HomeMy WebLinkAbout1997-06-30 City CouncilTO:
City of Palo Alto
City Manager’s Report
HONORABLE CITY COUNCIL 2
FROM:CITY MANAGER DEPARTMENT: Planning and
Community Environment
DATE:June 30, 1997 CMR:301:97
SUBJECT:FINDINGS AND CONDITIONS OF APPROVAL FOR THE
STANFORD SAND HILL CORRIDOR PROJECTS
REQUEST
This report, which augments CMR:126:97, prepared for the City Council hearing on
January 27, 1997, presents for Council action Findings and Conditions of Approval for each
of the projects comprising the Stanford Sand Hill Corridor projects. The recommended
Findings and Conditions of Approval reflect the Council’s June 2, 1997 direction to staff and
are the outcome of extensive City Council consideration of the Environmental Impact
Report, public testimony, Board and Commission recommendationsl and related Council
discussions.
RECOMMENDATIONS
In summary,
1.
it is recommended that City Council:
Certify the Environmental Impact Report as prepared in compliance with CEQA;
Approve the 628-unit Stanford West Apartment Housing project;
Approve the Stanford West Senior Housing project, including 388 independent living .
condominium units, 66 assisted living units and 47 skilled nursing rooms;
Approve the increase of the Stanford Shopping Center development to allow an
additional 80,000 square feet of floor area and one additional parking structure;
CMR:301:97 Page 1 of 21
o
o
Approve the Sand Hill Road Extension and widening and related roadway
improvements, including the widening of Sand Hill Road to four lanes from Santa
Cruz Avenue to Arboretum Road and a two-lane extension from Arboretum Road to
E1 Camino.Real;
Approve a Multiple Family Residential land use designation and RM-40 prezoning
for a new 2.5-acre parcel at Pasteur Drive and Sand Hill Road, with subsequent
annexation to the City;
Approve a Tentative Subdivision Map; and
Approve a Development Agreement covering the road improvements, apartments,
senior housing and Shopping Center projects.
These approvals involve a considerable number of specific actions that are recommended for
Council approval and listed below:
Certification of Environmental Impact Report (EIR)
Staff recommends that the City Council adopt the Resolution of Certification making
findings and:
A.Certifying that the Final EIR was completed in compliance with CEQA; and
Bo Certifying that the Final EIR was presented to the City Council, as lead agency, and
that the Council reviewed and considered the information contained in the Final EIR
prior to approving :the projects; and
Co Adopting the Minigation Monitoring Program.
Attachment 2 --
Attachment 3 --
Attachment 4 --
Attachment 5 --
Resolution of Certification, with Exhibits
Exhibit A: Mitigation and Condition Monitoring Program
Exhibit B: Stanford West Apartment Project -- Findings Re:
Changes and Mitigation Measures Adopted to Reduce
Impacts and Alternatives to the Project
Exhibit C: Stanford West Senior Housing Project --
Findings Re: Changes and Mitigation Measures Adopted to
Reduce Impacts and Alternatives to the Project
CMR.’301:97 Page 2 of 21
Attachment 6 --
Attachment 7--
Attachment 8 --
Attachment 9 --
Attachment 10 --
Attachment 11 --
Attachment 12--
Exhibit D: Stanford Shopping Center Expansion -- Findings
Re: Changes and Mitigation Measures Adopted to Reduce
Impacts and Alternatives to the Project
Exhibit E: Sand Hill Extension and Widening and Related
Roadway Improvements -- Findings Re: Changes and
Mitigation Measures Adopted to Reduce Impacts and
Altematives to the Project
Exhibit F: Annexations -- Findings Re: Changes and
Mitigation Measures Adopted to Reduce Impacts and
Alternatives to the Project
Exhibit G: Stanford West Apartment Project -- Statement of
Overriding Conditions
Exhibit H: Stanford West Senior Housing -- Statement of
Overriding Conditions
Exhibit I: Stanford Shopping Center Expansion -- Statement
of Overriding Conditions
Exhibit J: Sand Hill Extension and Widening and Related
Roadway Improvements -- Statement of Overriding
Conditions
Stanford West Apartment Housing
Regarding the proposed Apartment Housing pr~ect, it is recommended that the Council
approve:
D.Comprehensive Plan Land Use Map amendment from Streamside Open Space to
Multiple Family Residential for a small portion of the site.
Attachment 13 -- Resolution, Comprehensive Plan Amendment for Apartment
Housing Project
E.Amendment to the Comprehensive Plan Land Use Element to amend the definition
of the Streamside Open Space designation.
