Loading...
HomeMy WebLinkAbout2024-10-21 City Council Agenda PacketCITY COUNCIL Regular Meeting Monday, October 21, 2024 CITY O F Council Chambers & Hybrid PALO 5:30 PM ALTO Palo Alto City Council meetings will be held as "hybrid" meetings with the option to attend by teleconference or in person. Information on how the public may observe and participate in the meeting is located at the end of the agenda. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media Center https://midpenmedia.org. VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone: 1(669)900-6833 PUBLIC COMMENTS General Public Comment for items not on the agenda will be accepted in person for up to three minutes or an amount of time determined by the Chair. General public comment will be heard for 30 minutes. Additional public comments, if any, will be heard at the end of the agenda. Public comments for agendized items will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. Requests to speak will be taken until 5 minutes after the staff's presentation or as determined by the Chair. Written public comments can be submitted in advance to city.council@CityofPaloAlto.org and will be provided to the Council and available for inspection on the City's website. Please clearly indicate which agenda item you are referencing in your subject line. PowerPoints, videos, or other media to be presented during public comment are accepted only by email to city.clerk@CityofPaloAlto.org at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB's or other physical electronic storage devices are not accepted. Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks, posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do not create a facility, fire, or safety hazard; and (3) persons with such items remain seated when displaying them and must not raise the items above shoulder level, obstruct the view or passage of other attendees, or otherwise disturb the business of the meeting. TIME ESTIMATES Listed times are estimates only and are subiect to change at any time. including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public. October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. CALL TO ORDER SPECIAL ORDERS OF THE DAY (5:30 - 5:50 PM) Review List of Applicants and Select Candidates to Interview for the Parks and Recreation Commission Vacancy. CEQA Status — Not a project. 2. Resolution in Support of the Child Care Program: Build the Future Santa Clara County AGENDA CHANGES, ADDITIONS AND DELETIONS PUBLIC COMMENT (5:50 - 6:20 PM) Members of the public may speak in -person ONLY to any item NOT on the agenda. 1-3 minutes deepnding on # of speakers. Public Comment is limited to 30 minutea. Additional public comments, if any, will be heard at the end of the agenda. COUNCIL MEMBER QUESTIONS. COMMENTS. ANNOUNCEMENTS (6:20 - 6:25 PM) Members of the public may not speak to the item(s). CONSENT CALENDAR (6:25 - 6:30 PM) Items will be voted in one motion unless removed from the calendar by three Council Members. 3. Approval of Minutes from September 30, 2024 and October 7, 2024 Meetings 4. Approval of FY 2024 Reappropriation Requests to FY 2025; CEQA Status: Not a Project 5. Approval of Purchase Order with Anixter, Inc. for the Purchase of Fiber Materials Not -to - Exceed $348,003; and Authorization to Execute Changes Not -to -Exceed $30,000 for Related, for a Total Not -to -Exceed Amount of $378,003 for Fiscal Year 2025; CEQA Status — Council action on this item is within the scope of the Final Initial Study and Mitigated Negative Declaration (IS/MND) was adopted by Council Resolution on June 17, 2024 6. Approval of Contract Amendment Number 2 to Contract Number C19173035 with Team Sheeper, Inc., for a five-year Operating and Revenue Sharing Agreement for operations of Rinconada Pool, with an option to renew for an additional five years, effective January 1, 2025; CEQA status —not a project. 7. Approval of Contract Amendment Number 1 to Contract Number S25190354 with Larratt Bros Plumbing Inc. in the Amount of $410,000 for the Residential Emergency Water Heater Replacement Pilot Program Within Electrification Programs; CEQA Status — Not a Project. 8. Approval of Contract Amendment No. 3 to Contract No. S18171325 with ESO Solutions for a 5 -Year Extension, Increasing the Total Not -to -Exceed (NTE) Amount by $150,007 to $277,155 for the Fire Department's Records Management System (RMS) and Electronic October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. Patient Care Reporting (ePCR) Software; CEQA Status: Not a Project 9. Adoption of a Resolution Authorizing Grant Applications to the California Department of Resources Recycling and Recovery (CalRecycle); CEQA status — not a project. 10. Approval of 1) Increase of Construction Contingency for Contract No. C21178123B with Swinerton Builders in the Amount Not -to -Exceed $1,000,000; 2) Increase of Construction Contingency for Contract No. C23186775 with L.D. Strobel Co., Inc. in the Amount of $25,000; 3) Increase of Contingency for Purchase Order No. 4523000432 with Pivot Interiors in the Amount of $40,000 in the Capital Improvement Fund for the New Public Safety Building Capital Project (PE -15001); CEQA — Environmental Impact Report for the New Public Safety Building and New California Avenue Area Garage (Resolution 9772) 11. SECOND READING: Adoption of an Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) to Conform with County Amendments and Approval of the Updated Agreement Between the County of Santa Clara and City of Palo Alto for a Tobacco Retail Permit Program (FIRST READING: September 23, 2024 PASSED 7-0) 12. SECOND READING: Adopt an Ordinance Adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 in the Palo Alto Municipal Code as well as Amendments to the Zoning District Map, and Rezoning of Parcels Within the NVCAP area (FIRST READING: September 23, 2024 PASSED 6-1 Kou no; PREVIOUSLY INTRODUCED: August 5, 2024 PASSED 6-1, Kou no) CITY MANAGER COMMENTS (6:30 - 6:45 PM) BREAK (15 MINUTES) ACTION ITEMS (ITEM 13: 7:00 - 8:30 PM. ITEM 14: 8:30 - 9:30 PM. ITEM 15: 9:30 - 10:30 PM) Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters. 13. Approval of FY 2025 Architectural Review Board, Historic Resources Board, Human Relations Commission, and Planning and Transportation Commission Workplans; CEQA status — not a project 14. Adoption of City Council Positions on State and Local Measures Presented to Palo Alto Voters on the November 5, 2024 Ballot; CEQA status — not a project 15. Colleagues Memo - Restoration of subjective aesthetic standards to Palo Alto's Wireless Communication Facilities (WCF) ordinance. October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. ADJOURNMENT INFORMATION REPORTS Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting's agenda. 16. Informational Report on the Annual Review of the City's Renewable Procurement Plan, Renewable Portfolio Standard Compliance, and Carbon Neutral Electric Supplies for 2023; CEQA Status — Not a Project 17. City of Palo Alto Monthly Investment Activity Report for September 2024 (Unaudited) OTHER INFORMATION Standing Committee Meetings this week Public Comment Letters Schedule of Meetings October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. PUBLIC COMMENT INSTRUCTIONS Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone. 1. Written public comments may be submitted by email to city.council@cityofpaloalto.org. 2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item. 3. Spoken public comments for agendized items using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom -based meeting. Please read the following instructions carefully. o You may download the Zoom client or connect to the meeting in- browser. If using your browser, make sure you are using a current, up-to-date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below. o You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak. o When you wish to speak on an Agenda Item, click on "raise hand." The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak. o When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments. 4. Spoken public comments for agendized items using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted. CLICK HERE TO JOIN Meeting ID: 362-027-238 Phone: 1-669-900-6833 Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City's ADA Coordinator at (650) 329-2550 (voice) or by emailing ada@cityofpaloalto.org. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service. October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. California Government Code §84308, commonly referred to as the "Levine Act," prohibits an elected official of a local government agency from participating in a proceeding involving a license, permit, or other entitlement for use if the official received a campaign contribution exceeding $250 from a party or participant, including their agents, to the proceeding within the last 12 months. A "license, permit, or other entitlement for use" includes most land use and planning approvals and the approval of contracts that are not subject to lowest responsible bid procedures. A "party" is a person who files an application for, or is the subject of, a proceeding involving a license, permit, or other entitlement for use. A "participant" is a person who actively supports or opposes a particular decision in a proceeding involving a license, permit, or other entitlement for use, and has a financial interest in the decision. The Levine Act incorporates the definition of "financial interest" in the Political Reform Act, which encompasses interests in business entities, real property, sources of income, sources of gifts, and personal finances that may be affected by the Council's actions. If you qualify as a "party" or "participant" to a proceeding, and you have made a campaign contribution to a Council Member exceeding $250 made within the last 12 months, you must disclose the campaign contribution before making your comments. October 21, 2024 Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas. Item 1 Item 1 Staff Report City Council Staff Report Report Type: SPECIAL ORDERS OF THE DAY CITY O F Lead Department: City Clerk PALO ALTO Meeting Date: October 21, 2024 Report #:2409-3459 TITLE Review List of Applicants and Select Candidates to Interview for the Parks and Recreation Commission Vacancy. CEQA Status — Not a project. RECOMMENDATION Review a list of applicants and select candidates to interview for the vacancy on the Parks and Recreation Commission. BACKGROUND The Parks and Recreation Commission has one (1) vacancy for a partial term expiring on March 31, 2026. The Special Recruitment was initiated due to a commissioner resigning before their term expired. The City Clerk's office was formally notified of the leave on September 2, 2024, and a special recruitment began on September 5, 2024. The recruitment closed on October 6, 2024, and staff received a total of 6 applications during the recruitment period. • Vadim Axelrod • Christopher Alan Brosnan • Yu Deng • James Fox • Marc Schoenen • Rebecca Shomair At the February 26, 2024 meeting, the City Council set a process to select Boards and Commission candidates to interview. The direction provided was to allow each Council Member a limited number of votes (number of vacancies plus 50%, round up) to select their preferred candidates to interview with a threshold of 2 votes needed for an interview. The Parks and Recreation Commission has 1 vacancy, in alignment with the direction set in February, each Council Member has 2 votes. It is at the discretion of the City Council to determine how to proceed with the selection of candidates to interview for the Special Parks and Recreation Commission Recruitment. Item 1: Staff Report Pg. 1 Packet Pg. 7 of 377 Item 1 Item 1 Staff Report The City Council is tentatively scheduled to interview the selected applicants at the October 28 meeting and make its appointment at the November 4, 2024 meeting. MEMBERSHIP REQUIREMENTS According to Palo Alto Municode (PAMC 2.25.010), members of the commission shall have demonstrated interest in parks, open space, and recreation matters. Members of the commission shall at all times be residents of Palo Alto. FISCAL/RESOURCE IMPACT There is no Fiscal/Resource Impact. STAKEHOLDER ENGAGEMENT City staff publicized the recruitment through its Uplift and City Clerk's Office newsletters and the City's social media forums. The recruitment was also advertised in print and online in Palo Alto's local newspapers. ENVIRONMENTAL REVIEW Council action on this item is not a project as defined by CEQA because it an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. CEQA Guidelines section 15378(b)(5). ATTACHMENTS Attachment A: Parks and Recreations Commission Applications Redacted APPROVED BY: Mahealani Ah Yun Item 1: Staff Report Pg. 2 Packet Pg. 8 of 377 Submitted on Receipt number Related form version I Personal Information 21 September 2024, 9:10pm 74 10 Name Vadim Axelrod Cell Phone Number Home Phone Number Email Address Are you a Palo Alto resident? Yes Address City Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices Yes California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse Yes own real property in Palo Alto? How did you learn about the vacancy on the Parks and Email from the City Recreation Commission? 1 of 3 Item 1: Staff Report Pg. 3 Packet Pg. 9 of 377 Item 1 Attachment A - Redacted PRC Applications Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation I give permission for the City of Palo Alto to post to the City's website the attached Board and Commission Application intact. I have read and understand my rights under Government Code Section 6254.21. I may revoke this permission at any time by providing written notice to the Palo Alto City Clerk. Startup founder Please list your relevant education, training, experience, Youth sports coach (soccer, softball), AYSO certified certificates of training, licenses, and professional registration. Parks & Rec Commission, city of Rye Brook, NY (3 years) If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I Application Questions 1. Why are you interested in serving on the Parks & Recreation Commission and what experience would you bring to the position? 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks. Trails. Natural Open Spaces. & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element & Natural Environment Element Baylands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) San Carlos Economic Development Advisory Commission (2 years) Pluggedln volunteer (tech training for disadvantaged youth) Stanford Peninsula Alumni Board (10 years) I love the green spaces in Palo Alto and use them frequently, seeing the various activities there: * Youth sports (organized and pickup) * Adult sports (I'm active in Ultimate Frisbee) * Children's playgrounds (3 kids) Dog use (I have a 7 -year -old cockapoo) Bicycling (I ride most everywhere with kids) Nature exploration (avid hiker and birdwatcher) I served on Parks & Rec in Rye Brook, NY and affected projects such as playground renewals, pickleball court introductions, DFIB installations and maintenance improvements. I'd love to bring my experience from Parks & Rec, personal involvement and knowledge of Palo Alto having first moved here in 1991 to the city! Grass vs Artificial Turf mandates. I feel that there is need for both but the balance should be in favor of grass given the California climate and environmental impacts of turf. I believe that Palo Alto has some excellent facilities and want to make sure there is safe and convenient access to them for pedestrians and bicycles (path and signage improvements, safe crossing, bike parking, etc.). In the past, I've read portions of the Bicycle Pedestrian Plan and the Cubberley Report. 2 of 3 Item 1: Staff Report Pg. 4 Packet Pg. 10 of 377 Youth Master Plan (2003) Cubberley Community Advisory Committee Report (2013) Concordia Master Plan (2019) If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook Signature Date Completed Item 1 Attachment A - Redacted PRC Applications Yes Name of signatory: Vadim Axelrod Link to signature 09/21/2024 3 of 3 Item 1: Staff Report Pg. 5 Packet Pg. 11 of 377 Submitted on Receipt number Related form version I Personal Information 20 September 2024, 8:32pm 73 10 Name Christopher Alan Brosnan Cell Phone Number Home Phone Number Email Address Are you a Palo Alto resident? Yes Address City Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices No California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse No own real property in Palo Alto? How did you learn about the vacancy on the Parks and Email from the City Recreation Commission? 1 of 3 Item 1: Staff Report Pg. 6 Packet Pg. 12 of 377 Item 1 Attachment A - Redacted PRC Applications Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation Please list your relevant education, training, experience, certificates of training, licenses, and professional registration. If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I Application Questions I request that the City of Palo Alto redact my home address, phone numbers, and email address from the attached Board and Commission Application prior to posting to the City's website. Driver I was a CYSA soccer referee, mainly in Palo Alto, for over five years I have coached basketball at Gunn High School for ten seasons now I lifeguarded and taught swim lessons for the city for eight years I've been volunteering at the Palo Alto Pollinator Garden for three years now I help maintain the native plant garden at Mitchell Park Library I serve on the landscape committee for the Greenhouse condominiums in Palo Alto 1. Why are you interested in serving on the Parks & Recreation I am an avid gardener and hiker. I have lived in Palo Alto for over 30 Commission and what experience would you bring to the years. I know every park and trail in this amazing town. My knowledge position? and vigour for people and plants would be an incredible asset to the commission. I have a lot of experience working with youths. 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks. Trails. Natural Open Spaces. & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element & Natural Environment Element Baylands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) Youth Master Plan (2003) Cubberley Community Advisory Committee Report (2013) Concordia Master Plan (2019) If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook. Drawing pickleball lines at Fletcher Middle School is important to me because I live nearby and I love playing pickleball Mitchell Park needs more trees. I know which trees to plant and where for maximum benefit I do not have eperience with these documents, but I am very good with computers and my reading comprehension is spectacular. Yes 2 of 3 Item 1: Staff Report Pg. 7 Packet Pg. 13 of 377 Item 1 Attachment A - Redacted PRC Applications Signature Name of signatory: Chris Brosnan Link to signature Date Completed 09/20/2024 3 of 3 Item 1: Staff Report Pg. 8 Packet Pg. 14 of 377 Submitted on Receipt number Related form version I Personal Information 7 October 2024, 12:26am 80 10 Name Yu Deng Cell Phone Number Home Phone Number Email Address Are you a Palo Alto resident? Address Yes City _ Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices No California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse No own real property in Palo Alto? How did you learn about the vacancy on the Parks and Community Group Recreation Commission? Email from the City 1 of 4 Item 1: Staff Report Pg. 9 Packet Pg. 15 of 377 Item 1 Attachment A - Redacted City Website PRC Applications I Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation Please list your relevant education, training, experience, certificates of training, licenses, and professional registration. If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I Application Questions 1. Why are you interested in serving on the Parks & Recreation Commission and what experience would you bring to the position? I request that the City of Palo Alto redact my home address, phone numbers, and email address from the attached Board and Commission Application prior to posting to the City's website. Investor Relations Education: 1. Master of Science (MS), Economics, Finance, and Management University of Bristol 2007 - 2008 2. Bachelor of Business Administration (BBA), ACCA Shanghai Jiao Tong University 2002 - 2006 3. Certificate in Foods, Nutrition, and Health UW Professional & Continuing Education 2014-2015 Work Experience: 1. Investor Relations Director @ Ark7 Inc 2021 — Present Part-time role managing investor relations for a fractional real estate investment platform. 2. Owner and Lead Instructor @ FIT4MOM 2012 - 2018 Managed and led fitness classes, including pre- and post -natal workouts, promoting community health and wellness in Bellevue, Washington. 1. PTA President — Ohlone Elementary School 2024 - 2025 I currently serve as the PTA President at Ohlone Elementary School, leading efforts to foster strong school -community relations and coordinating activities that support both students and faculty. My role involves organizing events, managing committees, and serving as a key liaison between parents, staff, and the school administration. 2. Partnership Lead — 8by8 2021 - 2023 I have focused on civil rights and social action, building partnerships with organizations to advocate for social justice causes. 3. Parks and Community Services Board Member — City of Bellevue, WA 2016-2018 I collaborated with city officials to improve community parks and recreational services. I played a role in policy discussions, long-term planning, and community engagement, ensuring that public spaces met the needs of Bellevue residents. I am passionate about enhancing community well-being by creating vibrant public spaces where individuals and families can connect, be active, and enjoy nature. Serving on the Palo Alto Parks & Recreation Commission would allow me to contribute to the development of parks and programs that foster community engagement. My experience as a Parks and Community Services Board Member in Bellevue, Washington has provided valuable insight into park planning and management, ensuring that spaces meet diverse community needs. As the PTA President at Ohlone Elementary School, I've developed strong leadership skills and successfully organized inclusive community events. With my background in community service, leadership, and public engagement, I am eager to support initiatives that promote outdoor play, 2 of 4 Item 1: Staff Report Pg. 10 Packet Pg. 16 of 377 Item 1 Attachment A - Redacted youth programs, and wellness for P PRC Applications erience will allow me to make a meaningful contribution to me ar s Recreation Commission. 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center. 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks Trails Natural Open Spaces & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element & Natural Environment Element Bavlands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) Youth Master Plan (2003) Cubberley Community Advisory Committee Report (2013) Concordia Master Plan (2019) If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook Signature A recent issue that came before the Palo Alto Parks & Recreation Commission, which is of particular interest to me, is the ongoing discussion regarding the lack of a city -owned indoor gym. This is a significant concern, as access to year-round indoor recreational facilities is essential for promoting physical activity, especially during colder months. Palo Alto residents are currently debating between two potential locations: Greer Park and the Cubberley Community Center. I am particularly interested in this issue because it directly impacts the well-being of families and youth in our community. An indoor gym would provide opportunities for sports programs, fitness classes, and recreational activities that bring residents together. Both locations offer unique benefits —Greer Park has ample space, while Cubberley has existing infrastructure for community use. I am eager to see how the Commission balances these factors to determine the best solution for residents. I'd like to focus on how Palo Alto's parks and recreational spaces can adapt to the state mandate to accommodate 6,000 new housing units, with 40% designated for low-income residents. This poses both challenges and opportunities to ensure that existing and new parks are accessible and equipped to serve a growing, diverse population. One key goal is to ensure that green spaces and recreational facilities expand with housing development, particularly in areas where density will increase. This includes identifying available land and collaborating with city planners, builders, and community members to incorporate parks and recreational amenities into housing plans. I would also advocate for innovative solutions, such as multi -use facilities, to maximize space in urban areas. By leveraging my experience in community engagement and public service, I would work to gather feedback from residents and stakeholders to ensure that parks continue to meet the evolving needs of our growing community. The Parks, Trails, Natural Open Space, and Recreation Master Plan for Palo Alto outlines a vision for the city's parks and recreation system over the next 20 years. It focuses on community engagement, guiding principles, and goals to enhance existing facilities while addressing future needs. The plan includes policies, projects, and recommendations for capital improvements and prioritizes investments in recreation, programming, and environmental maintenance. Yes Name of signatory: Yu Deng 3 of 4 Item 1: Staff Report Pg. 11 Packet Pg. 17 of 377 Item 1 Attachment A - Redacted PRC Applications Link to signature Date Completed 10/05/2024 4 of 4 Item 1: Staff Report Pg. 12 Packet Pg. 18 of 377 Submitted on Receipt number Related form version I Personal Information 30 September 2024, 10:56pm 78 10 Name James Fox Cell Phone Number Home Phone Number Email Address Are you a Palo Alto resident? Address Yes City _ Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices No California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse No own real property in Palo Alto? How did you learn about the vacancy on the Parks and Other: David Moss, past member of the Board, told me about it and Recreation Commission? suggested I apply. 1 of 4 Item 1: Staff Report Pg. 13 Packet Pg. 19 of 377 Item 1 Attachment A - Redacted PRC Applications Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation Please list your relevant education, training, experience, certificates of training, licenses, and professional registration. If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I Application Questions 1. Why are you interested in serving on the Parks & Recreation Commission and what experience would you bring to the position? I request that the City of Palo Alto redact my home address, phone numbers, and email address from the attached Board and Commission Application prior to posting to the City's website. patent attorney I am an attorney licensed to practice law in California, and before the US Patent and Trademark Office (graduate of Santa Clara University Law School). I work in-house at a Bay Area pharmaceutical company (Corcept Therapeutics). I have a Ph.D. in Neuroscience from UCLA, and performed research at UCLA, UCSF, and at a local biotech company prior to going to law school and beginning to practice law. I also worked at a scientific instrumentation company (providing instruments and software for biophysical research) prior to and during law school. In my work, I have co-ordinated teams made up of people with different skills and functions to develop, manufacture, and sell new products; I believe that such experience working with teams on multi -year projects should be applicable to the work of the Parks & Recreation Commission as well. I live, work, and play in Palo Alto. I served on the Gunn Foundation Board (2006-2012, 3 years chair) - which provides college scholarships to Gunn High graduates with financial need. I was a community member (2008 - 2009) for the accreditation of Gunn High by the Western Association of Schools and Colleges. I participated (2018-2019) in community meetings (organized by Concordia Group) discussing plans for the Cubberly site. As a member of the Housing Impact Team at my synagogue, I helped us obtain a permit so unhoused car -dwellers could park in our parking lot at night. I am an avid tennis player. as a USTA player and team captain or co - captain, I was pleased to be able to reserve courts throughout the city for USTA matches. I am a constant bike rider and bike commuter, and take advantage of Palo Alto's bike boulevards to work and to and from our many parks (including occasionally biking to the Arastradero Preserve or Foothills Park, as well as to Mitchell, Peers, and others). I value participation in my community, and I enjoy the parks and recreational activities made available by the City. I believe that providing spaces and recreational activities enrich our community, and bring people together in positive ways - and I would like to help maintain and expand such services. My experience as a user of our parks, open spaces, children's (e.g., Children's Theater) and recreational activities provides me with a "consumer" perspective regarding how this Commission's work is valued by the community. My work experience has given me some familiarity with budgets, long- term planning (and how plans need to include room for change and delays), and working with disparate groups having different and sometimes competing interests. I believe that these and other skills 2 of 4 Item 1: Staff Report Pg. 14 Packet Pg. 20 of 377 Item 1 Attachment A - Redacted should be useful in the work of the PRC Applications performing the work of the Board. 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center. 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks. Trails. Natural Open Spaces. & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element & Natural Environment Element Baylands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) Youth Master Plan (2003) Cubberley Community Advisory Committee Report (2013) Concordia Master Plan (2019) If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook Signature Most recently, the proposal to extend the Palo Alto Airport runway over the Duck Pond has garnered much attention; surprisingly, those who proposed it did not seem to know that the nature preserve was protected parkland, and would require a public vote to allow such an intrusion. I would like to help preserve our open spaces and land vital to the survival of native birds, animals, and plants. I believe that maintaining and expanding our parkland, providing space for ad hoc public use (e.g., picnics, frisbee golf, birthday parties) as well as for organized recreational activities and sports, and providing green and open space for all to enjoy is very important for our city. I am interested in the proper development of Cubberly; I support the work providing bathrooms to parks that do not yet have them; I support the upgrading of our children's play spaces for improved safety, access, and water conservation; I support our public gardens, and bikeways and pollinator pathways to our parks. I believe that we must reach a workable agreement with the School District and actually implement a plan for Cubberly to upgrade and refurbish the sports and recreational facilities - it is time to move forward there. I am interested in the plans to expand and upgrade the sports facility in the Baylands off Geng Road, while maintaining the integrity of the nature preserve and protecting wildlife there and in nearby Bixby Park, and protecting all of that from any detrimental work in the airport. I am interested in the additional land near Foothills Park and would be happy to develop some of it for recreational use (and to provide access to the present portions of the park) while preserving as much of its natural state as possible. As a camper at the Towle campground with our kids when they were small, I appreciate that use of Foothills Park and would support expansion of camping - possibly to the new area. I participated as a community member in the public meetings and discussions facilitated by Concordia that were the basis of the "Concordia Master Plan 2019"; I have reviewed the "Parks, Trails, Natural Open Spaced, & Recreational Master Plan (2017)"; I have reviewed the "Palo Alto Baylands Handbook" published by the League of Women Voters in 1975 (which I understand was quoted in the "Baylands Master Plan (2008)") which cites the 1965 Palo Alto initiative as requiring city land for parks and recreational facilities to be dedicated by ordinance, which would require a city referendum for the approval of any substantial building, construction, reconstruction, or development - which calls into question an extension of the airport runway over the Duck Pond - I believe the Parks & Recreation Commission has responsibility and should be involved in protecting our park and bay land from such encroachment. Yes Name of signatory: James Fox Link to signature 3 of 4 Item 1: Staff Report Pg. 15 Packet Pg. 21 of 377 Date Completed Item 1 Attachment A - Redacted PRC Applications 09/30/2024 Item 1: Staff Report Pg. 16 Packet Pg. 22 of 377 4 of 4 Submitted on Receipt number Related form version I Personal Information Name Cell Phone Number 15 September 2024, 6:35pm 72 10 Marc Schoenen Home Phone Number Email Address Are you a Palo Alto resident? Yes Address City Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices No California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse No own real property in Palo Alto? How did you learn about the vacancy on the Parks and Email from the City Recreation Commission? 1 of 4 Item 1: Staff Report Pg. 17 Packet Pg. 23 of 377 Item 1 Attachment A - Redacted PRC Applications Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation Please list your relevant education, training, experience, certificates of training, licenses, and professional registration. If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I give permission for the City of Palo Alto to post to the City's website the attached Board and Commission Application intact. I have read and understand my rights under Government Code Section 6254.21. I may revoke this permission at any time by providing written notice to the Palo Alto City Clerk. Human Resources, General Motors Master's of Business Administration - Harvard Bachelor of Arts, Dual Major: Economics and Business Administration, Franklin & Marshall College People's Playbook Podcast - Guest Interviewee - Subject "Setting Boundaries" Carta - Interviewed as a contributor / rewards leader on the topic of location -based pay for remote workers in the post-Covid pandemic workplace environment Member and Contributor - World at Work Member - Conference Board - Compensation Council Member - Conference Board - Executive Compensation Council Member - HR Policy Association (Work Experience) Former Director, Global Compensation - Google (Work Experience) Former Sr. Director, Global Compensation - Uber (Work Experience) Former Vice President, Total Rewards - Impossible Foods (Work Experience) Current - Director, Compensation, General Motors Patron/Contributor/Performer - Western Ballet Patron/Contributor - Palo Alto Children's Theatre Patron/Contributor - Palo Alto Players Patron/Contributor - iSing Patron/Contributor - Palo Alto City Library Coach - Palo Alto Little League (2011-2013) Lector/Eucharistic Minister - St. Thomas Aquinas Church Mentor - Harvard Business School - to multiple current students Former Volunteer - GlassDoor - Homeless Shelter when we lived in London (2015-2019) Contributor - Palo Alto Partners in Education 2 of 4 Item 1: Staff Report Pg. 18 Packet Pg. 24 of 377 Item 1 Attachment A - Redacted Contributor - Gunn Foundation PRC Applications Patron/Contributor/Volunteer - Greenmeadow Swim Association Patron/Contributor/Volunteer - Diabetes Youth Families (2019 -present) I Application Questions 1. Why are you interested in serving on the Parks & Recreation We first moved here in 2011; we have seen greatness across our Commission and what experience would you bring to the community: The creation of Magical Bridge playground, the reopening of position? Mitchell Park Library with Ada's Cafe; there is much reason for optimism. After a gorgeous Summer filled with the Chili Cook -Off, concerts and movies in our parks, how can one not be excited about the splendor of Palo Alto's myriad recreational opportunities! Concurrently, there are opportunities in advocating for access. COVID- 19 upset all of society with disproportionate impact on vulnerable populations. Additionally, the growing cacophony on climate change obligates the commission to consider ways to support our community to thrive long-term. We are involved in local theater, sports, and frequent many small businesses that help Palo Alto thrive. In my day job, I have worked in Human Resources for 15+ years; my experience allows me to understand challenges in optimizing resources and promoting fairness, inclusion and equity across populations. 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center. 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks Trails Natural Open Spaces & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element R Natural Environment Element Bavlands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) June's PRC heard a presentation on traffic gardens. This topic really hits home for me. Our older daughter was also a student at Gunn (now graduated - in college), who would frequently bike to and from school. It underscores the opportunities that our children face in "hoed' we provide rich experiences for them, even in something as mundane and routine as commuting to school. Additionally, it emphasizes the need to reconsider ways to provide experiential opportunities for Palo Alto's next generation of leaders. By listening and providing opportunities for the youth of Palo Alto to become more involved as citizen advocates, there is an amazing path for this recreational activity (biking!) to be promoted and shepherded in a community -inducing and safe manner. And not only to be implemented, but also to be maintained and to thrive, setting an example for other communities on bicycle safety, and integrating experience into a daily school commute. Two areas I'm most passionate about are Bicycle / E -bike policy and access and the Parks long-term plan. On the former, I would help ensure there is a holistic and understood view on which areas bikes can access, and how they are inclusive and safe for bikers and other travelers alike. As e -bikes are more prevalent throughout our community, it is important that a balance is made to ensure access, while ensuring the safety and access of others who may want to enjoy the same trails, etc. as e -bikers. On the Parks long term plan, I would humbly come in with the understanding the Parks and Recreation commission has spent many years successfully developing and crafting a long-term plan. I would want to become even more familiar with such, and help ensure that milestones and success metrics are clearly defined and delivered upon, through reporting, transparency, and conversation with all of the relevant stakeholders. I am excited and humbled to be considered for this role. My primary experience with the above is as a citizen and member of the community - whether as a parent (re: Youth Master Plan), a bicycle commuter (I bike to work, our two oldest children have biked to school), and a frequenter of events and sporting activities across Palo Alto's various parks. We are an "outside" family, so Parks and Recreation is a topic that is near and dear to our collective hearts. 3 of 4 Item 1: Staff Report Pg. 19 Packet Pg. 25 of 377 Youth Master Plan (2003) Cubberley Community Advisory Committee Report (2013) Concordia Master Plan (2019) If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook. Signature Date Completed Item 1 Attachment A - Redacted PRC Applications Yes Name of signatory: Marc R Schoenen 09/15/2024 4 of 4 Item 1: Staff Report Pg. 20 Packet Pg. 26 of 377 Submitted on Receipt number Related form version I Personal Information Name Cell Phone Number 6 October 2024, 5:24pm 77 10 Rebecca Shomair Home Phone Number Email Address Are you a Palo Alto resident? Yes Address _ City _ Postal Code Do you have any relatives or members of your household who No are employed by the City of Palo Alto, who are currently serving on the City Council, or who are Commissioners or Board Members? Are you available and committed to complete the term applied Yes for? Fair Political Practices No California state law requires board/commission members to file a disclosure of financial interests (Fair Political Practices Commission, Conflict of Interest. Form 700). Do you/your spouse have an investment in, or do you or your spouse serve as an officer or director of, a company doing business in Palo Alto which you believe is likely to: 1. Engage in business with the City; 2. Provide products or services for City projects; or 3. Be affected by decisions of this Board or Commission? Excluding your principal residence, do you or your spouse No own real property in Palo Alto? How did you learn about the vacancy on the Parks and Community Group Recreation Commission? Email from the City 1 of 4 Item 1: Staff Report Pg. 21 Packet Pg. 27 of 377 Item 1 Attachment A - Redacted Palo Alto Weekly PRC Applications I Consent to Publish Personal Information on the City of Palo Alto Website Read the code, and check only ONE option below: I Personal and Job Experience Occupation Please list your relevant education, training, experience, certificates of training, licenses, and professional registration. If describing work experience, please include company/employer name and occupation. Please describe your involvement in community activities, volunteer and civic organizations, including dates and any offices held. I Application Questions I request that the City of Palo Alto redact my home address, phone numbers, and email address from the attached Board and Commission Application prior to posting to the City's website. Marketing and Communications I have over 20 years of experience in high-tech marketing and communications. My expertise includes: • Translating complex technical and policy topics into easily understandable content • Public relations, social media, internal, crisis, and executive communications • Developing and implementing communication programs aligned with corporate goals and regulatory requirements Relevant work experience: • Cisco (Current): Head of Communications for Outshift, Cisco's internal incubator focused on creating what's next and new for the company • Dataiku (2021-2024): VP of Communications • Hitachi Vantara (2017-2021): Various senior communications roles • Pentaho (2010-2017): Led corporate communications, through acquisition by Hitachi I hold a BA in Journalism with minor in Business from Indiana University Bloomington (our sister city), providing a strong foundation for work in policy communication and public affairs. Born and raised in a small Georgia town, I learned early that community involvement is a way of life. These values led me to Greenmeadow in Palo Alto, where I've found numerous ways to contribute. They say if you want something done, give it to a busy person - that's me! My community involvement includes: • Greenmeadow community (2017 -present): o Annual 4th of July Parade and swim team volunteer o Lead organizer for holiday events (Halloween, winter celebrations) • Oshman Family JCC Board Member (2018 -present): o Co -Chair of Board Alumni Group (current) o Former Vice Chair of Executive Committee o Former Chair of Early Childhood Education Committee o Co-chair of annual benefit o Co-chair of multiple OFJCC Chai Giving Circles • Children's schools & activities: o Regular volunteer for school events o Palo Alto Soccer Club team parent These experiences have deepened my understanding of Palo Alto's community needs and recreational facilities. 1. Why are you interested in serving on the Parks & Recreation I recognize that the next few years are critical, especially with the Commission and what experience would you bring to the Cubberley project, and I hope to play a significant role in moving it 2 of 4 Item 1: Staff Report Pg. 22 Packet Pg. 28 of 377 position? 2. Please describe an issue that recently came before the Commission that is of particular interest to you and describe why you are interested in it. Archived video meetings are available from the Midpen Media Center. 3. If appointed, what specific goals would you like to see the Parks and Recreation Commission achieve, and how would you help in the process? 4. Parks and Recreation Commission Members work with the documents listed below. If you have experience with any of these documents, please describe that experience. Experience with these documents is not required for selection. Parks Trails Natural Open Spaces & Recreation Master Plan (2017) Palo Alto Comprehensive Plan (2017): Community Services and Facilities Element R Natural Environment Element Bavlands Master Plan (2008) Park Dedication Ordinance (Municipal Code) Bicycle - Pedestrian Transportation Plan (2012) Youth Master Plan (2003) Cubberlev Community Advisory Committee Report (2013) Concordia Master Plan (2019) Item 1 Attachment A - Redacted forward. My background in strategic PRC Applications a valuable in engaging the community and translating complex plans Into accessible information. As a frequent user of Palo Alto's parks and a parent, I have a personal stake in their development. My experience in tech could bring fresh perspectives on using data to improve park management and user experience. I'm excited about the opportunity to help shape our recreational spaces, ensuring they meet the diverse needs of our community while navigating challenges and opportunities for innovation. Palo Alto has truly become my home, and I'm committed to contributing in ways I know I can. I want to make it even better for all residents. I've long been interested in the ongoing discussion about Cubberley Community Center, and recent developments make it even more exciting. I've followed this issue, from attending community planning meetings with Concordia years ago to the landmark agreement just announced between the city and school district. This new deal, allowing the city to purchase 7 acres and redevelop the aging campus, is a significant step forward. The challenge now is developing a plan that balances preserving existing services with modernization and expansion, all while preparing for a crucial bond vote in November 2026. I'm particularly interested in how we can transform Cubberley into a multi -use space that fosters community connections while addressing needs like updated recreational facilities and flexible spaces for evolving programs. The decisions made will have long-lasting impacts on our city's social fabric and quality of life. If appointed, I would focus on three main goals with an approach that is both collaborative and community -focused. 1. Enhance community engagement: Leverage my communications expertise to increase awareness and participation in parks and recreation programs. I'd develop outreach strategies to ensure community members are informed and involved. 2. Explore Al opportunities: Utilize my tech background to investigate how Al could enhance our parks and recreation offerings. This could include Al -assisted program recommendations or improved data analysis for better decision -making, always ensuring alignment with city policies and privacy concerns. 3. Advance key projects: Prioritize moving forward on critical projects like Cubberley Community Center. I'd use my skills in facilitation, strategic communication, and policy development to help build consensus, navigate complex stakeholder landscapes, and maintain momentum on these important initiatives. To be upfront, I don't have direct experience with these specific documents. But as a communications professional who's tackled complex policies and technical content, I'm confident I can quickly become familiar with them. Throughout my career, I've excelled at taking dense technical information and making it accessible to diverse audiences. What sets me apart is my expertise in breaking down complex docs into various engaging formats - think social media posts, videos, e -books, and more. A valuable skill in helping the community better understand and engage with parks and recreation policies and plans. While I may not have hands-on experience with these exact documents, I'm an avid Palo Alto Weekly reader (home delivery subscriber) and have kept a close eye on park and recreation updates, opportunities, and issues. This has given me a solid grasp of how the work the Parks and Recreation Commission does and these documents impact our 3 of 4 Item 1: Staff Report Pg. 23 Packet Pg. 29 of 377 Item 1 Attachment A - Redacted community. PRC Applications If you'd like to provide any additional documents, please upload below. Please confirm that you have read the Boards and Commissions Handbook. View the Boards and Commissions Handbook. Signature Date Completed Yes Name of signatory: Rebecca Shomair Link to signature 10/06/2024 4 of 4 Item 1: Staff Report Pg. 24 Packet Pg. 30 of 377 Item 2 Item 2 Staff Report City Council Staff Report Report Type: SPECIAL ORDERS OF THE DAY CITY O F Lead Department: City Clerk PALO LTO Meeting Date: October 21, 2024 Report #:2409-3486 TITLE Resolution in Support of the Child Care Program: Build the Future Santa Clara County RECOMMENDATION On behalf of the Mayor, this resolution supporting the Build the Future Santa Clara County initiative is presented for consideration for a vote of approval. ATTACHMENTS Attachment A: Resolution in Support of Build the Future Santa Clara County APPROVED BY: Mahealani Ah Yun Item 2: Staff Report Pg. 1 Packet Pg. 31 of 377 I Item 2 Attachment A - Resolution in Support of Build the Future Santa Clara County IN SUPPORT OF BUILD THE FUTURE SANTA CLARA COUNTY WHEREAS, the Council for a Strong America issued a report in early 2023 which details that the shortage of infant -toddler child care costs the United States $122 billion in lost earnings, productivity, and revenue every year; and WHEREAS, this shortage translates to a $15 billion economic threat to California and a $3 billion threat to Santa Clara County; and WHEREAS, a family living in Palo Alto needs to pay an average of $38,400 per child year for infant care, $30,600 per year for one preschooler's child care; and $10,500 per year for one school age student's afterschool child care; and WHEREAS, the two most significant monthly expenses faced by working families are rent and child care; and WHEREAS, the lack of an affordable child care option leads to underemployment, greater housing instability, less consumer spending, depressed business productivity and the near impossibility of seeking, securing and maintaining employment; and WHEREAS, investing in affordable child care provides vital infrastructure to working parents and supports early childhood development, allows families to remain the Bay Area, creates a stronger economy, improves business productivity and consumer spending, decreases poverty, leads to safer communities, and provides additional revenue for cities; and WHEREAS, cities have a direct interest in building strong local economies, supporting and benefiting from local small businesses, attracting and retaining families and employers; and WHEREAS, one of the most impactful tools we can deploy to solve our greatest economic and societal challenges is investing in broadly accessible, high quality child care immediately; and WHEREAS, investments in the child care sector should prioritize supporting our most underserved children and their families, as demonstrated locally with the City's Child Care Subsidy Program; and WHEREAS, the City of Palo Alto has actively demonstrated the importance of Early Care and Education since the 1970's by commissioning and working on goals linked to a series of Child Care Master Plans, in addition to our support for ongoing work of the Palo Alto Early Care and Education Committee (PAACECE), the City's key arm to work on child care issues; and WHEREAS, the City of Palo Alto has long recognized the importance of early learning and education as articulated in the Comprehensive Plan 2030 Policy #'s T-2.5 and C-1.15; and O Item 2: Staff Report Pg. 2 7 O Item 2 OAttachment A - Resolution in Support of Build the Future Santa WHEREAS, the City of Palo Alto understands that the ability to afford quali cial need for its workforce and has implemented a program which assists regular em Clara County care expenses; and NOW, THEREFORE, BE IT RESOLVED that the City of Palo Alto continue to support efforts to provide access to high -quality child care to all children and families in Palo Alto; and be it further RESOLVED, that the City of Palo Alto will continue to empower City departments to, as applicable, promote child care businesses in the city and provide support for providers who desire to operate within the city; and RESOLVED, that the City of Palo Alto will continue to empower and promote the importance of child care businesses through the work of the PAACECE which advises the City on early care issues under the oversight of the Community Services Department and provides support for providers who desire to operate within this city; and RESOLVED, that the City of Palo Alto joins with Build the Future Santa Clara County through PAACECE in advocating for solutions to address our child care crisis, including but not limited to working with a diverse array of partners for the purpose of addressing this economic and social crisis. INTRODUCED AND PASSED: September 16, 2024 ATTEST: APPROVED: City Clerk Mayor APPROVED AS TO FORM: City Manager City Attorney O O Item 3 Item 3 Staff Report City Council Staff Report Report Type: CONSENT CALENDAR CITY O F Lead Department: City Clerk PALO a LTO Meeting Date: October 21, 2024 Report #:2410-3561 TITLE Approval of Minutes from September 30, 2024 and October 7, 2024 Meetings RECOMMENDATION That the minutes be reviewed and approved. ATTACHMENTS Attachment A: September 30, 2024 Draft Action Minutes Attachment B: October 7, 2024 Draft Action Minutes APPROVED BY: Mahealani Ah Yun Item 3: Staff Report Pg. 1 Packet Pg. 34 of 377 Item 3 Attachment A - September 30, 2024 Draft CITY COUNCIL "�. Action Minutes CITY Or PALO DRAFT ACTION MINUTES ALTO Special Meeting September 30, 2024 The City Council of the City of Palo Alto met on this date in the Council Chambers and by virtual teleconference at 5:30 P.M. Present In Person: Burt, Kou, Lauing, Lythcott-Haims, Stone, Tanaka, Veenker Present Remotely: Absent: Agenda Changes, Additions and Deletions Closed Session 1. PUBLIC EMPLOYEE PERFORMANCE EVALUATIONS Authority: Cal. Gov. Code section 54957(b); Title: City Manager and City Attorney 2. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Authority: Government Code Section 54956.8. Property: 4000 Middlefield Road, Palo Alto (Informally known as the Cubberley Site) Negotiating Party: Palo Alto Unified School District City Negotiators: (Ed Shikada, Kiely Nose, Kristen O'Kane, Lauren Lai) Subject of Negotiations: Purchase, Exchange, and/or Lease, Price and Terms of Payment 3. CONFERENCE WITH CITY ATTORNEY -POTENTIAL LITIGATION Subject: Potential litigation regarding refund of parking in -lieu fees paid by Hamilton Real, LLC in connection with development of 240-248 Hamilton Avenue, as set forth in letter dated May 15, 2024 from David Lanferman, Esq. Authority: Potential Exposure to Litigation Under Government Code Section 54956.9(d)(2) One Case, as Defendant MOTION: Council Member Lauing moved, seconded by Council Member Kou to go into Closed Session. MOTION PASSED: 7-0 Page 1 of 2 Item 3: Staff Report Pg. 2 Packet Pg. 35 of 377 Item 3 Attachment A - DRAFT ACTION MI N UT September 30, 2024 Draft Action Minutes Council went into Closed Session at 5:33 P.M. Council returned from Closed Session at 10:28 P.M. Mayor Stone announced no reportable action. Adjournment: The meeting was adjourned at 10:29 P.M. ATTEST: APPROVED: City Clerk Mayor NOTE: Action minutes are prepared in accordance with Palo Alto Municipal Code (PAMC) 2.04.160(a) and (b). Summary minutes (sense) are prepared in accordance with PAMC Section 2.04.160(c). Beginning in January 2018, in accordance with Ordinance No. 5423, the City Council found action minutes and the video/audio recordings of Council proceedings to be the official records of both Council and committee proceedings. These recordings are available on the City's website. Item 3: Staff Report Pg. 3 Page 2 of 2 Sp. City Council Meeting Draft Action Minutes: 09/30/2024 Packet Pg. 36 of 377 Item 3 ttachment B - October 7, 2024 Draft Action C CITY COUNCIL Minutes CITY Or PALO DRAFT ACTION MINUTES ALTO Regular Meeting October 7, 2024 The City Council of the City of Palo Alto met on this date in the Council Chambers and by virtual teleconference at 5:30 P.M. Present In Person Present Remotely: Absent: Special Orders of the Day Burt, Kou, Lythcott-Haims, Stone, Tanaka, Veenker Council Member Tanaka Arrived at 5:35 P.M. Lauing 1. Signing of a Fricndship City Agrccmcnt bctwccn thc City of Palo Alto and Narok, Kcnya in Celebration of Palo Alto's First Fricnd.