenance
needs.
PROGRESS
Completed the design and acquired
Planning approval’for the construction of
DOT and NEC Improvements at Gas
Station Number 2. Worked with the CIP
Design Consultant to soften the impact of
the proposed gas control safety
improvements at Station 2.
Completed bidding and construction of
Gas Main Replacement project Phase VI
which included 20,000 linear feet of new
Polyethylene gas mains. Completed
design and bidding process for Gas Main
Replacement Project Phase VII.
Major Activity: Distribution System Engineering
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Review and respond to all requests for
engineering support from Customer Design
and Connection Services and Operations
within 1.5 working days of the request.
100%100%87.7%I
Major Activity: Distribution Operation/Maintenance
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED
BUDGET
Proaetively maintain the Gas Distribution
System by limiting all (100%) of customer
service disruptions due to mainline leak
repairs to 4 hours or less.
94.5%100%
1996-97
ACTUALS
96.4%
Major Activity: Customer Design/Connection - CIP
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
o
Review, comment and return
customer/development plans within 10
working days of receiving completed
application and plan sets for new service.
Install approved new customer services
within 40 calendar days from the day
customers receive receipts for’service ’
payment from Revenue Collections.
10
45
10
4O
. 1996-97
ACTUALS
10
40
Major Activity: System Improvements - CIP
IMPACT MEASURES
Replace 20,000 linear feet of deficient gas
mains per fischl year as part of the
Infrastructure Replacement Program.
Design and construct improvements to one
gas receiving station to meet current code
requirements.
1995-96
ACTUALS
20,000
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
20,000 20,000
FUND OVERVIEW
In 1996-97, staff 6ompleted construction of the Storm Water Pump Station Improvement Project and
Phase 1 of the Storm Drain System Rehabilitation Project. These projects upgraded the City’s six
storm water pump stations and repaired or rehabilitated the most deteriorated components of the City’s
storm drain system. Staff also completed the design of storm draiffage improvements for the Barron
Park neighborhood and reached the 65 percent design stage on Phase 2 of the Storm Drain System
Rehabilitation Project. Storm water quality was enhanced by implementing a new program for mobile
cleaners who power wash buildings, paved areas, and equipment. Industrial sources were sampled
more thoroughly .allowing better targeting of sites for future inspections. The classroom program was
expanded and new materials generated to encourage storm water pollution prevention.
FUNCTIONAL AREA: STORM DRAINAGE SYSTEM IMPROVEMENTS.
KEY PLANS
~Complete upgrade of six storm drainage
pump stations. ..
PROGRESS
DCompleted upgrade of six storm water
pump stations.
Design local storm drainage improvements
in the Barton Park neighborhood.
Complete a public outreach effort to assess
the level of community interest in capital
improvements which would increase the
capacity of the City’s storm drainage
system.
Coordinatewith ~he Council, Finance
Committee and the Utilities Advisory
Commission on pol.icy!ssues concerning
the proposed Storm Drain Master Plan.
Completed design of local storm drainage
improvements in the Barron Park
neighborhood~ "
Completed public outreach efforts; final
report to Council is on hold, pending
review of policy issues concerning the
proposed Storm Drain Master Plan by the
Utilities Advisory Commission (see _
below).
Completion of the review of policy issues
concerning the proposed Storm Drain
Master Plan is on hold, pending analysis of
the impacts of State ballot Proposition 218
on the City’s ability to enact futurerate
increases to fund the improvements.
KEY PLANS PROGRESS
Continue construction of a storm drain
pipeline replacement/rehabilitation project
and design the next phase of work.
Major Activity: Flood Control Improvements
IMPACT MEASURES
Completed construction of a storm drain
pipeline replacement/rehabilitation project
and reached the 65 percent stage in the
design of the next phase of work.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Respond to 90 percent of telephone inquiries
regarding Santa Clara Valley Water District
flood control projects within one working
day.
Respond to 90 percent of verbal inquiries
regarding Flood Zone information within.
one working day.
100%
99%
90%
90%
100%
100%
FUNCTIONAL AREA: STORM DRAINAGE OPERATION/MAINTENANCE
Major Activity: Storm Water Quality Protection
IMPACT MEASURES
1.
1996-97
1995-96.ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Respond to all reported
non-hazardous/non-emergency storm drain
contamination within one working day.
Issue all compliance directives in confirmed
cases of illegal discharges within one working
day.