Attachment 14-- Resolution, Comprehensive Plan Amendment to Definition
of Steamside Open Space Land Use Designation [Note: this
amendment is also required for the Stanford West Senior
Housing and the Sand Hill Road Extension and Related
Road Improvements projects. It is only necessary to adopt
the motion once]
CMR:301:97 Page 3 of 21
Fo Amendment to the Comprehensive Plan .Urban Design Element to add a description
of the Sand Hill Road scenic route designation.
Attachment 15--Resolution, Comprehensive Plan Amendments for Road
Improvements Project, Section 5 [Note: this amendment is
also necessary for the Sand Hill Road Extension and
Widening and Related Road Improvements project. It is
only necessary to adopt the motion once]
Ho
Site and Design approval.
Attachment 16 -- Findings, Stanford West Apartment Housing Project, pages
1 and2
Attachment 17-- Conditions of Approval, Stanford West Apartment Housing
Project
A Variance to allow on-street parking where off-street parking is otherwise required.
Attachment 16 -- Findings, Stanford West Apartment Housing Project, pages
7and8
Jo
Ko
A Variance to allow Arterial and Special Setback on Sand Hill Road to be 18 feet,
where 25 feet is otherwise required (to allow carport and surface parking intrusions).
Attachment 16 -- Findings, Stanford West Apartment Housing Project, page 8
A Design Enhancement Exception to allow side yard setbacks in some locations to
be as small as 0 feet where 16 feet is normally required (amount of setback
encroachment varies) and to allow daylight plane encroachments in some locations
of up to 22 feet (daylight plane encroachments vary).
Attachment 16 -- Findings, Stanford West Apartment Housing Project,. page 9
A Design Enhancement Exception to allow less private open space for 29 apartment
units than is otherwise required.
Attachment 16 -- Findings, Stanford West Apartment Housing Project, pages
9 and 10
CMR:301:97 Page 4 of 21
Stanford West Senior Housing
Regarding the proposed Senior Housing project, it is recommended that the Council approve:
Comprehensive Plan Land Use Map amendment from Major Institution/Special
Facilities and Streamside Open Space to Multiple Family Residential.
Attachment 18 -- Resolution, Comprehensive Plan Amendment for Senior
Housing Project, Section 2
Mo Comprehensive Plan Land Use Map amendment from Multiple Family Residential
and Streamside Open Space to Major Institution/Special Facilities, to accommodate
adjustments between the Senior Housing parcel, the adjacent Children’s Health
Council parcel and the parcel proposed for Stanford West Apartment Housing.
Attachment 18 -- Resolution, Comprehensive Plan Amendment for Senior
Housing Project, Section 3
No Amendment to the Comprehensive Plan Land Use Element to amend the definition
of the Streamside Open Space designation.
Attachment 14 --Resolution, Comprehensive Plan Amendment to Definition
of Streamside Open Space Land Use Designation [Note:
this amendment is also required for the Stanford West
Apartment Housing and the Sand Hill Road Extension and
Related Road Improvements projects. It is only necessary.
to adopt the motion once]
O.Zone Map amendment from Public Facility (PF) to Planned Community (PC).
Attachment 19 -- Ordinance, Planned Community Zone Map Amendment for
Senior Housing Project
Attachment 20-- Conditions of Approval, Planned Community Zone Map
Amendment for Senior Housing Project
Attachment 21 -- Findings, Planned Community Zone Map Amendment for
Senior Housing Project
Po Zone Map amendment from Medium Density Multiple Family Residential (RM-30)
to Public Facility (PF), to accommodate adjustments between the Senior Housing
parcel and the adjacent Children’s Health Council parcel at 700 Sand Hill Road.
CMR:301:97 Page 5 of 21
Attachment 22 -- Ordinance, RM-30 to PF Zone Map Amendment for Senior
Housing Project
Zone Map amendment l~om Public Facility (PF) to Medium Density Multiple Family
Residential (RM-30), to accommodate adjustments between the Senior Housing
parcel and the adjacent parcel at 1000 Sand Hill Road, proposed to be developed with
the Stanford West Apartment project.
Attachment 22 -- Ordinances, RM-30 to PF Zone Map Amendment for Senior
Housing Project
Design Enhancement Exception to side yard fencing regulations to allow no solid wall
or fence to be provided along the common property line between the Multiple Family
(RM) zoned site and the. Planned Community (PC).zoned Senior Housing site.
Attachment 20 -- Findings, Planned Community Zone Map Amendment for
Senior Housing Project, page 5
Stanford Shopping Center Expansion
Regarding the proposed Stanford Shopping Center Expansion, it is recommended that the
Council approve:
So Zone text amendment to Section 18.43.050(g)(2) of the Palo Alto Municipal Code to
allow the development cap to be revised to 80,000 square feet of additional
development beyond that existing on June 14, 1996.