-hip City Item Removed Off Agenda NO ACTION 2. Resolution Expressing Appreciation to Amy French Upon Her Retirement MOTION: Council Member Kou moved, seconded by Council Member Burt to approve resolution Expressing Appreciation to Amy French Upon Her Retirement. MOTION PASSED: 7-0 Closed Session 3. PUBLIC EMPLOYEE PERFORMANCE EVALUATION Authority: Cal. Gov. Code section 54957(b); Title: City Clerk 4. CONFERENCE WITH LABOR NEGOTIATORS Authority: Cal. Gov. Code section 54957.6; Agency representative: Dan Rich, MRG; Unrepresented Employees: City Attorney, City Clerk and City Manager Page 1 of 5 Item 3: Staff Report Pg. 4 Packet Pg. 37 of 377 Item 3 ttachment B - October 7, DRAFT ACTION MINUT N U T 2024 Draft Action Minutes inconsistent with theCit s zoning code and or Comprehensive Plon lond use designotions .which the appliconts hoveasserted the City connot disopprove—under Government Code 65589.5(d)(5) Authority RAtent+a1€xposure—t9 Litigation Under Government Code Section 54956.9(d)(2) 1O coses, s Defendont. Item Removed Off Agenda MOTION: Council Member Lythcott-Haims moved, seconded by Council Member Veenker to go into Closed Session. MOTION PASSED: 7-0 Council went into Closed Session at 5:42 P.M. Council returned from Closed Session at 8:35 P.M. Mayor Stone announced no reportable action. Agenda Changes, Additions and Deletions Public Comment Council Member Questions, Comments and Announcements Consent Calendar Council Member Tanaka registered a no vote on Agenda Item Numbers 8, 10, 15. MOTION: Council Member Lythcott-Haims moved, seconded by Council Member Veenker to approve Agenda Item Numbers 6-16. MOTION PASSED ITEMS 6-7, 9, 11-14, 16: 7-0 MOTION PASSED ITEMS 8, 10, 15: 6-1, Tanaka no Page 2 of 5 City Council Meeting Draft Action Minutes: 10/07/2024 Item 3: Staff Report Pg. 5 Packet Pg. 38 of 377 Item 3 ttachment B - October 7, DRAFT ACTION MINUT N U T 2024 Draft Action Minutes 6. Approval of Minutes from September 16, 2024 and September 23, 2024 Meetings 7. Approval of Dark Fiber License Agreement No. S24189080 with Adobe Creek Networks to Build and License Dark Fiber in the Foothills, and Approval of a Fiscal Year 2025 Budget Amendment in the Fiber Fund; CEQA Status — Exempt under CEQA Guidelines Section 15301 and 15303. 8. Adopt a Resolution Amending Rate Schedules G-1 (Residential Gas Service), G-2 (Residential Master -Metered and Commercial Gas Service), G-3 (Large Commercial Gas Service), and G-10 (Compressed Natural Gas Service) to Raise the Upper Limit on the Monthly Transportation Charge; CEQA Status: Exempt Under Public Resources Code 15273(a) 9. Authorize the City Manager or their Designee to Exercise the Option to Renew the Lease Between the City of Palo Alto and Steve Nash and Dennis Ryan for 4 Months at 975 Terra Bella Ave in Mountain View at a Monthly Rent of $35,587.95 for a Total Not -to -Exceed of $213,527.70 through February 28, 2025; Direct Staff to Explore Purchase of Property to Meet the Future Needs of Grid Modernization and Other Capital Projects; and Approval of an Amendment to Fiscal Year 2025 Budget Appropriation in the Electric Fund; CEQA Status — Categorically Exempt; Sec. 15301. 10. Approval of Two Purchase Orders, 4525000111 and S25192604 with ePlus Technology Inc. to procure Data Center Equipment and Implementation for Fiber -to -the -Premises for a Three -Year Term with an Amount Not -To -Exceed $543,134; CEQA Status — Mitigated Negative Declaration Approved June 2024. 11. Adoption of a Resolution to Authorize the Acceptance of Electronic Government Claims 12. Approval of Contract Amendment Number 1 to Contract Number S24191026 with the Palo Alto Chamber of Commerce to Increase the not -to -exceed Amount by $40,000 to Provide Support for the 3rdThursday California Avenue Events (to a new total NTE of $95,000); CEQA status - Not a Project 13. Adopt a Resolution to Amend Palo Alto's Baylands Priority Conservation Area to Conform to New Planning Criteria. CEQA: Not a 'Project' and is Exempt from CEQA Review. 14. Adopt a Resolution Approving a Local Hazard Mitigation Plan Volume I and II and Adopt the LHMP into the City's 2030 Comprehensive Plan Safety Element; CEQA status - Resolution 9720, no additional environmental review required. 15. Approval of Amendment via Change Order to Contract Number C22183580 with MP Nexlevel of California, Inc. in the Amount of $1,650,000 for the Fiber -to -the -Premise (FTTP) Pilot Project inclusive of $150,000 in contingency funding for a Revised Total Not - to -Exceed Amount of $11,347,390 From March 21, 2022 Through April 30, 2025; Authorize the City Manager to Execute Change Orders Not -to -Exceed $150,000 for FTTP ; Page 3 of 5 City Council Meeting Draft Action Minutes: 10/07/2024 Item 3: Staff Report Pg. 6 Packet Pg. 39 of 377 Item 3 ttachment B - October 7, DRAFT ACTION MI N UT 2024 Draft Action Minutes CEQA Status — Council action on this item is within the scope of the Final Initial Study and Mitigated Negative Declaration (IS/MND) for the Fiber -to -the -Premises Project, adopted on June 17, 2024. 16. Approve Task Order 4.28 Dispatch Center Assessment as Recommended by the Policy & Services Committee; Direct Additional Dispatch Center Work Discussed by Policy & Services Committee Members be Considered When Reviewing the Proposed FY25 Audit Plan; and Grant Authority to the City Manager to Execute any Necessary Privacy -Related Agreements to Implement this Audit; CEQA status — not a project. City Manager Comments Ed Shikada, City Manager Action Items 17. Approval of FY 2025 Parks and Recreation Commission and Public Art Commission Workplans; CEQA status — not a project MOTION: Council Member Veenker moved, seconded by Council Member Lythcott-Haims to approval the Parks and Recreation Commission Fiscal Year 2025 Workplan and the additional direction to: 1. Evaluate the middle school athletic programs and recommend approaches to align with the current program with universal access for students and State Law and evaluate outsourcing middle school athletics to local nonprofits. 2. Request staff agendize a study session on park dedication status and updates. MOTION PASSED: 7-0 MOTION: Council Member Burt moved, seconded by Mayor Stone to approval the Public Art Commission Fiscal Year 2025 Workplan and the additional direction to pursue a plan for extensive artistic activation of the Cubberley space in collaboration with the artists. MOTION PASSED: 7-0 Item 3: Staff Report Pg. 7 Page 4 of 5 City Council Meeting Draft Action Minutes: 10/07/2024 Packet Pg. 40 of 377 Item 3 ttachment B - October 7, DRAFT ACTION MI N UT 2024 Draft Action Minutes AA1. Authorize Execution of a Memorandum of Understanding with the Palo Alto Unified School District for the Purchase and Lease of Land at 4000 Middlefield Road, Informally Known as the Cubberley Site; CEQA Status— Not a Project MOTION: Council Member Burt moved, seconded by Mayor Stone to authorize the City Manager to execute a Memorandum of Understanding with the Palo Alto Unified School District (PAUSD or District) for the purchase and lease of land at 4000 Middlefield Road, informally known as the Cubberley site and direct staff and a Cubberley Ad Hoc Committee to proceed with next steps including but not limited to resumption of master planning for the Cubberley site and undertaking the development of formal agreements including a new lease agreement and a purchase and sale agreement. MOTION PASSED: 7-0 Adjournment: The meeting was adjourned in Honor of Roy Clay Sr. at 10:45 P.M. ATTEST: APPROVED: City Clerk Mayor NOTE: Action minutes are prepared in accordance with Palo Alto Municipal Code (PAMC) 2.04.160(a) and (b). Summary minutes (sense) are prepared in accordance with PAMC Section 2.04.160(c). Beginning in January 2018, in accordance with Ordinance No. 5423, the City Council found action minutes and the video/audio recordings of Council proceedings to be the official records of both Council and committee proceedings. These recordings are available on the City's website. Item 3: Staff Report Pg. 8 Page 5 of 5 City Council Meeting Draft Action Minutes: 10/07/2024 Packet Pg. 41 of 377 Item 4 Item 4 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Administrative Services Meeting Date: October 21, 2024 Report #:2405-3061 TITLE Approval of FY 2024 Reappropriation Requests to FY 2025; CEQA Status: Not a Project RECOMMENDATION Staff recommends that the City Council amend the Fiscal Year 2025 Budget Appropriation for various funds as identified in Attachment A, and various capital projects as identified in Attachment B and Attachment C (requires 2/3 approval). EXECUTIVE SUMMARY As a part of the fiscal year-end process, staff reviews the City's unencumbered and unspent appropriations of the fiscal year just ended (FY 2024), along with the City's spending plans. Encumbered amounts are contractual obligations (for example, commitments made through purchase orders), which are carried forward from one fiscal year to the next without the need for Council approval. Each year there are important projects that carry over or unable to encumber funds in the year that just ended. The reappropriation process allows staff to bring forward funding recommendations to City Council to continue these projects into the next fiscal year (FY 2025) without impacting funding programmed for services in FY 2025. In limited instances, staff recommends appropriation actions for the technical clean-up of projects in the current fiscal year. In FY 2025, staff is recommending to appropriate additional funding for the New Public Safety Building capital project (PE -15000) to adjust for higher than anticipated salary and benefits costs and fund the contractual construction costs through certificate of occupancy. Additionally, staff is recommending to reduce the Electric Customer Connections capital project (EL -89028) from $5.8 million to $3.4 million. The adjustment accounts for an over encumbrance of transformer purchases to the project, which are being reassigned to the Grid Modernization for Electrification capital project (EL -24000) to better align funding with planned work in FY 2025. Staff also recommends revising the New Downtown Parking Garage project (PE -15007) funding sources schedule and expenditure schedule to reflect additional transfers of $10.1 million from the University Avenue Parking In Lieu Fund in FY 2025. This revision reflects the City Council direction from December 2023 to resume work on the project, Item 4: Staff Report Pg. 1 Packet Pg. 42 of 377 Item 4 Item 4 Staff Report recognizing FY 2024 year-end fund balances and increases the total project budget to $17.3 million. BACKGROUND On September 22, 2014, the City Council approved a recommendation to amend Chapter 2.28, Section 2.28.090 of the Municipal Code, reducing the previous two-step reappropriations process (preliminary and final reappropriation authorization) to one step as long as the Administrative Services Department (ASD) Director/Chief Financial Officer (CFO) certifies that sufficient unencumbered and unexpended funds are available in the Fiscal Year that just ended (FY 2024) to be carried forward to the subsequent Fiscal Year (FY 2025). Additionally, the City Council amended the Municipal Code to eliminate the provision allowing for the automatic reappropriation of capital project funds. Since capital projects may still be delayed or deferred for various reasons, there remains a need to reappropriate funds for capital projects in some instances. This reappropriation is completed through a review of the status of projects as part of the annual budget process and is built into the annual adopted budget. As FY 2024 has closed and staff has processed necessary accounting transactions, unexpended and unencumbered funds for each capital project have been reviewed a final time. Based on that review, staff recommends capital dollars remaining for some projects in various funds through FY 2024 be reappropriated to FY 2025. Also, as part of this review, staff found that some reappropriations earlier in the year resulted in excessive funding for certain projects in FY 2025. Therefore, this staff report recommends reversing a portion of those previously authorized reappropriations to address these situations. ANALYSIS Attachment A identifies those operating budget requests that staff recommends for approval, while Attachment B lists recommended capital project requests. Attachment C includes technical clean-up actions to align project budgets with intended funding levels. With the submission of this report for City Council consideration, the ASD Director/CFO certifies sufficient unencumbered and unexpended funds are available from FY 2024 to be reappropriated to FY 2025. To support the continuity of business for these ongoing projects and initiatives, this report is being brought forward prior to the FY 2024 Annual Comprehensive Financial Report (ACFR), scheduled to be considered by the Finance Committee in December. Operating Budget Reappropriations The projects recommended for budget reappropriations are outlined in more detail in Attachment A and can generally be grouped into the following categories: • Funding for Citywide Council Priorities: Items in this category are related to citywide priority needs previously identified by the Council, as part of the FY 2024 priority setting Item 4: Staff Report Pg. 2 Packet Pg. 43 of 377 Item 4 Item 4 Staff Report in January 2024, that could not be completed in FY 2024 and funding is recommended to be reappropriated to FY 2025 to complete the work. Examples of projects in this category include: Reliance & Resiliency Strategic Plan ($0.6 million), Seismic Ordinance Update ($0.3 million), Labor Negotiations ($0.3 million), Advancing Racial Equity ($0.2 million), and Sustainability and Climate Action Plan (S/CAP) Studies ($0.1 million). • Timing and Workload Delays: Projects in this category were delayed due to competing workload demands, appropriation of funds late in the fiscal year, or other unanticipated delays. Examples of projects in this category include: Information Technology Professional Services Contracts and Software Application Maintenance ($1.0 million), Tree Trimming ($0.4 million), Airplane Noise Reduction Study ($75,000), Foothill Fire Management Funds ($50,000), and San Antonio Coordinated Area Plan Development ($47,000). • Multi -year Funding Agreements: Projects in this category include approved donations, grants, loans, and other funding agreements that are anticipated to continue in the coming year. Examples in this category include: Organized Retail Theft Grant ($4.9 million), Mental Health Services Grant ($0.7 million), Information Technology Fees for Planning and Development Services Technology Replacement ($0.1 million), and Direct Cost Recovery Projects in the Planning and Development Services Department ($0.1 million). • Think Fund Teen Services Programs (formerly Bryant Street Garage Teen Program): In 2001, the City Council voted to lease commercial space at the Bryant Street garage located at 455 Bryant Street. Since this site was formerly the location of the Bryant Street Teen Center, a stipulation in the lease required that 75% of the rental revenues would be used to fund programs specifically for Palo Alto youth and teens. Teen Services programs include, but are not limited to: Think Fund grants, ClickPA website, Teen Arts Council, MakeX, Art Center, Think Fund Gala, and the BuoyancyTeen Festival. The unspent balance of $0.2 million is recommended to be reappropriated to FY 2025 to ensure resources are available to continue providing quality teen services to the community and develop a long-term approach to maintain delivery of these services. • Management Training Program: The Management Training Program provides $1,000 per eligible employee under the terms outlined in the MGMT and PAPMA labor agreements. The purpose of this program is to provide employees with resources to improve and supplement their job and professional skills. In total, $0.3 million in unused funding is requested to be reappropriated to FY 2025 for various training programs, including: ethics, civics and citizen engagement, leadership and management, budget, finance, procurement, interpersonal communication, presentation skills, business writing, time Item 4: Staff Report Pg. 3 Packet Pg. 44 of 377 Item 4 Item 4 Staff Report management, project management, change management, online -based education, and safety and security. Operating Reappropriations Previously Approved FY 2025 Adopted Operating Budget As part of the FY 2025 Budget review process, early reappropriation of anticipated savings in the General Fund in FY 2024 was recommended and approved by the Council to fund actions in FY 2025. The total approved amount of $16.1 million is available to be spent in FY 2025 consisted of the $9.6 million Uncertainty Reserve, $6.2 million Utility Transfer Litigation Reserve, $0.2 million for the City Employee Childcare program, and $0.1 million for Overnight Warming Locations (OWL) and $40,000 for the Human Services Resource Allocation Process (HSRAP) Reserve. The Uncertainty Reserve was established as part of the FY 2023 Mid -Year Review to proactively set aside funding for anticipated future deficits. The funding remaining in the Uncertainty Reserve in FY 2024 ($9.6 million) was reappropriated to FY 2025 as part of the budget process and $6.1 million was used to balance FY 2025. As part of the FY 2025 Adopted Budget, $2.6 million was added to the Uncertainty Reserve from the General Fund Budget Stabilization Reserve (BSR) leaving $6.1 million for future needs. The Utility Transfer Litigation Reserve was established in FY 2022 to set aside funding for financial impacts from the lawsuit, Green v. City of Palo Alto (Santa Clara Superior Court, Case No. 1 -16 - CV -300760). Settlement payments from the City are scheduled from FY 2024 through FY 2026, so $6.2 million was reappropriated to fund settlement payments of $3.1 million in FY 2025. The remaining $3.1 million will be reappropriated to FY 2026 as part of the FY 2026 Adopted Budget to complete settlement payments. Funding reserved for $3.4 million of the total settlement was estimated to be paid in FY 2024; however, this payment was unable to be made before the end of the fiscal year. The funding is recommended to be reappropriated from FY 2024 to FY 2025 as part of this report for a total reappropriation of $9.6 million to complete settlement payments in FY 2025 and FY 2026, see Attachment A for more information. The City Employee Childcare Program provides funding for a childcare subsidy program for qualified City of Palo Alto employees. Services provided in this program include, but are not limited to childcare or after school care using a Palo Alto childcare provider. This action reappropriates the remaining balance of $240,000 from the first year of this pilot program to continue for a second year as a way to increase employee engagement, long-term retention, and reduce turnover. The remaining balance of $56,000 was reappropriated to FY 2025 to extend the Overnight Warming Location (OWL) pilot program from FY 2024. The OWL is activated as a response to life - threatening weather conditions that functions as an overnight shelter for unhoused individuals Item 4: Staff Report Pg. 4 Packet Pg. 45 of 377 Item 4 Item 4 Staff Report when the County declares an Inclement Weather Alert based on predefined thresholds of cold or rain. As part of the FY 2015 Adopted Budget, the City Council established a one-time reserve of $50,000 for HSRAP funding requests. In FY 2019, $10,000 was allocated to Heart and Home Collaborative, a non-profit organization that provides shelter and services to unhoused women in Palo Alto. No additional funds were allocated from this reserve in FY 2024, so the remaining balance of $40,000 was reappropriated to FY 2025. Capital Budget Reappropriations As discussed in the Background section of this report, starting with the Fiscal Year 2016 capital budget, all capital project reappropriations require City Council approval. The FY 2025 Adopted Budget included $228.7 million in reappropriated expenditure funds, partially offset by $89.5 million in reappropriated revenue, across all City funds based on estimates of anticipated spending and revenue collections in FY 2024. Since the adoption of the capital budget, some adjustments and refinements to project reappropriations are required since FY 2024 year-end actuals and projects costs have been updated to reflect actual experience. These primarily reflect either increases or decreases to assumed reappropriations in the FY 2025 Adopted Budget: • Additional reappropriations are recommended when project expenditures originally anticipated to occur before the end of FY 2024 will now instead occur in FY 2025. Similarly, revenue anticipated to be collected in FY 2024 will be reappropriated to FY 2025 to align with actual collections. • Downward adjustments to reappropriations are recommended when expenses are no longer anticipated to occur in FY 2025 and funding was previously reappropriated in the budget document to FY 2025. If expenses were realized in FY 2024, an adjustment to reduce the budgeted reappropriation is needed as the activity no longer needs funding in FY 2025. The downward reappropriation of revenue is treated similarly; an adjustment to reduce the reappropriated revenue is needed to align collections in the appropriate fiscal year. Table 1 summarizes the recommended capital project adjustments by fund as detailed in Attachment B. These Fiscal Year 2025 adjustment amounts represent the final step in the City Council -approved change to the reappropriation process. There are sufficient expenditure savings in Fiscal Year 2024 to support all recommended adjustments. Item 4: Staff Report Pg. 5 Packet Pg. 46 of 377 Item 4 Item 4 Staff Report Fund Number of Projects Recommended Expense Reappropriation Adjustment Recommended Revenue Reappropriation Adjustment Capital Improvement Fund 58 $17,447,326 $16,593,122 Cubberley Infrastructure Fund 3 $19,280 $1,552,600 Airport Fund 4 ($358,800) $104,726 Electric Fund 12 $12,049,303 $10,000,000 Fiber Optics Fund 2 $2,753,787 - Gas Fund 4 ($53,970) - Stormwater Management Fund 6 $310,273 $1,377,399 Wastewater Collection Fund 1 $9,241 - Wastewater Treatment Fund 8 ($41,732,774) $126,323,353 Water Fund 6 ($1,715,167) - Vehicle Replacement and Maintenance Fund 3 ($522,989) Total All Funds 107 ($11,794,489) $155,951,200 The active review of all project reappropriations results in a reduced level of reappropriated funding from one year to the next, compared to the process of automatically reappropriating unspent capital funding, and better reflects the needs of the various capital projects and of the overall program. In total, $216.9 million will be reappropriated for capital projects, offset by $245.5 million in revenue for the projects. It should be noted 81% of the total recommended revenue reappropriation adjustment amount of $156.0 million comes from the Wastewater Treatment Fund because there is substantial lag time in reimbursement of funds from the State Revolving Fund (SRF) loans that support Wastewater Treatment projects. Technical Clean-uo Actions As detailed in Attachment C, due to higher -than -budgeted salaries and benefits costs in prior years, the remaining funds in the New Public Safety Building capital project (PE -15001) are insufficient to cover the awarded design and construction contract cost of $115.6 million (Report #11752).1 This action will increase the project's appropriation by $0.9 million in FY 2025 for a total project budget of $119.5 million to fund the design and construction costs through certification of occupation. 'City Council, February 21, 2021, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=81421 Item 4: Staff Report Pg. 6 Packet Pg. 47 of 377 Item 4 Item 4 Staff Report Staff is also recommending reducing the Electric Customer Connections capital project (EL -89028) from $5.8 million to $3.4 million. In May 2024, City Council approved increasing the City Manager's authority to purchase electric transformers from $2 million up to $4 million annually from prequalified vendors.2 The latest round of transformer purchases in FY 2024 were incorrectly allocated to EL -89028 and carried forward into FY 2025. This corrective action will reassign the transformers to the Grid Modernization for Electrification project (EL -24000) to better align funding with planned work in FY 2025. Finally, staff recommends revising the New Downtown Parking Garage project (PE -15007) funding sources schedule and expenditure schedule to reflect additional transfers of $10.1 million from the University Avenue Parking In Lieu Fund in FY 2025. This revision reflects the City Council direction from December 2023 to resume work on the project and trues -up the allocation of Parking In -Lieu funding with the fund balance at FY 2024 year end increasing the total project budget to $17.3 million. FISCAL/RESOURCE IMPACT All projects, programs, and corresponding funding contained within this report were previously approved by the City Council for FY 2024. This report simply realigns funding between fiscal years to align with the status of projects and programs. The ASD Director/CFO certified that sufficient funds exist in FY 2024 for the recommended Fiscal Year 2025 Operating Budget adjustments (Attachment A), and Capital Budget adjustments (Attachment B). For Operating reappropriations, staff recommends expense reappropriations of $6.0 million in the General Fund, $4.9 million in Special Revenue Funds, $0.6 million in Enterprise Funds, and $1.1 million in Internal Service Funds. Staff also recommends revenue reappropriations of $1.1 million in the General Fund and $5.0 million in Special Revenue Funds. For capital projects, in addition to the amounts reappropriated as part of the FY 2025 Adopted Capital Budget, staff recommends $17.5 million in expenses be reappropriated to FY 2025 in the Capital Improvement Funds, offset by $18.1 million in revenue reappropriations. Also recommended is reduction of $28.7 million in expenses reappropriated in various Enterprise Funds with an increase of $137.8 million in revenue mostly due to projects in the Wastewater Treatment Fund awaiting reimbursement for State Revolving Fund loans. Lastly, a reduction of $0.5 million in expenditures is recommended in the Internal Service Funds. The cumulative reappropriation, including amounts approved in the FY 2025 Adopted Capital Budget, will be $82.1 million in expenses, partially offset by $35.0 million in revenue in the Capital Improvement 2 City Council, May 6, 2024, Staff Report #2403-2755, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82816 3 City Council December 11, 2023, Staff Report #2309-2043, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82569 Item 4: Staff Report Pg. 7 Packet Pg. 48 of 377 Item 4 Item 4 Staff Report Fund projects; $126.5 million in expenses offset by $210.4 million in revenue in the Enterprise Fund projects; and $8.3 million in expenses in the Internal Service Fund projects. The results of the reappropriations will have a net zero impact to the total projects' budgets over the life of the projects. Three technical clean-up actions are recommended to adjust the funding appropriation for two capital projects. The New Public Safety Building capital project (PE -15001) will be increased by $0.9 million to fund construction costs through certificate of occupancy and address higher -than - budgeted salaries and benefits costs in prior years. The Electric Customer Connections (EL -89028) funding will be reduced by $2.4 million to reallocate the latest round of electrical transformers incorrectly encumbered onto this project but intended for the Grid Modernization for Electrification project (EL -24000) in FY 2025. The New Downtown Parking Garage capital project (PE -15007) funding sources schedule and expenditure schedule is being revised to reflect additional transfers from the University Avenue Parking In Lieu Fund of $10.1 million, to true -up the allocation of Parking In -Lieu funding with the fund balance at FY 2024 year end, for design and construction work expected during the five-year CIP period. STAKEHOLDER ENGAGEMENT Review and reconciliation of the funding available for both the Operating reappropriations and the reappropriations for individual Capital projects was coordinated between ASD divisions of the Office of Management and Budget and Accounting, as well as with the departments requesting the reappropriated funds. ENVIRONMENTAL REVIEW The action recommended is not a project for the purposes of the California Environmental Quality Act. ATTACHMENTS Attachment A: FY 2024 to FY 2025 Operating Reappropriation Requests Attachment B: FY 2024 to FY 2025 Capital Reappropriation Requests Attachment C: Capital Improvement Plan FY 2025 Technical Clean-up Actions APPROVED BY: Lauren Lai, Administrative Services Director Item 4: Staff Report Pg. 8 Packet Pg. 49 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Description Revenue Expense Appropriation Appropriation 102 General Fund Community Services Bryant St. Revenue - Teen Services This action reappropriates funds for teen services from revenue generated $ - $ 216,000 by the rental of the Bryant Street Garage. In 2001, the City Council voted to lease out a garage property located at 455 Bryant Street. Since this site was formerly the location of the Bryant Street Teen Center, a stipulation in the lease required that 75 percent of the rental revenues would be used to fund programs specifically for Palo Alto youth and teens. In prior years, Staff has returned to the Policy and Services Committee and City Council for guidance on community engagement and potential uses of this funding (CMR 4776, CMR 8887). Teen services programs include, but are not limited to: Think Fund grants, ClickPA website, Teen Arts Council, MakeX, Art Center, Think Fund Gala and the Buoyancy Teen Festival. This action will reappropriate $216,000, the remaining value, to ensure resources are available to continue providing quality teen services to the community and develop a long-term approach to maintain delivery of these services. 102 General Fund Human Resources Labor Negotiations This action reappropriates funding necessary for labor negotiations. The $ - $ 292,000 City's Labor Negotiations team will be in active negotiations for all labor units in FY 2025. SEIU's contract is set to expire December 31, 2024 and the contracts all four safety units, UMPAPA, and SEIU-Hourly are set to expire June 30, 2025. The Human Resources Department will utilize contracts with outside legal counsel for labor relation, employment matters, and strategic negotiations. This proactive financial adjustment will ensure the availability of resources to cover anticipated legal expenses associated with the continuing counsel required for negotiating and enforcing of the labor contracts. 102 General Fund Non -Departmental Advancing Racial Equity This action reappropriates the remaining funds of the original $0.5 million $ - $ 241,000 appropriated for the advancement of racial equity and the associated workplan. The City is continuing efforts to educate and train staff, Council, and Boards and Commission members on Diversity, Equity, and Inclusion (DEI) topics. 102 General Fund Non -Departmental Mental Health Services Grant On April 3, 2023 (Staff Report 2303-1179) the City accepted a $2.0 million $ 997,000 $ 679,000 grant awarded by the Department of Health and Human Services Substance Abuse and Mental Health Services Administration (SAMHSA) for assistance related to North County TRUST (Trusted Response Urgent Support Team). TRUST is focused on responding to individuals in crisis, providing follow-up and referrals, as needed, and de-escalating high stress situations. This program is in addition to the City's Psychiatric Emergency Response Team (PERT) and the County's Mobile Crisis Response Teams (MCRT) programs. This action reappropriates the remaining funds as well as the revenue reimbursement to FY 2025. Item 4: Staff Report Pg. 9 1 Packet Pg. 50 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Title Description Revenue Expense Appropriation Appropriation 102 General Fund Non -Departmental Utility Transfer Litigation Reserve This action reappropriates $3.4 million for the financial impacts of a $ - $ 3,400,000 lawsuit, Green v. City of Palo Alto (Santa Clara Superior Court, Case No. 1 -16 -CV -300760). This is in addition to the $6.2 million already reappropriated for this reserve as part of the FY 2025 Adopted Budget. This case was a class action lawsuit filed on October 6, 2016, that claimed the City's gas rates were taxes that exceeded the cost of providing service, absent voter approval, because the rates funded annual transfers from the utilities to the City's general fund. The lawsuit sought a refund of three years of alleged overpayments by gas ratepayers. The financial settlement payment is planned over three fiscal years, FY 2024 through FY 2026, so the funding remaining in the reserve is recommended to be reappropriated to FY 2025 to complete the settlement payments. 102 General Fund Non -Departmental Management Development Funds This action reappropriates funding for management training and $ - $ 250,000 professional development. The Management Training Program provides $1,000 per eligible employee under the terms outlined in the labor agreements and compensation plans with the Management and Professional group and the Palo Alto Police Management Association. In alignment with the City's Positive Workplace initiative and to address the City's overall need for training and development the Human Resources' Workforce Development/Training Division has recently completed a Request for Proposal procurement process from which three vendors have been identified and selected. These vendors have been chosen to deliver Organizational Development, Leadership Training, and Coaching services across all city departments. This strategic partnership with the selected vendors will entail close collaboration with City leadership and the various department. The reallocated funds will be used to fund the contracts in the upcoming three years. 102 General Fund Planning and Development Direct Cost Recovery Project This is a cost neutral action to reappropriate remaining revenue and $ 29,000 $ 29,000 Services Budget expense funding related to deposit -based cost recovery projects at multiple sites. These are fully cost recoverable projects that are tracked separately using deposit accounts. The funds do not comingle with other contract service budgets and funds are only accessible for this purpose. All costs will be reimbursed by the applicant. Item 4: Staff Report Pg. 10 1 Packet Pg. 51 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Description Revenue Expense Appropriation Appropriation 102 General Fund Planning and Development Direct Cost Recovery Project This is a cost neutral action to reappropriate the remaining revenue and $ 35,000 $ 35,000 Services Budget - 3225 El Camino Real expense funding related to the deposit -based cost recovery project at 3225 El Camino Real. This is a fully cost recoverable project that is tracked separately using deposit accounts. The funds do not comingle with other contract service budgets and funds are only accessible for this purpose. All costs will be reimbursed by the applicant. 102 General Fund Planning and Development San Antonio Coordinated Area Plan As part of the FY 2024 Adopted Budget, $50,000 was appropriated to $ - $ 47,000 Services (CAP) explore a collaboration opportunity with California Polytechnic State University students to draft a working concept of a San Antonio CAP. This initial funding supported related travel, research, consultant and/or part- time staff for these efforts. The working concept is a starting point for the larger CAP process, which is still estimated at $0.7 milllion over three to four years, although the ultimate cost of each plan will depend on size and complexity. This action will continue funding into FY 2025 to support the CAP project. 102 General Fund Planning and Development Seismic Ordinance Update As part of the FY 2024 Adopted Budget, $225,000 was appropriated for a $ - $ 216,000 Services seismic and resiliency study and ordinance update. This action reappropriates the remaining $216,000 to complete the RFP process for a consultant that began in FY 2024 and continue the work of updating the City's siesmic ordinance in FY 2025. 102 General Fund Public Works Foothill Fire Management This action reappropriates $50,000 that had been allocated in the FY 2024 $ - $ 50,000 Adopted Budget for the Foothills Fire Management Plan which includes roadside vegetation management and clearing, fuels and fire danger assessment, and fire prevention and preparedness. The funds were unused due to an unsuccessful RFP for those services. With the new fire season in progress, the reappropriated funds will support assistance from the Santa Clara County Fire Safe Council (SCCFSC) while a new RFP is prepared. 102 General Fund Public Works SFO GBAS & Airplane Noise This action reappropriates $75,000 that had been allocated in the FY 2024 $ - $ 75,000 Adopted Budget for an on -call professional services contract that will support work tasks resulting from engagement initiated but not completed in FY 2024 with San Francisco International Airport (SFO) on the Ground Based Augmentation System (GBAS) project and other potential actions to decrease airplane noise. Item 4: Staff Report Pg. 11 1 Packet Pg. 52 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Description Revenue Expense Appropriation Appropriation 102 General Fund Public Works Sustainabilty S/CAP Studies This action reappropriates $122,000 remaining from the $600,000 $ - $ 122,000 allocated in the FY 2024 Adopted Budget to perform S/CAP studies. The reappropriated funds will allow Energy and Environmental Economics (E3) to complete four studies critical to the implementation of S/CAP that were started but not completed in FY 2024: 1) the S/CAP Funding Source Survey, 2) the Building Sector Study, 3) the EV Charger Strategic Plan, and 4) the S/CAP Funding Study. 102 General Fund Public Works Tree Trimming This action reappropriates $368,000 to complete the final three months of $ - $ 368,000 the third year of a not -to -exceed $3.8 million contract (C21181420) with West Coast Arborists (WCA) for tree care including, but not limited to, tree trimming, stump removal, stump grinding, and emergency callouts. Staff will return to Council in Fall 2024 to extend this contract beyond FY 2025. Total General Fund Reappropriation $ 1,061,000 $ 6,020,000 Item 4: Staff Report Pg. 12 1 Packet Pg. 53 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Number Fund Name Department Title Description Recommended Revenue Appropriation Recommended Expense Appropriation 513 Electric Fund Utilities Reliability & Resiliency Strategic This action reappropriates $640,000 to FY 2025 to continue the REP for the $ - $ 640,000 Plan Reliability and Resiliency Strategic Plan (RRSP) that is part of the City's Sustainability and Climate Action Plan (S/CAP) and relates to the City's Grid Modernization project. This is in relation to staff report #2401-2496 that was approved by the Council in April 2024. Due to the timing of contract award and additional legal review, the contracts with to contract with a consultant and a partnership with Stanford Linear Accelerator (SLAC) were not approved before year-end. Total Enterprise Fund Reappropriation - 640,000 Item 4: Staff Report Pg. 13 Packet Pg. 54 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Title Description Revenue Expense Appropriation Appropriation 248 SLES Fund Police Organized Retail Theft Grant On December 4, 2023 (Staff Report 2309-2066) the City accepted a $5.2 $ 4,962,700 $ 4,866,400 million Organized Retail Theft (ORT) grant awarded by the State of California Board of State and Community Corrections (BSCC) for a three- year program to combat ORT and to increase the recovery of stolen vehicles. The Palo Alto Police Department's ORT grant program utilizes overtime to patrol and investigate ORT crimes at shopping districts. As part of the program, the Department will also equip patrol vehicles with technology to aid in the apprehension of stolen vehicles. This action reappropriates the remaining funds as well as the revenue reimbursement to FY 2025. 248 SLES Fund Police Wellness Grant In March 2023 the City received $47,742 from the State of California Board $ 46,500 $ 46,500 of State and Community Corrections (BSCC) for the Officer Wellness and Mental Health Grant Program. This wellness grant provides funding for law enforcement agencies to improve officer wellness and expand mental health resources. The funds were not yet spent because the Department was researching best practices for mental health programs. This action reappropriates the remaining funds along with the associated revenue to FY 2025 for department -wide comprehensive body scans used for early detection of illness and disease. Total Special Revenue Fund Reappropriation 5,009,200 4,912,900 Item 4: Staff Report Pg. 14 1 Packet Pg. 55 of 377 FY 2024 TO FY 2025 OPERATING BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT A Attachment A - FY 2024 to FY 2025 ,Operating Reappropriation Requests Fund Recommended Recommended Number Fund Name Department Description Revenue Expense Appropriation Appropriation 682 Tech Fund Information Technology Isoftware Application Maintenance This action reappropriates $900,000 for enhancements to the ERP and GIS $ - $ 900,000 systems, as well as specialized consultant work for ERP and GIS projects, and maintenance of infrastructure. These funds will ensure the continued improvement and functionality of the City's software applications, supporting the its operational needs for FY 2025. 682 Tech Fund Information Technology Contract Services This action reappropriates $100,000 for the city's IT on -call professional $ - $ 100,000 services vendors to support various ongoing and new IT projects requiring specialist consultants, such as the Citywide SharePoint new site development and BI development. Given the expertise and specialized knowedge these consultants bring, the reappropriation of unused funds is essential completion of these important initiatives. 682 Tech Fund Information Technology Planning and Development This action reappropriates $101,000 in Planning and Development Services $ - $ 101,000 Services Technology Fee Tech Fee budget. As part of the Adopted Municipal Fee Schedule, some PDS fees include a surcharge of up to support technology projects. These projects include ongoing technical support of the City's Geographic Information System (GIS) and the new [SRI platform, implementing an online permitting system, expanding Accela capabilities, and digitizing and storing plans and records. Total Internal Service Fund Reappropriation $ - $ 1,101,000 Total All Funds Reappropriation $ 6,070,200 $ 12,673,900 Item 4: Staff Report Pg. 15 1 Packet Pg. 56 of 377 FY 2024 TO FY 2025 CAPITAL BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT B Attachment B - FY 2024 to FY 2025 Capital Reappropriation Requests Expenses Revenues Fund Number and Name Project Title Proj. No. Adopted Reapp Final Reapp Total Reapp Adopted Reapp Final Reapp Total Reapp 471 -Capital Improvement Fund Americans With Disabilities Act Compliance PF-93009 800,000 800,000 - - - Animal Shelter Renovation PE -19002 2,712,807 7,432 2,720,239 - - - Art In Public Spaces AC -86017 1,637,708 (15,686) 1,622,022 - - - Athletic Courts Resurfacing PG -06001 174,027 240,000 414,027 - - - Baylands Comprehensive Conservation Plan PG -17000 43,100 43,100 - - - Baylands Interpretive Signage Program OS -24001 162,000 162,000 162,000 - 162,000 Baylands Nature Preserve Entrance Gate OS -24000 97,462 (0) 97,462 - - - Benches, Signage, Walkways, Perimeter Landscaping, and Site Amenities PG -06003 128,021 (8,557) 119,464 - - - Bicycle and Pedestrian Transportation Plan Implementation PL -04010 2,900,000 216,205 3,116,205 - 250,720 250,720 Boulware Park Improvements PE -17005 135,764 103,544 239,308 - 188,979 188,979 Building Systems Improvements PF-01003 100.000 1,454 101,454 - - - California Avenue District Gateway Signs PE -17004 123,382 123,382 - - - California Avenue Streetscape Update PL -23000 15,945 15,945 - - - Capital Improvement Fund Administration AS -10000 - 120,300 120,300 - - - Charleston/Arastradero Corridor Project PE -13011 - - - - 4,834 4,834 Churchill Avenue Enhanced Bikeway PL -14000 2,000,000 776,100 2,776,100 - - - Churchill Avenue Rail Grade Separation and Safety Improvements PL -24001 - 3,644,982 3,644,982 - 3,080,625 3,080,625 Churchill Avenue/Alma Street Railroad Crossing Safety Improvements PL -20000 - 2,054,106 2,054,106 - 4,187,637 4,187,637 City Bridge Improvements PE -20001 1,220,088 14,218 1,234,306 - - - City Facilities Assessment PE -20002 30,000 30,000 - - - City Facility Parking Lot Maintenance PE -09003 240,487 240,487 - - - City Hall Space Planning PE -19000 571,373 571,373 - - - Civic Center Electrical Upgrade & EV Charger Installation PE -17010 1,035,399 1,035,399 - 174,000 174,000 Civic Center Fire Life Safety Upgrades PE -18016 140,929 9,071 150,000 - - - Civic Center Waterproofing Study and Repairs PE -15020 426,969 568 427,537 - - - Curb and Gutter Repairs PO -12001 - 17,606 17,606 - - - Downtown Automated Parking Guidance Systems PL -15002 57,398 54,782 112,180 - - - El Camino Park Turf Replacement PG -24000 - 792,000 792,000 - - - Electric Charger Infrastructure Installation PF-23000 98,026 81,113 179,139 - - - Electrification of City Facilities PE -24001 491,474 8,526 500,000 - - - Facility Interior Finishes Replacement PF-02022 20,000 106,757 126,757 - - - Fire Station 3 Replacement PE -15003 - 1,000 1,000 - - - Fire Station 4 Replacement PE -18004 8,059,655 (1,306) 8,058,349 - - - Fire Training Facility Replacement FD -24000 - 50,000 50,000 - - - Foothills Nature Preserve Boronda Lake Dock Replacement OS -18000 210,000 210,000 - - - Foothills Nature Preserve Dam Seepage Investigation and Repairs PE -20000 75,066 0 75,066 - - - Foothills Nature Preserve Improvements PE -21000 692,744 2,074 694,818 - - - Golf Course Net and Artificial Turf Replacement PG -18000 770,000 770,000 - - - Golf Reconfiguration & Baylands Athletic Center Improvements PG -13003 87,150 3,373 90,523 - - - Homekey Facilities PE -24005 4,401,987 (2,059,166) 2,342,821 - - - JMZ Renovation AC -18001 576,515 576,515 - 36,196 36,196 Library Automated Material Handling LB -21000 383,002 380,000 763,002 382,983 - 382,983 Lucie Stern Community Theater Mechanical Equipment Replacement PE -24002 199,834 (121) 199,713 - - - Lucie Stern Community Theatre Fire Curtain AC -24001 200,000 200,000 - - - Lucie Stern Community Theatre Theatrical and House Lighting System Replacement PE -24003 26,350 26,350 - - - Meadow Drive and Charleston Road Rail Grade Separation and Safety Improvements PL -24000 - 5,294,738 5,294,738 - 4,419,375 4,419,375 Mitchell Park Library Repair PE -24006 162,076 81,124 243,200 - - - Municipal Service Center Lighting, Mechanical, and Electrical Improvements PF-16006 6,365,504 6,365,504 500,000 - 500,000 New California Avenue Area Parking Garage PE -18000 732,260 12,500 744,760 - - - New Downtown Parking Garage PE -15007 5,101,358 309,242 5,410,600 5,398,600 - 5,398,600 Item 4: Staff Report Pg. 16 1 Packet Pg. 57 of 377 FY 2024 TO FY 2025 CAPITAL BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT B Attachment B - FY 2024 to FY 2025 Capital Reappropriation Requests Expenses Revenues Fund Number and Name Project Title Proj. No. Adopted Reapp Final Reapp Total Reapp Adopted Reapp Final Reapp Total Reapp New Public Safety Building PE -15001 1,454,374 - 1,454,374 - - - Newell Road/San Francisquito Creek Bridge Replacement PE -12011 13,656,435 1,270,347 14,926,782 9,800,000 113,729 9,913,729 Off -Road Pathway Resurfacing And Repair OS -09001 244,733 244,733 - - - Open Space Lakes And Pond Maintenance OS -00002 27,169 29,999 57,168 - - - Open Space Trails and Amenities OS -00001 71,651 41,004 112,655 - - - Park and Open Space Emergency Repairs PG -09002 53,687 186,458 240,145 - - - Park Restroom Installation PG -19000 629,570 0 629,570 629,570 - 629,570 Parking District Implementation PL -15003 163,900 163,900 - - - Performing Arts Venues Seat Replacement AC -18000 172,986 (12,636) 160,350 - - - Railroad Grade Separation and Safety Improvements PL -17001 - 297,830 297,830 - 567,246 567,246 Ramos Park Improvements PG -14000 - 349,898 349,898 - - - Rinconada Park Improvements PE -08001 - 1,417 1,417 - - - Rinconada Pool Family Changing Room PE -24004 200,070 49,930 250,000 - - - Robles Park Improvements PE -18015 638,556 3,613 642,169 - - - Roth Building Rehabilitation Phase 1 PF-23001 238,046 - 238,046 - 940,598 940,598 Safe Routes To School PL -00026 500,000 459,994 959,994 - - - Sidewalk Repairs PO -89003 - 438,850 438,850 - 511,673 511,673 Sign Reflectivity Upgrade PO -11000 - 13,308 13,308 - - - Street Lights Condition Assessment PE -13014 220,000 220,000 - - - Street Lights Improvements PO -05054 362,409 (19,038) 343,371 - - - Street Maintenance PE -86070 89,688 151,363 241,051 - - - Traffic Signal and Intelligent Transportation Systems PL -05030 - 1,248,434 1,248,434 - 1,298,721 1,298,721 Transportation and Parking Improvements PL -12000 - 597,735 597,735 - 818,789 818,789 University Avenue Parking Improvements PF-14003 155,416 155,416 - - - Water, Gas, Wastewater Office Remodel PE -19001 - 24,893 24,893 - - - 471 -Capital Improvement Fund TOTAL 62,268,605 17,447,326 79,715,930 16,873,153 16,593,122 33,466,275 472-Cubberley Fund Cubberley Field Restroom CB-17OO2 648,676 (50,759) 597,917 - - - Cubberley Gym HVAC Replacement CB -24000 800,000 800,000 - - - Cubberley Repairs CB -17001 491,096 (2,952) 488,144 - - - Cubberley Roof Replacements CB -16002 400,000 72,991 472,991 - 1,552,600 1,552,600 472-Cubberley Fund TOTAL 2,339,772 19,280 2,359,052 - 1,552,600 1,552,600 530 -Airport Fund Airport Access Road Reconstruction AP -24000 300,000 300,000 270,000 - 270,000 Airport Layout Plan AP -21000 - - - 87,303 87,303 Airport Parking Lot EV Charger Installation AP -24001 25,000 25,000 22,500 - 22,500 Airport Temporary Office Buildings AP -22001 358,800 (358,800) - - - - Airport Zero Emission Vehicle Fleet Replacement AP -23000 156,647 156,647 156,647 (31,788) 124,859 Automated Weather Observation System AP -19000 341,839 341,839 341,839 49,211 391,050 530 -Airport Fund TOTAL 1,182,286 (358,800) 823,486 790,986 104,726 895,712 523 -Electric Fund Colorado Distribution Feeder Outlet Replacement EL -22002 379,109 379,109 - - - Colorado Power Station Equipment Upgrades EL -19001 1,733,011 (7,672) 1,725,339 - - - Colorado Substation Site Improvements EL -19002 1,138,294 (40,385) 1,097,909 - - - Electric Utility Geographic Information System EL -02011 85,000 85,000 - - - Foothills Rebuild (Fire Mitigation) EL -21001 2,203,852 2 203 852 - - - - Grid Modernization for Electrification EL -24000 18.182.640 (294,2011 17,888,439 15,000,000 10,000,000 25,000,000 Hanover Substation Upgrade Project EL -24001 14,779,014 14,779,014 - - - Inter -substation Line Protection Relay EL -17005 462,505 462,505 - - - Rebuild Underground District 24 EL -10006 139,066 (139,066) - - - - Smart Grid Technology Installation EL -11014 1,007,749 225,516 1,233,265 - - - Substation Breaker Replacement EL -17002 2,347,334 (720,357) 1,626,977 - - - Substation Facility Improvements EL -89044 - 300,000 300,000 - - - Item 4: Staff Report Pg. 17 1 Packet Pg. 58 of 377 FY 2024 TO FY 2025 CAPITAL BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT B Attachment B - FY 2024 to FY 2025 Capital Reappropriation Requests Expenses Revenues Fund Number and Name Project Title Proj. No. Adopted Reapp Final Reapp Total Reapp Adopted Reapp Final Reapp Total Reapp Substation Physical Security EL -16003 2,916,589 (313,802) 2,602,787 - - - 523 -Electric Fund TOTAL 30,131,040 12,049,303 42,180,343 15,000,000 10,000,000 25,000,000 533 -Fiber Optics Fund Fiber Optics Network - System Improvements FO -10001 400,000 400,000 - - - Fiber Optics Network - System Rebuild FO -16000 12,344,530 (933,997) 11,410,533 - - - Fiber -to -the -Premises (FTTP) FO -24000 5,925,164 3,687,784 9,612,948 - - - 533 -Fiber Optics Fund TOTAL 18.669.694 2,753,787 21423 481 - - - 524 -Gas Fund Gas Distribution System Improvements GS -11002 666.723 41,551 708,274 - - - Gas Main Replacement - Project 24 GS -14003 698.800 (58,2711 640.529 - - - Gas Main Replacement - Project 25 GS -15000 3.703849 (15,5251 3,688.324 - - - Gas Meters and Regulators GS -80019 188.545 (21,7251 166.820 - - - 524 -Gas Fund TOTAL 5.257.917 (53,970 5.203.947 - - - 528-Stormwater Fund Corporation Way System Upgrades SD -21000 E Bayshore Rd & E Mead Dr Storm Drain System Upgrade SD -22000 66.231 (10,232) 779gg - - - E Meadow Cir Connection to Adobe Crk Pump Station SD -26000 i 2,4 57 (3,436) 131 051 - - - Green Stormwater Infrastructure SD -22001 1 613 4 274,129 1 7 5q7 - 1,215,562 1,215,562 Storm Drain Pump Station to Adobe Creek SD -20000 1 flR0 31,661 - - - Storm Drain System Repl & Rehab SD -06101 18,152 gp, - - - Trash Capture Device Installation SD -22002 - _ - 161,837 161,837 W Bayshore Rd Trunk Line Improvements SD -23000 - - 528-Stormwater Fund TOTAL 310,273 1,377,399 1,377,399 527 -Wastewater Collection Fund Wastewater Collection System Rehabilitation/Augmentation Project 31 WC -19001 - 9,241 a - - - Wastewater General Equipment and Tools WC -13002 40,000 40,000 - - - 527 -Wastewater Collection Fund TOTAL 40,000 9,241 49,241 - - - 526 -Wastewater Treatment Fund Advanced Water Purification Facility WQ-19003 17,126,395 (47,192) 17,079,203 17,126,395 722,761 17,849,156 Headworks Facility Replacement WQ-16002 3,011,889 127,085 3,138,974 - 4,757,000 4,757,000 Horizontal Levee Pilot WQ-22001 76,235 (74,157 2,078 - - - Joint Intercepting Sewer Rehabilitation WQ-24000 3,593,920 3,593,920 3,593,920 8,906,080 12,500,000 Outfall Line Construction WQ-19000 10,605,800 - 10,605,800 - 10,582,800 10,582,800 Plant Repair, Retrofit & Eqpt Replacement WQ-19002 9,873,923 (6,000,630) 3,873,293 - - - Primary Sedimentation Tank Rehabilitation WQ-14003 2,989,461 (745,430) 2,244,031 - 4,837,272 4,837,272 Secondary Treatment Upgrades WQ-19001 36,128,770 (34,992,450) 1,136,320 36,128,770 96,517,440 132,646,210 526 -Wastewater Treatment Fund TOTAL 83406 393 (41,732,7741 41673 619 56,849,085 126,323,353 183,172,438 522 -Water Fund Water Distribution System Improvements WS -11003 670.388 (85,175) 585214 - - - Water General Equipment/Tools WS -13002 50.000 - 50.000 - - - Water Main Replacement - Project 29 WS -15002 3.089.102 (2,107,681) 981421 - - - Water Main Replacement - Project 30 WS -16001 415 000 4,629 419.629 - - - Water Regulation Station Improvements WS -07000 18.519 48,318 66.837 - - - Water System Supply Improvements WS -11004 3.416.706 (84,161) - - - Water Tank Seismic Upgrade and Rehabilitation WS -09000 737 637 508,903 1 746 735 - - - Water, Gas, Wastewater Utility GIS Data WS -02014 s0000 -50000 - - - 522 -Water Fund TOTAL (1,715,167) 674 3g1 - - - 682 -Technology Fund City Council Chamber TE-19001 - - - Computer Aided Dispatch TE-23000 - - - Enterprise Resource TE-19000 - - - Infrastructure Management TE-13004 - - - Radio Infrastructure TE-05000 - - - Utilities Customer Billing TE-10001 - - - 682 -Technology Fund TOTAL 681 -Vehicle Fund Emergency Repair and Replacement VR-15001 - 66 - - - Vehicle/Equipment Replacement - FY 2020 VR-20000 30,000 30,000 - - - Item 4: Staff Report Pg. 18 1 Packet Pg. 59 of 377 FY 2024 TO FY 2025 CAPITAL BUDGET REAPPROPRIATIONS Item 4 ATTACHMENT B Attachment B - FY 2024 to FY 2025 Capital Reappropriation Requests Expenses Revenues Fund Number and Name Project Title Proj. No. Adopted Reapp Final Reapp Total Reapp Adopted Reapp Final Reapp Total Reapp Vehicle/Equipment Replacement - FY 2021 VR-21000 17,351 (370) 16,981 - - - Vehicle/Equipment Replacement - FY 2023 VR-23000 729,331 (376,413) 352,918 - - - Vehicle/Equipment Replacement - FY 2024 VR-24000 4,178,469 (146,206) 4,032,263 - - - 681 -Vehicle Fund TOTAL 4,994,813 (522,989) 4,471,824 - - - GRAND TOTAL 228,654,220 (11,794,489) 216,859,731 89,513,224 155,951,200 245,464,424 Item 4: Staff Report Pg. 19 Packet Pg. 60 of 377 CAPITAL IMPROVEMENT PLAN FY 2025 TECHNICAL CLEAN-UP ACTIONS Item4 ACHMENTC Attachment C - Capital Improvement Plan FY 2025 Technical Clean-up Fund Name Department Project No. Project Description xpense Capital Improvement Fund Public Works PE -15001 New Public Safety Building Due to higher -than -budgeted salaries and benefits $ - $ 937,000 costs in prior years, the remaining funds in this project are insufficient to cover the total design and construction contract cost of $115.6 million (Report #11752). This action will increase appropriation by $0.9 million in FY 2025 to restore the full amount of funding required for the project's design and construction contract and increase the total project budget to $119.5 million. Capital Improvement Fund Public Works PE -15007 New Downtown Parking Garage Staff recommends revising the New Downtown $ 10,100,000 $10,100,000 Parking Garage project funding sources schedule and expenditure schedule to reflect additional transfers of $10.1 million from the University Avenue Parking In Lieu Fund in FY 2025. This revision reflects the City Council direction from December 2023 (Report # 2309-2043) to resume work on the project and increases the total project budget to $17.3 million. Electric Fund Utilities EL -89028 Electric Customer Connections City Council approved increasing the City Manager's $ - $ (2,403,054) authority to purchase electric transformers from $2 million to $4 million annually from prequalified vendors (Report # 2403-2755).Various projects, such as Electric System Improvements (EL -98003), Electric Customer Connections (EL -89028), and Grid Modernization for Electrification (EL -24000), utilize these transformers. In FY 2024, the entire latest round of transformer purchases were incorrectly encumbered in EL -89028 in FY 2024 and carried forward into FY 2025. This action will align funding in FY 2025 with planned work in this project by reducing the budget from $5.8 million to $3.4 million. Item 4: Staff Report Pg. 20 1 Packet Pg. 61 of 377 Item 5 Item 5 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: October 21, 2024 Report #:2408-3366 TITLE Approval of Purchase Order with Anixter, Inc. for the Purchase of Fiber Materials Not -to -Exceed $348,003; and Authorization to Execute Changes Not -to -Exceed $30,000 for Related, for a Total Not -to -Exceed Amount of $378,003 for Fiscal Year 2025; CEQA Status — Council action on this item is within the scope of the Final Initial Study and Mitigated Negative Declaration (IS/MND) was adopted by Council Resolution on June 17, 2024 RECOMMENDATION Staff Recommends that the City Council: 1. Approve and authorize the City Manager or their designee, to execute purchase order 4525000136 with Anixter Inc. in the amount of $348,003 for the purchase of fiber optic cable, enclosures, patch panels and cabinets for the FTTP Pilot Project; and 2. Authorize the City Manager or their designee to negotiate and execute one or more changes to purchase order 4525000136 with Anixter, Inc. for related but unforeseen work which may develop during the FTTP pilot not -to -exceed $30,000; for a total not -to -exceed amount of $378,003 for Fiscal Year 2025. BACKGROUND On December 19, 2022, City Council directed staff to proceed with the Fiber Expansion Plan to implement the Fiber Rebuild project and Phase 1 of the FTTP Project. In Phase 1, FTTP would be built out in selected areas of the city and expanded gradually (Staff Report ID 148001). Construction of the fiber backbone in the Fiber Rebuild project and last mile infrastructure to provide FTTP broadband internet to the community in the FTTP project will be a significant undertaking for the City. Council approval of this purchase order will allow the utilities 1 Staff Report ID 14800 https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes- reports/reports/city-ma nager-reports-cm rs/2022/12-19-2022-id-14800. pdf Item 5: Staff Report Pg. 1 Packet Pg. 62 of 377 Item 5 Item 5 Staff Report department to order the necessary materials and components in the quantities and specifications required to build FTTP in the pilot area. ANALYSIS The design of the pilot area strategically covers initial test area plans for grid modernization, and a core portion of the Phase 1 FTTP area. The pilot area is bounded by West Bayshore, Embarcadero Road, Louis Road, and Colorado Ave). The FTTP pilot is predominantly aerial construction in the grid modernization pilot area. FTTP build out must be constructed in a manner that provides a pathway from the fiber hut to the areas of higher interest. Based on the engineering design of the pilot area, the City's consultant Magellan and staff developed a comprehensive list of the materials and components required to build FTTP along with the quantities and material specifications. The build of materials (BOM) include various counts of fiber cables, vaults, splice trays, enclosures, patch panels, fiber distribution cabinets and pole attachment materials. The request for quotation (RFQ) for the fiber BOM was published on June 6, 2024 on the City of Palo Alto's e -procurement website (OpenGov), with a RFQ due date of July 10, 2024. The City received five (5) bids. One of the bids was deemed non -responsive because they only provided costs for a subset of the materials on the BOM. Below is the procurement summary table: Project Bid Number and Name RFQ 190165 — Purchase and Delivery of Assorted Fiber Optic Material for Fiber -to -the -Premises (Pilot) Proposed Length of Project 3 —6 months Total Days to Respond to Bid 34 days Number of Bids Received 5 Bid Price Range $342,341 - $535,242 FISCAL/RESOURCE IMPACT Funding for this purchase order is available in the Fiscal Year 2025 Capital Improvement Plan budget for the Fiber -To -The -Premises "FTTP" Capital Project (FO -24000). The base purchase order amount of $348,003 is slightly higher than the bid proposal of $342,341 because there is a minimum charge for reels of cables. Purchasing a full reel is more cost and construction effective than buying a partial reel. The excess cables will be used for subsequent phases of FTTP or dark fiber projects. STAKEHOLDER ENGAGEMENT Staff continues to engage with the community on the FTTP efforts primarily through the City's Finance Committee and Utilities Advisory Commission discussions which are open to the public to participate and share feedback. Item 5: Staff Report Pg. 2 Packet Pg. 63 of 377 Item 5 Item 5 Staff Report In addition, staff continues to share updates through the Palo Alto Fiber project webpage6, City communications channels such as social media', and Medium.com blog8. ENVIRONMENTAL REVIEW The FTTP Project has been assessed in accordance with the authority and criteria contained in the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the environmental regulations of the City. A final Initial Study -Mitigated Negative Declaration (IS/MND) that incorporated revisions, as appropriate, based on public comments was adopted by Council Resolution on June 17, 2024. (Staff Report 2403-27132). ATTACHMENTS Attachment A: Anixter, Inc. Purchase Order -4525000136 APPROVED BY: Dean Batchelor, Director of Utilities Staff: Dave Yuan, Utilities Strategic Business Manager z Staff Report 2403-2713 https://cityofpaloaIto.primegov.com/Portal/viewer?id=0&type=7&uid=2b77638f-b16d- 43a9-ae2a-4b57a96f813d Item 5: Staff Report Pg. 3 Packet Pg. 64 of 377 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 Ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Tel:(650)329-2271 Fax:(650)329-2468 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard@cityofpaloalto.org DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Item Material/Description Quantity UM Net Price Net Amount RFQ 190165 PURCHASE AND DELIVERY OF ASSORTED FIBER OPTIC MATERIAL (PILOT) DATED JULY 10, 2024. AND STAFF REPORTS #2408-3366 APPROVED ON OCTOBER 21, 2024. 