Respond to all incidents of illegal disposal to
the storm drain and sanitary sewer system
within one working day.
100%
100%
100%
100%
100%
100%
100%
100%
100%
Major Activity: SD In-house Maintenance
IMPACT MEASURES
¯ 1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
1.Annually clean 10 percem of storm drain
pipelines.
2. Annually inspect and clean all catch basins.
3.Investigate 95 percent of all service requests
within 5 working days.
10%
100%
100%
10%
100%
95%
Major Activity: Emergency Response
IMPACT MEASURES
1995-96
ACTUALS
1996-97"
ADJUSTED
BUDGET
o
Respond to 90 percent of emergency flooding
calls within 4 hours.
Contain and clean up 95 percent of spills of
identified non-hazardous materials within the
public right-of-waywithin 4 hours.
100%
¯ 100%
9O%
95%
1996-97
ACTUALS
17%
100%
98%
1996-97
ACTUALS
100%
95%
FUND OVERVIEW
In 1996-97, the Refuse Fund accomplishments included: continuing efforts toward the clean-up of
the Downtown area which included the purchase of a hand-operated sweeping machine to improve
the quantity and quality of th~ sidewalk clean-up as well as expanding trash receptacle emptying to
include Sunday service. Approximately 50 percent of Palo Alto waste was diverted to the SMART
Station, and home composting workshops were held with over 450 residents attending. The Los Altos
Treatment Plant Wetland Determination Study and a draft Environmental Impac.t Report (EIR) are
also completed. Applications are in process for approval.
FUNCTIONAL AREA: SOLID WASTE
KEY PLANS
~Expand curbside collection program to
accept mixed paper.
PROGREss
~3 Council directed staff to implement a
drop-offprogram.
Expand the current size requirement of
compost material to a larger size.
Direct two-thirds ofPalo Alto’s solid waste
stream to the Sunnyvale Materials and
Recovery Transfer Station (SMART) to
achieve an additional 15 percent waste
diversion goal.
Completed. The screens used for
composting were changed from half an
inch, to five eights of an inch, which
reduced waste and increased the quanti.ty
of a marketable producfi
Approximately 50 percent (minimum per
agreement with Sunnyvale and Waste
Management) ofPalo Alto waste was
diverted to the SMART Station.
Major Activity: Solid Waste Permit/Enforcement
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Conduct 100 percent of all self-monitoring
inspections and sampling analysis programs
to achieve compliance with regulatory
mandates.
Conduct two visual inspections per week of
garbage truck contents for illegal materials.
100%
2
100%
2
2.Staff continued to find illegal materials in loads.
Major Activity: Landfill Operations
IMPACT MEASURES
1. Annually recover 6 tons of recyclable
materials from the landfill disposal area.
2.Annually process 10,000 tons of green yard
waste into compost material for City use and
resale.
3. Operate the landfill 361 days a year for public
use.
¯ 1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
7.0
15,051
361
24
10,000
361
1996-97
ACTUALS
100%
1996-97
ACTUALS
101
16,933
361
The use of a loader enabled the recovery of more material.
More material was brought to the landfill than anticipated.
Major Activity: Recycling
IMPACT MEASURES
1.Plan a minimum of four events annually
which emphasize recycling and waste
reduction.
2.Increase business participation in recycling
collection by 3 percent annually.
3. Increase overall program tonnages by 5
percent in 96/97 and 5 percent in 97/98.
Increase diversion of solid waste stream
which was established in base year 1990, to
46 percent by the end of 1996-97 and 48
percent by the end of 1997-98.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
4
3%
.4
3%
5%
46%
6
3%
12%
49%
o Market prices for recyled materials dropped off resulting-in fewer thetis from containers, and
the stimulated economy generated increased consumer consumption resulting in more
generated waste.
Major Activity: Hazardous Waste
IMPACT MEASURES
1: Conduct a minimum of 12 household
hazardou.s waste collection events annually.
Manage 95 percent of the hazardous waste
generated by City operations within the time
period specified by regulatory agencies.
1996-97
1995-96 ADJUSTED 1996-97 :
ACTUALS BUDGET ACTUALS
12
95%
12
95%
13
100%
Major Activity: Composting
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Hold a minimum of three compost
give-away days each fiscal year.
-Sell a minimum of 50 percent of the compost
produced each fiscal year.