To
Attachment 23 -- Ordinance, Amendment of Site Development Regulations
for Stanford Shopping Center Expansion Project
Zone Map amendment to add a Landscape Combining (L) classification to the
Community Commercial (CC) zoned area of the Shopping Center located adjacent to
San Francisquito Creek.
Attachment 24 -- Ordinance, Zone Map Amendment for Stanford Shopping
Center Expansion Project
Variance to allow a 3-foot setback on Arboretum Road for a retail building where 24
feet is otherwise required.
CMR:301:97 Page 6 of 21
Attachment 25--Findings, Stanford Shopping Center Expansion Project,
page 5
Wo Architectural Review approval.
Attachment25--Findings, Architectural Review of .Stanford Shopping
Center Expansion Project, pages 1 through 4
Attachment 26 -- Conditions of Approval, Architectural Review of Stanford
Shopping Center Expansion Project
Sand Hill Road Extension and Widening and Related Roadway Improvements
NOTE: The ordinances, resolutions and related material for the Roadway Improvements,
Apartment Housing, Senior Housing, Shopping Center Expansion, Tentative Subdivision
Map, Development Agreement and .Annexations, as recommended by the Planning
Commission and ARB, were provided with the January 27, 1997 staff report (CMR: 126:97).
For this staff report, . changes to the January 27, 1997 findings and conditions and
Development Agreement are indicated with strikeouts and shading.
Regarding the Sand Hill Road Widening and Extension and Related Roadway Improvements
Project, it is recommended that the Council approve:
Wo Comprehensive Plan Land Use Map and Street Network amendments to include the
proposed changes to the circulation network.
X°
Y°
Attachment 27 -- Resolution, Comprehensive Plan Amendments for Roadway
Changes and StreamsideOpen Space Boundaries, Section 2
Comprehensive Plan Land Use Map amendment to amend the boundary of the
Streamside Open Space designated area adjacent to the Sand Hill Road extension.
Attachment 27 -- Resolution, Comprehensive Plan Amendments for Roadway
Changes and Streamside Open Space Boundaries, Section 3
Amendment to the Comprehensive Plan Transportation Element relating to various
road improvements in the Sand Hill Road corridor.
Attachment 15 -- Resolution, Comprehensive Plan Amendments for Road
Improvements Proj6ct, Sections 2 and 3
CMR:301:97 Page 7 of 21
BB.
CC.
Amendment to the. Comprehensive Plan Land Use Element to amend the
"Transportation" discussion of the "Objectives, Policies and Programs" section.
Attachment 15--Resolution, Comprehensive Plan Amendments for Road
Improvements Projects, Section 4
Amendment to the Comprehensive Plan Urban Design Element to add a description
of the Sand Hill Road scenic route designation.
Attachment 15 -- Resolution, Comprehensive Plan Amendments for Road
Improvements Projects, Section 5 [Note: this amendment
is also required for the proposed Apartment project; it is
only necessary to adopt the motion once]
Amendment to the Comprehensive Plan Land Use Element to amend the definition
of the Streamside Open Space designation.
Attachment 14 --Resolution, Comprehensive Plan Amendment to Definition
of Steamside Open Space Land Use Designation [Note: this
amendment is also required for the proposed Apartment and
Senior Housing projects; it is only necessary to adopt the
motion once]
Amend the Special Setback Map (Municipal Code Section 20.08.020) to designate a
24-foot special setback on both sides of the Sand Hill Road extension, between~
Arboretum Road and E1 Camino Real, and to designate a 24-foot special setback on
Sand Hill Road along the frontage of the new parcel created by the realignment of
Pasteur Drive.
DD.
Attachment 28 -- Ordinance, Amendment of Special Setback Map
Architectural Review.approval.
Attachment29--Findings, Architectural Review of Sand Hill Road
Extension and Related Roadway Improvements
Attachment 30 -- Conditions of Approval, Architectural Review of Sand Hill
Road Extension and Related Roadway Improvements
Annexations~
Regarding future annexation, it is recommended that the Council approve:
CMR:301:97 Page 8 of 21
EE.Amend the Land Use Map of the Palo Alto Comprehensive Plan to: (a) change the
land use designation of the to-be-created Pasteur parcel from "Major
Institution/University Lands/Campus Education Facilities" to "Multiple Family
Residential"; and (b) change the land use designation of the portion of land that will
become part of Pasteur Drive when it is re-aligned from "Major Institution/University
Lands/Campus Education Facilities" to "Major Institution/Special Facilities."