0010 24 CT Fiber Cable, Armored, Loose 16,958 FT 0.33 5,596.14 Catalog number: LE024*C5201S1D 0020 96 CT Fiber Cable, Armored, Loose 11,964 FT 0.62 7,417.68 Catalog number: LE096*C8201S1D 0030 144 CT Fiber Cable, Armored, Loose 25,707 FT 0.84 21 ,593.88 Catalog number: LE144*CC201S1D 0040 432 CT Fiber Cable, Armored, Ribbon 16,743 FT 3.66 61 ,279.38 Catalog number: 760213884 0050 1" HDPE Conduit, Orange SDR-1 1 5,000 FT 0.38 1,900.00 (MA Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 4 1 Packet Pg. 65 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 2 of 7 Item Material/Description Quantity UM Net Price Net Amount 0060 2" HDPE Conduit, Orange SDR-1 1 3,000 FT 0.94 2,820.00 0070 Mule Tape 3,000 FT 0.02 60.00 0080 #12 AWG Solid Thhn Insulated Tracer Wire 1,234 FT 0.17 209.78 0090 Drop Vault, 12" x 12" 6 EA 145.11 870.66 0100 Vault, 24" x 36" 26 EA 433.85 11,280.10 0110 Large Vault, 30" x 48" 9 EA 939.67 8,457.03 0120 288F Pad mounted FDH Splitter Cabinet 6 EA 3,260.86 19,565.16 Catalog number: R -D -A2 -288-C1 E-1 001-B 100F 0130 1 x32 Splitter (4 per FDH at install) 24 EA 828.65 19,887.60 Catalog number: KC1-CAA 0140 144 port rack mount panel 1 EA 4,108.70 4,108.70 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 5 1 Packet Pg. 66 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 Ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 3 of 7 Item Material/Description Quantity UM Net Price Net Amount Catalog number: 760239066 1 UDS-2U-BK-LA-A 0150 432 port rack mount panel 4 EA 11,298.91 45,195.64 Catalog number: 760239070 1 UDS-6U-BK-LA-A 0160 Snow Shoes 210 EA 17.20 3,612.00 0170 Anchors - Softscape 41 EA 28.12 1,152.92 0180 Anchors - Hardscape 20 EA 42.30 846.00 0190 6M Strand 50,000 FT 0.17 8,500.00 0200 48 CT Fiber Cable, Armored, Loose 7,147 FT 0.39 2,787.33 Catalog number: LE048*C5201S1D 0210 5/8" x 8' Copper Clad Ground Rod 100 EA 15.76 1,576.00 0220 Fan Out Kits 10 EA 22.25 222.50 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 6 1 Packet Pg. 67 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 4 of 7 Item Material/Description Quantity UM Net Price Net Amount 0230 Guy Marker -Yellow plastic cover 60 EA 3.31 198.60 0240 Pole Attachment Hardware 414 EA 112.00 46,368.00 CUSTOMER ITEM 311 ON BOM Attachment A - INCLUDES ALL ITEMS BELOW * * * 450ea J8810 5/8X10MB ($1.75, 787.50, 2wks, SPQ: 50ea) 414ea SI-5365 5/8 SQ NUT ($0.17/ea, 703.80, 1-2wks) 450ea LS -S9104 LINE SPLICE($3.89, 1750.50, 14wks, SPQ: 50) 414ea J8812 5/8X12MB ($2.00, 828.00, 1-2wks) 414ea 7903 5-5/8 SUSP CLAMP ($6.48/ea, 2, 682.72, 1-2wks) 400ea DE -S1104 ($1.90, 760, 2wks, SPQ: 100) 414ea J8814 14in MB ($2.00, 828.00, 1-2wks) 425ea SI-1755 CURVED SUSP CLAMP ($4.85/ea, 2, 061.25, 8wks, SPQ: 25) 2000ea SI-7512-050 ($0.51, 1,020.00, 8wks, SPQ: 2,000 414ea J8816 5/8X16 MB ($36.00, 14,904.00, 1-2wks) 425ea J7930 CROSSOVER CLAMP ($14.40/ea, 6,120, 12wks, SPQ: 25) 400ea SI-0038 ($1.49, 596.00, 7wks, SPQ: 400) 414ea 5510 5/8X10 THIMBLEYE ($5.90, 2,442.60, 1-2wks) Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 7 1 Packet Pg. 68 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 Ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 5 of 7 Item Material/Description Quantity UM Net Price Net Amount 450ea SI-4430 GUY ATTACH ($1.60/ea, 720.00, 2wks, SPQ: 50) 414ea J6493 ($0.29, 120.06, 1-2wks) 414ea 5512 5/8X12 THIMBLEYE ($4.00, 1,656.00, 1-2wks) 400ea SI-2175 D CABLE LASHIN WIRE CLAMP ($0.45/ea, $180.00, SPQ: 400, 2wks) 414ea J7487 ($0.14, 57.96, 1-2wks) 414ea J8053 5/8X14 THIMBLEYE ($5.00, 2,070.00, 1-2wks) 500ea SI -7511-10 10" SS LASH STRAP ($0.14/ea , 70.00, 8wks, SPQ: 500) 414ea PM128 ($2.98/ea, 1,233.72, 1-2wks)" 414ea J8054 5/8X16 THIMBLEYE ($5.40, 2,235.60, 1-2wks) 414ea SI-7511-16 16" LASHING SUPP STRAP ($0.15/ea, 62.10, 1-2wks) 425ea L504 ($3.60/ea, 20wks, SPQ: 25) 500ea SI-9102 2x2 SQ WASHER 11/16 ($ 0.35, 175.00, 2wks) 400ea SI-2174 ($1.93/ea, 772.00, SPQ: 100, 8wks)" TOTAL (ITEM 311): $46,366.81 0250 FOSC 450 B Closure 62 EA 205.90 12,765.80 Catalog number: 058514-000 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 8 1 Packet Pg. 69 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 6 of 7 Item Material/Description Quantity UM Net Price Net Amount 0260 Splice Tray for B -Gel Closure (SM12) 186 EA 18.85 3,506.10 Catalog number: Z75279-000 0270 Slack Basket for B -Gel Closure 62 EA 16.27 1,008.74 Catalog number: 457507-000 0280 FOSC 450 C Closure 42 EA 228.56 9,599.52 Catalog number: J1945R-000 0290 Splice Tray for C -Gel Closure (SM 12) 126 EA 26.35 3,320.10 Catalog number: EM5842-000 0300 Slack Basket for C -Gel Closure 42 EA 16.84 707.28 Catalog number: RHo199-000 0310 FOSC 450 D Closure 27 EA 323.86 8,744.22 Catalog number: 931866-000 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 9 1 Packet Pg. 70 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address ANIXTER INC P O BOX 842584 DALLAS TX 75284 Tel: 8003502285 Ship Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Rill Tn. Utilities Electric Operations City of Palo Alto 3201 E. Bayshore Road Palo Alto CA 94303 Item 5 Attachment A - Anixter, Inc. Purchase Order - 4525000136 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4525000136 Date 09/18/2024 Vendor No. 105666 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship bestway Required Date 03/17/2025 Buyer/Phone Renee Howard / 650-496-5900 Email renee.howard a citvofoaloalto.o DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 7 of 7 Item Material/Description Quantity UM Net Price Net Amount 0320 D Size splice Tray 82 EA 39.78 3,261.96 Catalog number: JL0937-000 0330 Slack Basket for D -Gel Closure 27 EA 17.95 484.65 Catalog number: 089279-000 Sub-Total ------------------------- 318,903.47 Sales Tax 29,099.94 PRICE HAS BEEN QUOTED * * * * (I fi1IA Al AAAIA A Total 348,003.41 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 5: Staff Report Pg. 10 l Packet Pg. 71 of 377 TERMS AND CONDITIONS OF PURCHASE Item 5 Attachment A - Anixter, ACCEPTANCE/AGREEMENT: City of Palo Alto (City) reserves the right to reject any and all quotations, to waive any informalities, and, unless otherwise specified by Seller, to accept any item in a quotation. By accepting or filing this Purchase Order (P.O.), Seller agrees to the terms and conditions herein which shall prevail over any inconsistent provision in any form or other paper submitted by Seller. All shipments or services performed shall be deemed to have been made pursuant hereto. No other terms are acceptable. This P.O., including all specifications and drawings, shall constitute the entire agreement between the parties unless modified in writing by City. CITY'S PROPERTY: Seller agrees that the information, tools, jigs, dies, or materials, and drawings, patterns, and specification supplied or paid for by City shall be and remain City property and shall be held by Seller for City unless directed otherwise. Seller shall account for such items and keep them protected, insured, and in good working conditions without expense to City. DELIVERY: The terms of delivery are as stated on the reverse side hereof. The obligation of Seller to meet the delivery dates, specifications, and quantities set forth herein is of the essence of this P.O. No boxing, packing, or cartage charge will be allowed unless authorized by this P.O. Deliveries are to be made both in quantities and at times specified herein or, if not, such quantities and times are specified pursuant to City's written instruction. Items not delivered may be canceled without penalty to City. Shipments in greater or lesser quantity that ordered may be returned at Seller's expense unless written authorization is issued by City. PRICES: The price which Seller charges in filling this P.O. shall not be higher than Seller's most recent quote or charge to City for such materials, supplies, services and/or installations unless City expressly agrees otherwise in writing. Notwithstanding the prices set forth the P.O. City shall receive the benefit of any general reduction in the price of any item(s) listed herein which may be made by Seller at any time prior to the last delivery of goods or services covered by this P.O. TERMINATION: City shall have the right to terminate this P.O. or any part thereof upon ten (10) days notice in writing to Seller. (1) Without ca...P City may terminate all or any part of this P.O. without cause. Any claim by Seller for damages due to termination without cause must be submitted to City within thirty (30) days after effective date of termination. (2) For f:ai cP If Seller fails to make any delivery in accordance with the agreed delivery date, delivery schedule, or otherwise fails to observe or comply with any of the other instructions, terms, conditions or warranties applicable to this P.O., City may, in addition to any other right or remedy provided by this P.O. or by law, terminate all or any part of this P.O. in writing without any liability of City with respect to Seller at any time during the term of this P.O. In the event of termination for cause, City may purchase supplies or services elsewhere on such terms or in such manner as City may deem appropriate and Seller shall be liable to City for any cost and other expenses incurred by City, which is charged to City. CHANGES: City shall have the right at any time by written notice via P.O. Change Order to Seller to make changes in the specifications, the quantity of items called for, delivery schedules, and requirements covering testing, packaging, or destination. Any claim by Seller for adjustment under this clause shall be deemed waived unless made in writing with then (10) days after receipt by Seller of notice of such change. Price increases or extensions of time for delivery shall not be binding on City unless evidenced by a P.O. Change Order issued by City's Purchasing Manager. INSPECTION: City shall have the right to inspect and approve or reject any materials, supplies, services and/or installations upon arrival of notice of completion prior to payment without regard to the manner of shipment, completion, or any shipping or price terms contained in this P.O. All materials, supplies, services and/or installations must be furnished as specified. (1) Defective, damaged, and nonconforming materials and/or supplies may be returned for credit or refund, at Seller's expense. City may charge Seller for all expenses of unpacking, examining, repacking and reshipping of such materials and/or supplies. (2) Defective, incorrect and nonconforming services and/or installations may be returned for credit or refund, at Seller's expense. All of the nhnww nofwithvranding,prior payw r t hhy Tity WARRANTY: Seller expressly warrants that all I f/or Inc. Purchase Order - installations covered by this P.O. shall: (1) conform to the specifications, drawing 4525000136 s specified by City or if none are so specified, to Seller's standard specification or the standards of the ASTM or ANSI or other national standard organizations; (2) be new and unless specified to the contrary on the face hereof, will be free from defects in material and workmanship and will be free of all liens and encumbrances and will conform to any affirmation of facts made on the container or label; (3) be adequately contained, packaged, marked, labeled and/or provided in compliance with all applicable federal and state laws and regulations (including materials deemed hazardous); (4) be performed within the rules and regulations of the Occupational Safety and Health Act of 1970 (as amended); (5) be produced or transferred or disposed of as required by federal and state laws and regulation under the conditions of the Toxic Substances Control Act; the Hazardous Materials Control and Hazardous Waste Regulations; and other toxic laws and programs. Seller further expressly agrees to protect, indemnify, and hold harmless City, its employees and agents for any loss, damage, fine, liability, fee (including reasonable charges and fees) or expense arising in connection with or resulting from Seller's failure to furnish materials or supplies or perform services that conform with any warranty contained herein. (6) have good marketable title. GOVERNING LAW: This P.O. shall be governed by the laws of the State of California. INDEPENDENT CONTRACTOR, INSURANCE: Seller certifies, by acceptance, that he/she is an independent contractor. Seller shall protect, defend, and indemnify and hold City harmless against all damages, liability, claims, losses and expenses (including attorney's fees) arising out of , or resulting in any way from Seller's negligence in providing the goods or services purchased hereunder or from any act or omission of Seller, its agents, employees, or subcontractors, Seller shall maintain such public liability insurance, including contractual liability, automobile and general public liability, (including non -owned automobile liability) Worker's Compensation, and employer's liability insurance as well adequately protect City against such damage, liabilities, claims, losses, and expenses (including attorney's fees). Seller agrees to submit certificates of insurance, evidencing its insurance coverage when requested by City. EQUAL OPPORTUNITY CLAUSE: By acceptance of this P.O., Seller certifies it is in compliance with the Equal Opportunity Clause required by Executive Order 11246, as amended, and the Palo Alto Municipal Code, as amended, including Affirmative Action Compliance Programs for Veterans; Handicapped; and Minority Business, and other equal opportunity programs. FORCE MAJEURE: City may delay delivery or acceptance occasioned by causes beyond its control. Seller shall hold such materials, supplies, services and or installations at the direction of City and shall deliver them when the cause affecting the delay has been removed. City shall be responsible only for Seller's direct additional costs in holding the goods or delaying performance of this P.O. and City's request. Seller shall also be excused if delivery is delayed by unforeseen events beyond its reasonable control, provided Seller notifies City as soon as they occur. City may cancel this P.O. if such delay exceeds thirty (30) days from the original delivery date. Seller shall use its best efforts to grant preference to this P.O. over those of other customers, which were placed after this P.O. AUTHORITY OF AGENT OR FACTOR: Seller represents that, whenever it executes this P.O. on behalf of a third party as an agent or factor, it shall disclose the existence of the agency or factor relationship to City. Seller shall be deemed to have the legal authority to enter into this P.O. with City on behalf of the third party. INTERPRETATION OF CONTRACT DOCUMENTS: In the event of a conflict between the terms of this P.O. and the attached specification with respect to any obligation of Seller, the provision which impose the greater obligations upon Seller shall prevail. CITY OF PALO ALTO PAGE 1 OF 3 GDS Rev. 06/22/2016 Item 5: Staff Report Pg. 11 Packet Pg. 72 of 377 TERMS AND CONDITIONS OF PURCHASE Item 5 Attachment A - Anixter, ENVIRONMENTALLY PREFERRED PURCHASING REQUIREMENTS: Seller agrees to comply with the City's Environmentally Preferred Purchasing Requirements. (1) Ha,ardni a Wnsrar Seller shall take -back all spent or otherwise discarded hazardous products sold to the City by the Seller if the spent or discarded products are classified as hazardous or universal wastes by State or Federal regulations. Seller shall provide convenient collection and recycling services (or disposal services if recycling technology is unavailable) for all universal wastes, which originate from the Vendor. Hazardous waste manifests or bills of lading must be provided to City staff upon request. Recycling and reuse of hazardous wastes must occur within the United States. Universal waste lists and information are available www.dtsc.ca.gov/HazardousWaste/UniversalWaste/. A hazardous waste list is available at http://www.calrecycle.ca.gov/LEA/Training/wasteclass/yep.htm. Additional information can be obtained by contacting the City of Palo Alto Hazardous Waste Department at (650) 496-6980. (2) Tarn Wasts and Pnlli ifinn Pravantinn Per Palo Alto City Council policy, the City is targeting to achieve Zero Waste by 2021. The City must also meet Municipal Regional Stormwater Permit requirements requiring no visible impact from litter via stormdrains by 2022. To that end the vendor, manufacturer and or contractor must individually or collaboratively comply with the waste reduction, reuse and recycling requirements of the City's Zero Waste and Pollution Prevention Programs. Seller acknowledges and agrees that if Seller fails to fully and satisfactorily comply with these requirements, the City will suffer, as a result of Seller's failure, substantial damages which are both extremely difficult and impracticable to ascertain. Therefore, the Seller agrees that in addition to all other damages to which the City may be entitled, in the event Seller fails to comply with the below requirements Seller shall pay City as liquidated damages the amounts specified below. The liquidated damage amount is not a penalty but considered to be a reasonable estimate of the amount of damages City will suffer as a result of such non-compliance. • Sellers shall adhere to the standard that all printed materials provided to the City that are generated from a personal computer and printer including, proposals, quotes, invoices, reports, and public education materials shall be double -sided, printed on a minimum of 30% post -consumer content paper or greater unless otherwise approved by the City's Environmental Services Division (650) 329-2117. Materials printed by a professional printing company shall be a minimum of 30% post -consumer material or greater and printed with vegetable based inks. Liquidated damages of $30 per document will be assessed by City for failure to adhere to this requirement. • All paper packaging must be Forest Stewardship Council (FSC) Certified. • All primary, secondary and shipping (tertiary) packaging be minimized to the maximum extent feasible while protecting the product being shipped. • All primary, secondary and shipping packaging shall be recyclable in the City's recycling program. A complete list of items accepted for recycling are found at www.zerowastepaloalto.org or by calling (650) 496-5910. If any portion is received that does not meet this requirement, liquidated damages of $235 or a minimum of $50 if the combined product and shipping cost is $235 or less will be assessed by City for failure to adhere to this requirement. • Expanded foam plastics (e.g., foam or cushion blocks, trays, packing 'peanuts'), such as but not limited to polystyrene (aka Styrofoam[tm]), polypropylene, or polyurethane shall not be used as primary, secondary or tertiary/shipping packaging with the following exceptions: o Primary packaging made from these materials may be used if the vendor, manufacturer, contractor individually or collaboratively does one of the following: (a) takes the material back at the City's convenience and at no cost to the City, or (b) pays the City of Palo Alto's disposal costs via payment of liquidated damages of $235, or a minimum of $50 if the combined product and shipping cost is $235 or less. o Bioplastics that meet ASTM D6400 standards for compostability may be accepted with approval from the City's Environmental Services Division subject to local municipal compost facility requirements. o If approved by the City's Environmental Services Division, a packaging requirement may be waived if no other viable packaging alternative exists. • Reusable/returnable pallets shall be used and I additional I Inc. Purchase Order - cost to the City. Seller shall provide documental Fe of pallets and/or recycling of broken pallets. Liquidated da 4525000136 of $50 if the combined product and shipping cost is $262 or less will be assessed by City for failure to adhere to this requirement. (3) Fnorny and Wafer FffiniannvL Seller shall provide products with an ENERGY STAR, Water Sense or State of California standard rating, whichever is more efficient, when ratings exist for those products. A life cycle cost analysis shall be provided to the City upon request and shall at minimum include: first cost, operating costs, maintenance costs, and disposal costs. Contacts for additional information about City of Palo Alto Hazardous Waste, Zero Waste and Utilities programs: Hazardous Waste Program (Public Works) (650) 496-6980 Zero Waste Program (Public Works) (650) 496-5910 Watershed Protection (650) 329-2117 Energy Efficiency (650) 496-2244 (4) I^niadafad fluwups Seller agrees that failure to comply with the City's Environmentally Preferred Purchasing Requirements will result in Liquidated Damages, according to the table marked Liquidated Damages on page 3 of this P.O. CITY OF PALO ALTO PAGE 2 OF 3 GDS Rev. 06/22/2016 Item 5: Staff Report Pg. 12 Packet Pg. 73 of 377 TERMS AND CONDITIONS OF PURCHASE Item 5 Attachment A - Anixter, Inc. Purchase Order - NONCOMPLIANCE WITH ENVIRONMENTALLY PREFERRED PURCHASING REQUIREMENTS, LIQUIDATED DAMAGES: The following table lists the events that constitute breaches of the Agreement's standard of performance warranting the imposition of liquidated the amount of liquidated damages for failure to meet the contractually required standards of performance. 4525000136 level, and Event of Non -Performance Acceptable Performance Level Liquidated Damage Amount (Allowed events per Fiscal Year) Recycled Paper Use Failure to use 30% recycled content paper 1 $30 per each document Recyclable Packaging Materials Failure of Seller to use secondary and shipping packaging that is recyclable in 1 $235 or a minimum of $50 if the combined product the City's recycling program. and shipping cost is $250 or less will be incurred if this is not adhered to. Expanded Foam Plastics Unapproved use of expanded foam plastics for secondary or shipping 0 $235 or a minimum of $50 if the combined product packaging and shipping cost is $235 or less Pallet Use 1 $262 or a minimum of $50 if the combined product Failure of Seller to take -back and reuse pallets, recycling only broken pallets, and shipping cost is $2 or less at no additional cost to the City. CITY OF PALO ALTO PAGE 3 OF 3 GDS Rev. 06/22/2016 Item 5: Staff Report Pg. 13 Packet Pg. 74 of 377 Item 6 Item 6 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Community Services Meeting Date: October 21, 2024 Report #:2408-3386 TITLE Approval of Contract Amendment Number 2 to Contract Number C19173035 with Team Sheeper, Inc., for a five-year Operating and Revenue Sharing Agreement for operations of Rinconada Pool, with an option to renew for an additional five years, effective January 1, 2025; CEQA status —not a project. RECOMMENDATION Staff recommends that Council approve and authorize the City Manager or designee to execute Amendment No. 2 to Contract Number C19173035 with Team Sheeper Inc. (Attachment B), for an additional five-year revenue share contract for operational oversight of Rinconada Pool's aquatics programming for the term of January 1, 2025 through December 31, 2029. EXECUTIVE SUMMARY The City of Palo Alto owns the Rinconada Pool which has been operated by third -party service provider, Team Sheeper, Inc., since 2018. Contract Number C19173035 with Team Sheeper, Inc. became effective January 1, 2019 and will terminate on December 31, 20241 based on a five-year contract term. Staff is recommending a contract amendment to extend the term for five years with an option for an additional five years if mutually agreeable to both parties. This recommendation is based on exceptional performance by Team Sheeper, Inc. and positive feedback from pool users, including a survey conducted by the Friends of the Rinconada Pool asking if pool users support a contract extension. Ninety percent of survey respondents were in favor of Team Sheeper, Inc. continuing as the Rinconada Pool operator. Aquatics programming provided by Team Sheeper, Inc. includes swim instructors and certified lifeguards to provide lap swim, open/recreation swim, a youth swim team, youth swim lessons, youth camps, masters swim, lane rentals for community swim teams and other community groups, and pool parties. Team Sheeper, Inc. is responsible for operating and delivering high - 1 City Council, December 18, 2018; Agenda Item #14; SR #9909 https://www.cityofpaloalto.org/civicax/filebank/blobdload.aspx?t=62283.26&BlobID=67973 Item 6: Staff Report Pg. 1 Packet Pg. 75 of 377 Item 6 Item 6 Staff Report quality aquatics programs, managing program registration, providing responsive customer service, adapting programs to community needs and demands, and setting user fees comparable to those of aquatics facilities in other nearby communities. The City is responsible for facility maintenance. BACKGROUND In 2015, the City struggled to hire and retain adequate pool staff to meet community demand for the lap swim, learn -to -swim and family recreation swim programs at Rinconada Pool. The Community Services Department (CSD) entered an emergency contract with an outside provider to mitigate its staffing shortages. Working on a very short timeline, CSD executed a contract with Team Sheeper Inc.,2 a professional third -party aquatics service provider who mobilized quickly to provide qualified professional swim instructors and lifeguards to support the Palo Alto aquatics programs. In search of a more sustainable and reliable solution for community aquatics services, in December 2015, CSD issued a Request for Proposals (RFP) to oversee all programming at the pool including: 1. Learn -to -swim lessons 2. The youth competitive swim team 3. The adult masters swim team 4. Aquatics facilities operations, including recreational swim, lap swim, and pool rentals After a careful review of proposals, Team Sheeper, Inc. was selected as the preferred contractor and was awarded a contract with the City effective March 1, 2017 through December 31, 2018.3 Staff, the public, and most Rinconada Pool user groups had very favorable responses toward this new contracted aquatic -services model. Due to this success, on July 18, 2018, an RFP was released to solicit contractors for a longer -term operational contract at the Rinconada Pool expected to take effect January 1, 2019. The goal of the new RFP was to identify a long-term partner who would collaborate with the City and the community to provide high -quality, accessible, and safe aquatics programming at the Rinconada Pool. The RFP scope included all current programming and the opportunity to introduce new services. Invitations to bid were sent to 60 potential bidders including the providers currently at the Rinconada Pool: Palo Alto Stanford Aquatics, Rinconada Masters and Team Sheeper, Inc. The RFP 2 City Council, May 9, 2016; Agenda Item #8; SR #6812 http://www.cityofpaloalto.org/civicax/filebank/blobdload.aspx?BloblD=52154 3 City Council, January 9, 2017; Agenda Item #10; SR #7552 https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager-reports- cm rs/yea r -a rch ive/2017/id-7552-sheeper. pdf Item 6: Staff Report Pg. 2 Packet Pg. 76 of 377 Item 6 Item 6 Staff Report received one response, from Team Sheeper, Inc. Staff completed an evaluation of Team Sheeper Inc.'s REP response, using the following criteria: • Safety of pool users and aquatics employees • City and Customer Costs • Quality of Service and Customer Satisfaction • Diversity of Programming and Accessibility Contract Number C19173035 was awarded to Team Sheeper, Inc. effective January 1, 2019 to December 31, 20244. ANALYSIS Operating with a single full -service contracted operator has resulted in a positive pool user experience with higher service levels than before. Therefore, staff recommends the Council approve Amendment Number 2, a five-year Operating and Revenue Sharing Agreement (Attachment B) with Team Sheeper, Inc. Team Sheeper Successes at Rinconada Pool from January 1, 2017 - Present 1. Stability and Consistency of Providing Services: Since assuming operations of Rinconada Pool in 2017, Team Sheeper, Inc. has provided seven years of consistent, stable, and safe operations. 2. Increase in Community Usage of Pool2018-2024: Pool usage has steadily increased since Team Sheeper, Inc. began operating all pool programs as shown in the table below. Program Jan -Jul 2019 Jan-Jul2024 %Increase 288 51.6% Lap Swim Avg Monthly Members 190 Annual Open Swim Visits 15,142 20,059 32.5% Swim Lessons 3,397 4,160 22.5% Campers 339 604 78.2% 3. Increase in Customer and Safety Services: It is a company practice and value to have a pleasant, friendly, and highly informed customer service staff member greet each patron and certified lifeguards to attentively watch and monitor all facility activities. 4 City Council, December 18, 2018; Agenda Item #14; SR #9909 https://www.cityofpaloalto.org/civicax/filebank/blobdload.aspx?t=62283.26&BlobID=67973 Item 6: Staff Report Pg. 3 Packet Pg. 77 of 377 Item 6 Item 6 Staff Report 4. Community Satisfaction: Team Sheeper, Inc.'s annual customer satisfaction survey reports have reflected overwhelming acceptance and high satisfaction with operational practices including program delivery, customer service, fee structure, safety, program content, and staff members. Chart # 1: Survey Results for Business Operations Lifeguards Communications Web/Online Experience Front Desk Customer Service Pool Deck Cleanliness Locker Rooms Experie rice Safety Fees Reasonable 0% 71% 20°%o 40% 6O/ 8O°l Satisfied to Extremely Satisfied Chart # 2: Lap Swim Survey Results f♦ 9094 f♦ 93% 82% f♦ 94% f♦ 90% f♦ 95% 100% 84% 97% 78% 0% 2O°l 4O°l 60% 8O% 100% Satisfied to Extremely Satisfied Item 6: Staff Report Pg. 4 Packet Pg. 78 of 377 Item 6 Item 6 Staff Report Chart # 3: Open Swim Survey Results Experience 81% Safety 97% 0% 2090 40% 6001 8001 100% Satisfied to Extremely Satisfied Chart # 4: Swim Lesson Survey Results Experience 94% Safety 9594 Fees Reasonable 89% 0% 2001 400/O 6O% 8O% 100% Satisfied to Extremely Satisfied Chart # 5: Camp Survey Results Likely to Register Again Next Year: Very 759' Likely to Extremely Likely Safety: Satisfied to Extemely Satisfied 97% 0% 200/O 400/O 600/O 800/O 100% Item 6: Staff Report Pg. 5 Packet Pg. 79 of 377 Item 6 Item 6 Staff Report Chart # 6: Palo Alto Masters Survey Results Experience Fees Reasonable 88% 78% 0% 2090 40% 60% 80% 100% Satisfied to Extremely Satisfied 5. Development of Youth Summer Swim Camps: In their first year of operations, Teem Sheeper began producing weekly learn -to -swim summer camps that have grown into camps for campers from 5 to 14 years of age. In 2024, 604 campers improved their swim skills. 6. Involvement with a Community Focus Group: Team Sheeper interacts and communicates regularly with "The Friends of Rinconada Pool" to better understand the wants and needs of the community lap swimmer. The Friends of Rinconada Pool is a group of swimmers formed to advocate for lap swimmer representation in pool operations surrounding time and space allocations. The group has evolved to include twice -annual social gatherings for all community members. 7. Pandemic and Post -pandemic Services: Team Sheeper, Inc. provided safe and robust aquatic services and programming that served the community with appropriate modified operations. During the pandemic, Rinconada Pool and Burgess Pool were the only pools operational in the area. 8. Conscience Steward of Community Asset: Team Sheeper, Inc. watches and listens to the needs of the community and interfaces with City Staff. They have played a role in the maintenance and improvement of pool fences, the pool slide, plaster resurfacing of both pools, the addition of bike racks, introduction of play pool covers, additional wall - mounted pace clock and refurbishment of lifeguard towers. 9. Understanding of Facility Legacy from Long -Time Pool Users: Every aquatic facility possesses a spirit and soul that develops from the patrons that make up the pool population. An operator must understand the wants and needs of the patrons who use the pool and potential patrons who may not yet be using the pool. Balancing the past, present and future with a desire to achieve a harmonious relationship across the spectrum of user groups is the overriding goal for Team Sheeper, Inc. Item 6: Staff Report Pg. 6 Packet Pg. 80 of 377 Item 6 Item 6 Staff Report If the Council does not approve the staff recommendation, staff would extend the current contract term for a reasonable time to allow staff to conduct a new competitive bid process. This is not desirable as it would be disruptive to already satisfied pool users, a significant staff effort, and unlikely to attract a significant number of responses due to the highly specialized nature of the work. FISCAL/RESOURCE IMPACT Like Team Sheeper's current contract, this contract utilizes a revenue share model, which means that the City does not pay Team Sheeper anything to operate Rinconada Pool. Instead, Team Sheeper, Inc. will collect customer payments and remit gross revenues of as much as 12% of revenues collected from all programs to the City of Palo Alto. The exact share of gross revenue remit to the City is dependent on the total revenue earned. The tiers that determine the percentage owed are proposed to change with this amendment as shown in the below table. For example, if total revenues earned are less than $1.75 million, the City's revenue share is 1%, if total revenues earned is $2 million the City's revenue share is 2%. Given that the average total annual revenue forTeam Sheeper has been $845,000, the new proposed tiers are not anticipated to have a large impact on revenues owed to the city. up to $1.25 million •d t.]ol.Mlokl-. up to $1.75 million , . . . •ituu1iIi1iuuuiiiiui 1% $1,250,001 to $1,500,000 $1,750,001 to $2,250,000 2% $1,500,001 to $1,750,000 $2,250,001 to $2,750,000 3% $1,750,001 to $2,000,000 $2,750,001 to $3,250,000 4% $2,000,001 to $2,500,000 $3,250,001 to $3,750,000 5% $2,500,001 to $3,000,000 $3,750,001 to $4,250,000 6% For each additional $500,000 in revenue, the gross revenue percentage will grow 1% point up to a maximum of 12% STAKEHOLDER ENGAGEMENT Staff and Team Sheeper, Inc. provide an annual performance update to the Parks and Recreation Commission (PRC) on progress of the Rinconada Pool operations. The report and presentation include revenues, expenditures, and program updates within lap swim, open swim, Master's, swim lessons and camps. This also includes Palo Alto Stanford Aquatics' (PASA) use of the pool. A monthly community e -newsletter provides program updates, pool closures, and facility maintenance to those who are signed up to receive them. Item 6: Staff Report Pg. 7 Packet Pg. 81 of 377 Item 6 Item 6 Staff Report Staff and Team Sheeper, Inc. also provide a quarterly update with the Friends of the Rinconada Pool. Friends of Rinconada Pool (FoRP) is an unincorporated association that represents the interests of lap swimmers of Rinconada Pool, and facilitates communication and problem -solving between lap swimmers, the City of Palo Alto, and pool or swim program operators under contract to the City. At the request of the City, FoRP surveyed its members to solicit their opinions on the upcoming renewal of the contract with Team Sheeper, Inc. This report (Attachment A) summarizes the results, while appendices contain the text of the questionnaire and all individual responses. ENVIRONMENTAL REVIEW The recommendation in this report does not constitute a project requiring review under the California Environmental Quality Act (CEQA). ATTACHMENTS Attachment A: Friends of the Rinconada Pool Survey Results Attachment B: Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 APPROVED BY: Kristen O'Kane, Community Services Director Item 6: Staff Report Pg. 8 Packet Pg. 82 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results Friends of Rinconada Pool Survey Report 2024 Team Sheeper Contract Renewal Friends of Rinconada Pool (FoRP) is an unincorporated association that represents the interests of lap swimmers of Rinconada Pool, and facilitates communication and problem -solving between lap swimmers, the City of Palo Alto, and pool or swim program operators under contract to the City. At the request of the City, FoRP conducted a survey of its members to solicit their opinions on the upcoming renewal of the contract with Team Sheeper who currently operates the City's swim programs. This report summarizes the results, while appendices contain the text of the questionnaire and all individual responses. SUMMARY The survey comprised five questions (APPENDIX 1: Survey Questionnaire), two directly related to the contract renewal, two soliciting feedback on what was working for swimmers and what changes they might like, and one for additional comments. FoRP members were invited, by email, to enter their responses into a Google Form. The survey was expected to take less than two minutes to complete, and was open for responses Jul 22 - Jul 31 2024. 40 out of 113 list members responded (a 35% response rate). The results were overwhelmingly in favor of contract renewal with 90% of respondents selecting "Yes." Explanations for this consistently included a high degree of satisfaction with overall pool management, including a significant number of responses calling out frequent and consistent communication, and several mentioning successful balancing of needs of different swim groups. Of the four responders who selected "no," three elaborated on their responses. Two objected to outsourcing a city service to a private for-profit contractor. One presented allegations of a more serious nature. These responses warrant careful consideration, and are presented separately in the discussion of Contract Renewal responses. In pool operations, the two primary sources of satisfaction were the extensive hours of operation/availability of lap swim lanes, and the friendliness of staff. Cleanliness of the facility and the pool itself were also mentioned often. The most consistently requested change was the addition of evening lap swim hours. A noticeable number of responders expressed a desire for more consistent management of lane allocations (in particular, transitions between masters and lap lanes, and usage of lesson lanes), and stronger enforcement of pool rules (in particular, keeping open swimmers out of lap lanes and adhering to opening times for open swim). The results are discussed in more detail below. All individual responses are provided in APPENDIX 2: Individual Responses. 2024-08-08 Item 6: Staff Report Pg. 9 Packet Pg. 83 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results CONTRACT RENEWAL • Yes •No Distribution of responses to the question, "Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs?" (40 total responses) As shown above, 36 (90%) of the 40 respondents indicated that they were in favor of renewing the contract and subsequently offered grounds for their opinion. Of these 36, 24 (67%) offered sentiments reflecting a high degree of satisfaction with overall pool management, for instance, "The pool is run better than ANY public pool in the nearby area." The following additional comments capture majority sentiment: • "Please do not go back to city management." • "Renew the contract!!!" • "Renew the contract!!" • "Rinconada pool has definitely become a much more welcoming, prolem solving pool with PASS management." • "Please DO renew the contract with Team Sweeper - they are GREAT" • "Keep Team Sheeper!" • Recommend you extend Sheeper's contract. • "Thanks to Team Sheeper and Friends of Rinconada Pool for helping to create a great pool community!" Of the four respondents who were not in favor of contract renewal, three provided elaborations. These are offered here in full without discussion, but with added emphasis highlighting areas of potential concern. • "Terrible Management, Terrible CEO, Terrible HR, Terrible Employees, except Marla who left for good reason and Jerome and Meena. They do Age discrimination and race and color discrimination and have violated local, state and nationallaws." • "It is a City pool that receives tax dollars and should not be run by a private company that puts their agenda first. Tim Sheeper can be manipulative and political in getting his way - including excluding lap swim hours in the evening as well as offering more lanes for lap swimmers during non -work and non -sun hours. In addition, daily drop -in fees are 2024 FoRP Survey Report 1 2024-08-08 Item 6: Staff Report Pg. 10 Packet Pg. 84 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results so much higher than when it was City run - especially for masters swimming which charges $20. " • "Dislike privatizing public services. Was better when city ran it." 69�kiIII►T,II1*1:1 %I 'II 1.1 IsislU r]II Overall management 24 67% Communications 8 22% Balancing needs of different swim programs 4 11% Community spirit 3 8% Breakdown of factors related to pool management mentioned favorably. Note that lack of mention by a respondent likely indicates neutrality rather than a negative view. In specific management factors, 8 respondents (22%) called out improved communications, e.g., "Improved communications on circumstances important to lap swimmers.... Open and responsive to requests for improvements." Other factors mentioned included balancing needs of different programs (4 respondents, 11%), and promoting a community spirit (3 respondents, 8%), e.g., "Team Sheeper does a great job balancing the needs of different swim programs, and fostering a vibrant swim community." 2024 FoRP Survey Report 1 2024-08-08 Item 6: Staff Report Pg. 11 Packet Pg. 85 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results SENTIMENTS RELATED TO POOL OPERATIONS Hours of operation/availability of lap swim lanes 19 47% Friendliness & helpfulness of staff 17 42% Cleanliness of facility 8 20% Cleanliness of pool 4 10% Pricing 3 7% Safety 2 5% Ease of payment 2 5% Breakdown of factors related to pool operations mentioned favorably. Note that lack of mention by a respondent likely indicates neutrality rather than a negative view. Most responses to what is working well for swimmers were related to pool operations. A high number of all respondents, 19 (47%), cited hours of operation/availability of lap swim lanes as a prime source of satisfaction, e.g., "Always a lane for me at anytime which is the main interest!" 17 (42%) spoke of the friendliness and helpfulness of staff, for example, "Everyone is very helpful at the pool and feel like you are welcome with smile evertime." A significant number of respondents highlighted cleanliness of the facility, 8 respondents (20%), e.g., "The facility is clean! That is a huge plus."4 respondents (10%) specifically called out cleanliness of the pool itself, e.g., "Pool is well designed and kept clean." Three other factors were mentioned favorably by more than one respondent: Pricing (3 respondents, 7%), ".. the prices are completely reasonable and fair," safety (2 respondents, 5%), "PASS has improved the safety of swimmers with its staffing levels," and ease of payment (2 respondents, 5%), "Easy payment process." Three factors each received mention by a single respondent: • "... the check in is efficient," • "Shallow lanes kept open for disabled." • "Pool temperature is top concern of staff." 2024 FoRP Survey Report 1 2024-08-08 4 Item 6: Staff Report Pg. 12 Packet Pg. 86 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results DESIRED CHANGES Add evening hours 9 23% Improved lane management 4 10% Better rule enforcement 4 10% Pool temperature never above 82°F 3 7% Extend morning hours 2 5% Fix pace clocks 2 5% Lower shower temperature in summer 2 5% Lower prices (at least for residents and seniors) 2 5% Breakdown of factors related to pool operations mentioned favorably. Note that lack of mention by a respondent likely indicates neutrality rather than a negative view. The most common change requested was the addition of evening lap swim hours (9 respondents, 23%), "Evening dedicated lap swim hours to avoid UV rays which are strong in the early morning thru afternoon 6 months out of the year. " 2 respondents (5%) suggested extended morning hours to relieve 6-8 am lane congestion, "Open 30 to 60 minutes early in the morning could reduce over crowded periods between 6-8 am." 4 (10%) respondents asked for improved lane management, having to do with adjusting lane allocations in response to actual demand, e.g., by the masters swim program, "Also, when the lap swim lanes are full, Masters lanes should be consolidated." or the open swim program, "Be flexible with pool assignments: if few kids show up and lap swimmers are three to a lane, feel comfortable temporarily making more swim lanes out of family swimming that is not being used." 4 (10%) respondents wished for some form of better rule enforcement, mostly related to lane usage, "Keep family swim members OUT OF THE LAP LANES.," ".. masters swim coaches need to be more diligent on having masters swimmers exit the pool when the masters session ends.," "not letting kids in to lap pool during non open swim hours. " In other specific changes, 3 respondents (7%) commented on pool temperature, intimating (or stating) that 82°F should be considered maximum rather than median temperature, "Consistent water temperature of 81°-82°."2 respondents (5%) requested each of fixing the pace clocks, "Time clocks that can be read from any spot in the pool. There are so many missing lights now in the 2 existing ones, I have to guess starts., " lowering the temperature of shower water (particularly in the summer), "lower the temperature of the showers (too hot)," and lowering 2024 FoRP Survey Report 1 2024-08-08 Item 6: Staff Report Pg. 13 Packet Pg. 87 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results prices (at least for residents and seniors), "Under city management, a packet of 10 swims was 20$. Now my 2 or 3 times a week is much more expensive." One respondent expressed dissatisfaction with conditions in the changing room: "Changing room is nasty: Cleanliness is abhorrent (hair in shower, on floor, wet, slippery, swim trunk dryer is always broken, particularly in the summer)" Other respondents had specific suggestions for improvements: • "Offer a multi -swim pass that isn't based on a monthly fee for swimmers who are regulars but who can't swim enough to justify a monthly pass." • "... more adult pull buoys please," • "Open a few lanes to lap swimming during PASA practice.' • "It would be nice if swimmers could get to know the lifeguards better. We try not to bother them as they are so busy, but I would like to know their names. Having photos with names on them up on the bulletin board inside the entrance would help." • "Please include signage of how the pool showers work -- specifically the red handle to turn the water off. Better signage to turn off water when finished with shower instead of letting the water run." • "Maybe more modern lockerroom" • "Install a sauna! (Hey, you asked.)" 2024 FoRP Survey Report 1 2024-08-08 Item 6: Staff Report Pg. 14 Packet Pg. 88 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results APPENDIX 1: Survey Questionnaire Item 6: Staff Report Pg. 15 Packet Pg. 89 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Cont Results nsion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION I. Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? Mark only one oval. Yes CDNo 2. Please tell us why you feel that way. Be as specific as possible. Item 6: Staff Report Pg. 16 Packet Pg. 90 of 377 Item 6 GENERAL FEEDBACK Attachment A - Friends of We'd like to know how things are working out for you at the pool, and how Rinconada Pool Survey you better. Results 3. What, if anything, is working particularly well for you at the pool? 4. What, if any, changes would improve your pool experience? 5. Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 17 Packet Pg. 91 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results APPENDIX 2: Individual Responses Item 6: Staff Report Pg. 18 Packet Pg. 92 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey Results 2024 Team Sheeper/PASS Contract Extension Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes 0 No Please tell us why you feel that way. Be as specific as possible. Every aspect of the pool management has improved, extended hours, friendly staff, e mail notices of any schedule changes, POOL TEMPERATURE IS STABLE at 82. Item 6: Staff Report Pg. 19 Packet Pg. 93 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Extended hours compared to the old days. Pool temperature is top concern of staff What, if any, changes would improve your pool experience? None Do you have other comments? Please do not go back to city management. Just looks at Eagle pool in Mountain View. Short hours mean you ALWAYS have to share lane and often circle This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 20 Packet Pg. 94 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. The pool is run better than ANY public pool in the nearby area. Item 6: Staff Report Pg. 21 Packet Pg. 95 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? The facility is clean! That is a huge plus. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Can't think of a thing! It's truly a superbly run facility. Do you have other comments? Renew the contract!!! This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 22 Packet Pg. 96 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Best run pool in the area. Item 6: Staff Report Pg. 23 Packet Pg. 97 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how Results you better. What, if anything, is working particularly well for you at the pool? Super clean ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Do you have other comments? Renew the contract!! This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 24 Packet Pg. 98 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. the monthly fee is OK and the pool seems to operate to plan Item 6: Staff Report Pg. 25 Packet Pg. 99 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Check in is quick. The life guards are helpful. The regular lap swimmers are great. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Keep family swim members OUT OF THE LAP LANES. They routinely go under the ropes to enter lap lanes. Life guards could be more helpful directing swimmers to lanes to share by ability and sex. In general, slow with slow, fast with fast, women with women. Be flexible with pool assignments: if few kids show up and lap swimmers are three to a lane, feel comfortable temporarily making more swim lanes out of family swimming that is not being used. There are boys too old to follow their mothers into the girl's locker room. We should advertise protocol for sharing lane: always ask, do not enter the pool without authorization, do not dive in over a swimmer already in the lane as that is dangerous. Some of the very aggressive male swimmers need to share lanes with other very aggressive male swimmers so they can learn courtesy and safety first hand. Injuries can happen, but when they do, I recommend that the injuring party receive a temporary suspension of their pool privileges. Can lap swimmers occasionally have night swimming??? This would be great. Do you have other comments? I'm generally very happy with Rinconada. It would be fun to have night lap swimming once in a while. ............................................................................................................................................................................................................................................................................................................................... This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 26 Packet Pg. 100 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. They are doing a good job, things are running smoothly. Item 6: Staff Report Pg. 27 Packet Pg. 101 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.. you better. What, if anything, is working particularly well for you at the pool? I love to be able to swim in this beautiful and clean setting 4x a week ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? lower the temperature of the showers (too hot) - offer evening lap swim hours ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? No This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 28 Packet Pg. 102 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Not really sure what the swim program include -- if this includes youth swim lesson/camps/etc., yes, I agree. Item 6: Staff Report Pg. 29 Packet Pg. 103 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? When all equipment is working (pumps/heater/etc.) the pool is a fantastic resource. The staff is friendly and helpful. What, if any, changes would improve your pool experience? During the summer season, more lap swim hours would be appreciated or moving children's lessons into the children's pool. There also needs to be better watch of parents who allow their younger swimmers to lap swim alone. There should be guidance for younger swimmers to swim in the shallower lanes. Even if the child can adequately swim laps, it is uncomfortable to share a deeper water lane with a young swimmer. Summer guards need to be more aware of the pool deck. Do you have other comments? Please include signage of how the pool showers work -- specifically the red handle to turn the water off. Better signage to turn off water when finished with shower instead of letting the water run. Parents who bring their young children in to shower need to be mindful of the shower rules. Parents who allow their children to stand for 10-15 minutes under the water need to be reminded of the recommendation to keep showers to a limit of 3-5 minute as posted in the locker room. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 30 Packet Pg. 104 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Great pool access. Great at balancing multiple programs to maximum the use of this facility. Item 6: Staff Report Pg. 31 Packet Pg. 105 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Easy payment process. Friendly staff. Pool access is outstanding, even when balancing multiple programs and community needs. What, if any, changes would improve your pool experience? Offer a multi -swim pass that isn't based on a monthly fee for swimmers who are regulars but who can't swim enough to justify a monthly pass. Also, offer evening hours on weekends for lap swimming. Do you have other comments? This content is neither created nor endorsed by Google. GooglE Forms Item 6: Staff Report Pg. 32 Packet Pg. 106 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? U Yes ®No Please tell us why you feel that way. Be as specific as possible. It is a City pool that receives tax dollars and should not be run by a private company that puts their agenda first. Tim Sheeper can be manipulative and political in getting his way - including excluding lap swim hours in the evening as well as offering more lanes for lap swimmers during non -work and non -sun hours. In addition, daily drop -in fees are so much higher than when it was City run - especially for masters swimming which charges $20. Item 6: Staff Report Pg. 33 Packet Pg. 107 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Pool is well designed and kept clean. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Evening dedicated lap swim hours to avoid UV rays which are strong in the early morning thru afternoon 6 months out of the year. The pool could be shut during the height of the afternoon when few people swim due to both work schedules and sun. Do you have other comments? Such a shame that the City cant have more control over Sheeper's scheduling and fees. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 34 Packet Pg. 108 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Seems to be a fair balance of pool usage Item 6: Staff Report Pg. 35 Packet Pg. 109 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.. you better. What, if anything, is working particularly well for you at the pool? Pleasant swim experience and I can sometimes get a whole lane if I time my swim well. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 36 Packet Pg. 110 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. The pool is managed well, communicated timely, cleanness and pool quality is very good. Everyone is very helpful at the pool and feel like you are welcome with smile evertime. Item 6: Staff Report Pg. 37 Packet Pg. 111 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 38 Packet Pg. 112 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Everything is pretty seamless today. No complaints from me. Item 6: Staff Report Pg. 39 Packet Pg. 113 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 40 Packet Pg. 114 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. PASS has improved the safety of swimmers with its staffing levels, it has addressed community spirit building among swimmers and staff, improved advance communication with swimmers when issues arise... definitely a work with us perspective! Item 6: Staff Report Pg. 41 Packet Pg. 115 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? The availability of lanes during times I swim, info about pool temps or breakdown of equipment What, if any, changes would improve your pool experience? Time clocks that can be read from any spot in the pool. There are so many missing lights now in the 2 existing ones, I have to guess starts. ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? Rinconada pool has definitely become a much more welcoming, prolem solving pool with PASS management. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 42 Packet Pg. 116 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. The pool is extremely well managed. Attentive lifeguards. Friendly and helpful staff at the front desk. Lots of available lap swim time. Lanes are managed. (None of this was true before Team Sweeper.) .............................................................................................................................................................................................................................................................................................................................................. Item 6: Staff Report Pg. 43 Packet Pg. 117 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.. you better. What, if anything, is working particularly well for you at the pool? I can swim laps almost any time of day. If we have to share lanes, the lifeguards actively try to match similar swimmers in each lane. What, if any, changes would improve your pool experience? Open a few lanes to lap swimming during PASA practice. ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? Please DO renew the contract with Team Sweeper - they are GREAT. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 44 Packet Pg. 118 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. I really enjoy lap swimming at Rinconada pool. The current team are friendly, and the facility is clean. It's a pleasant, pretty placeto swim. Item 6: Staff Report Pg. 45 Packet Pg. 119 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L..sults you better. What, if anything, is working particularly well for you at the pool? I am offered enough lap swim hours to be able to swim 3-4 times per week. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? I wish they still offered some night lap swim hours. I wouldn't go then, but I know a friend who would appreciate it. During the crowded summer, there are some times when only 5 lap swim lanes are available. In the winter months, this time period offers 14 lap lanes. Having room for only 10 swimmers during the times that offer only 5 lap swim lanes usually means that I only use my snorkel and fins since the other person is swimming freestyle. I don't like having swimmers hit me with their arms while doing the freestyle or hit me with their arms or legs while they're swimming the breaststroke. Do you have other comments? Jerome is a very nice manager. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 46 Packet Pg. 120 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Great organization, safety and order at lap pool is very good. Quality of water seems to have improved Item 6: Staff Report Pg. 47 Packet Pg. 121 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Lane assignments, having multiple community member groups using the pool ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Changing room is nasty: Cleanliness is abhorrent (hair in shower, on floor, wet, slippery, swim trunk dryer is always broken, particularly in the summer), showers: Please, install at least better showers, super hot in the summer, have at least two temperature regulations, maybe hot/cold, but one isn't enough). Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 48 Packet Pg. 122 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Pool open all day, we'll run has made a huge difference in ability to swim here. Item 6: Staff Report Pg. 49 Packet Pg. 123 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Hours are great so nice to use the pool ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 50 Packet Pg. 124 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Consistent service and hours of operation. Improved communications on circumstances important to lap swimmers. Friendly staff. Open and responsive to requests for improvements. .............................................................................................................................................................................................................................................................................................................................................. Item 6: Staff Report Pg. 51 Packet Pg. 125 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Very few unexpected closures. Friendly staff at pool entrance. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Water temperature feels higher than 82 degrees on some days - especially on hot days. More importantly, masters swim coaches need to be more diligent on having masters swimmers exit the pool when the masters session ends, especially when a number of lap swimmers are waiting on the pool deck and are already doubling up in the other lanes. I have witnessed a masters coach deep in conversation with a masters swimmer and blocking a lane after the masters swim session has ended, paying no attention to lap swimmers waiting for the lane to empty. Also, some masters swimmers remain in the water long after the masters session has ended (15 to 20 minutes). This is especially concerning during the busy summer time and on hotdays. Do you have other comments? Still have concerns about transition from masters to lap swimmers as noted above. Also, when the summer session first started there was dirt and debris at the bottom of the pool, but since then it's been a lot cleaner. Thanks! This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 52 Packet Pg. 126 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. The pool is well managed Item 6: Staff Report Pg. 53 Packet Pg. 127 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Good staffing, clean, ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Open 30 to 60 minutes early in the morning could reduce over crowded periods between 6-8 am. Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 54 Packet Pg. 128 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? U Yes ®No Please tell us why you feel that way. Be as specific as possible. Item 6: Staff Report Pg. 55 Packet Pg. 129 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Shallow lanes kept open fordisabled ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Cleaner changing rooms. Equipment repaired. Life guards paying better attention Do you have other comments? Front desk staff paying attention and not letting kids in to lap pool during non open swim hours ............................................................................................................................................................................................................................................................................................................... This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 56 Packet Pg. 130 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Back before Team Sheeper had the pool contract, I wasn't thrilled with the decision to switch from a public program to one held privately. But in the years since, swimming both at Burgess & Rinconada, I changed my opinion. My experiences have been consistently positive. Item 6: Staff Report Pg. 57 Packet Pg. 131 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 58 Packet Pg. 132 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. I'm not a big fan of Sheeper, but I don't see a plan B. I don't see the city taking it back. Item 6: Staff Report Pg. 59 Packet Pg. 133 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Longer lap swim hours ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? more lap lanes during the summer days Do you have other comments? Still looking for a viable alternative ....................................................................................................................................................................... This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 60 Packet Pg. 134 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Item 6: Staff Report Pg. 61 Packet Pg. 135 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 62 Packet Pg. 136 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. As a Palo Alto resident lap swimmer I find that the pool is well staffed and run and that it has not been difficult to find a lane at the morning time I usually swim. The staff is cordial and was helpful to me as I returned after 12 weeks away while recovering from knee joint replacement surgery. The lifeguard kindly and carefully promptly upon request gave me a ride into the pool on the handicap chair and helped me out promptly when I completed my walk/swim routine thisweek. Item 6: Staff Report Pg. 63 Packet Pg. 137 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? The pool seems especially clean this past week. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? It would be nice if swimmers could get to know the lifeguards better. We try not to bother them as they are so busy, but I would like to know their names. Having photos with names on them up on the bulletin board inside the entrance would help. Do you have other comments? none at this time This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 64 Packet Pg. 138 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes ®No Please tell us why you feel that way. Be as specific as possible. Terrible Management, Terrible CEO, Terrible HR, Terrible Employees, except Marla who left for good reason andJerome erome and Meena. They do Age discrimination and race and color discrimination and have violated local, state and national laws. Item 6: Staff Report Pg. 65 Packet Pg. 139 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Nothing at all. Terrible Management, Terrible CEO, Terrible HR, Terrible Employees specifically Kathy Miller who colluded with HR in lying about me , except Marla who left for good reason and Jerome and Meena. They do Age discrimination and race and color discrimination and have violated local, state and national laws and ADA laws. What, if any, changes would improve your pool experience? Stop age discrimination and race and color discrimination and stop violating local, state and national laws. They must stop violating ADA laws as well. .............................................................................................................................................................................................................................................................................................................................................. Do you have other comments? They should refund the monies I paid. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 66 Packet Pg. 140 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Pool is run efficiently and lots of lap swim hours Item 6: Staff Report Pg. 67 Packet Pg. 141 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Maybe more modern locker room Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 68 Packet Pg. 142 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Tim has been able to provide continual Life -Guard support. The pool is open on time. It is running smoothly. Item 6: Staff Report Pg. 69 Packet Pg. 143 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? The pool opening on time! The pool staying open...and the communication when the pool is closed is very helpful What, if any, changes would improve your pool experience? *Evening hours! *Also, I think the "6-8 AM" swim hours should be reserved for ADULTS ONLY(I 6 years and older). These are PEAK hours. *Also, when the lap swim lanes are full, Masters lanes should be consolidated. ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? I am noticing recently the increase in "private" swim lessons in the shallow lanes. I have had to move due to parents gorking with their own children. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 70 Packet Pg. 144 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. My experience with Team Sheeper is positive. Item 6: Staff Report Pg. 71 Packet Pg. 145 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Staffs are polite and friendly. They keep us informed about any changes in Pool schedule. The change room is clean and comfortable. The fees are resonable with city's suppport. They handle it well during pandemic lock down period. In general, I would like to see they continue their good service. What, if any, changes would improve your pool experience? It would be better if there are more hours for lap swimming later in the day. Do you have other comments? No This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 72 Packet Pg. 146 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Everything seems to work just fine. Item 6: Staff Report Pg. 73 Packet Pg. 147 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Evening hours Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 74 Packet Pg. 148 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Super happy w service and overall pool experience. They are doing a fantastic job- no complaints. Item 6: Staff Report Pg. 75 Packet Pg. 149 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? It's clean and a friendly place to swim. Great space and locker rooms. Great communication. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? I would love if it opened earlier- 5 or 530. Do you have other comments? No This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 76 Packet Pg. 150 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. Friendly staff, everything works well, the reaction to and organization during Covid was excellent Item 6: Staff Report Pg. 77 Packet Pg. 151 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Its all good as far as I am concerned ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 78 Packet Pg. 152 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. They are always very proactive. For Covid they were quick to put a schedule into place which saved my mental health ! Always trying to improve and to connect members of Rinconada .............................................................................................................................................................................................................................................................................................................................................. Item 6: Staff Report Pg. 79 Packet Pg. 153 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? Always a lane for me at anytime which is the main interest! Very nice people ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 80 Packet Pg. 154 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. I don't think there are any other options. Item 6: Staff Report Pg. 81 Packet Pg. 155 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.. you better. What, if anything, is working particularly well for you at the pool? Staff is reliable about showing up on time. What, if any, changes would improve your pool experience? Under city management, a packet of I 0 swims was 20$. Now my 2 or 3 times a week is much more expensive. ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 82 Packet Pg. 156 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. There has been ample lap swimming time available the majority of the year ( with the exception of the summer with all the rec. swim and camps ) , pool is run smoothly. Seems the initial worries about less time available for lap swimming is not a problem overall. Item 6: Staff Report Pg. 83 Packet Pg. 157 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? As above, the lap swimming availability. ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? Possibly lower costs for residents and seniors. Do you have other comments? interested in more adult pull buoys please, thanks ....................................................................................................................................................................... This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 84 Packet Pg. 158 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Team Sheeper does a much better job than the city in managing the pool. They are able to hire full time employees with benefits which attracts more long term employees. The city used to restrict guards to under 1,000 hours per year to avoid the city's expensive benefit packages. Having full time year round staff that know the community makes a better experience for all. Item 6: Staff Report Pg. 85 Packet Pg. 159 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.. you better. What, if anything, is working particularly well for you at the pool? I love the hours from early morning to evening everyday making it convenient to fit swimming in my schedule. What, if any, changes would improve your pool experience? I'm happy with the status quo ............................................................................................................................................................................................................................................................................................................................................... Do you have other comments? Keep Team Sheeper! This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 86 Packet Pg. 160 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. They are fine and I'm not certain there is a better option Item 6: Staff Report Pg. 87 Packet Pg. 161 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 88 Packet Pg. 162 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? U Yes ®No Please tell us why you feel that way. Be as specific as possible. Dislike privatizing public services. Was better when city ran it. Item 6: Staff Report Pg. 89 Packet Pg. 163 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? What, if any, changes would improve your pool experience? Better enforcement of rules. Do you have other comments? Why is a for-profit company running a city service? ....................................................................................................................................................................... Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 90 Packet Pg. 164 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Please tell us why you feel that way. Be as specific as possible. They've done a great job with managing Rinconada --- operations, communications, etc. Item 6: Staff Report Pg. 91 Packet Pg. 165 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how Results you better. What, if anything, is working particularly well for you at the pool? hours and lane swimming availability most of the year ............................................................................................................................................................................................................................................................................................................................................... What, if any, changes would improve your pool experience? better lifeguard training in summer when pal swimmers share the pool with recreational swimmers Do you have other comments? This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 92 Packet Pg. 166 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. On time. Helpful. Friendly. Item 6: Staff Report Pg. 93 Packet Pg. 167 of 377 GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and What, if anything, is working particularly well for you at the pool? Staff. Locker rooms/showers. What, if any, changes would improve your pool experience? Consistent water temperature of 8 I O-82° Do you have other comments? Item 6 Attachment A - Friends of Rinconada Pool Survey how L.Results you better. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 94 Packet Pg. 168 of 377 Item 6 Attachment A- Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results li Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? OYes Please tell us why you feel that way. Be as specific as possible. Things are working well. There are enough lanes and hours available for lap swimmers, the check in is efficient, and the staff is helpful and friendly. Item 6: Staff Report Pg. 95 Packet Pg. 169 of 377 Item 6 Attachment A - Friends of GENERAL FEEDBACK Rinconada Pool Survey We'd like to know how things are working out for you at the pool, and how L.sults you better. What, if anything, is working particularly well for you at the pool? See above answer. What, if any, changes would improve your pool experience? The camps in the summer use several lap swimming lanes. Recommend that the lifeguards don't clear the pool, until the camp kids are ready to get into the water. Yesterday morning, we were asked to get out at least 15 minutes prior to when the kids were ready to jump into the water. There should be better communication between the guards and the camp personnel to be able to pick a time that is closer to when the pool is actuallyneeded. Do you have other comments? Recommend you extend Sheeper's contract. This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 96 Packet Pg. 170 of 377 Item 6 Attachment A - Friends of Rinconada Pool Survey 2024 Team Sheeper/PASS Contra Results Sion Survey The contract with Team Sheeper/Palo Alto Swim Sport (PASS) to operate Rinconada swim programs expires at the end of this year. Friends of Rinconada Pool (FoRP) is gathering lap swimmer opinions to ensure they are represented in the City's decision about extending the contract. FoRP is independent of both Team Sheeper/PASS and the City of Palo Alto, and will convey all viewpoints fairly. In addition to offering input on the contract extension, the survey offers you an opportunity to provide other feedback to FoRP. The survey should take less than two minutes to complete. Learn more about Friends of Rinconda Pool: https://sites.google.com/view/friendsofrinconadapool CONTRACT EXTENSION Are you in favor of the City extending the contract with Team Sheeper/Palo Alto Swim & Sport (PASS) to operate Rinconada Pool swim programs? O Yes Item 6: Staff Report Pg. 97 Packet Pg. 171 of 377 Item 6 Attachment A - Friends of Please tell us why you feel that way. Be as specific as possible. Rinconada Pool Survey Results The pool is extremely well -managed: There is a friendly and welcoming atmosphere, the prices are completely reasonable and fair, and the fact that I can swim almost anytime I want is incredible! Team Sheeper does a great job balancing the needs of different swim programs, and fostering a vibrant swim community. I am extremely impressed with how well Camp Rinconada is run: Both campers and counselors look happy, excited and relaxed, and the kids are carefully supervised and have never interfered with my enjoyment of the pool. I love seeing the nurturing of the next generation of swimmers, and ensuring a future supply of lifeguards! GENERAL FEEDBACK We'd like to know how things are working out for you at the pool, and how FoRP might serve you better. What, if anything, is working particularly well for you at the pool? The hours it is open, having a monthly subscription, the sense of an open, lively and friendly community. .............................................................................................................................................................................................................................................................................................................................................. What, if any, changes would improve your pool experience? I. Reduce the water temperature! (82 is borderline tolerable.) 2. Fix the pace clocks, already! 3. Install a sauna! (Hey, you asked.) Do you have other comments? Thanks to Team Sheeper and Friends of Rinconada Pool for helping to create a great pool community! This content is neither created nor endorsed by Google. Google Forms Item 6: Staff Report Pg. 98 Packet Pg. 172 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, AMENDMENT NO. 2 TO CONTRACT NO. C19173035 Amendment Number 2 BETWEEN THE CITY OF PALO ALTO AND TEAM SHEEPER INC. This Amendment No. 2 (this "Amendment") to Contract No. C19173035 (the "Contract" as defined below) is entered into as of October 21, 2024, by and between the CITY OF PALO ALTO, a California chartered municipal corporation ("CITY"), and TEAM SHEEPER INC., a California Corporation, located at 501 Laurel Street, Menlo Park, Ca 94025 ("CONTRACTOR"). CITY and CONTRACTOR are referred to collectively as the "Parties" in this Amendment. RFrITAI c A. The Contract (as defined below) was entered into by and between the Parties hereto for the provision of providing aquatic services for the City of Palo Alto offered at Rinconada Pool, as detailed therein. B. The Parties now wish to amend the Contract in order to (1) exercise renewal option of five years by extending the contract term end date from December 31, 2024 to December 31, 2029; (2) update scope of work; (3) update schedule of performance; (4) update payment plan; and (5) update pricing, as detailed herein. NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the Parties agree: SECTION 1. Definitions. The following definitions shall apply to this Amendment: a. Contract. The term "Contract" shall mean Contract No. C19173035 between CONSULTANT and CITY, dated November 26, 2018 as amended by: Amendment No.1, dated March 6, 2023 b. Other Terms. Capitalized terms used and not defined in this Amendment shall have the meanings assigned to such terms in the Contract. SECTION 2. Section 3 entitled "TERM" of the Contract is hereby amended to read as follows: The term of this Agreement is from January 1, 2019 to December 31, 2029 inclusive, subject to the provisions of Sections Q and V of the General Terms and Conditions. Vers.: Aug. 5, 2019 Page 1 of 19 Item 6: Staff Report Pg. 99 Packet Pg. 173 of 377 Docusign Envelope ID: 386211AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, SECTION 3. The following exhibit(s) to the Contract is/are hereby a Amendment Number as indicated below, to read as set forth in the attachment(s) to this Amendment, which is/are hereby incorporated in full into this Amendment and into the Contract by this reference: a. Exhibit "A" entitled "SCOPE OF SERVICES, AMENDMENT NO. 2", AMENDED, REPLACES PREVIOUS. b. Exhibit "B" entitled "SCEHDULE OF PERFORMANCE, AMENDMENT NO. 2", AMENDED, REPLACES PREVIOUS. c. Exhibit "C" entitled "PAYMENT PLAN, AMENDMENT NO.2", AMENDED, REPLACES PREVIOUS. D. Exhibit "C-1" entitled "INITIAL PRICING, AMENDMENT NO.2", AMENDED, REPLACES PREVIOUS. SECTION 4. Legal Effect. Except as modified by this Amendment, all other provisions of the Contract, including any exhibits thereto, shall remain in full force and effect. SECTION 5. Incorporation of Recitals. The recitals set forth above are terms of this Amendment and are fully incorporated herein by this reference. (SIGNATURE BLOCK FOLLOWS ON THE NEXT PAGE.) Vers.: Aug. 5, 2019 Page 2 of 19 Item 6: Staff Report Pg. 100 Packet Pg. 174 of 377 Docusign Envelope ID: 386211AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, SIGNATURES OF THE PARTIES Amendment Number 2 IN WITNESS WHEREOF, the Parties have by their duly authorized representatives executed this Amendment effective as of the date first above written. CITY OF PALO ALTO City Manager APPROVED AS TO FORM: City Attorney or designee TEAM SHEEPER INC. Officer 1 By: DocuSigned by: 09FDB 12D95194EC... Name: Tim Sheeper Title: CEO Officer 2 By:DocuSigned by: raVD� R Wbl E705461 D26A64A4... Name: Carole Hayworth Title: CFO Attachments: Exhibit "A" entitled "SCOPE OF SERVICES, AMENDMENT NO. 2", AMENDED, REPLACES PREVIOUS. Exhibit "B" entitled "SCEHDULE OF PERFORMANCE, AMENDMENT NO. 2", AMENDED, REPLACES PREVIOUS. Exhibit "C" entitled "PAYMENT PLAN, AMENDMENT NO.2", AMENDED, REPLACES PREVIOUS. Exhibit "C-1" entitled "INITIAL PRICING, AMENDMENT NO.2", AMENDED, REPLACES PREVIOUS. Vers.: Aug. 5, 2019 Page 3 of 19 Item 6: Staff Report Pg. 101 Packet Pg. 175 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 *:C111.11r_1 SCOPE OF SERVICES, AMENDMENT NO. 2 AMENDED REPLACES PREVIOUS Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 CONTRACTOR agrees to provide aquatics services for the City of Palo Alto offered at Rinconada Pool, 777 Embarcadero Road, Palo Alto, CA 94301 and other pools in Palo Alto. General Standards For CONTRACTOR a. Provide Quality Services i. Conduct the programs in a safe manner ii. Not allow participants to be in the pool without at least two Certified Lifeguards present on the pool deck and providing supervision. Contractor shall provide these lifeguards for all programs it offers under this Agreement. iii. Swim Instructors and Certified Lifeguards are: 1. Knowledgeable and experienced in the subject and age group being taught based on the specific training program for lifeguards and swim instructors 2. Reliable and punctual 3. Start and end lessons on time 4. Organized and prepared to teach at the start of each lesson iv. Program Evaluations 1. At least annually, evaluations will be distributed to participants from all pool programs. CONTRACTOR will communicate with participants the importance of completing the evaluation. CONTRACTOR will provide responses to CITY staff. v. Process all registrations for aquatics programming b. Provide Excellent Customer Service i. Build rapport with customers by greeting all participants and parents and create a welcoming and professional atmosphere ii. Address customer and City staff questions and concerns within 24 hours and provide follow-up if needed iii. Maintain a high quality website with up-to-date accurate information c. Maintain Quality Instructors and Employees i. Conduct comprehensive backgrounding reviews for all employees ii. Appear at the pool wearing appropriate attire that is clean, presentable and clearly identified as Palo Alto Aquatics staff iii. Swim instructors and Certified Lifeguards will not use cell phones during work shifts i.e., while on the pool deck and in front of customers, except in an emergency iv. Provide consistency with quality standards for all instructors and employees Vers.: Aug. 5, 2019 Page 4 of 19 Item 6: Staff Report Pg. 102 Packet Pg. 176 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, d. Manage Administrative Tasks Amendment Number 2 i. CONTRACTOR shall provide its own cash registers, computers, and other equipment necessary to process and record payments, registrations, schedules, and other administrative functions. ii. Maintain Proactive and Consistent Communication with CITYstaff iii. Communicate problems and issues immediately with the City of Palo Alto Project Manager via phone, email or in person. iv. Inform City staff of participant injuries and complete necessary accident reports within 24 hours. Accident forms should be available on site. v. Respond in a timely manner to emails and phone calls within 24 hours. vi. Establish and maintain working relationships with City staff and customers vii. Monitor condition of facility and all equipment in and around the facility. CONTRACTOR shall proactively report maintenance issues/concerns to Project Manager at least weekly and shall assist with projects requiring coordination between CONTRACTOR and citystaff. viii. Maintain an up-to-date comprehensive Aquatics Manual with Policies and Procedures at pool site at all times. The manual shall include, but not be limited to the following information: 1. safe work habits 2. safe use of chemicals 3. how to use MSDS sheets 4. safe use of equipment 5. proper use of cautions signs, barriers, or other devices 6. proper handling of hazardous materials, biological waste, and blood -borne pathogens ix. Responsible for including policies and procedures with regard to detailed safetyplan, swim lessons and pool deck entry that Project Manager agrees to (i.e. waiting lists, cancellation, refund, satisfaction, etc.) x. Instructors are responsible for verifying that only registered participants are permitted to participate in programs. xi. Ensure only swim staff use the pool office. xii. Utilize best practices and relevant legal requirements to create and enforce pool rules, which shall be kept on site, reviewed and updated annually, and observed by all staff. xiii. CONTRACTOR shall be first responder to all biological contaminants in the pool includingvomit and urine. This entails removing solid material from the pool and pouring chemicals in per Council codes. City staff will make adjustments to chemicals through the automated chemical monitoring system. City staff shall take over care of water chemistry after initial treatment to ensure safety of water per state and county guidelines. xiv. Provide an annual report no later than 45 days after the end of each year during the Contract Term to staff which will be presented to the CITY'S Parks & Recreation Commission for review and comment by the Vers.: Aug. 5, 2019 Page 5 of 19 Item 6: Staff Report Pg. 103 Packet Pg. 177 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Commission. The annual report should include the f AmendmentNumber2 1. Total program hours by program area 2. Participation statistics by program area including resident and non-resident percentages 3. Customer satisfaction survey results 4. User group feedback by program area or rental 5. Gross revenues and revenue shares between CONTRACTOR and the CITY 6. Risk management documentation 7. Training certifications listed by staff members e. CONTRACTOR shall provide the following maintenance services i. Keep facility neat throughout the day by putting away all equipment from pool deck, empty trash cans, pick up trash from pool deck, remove and replace pool covers on appropriate reels after each use 1. Contractor shall ensure that items/equipment necessary to maintain near the pool shall be kept in ways that maximize their expected life and minimize clutter on the pool deck 2. CONTRACTOR shall close the pool for one week each December for City staff to performance facility maintenance. City staff and the CONTRACTOR shall come to mutual agreement on the schedule at least 30 days in advance. ii. Maintain cleanliness of pools, locker rooms, lobby and office space during facility operational hours, including: 1. Light sweeping of pool deck and indoor spaces 2. Spot mopping and cleaning locker rooms 3. Take out trash at end of day and during sessions as needed 4. Pick up trash from pool deck 5. Light cleaning of lobby and other indoor space f. CONTRACTOR shall utilize all offices, storage spaces, locker rooms and other indoor spaces within the Rinconada Pool complex in their optimal capacity. For example, items that are rarely used, shall not be stored in spaces that could house campers for indoor activities or snack bar areas. g. CONTRACTOR shall maintain inventory of badges, keys and other small equipment issued by the City and shall alert the City within 24 hours of missing items. II. Specific Programs to be Staffed and Run by CONTRACTOR a. CONTRACTOR shall provide discounted pricing for all programs to Palo Alto residents programs as agreed to in Exhibit C-1 "Initial Pricing." "City of Palo Alto residents" as used in this Contract are only those people who can prove residence in the City of Palo Alto by showing a valid state -issued identification with an address in the City; or a utility bill from the City of Palo Alto; or in the case of students, a current identification card from a Palo Alto Unified School District school. CONTRACTOR shall be responsible for verifying residency. i. CONTRACTOR shall ensure that low income Palo Alto residents are Vers.: Aug. 5, 2019 Page 6 of 19 Item 6: Staff Report Pg. 104 Packet Pg. 178 of 377 Docusign Envelope ID: 386211AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, referred to the 501(c) Beyond Barriers to help provi AmendmentNumber2 cial aid discounted pricing for youth swim lessons to low income Palo Alto residents. ii. CONTRACTOR shall offer senior discounted pricing for Palo Alto resident adults age 60 or older for open swim, lap swim, and masters swim. b. CONTRACTOR shall staff and run swim lessons and swim camps for various ages (including children) and skill levels. CONTRACTOR shall adhere to the following standards: i. CONTRACTOR shall offer a minimum of at least the following: swim lessons 6 days per week during summer and shall aim to offer at least 10,000 30 minute lessons peryear. ii. CONTRACTOR shall offer a minimum of 8 weeks of swim camps per year that can enroll a minimum of 30 children per week. iii. At the end of each lesson and camp session the CONTRACTOR will monitor and ensure participants are picked up by an authorized adult. c. CONTRACTOR shall staff and run Open/Recreational and Lap Swim programs. i. CONTRACTOR shall provide a minimum of 500 open swim lane hours during the summer season and 100 open swim lane hours during non - summer seasons (Spring and Fall). ii. CONTRACTOR shall provide a minimum of 500 lane hours/week for lap swim lane hours during the summer season and 400 lane hours/week lap swim lane hours during non -summer seasons. d. Accept fees for service from pool users using the CONTRACTOR's point -of -sale system. e. CONTRACTOR shall staff and run or subcontract for an adult masters swim team and a youth swim team. i. CONTRACTOR shall aim to maintain a minimum of 75 monthly master swim team members and a minimum of 200 monthly youth swim team members. ii. CONTRACTOR to provide a minimum of 200 lane hours / week for the youth swim team. iii. CONTRACTOR to provide a minimum of 49 lane hours / week for the adult masters swim team f. CONTRACTOR shall offer pool parties and additional aquatics programming such as aqua- aerobics, diving classes/teams, water polo, personal training in the water, special events, and/or fitness activities using both water and park features (boot camps, etc.) g. CONTRACTOR shall provide access to open swim at least 200 hours per summer for CITY -affiliated summer camps in exchange for CONTRACTOR -run summer camps' use of Rinconada Park and other City cultural facilities. h. CONTRACTOR is authorized to sell a limited amount of convenience food and other merchandise to customers at the pool should CONTRACTOR so desire. i. CONTRACTOR and CITY shall mutually set pool schedule and prices for aquatics Vers.: Aug. 5, 2019 Page 7 of 19 Item 6: Staff Report Pg. 105 Packet Pg. 179 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, programming. The initial pricing structure can be f AmendmentNumber2 C Compensation and pool schedule can be found in Exhibit B. III. City's Responsibilities a. CITY shall provide clean and safe facility. i. CITY staff will maintain chemical room, provide daily aquatics inspections/maintenance and oversee facility management ii. CITY is responsible for the costs of maintaining the pool and facilities, including heating and utility costs, maintenance and repair, (other than those general items listed in CONTRACTOR's responsibilities), pool chemical costs, and labor costs associated with these items. Additionally, CITY shall provide some general supplies, such as locker room soap and toilet paper sufficient for average daily use. iii. CITY shall make repairs to facility when needed and shall maintain chemicalsfor all pools. iv. City shall maintain the primary responsibility over pool vacuuming and cleaning debris from trees on pool deck, including landscaping of trees, grass and brush. v. CITY shall provide badges, keys and other small equipment. vi. CITY shall provide access to a phone line and internet access at Rinconada Pool vii. CITY shall provide quarterly walk through safety inspections and trainings b. CITY shall develop and maintain proactive and consistent communication and rapport with CONTRACTOR i. Respond in a timely manner to emails and phone calls ii. Communicate and resolve issues and concerns immediately iii. CITY shall provide excellent customer service to CONTRACTOR staff and customers Vers.: Aug. 5, 2019 Page 8 of 19 Item 6: Staff Report Pg. 106 Packet Pg. 180 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 PROGRAM DESCRIPTIONS The following program descriptions may be implemented according to the terms of this Scope of Work and may be changed by CONTRACTOR after consultation with CITY. Swim Lessons Levels Water Babies 1 (6-18 mos) This class will introduce your child to the water and aims to help your child gain comfort while swimming with a caretaker. The class will sing songs and play games while teaching back floats, kicks, submerging underwater, and how to safely swim to the wall and climb out. The max student -to -teacher ratio is 6:1, with a minimum age of 6 months and a maximum age of 18 months. Your child must be 6 months old by your first lesson to attend. Duration: 30 minutes. Goal: Water comfort and swimming with a caretaker. Class ratio: 6:1. 1 caretaker per child Water Babies 2 (1.5-3 yrs old) This class will introduce your child to the water and aims to help your child gain comfort while swimming with a caretaker. As students get closer to 3 years old, we will begin to prepare them for Level 1. The class will teach students to blow bubbles, back float, equipment -assisted and no assisted tummy kicks, back kicks, submerging underwater, and how to safely swim to the wall and climb out. The max student -to -teacher ratio is 6:1, with a minimum age of 1.5 years and a maximum of 3 years old. Your child must be 1.5 years old by your first lesson or turning 1.5 years old within your session to attend. Duration: 30 minutes. Goal: Water comfort, swimming with a caretaker and preparing for youth swim lessons! Class Ratio: 6:1. 1 caretaker per child Level 1 -Little Kids (Beginners 3-4.11 yrs old) No experience needed! This beginner class focuses on your child's water confidence while developing their comfort and basic water safety skills without a parent in the water. This class will teach fundamental swim skills such as submerging underwater, front and back floats, and kicking on their front and back side for a short distance. We will also teach students how to recover after jumping/falling into the water. Your child must be turning 3 years old within your session to attend. Age Requirement: 3 yo — 4.11 yo. Duration: 30 minutes. Goal: Water comfort and swimming with an instructor. Class Ratio: 3:1 Level 1 -Big Kids (Beginners 5+ yrs old) No experience needed! This beginner class focuses on your child's water confidence while developing their comfort and basic water safety skills without a parent in the water. This class continues teaching fundamental swim skills learned from Level 1: Little Kids such as submerging underwater and floating. We will work on independent swimming at a longer distance, breathing techniques, and water safety skills such as knowing what to do if we fall in the pool! Entry Requirement: 5+ years old OR completion of Level 1: Little Kids. Duration: 30 minutes. Goal: Independently swim 20ft with streamline kicks, back kicks and roll- over breaths. Class Ratio: 3:1 Level 2- This intermediate class is taught in the deep end of our pool (6.5 ft). Swimmers must pass Level 1: Big Kids or must be able to swim in the deep end on their front, back, and roll-over Vers.: Aug. 5, 2019 Page 9 of 19 Item 6: Staff Report Pg. 107 Packet Pg. 181 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, to breathe for 12.5 yards unassisted. Swimmers will be introduced to Free Amendment Number2 and treading water for 15 seconds while continuing to develop their comfort and water safety skills. Entry Requirement: Can independently swim 20 ft with streamline kicks, back kicks, and roll-over breaths, and is comfortable swimming in 6.5 ft deep water. Duration: 30 minutes. Goal: Independent freestyle with roll-over breaths and Backstroke for 12.5 yds. Class Ratio: 3:1 Level 3- This class uses Freestyle and Backstroke learned in Level 2 to swim 25 yards independently. Swimmers must pass Level 2 or be able to swim Freestyle and Backstroke for half the pool length (12.5 yards) independently. As class progresses, we will build endurance to swim 25 yards. Students will additionally be introduced to Breaststroke kicks and treading water for 30 seconds. Entry Requirement: Can independently swim Freestyle with roll-over breaths and Backstroke for 12.5 yards. Duration: 30 minutes. Goal: Freestyle with side -breathing, Backstroke, and Breaststroke kicks for 25 yards. Class Ratio: 4:1 Level 4- Swimmers will review Freestyle, Backstroke, and the introductory Breaststroke kick, and continue overall efficiency within the strokes for 25 yards. They will learn Breaststroke with proper breathing technique, dolphin kicks for Butterfly, somersaults to prepare for flip -turns, and treading water for 1 minute. Through hands-on instruction, swimmers develop proper body position, breathing, and rhythm. This is the final level in swim school and swimmers who pass this level will be eligible for the Bridge Youth Team: Beginner Group. Entry Requirement: Freestyle with side -breathing, Backstroke, and Breaststroke kicks for 25 yards. Duration: 30 minutes. Goal: Freestyle, Backstroke, Breaststroke, and Butterfly for 50 yards. Class Ratio: 4:1 Swim Camp Whetherjust learning to swim or developing strokes, your child receives a daily, 45 -minute, level - appropriate lesson from a trained Swim School instructor (ratio 4:1). A child's swim level is assessed on the first day of camp, and campers with similar abilities are grouped together. More advanced swimmers also get a workout -style swim session in a 25 -yard format to practice what they have learned. Daily hands-on lessons in small focused groups invariably lead to rapid advancement in a child's swim skills. In addition to swim instruction, campers have daily swim -related workouts, free swim time for land and camp games, crafts, and lunch. Your child should come home healthy -tired but able to have loads of fun the entire week! Sample Daily Activities 8:45 Camper check -in 9:00 Camp games, settle in for Director Address 9:30 Group A: Swim lesson, Group B: Land games for swim strength and conditioning followed Vers.: Aug. 5, 2019 Page 10 of 19 Item 6: Staff Report Pg. 108 Packet Pg. 182 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, by a healthy snack Amendment Number 2 10:15 Group A: Healthy snack followed by land games for swim strength and conditioning. Group B: Swim lesson plus, for more advanced swimmers, a swim work-out 11:00 Transition out of pool (sunscreen!) 