Reduce the processing time to produce a
ready-to-use product to less than one year.
n/a 50%
<1
5
100%
<1
Three evbnts totalling 5 days were held, with no additional costs, due to popular demand.~
FUNCTIONAL AREA: COLLECTION, HAULING AND DISPOSAL
KEY PLANS PROGRESS
Oversee Environmental Impact Report
(EIR) and design of the former Los Altos
Treatment Plant site for the refuse,
collection, hauling and disposal operations
yard.
Major Activity: Collection and Hauling Contract
The Los Altos Treatment Plant Wetland
Determination Study and a draft EIR are
completed. Applications are in process for
approval.
IMPACT MEASURES
1.Achieve 100 percent of weekly collections
from 24,000residences.
Provide a minimum of one w~ekly refuse.
collection for 100 percent of businesses who
request service.
Limit rate of call backs to .5 percent of total
collections, and respond, within 24 hours.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
99%
99%
.1%
100%
100%
.5%
99%
100%
.5%
Major Activity: Offsite Material Recovery/Disposal
I ,MPACT MEASURES
Maintain a 15 percent recycling rate of all
refuse processed through the Sunnyvale
Materials and Recovery Transfer (SMART)
Station.
Increase the projected life span of the Palo
Alto landfill by 3. percent annually through
increased recycling efforts and use of the
SMART Station.
3.Keep the SMART station operational for Palo
Alto needs 361. days a year.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
10%
3%
361
15%
3%
361
10%
3%
361
FUNCTIONAL AREA: STREET SWEEPING
KEY PLANS -
El Remove 2,400 tons Of leaves from City
streets and piopertie.s ~’or composting.
Major Activity: Street Sweeping Maintenance
IMPACT MEASURES
PROGRESS
Removed 1,772 tons of leaves. Less
rainfall than prior year resulted in dry
leaves, which, is weightless.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUAI~S
°
Sweep 80 percent of all residential and arterial
routes on a. weekly basis.
Sweep 95 percentof business districts 3 times
per week.
86%
84%
80%
95%
94%
100 %
FUND OVERVIEW
As a member of the steering committee for the San Francisco Public Utilities Commission
(SFPUC) water supply master plan, staff provided direction on the supply alternatives and
investigation of the project objectives.
A comprehensive review was conducted on financial and operational areas of comparable
municipal water utilities and the results were presented to the Utilities Advisory Commission.
The "Water Fund Financial Review" identified reasons why Palo Alto rates are somewhat above
surrounding areas. In 1996-97, the Utilities Customer Information system (CIS) changed
direction from design and development of an in-house system to the acquisition of the software
from an outside vendor which has been selected. At the direction of Council a charitable giving
program for utilities customers, Project PLEDGE, was introduced as a one-year pilot program.
This program is designed to operate with minimal staff resources and cost.
Crews completed 15,840 linear feet of main replacements, the design of Water Main "
Replacement Project Phase XI, the installation of a Water Supervisory Control and Data
Acquisition system, the interior and exterior coating of Montebello Reservoir, the design of
Water Valve Replacement Phase I, and received for evaluation proposal the Water Wells
Regional Storage and.Distribution System study.
FUNCTIONAL AREA: RESOURCE MANAGEMENT
KEY PLANS PROGRESS
Actively participate with the Bay Area
Water Users Association and the San
Francisco Public Utilities Commission
(SFPUC) in the preparation of a Regional
Water Integrated Resource Plan. "
Develop custom-tailored marketing plans
for each customer market segment.
Palo Alto is one of five steering
committee members for the Bay Area
Water Users Association representing
San Francisco Public Utilities
Commission purchases. Monthly
meetings throughout Phases I (scoping)
have allowed for Palo Alto’s interests to
be well represented. Palo Alto staff will
remain on the steering committee during
Phase II (study) providing guidance and
direction for the effort to evaluate new
supply alternatives.
Completed for key customers. Initiated
for large commercial. Initiated for
residential (pend.ing changes to best
management practices).
KEY PLANS
Research whether there is a significant
correlation between the quality of Palo
Alto’s water and the City’s ability to attract
water- sensitive industries.
Evaluate 3 Demand Side Management
Programs and initiate the implementation
of the selected programs.
PROGRESS
Project delayed due to restructuring in
the electric industry..
Initiated implementation of one program
due to time constraints from electric
deregulation.
Major Activity: Competitive Assessment
IMPACT MEASUREs
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ,ACTUALS
Forecast customer water usage within 10
percent of actual usage.
