July 7, 1997 CMR:318:97
APPROVAL OF THE SPECIFIC JOINT PARTICIPATION
AGREEMENT WITH PACIFIC BELL TO INSTALL
FUTURE SUBSTRUCTURE ALONG FOREST AVENUE
BETWEEN THE 700 AND 900 BLOCK
REQUEST
This is a request for approval of a Specific Joint Participation Agreement with Pacific Bell for
installation of future electric substructure along Forest Avenue between the 700 and 900 block.
RECOMMENDATIONS
Staff recommends that the Council approve and authorize the Mayor to execute the attached
Specific Joint Participation Agreement, including payment of the City’s portion of the work
which is estimated to be $125,000.
POLICY IMPLICATIONS
Approval of this request is consistent with existing policies.
EXECUTIVE SUMMARY
Backffound~.
On May 19, 1997, staff received approval to proceed with engineering on a joint construction
project with Pacific Bell (CMR:243:97) to install future electric substructure between the 700
and 900 block of Forest Avenue (see attached map). Engineering is now completed, and Pacific
Bell is soliciting bids from contractors to install the substructure. Construction is scheduled
to begin in mid-July 1997.
To take advantage of the economics of joint use of trenches, the City and Pacific Bell executed
a master agreement in 1975 (amended in September 1990) for participation,i~joint underground
construction projects. This agreement, however, limits the expenditure_t6 $25,000 per project.
Whenever the amount involved in a project exceeds $25,000, a specific supplementary
¯ agreement is needed.
CMR:31,~:97 Page 1 of 2
The supplementary agreement references the master agreement for general terms and
conditions and requires, when the work is contracted, the use of the exact unit prices quoted by
the contractor to determine the costs shared between the utilities. Accordingly, Pacific Bell,
who will administer the contract for this project, will bill the City on the basis of prices quoted
and terms agreed upon in Exhibit "A".
FISCAL IMPACT
A Budget Amendment Ordinance (BAO) was approved by Council on June 2, 1997,
(CMR:261:97) to increase the Electric Fund Customer Design/Connection Capital
Improvement Project No. 8928 to cover the costs of this joint construction project.
ENVIRONMENTAL ASSESSMENT
This project is exempt from the provisions of the Califomia Environmental Quality Act (CEQA)
pursuant to sections 15302 (replacement of existing facilities) and 15303 (minor new
construction) of the CEQA guidelines.
ATTACHMENTS
Attachment A - Specific Agreement
Attachment B - Map of project site
PREPARED BY: Patrick Valath and Tomm Marshall
ED;~T¢~ J. 1VI~IZE~K
Direo~or of Utilities
CITY MANAGER APPROVAL:
HARRISON
Assistant City Manager.
CMR:xxx:97 Page 2 of 2
SPECIFIC AGREEMENT FOR JOINT PARTICIPATION
INSTALLATION OF UNDERGROUND FACILITIES SYSTEM
700 thru 900 Block of Forest Avenue
THIS AGREEMENT, made and entered into this day
of , 1997, by and among PACIFIC BELL, a California
corporation, hereinafter called "COMPANY, and the CITY OF PALO
ALTO, a municipal corporation hereinafter called "CITY":
W I T N E S S E T H:
WHEREAS, CITY, and COMPANY on September 24, 1990 entered
into an agreement (Contract No. MD-723) entitled "AMENDED MASTER
AGREEMENT FOR INSTALLATION OF UNDERGROUND FACILITIES SYSTEMS BY
AND AMONG THE CITY ~OF PALO ALTO, PACIFIC BELL AND CABLE COOP
(LESS THAN $25,000.00)" which agreement provided for joint
participation in the installation of underground facilities
systems, subject to CITY’S Council approval where CITY’S share of
cost will exceed Twenty-Five Thousand Dollars ($25,000); and
WHEREAS, it is necessary for COMPANY to open trenches in the
area of the City of Palo Alto in connection with Project #.PI-
1509Q; and ~
WHEREAS, COMPANY will act as the Trenching Agent under the
master agreement and CITY desires to have installed in the open
trenches certain of their own underground facilities the share of
which ins~allation costs will exceed Twenty-Five Thousand Dollars
($25,000) ;
NOW, THEREFORE, the parties hereto agree as follows:-
SECTION I. COMPANY agrees to act as Trenching Agent to
install, or have installed, certain underground facilities to be
used exclusively or shared by and among CITY, and COMPANY in
connection with the Project. The extent and location of such
facilities shall be agreed upon by the authorized representatives
of the parties hereto prior to such installation. CITY agrees to
reimburse COMPANY for the costs of such installation in
accordance with the terms set forth in Exhibit "A" (Terms of
Agreement).
This is a separate agreement approved by CITY’S
Council as contemplated by Section 2 of Contract No. MD 723, and
the terms and conditions of Contract No. MD 723 entitled,
"AMENDED MASTER AGREEMENT F6R INSTALLATION OF UNDERGROUND
FACILITIES SYSTEMS BY AND AMONG THE CITY OF PALO ALTO, PACIFIC
BELL AND CABLE COOP (LESS THAN $25,000.00)," dated September 24,
1990, among CITY, CABLE COOP and COMPANY including any future
amendments thereto, are hereby incorporated by reference into
this agreement.A copy of Contract No. MD 723 is attached hereto
as Exhibit "C".
IN WITNESS WHEREOF, the parties have caused this agreement
to be executed the day and year first above written.
ATTEST:CITY OF PALO ALTO
City Clerk
APPROVED AS TO FORM:
Sr. Assistant City Attorney
APPROVED:
Mayor
City Manager
Director of Finance
Director of Utilities
EXHIBIT "A"
700 to 900 Block of Forest Ave.
UNDERGROUND SUBSTRUCTURE INSTALLATION
TERMS OFAGREEMENT
no
B o
CONSTRUCTION CONTRACT (See attached bid items for breakdown of
cost estimate.)
All bid~items solely for the CITY use shall be charged 100%
to the City.
o
°
All bid items solely for the COMPANY use shall be charged
100% to the Company.
All joint trench bid item costs will be determined using a
space/cost allocation formula, which divides the minimum
trench area required for each trench occupant individually
by the sum of the minimum trench areas for all occupants.
Pavement and surface restoration over joint trench shall be
shared equaily by the number of occupants in the trench.
All optional bid items, whenever used, shall be charged
.individually or jointly depending on how the items are used.
Cost of compaction testing shall be shared equally by the
number of occupants in the trench. _
BID PACKAGE PREPARATION AND CONTRACT ADMINISTRATION
Four percent (4%) of CITY’S share of actual cost of construction
shall be added to CITY’S cost for bid package and contract
administration performed by COMPANY staff.
C:\wPDoc\PACBELL\AGRFORST.SPE
APPROVED AP.R 19.97
Thl
ENGR. MANAGER
ENGR PEV
DRAWN P~D
CHECKED PEV
PROPOSED PA CBELL
CONDUIT INSTALLA TION
ALONG FOREST AVE.
REV DATE DESCRIPTION
CITY OF PALO ALTO
CALIFOKNIA
APPR
WORK ORDER DRAWING NO.