11:15 Lunch from home enjoyed on the benches or picnic -style on the grass 11:45 Camper choice: land games, crafts, relax with friends 12:45 Transition to free swim 1:00 Free swim 1:50 Get ready for pick-up or transfer to extended care Is This Camp for You? For ages 5 to 12 years (on the first day of camp) For campers who HAVE COMPLETED kindergarten Camp is for kids who are comfortable in the water, enjoy social group situations, and respond well to instruction Ideal before any family vacation that includes water activities! Pre -K Camp Palo Alto Swim and Sport offers Pre -K Aquatics camp for kids age 4.5-6! For our little ones, Camp Palo Alto provides fun, instruction, and encouragement in a safe, friendly environment. Each camper receives a daily 45 -minute swim lesson from a Palo Alto Swim School instructor, plus has time for land games, crafts and a light lunch. They'll enjoy community and team fun while developing a love of water and swim skills. Your child should come home healthy -tired but not destroyed for the rest of the day! When you check out each day, stick around to enjoy Open Swim with your child. Spending time in the pool together reinforces what they've learned and improves their feel for the water. Open Swim starts at noon! Sample Daily Schedule 8:45 Check -in 9:00 Welcome and games 9:45 Crafts and snack 10:45 Fun stretching Vers.: Aug. 5, 2019 Page 11 of 19 Item 6: Staff Report Pg. 109 Packet Pg. 183 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 11:00 Swim lesson 11:45 Dry off, get ready for lunch 12:00 Lunch time with friends and counselors 12:30 Story time 1:00 Free swim in Baby Pool or play games 1:50 Pick up or transfer to extended care For ages 4.5 to 6 years (on the first day of camp) Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 For campers who have NOT COMPLETED kindergarten, or who need extra assistance Campers are toilet trained and can manage the toilet independently 4:1 child -to -adult ratio both during swim lessons and with counselors on land Ideal before any family vacation that includes water activities! Morning Extended Camp We are pleased to offer early Extended Camp from 8:00 to 8:45 a.m., so you can drop off your kids and be on your way! You can be sure that check -in will be fast and your child will receive great care for a happy start to the day! Afternoon Extended Camp Extended camp is just the ticket for your child to rest and re -energize, play social games, read, advance some new skills or listen to music! Tried and true, our counselors provide a safe and lively afternoon of new and varied activities, full of opportunities for the campers to mix and mingle or have some quiet time; build and create; or have fun with more sports! The kids won't miss a beat, as they seamlessly transition to the afternoon segment of their day of excitement. Pool Parties Have a birthday party or special event at the pool! Reserve two hours of fun for your family and friends! Party includes: Swim admission for 12 kids and 4 adult chaperones (over age 18), 2 large picnic tables reserved for your group Masters Swim We welcome swimmers of all abilities, age 18 and up, who are interested in regular structured workouts. Previous experience in competitive swimming is not necessary. Masters swimmers include beginners, triathletes, former collegiate athletes, nationally ranked competitors and everything in between — all ages, shapes, and sizes. Every workout is different and you'll learn something each and every time. Along with ongoing conditioning at workouts, the team provides stroke instruction, intra-club activities, competitions, and social events throughout the year. We focus on developing swimming skills, enhancing the enjoyment of swimming through regular Vers.: Aug. 5, 2019 Page 12 of 19 Item 6: Staff Report Pg. 110 Packet Pg. 184 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, workouts and professional instruction, and the promotion of lifetime fitne AmendmentNumber2 ing. Youth Swim Team Year round competitive swim team offering high quality professional coaching and technique instruction for all ages and abilities. The goal is to provide every member an opportunity to improve swimming skills and achieve success at his or her level of ability, from novice to international competitor. We are constantly growing and training young swimmers to maintain a well-rounded competitive swim team. Lap Swim Lanes are dedicated to lap swimming in the deep pool at Rinconada seven days per week year round. Two lifeguards are on duty at all times. We observe circle swimming when there are more than two swimmers per lane. The number of lanes for Lap Swimming varies according to scheduled activities in each pool, but during the times below, you will find designated lap lanes. Look for the yellow cones on deck. If you are registered to pay for laps monthly, you can come to Recreation Swim any time. Choose to swim laps or play with your kids —your time in the pool is already paid for. Even drop -in fees are good all day for both Laps and Open/Recreation Swim. Open/Recreation Swim Lifeguards are on duty at all times during open swim. No registration required, just drop in (or use a pass) to play in the round pool and deep pool; many open swim sessions include use of the diving boards. Children 5 years and younger must have a parent/guardian (16+) in the pool, within arm's reach at all times. Children 6 —12 years must have a parent/guardian (16+) on the pool deck supervising them, unless they are attending a registered class or program. Vers.: Aug. 5, 2019 Page 13 of 19 Item 6: Staff Report Pg. 111 Packet Pg. 185 of 377 Docusign Envelope ID: 386211AE-B829-4A00-8733-E0E5BCBEEB70 EXHIBIT B SCHEDULE OF PERFORMANCE, AMENDMENT NO. 2 AMENDED REPLACES PREVIOUS Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 Program Aquatics Seasons Offered Swim lessons Spring, Summer, Fall and optional Winter Swim camps Summer Lap swim Spring, Summer, Fall, and Winter (all seasons) Open/Recreational swim Spring, Summer, Fall and optional Winter Masters Swim Spring, Summer, Fall, and Winter (all seasons) Youth Swim Team Spring, Summer, Fall, and Winter (all seasons) Vers.: Aug. 5, 2019 Page 14 of 19 Item 6: Staff Report Pg. 112 Packet Pg. 186 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, PROPOSED SCHEDULE Amendment Number 2 Palo Alto Swim & Sport Rinconada Pool Schedule: School Year Lap Pool MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY Masters Laps Masters laps asters Laps stern Laps Masters Laps Laps Laps 6-7AM 4 4 (7) (7) (7) (7) (7) (7) (7) (7) (7) (7) (14) (14) 7 -SAM Masters Laps Masters Laps ters Laps Maste Laps Master Laps Laps Laps 7) (7) (7) (7) 7) (7) (7 (7) (7) (7) (14) (14) J Laps Laps Laps Laps Laps Laps Masters Laps 8-8:30 AM (14) (14) (14) (14) (14) (14) (30) (4) Laps Laps Laps Laps Laps Laps Masters Laps 8:30 -9 AM IT (3) RI (13) (14) (14) (14) (14) (10) (4) Laps Laps Laps s. Laps 9-9:30 AM Laps PASA Masters Laps 111 (13) RI (13) (14) (14) (14) (14) (10) (4) 930 -10 AM v Laps 5. Laps Laps Laps Laps PASA Laps RI (13) RI (13) (14) (14) (14) (14) (14) s. Laps Laps Laps Laps Laps PASA Laps 10-10:30 AM IT (13) nl (13) (14) (14) (14) (14) (14) 10:30 -11 AM Laps Laps Laps Laps Laps PASA Laps (14) (14) (14) (14) (14) (14) (14) Laps Laps Laps Laps Laps PASA Laps 11 AM -12 PM (14) (14) (14) (14) (14) (14) (14) Laps Laps Laps Masters Laps Laps PASA Laps 17- 1z:3o PM (14) (7) (14) (7) (7) (14) (14) (14) 1230 -1 PM Laps Laps Laps Masters Laps Laps Laps Laps (14) (7) (14) ) (7) (14) (14) (14) Laps Laps Laps Laps Laps Laps Laps 1-2 PM (14) (14) (14) (14) (14) (14) (14) Laps Laps Laps Laps Laps Laps Laps 2-3 PM (14) (14) (14) (14) (14) (14) (14) Laps Laps Laps Laps Laps Laps Laps 3-4 PM (14) (14) (14) (14) (14) (14) (14) PASA PASA 4-5 PM (14) (14) (14) ASA PASA PASA PASA 5-6 PM (14) (14) (14) (14) PASA PASA PASA PASA 6-7 PM (14) (14) (14) PASA PASA PASA 7-0 PM This schedule may be modified by CONTRACTOR after consultation with CITY. Vers.: Aug. 5, 2019 Page 15 of 19 Item 6: Staff Report Pg. 113 Packet Pg. 187 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 PAYMENT PLAN, AMENDMENT NO. 2 AMENDED REPLACES PREVIOUS Revenue Sharing CONTRACTOR will collect revenue from customers for all programs they provide under this agreement and any Rinconada Pool subcontracts they hold subject to the prices listed in this agreement. For the purposes of the revenue share, CONTRACTOR shall maintain an annual profit and loss statement ("Statement") during the Term and any Extended Term of this Agreement. CONTRACTOR will pay gross revenues of as much as 12% of all revenues collected from all programs provided on behalf of the City of Palo Alto with the CITY based upon the following table: Percent of all gross revenue from all programs under this Annual Total Revenue contract Dollars owed to City up to $1.75 million 1% $1,750,001 to $2,250,000 2% $2,250,001 to $2,750,000 3% $2,750,001 to $3,250,000 4% $3,250,001 to $3,750,000 5% $3,750,001 to $4,250,000 6% For each additional $500,000 in revenue, the gross revenue percentage will grow 1% point up to a maximum of 12% Revenue share payments for each calendar year shall be paid to the CITY no later than January 31 of the following year. Additional Services The CONTRACTOR shall provide additional services only by advanced, written authorization Vers.: Aug. 5, 2019 Page 16 of 19 Item 6: Staff Report Pg. 114 Packet Pg. 188 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, from the CITY. The CONTRACTOR, at the CITY's project manager's request, Amendment Number 2 detailed written proposal including a description of the scope of services, schedule, level of effort, and CONTRACTOR'S proposed maximum compensation, including reimbursable expense, for such services. The additional services scope, schedule and maximum compensation shall be negotiated and agreed to in writing by the CITY's project manager and CONTRACTOR prior to commencement of the services. Payment for additional services is subject to all requirements and restrictions in this Agreement. No Reimbursable Expenses The administrative, overhead, secretarial time or secretarial overtime, word processing, photocopying, in-house printing, insurance and other ordinary business expenses are included within the scope of payment for services and are not reimbursable expenses. CONTRACTOR shall not be reimbursed for any expenses. Vers.: Aug. 5, 2019 Page 17 of 19 Item 6: Staff Report Pg. 115 Packet Pg. 189 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 EXHIBIT C-1 INITIAL PRICING, AMENDMENT NO. 2 AMENDED REPLACES PREVIOUS Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 Resident Rates Program Fee Annual Fee Monthly Drop -In Per Lesson/Session Lap Swim General $65 $9 Senior $52 $8 Open Swim General $9 Child $5 Swim Lessons Group $29 Private $79 Masters General $30 $88 $20 Student/Senior $30 $80 $20 Camps $575 per week Youth Swim Team PASA pricing applies Non -Resident Rates Program Fee Annual Fee Monthly Drop -In Per Lesson/Session Lap Swim General $72 $10 Senior $61 $9 Open Swim General $10 Child $6 Swim Lessons Group $29 Private $79 Masters General $30 $88 $20 Student/Senior $30 $80 $20 Camps $575 per week Vers.: Aug. 5, 2019 Page 18 of 19 Item 6: Staff Report Pg. 116 Packet Pg. 190 of 377 Docusign Envelope ID: 386211 AE-B829-4A00-8733-E0E5BCBEEB70 Item 6 Attachment B - Contract with Team Sheeper, Inc.; Contract C19173035, Amendment Number 2 Youth Swim Team I I PASA pricing applies These rates may be modified by CONTRACTOR after consultation with CITY. Vers.: Aug. 5, 2019 Page 19 of 19 Item 6: Staff Report Pg. 117 Packet Pg. 191 of 377 Item 7 Item 7 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: October 21, 2024 Report #: 2407-3303 TITLE Approval of Contract Amendment Number 1 to Contract Number S25190354 with Larratt Bros Plumbing Inc. in the Amount of $410,000 for the Residential Emergency Water Heater Replacement Pilot Program Within Electrification Programs; CEQA Status — Not a Project. RECOMMENDATION Staff recommends that City Council approve and authorize the City Manager or their designee to execute Amendment No. 1 to Contract No. S25190354 with Larratt Bros Plumbing Inc. (Attachment A) to expand the Heat Pump Water Heater Pilot Program in an amount not -to - exceed $410,000 for the Emergency Water Heater Replacement Pilot Program. This amendment results in a revised total contract not -to -exceed amount of $495,000. EXECUTIVE SUMMARY Staff is seeking approval for contract amendment No. S25190354 for the Single -Family Residential Emergency Water Heater Replacement (REWHR) Pilot Program to contribute to the success of the Advanced Heat Pump Water Heater (HPWH) Pilot Program in replacing a total of 1,000 gas water heaters. Staff is requesting to increase the contract an additional $410,000, to enable expansion of the REWHR Pilot Program, by unencumbering funds from contract No. C23186588, the Advanced HPWH Pilot Program. This additional budget will have no impact on the General Fund or utility rates. BACKGROUND Staff and the community have been working to achieve the community's greenhouse gas (GHG) emissions reduction goals of reducing GHG emissions 80% from 1990 levels by 2030, as adopted in the Sustainability and Climate Action Plan (S/CAP). The current S/CAP was adopted in June 2023 along with the 2023-2025 S/CAP Work Plan.' The 2023-2025 SCAP Work Plan includes work item 2.1 D for the launch of a HPWH pilot to achieve the replacement of 1,000 gas water heaters with HPWHs. 12023-2025 S/CAP Work Plan https://www.cityofpaloalto.org/files/assets/public/v/1/sustainability/reports/2023-2025- scap-work-plan final.pdf Item 7: Staff Report Pg. 1 Packet Pg. 192 of 377 Item 7 Item 7 Staff Report The "Advanced HPWH Pilot Program" was launched in March 2023.2 It includes rebates for residents who hire their own contractors and a Full -Service program for those who want the City to take care of the whole process, as well as the more recent addition of the Emergency Replacement program in September 2024. As of July 22, 2024, 384 installations had been completed through a combination of the City's rebate program and Full -Service program, with another 40 installations scheduled. Staff expects that the addition of the Emergency Replacement program will increase the rate of installation. Many of the customers signing up for the Full Service HPWH program have dropped out because they are in urgent need to replace a leaking or broken water heater. The Full Service HPWH program is not designed to accommodate emergency installations. I'e10/_1W&IV Gas tank water heaters typically last between 10 to 12 years. It is not uncommon for homeowners to wait until the water heater shows signs of needing a replacement before they call a plumber. Up to 85 percent of water heater replacements occur in an "emergency" when the current water heater fails.3 In such an emergency scenario, the task of switching from a gas water heater to a HPWH is often too complicated and takes too much time for the average homeowner to handle when they are focused on restoring hot water to their family. The REWHR Pilot Program is designed to serve the many homes experiencing water heater failures that require rapid action, with a goal to restore hot water to customers within two business days while helping the homeowner switch from a gas water heater to a HPWH. Customers could opt to pay a premium covering work outside of standard business hours if faster service is desired. Solicitation Process The City issued an RFP on February 29, 2024. Through a competitive RFP process, staff identified Larratt Bros Plumbing as a provider with extensive experience performing HPWH installations. Table 1 summarizes the details of the RFP. ... •' RFP Name/Number Emergency Water Heater Replacement Service RFP No. 190354 RFP Issued February 29, 2024 Proposals Due March 22, 2024 # of Firms Notified 3017 Total Days to Respond to RFP 22 2 On October 3, 2022, City Council approved the contract with Synergy Companies, which includes, among other tasks, the administration of a Full -Service Heat Pump Water Heater Program within the Advanced Heat Pump Water Heater Pilot (Staff Report #14542) https://www.cityofpaloaIto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager- reports-cm rs/2022/10-03-2022-id-14542.pdf 3 New Buildings Institute, 2022. https://newbuiIdings.org/scaling-up-market-transformation-for-heat-pump-water-heaters/ Item 7: Staff Report Pg. 2 Packet Pg. 193 of 377 Item 7 Item 7 Staff Report # of Proposals Received 5 Non -responsive bidders/Responsive bidders 2/5 Public Link to Solicitation https://procurement.opengov.com/portal/palo-alto- ca/projects/83035 Proposals Price Range per Installed Heat Pump Water Heater $8,000 $25,500 The RFP responses (proposals) were evaluated based on several key criteria including the quality of proposals, the specifics of the proposed solutions, the experience of the contractors with heat pump water heaters and emergency water heater replacements, the proposed program costs, ability to install heat pump water heaters in a timely way, and prior record of performance for government agencies. Larratt Bros Plumbing was selected for this project because they scored the highest of all bidders. They demonstrated an innovative approach to replacing gas water heaters with heat pumps in a time sensitive and customer friendly way. They also received high customer satisfaction scores as well as high praise from former project collaborators. Two of the bidders were deemed non -responsive due to lack of complete proposal packets. The proposal that was selected (Larratt Bros Plumbing) included installed heat pump water heater costs at the low end of the project cost range listed in Table 1, at $8,000. In August, CPAU established an $85,000 contract with Larratt Brothers Plumbing to begin the HPWH ER Pilot, covering up to 20 homes. Staff proposes a contract increase of $410,000 to cover 100 or more homes. This would cover the current rebate of 55% of project costs up to $3,500 per HPWH, permit fees, home assessments, and the cost of loaner water heaters, where needed. The additional funds would ensure that HPWH ER Pilot can continue covering the first 100 homes as envisioned in the RFP. Their unique customer service tool, called Plunjr, allows homeowners to enter the program quickly and obtain an assessment and quote for a new HPWH. FISCAL/RESOURCE IMPACT The funding source for this contract is the budget for the Advanced Heat Pump Water Heater Pilot Program, which includes budgets in both the electric and gas utility funds and is funded by a combination of Public Benefits and Cap and Trade revenue sources.4 The HPWHs installed through the HPWH ER Pilot will count towards the goal of 1,000 HPWHs in Palo Alto. Program promotion and outreach will be funded through the climate reduction outreach budget established in the FY 2025 Adopted Budget. 4 For the Full Service HPWH Program, City Council approved $1.25 million from Gas Cap and Trade Revenues, $4.5 million from Electrification Reserve (funded by the electric utility's Electric Special Projects Reserve) at the September 27, 2022 Council meeting. See Staff Report #14606. https://www.citvofDaloalto.ore/files/assets/oublic/v/1/agendas-minutes-reoorts/reoorts/citv-manaeer-reoorts- cm rs/2022/id.-14606-sca p -u pdate-reach-code-cha nges-and-advanced-h pwh-progra m. pdf Item 7: Staff Report Pg. 3 Packet Pg. 194 of 377 Item 7 Item 7 Staff Report The HPWH ER Pilot supports the Council -approved Sustainability Plan, the Council -approved Ten-year Energy Efficiency Targets, Comprehensive Plan Goals N4.2.1 (educate customers on efficient water use), N7.4.2 (implement cost effective energy efficiency programs for all customers) and N7.7.2 (explore the transition of existing buildings from gas to electric or solar water and space heating). The Pilot program also furthers the Utilities Strategic Plan Collaboration priority (Strategy 1, increasing communication and engagement with the community). STAKEHOLDER ENGAGEMENT Since December 2023, staff has reached out to customers who have signed up with the Full Service HPWH program to get their feedback. This feedback has been invaluable for ongoing improvements to the Full Service HPWH program and has also informed the design of the HPWH ER program. In January 2024, staff presented the initial program design and solicited feedback from the S/CAP Working Group on the HPWH ER Pilot, continuing discussions on this topic in April and May 2024. Staff has also been in communication with Peninsula Clean Energy, Silicon Valley Clean Energy, Marin Clean Energy, and Sacramento Municipal Utility District as they prepare to launch similar HPWH ER programs in their service territories. ENVIRONMENTAL REVIEW Council's approval of the attached agreement described in this staff report does not meet the definition of a project under the California Environmental Quality Act (CEQA), pursuant to the California Public Resources Code Section 21065, because it is not an activity that will cause a direct physical change in the environment. In the alternative, Council's approval of this agreement is exempt from review under CEQA Guidelines Section 15302, as replacement of existing facilities, and Section 15308, as an action taken for the protection of the environment. ATTACHMENTS Attachment A: Contract with Larratt Brothers; Contract S25190354 Amendment 1 Attachment B: Contract with Larratt Brothers; Contract S25190354 APPROVED BY: Dean Batchelor, Director of Utilities Staff: Diane Bailey, Sustainability Programs Administrator Item 7: Staff Report Pg. 4 Packet Pg. 195 of 377 Docusign Envelope ID: 421 D75DB-36EC-409C-A7AB-0911695569B4 Item 7 Attachment A - Contract with Larratt Brothers; Contract 525190354, AMENDMENT NO. 1 TO CONTRACT NO. S25190354 Amendment 1 BETWEEN THE CITY OF PALO ALTO AND LARRATT BROS PLUMBING INC. This Amendment No. 1 (this "Amendment") to Contract No. S25190354 (the "Contract" as defined below) is entered into as of October 7, 2024 by and between the CITY OF PALO ALTO, a California chartered municipal corporation ("CITY"), and LARRATT BROS PLUMBING INC., a California corporation, located at 88 Elmira Street, San Francisco, CA 94124 ("CONSULTANT"). CITY and CONSULTANT are referred to collectively as the "Parties" in this Amendment. RECITALS A. The Contract (as defined below) was entered into by and between the Parties hereto for the provision of providing Emergency Water Heater Replacement Services (the "Project") to customers in single family homes in connection with the Project, as detailed therein. B. The Parties now wish to amend the Contract in order to increase compensation by Four Hundred Ten Thousand Dollars ($410,000) from Eighty -Five Thousand ($85,000) to a new total not to exceed Four Hundred Ninety -Five Thousand Dollars ($495,000) with no change to the contract term. NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the Parties agree: SECTION 1. Definitions. The following definitions shall apply to this Amendment: Contract. The term "Contract" shall mean Contract No. S25190354 between CONSULTANT and CITY, dated August 1, 2024. Other Terms. Capitalized terms used and not defined in this Amendment shall have the meanings assigned to such terms in the Contract. SECTION 2. Section 4 "NOT TO EXCEED COMPENSATION" of the Contract is hereby amended to read as follows: "The compensation to be paid to CONSULTANT for performance of the Services shall be based on the compensation structure detailed in Exhibit C, entitled "COMPENSATION," including any reimbursable expenses specified therein, and the maximum total compensation shall not exceed Four Hundred Ninety -Five Thousand Dollars ($495,000). The hourly schedule of rates, if applicable, is set out in Exhibit C-1, entitled "SCHEDULE OF RATES." Any work performed or expenses incurred for which payment would result in a total exceeding the maximum compensation set forth in this Section 4 shall be at no cost to the CITY." 6056850 Vers.: Aug. 5, 2019 Page 1 of 3 Item 7: Staff Report Pg. 5 Packet Pg. 196 of 377 Docusign Envelope ID: 421 D75DB-36EC-409C-A7AB-0911695569B4 Item 7 Attachment A - Contract with Larratt Brothers; Contract 525190354, Amendment 1 SECTION 3. Legal Effect. Except as modified by this Amendment, all other provisions of the Contract, including any exhibits thereto, shall remain in full force and effect. SECTION 4. Incorporation of Recitals. The recitals set forth above are terms of this Amendment and are fully incorporated herein by this reference. (SIGNATURE BLOCK FOLLOWS ON THE NEXT PAGE.) 6056850 Vers.: Aug. 5, 2019 Page 2 of 3 Item 7: Staff Report Pg. 6 Packet Pg. 197 of 377 Docusign Envelope ID: 421 D75DB-36EC-409C-A7AB-0911695569B4 Item 7 Attachment A - Contract with Larratt Brothers; Contract 525190354, Amendment 1 SIGNATURES OF THE PARTIES IN WITNESS WHEREOF, the Parties have by their duly authorized representatives executed this Amendment effective as of the date first above written. CITY OF PALO ALTO LARRATT BROS PLUMBING, INC. by: 1YJDocuSignedd� ,j A. /hIi11AlAJ F64CD050FBB74CD__- City Manager Aa Gianni Name: Title: President APPROVED AS TO FORM: Signed by: City Attorney or designee BC98D476B5C54EA Alex Perez Name: Title: service Manager 6056850 Vers.: Aug. 5, 2019 Page 3 of 3 Item 7: Staff Report Pg. 7 Packet Pg. 198 of 377 Certificate Of Completion Envelope Id: 421 D75DB36EC409CA7AB0911695569B4 Subject: Complete with Docusign: S25190354 Amed 1 Larrett final.pdf Source Envelope: Document Pages: 3 Signatures: 2 Certificate Pages: 2 Initials: 0 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) Record Tracking Status: Original 9/11/2024 2:06:09 PM Security Appliance Status: Connected Storage Appliance Status: Connected Signer Events Aaron Gianni aaron@larrattbros.com President Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Alex Perez alex@larrattbros.com Service Manager Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Editor Delivery Events Agent Delivery Events Intermediary Delivery Events Certified Delivery Events Carbon Copy Events Diane Bailey Diane.Bailey@CityofPaloAlto.org Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Holder: Annmarie Romero annmarie.romero@cityofpaloalto.org Pool: StateLocal Pool: City of Palo Alto Signature by: EDI-Si,"ed ar6ta C1a17lw F64CD050FBB74CD... Signature Adoption: Pre -selected Style Using IP Address: 98.97.24.229 ESI,"by: ed Lt iF Pu"v BC98D476B5C54EA... Signature Adoption: Pre -selected Style Using IP Address: 76.126.2.91 Signature Status Status Status Status Status COPIED Item 7 Attachment A - Contract Attachment with Larratt Brothers; GUSTgn Contract 525190354, Status: Co Amendment 1 Envelope Originator: Annmarie Romero 250 Hamilton Ave Palo Alto , CA 94301 annmarie.romero@cityofpaloalto.org IP Address: 199.33.32.254 Location: DocuSign Location: DocuSign Timestamp Sent: 9/11/2024 2:07:28 PM Viewed: 9/12/2024 7:58:10 PM Signed: 9/12/2024 7:58:27 PM Sent: 9/12/2024 7:58:29 PM Resent: 9/13/2024 7:15:10 AM Resent: 9/16/2024 9:52:47 AM Viewed: 9/16/2024 10:34:10 AM Signed: 9/16/2024 10:34:29 AM Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Sent: 9/16/2024 10:34:31 AM Item 7: Staff Report Pg. 8 Packet Pg. 199 of 377 Item 7 Attachment A - Contract Carbon Copy Events Status Timest with Larratt Brothers; Tabatha Boatwright Tabatha.Boatwright@CityofPaloAlto.org COPIED Sent: 9/1 Viewed: 9 Contract 525190354, Amendment 1 Utilities Management Analyst City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/11/2024 2:07:28 PM Certified Delivered Security Checked 9/16/2024 10:34:10 AM Signing Complete Security Checked 9/16/2024 10:34:29 AM Completed Security Checked 9/16/2024 10:34:32 AM Payment Events Status Timestamps Item 7: Staff Report Pg. 9 Packet Pg. 200 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, CITY OF PALO ALTO CONTRACT NO. S25190&Contract S25190354 AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PALO ALTO AND LARRATT BROS PLUMBING INC. This Agreement for Professional Services (this "Agreement") is entered into as of the Pt day of August, 2024 (the "Effective Date"), by and between the CITY OF PALO ALTO, a California chartered municipal corporation ("CITY"), and LARRATT BROS PLUMBING INC., a California corporation, located at 88 Elmira Street, San Francisco, CA 94124 ("CONSULTANT"). The following recitals are a substantive portion of this Agreement and are fully incorporated herein by this reference: RECITALS A. CITY intends to award a contract for the Emergency Water Heater Replacement Services (the "Project") and desires to engage a consultant to provide heat pump water emergency replacement services to customers in single family homes in connection with the Project (the "Services", as detailed more fully in Exhibit A). B. CONSULTANT represents that it, its employees and subconsultants, if any, possess the necessary professional expertise, qualifications, and capability, and all required licenses and/or certifications to provide the Services. C. CITY, in reliance on these representations, desires to engage CONSULTANT to provide the Services as more fully described in Exhibit A, entitled "SCOPE OF SERVICES". NOW, THEREFORE, in consideration of the recitals, covenants, terms, and conditions, in this Agreement, the parties agree as follows: SECTION 1. SCOPE OF SERVICES. CONSULTANT shall perform the Services described in Exhibit A in accordance with the terms and conditions contained in this Agreement. The performance of all Services shall be to the reasonable satisfaction of CITY. SECTION 2. TERM. The term of this Agreement shall be from the date of its full execution through July 31, 2026 unless terminated earlier pursuant to Section 19 (Termination) of this Agreement. SECTION 3. SCHEDULE OF PERFORMANCE. Time is of the essence in the performance of Services under this Agreement. CONSULTANT shall complete the Services within the term of this Agreement and in accordance with the schedule set forth in Exhibit B, entitled "SCHEDULE OF PERFORMANCE". Any Services for which times for performance are not specified in this Agreement shall be commenced and completed by CONSULTANT in a reasonably prompt and timely manner based upon the circumstances and direction communicated to the CONSULTANT. CITY's agreement to extend the term or the schedule for performance shall not preclude recovery of damages for delay if the extension is required due to the fault of CONSULTANT. Professional Services Rev. Jan 29, 2024 Page 1 of 38 Item 7: Staff Report Pg. 10 Packet Pg. 201 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 SECTION 4. NOT TO EXCEED COMPENSATION. The compensa ion to be paid to CONSULTANT for performance of the Services shall be based on the compensation structure detailed in Exhibit C, entitled "COMPENSATION," including any reimbursable expenses specified therein, and the maximum total compensation shall not exceed Eighty -Five Thousand Dollars ($85,000). The hourly schedule of rates, if applicable, is set out in Exhibit C-1, entitled "SCHEDULE OF RATES." Any work performed or expenses incurred for which payment would result in a total exceeding the maximum compensation set forth in this Section 4 shall be at no cost to the CITY. SECTION 5. INVOICES. In order to request payment, CONSULTANT shall submit monthly invoices to the CITY describing the Services performed and the applicable charges (including, if applicable, an identification of personnel who performed the Services, hours worked, hourly rates, and reimbursable expenses), based upon Exhibit C or, as applicable, CONSULTANT's schedule of rates set forth in Exhibit C-1. If applicable, the invoice shall also describe the percentage of completion of each task. The information in CONSULTANT's invoices shall be subject to verification by CITY. CONSULTANT shall send all invoices to CITY's Project Manager at the address specified in Section 13 (Project Management) below. CITY will generally process and pay invoices within thirty (30) days of receipt of an acceptable invoice. SECTION 6. QUALIFICATIONS/STANDARD OF CARE. All Services shall be performed by CONSULTANT or under CONSULTANT's supervision. CONSULTANT represents that it, its employees and subcontractors, if any, possess the professional and technical personnel necessary to perform the Services required by this Agreement and that the personnel have sufficient skill and experience to perform the Services assigned to them. CONSULTANT represents that it, its employees and subcontractors, if any, have and shall maintain during the term of this Agreement all licenses, permits, qualifications, insurance and approvals of whatever nature that are legally required to perform the Services. All Services to be furnished by CONSULTANT under this Agreement shall meet the professional standard and quality that prevail among professionals in the same discipline and of similar knowledge and skill engaged in related work throughout California under the same or similar circumstances. SECTION 7. COMPLIANCE WITH LAWS. CONSULTANT shall keep itself informed of and in compliance with all federal, state and local laws, ordinances, regulations, and orders that may affect in any manner the Project or the performance of the Services or those engaged to perform Services under this Agreement, as amended from time to time. CONSULTANT shall procure all permits and licenses, pay all charges and fees, and give all notices required by law in the performance of the Services. SECTION 8. ERRORS/OMISSIONS. CONSULTANT is solely responsible for costs, including, but not limited to, increases in the cost of Services, arising from or caused by CONSULTANT's errors and omissions, including, but not limited to, the costs of corrections such errors and omissions, any change order markup costs, or costs arising from delay caused by the errors and omissions or unreasonable delay in correcting the errors and omissions. SECTION 9. COST ESTIMATES. If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds the CITY's Professional Services Rev. Jan 29, 2024 Page 2 of 38 Item 7: Staff Report Pg. 11 Packet Pg. 202 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Brot hers Larratt hers, stated construction budget by ten percent (10%) or more, CONS Contract rot S25190354 ake recommendations to CITY for aligning the Project design with the budget, incorporate ulTY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY. SECTION 10. INDEPENDENT CONTRACTOR. CONSULTANT acknowledges and agrees that CONSULTANT and any agent or employee of CONSULTANT will act as and shall be deemed at all times to be an independent contractor and shall be wholly responsible for the manner in which CONSULTANT performs the Services requested by CITY under this Agreement. CONSULTANT and any agent or employee of CONSULTANT will not have employee status with CITY, nor be entitled to participate in any plans, arrangements, or distributions by CITY pertaining to or in connection with any retirement, health or other benefits that CITY may offer its employees. CONSULTANT will be responsible for all obligations and payments, whether imposed by federal, state or local law, including, but not limited to, FICA, income tax withholdings, workers' compensation, unemployment compensation, insurance, and other similar responsibilities related to CONSULTANT's performance of the Services, or any agent or employee of CONSULTANT providing same. Nothing in this Agreement shall be construed as creating an employment or agency relationship between CITY and CONSULTANT or any agent or employee of CONSULTANT. Any terms in this Agreement referring to direction from CITY shall be construed as providing for direction as to policy and the result of CONSULTANT's provision of the Services only, and not as to the means by which such a result is obtained. SECTION 11. ASSIGNMENT. The parties agree that the expertise and experience of CONSULTANT are material considerations for this Agreement. CONSULTANT shall not assign or transfer any interest in this Agreement nor the performance of any of CONSULTANT's obligations hereunder without the prior written approval of the City Manager. Any purported assignment made without the prior written approval of the City Manager will be void and without effect. Subject to the foregoing, the covenants, terms, conditions and provisions of this Agreement will apply to, and will bind, the heirs, successors, executors, administrators and assignees of the parties. SECTION 12. SUBCONTRACTING. Subcontracts Authorized: Notwithstanding Section 11 (Assignment) above, CITY agrees that subcontractors may be used to complete the Services. The subcontractors authorized by CITY to perform work on this Project are: QuitCarbon Inc. 945 Market St, Suite 501 San Francisco CA 94103 415-446-1620 Service: Home Assessments workflow and data gathering prior and during install. Avila Electric 1212 Verde Rd Half MoonBay CA 94019 650-245-8753 Services: Electrical Professional Services Rev. Jan 29, 2024 Page 3 of 38 Item 7: Staff Report Pg. 12 Packet Pg. 203 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 Ingraham Electric 322 Princeton Ave El Granada, Ca 94018 650-728-2262 Services: Electrical Zylac Construction 12345 Grange Rd, Meadow Vista CA 95722 530-368-0856 Services: General Contracting, Electrical Services CONSULTANT shall be responsible for directing the work of any subcontractors and for any compensation due to subcontractors. CITY assumes no responsibility whatsoever concerning compensation of subcontractors. CONSULTANT shall be fully responsible to CITY for all acts and omissions of subcontractors. CONSULTANT shall change or add subcontractors only with the prior written approval of the City Manager or designee. SECTION 13. PROJECT MANAGEMENT. CONSULTANT will assign Aaron Gianni, CEO, 88 Elmira Street, Suite A, San Francisco, CA 94124, telephone: 650-873-5794, Email: service&larrattbros.com as the CONSULTANT's Project Manager to have supervisory responsibility for the performance, progress, and execution of the Services and represent CONSULTANT during the day-to-day performance of the Services. If circumstances cause the substitution of the CONSULTANT's Project Manager or any other of CONSULTANT's key personnel for any reason, the appointment of a substitute Project Manager and the assignment of any key new or replacement personnel will be subject to the prior written approval of the CITY's Project Manager. CONSULTANT, at CITY's request, shall promptly remove CONSULTANT personnel who CITY finds do not perform the Services in an acceptable manner, are uncooperative, or present a threat to the adequate or timely completion of the Services or a threat to the safety of persons or property. CITY's Project Manager is Diane Bailey, Utilities Department, Resource Management Division, 250 Hamilton Ave., Palo Alto, CA 94301 Telephone: 650-329-2241, Email: diane.Bailey(a,cityofpaloalto.org. CITY's Project Manager will be CONSULTANT's point of contact with respect to performance, progress and execution of the Services. CITY may designate an alternate Project Manager from time to time. SECTION 14. OWNERSHIP OF MATERIALS. All work product, including without limitation, all writings, drawings, studies, sketches, photographs, plans, reports, specifications, computations, models, recordings, data, documents, and other materials developed under this Agreement, in any form or media, shall be and remain the exclusive property of CITY without restriction or limitation upon their use, however CONSULTANT may use customer data that participating customers voluntarily provide to perform the tasks included in the Scope of Services. Neither CONSULTANT nor its subcontractors, if any, shall make any of such work product available to any individual or organization without the prior written approval of the City Manager or designee. CONSULTANT shall retain exclusive ownership of any software and Professional Services Rev. Jan 29, 2024 Page 4 of 38 Item 7: Staff Report Pg. 13 Packet Pg. 204 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, copyright interests it developed prior to the execution of this Agreement Contract S25190354 ed, improved or updated in CONTRACTOR'S performance of the Services. CONSuL lAIN I makes no representation of the suitability of the work product for use in or application to circumstances not contemplated by the Scope of Services. SECTION 15. AUDITS. CONSULTANT agrees to permit CITY and its authorized representatives to audit, at any reasonable time during the term of this Agreement and for four (4) years from the date of final payment, CONSULTANT's records pertaining to matters covered by this Agreement, including without limitation records demonstrating compliance with the requirements of Section 10 (Independent Contractor). CONSULTANT further agrees to maintain and retain accurate books and records in accordance with generally accepted accounting principles for at least four (4) years after the expiration or earlier termination of this Agreement or the completion of any audit hereunder, whichever is later. SECTION 16. INDEMNITY. 16.1. To the fullest extent permitted by law, CONSULTANT shall indemnify, defend and hold harmless CITY, its Council members, officers, employees and agents (each an "Indemnified Party") from and against any and all demands, claims, or liability of any nature, including death or injury to any person, property damage or any other loss, including all costs and expenses of whatever nature including attorney's fees, experts fees, court costs and disbursements ("Claims") resulting from, arising out of or in any manner related to performance or nonperformance by CONSULTANT, its officers, employees, agents or contractors under this Agreement, regardless of whether or not it is caused in part by an Indemnified Party. 16.2. Notwithstanding the above, nothing in this Section 16 shall be construed to require CONSULTANT to indemnify an Indemnified Party from a Claim arising from the active negligence or willful misconduct of an Indemnified Party that is not contributed to by any act of, or by any omission to perform a duty imposed by law or agreement by, CONSULTANT, its officers, employees, agents or contractors under this Agreement. 16.3. The acceptance of CONSULTANT's Services and duties by CITY shall not operate as a waiver of the right of indemnification. The provisions of this Section 16 shall survive the expiration or early termination of this Agreement. SECTION 17. WAIVERS. No waiver of a condition or nonperformance of an obligation under this Agreement is effective unless it is in writing in accordance with Section 29.4 of this Agreement. No delay or failure to require performance of any provision of this Agreement shall constitute a waiver of that provision as to that or any other instance. Any waiver granted shall apply solely to the specific instance expressly stated. No single or partial exercise of any right or remedy will preclude any other or further exercise of any right or remedy. SECTION 18. INSURANCE. 18.1. CONSULTANT, at its sole cost and expense, shall obtain and maintain, in full force and effect during the term of this Agreement, the insurance coverage described in Exhibit D, entitled "INSURANCE REQUIREMENTS". CONSULTANT and its contractors, if any, shall obtain a policy endorsement naming CITY as an additional insured under any general liability or Professional Services Rev. Jan 29, 2024 Page 5 of 38 Item 7: Staff Report Pg. 14 Packet Pg. 205 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 automobile policy or policies. Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 18.2. All insurance coverage required hereunder shall be provided through carriers with AM Best's Key Rating Guide ratings of A- :VII or higher which are licensed or authorized to transact insurance business in the State of California. Any and all contractors of CONSULTANT retained to perform Services under this Agreement will obtain and maintain, in full force and effect during the term of this Agreement, identical insurance coverage, naming CITY as an additional insured under such policies as required above. 18.3. Certificates evidencing such insurance shall be filed with CITY concurrently with the execution of this Agreement. The certificates will be subject to the approval of CITY's Risk Manager and will contain an endorsement stating that the insurance is primary coverage and will not be canceled, or materially reduced in coverage or limits, by the insurer except after filing with the Purchasing Manager thirty (30) days' prior written notice of the cancellation or modification. If the insurer cancels or modifies the insurance and provides less than thirty (30) days' notice to CONSULTANT, CONSULTANT shall provide the Purchasing Manager written notice of the cancellation or modification within two (2) business days of the CONSULTANT's receipt of such notice. CONSULTANT shall be responsible for ensuring that current certificates evidencing the insurance are provided to CITY's Chief Procurement Officer during the entire term of this Agreement. 18.4. The procuring of such required policy or policies of insurance will not be construed to limit CONSULTANT's liability hereunder nor to fulfill the indemnification provisions of this Agreement. Notwithstanding the policy or policies of insurance, CONSULTANT will be obligated for the full and total amount of any damage, injury, or loss caused by or directly arising as a result of the Services performed under this Agreement, including such damage, injury, or loss arising after the Agreement is terminated or the term has expired. SECTION 19. TERMINATION OR SUSPENSION OF AGREEMENT OR SERVICES. 19.1. The City Manager may suspend the performance of the Services, in whole or in part, or terminate this Agreement, with or without cause, by giving ten (10) days prior written notice thereof to CONSULTANT. If CONSULTANT fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided under this Agreement or at law, the City Manager may terminate this Agreement sooner upon written notice of termination. Upon receipt of any notice of suspension or termination, CONSULTANT will discontinue its performance of the Services on the effective date in the notice of suspension or termination. 19.2. In event of suspension or termination, CONSULTANT will deliver to the City Manager on or before the effective date in the notice of suspension or termination, any and all work product, as detailed in Section 14 (Ownership of Materials), whether or not completed, prepared by CONSULTANT or its contractors, if any, in the performance of this Agreement. Such work product is the property of CITY, as detailed in Section 14 (Ownership of Materials). 19.3. In event of suspension or termination, CONSULTANT will be paid for the Services rendered and work products delivered to CITY in accordance with the Scope of Services up to the effective date in the notice of suspension or termination; provided, however, if this Professional Services Rev. Jan 29, 2024 Page 6 of 38 Item 7: Staff Report Pg. 15 Packet Pg. 206 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Agreement is suspended or terminated on account of a default by CONSU Contract S25190354 1 be obligated to compensate CONSULTANT only for that portion of CONS s Services provided in material conformity with this Agreement as such determination is made by the City Manager acting in the reasonable exercise of his/her discretion. The following Sections will survive any expiration or termination of this Agreement: 14, 15, 16, 17, 19.2, 19.3, 19.4, 20, 25, 27, 28, 29 and 30. 19.4. No payment, partial payment, acceptance, or partial acceptance by CITY will operate as a waiver on the part of CITY of any of its rights under this Agreement, unless made in accordance with Section 17 (Waivers). SECTION 20. NOTICES. All notices hereunder will be given in writing and mailed, postage prepaid, by certified mail, addressed as follows: To CITY: Office of the City Clerk City of Palo Alto Post Office Box 10250 Palo Alto, CA 94303 With a copy to the Purchasing Manager To CONSULTANT: Attention of the Project Manager at the address of CONSULTANT recited on the first page of this Agreement. CONSULTANT shall provide written notice to CITY of any change of address. SECTION 21. CONFLICT OF INTEREST. 21.1. In executing this Agreement, CONSULTANT covenants that it presently has no interest, and will not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the Services. 21.2. CONSULTANT further covenants that, in the performance of this Agreement, it will not employ subcontractors or other persons or parties having such an interest. CONSULTANT certifies that no person who has or will have any financial interest under this Agreement is an officer or employee of CITY; this provision will be interpreted in accordance with the applicable provisions of the Palo Alto Municipal Code and the Government Code of the State of California, as amended from time to time. CONSULTANT agrees to notify CITY if any conflict arises. 21.3. If the CONSULTANT meets the definition of a "Consultant" as defined by the Regulations of the Fair Political Practices Commission, CONSULTANT will file the appropriate financial disclosure documents required by the Palo Alto Municipal Code and the Political Reform Act of 1974, as amended from time to time. SECTION 22. NONDISCRIMINATION; COMPLIANCE WITH ADA. Professional Services Rev. Jan 29, 2024 Page 7 of 38 Item 7: Staff Report Pg. 16 Packet Pg. 207 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 22.1. As set forth in Palo Alto Municipal Code Section 2.ju.io, as amended from time to time, CONSULTANT certifies that in the performance of this Agreement, it shall not discriminate in the employment of any person due to that person's race, skin color, gender, gender identity, age, religion, disability, national origin, ancestry, sexual orientation, pregnancy, genetic information or condition, housing status, marital status, familial status, weight or height of such person. CONSULTANT acknowledges that it has read and understands the provisions of Section 2.30.510 of the Palo Alto Municipal Code relating to Nondiscrimination Requirements and the penalties for violation thereof, and agrees to meet all requirements of Section 2.30.510 pertaining to nondiscrimination in employment. 22.2. CONSULTANT understands and agrees that pursuant to the Americans Disabilities Act ("ADA"), programs, services and other activities provided by a public entity to the public, whether directly or through a contractor or subcontractor, are required to be accessible to the disabled public. CONSULTANT will provide the Services specified in this Agreement in a manner that complies with the ADA and any other applicable federal, state and local disability rights laws and regulations, as amended from time to time. CONSULTANT will not discriminate against persons with disabilities in the provision of services, benefits or activities provided under this Agreement. SECTION 23. ENVIRONMENTALLY PREFERRED PURCHASING AND ZERO WASTE REQUIREMENTS. CONSULTANT shall comply with the CITY's Environmentally Preferred Purchasing policies which are available at CITY's Purchasing Department, hereby incorporated by reference and as amended from time to time. CONSULTANT shall comply with waste reduction, reuse, recycling and disposal requirements of CITY's Zero Waste Program. Zero Waste best practices include, first, minimizing and reducing waste; second, reusing waste; and, third, recycling or composting waste. In particular, CONSULTANT shall comply with the following Zero Waste requirements: (a) All printed materials provided by CONSULTANT to CITY generated from a personal computer and printer including but not limited to, proposals, quotes, invoices, reports, and public education materials, shall be double -sided and printed on a minimum of 30% or greater post -consumer content paper, unless otherwise approved by CITY's Project Manager. Any submitted materials printed by a professional printing company shall be a minimum of 30% or greater post -consumer material and printed with vegetable -based inks. (b) Goods purchased by CONSULTANT on behalf of CITY shall be purchased in accordance with CITY's Environmental Purchasing Policy including but not limited to Extended Producer Responsibility requirements for products and packaging. A copy of this policy is on file at the Purchasing Department's office. (c) Reusable/returnable pallets shall be taken back by CONSULTANT, at no additional cost to CITY, for reuse or recycling. CONSULTANT shall provide documentation from the facility accepting the pallets to verify that pallets are not being disposed. SECTION 24. COMPLIANCE WITH PALO ALTO MINIMUM WAGE ORDINANCE. CONSULTANT shall comply with all requirements of the Palo Alto Municipal Code Chapter 4.62 (Citywide Minimum Wage), as amended from time to time. In particular, for any employee otherwise entitled to the State minimum wage, who performs at least two (2) hours of work in a calendar week within the geographic boundaries of the City, CONSULTANT shall pay such employees no less than the minimum wage set forth in Palo Alto Municipal Code Section 4.62.030 Professional Services Rev. Jan 29, 2024 Page 8 of 38 Item 7: Staff Report Pg. 17 Packet Pg. 208 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, for each hour worked within the geographic boundaries of the City of P Contract S25190354 on, CONSULTANT shall post notices regarding the Palo Alto Minimum Wage Urrnnance in accordance with Palo Alto Municipal Code Section 4.62.060. SECTION 25. NON -APPROPRIATION. This Agreement is subject to the fiscal provisions of the Charter of the City of Palo Alto and the Palo Alto Municipal Code, as amended from time to time. This Agreement will terminate without any penalty (a) at the end of any fiscal year in the event that funds are not appropriated for the following fiscal year, or (b) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Agreement are no longer available. This Section shall take precedence in the event of a conflict with any other covenant, term, condition, or provision of this Agreement. SECTION 26. PREVAILING WAGES AND DIR REGISTRATION FOR PUBLIC WORKS CONTRACTS. 26.1. This Project is not subject to prevailing wages and related requirements. CONSULTANT is not required to pay prevailing wages and meet related requirements under the California Labor Code and California Code of Regulations in the performance and implementation of the Project if the contract: (1) is not a public works contract; (2) is for a public works construction project of $25,000 or less, per California Labor Code Sections 1782(d)(1), 1725.5(f) and 1773.3(j); or (3) is for a public works alteration, demolition, repair, or maintenance project of $15,000 or less, per California Labor Code Sections 1782(d)(1), 1725.5(f) and 1773.3(j). SECTION 27. CLAIMS PROCEDURE FOR "9204 PUBLIC WORKS PROJECTS". For purposes of this Section 27, a "9204 Public Works Project" means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (Cal. Pub. Cont. Code § 9204.) Per California Public Contract Code Section 9204, for Public Works Projects, certain claims procedures shall apply, as set forth in Exhibit F, entitled "Claims for Public Contract Code Section 9204 Public Works Projects". ® This Project is not a 9204 Public Works Project. SECTION 28. CONFIDENTIAL INFORMATION. 28.1. In the performance of this Agreement, CONSULTANT may have access to CITY's Confidential Information (defined below). CONSULTANT will hold Confidential Information in strict confidence, not disclose it to any third party, and will use it only for the performance of its obligations to CITY under this Agreement and for no other purpose. CONSULTANT will maintain reasonable and appropriate administrative, technical and physical safeguards to ensure the security, confidentiality and integrity of the Confidential Information. Notwithstanding the foregoing, CONSULTANT may disclose Confidential Information to its employees, agents and subcontractors, if any, to the extent they have a need to know in order to perform CONSULTANT's obligations to CITY under this Agreement and for no other purpose, provided that the CONSULTANT informs them of, and requires them to follow, the confidentiality Professional Services Rev. Jan 29, 2024 Page 9 of 38 Item 7: Staff Report Pg. 18 Packet Pg. 209 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, and security obligations of this Agreement. Contract S25190354 28.2. "Confidential Information" means all data, information (including without limitation "Personal Information" about a California resident as defined in Civil Code Section 1798 et seq., as amended from time to time) and materials, in any form or media, tangible or intangible, provided or otherwise made available to CONSULTANT by CITY, directly or indirectly, pursuant to this Agreement. Confidential Information excludes information that CONSULTANT can show by appropriate documentation: (i) was publicly known at the time it was provided or has subsequently become publicly known other than by a breach of this Agreement; (ii) was rightfully in CONSULTANT's possession free of any obligation of confidence prior to receipt of Confidential Information; (iii) is rightfully obtained by CONSULTANT from a third party without breach of any confidentiality obligation; (iv) is independently developed by employees of CONSULTANT without any use of or access to the Confidential Information; or (v) CONSULTANT has written consent to disclose signed by an authorized representative of CITY. 28.3. Notwithstanding the foregoing, CONSULTANT may disclose Confidential Information to the extent required by order of a court of competent jurisdiction or governmental body, provided that CONSULTANT will notify CITY in writing of such order immediately upon receipt and prior to any such disclosure (unless CONSULTANT is prohibited by law from doing so), to give CITY an opportunity to oppose or otherwise respond to such order. 28.4. CONSULTANT will notify City promptly upon learning of any breach in the security of its systems or unauthorized disclosure of, or access to, Confidential Information in its possession or control, and if such Confidential Information consists of Personal Information, CONSULTANT will provide information to CITY sufficient to meet the notice requirements of Civil Code Section 1798 et seq., as applicable, as amended from time to time. 28.5. Prior to or upon termination or expiration of this Agreement, CONSULTANT will honor any request from the CITY to return or securely destroy all copies of Confidential Information. All Confidential Information is and will remain the property of the CITY and nothing contained in this Agreement grants or confers any rights to such Confidential Information on CONSULTANT. 28.6. If selected in Section 30 (Exhibits), this Agreement is also subject to the terms and conditions of the Information Privacy Policy and Cybersecurity Terms and Conditions. SECTION 29. MISCELLANEOUS PROVISIONS. 