Collect and maintain detailed customer data
on 20 Percent ofPalo Alto’s major
customers.
.3%10%
n/a 20%
2.5%
20%
Major Activity: Market Programs
IMPACT MEASURES
Within 5 working days, complete design
review of commercial landscape¯ plans
submitted for compliance with Palo Alto
Landscape Water Efficiency Standards.
Achieve more than 95 percent of customer
satisfaction with our products and services.
Achieve 100% of the strategies included in
the annual Utility Marketing Services
Communicatio~a Plan.
1996-97
1995-96 ADJUSTED ¯1996-97
ACTUALS BUDGET ACTUALS
n/a 95%
lOO%
<5
95%
100%
FUNCTIONAL AREA: SUPPORT SERVICES AND RATES
KEY PLANS
~Assist with the design of application
software for users of the Customer
Information System (CIS) Project.
Implement operational changes and
business process improvements identified
by the Utilities Business Process
Reengineering Study.
Implement and evaluate effectiveness of the
automatic meter reading pilot project to
increase customer satisfaction and achieve
timely billing.
Work with Administrative Services
Department staff to implement a Charitable
Giving Program for utility customers.
PROGRESS
During 1996-97, the Customer Information
System (CIS)project changed direction
from an in-house development to the
acquisition of the software from an outside
vendor. Consequently, staff focused during
the year on the RFP evaluation process
rather that continuing design and
development in-house..
Po~tal bar coding was added to utilities
bills to lower postage costs. Master card of
Visa card payments of utilities bills are
now accepted -at City Hall. A new phone.
system-was installed in the Customer
Service Center with voice Messaging
capabilities.
A Request for Proposal (RFP) was issued
and responses received. The changing
.landscape of electric restructuring led to
the selection of 2 vendor.s, to run head-to-
head trials, rather than attempt to define
automatic meter reading needs too
specifically. Meeting were scheduled With
both vendors to finalize pricing, etc. and
occurred after the end of the fiscal year.
In June 1997, the-City implemented Project
PLEDGE program.
Major Activity: Customer Services
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET , ACTUALS
Achieve an overall annual customer
satisfaction rating of greaterthan 85 percent
from customers.
To process at least 80 percent of service
orders (tum-ons, tum-offs, and reads) within
2 working days of the scheduled date.
95%
84%
>85%
80%81.9%
Major Activity: Meter Reading
IMPACT MEASURES
1.Read 97 percent of water meters every. 27-33
days.
2.Maintain computer estimated (interim)
billings to less than. 1 percent of total billing.
3.Maintain a meter reading accuracy of at least
98.8 percent for the year.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
1996-97
ACTUALS
98%
0%
99.2%
97%
<1%
98.8%
97.1%
0%
99.2%
Major Activity: Rates and Reserves
IMPACT MEASURES
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
Maintain average residential rates no higher
than 10 percent of nearby communities.
Maintain average non-residential rates no
higher than 7 percent of nearby
communities.
10%
7%
10%
7%
1996-97
ACTUALS
5.5%
10.3%
1. and 2.Reflects a 6percent rate increase in 1996-97 to support a higher level of CIP
expenditure and an increased transfer to the General Fund
FUNCTIONAL AREA: DISTRIBUTION SYSTEM
KEY PLANS
Complete the installation of water main
replacements in Phase X on sections of the
following streets: Tasso, Byron,
Middlefield, Melville Kipling, Cowper,
Ash and Kellogg. Design water main
replacements for Phase XI which may
include portions of Webster, Palo Alto
Avenue, Lytton, Alma, Ramona and Birch
streets.
PROGRESS
Completed installation of Water Main
Replacement Phases X which included.
15,840 linear feet of PVC water mains.
Completed design and bid of Water Main
Replacement Project Phases XI which
included 15,840 linear feet.
KEY PLANS
Complete the removal and replacement of
the interior and exterior coatings on
Montebello Reservoir. Install corrosive
control measures on Park, Corte Madera
and Dahl. Perform fence and pavement
repairs on reservoir sites.
PROGRESS
Completed interior and exterior coatings on
Montebello Reservoir. Corrosion control
will be installed after coating warranty
period is complete.
¯ Major Activity: Distribution System Engineering
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
Review and respond to all requests for
engineering support from Customer Design
and Connection Services and Operations
within 1.5 working days of the request.