Attachment 27 -- Resolution, Comprehensive Plan Amendment for Roadway
Changes and Streamside Open Space Boundaries, Section 4
FF.Prezone as RM-40 a portion of a new parcel to be created by the re-alignment of
Pasteur Drive and Prezone as PF(L) an area of land that will become part of Pasteur
Drive.
Attachment 31 -- Ordinance, Prezoning for Pasteur Parcel to RM-40
GG Change the Zone Classification of a portion of the new parcel to be created by the re-
alignment of Pasteur Drive at Sand Hill Road from PF(L) to RM-40.
Attachment A -- Ordinance, Zone Map Amendment for Pasteur Parcel, PF(L)
to RM-40
Tentative Subdivision Map
Regarding the Tentative Subdivision Map, it is recommended that the Council approve:
HH.A Tentative Subdivision Map with an exception for roadway width and with street
names.as recommended by the Palo Alto Historical Association.
Attachment B -- Findings, Tentative Subdivision Map
Attachment C -- Conditions of Approval, Tentative Subdivision Map
Attachment D -- Letter from Palo Alto Historical Association
Development Agreement and Ordinance
II.It is recommended that the City Council adopt the ordinance approving the
development agreement between the City and Stanford.
Attachment E -- Ordinance, Adoption of Development Agreement
Attachment F -- Development Agreement
CMR:301:97 Page 9 of 21
Actions taken by the Council in approving the Sand Hill Corridor projects, other than those
approved by resolution or ordinance, shall be effective upon the date of each action taken by
vote of the Council, but shall be suspended and inoperative unless and until the Ordinance
Adopting the Development Agreement Between the City of Palo Alto and the Board of
Trustees of the Leland Stanford Junior University has been approved by the City Council
and, if submitted to a referendum by the City Council on its own motion or by a certified
sufficient petition of the electorate, pursuant to Article VI, section 3 of the Charter of the City
of Palo Alto, until approved by the voters.
BACKGROUND
In brief summary, the projects proposed by Stanford include: 1) the Sand Hill Road
Extension and Related Roadway Improvements; 2) the Stanford West Apartment Housing;
3) the Stanford West Senior Housing; and 4) the Stanford Shopping Center Expansion.
Stanford. has requested separate entitlement approvals for each of the four development
projects. Therefore, each project must be addressed both individually and in the context of
the other proposed projects. Also, Stanford has requested approval of a Tentative
Subdivision Map. The relocation of Pasteur Drive results in a fifth project that involves
Prezoning to RM-40 and annexation of a developable parcel adjacent to Pasteur Drive.
It should be noted that while staffhas prepared Findings and Conditions of Approval for each
project, the projects are highly interdependent and it is not staff’s recommendation that each
of the projects stand alone without any of the .others. The project-related ordinances,
resolutions, and related findings and conditions were provided to Council in the January 27,
1997 staff report. A number of conditions of approval and mitigations were modified in a
February 26, 1997 staff report (CMR: 152:97) and have been incorporated into this report.
Major attachments to this staffreport that were not part of the earlier staff reports include the
resolution certifying the EIR and adopting the Mitigation and Condition Monitoring
Program, which includes extensive findings regarding the environmental impacts relating to
each project, as well as findings of overriding considerations in support of project approval.
The project history, discussions of project-related issues and recommendations related to
these issues expressed by the Council, the Planning Commission, the Architectural Review
Board, and staff are detailed at length in the January 27, 1997 City Manager’s Report
(CMR: 126:97) and related staff reports cited earlier in this report.
POLICY IMPLICATIONS
The July 24, 1996 Planning Commission staff reports contain an extensive discussion and
analysis of each project’s consistency with the Comprehensive Plan, as well as discussion
of recommended Comprehensive Plan amendments.
CMR:301:97 Page 10 of 21
DISCUSSION
Zoning Ordinance Compliance
Proposed changes to the Zoning Ordinance are identified earlier in this report in the
"Recommendations" section. Please refer to the January 27, 1997 City Manager’s Report
(CMR: 126:97), starting on page 26, for the detailed analysis of zoning ordinance compliance
for each Sand Hill Corridor project.
Annexations
As described in Section 5.1 of the Final EIR, staff is recommending that the City initiate
annexation to the City of Palo Alto of several small areas of land in connection with the
proposed Stanford projects. All of the areas recommended to be annexed are now in the
unincorporated area of Santa Clara County. The largest area is a portion of a small parcel
that will be created by the realignment of Pasteur Drive at Sand Hill Road. Stanford does not
have any current plans to develop the parcel and has not applied for any approvals in
connection with the parcel. However, creation of the parcel would result either in a pocket
of unincorporated land surrounded by the City of Palo Alto or having Pasteur Drive divided
between the City and County. Neither alternative would be efficient for either the City or
the County. Thus, staff recommends that the parcel be incorporated into the City.