29.1. This Agreement will be governed by California law, without regard to its conflict of law provisions. 29.2. In the event that an action is brought, the parties agree that trial of such action will be vested exclusively in the state courts of California in the County of Santa Clara, State of California. 29.3. The prevailing party in any action brought to enforce the provisions of this Agreement may recover its reasonable costs and attorneys' fees expended in connection with that Professional Services Rev. Jan 29, 2024 Page 10 of 38 Item 7: Staff Report Pg. 19 Packet Pg. 210 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, action. The prevailing party shall be entitled to recover an amount equal to Contract S25190354 lue of legal services provided by attorneys employed by it as well as any attorneys tees pail to third parties. 29.4. This Agreement, including all exhibits, constitutes the entire and integrated agreement between the parties with respect to the subject matter of this Agreement, and supersedes all prior agreements, negotiations, representations, statements and undertakings, either oral or written. This Agreement may be amended only by a written instrument, which is signed by the authorized representatives of the parties and approved as required under Palo Alto Municipal Code, as amended from time to time. 29.5. If a court of competent jurisdiction finds or rules that any provision of this Agreement is void or unenforceable, the unaffected provisions of this Agreement will remain in full force and effect. 29.6. In the event of a conflict between the terms of this Agreement and the exhibits hereto (per Section 30) or CONSULTANT'S proposal (if any), the Agreement shall control. In the event of a conflict between the exhibits hereto and CONSULTANT'S proposal (if any), the exhibits shall control. 29.7. The provisions of all checked boxes in this Agreement shall apply to this Agreement; the provisions of any unchecked boxes shall not apply to this Agreement. 29.8. All section headings contained in this Agreement are for convenience and reference only and are not intended to define or limit the scope of any provision of this Agreement. 29.9. This Agreement may be signed in multiple counterparts, which, when executed by the authorized representatives of the parties, shall together constitute a single binding agreement. SECTION 30. EXHIBITS. Each of the following exhibits, if the check box for such exhibit is selected below, is hereby attached and incorporated into this Agreement by reference as though fully set forth herein: ® EXHIBIT A: SCOPE OF SERVICES ® EXHIBIT B: SCHEDULE OF PERFORMANCE ® EXHIBIT C: COMPENSATION ® EXHIBIT C-1: SCHEDULE OF RATES ® EXHIBIT D: INSURANCE REQUIREMENTS ® EXHIBIT E: INFORMATION SECURITY POLICY ® EXHIBIT F: CYBERSECURITY TERMS AND CONDITIONS THIS AGREEMENT IS NOT COMPLETE UNLESS ALL SELECTED EXHIBITS ARE A TTA CHED. Professional Services Rev. Jan 29, 2024 Page 11 of38 8 Item 7: Staff Report Pg. 20 Packet Pg. 211 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, CONTRACT NO. S25190354 SIGNATURE PAG Contract S25190354 IN WITNESS WHEREOF, the parties hereto have by their duly authorized representatives executed this Agreement as of the date first above written. CITY OF PALO ALTO DocuSigned by: qua h tffl2Manager APPROVED AS TO FORM: DocuSigned by: '' Att y or designee LARRATT BROS PLUMBING, INC. DocuSigned by: �aYbl� LI F64CD050FBB74CD.. Aaron Gianni Name: Title: President DocuSigned by B F. BC98D476BSC54EA. Alex Perez Name: Title: Service Manager Professional Services Rev. Jan 29, 2024 Page 12 of 38 Item 7: Staff Report Pg. 21 Packet Pg. 212 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, EXHIBIT A Contract S25190354 SCOPE OF SERVICES CONSULTANT shall provide the Services detailed in this Exhibit A, entitled "SCOPE OF SERVICES". Notwithstanding any provision herein to the contrary, CONSULTANT's duties and services described in this Scope of Services shall not include preparing or assisting CITY with any portion of CITY's preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with CITY. CITY shall at all times retain responsibility for public contracting, including with respect to any subsequent phase of this project. CONSULTANT's participation in the planning, discussions, or drawing of project plans or specifications shall be limited to conceptual, preliminary, or initial plans or specifications. CONSULTANT shall cooperate with CITY to ensure that all bidders for a subsequent contract on any subsequent phase of this project have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by CONSULTANT pursuant to this Scope of Services. CONSULTANT will leverage its technical expertise and local experience to deliver the Heat Pump Water Heater Emergency Replacement Pilot Program ("HPWH ER Pilot Program", "HPWH ER Pilot" or "the Program") to CITY/CPAU customers within the City of Palo Alto. The HPWH ER Pilot will provide emergency replacement service to Palo Alto residents living in single-family homes and receiving utility service from City of Palo Alto Utilities. In addition, Residential Energy Assistance Program (REAP) customers may also be eligible to participate in the Program if they experience a sudden water heater failure; for eligible REAP customers, the full cost of replacement with a HPWH will be covered by the CITY at the rate listed in Table C- 1. Replacements will include either the direct installation of a heat pump water heater or use of a temporary gas water heater, with a heat pump water heater installation following necessary site preparation work as described in the following 2 scenarios: 1. Instant Electrification — This scenario allows for immediate installation of a heat pump water heater within 2 business days of the customer call. 2. Gas Loaner Electrification — Electrification may not be feasible within 2 business days if additional electrical or site preparation work is needed. In this case, if a heat pump water heater cannot be installed within 2 business days, consultant will install a temporary loaner water heater while completing the necessary site preparation work for the permanent HPWH. Customers do not have the option to keep the "loaner" gas water heater. CPAU will offer a customer rebate to all projects that have completed a HPWH installation and have passed final inspection. The invoice issued by CONSULTANT to the customer shall reflect the full amount of the CPAU rebate (i.e. instant rebate). A. HPWH ER Pilot Service Level Expectations (SLEs) The following SLEs for the CONSULTANT's performances of the Services are designed to Professional Services Rev. Jan 29, 2024 Page 13 of 38 Item 7: Staff Report Pg. 22 Packet Pg. 213 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, deliver timely, quality service to customers and to achieve high custom Contract S25190354 Is. These metrics will be tracked on an ongoing basis to ensure that the CO s are meeting the SLEs. 1. Emergency replacements or loaner equipment must be installed within two business days (defined as Monday through Friday, excluding federal holidays) of a customer call. As an example, if a customer calls on a Friday evening at 9pm, the emergency replacement must be completed by the end of the business day on Tuesday assuming Monday and Tuesday are non -holidays. Consultant will provide customers with the option to expedite the emergency replacement during nights and weekends by paying overtime fees. 2. For customers receiving a water heater loaner, the permanent electric water heater must be installed and in operation within 6 weeks of customer enrollment, barring electrical panel service upgrade delays, or instances where the customer chooses not to move ahead with the heat pump water heater. 3. 100% of the HPWH and gas water heater installations receive permits and pass final inspection; and at least 80% of installation projects pass final inspection on the first time. 4. Achieve a minimum of 75% satisfaction rating from customer surveys. B. HPWH ER Pilot Eligible Measures CONSULTANT will deliver eligible measures as listed in Table C-1 of Exhibit "C," Compensation. CONSULTANT may request adding or deleting measures to the Program and all such changes require the prior written consent of the CITY. All work completed by CONSULTANT under this Agreement must comply with California's most recently adopted building and appliance efficiency standards. C. HPWH ER Pilot Program Cost Allocation CITY and customer will each pay a portion of the total installed costs as specified in Exhibit "C". The CITY bears no responsibility for any of CONSULTANT's costs and/or compensation associated with CONSULTANT's performance of any Non-standard Site Preparation and/or Installation Services, including Electrification Labor Rates; all such compensation will remain the sole the responsibility of customers who elect to request Electrification Site Preparation Services, as listed in Exhibit C. The CITY bears no responsibility for any of CONSULTANT's costs and/or compensation associated with CONSULTANT's delivery of extended parts and labor warranties for any of the HPWH ER Pilot Program Eligible Measures; all such compensation will remain the sole the responsibility of customers who elect to purchase Extended Parts and Labor Warranties. All customer payment amounts, Electrification Site Preparation Services costs, Electrification Labor Rates and any Extended Parts and Labor Warranty costs, if Professional Services Rev. Jan 29, 2024 Page 14 of 38 Item 7: Staff Report Pg. 23 Packet Pg. 214 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, applicable, will be included and clearly disclosed in each customer' & Contract S25190354 Participation Agreement. D. HPWH ER Pilot Installation Program Staffing CONSULTANT agrees to staff the Program in accordance with the Staffing plan set forth in Table A-3. CONSULTANT shall notify the CITY concerning proposed changes to the staffing plan, and all such changes require the prior written consent of the CITY. CITY reserves the right to (i) request CONSULTANT conduct criminal background checks to City's satisfaction on all CONSULTANT's staff, subcontractors or agents that may enter customer property, and (ii) require that any staff, subcontractor or agent of CONSULTANT that fails the background check shall not be permitted to enter any customer premises. Table A-3. HPWH ER Pilot Program Staffing Plan Company Name and Title Role and Responsibilities Larratt Bros Aaron Gianni, President Program implementation and set standards for Larratt Bros and Plunjr as well as quality control. Larratt Bros Alex Perez, Service Day-to-day operational details of interactions Manager between homeowners. Reporting. Permitting. Larratt Bros Carlos Catagena, Customer intake and dispatching of Service Admin technicians. Permitting. Account payable and accounts receivable. Larratt Bros Melissa Smith, Office Manager Plumber. Equipment installation and Larratt Bros Brandon Dillon, Service Plumber customer satisfaction Larratt Bros Jonah Geller, Service Plumber & Electrician. Equipment Plumber installation and customer satisfaction Larratt Bros Arturo Garcia, Service Plumber. Equipment installation and Plumber customer satisfaction Larratt Bros Brent Boblitt Electrician. QuitCarbon Cooper Marcus, CEO Program manager. Overall design and execution of QuitCarbon's responsibilities. QuitCarbon Adam Klaus, Head of Responsible for day-to-day operational Operations details of interactions between homeowners, Larratt Bros, and QuitCarbon. E. HPWH ER Pilot Program Implementation & Delivery Task 1: HPWH ER Kick-off and Set up Professional Services Rev. Jan 29, 2024 Page 15 of 38 Item 7: Staff Report Pg. 24 Packet Pg. 215 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 Task 1.1: HPWHER Kick -Off CONSULTANT shall organize the HPWH ER Pilot Kick -Off meeting in conjunction with CPAU to review HPWH ER Pilot goals, design and delivery, budget, staffing plan, roles, timelines and priorities in the delivery of the HPWH ER Pilot. The meeting will also cover coordination with other CPAU programs, logistics, data integration, invoicing requirements, customer management, and scheduling of ongoing check -in meetings. CONSULTANT will initially set up check -in meetings on a weekly basis, and meetings can be reduced in frequency if mutually agreed upon. CONSULTANT will work with CPAU staff to determine the agenda at a minimum one day prior to the meeting. Meetings will focus on Program progress updates, reviewing deliverables, and determining expected milestones for the next meeting. CONSULTANT will provide a weekly report tracking customer intake timing and status before each meeting. Task 1.1 Deliverables: Meeting agenda and minutes Task 1.2: Develop HPWHER Pilot Documents CONSULTANT shall create the following Program documents in close consultation with CPAU staff, for use by CITY and CONSULTANT. Task 1.2.1 Develop Program Policies and Procedures Manual. CONSULTANT will draft the Program Policies and Procedures in collaboration with the CITY, which will include, at a minimum, the following: i. The terms and conditions for eligible customers to participate in the Program; ii. The process for customers to participate in the Program, including the criteria for disqualification from participation; iii. The process for scheduling and performing the different types of customer site assessments (virtual, phone -assisted virtual and in -person); iv. The process for assessing the suitability of heat pump water heaters (HPWH) including 120 volt HPWHs and the need for a loaner unit to restore hot water within 48 hours for a customer; v. The process to obtain CITY approval for installation for qualifying REAP customers; vi. The process for collecting customer deposits for a gas loaner unit and customer payments for eligible measures including electrification site preparation, HPWH installation and permit fee, and Extended Parts and Labor Warranty; vii. The process for installing Eligible Measures, including creating a quality assurance and quality control plan and checklist for compliance with Palo Alto permitting requirements that also ensures the appropriate heat pump size, and that measures are Professional Services Rev. Jan 29, 2024 Page 16 of 38 Item 7: Staff Report Pg. 25 Packet Pg. 216 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, installed and working properly; Contract S25190354 viii. The process for obtaining customer feedback as well as a customer complaint resolution plan; ix. The process for tracking customer projects, from intake to site assessment to installation to final inspection, and transmitting customer project data including photos to the CITY's Program Tracking Platform (Quickbase); x. The process for providing weekly Program Reports; xi. The process for submitting Program invoices, including customer rebate reimbursements for projects that have passed final inspection. CONSULTANT will collaborate with the CITY to draft a Program Policies and Procedures Manual and will provide and review any written revisions and updates to the Program Policies and Procedures Manual with the CITY to secure CITY's final approval. CONSULTANT will adhere to and document its compliance with applicable policies and procedures in the Program Policies and Procedures Manual as it performs the Services in this Scope of Work. Task 1.2.1 Deliverables: Completed Program documents including Program Policies and Procedures Manual that are approved by CPA U Task 1.2.2 Develop Templates for Customer Site Assessment Report and Project Estimate CONSULTANT will create a Customer Site Assessment Report Template for CITY review and approval and will revise as directed by CITY before use. Once finalized and approved by CITY, the Customer Site Assessment Report will be provided by CONSULTANT to the customer and will provide a Customer Estimate with information necessary for the customer to understand options available to them to replace their gas water heater with a heat pump water heater, including the use of alternative equipment to temporarily restore hot water until it is possible to make a permanent heat pump water heater installation. CONSULTANT will provide revisions and updates to the Customer Site Assessment Report Template upon CITY request. Customer Site Assessments will include the following elements regarding equipment and appliances located at the residential property owned or occupied by the customer interested in exploring participation in the Program, each to be documented on the Customer Site Assessment Report Template: i. An inventory of gas and electric equipment and appliances and nameplate (or equivalent alternative) power use, in order to facilitate load calculations; ii. Evaluation of the condition and capacity of the existing electrical systems and recommended upgrades or alternative power efficient strategies that may be necessary to enable installation of a heat pump water heater; iii. Recommended location for new electrical equipment and HPWH, noting any observed space or structural constraints and possible remedies; and Professional Services Rev. Jan 29, 2024 Page 17 of 38 Item 7: Staff Report Pg. 26 Packet Pg. 217 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, iv. Identification of home size including total bedrooms and bathrod Contract S25190354 facilitate compliance with Plumbing Code First Hour Ratings requirements; Customer Estimate will include: i. Description of a work plan, including planned equipment, site preparation measures, any other work, and timeline, that will be executed if customer opts to participate in the Program; and ii. Estimated cost of work to be performed, for customer and CITY's review. Task 1.2.2 Deliverable: Customer Site Assessment Report and Estimate Templates Task 1.2.3 Develop Customer Site Assessment Agreement CONSULTANT will create a Customer Site Assessment Agreement that includes the following, at a minimum: i. Provides an overview of the Program; ii. Grants CONSULTANT permission to perform the Customer Site Assessment to determine whether it is possible to replace the broken water heater with a heat pump water heater and which site preparation measures would be required; iii. Fully indemnifies CITY against all loss, damages, costs and liability arising from any claims stemming from the Customer Site Assessment; iv. Collects basic information from the customer, including but not limited to customer contact information and installation address. CONSULTANT will submit the Customer Site Assessment Agreement to CITY for review and approval, and will revise and update the Customer Site Assessment Agreement as directed by CITY before use. CONSULTANT will provide the Customer Site Assessment Agreement to customers in electronic and paper formats if requested by the customer. CONSULTANT will scan paper forms completed by customers and submit them to CITY electronically. Task 1.2.3 Deliverable: Customer Site Assessment Agreement Template Task 1.2.4 Develop Program Participation Agreement CONSULTANT will create a Program Participation Agreement that grants CONSULTANT permission to install Eligible Measures, collect customer payments, offer an Extended Parts and Labor Warranty for additional costs, and enroll customer in any State or local financing programs. The Program Participation Agreement will include, at a minimum, the following elements: i. Customer contact information; ii. Installation address; iii. Project scope; iv. Project costs by line item, including electrification site preparation services and Electrification Labor Rates, as defined in Exhibit C, as well as customer's sole responsibility for any costs associated with them; Professional Services Rev. Jan 29, 2024 Page 18 of 38 Item 7: Staff Report Pg. 27 Packet Pg. 218 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, v. Product and labor warranty information, including Extended Parl Contract S25190354 Warranty agreement specifying coverage of any defects in material or workmanship under normal use during the five (5) year warranty period, and also specifying that during the warranty period Larratt Brothers Plumbing will repair or replace, at no charge, products or part of a product that proves defective because of improper material or workmanship, under normal use and maintenance. vi. Customer payments and payment options available if customer opts to participate in the Program; vii. Customer finance programs such as GoGreen Financing, payment amount, terms, and payment options available if customer opts to participate in the Program; viii. Language specifying that the Customer is responsible for providing a fully refundable down payment on any loaned or temporary water heating equipment (whether it's a gas water heater with a tank, or tankless gas, or a 120volt HPWH that is temporary) agreed to as part of the project, to be credited to the Customer upon project completion. ix. Language releasing CITY of liability for any claims arising out of customer's participation in the Program, and CONSULTANT's performance of the Services involved in the Program, including initial pre -Program site assessments; x. Language and/or supplemental forms enrolling customers in any State or local financing programs. CONSULTANT will submit the Program Participation Agreement to CITY for review and approval and will revise and update as directed by CITY before use. CONSULTANT will provide the Program Participation Agreement to customers in electronic format, unless specifically requested by the Customer to be in paper format. CONSULTANT will scan paper forms completed by customers and submit them to CITY electronically. Task 1.2.4 Deliverable: Customer Program Participation Agreement Template Task 1.2.5 Develop Customer Feedback Forms CONSULTANT will develop a Customer Feedback Form template. The Customer Feedback Form gives customers the opportunity to evaluate the Program, including the Site Assessment, the on -going customer support, and the overall customer experience associated with the Program. The Customer Feedback Form must include, at minimum, a question for the customer that enables CITY to calculate a Net Promotor Score value, which is a standardized metric used to assess customer satisfaction. CONSULTANT will submit the Customer Feedback Form Template to CITY for review and approval and will revise and update it as directed by CITY before use. CONSULTANT will provide the Customer Feedback Forms to customers in both electronic and (if requested) paper formats. CONSULTANT will scan paper forms completed by customers and submit them to CITY electronically. Task 1.2.5 Deliverable: Customer Feedback Form Template Task 1.2.6 Develop Program Report Template Professional Services Rev. Jan 29, 2024 Page 19 of 38 Item 7: Staff Report Pg. 28 Packet Pg. 219 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 CONSULTANT will create a standard Program Report template to meet ul I Y reporting requirements. This Program Report will be delivered monthly. CONSULTANT will assist CITY in finalizing Program performance metrics to include in the Program Reports. These metrics may include data specified by CITY. The Program Report will also provide summary statistics including, but not limited to: i. Number and type of measures installed; ii. Number of projects that meet/do not meet the 48 hours emergency replacement timeframe; iii. Number and type of loaner water heaters installed. CONSULTANT will submit the Program Report Template to CITY for review and approval and will revise and update the Program Report Template as directed by CITY before use. In the event that the CITY receives adequate data reporting through Quickbase or a similar database, CONSULTANT is no longer required to submit reports. Task 1.2.6 Deliverable: Program Report Template Task 1.2.7 Develop Program Invoice Template CONSULTANT will create a standard Program Invoice Template to meet CPAU's invoicing requirements, including, but not limited to: i. Name of company providing invoice (Larratt Bros.); ii. Invoice number; iii. Invoice date; iv. Larratt's remit -to address for invoicing; v. Invoice amount, broken out as directed by Project Manager; vi. Description of work. CONSULTANT will submit the Program Invoice Template to CITY for review and approval and will revise and update the Program Invoice Template as directed by CITY before use. Task 1.2.7 Deliverable: Program Invoice Template Task 1.3 Transmit Customer Information to CITY's Program Tracking Database CONSULTANT will provide CITY with electronic customer information in a format that can be loaded into CITY's Quickbase platform and transmitted at a mutually agreed upon frequency. While the use of an API to transmit data will be preferred, other electronic formats for transmission of customer data may include .csv,.xls and .jpg file formats. CONSULTANT may utilize Rock Rabbit software to submit customer project data into CITY's Quickbase platform. CONSULTANT will ensure that CITY staff will be able to access Program data, including the following elements: Professional Services Rev. Jan 29, 2024 Page 20 of 38 Item 7: Staff Report Pg. 29 Packet Pg. 220 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, i. Customer contact information (name, address, phone, email); Contract S25190354 ii. Customer eligibility for REAP service; iii. Timestamp for initial customer intake and completion of water heater emergency replacement; iv. Existing water heater description (age, model, condition); v. Site Assessment Report and recommendations provided; vi. Installed equipment and project cost invoiced to customer; vii. Completed customer forms, as described in this Exhibit A (Site Assessment Agreement, Project Estimate, Program Participation Agreement, Customer Feedback Form); viii. Non -warranty and warranty related repair issues; ix. Project costs covered by CPAU, including site assessment cost and loaner cost where applicable; x. Summary of customer compliments and/or complaints, and reasons for rejection of proposed installations by customer; xi. Customer referrals to other programs; xii. Customer payments collected; xiii. Records of customers' Extended Parts and Labor Warranties. CONSULTANT will revise and update the above list of Program data as directed by CITY. CITY will own all customer information and Program data. CONSULTANT will adhere to the CITY's Exhibit E - Information Privacy Policy and Exhibit F - Cybersecurity Terms and Conditions; specifically, CONSULTANT will protect the confidentiality of all customer information and Program data used, prevent any sale or release of such information and data to third parties unless agreed upon in writing by the customer, and ensure CITY has secure access to all customer information and data collected through the CIS. Task 1.3 Deliverable: Successful integration of customer data from CONSULTANT'S system(s) into CITY's Program Tracking Platform Task 1.4: Set up and testing of Program invoice and rebate submission CONSULTANT shall work closely with CPAU to streamline the submission of project invoices and rebate applications. CPAU may require CONSULTANT utilize Rock Rabbit software to submit rebate applications. Task 1.4 Deliverables: Completion of user testing to submit project invoices and rebate applications. Task 1.5 Provide Eligible Measure List Updates Sixty days before the start of each fiscal year, or as requested by CITY but no more than two (2) times per fiscal year, CONSULTANT will provide to the CITY proposed updates of Table C- I for CITY review and approval. The proposed tables will include any new Eligible Measures proposed by CITY or CONSULTANT as well as changes to effective time periods that reflect measures no longer offered. Professional Services Rev. Jan 29, 2024 Page 21 of38 8 Item 7: Staff Report Pg. 30 Packet Pg. 221 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 Task 1.5 Deliverable: Eligible Measure List Updates Task 1.6 Enroll in State or Local Financing Programs CONSULTANT will enroll in GoGreen Financing, the public -facing platform of the California Hub for Energy Efficiency Financing, as a qualified CONSULTANT to provide energy efficiency and electrification installation services in Santa Clara County. When CONSULTANT is successfully enrolled in GoGreen Financing, CONSULTANT will provide CITY a link to the public -facing financing program website for Santa Clara County documenting CONSULTANT's enrollment or provide CITY with a letter certifying CONSULTANT's enrollment in the program in Santa Clara County. If mutually agreeable, CONSULTANT will enroll in additional financing programs or enlist third -party financial partners, such as National Energy Improvement Fund, to provide lending services. CONSULTANT will update the Program Participation Agreement with financing programs which CONSULTANT is enrolled in and promote these financing programs to customers participating in the Program. Task 1.6 Deliverable: Listing on public facing financing program website or letters certifying CONSULTANT's enrollment TASK 2- PROGRAM IMPLEMENTATION CONSULTANT shall intake customers, assess their projects, install water heaters, provide post - installation customer service, resolve customer issues, gather customer feedback, and process invoices to CPAU and customers. Task 2.1 Implement Marketing and Outreach Activities CONSULTANT will market the Program in collaboration with CITY. Task 2.1 Deliverable: Ongoing collaboration with CITY in marketing and outreach activities to promote Program. Task 2.2: Develop Customer Intake & hotline CONSULTANT shall collaborate with CPAU to create an emergency water heater replacement hotline and determine the most appropriate customer intake process with mutually agreed upon protocols to ensure that customers can access service outside of standard business hours, where required. Task 2.2 Deliverable: Create and maintain an emergency water heater replacement hotline within 30 days of contract award Task 2.3 Perform Customer Site Assessments and Deliver Customer Estimate Professional Services Rev. Jan 29, 2024 Page 22 of 38 Item 7: Staff Report Pg. 31 Packet Pg. 222 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 CONSULTANT will: 1) Respond to customer requests for an emergency water heater replacement and perform a site visit within 1 business day of the customer call to determine the emergency replacement scenario and applicable approaches. 2) Collect all data necessary during the customer site assessment to determine whether it is feasible to install a heat pump water heater on the day of the customer site visit or whether a temporary water heater will be necessary, and develop the Customer estimate. 3) Select equipment sizing, model, and configure in accordance with the Program Guidelines; perform electric load calculations or other assessments as needed. 4) Provide project estimate to customer including itemization of any customer deposit required toward loaner equipment where applicable. CONSULTANT will offer to review the estimate with the customer by phone, online chat, or mutually agreeable communication channel, to explain the findings, address any questions, and begin planning for an installation. CITY reserves the right to accompany CONSULTANT during Customer Site Assessment visits. Task 2.3 Deliverable: One site assessment and project estimate for each eligible customer within 1 business day of customer calling the hotline. Task 2.4 Execute Program Participation Agreement, Collect Customer Payments, and Enroll Customers in Financing Programs After completing Task 2.4 with the customer, CONSULTANT will: 1) Provide the Program Participation Agreement to the customer and obtain customer's signature; 2) As necessary, CONSULTANT will coordinate with the customer to correct any errors or omissions in the Program Participation Agreement; 3) Assist customer in understanding any payments that are the customer's responsibility, such as Customer payments, payments for Electrification Site Preparation Services and associated labor rates, and Extended Parts and Labor Warranties; 4) Assist customer in understanding CITY -approved financing programs, options, and payment terms; 5) Collect any customer payments including Customer payments, payments for Electrification Site Preparation Services and associated labor rates, and Extended Parts and Labor Warranties; 6) Assist interested customers with enrollment in GoGreen and potentially other CITY - approved State or local financing programs. Task 2.5 Install Measures and Provide Post -Installation Quality Control CONSULTANT will begin installation work to restore hot water within 2 business days of customer request: Professional Services Rev. Jan 29, 2024 Page 23 of 38 Item 7: Staff Report Pg. 32 Packet Pg. 223 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract 1) hers Larratt hers, with Brot Apply for and obtain any required permits on the customer's be Contract rot 354 2) Install Eligible Measures in accordance with all applicable federa1 and state laws and building codes, manufacturer's specifications and City of Palo Alto permitting requirements; a. CONSULTANT will hold the appropriate license(s) for any installation and work performed under this Agreement. b. CONSULTANT will notify CITY Project Manager of any delays which may result in exceedance of target for hot water restoration within 2 business days. c. If a loaner water heater is installed, CONSULTANT shall create and provide to customer a Scope of Work for the final heat pump water heater installation within 6 weeks, with exceptions for electrical panel or electrical service upgrade delays. d. If a customer receives a loaner and chooses not to proceed with a heat pump water heater installation, customer will be obligated to either return the loaner within 60 days, or CONSULTANT shall keep the emergency loaner deposit. 3) Implement the quality assurance and quality control plan to verify each project has been installed properly and documented accurately; 4) Upon completion of heat pump water heater installation, assist customers in understanding equipment operation, including programming and performing preventative maintenance; 5) Provide customer with technical manuals and warranty documentation; 6) Remain available throughout the installation process to answer questions from customers or CITY about projects. As needed, CONSULTANT will direct customers to appropriate CITY resources or vendors for questions related to other CITY programs; 7) Obtain final inspections and complete the job closure paperwork for all installed Measures; 8) Update project information in Quickbase (or CITY's chosen program platform) with completed project installation data and invoice information for inclusion in the Program Report and Program Invoice; 9) Provide customers, at a minimum, a one (1) year warranty for all measures installed under the Program, effective from the date of installation. CONSULTANT will ensure that all manufacturer product warranties held by CONSULTANT will be transferred to the customer upon installation. a. CONSULTANT shall respond to workmanship warranty calls as needed and assist customer in responding to product warranty issues. Address all workmanship and product replacement warranty issues to reasonable customer satisfaction. CITY reserves the right to accompany CONSULTANT during project installation and final Inspection, with the condition that this would in no way impede or delay CONSULTANTS provision of service to customer. Task 2.5 Deliverable: Provide timely Heat Pump Water Heater installation services as needed and where infeasible, provide referrals. Task 2.6 Provide Customer Service, Feedback and Issue Resolution Professional Services Rev. Jan 29, 2024 Page 24 of 38 Item 7: Staff Report Pg. 33 Packet Pg. 224 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract 525190354 CONSULTANT will collaborate with CITY to create a dedicated phone number availab eon customer -facing materials as directed by CITY for all CITY customer contacts to schedule Site Assessments, provide Program information, and answer customer inquiries during normal business hours, Monday through Friday between 8 AM —5 PM, as well as a rollover arrangement for afterhours service. CONSULTANT will request customer feedback as described in Customer Feedback Form. CONSULTANT will transmit customer feedback data to CITY's Program tracking platform. CONSULTANT will provide monthly customer feedback results to CITY in CONSULTANT's monthly invoicing and reporting. CONSULTANT will address and attempt to resolve all customer issues discovered through either survey feedback or other means of customer contact within five (5) business days of receiving feedback. CONSULTANT will document all such customer issues, actions taken to resolve them, and outcomes and report them to CITY. If CONSULTANT cannot resolve Program -related issues to the customer's satisfaction within five (5) business days, CONSULTANT will immediately provide CITY with a detailed description of each complaint, including the customer's name and contact information and any other information requested by CITY. CONSULTANT will pursue continuous improvements in delivery of Services provided under this Agreement to customers to drive customer satisfaction and will revise its processes, procedures and documents as directed by CITY to ensure customer satisfaction. Customer feedback issues will be tracked by CONSULTANT using the monthly reports, as well as a completed Customer Feedback Form. CITY may separately survey Program participants regarding CONSULTANT's performance. TASK 3— PROGRAM INVOICING AND REPORTING Task 3.1 Data Management CONSULTANT will export Program data to CITY's Program tracking platform. CONSULTANT will update the CITY's Program platform with project information gathered from Customer Site Assessments and completed project installations. CONSULTANT will track detailed customer information such as challenges encountered in Program implementation and proposed solutions. CONSULTANT will respond to CITY's written data requests within 30 calendar days to meet evaluation, measurement, and verification ("EM&V") and other regulatory requirements. Task 3.2 Reporting CONSULTANT will provide completed Program Reports to CITY on CITY -approved reporting templates on a monthly basis. Program Reports are critical to the success of the Services described herein, and therefore CONSULTANT's timely submittal of complete and accurate Program Reports is required Professional Services Rev. Jan 29, 2024 Page 25 of 38 Item 7: Staff Report Pg. 34 Packet Pg. 225 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, in order for CONSULTANT to receive payments under this Agreement Contract S25190354Brothers, Task 3.3 Invoicing Using the Program Invoice Template, CONSULTANT will invoice CITY on a monthly basis consistent with Section 5 of the Agreement and in accordance with the specific guidelines set forth in this Exhibit "A" and in Exhibit "C", "Compensation" through the CITY's designated submission approach or system. CITY will reimburse CONSULTANT for site assessments, City Permit Fee, and loaner water heater expenses; all other expenses will be the responsibility of the customer to pay and CONSULTANT to collect. In the event that a customer discontinues their heat pump water heater installation, CONSULTANT can keep the loaner water heater down payment from the customer and City will only reimburse CONSULTANT for site assessment of that canceled project. Proper record -keeping is critical for the success of the Services described herein. As such, CONSULTANT must timely and accurately provide the following elements in order to receive payment for Services under this Agreement: i. Completed Program Invoice Template; ii. Executed Customer Site Assessment Agreement for each project; iii. Executed Program Participation Agreement for each project; iv. Completed Customer Feedback Form for each project (for customers who have completed Feedback Forms); v. Completed project installation and invoice information for each project entered into CITY Program platform in a mutually agreed upon format. CONSULTANT shall invoice CPAU for the agreed -upon fee for loaner installation, permit fee, and the agreed -upon fee for site assessments. Task 3.3 Deliverable: Upon passing final permit inspection, CONSULTANT will invoice CPA Ufor the agreed upon CITY project contributions. TASK 4— PROGRAM CLOSE OUT Task 4.1 Resolve Outstanding Jobs in Progress CONSULTANT will complete all outstanding projects in progress and resolve any complaints from previously completed projects as a prerequisite for CITY to process CONSULTANT's invoices. Task 4.2 Develop and Submit Program Final Report CONSULTANT will submit a final Program report, which includes a written overview of the Program and a spreadsheet detailing the itemized and total Program costs. The Program Final Report will include Program achievements, challenges, goals, and lessons learned. CONSULTANT will deliver the Program Final Report within 30 calendar days before the end of the Term. Professional Services Rev. Jan 29, 2024 Page 26 of 38 Item 7: Staff Report Pg. 35 Packet Pg. 226 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Task 4.2 Deliverable: Program Final Report Contract S25190354 Professional Services Rev. Jan 29, 2024 Page 27 of 38 Item 7: Staff Report Pg. 36 Packet Pg. 227 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, EXHIBIT B Contract S25190354 SCHEDULE OF PERFORMANCE CONSULTANT shall perform the Services so as to complete each milestone within the number of days/weeks specified below. The time to complete each milestone may be increased or decreased by mutual written agreement of the Project Managers for CONSULTANT and CITY so long as all work is completed within the term of the Agreement. CONSULTANT shall provide a detailed schedule of work consistent with the schedule below within 2 weeks of receipt of the notice to proceed ("NTP") from the CITY. Milestones Completion Number of Days/Weeks (as specified below) from NTP Task 1 HPWH ER Kick-off and Set up 30 days Task 1.1 HPWH ER Kick-off Task 1.2 Develop HPWH ER Pilot Documents Task 1.2.1 Develop Program Policies and Procedures Manual Task 1.2.2 Develop Customer Site Assessment Report and Estimate Task 1.2.3 Develop Customer Site Assessment Agreement Task 1.2.4 Develop Program Participation Agreement Task 1.2.5 Develop Customer Feedback Forms Task 1.2.6 Develop Program Report Template Task 1.2.7 Develop Program Invoice Template Task 1.3 Transmit Customer Information to CITY's Program Tracking Database Task 1.4 Setup and testing of program invoice and rebate submission Task 1.5 Provide Eligible Measure List Updates Task 1.6 Enroll in State or Local Financing Programs Task 2 Program Implementation Task 2.1 Implement Marketing and Outreach Activities Task 2.2 Develop Customer Intake & hotline Task 2.3 Perform Customer Site Assessment and Deliver Customer Estimate Task 2.4 Execute Program Participation Agreement, Collect Customer Payments, and Enroll Customers in Financing Programs Task 2.5 Install Measures and Provide Post -Installation Quality Control Task 2.6 Provide Customer Service, Feedback and Issue Resolution Task 3 Program Invoicing and Reporting Task 3.1 Data Management Task 3.2 Reporting Task 3.3 Invoicing Task 4 Program Close Out Task 4.1 Resolve Outstanding Jobs in Progress Task 4.2 Develop and Submit Program Report Ongoing Ongoing Ongoing Within 30 days before end of Term Professional Services Rev. Jan 29, 2024 Page 1 of 38 Item 7: Staff Report Pg. 37 Packet Pg. 228 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 ❑ Optional Schedule of Performance Provision for On -Call or Additional Services Agreements. (This provision only applies if checked and only applies to on -call agreements per Section 1 or agreements with Additional Services per Section 4.) The schedule of performance shall be as provided in the approved Task Order, as detailed in Section 1 (Scope of Services) in the case of on -call Services, or as detailed in Section 4 in the case of Additional Services, provided in all cases that the schedule of performance shall fall within the term as provided in Section 2 (Term) of this Agreement. Professional Services Rev. Jan 29, 2024 Page 2 of 38 Item 7: Staff Report Pg. 38 Packet Pg. 229 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 EXHIBIT C COMPENSATION CITY agrees to compensate CONSULTANT for the Services performed in accordance with the terms and conditions of this Agreement, including Services, any specified reimbursable expenses, and Additional Services (if any, per Section 4 of the Agreement), based on the hourly rate schedule attached as Exhibit C-1. The compensation to be paid to CONSULTANT under this Agreement for all Services, any specified reimbursable expenses, and Additional Services (if any, per Section 4), shall not exceed the amount(s) stated in Section 4 of this Agreement. CONSULTANT agrees to complete all Services, any specified reimbursable expenses, and Additional Services (if any, per Section 4), within this/these amount(s). Any work performed or expenses incurred for which payment would result in a total exceeding the maximum amount of compensation set forth in this Agreement shall be at no cost to the CITY. CONSULTANT understands that CONSULTANT's receipt of compensation under this Agreement will depend on the number of customers who opt to participate in the HPWH ER Pilot Programs by executing Program Participation Agreements binding them to pay for any Eligible Measures installed, and CONSULTANT's satisfactory completion of invoicing activities as described in Exhibit A. CITY makes no guarantee, express or implied, regarding the number of customers who will participate in programs covered by this Agreement. The CITY bears no responsibility for any of CONSULTANT's costs and/or compensation to CONSULTANT associated with customer payments, CONSULTANT's performance of any of the Electrification Site Preparation Services, including Electrification Labor Rates, or CONSULTANT's delivery of Extended Parts and Labor Warranties for any of the Program Eligible Measures. All such compensation will remain the sole the responsibility of customers who may elect to participate in the HPWH ER Pilot Program. (see Exhibit A). REIMBURSABLE EXPENSES CONSULTANT'S ordinary business expenses, such as administrative, overhead, administrative support time/overtime, information systems, software and hardware, photocopying, telecommunications (telephone, internet), in-house printing, insurance and other ordinary business expenses, are included within the scope of payment for Services and are not reimbursable expenses hereunder. Reimbursable expenses, if any are specified as reimbursable under this section, will be reimbursed at actual cost. The expenses (by type, e.g. travel) for which CONSULTANT will be reimbursed are: NONE up to the not -to -exceed amount of: $0.00. A. Travel outside the San Francisco Bay Area, including transportation and meals, if specified as reimbursable, will be reimbursed at actual cost subject to the City of Palo Alto's policy for reimbursement of travel and meal expenses. Professional Services Rev. Jan 29, 2024 Page 3 of 38 Item 7: Staff Report Pg. 39 Packet Pg. 230 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, B. Long distance telephone service charges, cellular phone servi Contract S25190354 ile transmission and postage charges, if specified as reimbursable, will be relmbursea at actual cost. All requests for reimbursement of expenses, if any are specified as reimbursable under this section, shall be accompanied by appropriate backup documentation and information. Professional Services Rev. Jan 29, 2024 Page 4 of 38 Item 7: Staff Report Pg. 40 Packet Pg. 231 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 EXHIBIT C-1 SCHEDULE OF RATES Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 The figures set forth in this Exhibit C-1 include all of CONSULTANT's costs to perform all of the Services listed in this Agreement that correspond to that Eligible Measure, including, without limitation, CONSULTANT's administrative costs, marketing and outreach costs, implementation (materials and labor) costs, Electrification Site Preparation Services, Electrification Labor Rates and Extended Parts and Labor Warranty costs. No additional fees or charges will be required of CITY or its customers for CONSULTANT to perform the Services listed in this Agreement. CONSULTANT's schedule of rates is as follows: Eligible Measure Description of Measure Cost to Cost to City: Customer (not payable by City):* Installed cost per unit (incl Installed cost equipment + per unit (incl labor) ($) equipment + labor) ($) Heat pump water Remove existing gas water heater, $8,770 N/A heater (80 gallon, properly dispose of the old water heater 240V) - weekday and platform, cap the gas line, install the hours drain pan, install the heat pump water heater and condensate draining per Heat pump water $6,850 N/A heater (65 gallon, manufacturer's instruction based on 240V) - weekday location, install new safety straps meeting hours code, install noise and vibration reduction components (flexible pipe connectors, Heat pump water $6,630 N/A heater (50 gallon, rubber mat, rubber grommet at pipe -wall 240V) - weekday penetrations, rubber grommet where hours seismic strapping meets wall,) install expansion tank, complete job closure Heat pump water $8,990 N/A heater (80 gallon, paperwork, repair and paint walls to 120V) - weekday original condition as required, standard hours one (1) year labor warranty, and manufacturer's product warranty. Heat pump water $7,150 N/A heater (65 gallon, 120V) - weekday hours Emergency water Replace -in -kind tank -type water heater N/A $1,800 heater loaner - from loaner -reuse supply, properly weekday hours dispose of old water heater. When replacing with HPWH at a later date, keep loaner equipment for future projects. Professional Services Rev. Jan 29, 2024 Page 5 of 38 Item 7: Staff Report Pg. 41 Packet Pg. 232 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, The customer shall pay the $1800 at the Contract S25190354 time it is installed. The amount will be considered a "down payment" towards their electrification and noted on the final invoice as a credit from the CITY. Assessment and Utilizing Plunjr + QuitCarbon platform - N/A $250 Project Estimate - all homes will receive an assessment and with a Project Estimate - this row covers phone/chat/email remote service (not in -person at the support 24/7 homeowner's home) (Optional) Site When Larratt Bros staff go on -site to N/A $295 visit for perform assessment and prepare a Project assessment and Estimate. Note that this charge is instead project Estimate - of, not in addition to the virtual normal weekday assessment charge above. hours - Permit Optional use for inspectors to use Plunjr $500 N/A Coordination, app, at the discretion of the City. Permit cost The cost of the HPWHpermit will be N/A $247, subjected covered by the City. to annual adjustment to permit cost Non-standard Site Preparation and/or Installation Services costs for a HPWH installation Install 18" X 24" $125 N/A Louver Vents into existing door Provide and $165 N/A Install Condensate Pump Plumb out $500 N/A Temperature - Pressure Relief Valve and condensate to exterior away from foundation per building code requirements Provide and $500 N/A Install Thermostatic Mixing Valve Electrician, labor Per Hour Price. Non-standard labor costs $210 N/A hours will be estimated as part of the Project Estimate phase. Professional Services Rev. Jan 29, 2024 Page 6 of 38 Item 7: Staff Report Pg. 42 Packet Pg. 233 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, Plumber, labor Per Hour Price. Non-standard labor costs Contract S25190354 N/A hours will be estimated as part of the Project Estimate phase. Electrical services Install a new $1,650 N/A circuit breaker and up to30ft circuit between HPWH and electrical panel Additional Circuit $1,450 N/A run (per additional 50 feet) Electric panel Remove existing electrical panel, Time and N/A replacement properly dispose of old equipment, Materials - replace with new panel including this work is capability for future home electrification highly variable and EV readiness, include two additional in cost, and reserve breaker spaces above and beyond cannot be electrification readiness, replace circuit reduced to a breakers as required, repair and paint single pre - walls to original condition as required, determined standard one (1) year labor warranty, and price manufacturer's product warranty. Sub -panel Add electrical subpanel, properly dispose $1,650 N/A replacement / of old equipment, ensure home includes installation capability for future home electrification and EV readiness, include two additional reserve breaker spaces above and beyond electrification readiness, replace circuit breakers as required, repair and paint walls to original condition as required, standard one (1) year labor warranty, and manufacturer's product warranty. Install space- Remove existing 120V standard -width $250 N/A saver quad breaker, install tandem breaker to breaker (tandem maximize use of physical space in panel. breaker) Program Set Up Costs - Pilot kick off, Develop Pilot documents, Set up and testing of project invoice submissions and rebate applications. Larratt Bros set Includes a maximum of 16 person/hours N/A $5,500 up of meetings for Larratt Bros staff. Additional meeting time is noted in Comments section below. QuitCarbon set Includes a maximum of 8 person/hours of N/A $2,000 Professional Services Rev. Jan 29, 2024 Page 7 of 38 Item 7: Staff Report Pg. 43 Packet Pg. 234 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, up meetings for QuitCarbon staff. Additional Contract S25190354 meeting time is noted in Comments section below. Total N/A $7,500 Optional Additional Measures Heat pump water $10,197 N/A heater (80 gallon, 240V) - weeknight, weekend, holiday hours Heat pump water $8,085 N/A heater (65 gallon, 240V) - weeknight, weekend, holiday hours Heat pump water $7,293 N/A heater (50 gallon, 240V) - weeknight, weekend, holiday hours Heat pump water $10,232 N/A heater (80 gallon, 120V) - weeknight, weekend, holiday hours Heat pump water $8,201 N/A heater (65 gallon, 120V) - weeknight, weekend, holiday hours Emergency gas $500 $1,800 water heater loaner - weeknight, weekend, holiday hours Project Utilizing Plunjr + Larratt Bros call center N/A $250 Assessment & staff, with the benefit of QuitCarbon estimate - remote virtual assessments - note that some - weeknight, homes will receive this remote project bid weekend, holiday during non -weekday business hours hours Professional Services Rev. Jan 29, 2024 Page 8 of 38 Item 7: Staff Report Pg. 44 Packet Pg. 235 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, (Optional) Site When Larratt Bros staff go on -site to Contract S25190354 $295 visit for perform assessment and/or prepare a bid assessment and outside of normal business hours, this project estimate- additional charge will apply. Note that weeknight, this charge is instead of, not in addition weekend, holiday to, the site visits during normal business hours - upcharge hours that is noted in the first section above. Electrician Per Hour Price. Non-standard labor costs $400 N/A Hourly Rate - will be estimated as part of the Project weeknight, Estimate phase. weekend, holiday hours Plumber Hourly Per Hour Price. Non-standard labor costs $400 N/A Rate - weeknight, will be estimated as part of the Project weekend, holiday Estimate phase. hours Extended Parts Include 2 yr warranty from the date of $500 N/A and labor installation warranty Meetings, in excess of those listed in project Scope $150/hour Parts and labor shall be covered for one year. $0 Water Heaters installed in basements, attics, or any other $500-$1,000+ place other than the garage or outside (ground level) closet shall be accessed with an additional cost. Protection of floors, walls, or other finishes shall be assessed on an individual basis and the cost will vary depending on the level of protection required. * Note that the Costs to the Customer detailed here are not payable by the City and are only included here to establish the agreed upon pricing to be charged by CONSULTANT to customers. Professional Services Rev. Jan 29, 2024 Page 9 of 38 Item 7: Staff Report Pg. 45 Packet Pg. 236 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract with Larratt Brothers, EXHIBIT D Contract S25190354 INSURANCE REQUIREMENTS CONSULTANTS TO THE CITY OF PALO ALTO (CITY), AT THEIR SOLE EXPENSE, SHALL FOR THE TERM OF THE CONTRACT OBTAIN AND MAINTAIN INSURANCE IN THE AMOUNTS FOR THE COVERAGE SPECIFIED BELOW, AFFORDED BY COMPANIES WITH AM BEST'S KEY RATING OF A -:VII, OR HIGHER, LICENSED OR AUTHORIZED TO TRANSACT INSURANCE BUSINESS IN THE STATE OF CALIFORNIA. AWARD IS CONTINGENT ON C()MPT.TANCF. WITH CITY'S TNSTTRANCF. RFOTTTRFMFNTS AS SPECIFIED HFRFTN_ MINIMUM LIMITS REQUIRED TYPE OF COVERAGE REQUIREMENT EACH OCCURRENCE AGGREGATE YES WORKER'S COMPENSATION STATUTORY STATUTORY STATUTORY YES EMPLOYER'S LIABILITY STATUTORY YES GENERAL LIABILITY, INCLUDING BODILY INJURY $1,000,000 $1,000,000 PERSONAL INJURY, BROAD FORM PROPERTY DAMAGE $1,000,000 $1,000,000 PROPERTY DAMAGE BLANKET CONTRACTUAL, AND FIRE LEGAL BODILY INJURY & PROPERTY $1,000,000 $1,000,000 LIABILITY DAMAGE COMBINED. BODILY INJURY $1,000,000 $1,000,000 - EACH PERSON $1,000,000 $1,000,000 YES AUTOMOBILE LIABILITY, - EACH OCCURRENCE $1,000,000 $1,000,000 INCLUDING ALL OWNED, HIRED, PROPERTY DAMAGE $1,000,000 $1,000,000 NON -OWNED BODILY INJURY AND PROPERTY $1,000,000 $1,000,000 DAMAGE, COMBINED YES PROFESSIONAL LIABILITY, INCLUDING, ERRORS AND OMISSIONS, MALPRACTICE (WHEN ALL DAMAGES $1,000,000 APPLICABLE), AND NEGLIGENT PERFORMANCE YES THE CITY OF PALO ALTO IS TO BE NAMED AS AN ADDITIONAL INSURED: CONSULTANT, AT ITS SOLE COST AND EXPENSE, SHALL OBTAIN AND MAINTAIN, IN FULL FORCE AND EFFECT THROUGHOUT THE ENTIRE TERM OF ANY RESULTANT AGREEMENT, THE INSURANCE COVERAGE HEREIN DESCRIBED, INSURING NOT ONLY CONSULTANT AND ITS SUBCONTRACTORS, IF ANY, BUT ALSO, WITH THE EXCEPTION OF WORKERS' COMPENSATION, EMPLOYER'S LIABILITY AND PROFESSIONAL INSURANCE, NAMING AS ADDITIONAL INSUREDS CITY, ITS COUNCIL MEMBERS, OFFICERS, AGENTS, AND EMPLOYEES. I. INSURANCE COVERAGE MUST INCLUDE: A. A CONTRACTUAL LIABILITY ENDORSEMENT PROVIDING INSURANCE COVERAGE FOR CONSULTANT'S AGREEMENT TO INDEMNIFY CITY. II. THE CONSULTANT MUST SUBMIT CERTIFICATES(S) OF INSURANCE EVIDENCING REQUIRED COVERAGE AT THE FOLLOWING EMAIL: PURCHASINGSUPPORT(c ,CITYOFPALOALTO.ORG III. ENDORSEMENT PROVISIONS WITH RESPECT TO THE INSURANCE AFFORDED TO ADDITIONAL INSUREDS: A. PRIMARY COVERAGE WITH RESPECT TO CLAIMS ARISING OUT OF THE OPERATIONS OF THE NAMED INSURED, INSURANCE AS AFFORDED BY THIS POLICY IS PRIMARY AND IS NOT ADDITIONAL TO OR CONTRIBUTING WITH ANY OTHER INSURANCE CARRIED BY OR FOR THE BENEFIT OF THE ADDITIONAL INSUREDS. Professional Services Rev. Jan 29, 2024 Page 10 of 38 Item 7: Staff Report Pg. 46 Packet Pg. 237 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 C. CROSS LIABILITY Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 THE NAMING OF MORE THAN ONE PERSON, FIRM, OR CORPORATION AS INSUREDS UNDER THE POLICY SHALL NOT, FOR THAT REASON ALONE, EXTINGUISH ANY RIGHTS OF THE INSURED AGAINST ANOTHER, BUT THIS ENDORSEMENT, AND THE NAMING OF MULTIPLE INSUREDS, SHALL NOT INCREASE THE TOTAL LIABILITY OF THE COMPANY UNDER THIS POLICY. NOTICE OF CANCELLATION IF THE POLICY IS CANCELED BEFORE ITS EXPIRATION DATE FOR ANY REASON OTHER THAN THE NON-PAYMENT OF PREMIUM, THE CONSULTANT SHALL PROVIDE CITY AT LEAST A THIRTY (30) DAY WRITTEN NOTICE BEFORE THE EFFECTIVE DATE OF CANCELLATION. 