1.5 1.5
Major Activity: Transmission System Operations/Maintenance
1995-96
IMPACT MEASURES ACTUALS
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Proactively maintain water transmission
facilities in such a manner as to have no
disruptions of service due to equipment
failure.
o Comply with all federal and state regulations
for water system operations with a target
score of~100 percent compliance on all
required Department of Health Services and
Environmental Protection Agency testing.
Major Activity: Distribution Operations/Maintenance
100%
IMPACT MEASURES
1995-96
ACTUALS
0
100%
0
100%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
Proactively maintain the water distribution
system by limiting 95 percent of customer
service disruptions (due to mainline leak)
repairs to 4 hours or less.
89.6%95%86.9%
Major Activity: Customer Design/Connection - CIP
IMPACT MEASURES
1995-96
ACTUALS
1996-9"7
,~DJUSTED
BUDGET
Review, comment and return 95 percent of
customer/development plans within ten
working days of receiving complete
application for service and plan sets.
Install 95 percent of approved customer
services within 40 calendar days from the
date the Customer receives receipt from
Revenue Collections and after the customer
pays for the approved service to be installed.
84%
100%
95%
95%
1996-97
ACTUALS
88.5%
96.2%
Major Activity: System Improvements - cIP
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
Replace 16,000 linear feet of deficient water
mains per year.
Design and construct improvements to 1
well per year to meet customer demands.
Design and construct improvements to 1
reservoir per year to meet customer
demands.
15,840
0
16,000 15,840
0
0
Well site improvements are on hold until completion of the Wells Regional Storage and
Distribution System Study.
2.Montebello Reservoir was recoated on the interior and exterior.
FUND OVERVIEW
Crews completed the construction of Sanitary Sewer Rehabilitation Projects Phases IV, VI, and
VII. Phase V iscurrently under construction in the first quarter of 1997-98. The design of
Amarillo Avenue/Embarcadero Way Relief Sewer Project is started and the soil investigation is
complete. In addition, the California Environmental Quality Act Study is in progress.
In 1996-97, the Utilities Customer Information System (CIS) changed direction from in-house
development to the acquisition of the software from an outside vendor which has been selected.
At the direction of Council a charitable giving program for utilities customers, Project PLEDGE,
was introduced as.a one-year pilot program and designed to operate with minimal staff resources.
and costs.
FUNCTIONAL AREA: SUPPORT SERVICES AND ~RATES
KEY PLANS
[~Support the design Of application software
for users of the Customer Information
System (CIS) Project.
Work with Administrative Services
Department staff to implement a Charitable
Giving Program for Utilities customers.
PROGRESS
The Customer Information System (CIS) .
project changed direction from an in-house~
development to the acquisition of the
software from an outside vendor.
Consequently, staff focused during the year
on the RFP evaluation process rather than
continuing design and development in-
house.
In June 1997, the City implemented Project
PLEDGE program.
Major Activity: Customer Services
IMPACT MEASURES
1.Achieve an overall customer satisfaction
rating of greater than 85 percent from
customers.
2.Receive fewer than 20 complaints annually
regarding services provided by the City’s
contractor to clear sewer laterals.
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
95%
13
85%
6
90%
14
2.Midyear projection was underestimated.
Major Activity: Rates and Reserves
IMPACT MEASURES
1.Maintain residential rates 10 percent below
the rate charged in nearby communities.
~ 1996-97
1995-96 ADJUSTED 1996-97
ACTUAI~S BUDGET ACTUALS
-1.4%-12%-12.3%
FUNCTIONAL AREA: COLLECTION SYSTEM
KEY PLANS
Complete construction ofwastewater
collection system rehabilitation projects in
Downtown, Southgate, College Terrace and
on San Antonio Road from Byron to East
Charleston Road and at San Antonio Road
and Transport Avenue;
Construct major relief line in easement
from East Bayshore and Amarillo under
Highway 101 to the Regional Water
Quality Control Plant near Embarcadero
Way and Amarillo and on Amarillo from
Elmdale Place to E. Bayshore Road.
PROGRESS
Construction of approximately 28,000
linear feet of sewer rehabilitation in"
College Terrace; 7,900 linear feet of new
and lined main on San Antonio Road and
Barton Park ; and installation sewer liners
in Downtown is completed.
The design of the relief sewer isin
progress. ~ The soil investigation is
complete. The California Environmental ,
Quality Act initial study is 95 percent
complete and will undergo a 30 day ptiblic
review before going to Council for project
alignment approval in December 1997.