Other areas recommended for annexation are an area of land that will become part of Pasteur
Drive when it is aligned and a small sliver of land on Quarry Road that should be annexed
to ensure that the entire roadway will be in the City~
The procedure for annexing territory from unincorporated county area into the boundaries
of a city is found in the Cortese-Knox Local Government Reorganization Act of 1985 (Gov’t.
Code Sec. 56000, et seq.). The only actions recommended at this time are approval of the
Comprehensive Plan amendment and prezoning, as earlier described. Prior to construction
of the projects, however, the Council will be requested to take various other actions to
effectuate the annexations.
Because the location of the future "Pasteur parcel" and most of the other area to be annexed
is within the City’s Urban Service Area and Sphere of Influence, the City has the authority
to conduct a "city conducted annexation" of that area. Two small areas in and along Quarry
Road are outside the City’s Urban Service Area and will require approval of the Santa Clara
County Local Agency Formation Commission (LAFCO), as well as the City Council.
CMR:301:97 Page 11 of 21
Development Agreement
State law authorizes development agreements for the purpose of securing greater certainty
in the development process. Basically, a development agreement assures the right to
complete a project for a specified period of time. On the other hand, by assuring early
vesting, development agreements can help a City induce developers to make substantial
contributions to infrastructure, or other needs, including those which are "extraordinary" in
the sense that they could not be compelled through the City’s power to control development.
Development agreements are not without risks. When the City Council authorizes a
development agreement, it essentially "binds its successors" in a way that uniquely precludes
future Councils from dealing with as yet unknown problems. A development agreement is
a trade-off between the City’s ability to change development rules to address new planning
concerns, and the value of whatever "extraordinary" public benefits the development
agreement brings.
The Development Agreement, presented in Attachment E, reflects the issues negotiated and
resolved, at direction of Council, by City and Stanford staffs, in various sessions in May and
early June, 1997. The Development Agreement covers all project approvals as well as
benefits to the City outside of the project approvals.
The proposed development agreement secures Stanford’s ability to develop the Sand Hill
Road Corridor Projects, as fmally approved .by the City Council, for 15 years,
notwithstanding the City’s usual time limits on project approvals. In exchange, Stanford will
agree to provide the City with certain broad assurances as well as specific commitments. The
Development Agreement assures that Stanford will not challenge any aspect of the City’s
action (including the numerous exactions and other conditions of approval), and that Stanford
will bear the cost of development monitoring and defense of any lawsuits filed against the
City’s approval. Presented below are recently-negotiated changes to the draft Development
Agreement.
Special Condition Area B -- Applicant agrees to develop, until the year 2020, only
academic and recreational fields and associated support facilities in Special Condition
Area B with the exception of retaining the right to propose faculty, staff and/or
student housing in the area east of Fremont Road (Development Agreement, Page 15);
and
E1 Camino Park Lease Agreement -- The "El Camino Park" lease currently includes
the land that is park-dedicated, known as E1 Camino Park, as well as the areas the City
subleases to the Holiday Inn, MacArthur Park, the Red Cross, and the Valley
Transportation Authority (the train depot area). Under the Development Agreement,
CMR:301:97 Page 12 of 21
as of the time the first building permits are issued for the Stanford West Apartment
or Stanford West Senior Housing projects: (1) those portions of the lease except for
the dedicated parkland and depot area would revert back to Stanford, (2) the lease for
the dedicated parkland would be extended from 2013 to 2033 at a rent of one dollar
per year, and (3) the lease for the depot area would be extended to 2033 and remain
under the current terms and conditions, except that the City would have the right to
terminate as of the .current termination date of 2013 (Development Agreement,
page 14).
Tentative Subdivision Map
The Palo Alto Historical Association has submitted recommendations for street names for
the new street to be located behind Nordstrom and for the streets within the Apartment
project. The Palo Alto Fire Department and Communications staff have indicated their
approval of these proposed names.
The Association concurs with the choice of "Vineyard Lane"for the new street to be
located behind Nordstrom.
For the streets in the Apartment project, the Association recommends the following
names:
-Marx - Mosher
- Varian - Swain
-Clark - Durand
Project Plans
With the January 27, 1997 City Manager’s Report (CMR: 126:97), the Council was provided
a large set of plans (approximately 100 sheets) illustrating all project details as specified by
the City submittal requirements in July 1996. These plan sheets are datedApril 1, 1996.
Also provided with the January 27, 1997 staff report was the Tentative Subdivision Map.