Major Activity: Collection System Engineering
IMPACT MEASURES
1995-96
ACTUALS
!1. Review and respond to all requests for [2
¯ engineering support from Customer Design
and Connection Services and Operations
within 1.5 working days of the request.
1996-97
ADJUSTED
BUDGET
1996-97
ACTUALS
1.5 1.5
Major Activity: Collection System Operations and Maintenance
IMPACT MEASURES
Operate and maintain the system in such a
manner to have less than 2 reportable
releases of wastewater per year.
Proactively maintain the wastewater
collection facilities to keep 95 percent of
emergency related responses to sewage spills
and line blockages to 2 hours or less.
1995-96
ACTUALS
1
93.6%
1996-97
ADJUSTED
BUDGET
¯ 199.6.97 ¯
ACTUALS
2
95%
0
89.5%
Major Activity: Customer Design/Connection - CIP
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Review, comment and return, within 10
working days of receiving complete
application for service, plan sets for new
service.
Install new customer services within 40
calendar days from the date on the receipt
the Customer receives from Revenue
Collections after the Customer pays for the
approved service to be installed.
10
45 " ’
10
40
1996-97
ACTUALS
10
FUND OVERVIEW
In 1996-97, staff completed the long-term solids treatment and disposal plan and is in the process of
preparing financial agreements and environmental documents with partner agencies.
Pollutant levels for a number of constituents decreased during the last year due to efforts to control
sources and enhance treatment at the Regional Water Quality Control Plant (RWQCP). Selenium
was the most dramatic reduction (a 75 percent reduction from the previous year). More typical was
the nickel reduction of 12 percent. An extensive outreach program wfis directed towards the
industrial, commercial, and residential sectors. Regulatory compliance rates are at an all time high
with vehicle service facilities (historically a problem area) compliance is now at 88 percent.
FUNCTIONAL AREA: WASTEWATER TREATMENT
KEY PLANS
O Prepare an implementation plan for
long-term solids treatment and disposal.
Install .two ORACLE File Servers for Plant
process control data and operational
reports.
Complete phase 1 of the 72-inch interceptor
sewer rehabilitation, and begin phase 2.
This is a multi-year CIP project.
PROGRESS
In 1996-97. a long-re .rm solids treatment
and disposal plan was completed; staff is
the in process of preparing financial
agreements with partner agencies and is
preparing environmental documentation
Installation Of ORACLE file servers
complete.
Contract was issued for investigation of
72-inch interceptor; inspection is in
progress.
Major Activity: Wastewater Treatment Operation
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
o
Monitor and operate the Regional Water
Quality Control Plant processes and
equipment to keep operational costs below
$750 per million gallons on an annual
average.
To be in compliance with discharge permit
limits for 95 percent of all samples.
Analyze monitoring samples within 43 days
of the Sampling event.
Keep the consumption of natural gas below 45
therrn/million gallons based on an annual
average.
Keep the consumption of electrical energy
below 2,000 Kwh/million gallons treated
based on an annual average.
$591
96%
45
40
1,483
<$750
95%
45.
<45
<2,000
1996-97
ACTUALS
$670
95%
42
<45
1,646
Major Activity:’ WQCP Maintenance
IMPACT MEASURES
1.Ensure that the wastewater treatment process
equipment is in service 95 percent of the time.
.~annual average.
Keep maintenance costs below $500 per
million gallons of treated wastewater on an
1995-96
ACTUALS
97%
$341
1996-97
ADJUSTED
BUDGET
95%
<$500
19~-97
ACTUALS
96%
$415
Major Activity: WQCP System Improvement (CIP)
IMPACT MEASURES
1.Bid 80 percent of all projects in the year they
are budgeted for construction.
1995-96
ACTUALS
6O%
1996-97
ADJUSTED
BUDGET
75%
1996-97
ACTUALS
FUNCTIONAL AREA:_WASTEWATER ENVIRONMENTAL COMPLIANCE
KEY PLANS
Generate data, supplies, and information
needed to insure that the new discharge
permit will have reasonable and achievable
terms and conditions. -
Develop reasonable and Cost effective
potential source control measures for
pollutants on which the Regional Water
Quality Control Plant may need to take .
further action in order-to comply with the
new discharge permit.
PROGRESS
[73 In 1996-97 key data’was gathered and
analyzed which will serve as the basis for a
new discharge permit for the Regional
Water Quality Control Plant. Data gaps for
dioxins, chlorinated hydrocarbons and
similar compounds were filled by
conducting ultra low-level analysis.
Calculations to determine the potential for
violations and the fraction which will be
toxic to organisms were completed. A
mathematical model to evaluate dilution in
the Bay was calibrated and prepared for
use. Information from key areas in the
United States was collected to estimate a
reasonable site specific standard for copper.
In 1996-97 developing control strategies for
copper continued to be a critical function.
The contingency plan to obtain major
reductions from copper corrosion so .urces
was made ready should new copper
standards necessitate its use. In depth
discussions with brake pad manufacturers
were initiated, as brake pad wear.
constitutes the other major source of crpper
to San Francisco Bay. Control strategy
development proceeded for mercury and
certain pesticides as well. Specific sources
of mercury were identified for source
control work in 1997-98.
Major Activity: Source Control Program
IMPACT MEASURES
1.Achieve better than 15.percent reduction in
copper loading.
Ensure a minimum of 70 percent of vehicle
service facilities and photoprocessors are in
compliance with the Sewer Use Ordinance.
1996-97
1925-96 ADJUSTED 1996-97
ACTUALS BUDGET ACTUALS
26%
87%
20%
70%
45%
90%
Implement 95 percent of the tasks identified
in the Clean Bay Plan for the preceding
calendar year.
Identify, monitor and participate in
development of at least 5 environmental
regulatory requirements that would affect the
RWQCP.
100%
5
95%95%
The concentration of copper was exceptionally uniform and the flow (volume) to the plant was
not extraordinarily high. These factors~ combined with continued success in source control
resulted in a 45percent reduction from the base year (1993) compared to our target
reduction of 15 percent.
Major Activity: Public Outreach/Special Events
IMPACT MEASURES
1996-97
1995-96 ADJUSTED 1996-97
ACTUALS --BUDGET ACTUALS
Conduct 30 public presentations and special
events.
Provide water pollution prevention
information to at least 90 percent of large,
regulated industries and 75 percent of
regulated small businesses.
Publish and distribute 5 new or revised public
outreach pieces for industries, businesses and
residences.
100%
30
90/75%
35
90/75%
Major Activity: Permitting~nforcement
IMPACT MEASURES
1.Conduct 30 public presentations and special
events.
Issue 95 percent of Notices of Violation
within 30 days of the violation.
1996-97
1995-96 ADJUSTED
ACTUALS BUDGET
30
100%
30
95%
1996-97
ACTUALS
30
100%
FUND OVERVIEW
In 1996-97, the mail room was reconfigured to accommodate the new utility bill inserting machine
and folder..The new equipment allows insertion of the new two page utility bill. New departmental
mailboxes were installed allowing access to mail when the mail room is closed. They provide
increased security for mail and reduce the error rate for interdepartmental mail deliveries. A contract
for pre-sorting first class mail was established to reduce postage costs. The print shop improved
efficiency by purchasing new bindery equipment. Departmental printing requests were met with a
high speed copier and offset printing equipment located in the print shop and printing staff continued
oversight of the Citywide convenience copier rental contract.
FUNCTIONAL AREA: PRINTING AND MAILING SERVICES
KEY PLANS PRoGREss
Organize and establish a functional file
system for citywide-forms to reduce
duplication, standardize, and reduce
development time for customers.
Developed a plan of how to implement a
functional file system, including resources
needed for implementation. This project
will be completed in 1997-98.
Major Activity: Printing Services
IMPACT MEASURES
1.Meet negotiated printing deadlines on 100
percent of printing- requests.
1995-96
ACTUALS
100%
1996-97
ADJUSTED .1996-97
BUDGET ACTUALS
Major Activity: Mailing Services
IMPACT MEASURES
1995-96
ACTUALS
Process 100 percent of r.egular outgoing U.S.
mail within one working day of receipt in the
mailroom.
100%
1996-97
ADJUSTED 1996-97
BUDGET ACTUALS
10o% [ lOO%
FUND OVERVIEW
Major accomplishments for 1996-97 included placing a record 82 vehicles and equipment units into
service from prior and current fiscal years. Notable replacements were 2 aerial devices for Electric
Operations and the Green Machine for friendly sweeping of the Downtown area. Twenty nine
original equipment manufactured compressed natural gas vehicles.were placed into semite including
a full size Street Sweeping machine, thereby increasing the demand for operating the Compressed
Natural Gas (CNG) fueling Station to capacity. The project for underground fuel tanks was
completed at three Fire Stations and the Palo Alto Golf Course service yard. The Wireless Vehicle
Management System was installed at the Municipal Service Center (MSC) and on 40 vehicles.