ALTERNATIVES
The Council’s decision making choices are to consider the projects as applied for by the
applicant, and either approve, approve with conditions or deny the application. Staff is
recommending approval, with Conditions, of all of the proposed projects. The Council could
choose to approve any of the projects individually, with or without any of the others;
however, staff recommends that the Council approve the Apartment, Senior Housing or
CMR:301:97 Page 13 of 21
Shopping Center Expansion projects only if the Road Improvements project, or some form
of road improvements as may be determined by the Council, is also approved.
FISCAL IMPACT
The City retained the economic analysis firm of Sedway Kotin Mouchly Group to analyze
the impacts of the Sand Hill Corridor projects on the City of Palo Alto and the Palo Alto
Unified School District (PAUSD). Also analyzed was the impact of the proposed expansion
of the Stanford Shopping Center on the Palo Alto and Menlo Park downtown shopping areas.
This analysis is contained in a report that is separate from the Draft EIR but was distributed
with the DEIR. The Fiscal and Economic Analysis is discussed in the January 27, 1997 staff
report.
The fiscal impact analysis did not include the positive fiscal impact of the E1 Camino Park
lease arrangement, contined in the proposed development agreement. The following
assumptions were used to estimate the fiscal impact of the new lease arrangements:
O
Constuction of the projects will begin in 1998.
The value of the 20-year extension to the lease as it relates to dedicated
parkland was calculated on an "avoided cost" basis, assuming for comparison
purposes that the lease could alternatively have been extended for 20 years
under the current lease terms.
The value of the Holiday Inn and MacArthur Park subleases for the remainder
of the lease term to 2013 was calculated assuming: for Holiday Inn, 90
percent occupancy and a 4 percent per year compounded increase in
revenue/rental payments; for MacArthur Park, a 4 percent per year
compounded increase in revenue/rental payments.
Using these assumptions, the value to the General Fund in non-present value dollars for the
entire lease arrangement is estimated to be $26.3 million.
ENVIRONMENTAL ASSESSMENT
The environmental review process was summarized in the January 27, 1997 staff report.
In the course of environmental review and evaluation of the projects, Stanford has agreed to
a number of project revisions intended to address environmental and planning policy issues
raised by the City Council. A "Summary of Current Project Revisions" ("Summary,"
Attachment 1) has been prepared, which presents the latest project revisions, evaluates the
revisions to the impacts identified in the Draft and Final EIR, and identifies any additional
impacts that could occur, or mitigation measures that would be required as a result of the
revisions.
CMR:301:97 Page 14 of 21
The Summary concludes that the project revisions do not create any additional significant
impacts, increase substantially the magnitude of any impact over that previously identified
in the Draft EIR and Final EIR, or require the implementation of any additional mitigation
measures.
The Summary is made part of the EIR by the resolution certifying the EIR.
The attached Resolution of Certification includes a finding for each. significant impact
identified in the EIR indicating that either:
(1)Changes or alterations have been required (in the form of mitigation measures
or conditions) or incorporated into, the project, which avoid or mitigate the
significant environmental impacts of the project; or
(2)The changes or alterations (i.e., the mitigation measures) are within the
responsibility and jurisdiction of another public agency and have been, or can
and should be, adopted by that other agency; or
(3)Specific economic, legal, social, technological, or other considerations,
including considerations for the provision of employment opportunities for
highly trained workers, make infeasible the mitigation measures or alternatives
identified in the Final EIR, and with respect to impacts that cannot be
mitigated to less than significance, that overriding considerations or other
benefits of the project outweigh the environmental impacts (Public Resources
Code section 21081).
A Mitigation Monitoring Plan is required by CEQAfor every project approval for which an
EIR was prepared and mitigations were identified. The plan must specify the time t~ame for
implementation of the mitigation and indicate who will be responsible for overseeing that the
mitigation is properly implemented. The plans prepared for these projects also include all
the adopted Conditions of Approval, and thus is being called a "Mitigation and Condition
Monitoring Plan". Staff has found that it is easier to monitor all conditions and mitigations
if one source document is prepared. It also gives a clearer picture to all parties regarding
responsibilities and requirements, and more easily indicates where mitigations have been
modified by conditions.
A final draft of the Mitigation and Condition Monitoring Plan is attached as Exhibit A of the
EIR resolution (Attachment 3) and reflects Council’s review of the EIR mitigations and the
attached conditions of approval.
CMR:301:97 Page 15 of 21
PRIOR STAFF REPORTS
Other Documents Needed to Support Council Decision-Making
Documentation previously submitted to the City Council to support decision making for this
project is extensive. Although these information items are not included with this report, they
are publicly available documents. Previously submitted major staff reports and other
documentation include:
Planning Commission StaffReport Binder. Distributed in July 1996 and contains five
separate staff reports dated July 24, 1996, one for each proposed project, as well as
an overview report.
City Council Information Binder. Distributed in November 1996 and contains: a staff
report prepared for the November 25, 1996 joint study session; Planning Commission
staff report dated October 30, 1996; ARB staff reports dated September 12 and
October 16, 1996; minutes of all Planning Commission and ARB meetings held for
these projects; and minutes of two public meetings held on these projects in the City
of Menlo Park.
Environmental Impact Report. The Draft EIR consisted of Volumes 1 through 5 and
was provided in June 1996. The Final EIR consists of Volumes 1 through 8; Volumes
6 through 8 were provided on January 10, 1997.
Video Simulation.
City Council Staff Report Binder containing CMR:126:97. Distributed for the
January 27, 1997 Council meeting and containing the staff report on the Sand Hill
projects and recommended resolutions and findings.
A February 26, 1997 staff report (CMR:152:97), "Stanford Sand Hill Corridor
Projects -- Stanford University’s January 27, 1997 Letter to City Council."
STEPS FOLLOWING APPROVAIJ
The resolution certifying the EIR and all actions taken within that resolution will be
effective upon adoption of the resolution. Other resolutions and ordinances will be
effective upon the thirty-first day after adoption, but shall be suspended and
inoperative unless and until the Ordinance Adopting the Development Agreement
(Attachment E) has been approved by the Council and, if submitted to a referendum
CMR:301:97 Page 16 of 21
by the Council on its own motion, or by a certified sufficient petition of the electorate,
pursuant to Article IV, section 3 of the Charter, until approved by the voters.
Actions taken by the Council in approving the Sand Hill Corridor projects, other than
those approved by resolution or ordinance, shall be effective upon the date of each
action taken by vote of the Council, but shall be suspended and inoperative unless and
until the Ordinance Adopting the Development Agreement (Attachment E) has been
approved by the City Council and, if submitted to a referendum by the City Council
on its own motion or by a certified sufficient petition of the electorate, pursuant to
Article VI, section 3 of the Charter, until approved by the voters.
Should the. Council certify the EIR and approve any or all of the proposed projects,
within five days after second reading of ordinances, staff will file a Notice of
Determination (NOD) indicating such approvals with the Santa Clara County Clerk
and the State Office of Planning and Research. The NOD must be posted within 24
hours of receipt in the County Clerk’s office. The filing and posting of the NOD start
a 30-day statute of limitations on court challenges to the approval under CEQA.
A Final Subdivision Map must be submitted by Stanford and, if in conformance with
the Tentative Map, approved by the Council. Typically, at this time maintenance and
other agreements related to the improvement plans would be executed.
Annexation procedures for the Pasteur Parcel and the small rights-of-way areas
associated with the Road Improvements project will be initiated by the City.
The applicant must submit fmal design and landscape plans for Architectural Review
Board Approval. These plans, plus all conditions and mitigations noted as such in the
Mitigation and Condition Monitoring Plan, must be approved and signed off prior to
the issuance of any building permits for the projects.
ATTACHMENTS/EXHIBITS
2.
3.
4.
o
Stanford Sand Hill Corridor Projects EIR -- Summary of Current Projects Revisions
Resolution of Certification, with Exhibits
Exhibit A: Mitigation and Condition Monitoring Program
Exhibit B: Stanford West Apartment Project -- Findings Re: Changes and Mitigation
Measures Adopted to Reduce Impacts and Alternatives to the Project
Exhibit C: Stanford West Senior Housing Project -- Findings Re: Changes and
Mitigation Measures Adopted to Reduce Impacts and.Alternatives to the Project
Exhibit D: Shopping Center Expansion -- Findings Re: Changes and Mitigation
Measures Adopted to Reduce Impacts and Alternatives to the Project
CMR:301:97 Page 17 of 21
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
A.
B.
C.
D.
E.
F.