Agreements and training were completed with Palo Alto Unified School District (PAUSD) and
Ravenswood School District to use the CNG fueling station for their buses. Additional income was
provided by renting the second landfill dozer to the City of Watsonville for 6 months at $60,000. The
two replacement Parking Control scooters were purchased as electric powered scooters bringing the
Police Departments total to five electric scooters and eliminating four gasoline powered scooters.
FUNCTIONAL AREA: VEHICLE REPLACEMENT/ADDITIONS
KEY PLANS PROGRESS
Identify vehicles and equipment scheduled
for replacement that may be purchased
from manufacturer with Compressed
Natural Gas (CNG) systems. (Funding will
be provided from Utilities/Gas CIP to
purchase 30 vehicles with dedicated CNG).
Complete Vehicle Management System
CIP, which includes installing monitoring
equipment on 180 vehicles and developing
custom reports for management.
Seven 1997 (Ford) Vehicles have been
ordered with.Dedicated Compressed
Natural Gas options and will be in service
in Fall, 1997.
Forty of the one hundred eighty vehicles
have the onboard wireless management
system installed. Custom reports are 90
days behind schedule due to vendor
software delays.
Major Activity: Vehicle Replacement CIP Support
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Complete 90% of new fleet additions within
the fiscal year budgeted.
Bid 85 percent of all projects in the year they
are budgeted for construction:
90%
99%
90%
85%
-Major Activity: Vehicle Replacement/Outfitting
IMPACT MEASURES
1995-96
ACTUALS
1996-97
ADJUSTED
BUDGET
Place 90 percent of non-emergency vehicles
in service within 30 days from delivery date.
Replace 95 percent of vehicles within 6
months of the scheduled replacement date
for vehicles meeting replacement criteria.
90%
90%
90%
95%
1996-97
ACTUALS
90%
95%
1996-97
ACTUALS
90%
95%
FUNCTIONAL AREA: VEHICLE OPERATIONS/MAINTENANCE
KEY PLANS PROGRESS
El Implement plan for fuel storage and fuel El
alternatives (CNG and Electric expanded
use).
El Investigate and, if appropriate, develop El
agreements to provide maintenance service
for outside agencies including joint use of
fueling facilities where possible.
The implementation will occur in fiscal
1998-99 as a major change to the CIP
program for CNG powered vehicles~
Utilities will perform a long-term outlook
for alternatives fuel projects.
Agreements for fueling school buses with
CNG have been completed with Palo Alto
Unified School District and Ravenswood
City School District.
Major Activity: VehiCles Operations, Monitoring
IMPACT MEASURES
Provide 95 percent of monthly billing
statements to Finance for previous month’s
vehicle costs within 5_working days after the
end of each month.
o Provide departments with monthly usage,
accident and repair cost data reports which
summarize exceptions of either under-
utilized or excessive use vehicles.
1995-96
ACTUALS
90%
1996-97
ADJUSTED
BUDGET
95%
12
1996-97
ACTUALS
92%
12
Major Activity: Fuel Storage and Dispensing
IMPACT MEASURES.
1.Ensure 95 percent of fuet dispensers are
available for use annually through daily
monitoring offuel distribution and dispensing
at all fueling locations.
2. Provide 4 percent annuhl fuel Savings from
use of Compressed Natural Gas (CNG) in
vehicles from base year_ 1993-94.
1995-96
ACTUALS
99%
2%
1996-97
ADJUSTED
BUDGET
95%
4%
1996-97
ACTUALS
99%
1%
Major Activity: .Vehicle Operations/Maintenance
IMPACT MEASURES
1995-96
ACTUALS ¯
1996-97
ADJUSTED
BUDGET
Perform 95 percent of scheduled preventive
maintenance within 2 business days of
original schedule.
Annually perform -100 percent of mandatory
OSHA, highway, brake and smog
inspections to ensure compliance with legal
requirements.
Annually ensure that no more than 5 percent
the fleet is out of service on a daily basis.
90%
100%
4%
95%
100%
4%
1996-97
ACTUALS
97%
98%
3.5%