Exhibit E: Sand Hill Extension and Widening and Related Roadways Improvements--
Findings Re: Changes and Mitigation Measures Adopted to Reduce Impacts and
Alternatives to the Project
Exhibit F: Annexations -- Findings Re: Changes and Mitigation Measures Adopted
to Reduce Impacts and Alternatives to the Project
Exhibit G: Stanford West Apartment Project -- Statement of Overriding Conditions
Exhibit H: Stanford West Senior Housing -- Statement of Overriding Conditions
Exhibit I: Stanford Shopping Center Expansion -- Statement of Overriding Conditions
Exhibit J: Sand Hill Extension and Widening and Related Roadway Improvements --
Statement of Overriding Conditions
Resolution, Comprehensive Plan Amendment for Apartment Housing Project
Resolution, Comprehensive Plan Amendment to Definition of Steamside Open Space
Land Use Designation
Resolution, Comprehensive Plan Amendments for Road Improvements Projects
Findings, Stanford West Apartment Housing Project
Conditions of Approval, Stanford West Apartment Housing Project
Resolution, Comprehensive Plan Amendment for Senior Housing Project
Ordinance, Planned Community Zone Map Amendment for Senior Housing Project
Conditions of Approval, Planned Community Zone Map Amendment for Senior
Housing Project
F.indings, Planned Community Zone Map Amendment for Senior Housing Project
Ordinance, RM-30 to PF Amendment for Senior Housing Project
Ordinance, Amendment of Site Development Regulations for Stanford Shopping
Center Expansion Project
Ordinance, Zone Map Amendment for Stanford Shopping Center Expansion Project
Findings, Architectural Review of Stanford Shopping Center Expansion Project
Conditions of Approval, Architectural Review of Stanford Shopping Center
Expansion Project
Resolution, Comprehensive Plan Amendments for Road Improvements Project
Ordinance, Amendment of Special Setback Map
Findings, Architectural Review of Sand Hill Road Extension and Related Roadway
Improvements
Conditions of Approval, Architectural Review of Sand Hill Road Extension and
Related Roadway Improvements
Ordinance, Prezoning for Pasteur Parcel to RM-40
Ordinance, Zone Map Amendment for Pasteur Parcel, PF(L) to RM-40
Findings, Tentative Subdivision Map
Conditions of Approval, Tentative Subdivision Map
Letter from Palo Alto Historical Association
Ordinance, Adoption of Development Agreement
Development Agreement
CMR:301:97 Page 18 of 21
PREPARED BY:Kenneth R. Schreiber, Director of Planning
Environment
Susan Case, Senior.Assistant City Attorney
Steven Reiner, Contract Planner
and Community
DEPARTMENT HEAD REVIEW:
KENNETH R. SCHREIBER
Director of Planning and
Community Environment
CITY MANAGER APPROVAL:
City Manager
cc (w/attach):
cc (w/o attach):
Planning Commission
Architectural Review Board
City of Menlo Park (Jan Dolan, Don de la Pefia, Don Dey)
Stanford Management Company (Curtis Feeny, Bill Phillips, Diane Healey)
Stanford University (Larry Horton, Andy Coe, David Neuman)
Santa Clara County Planning (Leode Franklin)
City of Palo Alto Libraries
City of Menlo Park Library
San Mateo County Planning
Santa Clara Valley Transportation Authority
Town of Portola Valley
Bay Area Action
Citizens for Extension of Sand Hill Road
Greenmeadow Community Association
Lincoln Green Homeowners Association
Santa Clara County Housing Action Coalition
Sierra Club, Loma Prieta Chapter
CMR:301:97 Page 19 of 21
Stanford Arboretum Children’s Center
Tri-County Apartment Association
Crescent Park Neighborhood Association
Downtown North Neighborhood Association
Palo Alto Condominium Owners’ Association
Stanford Campus Residential Leaseholders
University Park Association
University South Neighborhoods Group
American Association of University Women
Committee for Green Foothills
League of Women Voters of Palo Alto
League of Women Voters - South San Mateo County
Peninsula Conservation Center
Palo Alto Board of Realtors
Palo Alto Chamber of Commerce
1100 Sharon Park Drive Homeowners Association
451 Oak Grove Homeowners Association
Belle Haven Against Drugs
Burgess Drive Homeowners Association
Campo Bello Homeowners Association
Felton Gables Homeowners Association
Flood Triangle Homeowners Association
Heritage at Menlo Homeowners Association
Linfield Oaks Homeowners Association
Lorelei Homeowners Association
Menlo Commons Homeowners Association
Menlo Oaks Homeowners Association
Menlo Park Homeowners Association
Menlo Towers Homeowners Association
Neighbors of St. Patrick’s
Park Forest Three Homeowners Association
Park Forest Two Homeowners Association
Park Manor Homeowners Association
POLBH
Rose Paraiso Manor Homeowners Association
Sand Hill Circle Association
Sand Hill Circle Townhouse Association
Santa Rita Homeowners Association
Sharon Heights Homeowners Association
Sharon Oaks Homeowners Associaiton
Stanford Hills Homeowners Association
CMR:301:97 Page 20 of 21
Suburban Park Homeowners Association
Willow West Homeowners Association
Menlo Park Chamber of Commerce
Joan Reinhart
Nancy Lytle
Holiday Inn (Clement Chen& AsSociates)
Palo Alto Chapter, American Red Cross
MacArthur Park
Peninsula Corridor Joint Powers Board
CMR:301:97 Page 21 of 21