2. IF THE POLICY IS CANCELED BEFORE ITS EXPIRATION DATE FOR THE NON-PAYMENT OF PREMIUM, THE CONSULTANT SHALL PROVIDE CITY AT LEAST A TEN (10) DAY WRITTEN NOTICE BEFORE THE EFFECTIVE DATE OF CANCELLATION. EVIDENCE OF INSURANCE AND OTHER RELATED NOTICES ARE REQUIRED TO BE FILED WITH THE CITY OF PALO ALTO SENT TO THE FOLLOWING EMAIL: PURCHASINGSUPPORT(a1 CITYOFPALOALTO.ORG Professional Services Rev. Jan 29, 2024 Page 11 of38 8 Item 7: Staff Report Pg. 47 Packet Pg. 238 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 EXHIBIT E Attachment B - Contract POLICY AN 3/IT with Larratt Brothers, RI 017 Contract S25190354 CITY OF PALO ALTO INFORMATION SECURITY POLICY POLICY STATEMENT This policy describes the information security policy and procedures for the protection of non- public information (the "Non -Public Information") created, collected, processed, received, stored and transmitted by the City of Palo Alto (the "City"). City employees and officials (the "Users") must maintain the accessibility, availability, confidentiality, integrity and regulatory compliance of Non -Public Information created, collected, processed, stored and transmitted by the City. The failure to comply with this policy and procedures could result in substantial damage, liability or loss in regard to the property or reputation of the City, another Authorized User, or any person who transacts business with the City, including the City's utility customers, third party vendors, and other governmental agencies. Authorized Users are obligated to report loss, damage or disclosure of Non -Public Information or other violation of this policy and procedure to their supervisor or the Information Security Manager (the "ISM") or other employee designated by the City's Information Technology Department (the "IT"). Violation of this policy and procedures, including the failure to report the violation, could include disciplinary or other action imposed or taken by the City or other affected person in accordance with Federal, California and City laws, ordinances, rules and regulations. PURPOSE Information pertaining to the business of the City, acting in both its governmental and proprietary capacities, is a vital asset of the City. An Authorized User of Non -Public Information shall use best efforts to protect the information covered by this policy and procedures from unauthorized access, availability, alteration, destruction, disclosure, modification or use. Because the City is required by applicable law to protect the Non -Public Information due to its sensitive nature and value, an Authorized User of the Non -Public Information shall exercise reasonable and appropriate care in conforming to applicable laws. This policy and procedure applies only to an Authorized User's access to and use of Non -Public Information. PROCEDURES IT has adopted Information Security Standards (the "Standards") to enforce this policy. IT shall inform and train authorized users on the requirements contained in this policy and procedures and the Standards. The authorized user shall comply with the Standards, in conjunction with this policy. Page 1 of 4 Item 7: Staff Report Pg. 48 Packet Pg. 239 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract POLICY AN 3/IT with Larratt Brothers, R 017 Contract S25190354 A. Covered Equipment and Devices This policy applies to all City -approved, -owned or —leased computer network systems and peripheral equipment (the "Equipment"), including any mobile communication device (the "Device"), whether or not owned by an Authorized User, that may be used to create, collect, process, store and transmit the Non -Public Information. B. Roles of Information Technology Department and Others IT, including the Chief Information Officer ("CIO") and the ISM, shall promote information security awareness within the City government community, and shall receive and maintain reports of incidents, malfunctions and threats to the City's information technology assets, which may have a security impact upon the City. The CIO and ISM are also responsible for developing the Standards. IT shall be responsible for the design, primary enforcement and maintenance of Non -Public Information security through education, training and other means. IT shall ensure that the following control measures and standards are enabled on every Equipment and Device: Limit physical and login access to the Equipment and the Devices to Authorized Users. Maintain the most current software patches and anti -virus software for the Equipment and the Devices. Enable and use host -based firewalls, as available, to ensure the security of the Equipment and the Device(s). Perform regular security scans on the Equipment and the Device(s). C. User Access Control Requirements 1. Do not access Non -Public Information except to the extent you have a need to do so in order to perform your City duties. 2. Do not disclose or share Non -Public Information with any person who does not have both a right to access the Non -Public Information and a need to do so in order to perform their City duties. 3. Do not alter or destroy Non -Public Information except to the extent you are required or authorized to do so. 4. An Authorized User who has access to Non -Public Information shall protect and secure that information while the information is in his or her custody in a manner that is consistent with applicable contract and legal requirements and restrictions and is reasonable and appropriate to the level of risk, sensitivity or value the Non - Public Information has to the City. 5. An Authorized User shall maintain the accessibility, availability, confidentiality, integrity and regulatory compliance of any Non -Public Information that is created, Page 2 of 4 Item 7: Staff Report Pg. 49 Packet Pg. 240 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract POLICY AN 3/IT with Larratt Brothers, R 017 Contract S25190354 collected, processed, stored and transmitted by the City on a 24 hours -per -day, 7 days -per -week ("24/7") basis. 6. An Authorized User shall maintain the protection of information assets from malicious code, including viruses and malware by following the City's incident management procedures, including detection, prevention, isolation, and recovery tools. D. Equipment and Devices Security Control Requirements: 1. Secure your Equipment and Devices by using a screen saver or built-in lock feature when you are physically away from your office or other work space. 2. Restrict physical access 24/7 to your Equipment and Devices, in particular, your laptop computer, by a lock and security cable, if the City makes them available. 3. Maintain possession of your Device(s) 24/7 and require a password or fingerprint to access and use the Device(s). 4. Log out when you cease access and use of Equipment and Device(s). 5. Notify the IT Help Desk and the ISM immediately whenever you become aware or suspect Non -Public Information, passwords, or other access control mechanisms have been compromised, disclosed, lost, or stolen. 6. Do not intentionally, recklessly or willfully alter, damage, or misuse any City - owned or —leased Equipment or Device. 7. The user shall comply with the Policy and the Standards whenever he or she uses a City Owned Mobile Device ("COMD") and or Employee -Owned Mobile Devices, also known as Bring Your Own Devices ("BYOD") to conduct the City business. 8. BYODs and COMDs include smartphones, cell phones, tablets PCs (Androids, iPads, etc.) and user -own laptops. Only authorized BYOD shall have access to the only authorized City's application systems. The City reserves the right to provide or withdraw access to the City infrastructure without notice. E. Utilities' Customer Identity and Credit Security Federal regulations amending the Fair Credit Reporting Act, including the Fair and Accurate Credit Transactions Act of 2003 (FACT Act), and the Red Flags Clarification Act of 2010, protect the Non -Public Information of customers of financial institutions, including utilities, that are defined as "creditors." These regulations require that consumer's Non -Public Information, such as credit card data, Social Security Numbers, driver's license numbers, or similar data be secured by Authorized Users and within the City's data management systems. Authorized Users are required to report any suspected or real breach of Utilities Non -Public Information to the ISM immediately. The ISM will identify, detect, prevent and mitigate the suspected, real or future breaches of security, as required by the regulations. F. Violations and Enforcement An Authorized User must report an actual or suspected violation of this policy and procedures to his or her supervisor and IT. The City will not discipline an Authorized User Page 3 of 4 Item 7: Staff Report Pg. 50 Packet Pg. 241 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 Attachment B - Contract POLICY AN 3/IT with Larratt Brothers, R 017 Contract S25190354 for making a good faith report of a potential violation of this policy and procedures or the Standards. A violation of this policy will be investigated by the appropriate City staff and if a violation is established, disciplinary action up to termination from employment may result. NOTE: Questions regarding this policy should be referred to the Information Technology Department, as appropriate. (-DocuSigned by: "' D7914D9897578424 lw L Recommended: ... Approved: Director Information Technology/CIO DocuSigned by: 39E7298FB2064DB City Manager Page 4of4 12/5/2017 Date 12/13/2017 Date Item 7: Staff Report Pg. 51 Packet Pg. 242 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 CITY O F Attachment B - Contract PALO A LT C' with Larratt Brothers, Io Alto Contract 525190354 ecurity ocument Version: V3.0 Doc: InfoSec 110 EXHIBIT "F" CYBERSECURITY TERMS AND CONDITIONS In order to assure the privacy and security of the personal information of the City's customers and people who do business with the City, including, without limitation, vendors, utility customers, library patrons, and other individuals and companies, who are required to share such information with the City, as a condition of receiving services from the City or selling goods and services to the City, including, without limitation, the Software as a Service services provider (the "Consultant") and its subcontractors, if any, including, without limitation, any Information Technology ("IT") infrastructure services provider, shall design, install, provide, and maintain a secure IT environment, described below, while it renders and performs the Services and furnishes goods, if any, described in the Statement of Work, Exhibit B, to the extent any scope of work implicates the confidentiality and privacy of the personal information of the City's customers. The Consultant shall fulfill the data and information security requirements (the "Requirements") set forth in Part A below. A "secure IT environment" includes (a) the IT infrastructure, by which the Services are provided to the City, including connection to the City's IT systems; (b) the Consultant's operations and maintenance processes needed to support the environment, including disaster recovery and business continuity planning; and (c) the IT infrastructure performance monitoring services to ensure a secure and reliable environment and service availability to the City. "IT infrastructure" refers to the integrated framework, including, without limitation, data centers, computers, and database management devices, upon which digital networks operate. In the event that, after the Effective Date, the Consultant reasonably determines that it cannot fulfill the Requirements, the Consultant shall promptly inform the City of its determination and submit, in writing, one or more alternate countermeasure options to the Requirements (the "Alternate Requirements" as set forth in Part B), which may be accepted or rejected in the reasonable satisfaction of the Information Security Manager (the "ISM"). Part A. Requirements: The Consultant shall at all times during the term of any contract between the City and the Consultant: (a) Appoint or designate an employee, preferably an executive officer, as the security liaison to the City with respect to the Services to be performed under this Agreement. (b) Comply with the City's Information Privacy Policy: (c) Have adopted and implemented information security and privacy policies that are documented, are accessible to the City, and conform to ISO 27001/2 — Information Security Management Systems (ISMS) Standards. See the following: http://www.iso.org/iso/home/store/cataloque tc/catalogue detail. htm?csnumber=42103 http://www.iso.org/iso/iso catalogue/catalogue tc/catalogue detail. htm?csnu mber=50297 (d) Conduct routine data and information security compliance training of its personnel that is appropriate to their role. (e) Develop and maintain detailed documentation of the IT infrastructure, including software versions and patch levels. (f) Develop an independently verifiable process, consistent with industry standards, for performing professional and criminal background checks of its employees that (1) would permit verification of employees' personal identity and employment status, and (2) would enable the immediate denial of access to the City's confidential data and information by any of its employees who no Page 1 of 3 Item 7: Staff Report Pg. 52 Packet Pg. 243 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 CITY O F Attachment B - Contract PALO A LT with Larratt Brothers, Io Alto Contract 525190354 ecurity ocument Version: V3.0 Doc: InfoSec 110 longer would require access to that information or who are terminated. (g) Provide a list of IT infrastructure components in order to verify whether the Consultant has met or has failed to meet any objective terms and conditions. (h) Implement access accountability (identification and authentication) architecture and support role -based access control ("RBAC") and segregation of duties ("SoD") mechanisms for all personnel, systems, and Software used to provide the Services. "RBAC" refers to a computer systems security approach to restricting access only to authorized users. "SoD" is an approach that would require more than one individual to complete a security task in order to promote the detection and prevention of fraud and errors. (i) Assist the City in undertaking annually an assessment to assure that: (1) all elements of the Services' environment design and deployment are known to the City, and (2) it has implemented measures in accordance with industry best practices applicable to secure coding and secure IT architecture. (j) Provide and maintain secure intersystem communication paths that would ensure the confidentiality, integrity, and availability of the City's information. (k) Deploy and maintain IT system upgrades, patches and configurations conforming to current patch and/or release levels by not later than one (1) week after its date of release. Emergency security patches must be installed within 24 hours after its date of release. (I) Provide for the timely detection of, response to, and the reporting of security incidents, including on -going incident monitoring with logging. (m) Notify the City within one (1) hour of detecting a security incident that results in the unauthorized access to or the misuse of the City's confidential data and information. (n) Inform the City that any third party service provider(s) meet(s) all of the Requirements. (o) Perform security self -audits on a regular basis and not less frequently than on a quarterly basis, and provide the required summary reports of those self -audits to the ISM on the annual anniversary date or any other date agreed to by the Parties. (p) Accommodate, as practicable, and upon reasonable prior notice by the City, the City's performance of random site security audits at the Consultant's site(s), including the site(s) of a third -party service provider(s), as applicable. The scope of these audits will extend to the Consultant's and its third -party service provider(s)' awareness of security policies and practices, systems configurations, access authentication and authorization, and incident detection and response. (q) Cooperate with the City to ensure that to the extent required by applicable laws, rules and regulations, and the Confidential Information will be accessible only by the Consultant and any authorized third -party service provider's personnel. (r) Perform regular, reliable secured backups of all data needed to maximize the availability of the Services. Adequately encrypt the City of Palo Alto's data, during the operational process, hosted at rest, and the backup stage at the Vendors' environment (including Vendor's contracting organization's environment). (s) Maintain records relating to the Services for a period of three (3) years after the expiration or earlier termination of this Agreement and in a mutually agreeable storage medium. Within thirty (30) days after the effective date of expiration or earlier termination of this Agreement, all of those records relating to the performance of the Services shall be provided to the ISM. (t) Maintain the Confidential Information in accordance with applicable federal, state, and local data and information privacy laws, rules, and regulations. (u) Encrypt the Confidential Information before delivering the same by electronic mail to the City and or any authorized recipient. (v) Provide Network Layer IP filtering services to allow access only from the City of Palo Alto's IP address to the Vendor environment (primarily hosted for the City of Palo Alto). (w) Offer a robust disaster recovery and business continuity (DR-BCP) solutions to the City for the systems and services the Vendor provides to the City. Page 2 of 3 Item 7: Staff Report Pg. 53 Packet Pg. 244 of 377 Docusign Envelope ID: 89609063-B82E-438D-9D8F-CC67956E95A7 Item 7 CITY () F Attachment B - Contract PALO A LT C' with Larratt Brothers, Alto Contract 525190354 ecurity ocumen Version: V3.0 Doc: InfoSec 110 (x) Provide and support Single Sign -on (SSO) and Multifactor Authentication (MFA) solutions for authentication and authorization services from the "City's environment to the Vendor's environment," and Vendor's environment to the Vendor's cloud services/hosted environment." The Vendor shall allow two employees of the City to have superuser and super-admin access to the Vendor's IT environment, and a cloud -hosted IT environment belongs to the City. (y) Unless otherwise addressed in the Agreement, shall not hold the City liable for any direct, indirect or punitive damages whatsoever including, without limitation, damages for loss of use, data or profits, arising out of or in any way connected with the City's IT environment, including, without limitation, IT infrastructure communications. (z) The Vendor must provide evidence of valid cyber liability insurance policy per the City's EXHIBIT "D" INSURANCE REQUIREMENTS. Part B. Alternate Requirements: Page 3 of 3 Item 7: Staff Report Pg. 54 Packet Pg. 245 of 377 Certificate Of Completion Envelope Id: 89609063B82E438D9D8FCC67956E95A7 Subject: Complete with Docusign: S25190354 Larrett contract final combined.pdf Source Envelope: Document Pages: 45 Signatures: 4 Certificate Pages: 5 Initials: 0 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) Record Tracking Status: Original 8/6/2024 10:06:11 AM Security Appliance Status: Connected Storage Appliance Status: Connected Signer Events Aaron Gianni aaron@larrattbros.com President Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Alex Perez alex@larrattbros.com Service Manager Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Amy Bartell Amy. Bartell@CityofPaloAlto.org Assistant City Attorney City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Accepted: 7/16/2015 5:52:40 AM ID: d8ecb53d-ef81-4016-8886-1560c48de42a Cecilia Magana Cecilia.Magana@CityofPaloAlto.org Purchasing Manager City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Holder: Annmarie Romero annmarie.romero@cityofpaloalto.org Pool: StateLocal Pool: City of Palo Alto Signature by: EDI-Sil"Id arr, Gtatn.Lu F64CD050FBB74CD... Signature Adoption: Pre -selected Style Using IP Address: 68.251.59.103 Signed using mobile gned byED—S! Lt iF Pu"v BC98D476B5C54EA... Signature Adoption: Pre -selected Style Using IP Address: 76.126.2.91 gned by: ED —Si ° D0B48F317E9342B... Signature Adoption: Pre -selected Style Using IP Address: 172.101.211.187 by:ED,c"Si,n,d Gi�ia 11La�alnA 3A4AFFC65940442... Signature Adoption: Pre -selected Style Using IP Address: 199.33.32.254 Item 7 Attachment B - Contract with Larratt Brothers, GUSTgn Contract S25190354 Status: Completed Envelope Originator: Annmarie Romero 250 Hamilton Ave Palo Alto , CA 94301 annmarie.romero@cityofpaloalto.org IP Address: 199.33.32.254 Location: DocuSign Location: DocuSign Timestamp Sent: 8/6/2024 10:09:11 AM Viewed: 8/6/2024 10:42:00 AM Signed: 8/6/2024 10:43:34 AM Sent: 8/6/2024 10:43:36 AM Viewed: 8/6/2024 11:44:39 AM Signed: 8/6/2024 11:46:27 AM Sent: 8/6/2024 11:46:29 AM Viewed: 8/6/2024 12:02:17 PM Signed: 8/6/2024 12:03:25 PM Sent: 8/6/2024 12:03:27 PM Viewed: 8/6/2024 5:43:03 PM Signed: 8/6/2024 5:43:11 PM Item 7: Staff Report Pg. 55 Packet Pg. 246 of 377 Item 7 Attachment B - Contract In Person Signer Events Signature Timest with Larratt Brothers, Editor Delivery Events Status Contract S25190354 Timesta Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Diane Bailey Sent: 8/6/2024 5:43:12 PM Diane.Bailey@CityofPaloAlto.org COPIED Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Tabatha Boatwright Sent: 8/6/2024 5:43:13 PM Tabatha.Boatwright@CityofPaloAlto.org COPIED Viewed: 8/8/2024 8:06:48 AM Utilities Management Analyst City of Palo Alto Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/6/2024 10:09:11 AM Certified Delivered Security Checked 8/6/2024 5:43:03 PM Signing Complete Security Checked 8/6/2024 5:43:11 PM Completed Security Checked 8/6/2024 5:43:13 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure Item 7: Staff Report Pg. 56 Packet Pg. 247 of 377 Electronic Record and Signature Disclosure created on: 10/1/2013 8:33:53 AM Parties agreed to: Amy Bartell Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 CONSUMER DISCLOSURE From time to time, City of Palo Alto (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per -page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Item 7: Staff Report Pg. 57 Packet Pg. 248 of 377 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 How to contact City of Palo Alto: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: david.ramberg@cityofpaloalto.org To advise City of Palo Alto of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at david.ramberg@cityofpaloalto.org and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Palo Alto To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to david.ramberg@cityofpaloalto.org and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Palo Alto To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check -box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to david.ramberg@cityofpaloalto.org and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will Item 7: Staff Report Pg. 58 Packet Pg. 249 of 377 Item 7 Attachment B - Contract with Larratt Brothers, Contract S25190354 have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Palo Alto as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Palo Alto during the course of my relationship with you. Item 7: Staff Report Pg. 59 Packet Pg. 250 of 377 Item 8 Item 8 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: IT Department Meeting Date: October 21, 2024 Report #:2408-3351 TITLE Approval of Contract Amendment No. 3 to Contract No. S18171325 with ESO Solutions for a 5 - Year Extension, Increasing the Total Not -to -Exceed (NTE) Amount by $150,007 to $277,155 for the Fire Department's Records Management System (RMS) and Electronic Patient Care Reporting (ePCR) Software; CEQA Status: Not a Project RECOMMENDATION Staff recommends that City Council approve and authorize the City Manager or their designee to execute Amendment No. 3 Contract S18171325 with ESO Solutions Inc. (Attachment A) for Fire Department Operations and Response Management Platform in an amount not -to -exceed (NTE) $151,007 and extend for an additional 5 -years through September 29, 2029. This amendment results in a NTE total amount of $277,155. BACKGROUND The initial Contract No. S18168886 was awarded under PAMC 2.30.360(i) for a one-year term from July 10, 2017, to June 30, 2018, with a total value of $7,995. This project aimed to transition the Palo Alto Fire Department (PAFD) from paper -based patient care reports (PCR) to an electronic format, aligning with County, State, and National reporting mandates. Following this, Contract No. S18171325 was awarded under PAMC 2.30.360(d) due to the absence of alternative sources, with a three-year term from September 30, 2018, to September 30, 2021, totaling $45,000. Amendment no. 1 extended this contract to September 29, 2024, with a revised NTE amount of $116,148. Subsequently, Amendment no. 2 allocated an additional $10,000 for optional [HR add-on software and increased reporting services, bringing the NTE value to $126,148. ANALYSIS The Palo Alto Fire Department (PAFD) seeks approval for Amendment No. 3 to Contract No. S18171325, extending it by five years through September 29, 2029, and increasing the contract's NTE value by $151,007, totaling $277,155. This extension will ensure continued Item 8: Staff Report Pg. 1 Packet Pg. 251 of 377 Item 8 Item 8 Staff Report access to ESO's Records Management System (RMS) and Patient Care Reporting (ePCR) software, which are integral to the City's Computer -Aided Dispatch (CAD) system. These tools are essential for maintaining Electronic Health Records (EHR) and National Fire Incident Reporting (NFIR) data. Despite exploring alternatives, ESO remains the most cost-effective option, with significantly lower recurring costs and fewer transition expenses. Following the amendment to the current contract (Amendment 2 term), the PAFD/ITD had committed to Purchasing to initiate a Request for Proposal (REP) process for a new contract. City reached out to three vendors—ESO, HealthEMS, and ImageTrend Elite. After comparing quotes, staff found ESO to be the most cost-effective option. Switching to ImageTrend Elite or HealthEMS would incur significant additional costs in the first year ($47,523 and $48,608 respectively) and higher annual increases (ESO: 5%, HealthEMS: 6%, ImageTrend Elite: 7%). Transitioning to a new vendor would involve significant expenses for initial setup, data migration, and employee training. Given the cost efficiency and PAFD's satisfaction with ESO, staff recommend continuing the partnership with ESO Solutions, Inc. ESO provides the most cost-effective solution, with the following annual costs: o Year 1: $27,779 o Year 2: $28,591 o Year 3: $30,020 o Year 4: $31,521 o Year 5: $33,098 The contract includes a not -to -exceed amount of $10,000 for the performance of any Add-on Software and/or increased reporting services. The total compensation for the Master Subscription and License Agreement services, including Add-on Software, will not exceed $277,155 over the contract term. Based on operational disruption to the Fire Department, staff executed an exemption from competitive solicitation under PAMC 2.30.360(b)(2) due to the impracticality of soliciting new vendors, given the high costs and potential risks involved. FISCAL/RESOURCE IMPACT Funding for this contract amendment in FY 2025 is within budgeted levels adopted by the City Council, no additional funding is requested. The Information Technology Department is funded by an internal service fund. Approximately 45% of the department is General Fund funded with the remaining 55% funded by Enterprise and special revenue funds. The cost for this contract is allocated directly to the Fire Department in the General Fund. Item 8: Staff Report Pg. 2 Packet Pg. 252 of 377 Item 8 Item 8 Staff Report STAKEHOLDER ENGAGEMENT The services were coordinated with internal stakeholders and the vendor. The Information Technology Department (ITD) met with PAFD to evaluate their business needs and documented their must -have features. ITD evaluated alternative solutions, but they would incur significantly higher initial setup and ongoing expenses. Given ESO's cost-effectiveness and staff's satisfaction with its performance, ESO remains the preferred choice. ENVIRONMENTAL REVIEW The approval of this contract is exempt from review under the California Environmental Quality Act (CEQA) under CEQA Guidelines section 15061(b)(3) because it can be seen that there is no possibility that the activity in question may have a significant effect on the environment. ATTACHMENTS Attachment A: ESO Solutions Contract S18171325 Amendment No. 3 APPROVED BY: Darren Numoto, Chief Information Officer Item 8: Staff Report Pg. 3 Packet Pg. 253 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ESO Solutions Contract (CONTRACT EXTENSION) S18171325 Amendment No. 3 AMENDMENT NO.3 TO MASTER SUBSCRIPTION AND LICENSE AGREEMENT BETWEEN THE CITY OF PALO ALTO AND ESO SOLUTIONS, INC. (PALO ALTO CONTRACT # S18171325) This Amendment No. 3 (this "Amendment") to Master Subscription and License Agreement (the "Agreement" as defined below) is made and entered into as of September 23, 2024 (the "Effective Date") by and between ESO Solutions, Inc., a Texas corporation having its principal place of business at 11500 Alterra Parkway, Ste 100, Austin, TX 78758 ("ESO"), and the City of Palo Alto, having its principal place of business at 250 Hamilton Ave., Palo Alto, CA 94301 ("Customer"), (each a "Party" and collectively the "Parties"). RECITALS WHEREAS, the Agreement (as defined below) was entered into by and between the Parties for the provision of software services, as detailed therein; and WHEREAS, the Parties entered into Amendment #1 in order to extend the term through September 29, 2024 and increase the amount of the Agreement accordingly, as detailed therein; and WHEREAS, the Parties entered into Amendment #2 in order to allocate a budget in the amount of Ten Thousand Dollars ($10,000) for optional Electronic Health Record (EHR) Add-on Software application(s) subscription and increased Reporting Services, as detailed therein WHEREAS, the Parties now wish to amend the Agreement to extend a 5 -year software extension subscription for the term through September 29, 2029 with an additional One Hundred Fifty -One Thousand Seven Dollars and Zero Cents ($151,007) increase compensation value of the Agreement accordingly, as detailed herein; NOW THEREFORE, for good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, Customer and ESO mutually agree as follows: 1. Definitions. The following definitions shall apply to this Amendment: Agreement. The term "Agreement" shall mean the Master Subscription and License Agreement effectively dated September 30, 2018 between Customer and ESO, as amended by: • Amendment No. 1, dated July 27, 2021 • Amendment No. 2, dated March 6, 2023 b Other Terms. Capitalized terms used and not defined in this Amendment shall have the meanings assigned to such terms in the Agreement. 2. The second sentence of the first paragraph of the Agreement is hereby amended to read as follows: "This Agreement hereby attaches and incorporates herein the following documents by reference as Item 8: Staff Report Pg. 4 Packet Pg. 254 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ESO Solutions Contract though fully set forth herein: the General Terms & Conditions, Exhibit A-1, S18171325 Amendment t A - lc, and Exhibit A-lz (collectively, the "Software Schedules"), EHR Sched1. No.3 it B ("Support Services Addendum"), and Exhibit C ("HIPAA Business Associate Addendum")." 3. Section 5.6 of the Agreement is hereby amended to read as follows: "5.6 Optional Add-on Software or increased Reporting Services Provision (This provision applies, only if needed by Customer, for Add -On Software subscription or increased tier Reporting Services fees. The budget will allocate additional funding to Exhibit A-Iz.) In addition to recurring compensation specified in Exhibit A-1(b&c), Customer has set aside the not -to - exceed compensation amount of Ten Thousand Dollars ($10,000) for the performance of any Add-on Software and/or increased Reporting Services (as defined in Exhibit A-1, Exhibit A -lb, Exhibit A-Ic, Exhibit A-lzz). The total compensation for performance of the Master Subscription and License Agreement services and Add-on Software, shall not exceed Two Hundred Seventy -Seven Thousand One Hundred Fifty -Four Dollars and Ninety Cents ($277,154.90), as detailed in Exhibit A-lz, Amendment No. 3. ESO will provide optional "Add-on Software application only by advanced written authorization from the Customer, which shall be incorporated as a part of this Agreement." 4. Exhibit A-lz to the Agreement, entitled "EXHIBIT A-lz MASTER FEE SUMMARY, AMENDMENT NO. 2" is hereby deleted and replaced in its entirety with Exhibit A-lz, as attached to this Amendment, entitled "EXHIBIT A-lz MASTER FEE SUMMARY, AMENDMENT NO. 3 (AMENDED, REPLACES PREVIOUS)," which is hereby attached and incorporated into this Amendment and into the Agreement in full by reference. 5. Legal Effect. The Parties agree that the terms and conditions of this Amendment modify the terms and conditions contained in the Agreement. Except as modified in this Amendment, all other terms and conditions of the Agreement shall remain in full force and effect. Taken together this Amendment and the Agreement (including exhibits) constitute the entire agreement between the Parties regarding the subject matter contained collectively herein. 6. Counterparts: Execution. This Amendment may be executed by the Parties individually or in any combination, in one or more counterparts, each of which shall be an original and all of which shall together constitute one and the same agreement. Execution and delivery of this Amendment by the Parties shall be legally valid and effective through: (i) executing and delivering the paper copy of the document, or (ii) creating, generating, sending, receiving or storing by electronic means this Amendment, the execution of which is accomplished through use of the DocuSign® electronic process. 7. Incorporation of Recitals. The recitals set forth above are terms of this Amendment and are fully incorporated herein by this reference. (REFER TO SIGNATURE PAGE ON NEXT PAGE) Item 8: Staff Report Pg. 5 Packet Pg. 255 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ESO Solutions Contract IN WITNESS WHEREOF, the undersigned expressly agree and warrant that S18171325 Amendment to sign and enter into this Amendment on behalf of the Party for which they sign and havd No. 3 dment as of the Effective Date first written above. ESO: Signed by: 'lam M 1 F0C830A7EF4479... [Signature] Robert Munden [Printed Name] Chief Legal & Compliance Officer [Title] 9/23/2024 [Date] CUSTOMER: [Signature] Ed shikada [Printed Name] [Title] [Date] AS TO FORM: [Signature] Philip Mai [Printed Name] Buyer [Title] [Date] Item 8: Staff Report Pg. 6 Packet Pg. 256 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ESO Solutions Contract EXHIBIT A -1z S18171325 Amendment MASTER FEE SUMMARY, AMENDMENT NO.3 (AMENDED, No. 3 REPLACES PREVIOUS) Fee Summary: All Fees (Less Discounts) by Exhibit, Fee Type and Contract Year* Exhibit A-1 Exhibit A -lb Contract Year** Recurring Fees One-time Fees Recurring Fees One-time Fees Per -Year Subtotals Contract Year 1 $ 9,665.88 $ 7,725.00 [$ 7,994.30***] -- $ 17,390.88 (Paid) Contract Year 2 $ 9,955.86 -- $ 8,234.13 -- $ 18,189.99 (Paid) Contract Year 3 $10,254.53 -- $ 8,481.15 -- $ 18,735.68 (Paid) Contract -- -- $ 2,183.91 -- $ 2,183.91 Year 4 (Paid) partial Subtotal (years 1-4) $29,876.27 $ 7,725.00 $18,899.19 -- $ 56,500.46 (Paid) Amendment No. 1, $64,225.46*** Including Exhibit A -lb Contract Year 1 recurring fee (paid) (Paid) $7,994.30*** Exhibit A -1c Recurring Fees One-time Fees -- -- Per -Year Subtotals Contract Year 5 $19,297.76 -- -- -- $19,297.76 (Paid) (9/30/21 - 9/29/22) Contract Year 6 $19,876.69 -- -- -- $19,876.69 (9/30/22 - 9/29/23) (Paid) Contract Year 7 $20,472.99 -- -- -- $20,472.99 (9/30/23 — 9/29- (Paid) 2024) Subtotal (years 5-7) $59,647.44 -- -- -- $59,647.44 (Paid) Amendment No. 2 (optional) Added -on Software or increased Reporting Services, $10,000 budget Amendment No. 3 Additional 5-yr Extension Fee for Volume Incidents ESO EHR ESO Inspections ESO Properties ESO Fire elestaff SUB -TOTAL (Up to (up to 11,604) (up to 11,604) Incidents integration 11,604) (up to 11,604) (up to 11,604) (i) Contract Year 8 $19,239 $249.83 $299.75 $5,995 $1,995 $27,778.58 (9/30/24 - 9/29/25) (ii) Contract Year 9 $20,200.95 -- -- $6,294.75 $2,094.75 $28,590.45 (9/30/25 - 9/29/26) (ii) Contract Year 10 $21,211 -- -- $6,609.49 $2,199.49 $30,019.97 (9/30/26 - 9/29/27) (ii) Contract Year 11 $22,271.55 -- -- $6,939.96 $2,309.46 $31,520.98 Item 8: Staff Report Pg. 7 Packet Pg. 257 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ESO Solutions Contract (9/30/27 - 9/29/28) I I S18171325 Amendment (ii) Contract Year 12 $23,385.13 -- -- $7,286.96 $2,424.93 �$33,097.02 (9/30/28 - 9/29/29) Total not -to -exceed amount of the Agreement (years 1-7) $116,147.90 (Paid) = $7,994.30 of year 1 and $80,269.33 (Amendment No.1] amending services (Paid) of year 5-7, recurring total fees under Exhibit A-1(b&c) during Contract Year 1- 6) *** Amendment No. 2 $10,000.00**** (Optional) Add-on Software %mendment No.3 $151,007.00 (i)(ii), Total not -to -exceed amount of the Agreement for 5-yr extension (Years 8 12) Maximum (including any Add-on Software or increase Reporting Service) $277,154.90 Total not -to -exceed amount of the Agreement (years 1-12) * Notwithstanding the foregoing, any Overages, as defined in Section 5.5 ("Audit Rights") of the Agreement, shall be addressed as provided for in the applicable Software Schedule. **Contract Years are defined as provided for in the applicable Software Schedule. *** The $7,994.30 recurring fee under Exhibit A -lb Contract Year 1 is paid. It is noted here but not included in any calculations except the last sum at the bottom of the table above, provided for informational purposes. **** Allocated budget set aside for Optional Add-on Software and Reporting Services fee is under Exhibit A-1zz (Paid) The rendered service fee has been paid. (i) The Agreement between ESO, Eagle County Health Service District and Public Safety Association, Inc., effective August 21, 2023, (the Master Agreement) shall govern the Terms and Conditions of this Quote (and upon the expiration or termination of the Master Agreement, ESO's then -current terms and conditions for such products (as indicated at www.eso.com) shall apply (ii) The parties acknowledge and agree that the term of this Agreement (the 'Term') shall have an effective (Subscription Start Date) of September 30, 2024 and continue for the period of five (5) years renewing on the anniversary of the Subscription Start Date (Annual Subscription Date) [With respect to the] The Term of Services for ESO Properties and Inspections (listed herein) annual Recurring Fees shall be invoiced on a prorate basis from September 30, 2024 through October 31, 2024 (Initial Term). Thereafter, ESO Properties and Inspections shall automatically terminate after the initial Term; and The Fees, except in the instance of (Overages), for the Services ordered herein shall be invoiced annually and due on the Annual Subscription Date as follows: a. Year One (9/30/24 - 9/29/25) - $27,778.58 b. Year Two (9/30/25 - 9/29/26) - $28,590.45 c. Year Three (9/30/26 - 9/29/27) - $30,019.97 d. Year Four (9/30/27 - 9/29/28) - $31,520.98 e. Year Five (9/30/28 - 9/29/29) - $33,097.02 EHR Product Description ESO EHR Patient care reporting suite for ALS and Transport EMS agencies, includes EHR web and mobile client, Quality Management, Basic Personnel Management, Insights Reporting Tool, Analytics, Patient Tracker. Allows for unlimited users, unlimited mobile applications, live support, state and federal data reporting, ongoing weekly web training, software updates and upgrades. FIRE Item 8: Staff Report Pg. 8 Packet Pg. 258 of 377 Docusign Envelope ID: 89DE245A-C133-4998-91 C6-9CE10CF8EBFA Item 8 Attachment A - ES0 Solutions Contract S18171325 Amendment No. 3 Product Description ESO Fire Includes Auto EHR-import or Auto -CAD import, federal NFIRS data reporting, software updates and upgrades. Incidents Telestaff Integration with Telestaff Rostering to place staff on the appropriate calls. Integration ESO Includes the ability to manage multiple code sets, using those to developed customized Check -lists for inspections. The application Inspections allows you to schedule, manage, execute and finalize inspections as well as reschedule any required follow up inspections. ESO Includes CAMEO integration, Pre -Plan view. Stores property and occupant history (presence of chemicals and tanks, Incidents, Properties and previous inspections). Item 8: Staff Report Pg. 9 Packet Pg. 259 of 377 Item 9 Item 9 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Community Services Meeting Date: October 21, 2024 Report #:2409-3531 TITLE Adoption of a Resolution Authorizing Grant Applications to the California Department of Resources Recycling and Recovery (CalRecycle); CEQA status — not a project. RECOMMENDATION Staff recommends that the City Council adopt a resolution approving the application for California Department of Resources Recycling and Recovery (CalRecycle) Grant Funds. This resolution is required by CalRecycle as part of the grant application. BACKGROUND The California Department of Resources Recycling and Recovery (CalRecycle) administers the Beverage Container Recycling Grant Program pursuant to Section 14581(a)(4) of the Public Resources Code. The purpose of the grant is to issue up to $1,500,000 annually in the form of grants for beverage container recycling and litter reduction programs to promote increased recycling of beverage containers throughout California and reduce beverage container litter in the waste stream. The Beverage Container Recycling Grant (BCRG) program seeks to achieve and maintain an 80% recycling rate for all California Refund Value (CRV) beverage containers, including aluminum, glass, plastic, and bi-metal. The minimum award for individual grants is $75,000 and the maximum award for individual grants is $275,000. ANALYSIS The City currently holds a contract with Townsend Public Affairs for grant support services. Following internal discussions, Community Services staff met with Townsend and identified the CalRecycle Beverage Container Recycling Grant as a viable funding opportunity. Community Services staff scheduled multiple meetings with Townsend and partnered with ZeroWaste in the initial discussion of the grant. Staff has identified eligible expenses, including the purchase and installation of ten (10) ADA-compliant water bottle filling stations if the grant is awarded. The funding will also support the installation, plumbing, and any necessary infrastructure Item 9: Staff Report Pg. 1 Packet Pg. 260 of 377 Item 9 Item 9 Staff Report modifications. These expenses are for the replacement of end -of -life drinking fountains for the following Parks: Mitchell Park (6), Ramos Park (2), and Robles Park (2) with a 10% contingency. This project supports the City Council priorities of Community Belonging and Climate Change. The Grant Program is a competitive process in which applications are evaluated and scored by a CalRecycle review panel based on the approved Scoring Criteria for the Beverage Container Recycling Grant Program, FYs 2024-25 and 2025-26. The grant and funding request application, which is an internal policy and procedure was signed by Community Services and Administrative Services Directors. The application for the CalRecycle grant was submitted before the deadline of September 24, 2024. The grant requires the governing body's approval and applicants to submit a resolution no later than the secondary due date of October 23, 2024. Failure to submit a resolution by this date will result in the disqualification of the application by CalRecycle. The resolution makes certain findings as required by CalRecycle. It authorizes the submission of grant applications on behalf of the City and designates the City Manager and the Assistant City Manager to execute any necessary grant documents. The authorization will last five years from the date of adoption. CalRecycle will send award notifications in March 2025 and grant funds must be expended by April 1, 2028. FISCAL/RESOURCE IMPACT Preparation for the grant application required staff resources, including multiple meetings with Townsend Public Affairs to ensure the application met all requirements. The City has requested $165,000 in grant funding and no matching funds are required. If the grant is awarded to the City, staff will recognize corresponding budget adjustments during the appropriate budget process. The grant is on a reimbursement basis, which requires City expenditures of funds before being reimbursed by the state. No net impact on the General Fund or Infrastructure Reserve is expected. This grant presents a valuable opportunity to replace aging infrastructure, specifically water bottle filling stations and allows for the installation of modern, ADA-compliant stations, promoting sustainability and accessibility in public spaces. ENVIRONMENTAL REVIEW Council action on this item is not a project as defined by CEQA because adoption of the resolution is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. CEQA Guidelines section 15061(b)(3). ATTACHMENT Attachment A: Resolution Authorizing Submittal of Grant Applications to CalRecycle APPROVED BY: Kristen O'Kane, Community Services Director Item 9: Staff Report Pg. 2 Packet Pg. 261 of 377 NOT YET APPROVED Resolution No. Item 9 ment A Attachment A - Resolution Authorizing Submittal of Grant pplications to CalRecycl Resolution Authorizing Submittal of Individual Grant Applications and Related Authorizations for all Grant Programs Offered by CalRecycle RECITALS A. The California Public Resources Code authorizes the Department of Resources Recycling and Recovery (CalRecycle) to administer various Grant Programs; and B. In furtherance of this authority, CalRecycle is required to establish procedures governing the administration of the Grant Programs; and C. CalRecycle grant application procedures require, among other things, an applicant's governing body to declare by resolution certain authorizations related to the administration of CalRecycle Grants. D. In furtherance of this authority, CalRecycle is required to establish procedures governing the administration of the Grant Programs. NOW, THEREFORE, the Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. The City of Palo Alto is authorized to submit an application to CalRecycle for all Grant Programs offered. SECTION 2. The City Manager, the Assistant City Manager, and the City Manager's designee(s) are hereby authorized as Signature Authority to execute in the name of the City of Palo Alto all grant documents, including but not limited to, applications, agreements, amendments, and requests for payment, necessary to secure grant funds and implement the approved grant project. // // // // 117_20240926_t524 Item 9: Staff Report Pg. 3 Packet Pg. 262 of 377 NOT YET APPROVED Item 9 ment A Attachment A - Resolution Authorizing Submittal of Grant SECTION 3. These authorizations are effective for five years from thpplcationstocalRecvch. l INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney Mayor le1»:t.1YAI103 City Manager Director of Community Services Director of Public Works 117_20240926_t524 Item 9: Staff Report Pg. 4 Packet Pg. 263 of 377 Item 10 Item 10 Staff Report City Council Staff Report From: City Manager CITY O F Report Type: CONSENT CALENDAR PALO Lead Department: Public Works ALTO Meeting Date: October 21, 2024 Report #:2410-3550 TITLE Approval of 1) Increase of Construction Contingency for Contract No. C21178123B with Swinerton Builders in the Amount Not -to -Exceed $1,000,000; 2) Increase of Construction Contingency for Contract No. C23186775 with L.D. Strobel Co., Inc. in the Amount of $25,000; 3) Increase of Contingency for Purchase Order No. 4523000432 with Pivot Interiors in the Amount of $40,000 in the Capital Improvement Fund for the New Public Safety Building Capital Project (PE -15001); CEQA — Environmental Impact Report for the New Public Safety Building and New California Avenue Area Garage (Resolution 9772) RECOMMENDATION Staff recommends that Council: 1. Approve an increase of construction contingency for Contract No. C21178123B with Swinerton Builders in the amount not to exceed $1,000,000 for a total contract contingency amount not to exceed $10,392,800; 2. Approve an increase of construction contingency for Contract No. C23186775 with L.D. Strobel Co., Inc. in the amount of $25,000 for a total contract contingency amount not to exceed $66,449; and 3. Approve an increase to the contingency for Purchase Order No. 4523000432 with Pivot Interiors, Inc in the amount of $40,000 for a total contingency amount not to exceed $132,169. BACKGROUND The New Public Safety Building (PSB) (PE -15001) and New California Avenue Area Parking Garage (PE -18000) projects are among ten key projects included in the 2014 Council Infrastructure Plan. The PSB was identified as the plan's highest priority project and is tied together with the parking garage project with respect to the California Environmental Quality Act (CEQA). The parking garage opened in December 2020. On February 1, 2021, Council approved the award of the construction contract for the PSB to Swinerton Builders and authorized execution and delivery of one series of Certificates of Participation in an amount not Item 10: Staff Report Pg. 1 Packet Pg. 264 of 377 Item 10 Item 10 Staff Report to exceed $120 million to finance the PSB construction.' The PSB construction is anticipated to receive a temporary certificate of occupancy (TCO) in December 2024. On March 6, 2023, Council approved a construction contract with L.D. Strobel Co., Inc. in the amount of $455,935 for the purchase and installation of radio antennas.2 On, June 19, 2023, Council approved a Purchase Order with Pivot Interiors in the amount of $756,021 to provide cubicle and office furniture for the new PSB.3 On June 17, 2024, Council approved additional contingencies to the construction contract with Swinerton Builders and the Purchase Order with Pivot Interiors in the amounts of $1,000,000 and $23,440, respectively.4 ANALYSIS The PSB is one of the most complex projects that the City has constructed to date. Given its complexity, since the PSB construction contract was awarded in early 2021, there have been change orders addressing issues of unforeseen site conditions, owner requested changes, design clarifications, and required changes due to authorities having jurisdiction, which are agencies that are responsible for enforcing codes and regulations. In addition, since change order costs are based on current construction costs rather than bid amounts, the significant escalation of construction costs over the past several years has impacted the project and the use of the contingency. On June 17, 20244, Council approved a $1,000,000 additional contingency amount for the PSB construction contract. As of September 2024, that contingency has been nearly used on multiple change orders including smoke control for the detention area, sally port coiling doors, and a number of other items needed to address code compliance and Americans with Disabilities Act (ADA) matters that are required to receive a TCO. Staff expects to receive a TCO in the next several weeks and an additional $1,000,000 is recommended to provide enough contingency authorization to continue to evaluate and process valid change orders needed for work required for TCO as the project nears completion. Due to the length of time it has taken to construct the PSB, additional funding authority is needed for existing contracts. • For the construction contract with L.D. Strobel Co., Inc., the original contract approved by Council on March 6, 2023 included base services of $414,486 and $41,449 for contingency. The existing contingency was used for the installation of additional lighting 1 City Council, February 1, 2021; Agenda Item #4, SR #11752, https://www.cityofpaloalto.org/files/assets/public/v/3/agendas-minutes-reports/reports/city-manager-reports- c m rs/yea r -a rc h ive/2021/i d-11752. pdf 2 City Council, March 6, 2023; Agenda Item #6, SR #2301-0886 https://www.cityofpaloalto.org/files/assets/public/v/1/public-works/engineering-services/cip-contracts/sr2301- 0886-3.6.2023-psb-radio-antenna-contract. pdf 3 City Council, June 19, 2023; Agenda Item #9, SR #2304-1375, https://www.cityofpaloalto.org/files/assets/public/v/1/pu blic-works/engineering-services/cip-contracts/sr2304- 1375-6.19.2023-pivot-one-workplace-pu rchase-orders. pdf 4 City Council, June 17, 2024; Agenda Item #17, SR #2404-2929, https://www.cityofpaloalto.org/files/assets/public/v/1/public-works/engineering-services/cip- contracts/s 1b9gof. pdf Item 10: Staff Report Pg. 2 Packet Pg. 265 of 377 Item 10 Item 10 Staff Report and ground bars (electrical connections that divert undesirable current to protect humans and equipment). The additional $25,000 is needed for additional coordination and ground bars installation. • For the Purchase Order with Pivot Interiors (Attachment A), the original contract approved by Council on June 19, 2023 included base services of $687,292 and $68,729 for contingency. On June 17, 2024, Council authorized an additional $23,440 in contingency for prevailing wage increase and additional storage fees through June 2024. The additional $40,000 contingency request is for additional costs for increased rates after July 1, 2024, project management and onsite lead coordination fees, and stair - carrying and double handling due to constricted space onsite. Staff is currently working on a contract amendment with the construction manager Cumming Group, formally known as Nova Partners, Inc., for construction management services through the end of the project and will bring that contract amendment to Council in November. FISCAL/RESOURCE IMPACT The Public Safety Building project (PE -15001) has remained within the design and construction budget of $115,632,064 stated at the time of the construction contract award. The recommendations in this report also are within that stated total project cost for design and construction. There have been overages against this project for salary and benefits costs that have affected the total project budget of $118.6 million as of the FY 2025 Adopted Budget. These additional salary and benefit charges total $937,000 and will increase the total project budget to $119.5 million. These charges will be corrected as part of CMR#2405-3061, Approval of Fiscal Year 2024 Reappropriation Requests to Fiscal Year 2025, scheduled for Council approval on October 21, 2024. Once this technical corrective action is approved, the project will be appropriately budgeted for design and construction expenses of $115,632,064, allowing for sufficient funding for the recommendations included in this report. Salary and benefits costs for capital projects are fully budgeted in the Capital Improvement Fund and any additional salary and benefit needs for this project will be addressed at Fiscal Year 2025 year-end through the Capital Improvement Fund Administration project (AS -10000). STAKEHOLDER ENGAGEMENT Staff provides monthly updates on PSB construction through the PSB's project webpage and newsletter. ENVIRONMENTAL REVIEW An Environmental Impact Report for the PSB and the New California Avenue Area Parking Garage was prepared and was certified by Council on June 11, 20218, by adoption of Resolution No. 9772.5 5 Resolution 9772, https://www.cityofpaloaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso- 9772.pdf?t=40475.53 Item 10: Staff Report Pg. 3 Packet Pg. 266 of 377 Item 10 Item 10 Staff Report ATTACHMENTS Attachment A: Pivot Purchase Order #4523000432 APPROVED BY: Brad Eggleston, Director Public Works/City Engineer Item 10: Staff Report Pg. 4 Packet Pg. 267 of 377 Vendor Address City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Tel:(650)329-2271 Fax:(650)329-2468 PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Rill Tn. ASD City of Palo Alto 250 Hamilton Avenue Palo Alto CA 94301 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number 4523000432 Date 05/30/2023 Vendor No. 100165 Payment Terms Payment Due 30 days FOB Point F.O.B Destination Ship via Vendor to ship best method Required Date 03/11/2024 Buyer/Phone Saira Cardoza / 650-329-2327 Email Saira.Cardoza@CityofPaloAlto.org DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Item Material/Description Quantity UM Net Price Net Amount "This Second Amended and Restated Purchase Order with Pivot Interiors, Inc., effective as of 10/21/2024, hereby amends and restates the Amended and Restated Purchase Order No. 4523000432 dated 06/30/2023 with Pivot Interiors, Inc. This Second Amended and Restated Purchase Order hereby supersedes that Amended and Restated Purchase Order dated 06/20/2023." This City of Palo Alto (City) Purchase Order agreement (PO) with Pivot Interiors pursuant and subject to Omnia agreement Contract 202000062 PH485, Sourcewell Contract no. 19Z08621 and Omnia agreement Contract R191819 & R191806 with Pivot Interiors for the procurement of Herman Miller Office furniture, project management, procurement of equipment and assembly services as detailed in this PO. Pivot Interiors, Inc. is an authorized dealer and sub -contractor of Herman Miller, Inc. All the furniture is fabricated specifically for the PSB. Installation is part of the original PO. However, due to delays in the completion of the Public Safety Building, Contractor has not been able to deliver any furniture in accordance with the PO and has been storing the furniture. Storage costs were not covered under the original PO. In addition, due to the delay in completing the PSB, there is a labor surcharge due to an increase in prevailing wages from the previous quote for the PO in 2023. Pivot Interiors, Inc. Department of Industrial Relation Registration Number is 1000018735. (MA Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 5 l Packet Pg. 268 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Lf> oR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Rill Tn. ASD City of Palo Alto 250 Hamilton Avenue Palo Alto CA 94301 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 2 of 7 Item Material/Description Quantity UM Net Price Net Amount This Project is subject to prevailing wages and related requirements as a "public works" under California Labor Code Sections 1720 et seq. and related regulations. Contractor is required to pay general prevailing wages as defined in California Labor Code Section 1773.1 and Subchapter 3, Title 8 of the California Code of Regulations Section 16000 et seq., as amended from time to time. Pursuant to Labor Code Section 1773, the City has obtained the general prevailing rate of per diem wages and the general rate for holiday and overtime work in this locality for each craft, classification, or type of worker needed to execute the contract for this Project from the State of California Department of Industrial Relations ("DIR"). Copies of these rates may be obtained at the City's Purchasing Department office. The general prevailing wage rates are also available at the DIR, Division of Labor Statistics and Research, website (see e.g. http://www.dir.ca.gov/DLSR/PWD/index.htm) as amended from time to time. Contractor shall post a copy of the general prevailing wage rates at all Project job sites and shall pay the adopted prevailing wage rates as a minimum. Contractor shall comply with all applicable provisions of Division 2, Part 7, Chapter 1 of the California Labor Code (Labor Code Section 1720 et seq.), including, but not limited to, Sections 1720, 1725.5, 1771, 1771.1, 1771.4, 1773.2, 1774, 1775, 1776, 1777.5, 1782, 1810, 1813 and 1815, and all applicable implementing regulations, including but not limited to Subchapter 3, Title 8 of the California Code of Regulations Section 16000 et seq. (8 CCR Section 16000 et seq.), as amended from time to time. DIR Registration and Other Requirements. Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 6 l Packet Pg. 269 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Lf> oR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Rill Tn. ASD City of Palo Alto 250 Hamilton Avenue Palo Alto CA 94301 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 3 of 7 Item Material/Description Quantity UM Net Price Net Amount General Notice to Contractor. City requires Contractor and its Subcontractors to comply with all applicable requirements of the California Labor Code including but not limited to Labor Code Sections 1720 through 1861, and all applicable related regulations, including but not limited to Subchapter 3, Title 8 of the California Code of Regulations Section 16000 et seq., as amended from time to time. Additional information regarding public works and prevailing wage requirements is available on the DIR website (see e.g. http://www.dir.ca.gov) as amended from time to time. Labor Code section 1771.1(a). City provides notice to Contractor of the requirements of California Labor Code section 1771.1(a), which reads: "A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or Section 10164 or 20103.5 of the Public Contract Code, provided the contactor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded." DIR Registration Required. Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 7 l Packet Pg. 270 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Lf> oR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Rill Tn. ASD City of Palo Alto 250 Hamilton Avenue Palo Alto CA 94301 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 4 of 7 Item Material/Description Quantity UM Net Price Net Amount City will not accept a bid proposal from or enter into this Construction Contract with Contractor without proof that Contractor and its Subcontractors are registered with the California Department of Industrial Relations ("DIR") to perform public work, subject to limited exceptions. Posting of Job Site Notices; Compliance Monitoring. City gives notice to Contractor and its Subcontractors that Contractor i required to post all job site notices prescribed by law or regulation and Contractor is subject to compliance monitoring and enforcement by DIR. Certified Payroll. Contractor shall furnish certified payroll records directly to the Labor Commissioner (DIR) in accordance with Subchapter 3, Title 8 of the California Code of Regulations Section 16461 (8 CCR Section 16461). City requires Contractor and its Subcontractors to comply with the requirements of Labor Code section 1776, including but not limited to: (i) Keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by, respectively, Contractor and its Subcontractors, in connection with the Project. Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 8 l Packet Pg. 271 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 LIFOR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Rill Tn. ASD City of Palo Alto 250 Hamilton Avenue Palo Alto CA 94301 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 5 of 7 Item Material/Description Quantity UM Net Price Net Amount (ii) The payroll records shall be verified as true and correct and shall be certified and made available for inspection at all reasonable hours at the principal office of Contractor and its Subcontractors, respectively. (iii) At the request of City, acting by its Project Manager, Contractor and its Subcontractors shall make the certified payroll records available for inspection or furnished upon request to the City's Project Manager within ten (10) days of receipt of City's request. 0 City requests Contractor and its Subcontractors to submit the certified payroll records to the City's Project Manager at the end of each week during the Project. (iv) If the certified payroll records are not provided as required within the 10 -day period, then Contractor and its Subcontractors shall be subject to a penalty of one hundred dollars ($100.00) per calendar day, or portion thereof, for each worker, and City shall withhold the sum total of penalties from the progress payment(s) then due and payable to Contractor. This provision supplements the provisions of Section 15 hereof. (v) Inform the City's Project Manager of the location of Contractor's and its Subcontractors' payroll records (street address, city and county) at the commencement of the Project, and also provide notice to the City's Project Manager within five (5) business days of any change of location of those payroll records. Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 9 l Packet Pg. 272 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Lf> oR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Hill Tn. City of Palo Alto Account Payable P.O.Box 10250 Palo Alto, CA 94303 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 6 of 7 Item Material/Description Quantity UM Net Price Net Amount This PO is governed by California law without regard to conflict of law principles. The venue for any dispute under this PO is Santa Clara County, California. This PO by reference incorporates the following contract documents into this PO by reference as though fully set forth herein: 1. Omnia agreement Contract 202000062 PH485 2. Omnia agreement Contract R191819 & R191806 3. Sourcewell Contract 19Z08621 4. Pivot Interiors Quote 411901-01, 411901-02, 411901-03, 411901-04, 411901-05 and 411901-06 5. City of Palo Alto Purchase Order Terms and Conditions 0010 PIVOT Project Management PSB 39,073 USE 1.00 39,073.30 0020 PIVOT Freight & Install PSB 121,957 USE 1.00 121,956.77 0030 PIVOT Materials PSB 526,261 USE 1.00 526,261.33 0040 PIVOT Contingency 108,729 USE 1.00 108,729.14 0050 Addtl Strg Fees & PrvIng Wage 21,480 USE 1.00 21 ,480.00 Sub -Total 817,500.54 Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 10 l Packet Pg. 273 of 377 City of Palo Alto Purchasing and Contract Administration P.O.Box 10250 Palo Alto CA 94303 Lf> oR�1 Tel:(650)329-2271 Fax:(650)329-2468 Vendor Address PIVOT INTERIORS INC. 3355 SCOTT BLVD STE 110 Santa Clara CA 95054-3138 Tel: 408-432-5600 Fax: 408-432-5601 Ship Tn. Public Works Engineering City of Palo Alto 250 Hamilton Ave., 6th Floor Palo Alto CA 94301 Hill Tn. City of Palo Alto Account Payable P.O.Box 10250 Palo Alto, CA 94303 Item 10 Attachment A - Pivot Purchase Order #4523000432 Purchase Order P.O. NUMBER MUST APPEAR ON ALL INVOICES, PACKAGES, SHIPPING PAPERS AND CORRESPONDENCE PERTAINING TO THIS ORDER PO Number Date Vendor No. Payment Terms FOB Point Ship via Required Date Buyer/Phone Email 4523000432 05/30/2023 100165 Payment Due 30 days F.O.B Destination Vendor to ship best method 03/11/2024 Saira Cardoza / 650-329-2327 Saira.Cardoza aa)CitvofPaloAlto. DELIVERIES ACCEPTED ONLY BETWEEN 7:00 AM & 3:00 PM UNLESS OTHER ARRANGEMENTS ARE INDICATED HEREIN Page 7 of 7 Item Material/Description Quantity UM Net Price Net Amount Sales Tax 1,960.05 * * * ORDERING VIA EMAIL ****PRICE HASBEEN QUOTED **** (I fi1IA Al AAAIA A Total 819,460.59 vVL�NW • ' Wv f'W1 V4� Chief Procurement Officer THIS P.O. IS SUBJECT TO THE TERMS AND CONDITIONS STATED BELOW AND ON THE LAST PAGE SPECIFICATIONS - Any specification and /or drawings referred to and/or attached hereto are expressly made a part of this Purchase Order. DELIVERY - Please notify the City promptly if delivery cannot be made on or before the date specified. If partial shipment is authorized, so indicate on all documents. Complete packing lists must accompany each shipment. INVOICE - A separate invoice is required for each order. Send to address indicated above. Item 10: Staff Report Pg. 11 1 Packet Pg. 274 of 377 TERMS AND CONDITIONS OF PURCHASE Item 10 Attachment A - Pivot ACCEPTANCE/AGREEMENT: City of Palo Alto (City) reserves the right to reject any and all quotations, to waive any informalities, and, unless otherwise specified by Seller, to accept any item in a quotation. By accepting or filing this Purchase Order (P.O.), Seller agrees to the terms and conditions herein which shall prevail over any inconsistent provision in any form or other paper submitted by Seller. All shipments or services performed shall be deemed to have been made pursuant hereto. No other terms are acceptable. This P.O., including all specifications and drawings, shall constitute the entire agreement between the parties unless modified in writing by City. CITY'S PROPERTY: Seller agrees that the information, tools, jigs, dies, or materials, and drawings, patterns, and specification supplied or paid for by City shall be and remain City property and shall be held by Seller for City unless directed otherwise. Seller shall account for such items and keep them protected, insured, and in good working conditions without expense to City. DELIVERY: The terms of delivery are as stated on the reverse side hereof. The obligation of Seller to meet the delivery dates, specifications, and quantities set forth herein is of the essence of this P.O. No boxing, packing, or cartage charge will be allowed unless authorized by this P.O. Deliveries are to be made both in quantities and at times specified herein or, if not, such quantities and times are specified pursuant to City's written instruction. Items not delivered may be canceled without penalty to City. Shipments in greater or lesser quantity that ordered may be returned at Seller's expense unless written authorization is issued by City. PRICES: The price which Seller charges in filling this P.O. shall not be higher than Seller's most recent quote or charge to City for such materials, supplies, services and/or installations unless City expressly agrees otherwise in writing. Notwithstanding the prices set forth the P.O. City shall receive the benefit of any general reduction in the price of any item(s) listed herein which may be made by Seller at any time prior to the last delivery of goods or services covered by this P.O. TERMINATION: City shall have the right to terminate this P.O. or any part thereof upon ten (10) days notice in writing to Seller. (1) Withnnt cap wa City may terminate all or any part of this P.O. without cause. Any claim by Seller for damages due to termination without cause must be submitted to City within thirty (30) days after effective date of termination. (2) For rage If Seller fails to make any delivery in accordance with the agreed delivery date, delivery schedule, or otherwise fails to observe or comply with any of the other instructions, terms, conditions or warranties applicable to this P.O., City may, in addition to any other right or remedy provided by this P.O. or by law, terminate all or any part of this P.O. in writing without any liability of City with respect to Seller at any time during the term of this P.O. In the event of termination for cause, City may purchase supplies or services elsewhere on such terms or in such manner as City may deem appropriate and Seller shall be liable to City for any cost and other expenses incurred by City, which is charged to City. CHANGES: City shall have the right at any time by written notice via P.O. Change Order to Seller to make changes in the specifications, the quantity of items called for, delivery schedules, and requirements covering testing, packaging, or destination. Any claim by Seller for adjustment under this clause shall be deemed waived unless made in writing with then (10) days after receipt by Seller of notice of such change. Price increases or extensions of time for delivery shall not be binding on City unless evidenced by a P.O. Change Order issued by City's Purchasing Manager. INSPECTION: City shall have the right to inspect and approve or reject any materials, supplies, services and/or installations upon arrival of notice of completion prior to payment without regard to the manner of shipment, completion, or any shipping or price terms contained in this P.O. All materials, supplies, services and/or installations must be furnished as specified. (1) Defective, damaged, and nonconforming materials and/or supplies may be returned for credit or refund, at Seller's expense. City may charge Seller for all expenses of unpacking, examining, repacking and reshipping of such materials and/or supplies. (2) Defective, incorrect and nonconforming services and/or installations may be returned for credit or refund, at Seller's expense. All of the ahnva nntwith_ctandin jprior paymant by WARRANTY: Seller expressly warrants that all /or Purchase Order installations covered by this P.O. shall: (1) conform to the specifications, drawing #4523000432 s specified by City or if none are so specified, to Seller's standard specification or the standards of the ASTM or ANSI or other national standard organizations; (2) be new and unless specified to the contrary on the face hereof, will be free from defects in material and workmanship and will be free of all liens and encumbrances and will conform to any affirmation of facts made on the container or label; (3) be adequately contained, packaged, marked, labeled and/or provided in compliance with all applicable federal and state laws and regulations (including materials deemed hazardous); (4) be performed within the rules and regulations of the Occupational Safety and Health Act of 1970 (as amended); (5) be produced or transferred or disposed of as required by federal and state laws and regulation under the conditions of the Toxic Substances Control Act; the Hazardous Materials Control and Hazardous Waste Regulations; and other toxic laws and programs. Seller further expressly agrees to protect, indemnify, and hold harmless City, its employees and agents for any loss, damage, fine, liability, fee (including reasonable charges and fees) or expense arising in connection with or resulting from Seller's failure to furnish materials or supplies or perform services that conform with any warranty contained herein. (6) have good marketable title. GOVERNING LAW: This P.O. shall be governed by the laws of the State of California. INDEPENDENT CONTRACTOR, INSURANCE: Seller certifies, by acceptance, that he/she is an independent contractor. Seller shall protect, defend, and indemnify and hold City harmless against all damages, liability, claims, losses and expenses (including attorney's fees) arising out of , or resulting in any way from Seller's negligence in providing the goods or services purchased hereunder or from any act or omission of Seller, its agents, employees, or subcontractors, Seller shall maintain such public liability insurance, including contractual liability, automobile and general public liability, (including non -owned automobile liability) Worker's Compensation, and employer's liability insurance as well adequately protect City against such damage, liabilities, claims, losses, and expenses (including attorney's fees). Seller agrees to submit certificates of insurance, evidencing its insurance coverage when requested by City. EQUAL OPPORTUNITY CLAUSE: By acceptance of this P.O., Seller certifies it is in compliance with the Equal Opportunity Clause required by Executive Order 11246, as amended, and the Palo Alto Municipal Code, as amended, including Affirmative Action Compliance Programs for Veterans; Handicapped; and Minority Business, and other equal opportunity programs. FORCE MAJEURE: City may delay delivery or acceptance occasioned by causes beyond its control. Seller shall hold such materials, supplies, services and or installations at the direction of City and shall deliver them when the cause affecting the delay has been removed. City shall be responsible only for Seller's direct additional costs in holding the goods or delaying performance of this P.O. and City's request. Seller shall also be excused if delivery is delayed by unforeseen events beyond its reasonable control, provided Seller notifies City as soon as they occur. City may cancel this P.O. if such delay exceeds thirty (30) days from the original delivery date. Seller shall use its best efforts to grant preference to this P.O. over those of other customers, which were placed after this P.O. AUTHORITY OF AGENT OR FACTOR: Seller represents that, whenever it executes this P.O. on behalf of a third party as an agent or factor, it shall disclose the existence of the agency or factor relationship to City. Seller shall be deemed to have the legal authority to enter into this P.O. with City on behalf of the third party. INTERPRETATION OF CONTRACT DOCUMENTS: In the event of a conflict between the terms of this P.O. and the attached specification with respect to any obligation of Seller, the provision which impose the greater obligations upon Seller shall prevail. CITY OF PALO ALTO PAGE 1 OF 3 GDS Rev. 06/22/2016 Item 10: Staff Report Pg. 12 Packet Pg. 275 of 377 TERMS AND CONDITIONS OF PURCHASE Item 10 Attachment A - Pivot ENVIRONMENTALLY PREFERRED PURCHASING REQUIREMENTS: Seller agrees to comply with the City's Environmentally Preferred Purchasing Requirements. (1) Hazardnus Waste Seller shall take -back all spent or otherwise discarded hazardous products sold to the City by the Seller if the spent or discarded products are classified as hazardous or universal wastes by State or Federal regulations. Seller shall provide convenient collection and recycling services (or disposal services if recycling technology is unavailable) for all universal wastes, which originate from the Vendor. Hazardous waste manifests or bills of lading must be provided to City staff upon request. Recycling and reuse of hazardous wastes must occur within the United States. Universal waste lists and information are available www.dtsc.ca.gov/HazardousWaste/UniversalWaste/. A hazardous waste list is available at http://www.calrecycle.ca.gov/LEA/Training/wasteclass/yep.htm. Additional information can be obtained by contacting the City of Palo Alto Hazardous Waste Department at (650) 496-6980. (2) Torn Wsste and Pnnnfinn Pra,,Anrine Per Palo Alto City Council policy, the City is targeting to achieve Zero Waste by 2021. The City must also meet Municipal Regional Stormwater Permit requirements requiring no visible impact from litter via stormdrains by 2022. To that end the vendor, manufacturer and or contractor must individually or collaboratively comply with the waste reduction, reuse and recycling requirements of the City's Zero Waste and Pollution Prevention Programs. Seller acknowledges and agrees that if Seller fails to fully and satisfactorily comply with these requirements, the City will suffer, as a result of Seller's failure, substantial damages which are both extremely difficult and impracticable to ascertain. Therefore, the Seller agrees that in addition to all other damages to which the City may be entitled, in the event Seller fails to comply with the below requirements Seller shall pay City as liquidated damages the amounts specified below. The liquidated damage amount is not a penalty but considered to be a reasonable estimate of the amount of damages City will suffer as a result of such non-compliance. • Sellers shall adhere to the standard that all printed materials provided to the City that are generated from a personal computer and printer including, proposals, quotes, invoices, reports, and public education materials shall be double -sided, printed on a minimum of 30% post -consumer content paper or greater unless otherwise approved by the City's Environmental Services Division (650) 329-2117. Materials printed by a professional printing company shall be a minimum of 30% post -consumer material or greater and printed with vegetable based inks. Liquidated damages of $30 per document will be assessed by City for failure to adhere to this requirement. • All paper packaging must be Forest Stewardship Council (FSC) Certified. • All primary, secondary and shipping (tertiary) packaging be minimized to the maximum extent feasible while protecting the product being shipped. • All primary, secondary and shipping packaging shall be recyclable in the City's recycling program. A complete list of items accepted for recycling are found at www.zerowastepaloalto.org or by calling (650) 496-5910. If any portion is received that does not meet this requirement, liquidated damages of $235 or a minimum of $50 if the combined product and shipping cost is $235 or less will be assessed by City for failure to adhere to this requirement. • Expanded foam plastics (e.g., foam or cushion blocks, trays, packing 'peanuts'), such as but not limited to polystyrene (aka Styrofoam[tm]), polypropylene, or polyurethane shall not be used as primary, secondary or tertiary/shipping packaging with the following exceptions: o Primary packaging made from these materials may be used if the vendor, manufacturer, contractor individually or collaboratively does one of the following: (a) takes the material back at the City's convenience and at no cost to the City, or (b) pays the City of Palo Alto's disposal costs via payment of liquidated damages of $235, or a minimum of $50 if the combined product and shipping cost is $235 or less. o Bioplastics that meet ASTM D6400 standards for compostability may be accepted with approval from the City's Environmental Services Division subject to local municipal compost facility requirements. o If approved by the City's Environmental Services Division, a packaging requirement may be waived if no other viable packaging alternative exists. • Reusable/returnable pallets shall be used and additional I Purchase Order cost to the City. Seller shall provide documental e of pallets and/or recycling of broken pallets. Liquidated da #4523000432 of $50 if the combined product and shipping cost is $262 or less will be assessed by City for failure to adhere to this requirement. (3) Fnarny and Water Fffiniennv Seller shall provide products with an ENERGY STAR, Water Sense or State of California standard rating, whichever is more efficient, when ratings exist for those products. A life cycle cost analysis shall be provided to the City upon request and shall at minimum include: first cost, operating costs, maintenance costs, and disposal costs. Contacts for additional information about City of Palo Alto Hazardous Waste, Zero Waste and Utilities programs: Hazardous Waste Program (Public Works) (650) 496-6980 Zero Waste Program (Public Works) (650) 496-5910 Watershed Protection (650) 329-2117 Energy Efficiency (650) 496-2244 (4)i^n,adated non Seller agrees that failure to comply with the City's Environmentally Preferred Purchasing Requirements will result in Liquidated Damages, according to the table marked Liquidated Damages on page 3 of this P.O. CITY OF PALO ALTO PAGE 2 OF 3 GDS Rev. 06/22/2016 Item 10: Staff Report Pg. 13 Packet Pg. 276 of 377 TERMS AND CONDITIONS OF PURCHASE Item 10 Attachment A - Pivot Purchase Order NONCOMPLIANCE WITH ENVIRONMENTALLY PREFERRED PURCHASING REQUIREMENTS, LIQUIDATED DAMAGES: The following table lists the events that constitute breaches of the Agreement's standard of performance warranting the imposition of liquidated the amount of liquidated damages for failure to meet the contractually required standards of performance. #4523000432 aeleveland Event of Non -Performance Acceptable Performance Level Liquidated Damage Amount (Allowed events per Fiscal Year) Recycled Paper Use Failure to use 30% recycled content paper 1 $30 per each document Recyclable Packaging Materials Failure of Seller to use secondary and shipping packaging that is recyclable in 1 $235 or a minimum of $50 if the combined product the City's recycling program. and shipping cost is $250 or less will be incurred if this is not adhered to. Expanded Foam Plastics Unapproved use of expanded foam plastics for secondary or shipping 0 $235 or a minimum of $50 if the combined product packaging and shipping cost is $235 or less Pallet Use 1 $262 or a minimum of $50 if the combined product Failure of Seller to take -back and reuse pallets, recycling only broken pallets, and shipping cost is $2 or less at no additional cost to the City. CITY OF PALO ALTO PAGE 3 OF 3 GDS Rev. 06/22/2016 Item 10: Staff Report Pg. 14 Packet Pg. 277 of 377 Item 11 Item 11 Staff Report City Council Staff Report Report Type: CONSENT CALENDAR CITY O F Lead Department: City Clerk PALO LTO Meeting Date: October 21, 2024 Report #:2409-3525 TITLE SECOND READING: Adoption of an Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) to Conform with County Amendments and Approval of the Updated Agreement Between the County of Santa Clara and City of Palo Alto for a Tobacco Retail Permit Program (FIRST READING: September 23, 2024 PASSED 7-0) RECOMMENDATION This item was heard by the City Council on September 23, 2024 for a first reading and was approved 7-0. No changes were made to the ordinance; it is now before you for a second reading. ATTACHMENTS Attachment A: Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) of Title 4 APPROVED BY: Mahealani Ah Yun, City Clerk Item 11: Staff Report Pg. 1 Packet Pg. 278 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter Ordinance No. 4.64 (Permits for Retailers Ordinance of the Council of the City of Palo Alto Amending I of Tobacco Products) of ("Permits for Retailers of Tobacco Products") Of Title 4 (Busine Title 4 Regulations). The Council of the City of Palo Alto ORDAINS as follows: SECTION 1. Findings and Declarations. The City Council finds and declares as follows: A. The City of Palo Alto and the County of Santa Clara have a partnership to regulate tobacco retailers and the sale of tobacco products in the City of Palo Alto. The City adopts the County's relevant ordinance and the County enforces the City's ordinance. B. The County adopted County Ordinance NS -517.96 in 2022 to amend its tobacco retailing ordinance. The City intends to make the same changes to its own ordinance through adoption of this ordinance. C. This Ordinance amends Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) to authorize denial of a permit to a Retailer whose permit was previously revoked; impose conditions on permits to facilitate enforcement; increase fines for violations; provide for impound and seizure of noncompliant products; require posting of public notice during any suspension; and clarify the existing prohibition on the sale of electronic cigarette products. SECTION 2. The following sections of Chapter 4.64 (Permits for Retailers of Tobacco Products) of Title 4 (Business Licenses and Regulations) are hereby amended as follows (new text underlined, deleted text in strikcthrough): CHAPTER 4.64. PERMITS FOR RETAILERS OF TOBACCO PRODUCTS 4.64.010 Intent. (a) This €Chapter is adopted to: (1) Ensure compliance with the business standards and practices of the €euntyCi�t r; (2) Encourage responsible retailing of tTobacco Products; (3) Discourage violations of laws related to tTobacco p.Products, especially those that prohibit or discourage the sale or distribution of tTobacco p. Products and eElectronic €Cigarette oProducts to individuals under twenty --one; (4) Respond to a new wave of addiction to eElectronic €Cigarette Products; 11620240822 ts24 Item 11: Staff Report Pg. 2 Packet Pg. 279 of 377 Not Yet Approved (5) Reduce vulnerability to unexplained illnesses associated with €Cigarette Products; and (6) Protect the public health and welfare. Item 11 4ttachment A - Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) of Title 4 (b) This €Chapter does not expand or reduce the degree to which the acts regulated by federal or state law are criminally proscribed or alter the penalties provided by such laws. 4.64.020 Definitions. For the purposes of this €Chapter, the following definitions shall apply: (a) "Arm's length transaction" means a sale in good faith and for valuable consideration that reflects the fair market value in the open market between two or more informed and willing parties, neither of which is under any compulsion to participate in the transaction. A sale between relatives, related companies or partners, or a sale for which a significant purpose is avoiding the effect of the violations of this €Chapter is not an arm's length transaction. (b) "Department" means any department of the City of Pal, Alto or County y of Santa Clara designated by the city m r to cnforcc or administer this chapter, including the County of Santa Clara's Department of Environmental Health and any agency or person designated by the Director of the Department of Environmental Health to enforce or administer the provisions of this €Chapter. (c) "Distribute or distribution" means the transfer, by any person other than a common carrier, of a tTobacco Product to another person for sale or personal consumption. (d) "Electronic €Cigarette p.Products" means any of the following products: (1) Any device or delivery system that can be used to deliver nicotine in aerosolized or vaporized form, including, but not limited to, an e -cigarette, e -cigar, e -pipe, vape pen, or e -hookah. (2) Any component, part, or accessory of such a device or delivery system that is used during its operation. (3) Any flavored or unflavored liquid or substance containing nicotine, whether sold separately or sold in combination with any device or delivery system that could be used to deliver nicotine in aerosolized or vaporized form. (4) Any product for use in an electronic nicotine device or delivery system whether or not it contains nicotine or tobacco or is derived from nicotine or tobacco. 11620240822 ts24 Item 11: Staff Report Pg. 3 Packet Pg. 280 of 377 Not Yet Approved Item 11 attachment A - Ordinanca Updating Palo Alto Municipal Code Chapter (5) Electronic €Cigarette Products shall not include any battery, 4.64(PermitsforRetailers carrying case, or other accessory not used in the operation of the dl of Tobacco Products) of separately. Electronic €Cigarette Products shall not include any pr Title4 en approved by the United States Food and Drug Administration for sale as a tobacco cessation product or for other therapeutic purposes where that product is marketed and sold solely for such approved use. See 21 U.S.C. § 387(a). As used in this &Subsection, nicotine does not include any food products as that term is defined pursuant to Section 6359 of the California Revenue and Taxation Code section 6359. (e) Hearing Officer shall mean the hearing officer appointed by the Department in accordance with County of Santa Clara Ordinance Code ("County Ordinance Code") section A38-4. "Impound" means the legal control exercised by the Department over the use. sale disposal, or removal of any Tobacco Products. (e#g) "Ownership" means possession of a ten percent or greater interest in the stock, assets, or income of a business, other than a security interest for the repayment of debt. Notwithstanding any other definition in this code, an owner means a person who possesses ownership. (fgh) "Permit" means a valid permit issued by the Department to a person to act as a retailer. (g1i) "Retailer" means any person who sells or distributes tTobacco P.Products for any form of consideration, whether or not they possess a current Permit. Retailing shall mean the doing of any of these actions. This definition is without regard to the quantity of tTobacco P.Products sold or distributed. (i41) "School" means a public or private elementary, middle, junior high, or high school. (+k) "Sale and sold" includes any sale, exchange, barter or offer for sale. (fl) "Tobacco gProduct" means (unless specifically noted elsewhere) any product subject to Subchapter IX (21 U.S.C. § 387 et seq. ("Subchapter IX")) of the Federal Food, Drug, and Cosmetic Act. (See 21 U.S.C. § 387a(b) (products subject to Subchapter IX); 21 C.F.R. §§ 1100.1- 1100.3 (tobacco products subject to Subchapter IX) and Electronic Cigarette Products.} Products subject to Subchapter IX include, but are not limited to, cigarettes, cigarette tobacco, roll -your - own tobacco, smokeless tobacco, cigars, pipe tobacco, and waterpipe tobacco, and cicctr„nic cigarcttc products. Products that are not subject to Subchapter IX include accessories of tobacco products, such as, but not limited to, ashtrays, spittoons, and conventional matches and lighters that solely provide an external heat source to initiate but not maintain combustion of a tobacco product. 4.64.030 Requirements and prohibitions. 11620240822 ts24 Item 11: Staff Report Pg. 4 Packet Pg. 281 of 377 Not Yet Approved (a) Permit required. It shall be unlawful for any person to act as a retail obtaining and maintaining a Permit pursuant to this €Chapter for each lo Retailing occurs. Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter i.64 (Permits for Retailers of Tobacco Products) of Title 4 (b) Lawful business operation. It shall be a violation of this €Chapter for any retailer to violate any local, state, or federal law applicable to tobacco products or the retailing of such tTobacco p.Products. (c) Display of pPermit. Each Permit shall be prominently displayed in a publicly visible place at the location identified in the Permit. (d) Notice of minimum age for purchase of tTobacco p.Products. Retailers shall post conspicuously, at each point of purchase, a notice stating that selling tTobacco pProducts to anyone under twenty-one years of age is illegal and subject to penalties. Such notice shall be subject to the approval of the public health d Department. (e) Positive identification required. No retailer shall sell or distribute a tTobacco Product to another individual who appcars to be , ndcr thirty years of agc without first examining the individual's identification to confirm that the individual is at least the minimum age required under -,State law to purchase and possess the tTobacco Product. (f) Minimum age for individuals selling tTobacco Products. No individual who is younger than the minimum age established by state law for the purchase or possession of tTobacco pProducts shall engage in retailing. (g) False and misleading advertising prohibited. A retailer without a Permit: (1) Shall keep all tTobacco Products out of public view. (2) Shall not display any advertisement relating to tTobacco P.Products that promotes the -,Sale or dDistribution of such products from the r -Retailer's location or that could lead a reasonable consumer to believe that tTobacco Products can be obtained at that location. (h) Limitation on storefront advertising. No more than fifteen percent of the square footage of the windows and clear doors of a physical storefront used for Retailing tTobacco Products shall bear advertising or signs of any sort, and all advertising and signage shall be placed and maintained in a manner that ensures that law enforcement personnel have a clear and unobstructed view of the interior of the premises, including the area in which the cash registers are maintained, from the exterior public sidewalk or entrance to the premises. However, this latter requirement of this subsection (h) shall not apply to an establishment where there are no windows or clear doors, or where existing windows are located only at a height that precludes a view of the interior of the premises by an individual standing outside the premises. 11620240822 ts24 Item 11: Staff Report Pg. 5 Packet Pg. 282 of 377 Not Yet Approved (i) Flavored Ttobacco p.Products. Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) of (1) Except as permitted in paragraph (3) of this subsection (i)no Title4 v oTrccccnTc�-�rrai i sell a tTobacco Product containing, as a constituent or additive, an artificial or natural flavor or aroma (other than tobacco) or an herb or spice, including but not limited to strawberry, grape, orange, clove, cinnamon, pineapple, vanilla, coconut, licorice, cocoa, chocolate, cherry, mint, menthol, or coffee, that is a characterizing flavor or aroma of the tTobacco Product, smoke, or vapor produced by the tTobacco Product. (2) A tTobacco pProduct shall be subject to a rebuttable presumption that the product is prohibited by paragraph (1) of this subsection if: (+A) The product's manufacturer or any other person associated with the manufacture or sale of tTobacco Products makes or disseminates public statements or claims to the effect that the product has or produces a characterizing flavor or aroma, other than tobacco; or (++B) The product's label, labeling, or packaging includes a statement or claim —including any text and/or images used to communicate information —that the product has or produces a characterizing flavor or aroma, other than tobacco. (v) Posts a sign outsidc thc rctail location that cicarly, sufficicntly, and conspicuously informs thc public that individuals undcr twcnty onc ycars of agc arc prohibitcd from cntcring thc gUJil aa wiwiiiuiaui 11620240822 ts24 Item 11: Staff Report Pg. 6 Packet Pg. 283 of 377 Not Yet Approved Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter (j) Vending machines prohibited. No tTobacco pProduct shall be sSold o464 (Permits for Retailershe public from a vending machine or appliance, or any other coin or token op ofTobacco Products) of I Title 4 device designed or used for vending purposes, including, but not limited to, devices that use remote control locking mechanisms. (k) Prohibition on sSale or 4Distribution of tTobacco pProducts to individuals under twenty- one. No (Retailer shall sell or distribute any tTobacco -pProduct to any individual who is under twenty-one years of age. (I) Prohibition on sSale or 4Distribution of eElectronic ECigarette pProducts. No person, whether or not issued a permit. shall Sell or Distribute Electronic Ciearette Products.No rctailcr L 4.64.040 Eligibility requirements for a pPermit. (a) No pPermit may be issued to authorize cRetailing at or from other than a fixed location. For example, (Retailing by persons on foot or from vehicles is prohibited. (b) No pPermit may be issued to authorize (Retailing at a temporary or recurring temporary event. For example, (Retailing at flea markets and farmers' markets is prohibited. (c) No pPermit may be issued to authorize (Retailing at any location where the profession of pharmacy is practiced by a pharmacist licensed by the sState in accordance with the Business and Professions Code and where prescription drugs are offered for sale. (d) No pPermit may be issued to authorize (Retailing at any location within 1,000 feet of a sSchool, as measured by a straight line between any point along the property line of any parcel on which a sSchool is located and any point along the perimeter of the -PPermit applicant's proposed business location; provided, however, that the prohibition contained in this subsection (d) shall not apply to the following: (1) Any (Retailer of tTobacco pProducts (as such term was defined in the predecessor Ordinance No. 5418) operating lawfully on June 30, 2018 provided that the (Retailer obtaineds a pPermit prior to July 1, 2020 pursuant to Sections 4.64.050 and 4.64.060, and timely reneweds its permit pursuant to Section 4.64.070(b); (2) Any retailer of electronic smoking devices (as such term was defined in the predecessor Ordinance No. 5418) operating lawfully on June 30, 2018 provided that the retailer obtaineds a permit prior to July 1, 2020 pursuant to Sections 4.64.050 and 4.64.060, and timely renews its permit pursuant to Section 4.64.070(b); however, any 11620240822 ts24 Item 11: Staff Report Pg. 7 Packet Pg. 284 of 377 Not Yet Approved such retailer is subject to the prohibition on the sale and distributi €Cigarette Pproducts established in Section 4.64.030(l); and Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter i.64 (Permits for Retailers of Tobacco Products) of Title 4 (3) Any lawfully operating Retailer of tTobacco p.Products that would otherwise become ineligible to receive or renew a pPermit due to the creation or relocation of a school. (e) No Permit may be issued to authorize Retailing at a location which is within 500 feet of a location occupied by another retailer, as measured by a straight line between any point along the perimeter of an existing retailer's business location and any point along the perimeter of the Permit applicant's proposed business location; provided, however, that the prohibition contained in this subsection (e) shall not apply to: (1) Any Retailer of tTobacco p.Products (as such term was defined in the predecessor Ordinance No. 5418) operating lawfully on June 30, 2018 provided that the r -Retailer obtaineds a Permit prior to July 1, 2020 pursuant to Sections 4.64.050 and 4.64.060, and timely renews its Permit pursuant to Section 4.64.070(b); and (2) Any Retailers of electronic smoking devices (as such term was defined in the predecessor Ordinance No. 5418) operating lawfully on June 30, 2018 provided that the retailer obtaineds a permit prior to July 1, 2020 pursuant to Sections 4.64.050 and 4.64.060, and timely reneweds its permit pursuant to Section 4.64.070(b); however, any such r -Retailer is subject to the prohibition on the sSale and dDistribution of eElectronic €Cigarette Products established in Section 4.64.030(l). (f) Any exemption granted to a r -Retailer pursuant to subsections (d) and (e) shall cease to apply upon the earlier of the following to occur: (1) The Retailer fails to timely renew the Permit pursuant to Section 4.64.070(b). (2) A new person obtains ownership in the business. 4.64.050 Application procedure. (a) It is the responsibility of each r -Retailer to be informed of all laws applicable to Rietailing, including those laws affecting the issuance of a Permit. No r -Retailer may rely on the issuance of a Permit as a determination by the j r or County of Santa Clara that the r -Retailer has complied with all laws applicable to r -Retailing. A Permit issued contrary to this €Chapter, contrary to any other law, or on the basis of false or misleading information supplied by a r -Retailer shall be revoked pursuant to Section 4.64.060. (b) All Permit applications shall be submitted on a form supplied by the 4Department. 11620240822 ts24 Item 11: Staff Report Pg. 8 Packet Pg. 285 of 377 Not Yet Approved (c) A permitted retailer shall inform the 4Department in writing of any information submitted on an application for a permit within fourteen cal€ change. Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter i.64 (Permits for Retailers of Tobacco Products) of Title 4 (d) All information specified in an application pursuant to this section shall be subject to disclosure under the California Public Records Act (Government Code Section 6250 et seq.) or any other applicable law, subject to the laws' exemptions. 4.64.060 Permit issuance, denial, and revocation. (a) Upon the receipt of a complete application for a Permit, the application fee, and the annual Permit fee, the 4Department shall issue a Permit unless substantial evidence demonstrates that one or more of the following bases for denial exists: (1) The information presented in the application is inaccurate or false. (2) The application seeks authorization for Retailing at a location for which this €Chapter prohibits issuance of a Permit. (3) The application seeks authorization for (Retailing by a person to whom this €Chapter prohibits issuance of a Permit. (4) The application seeks authorization for a Retailer whose Permit has previously been revoked or who has otherwise violated any provision of this Chapter within the last 60 months. (45) The application seeks authorization for r -Retailing that is prohibited pursuant to this €Chapter (e.g., mobile vending, €Electronic C€igarette Products) or that is unlawful pursuant to any other law. (6) The application seeks authorization for Retailing by a Retailer who has failed to pay any fees, penalties, or reinspection fees required by this Chapter. (b) A permit shall be revoked if the 4Department finds that one or more of the bases for denial of a permit under this section existed at the time application was made or at any time before the permit was issued. Such a revocation shall be without prejudice to the filing of a new pPermit application. (c) A permit shall be permanently revoked if the Retailer has committed violations as specified in section 4.64.130. 4.64.070 Permit term, conditions, renewal, and expiration. (a) Term of p.Permit. The term of a permit is one year. A Permit is invalid upon expiration. 11620240822 ts24 Item 11: Staff Report Pg. 9 Packet Pg. 286 of 377 Not Yet Approved Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter b) Conditions ofePermit. As conditions of Permit issuance and retentid 4.64 (Permits for Retailers I Allow compliance in of Tobacco Products) of Dections as described in Section 4.64.1 Title e 4 4 consent to inspection of all areas and records of a Retailer's business required to effectuate the purpose of this Chapter, including unlocking and allowing access to any area of Retailer's business requested by any individual authorized to monitor and facilitate compliance with this Chapter. Comply with any order of the Department to impound any product not authorized to be sold by this Chapter and cooperate with any Departmental seizure of any product, subject to appeal of those actions. (3) Failure to comply with these Permit conditions may result in Permit suspension or revocation as described in Section 4.64.130. (bc) Renewal of pPermit. The dDepartment shall renew a Permit upon timely payment of the annual Permit fee provided that the r -Retailer is in compliant^complies with this €Chapter, as amended. The dDepartment may, in its discretion, agree to renew any expired Permit within the three-month period following expiration if the r -Retailer pays the annual Permit fee and applicable late charges. For every calendar month, or fraction thereof, that a r -Retailer fails to renew an expired Permit, a late charge equal to twenty percent of the annual Permit fee shall be assessed. A pPermit renewed within three calendar months of expiration shall be treated as if timely renewed. (€d) Issuance of p.Permit after revocation or expiration of permit. To apply for a new Permit more than three calendar months after expiration of a p.Permit or following revocation of a p.Permit that was wrongly issued, a r -Retailer must submit a complete application for a P.Permit, along with the application fee and annual Permit fee. The dDepartment shall issue a permit pursuant to the requirements of Section 4.64.060. 4.64.080 Permits nontransferable. (a) A Permit may not be transferred from one person to another or from one location to another. Whenever a new person obtains ownership in a business for which a Permit has been issued, a new Permit shall be required, but any exemption granted pursuant to Section 4.64.040 shall cease to apply. (b) Notwithstanding any other provision of this C€hapter, prior violations of this €Chapter at a location shall continue to be counted against a location and Ppermit ineligibility and suspension periods shall continue to apply to a location unless: (1) One hundred percent of the interest in the stock, assets, or income of the business, other than a security interest for the repayment of debt, has been transferred to one or more new owners; and 11620240822 ts24 Item 11: Staff Report Pg. 10 Packet Pg. 287 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter (2) The €-t Department is provided with clear and convincing ev4.64(PermitsforRetailers n affidavit, that the business has been acquired in an aArm's 1Length of Tobacco Products) of Title 4 4.64.090 Permit conveys a limited, conditional privilege. Nothing in this €Chapter shall be construed to grant any person obtaining and maintaining a Permit any status or right other than the limited, conditional privilege to act as a -PRetailer at the location in the city identified on the face of the Permit. All Permits are issued subject to the €City's right to amend this €Chapter, and r -Retailers shall comply with all provisions of this €Chapter, as amended. 4.64.100 Fees. The dDepartment shall not issue or renew a Permit prior tobefore full payment of any applicable fees. The €itCounty Board of Supervisors shall, from time to time, establish by resolution or ordinance the fees to issue or to renew a pPermit. The fees shall be calculated so as to recover the cost of administration and cnforc^mcnt of this €Chapter, including, for example, issuing a Permit, administering the Permit program, Retailer education, and routine Retailer inspection and compliance checks d ^"tabor of violations/and prosccution of violators, but shall not exceed the cost of the regulatory programauthorized by this €Chapter. All fees and interest earned from such fees shall be used exclusively to fund administration and enforcement of this €Chapter. 4.64.110 Compliance monitoring. (a) Compliance with this €Chapter shall be monitored by the dDepartment. In addition, any peace officer may enforce the penal provisions of this €Chapter. The city managcrDepartment may designate any number of additional individuals to monitor and facilitate compliance with this €Chapter. (b) The 4Department or other individuals designated to enforce the provisions of this €Chapter shall €he€lemonitor each Retailer at least once per twelve-month period to determine if the Retailer is complying with all laws applicable to retailing, other than those laws regulating underage access to tTobacco Products. Nothing in this paragraph shall create a right of action in any r -Retailer or other person against the €City, the County of Santa Clara, or its agents. c) Any Retailer found to be in violation of this Chatter shall oav all costs related to enforcement to ensure retailer's compliance with this Chapter, including but not limited to, fees for reinspection to determine compliance after a violation, enforcement costs, litigation costs, and attorneys' fees in any administrative or civil matter in which the Department prevails pursuant to Division Al of the County Ordinance Code or any other provision of law. 4.64.120 Prevention of underage sales. 10 11620240822 ts24 Item 11: Staff Report Pg. 11 Packet Pg. 288 of 377 Not Yet Approved Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter (a) The 4Department or other departments or individuals designated to'-"1PermitsforRetailers provisions of this £Chapter shall, of Tobacco Products) of ach (Retailer at least twice per twelve-month period to determine whether the Title 4 conducting business in a manner that complies with laws regulating youth access to tTobacco -pProducts. Nothing in this paragraph shall create a right of action in any (Retailer or other person against the £City, the County of Santa Clara, or its agents. (b) The £ity-Department or other departments or individuals designated to enforce the provisions of this Chapter shall not enforce any law establishing a minimum age for tTobacco -pProduct purchases against an individual who otherwise might be in violation of such law because of the individual's age ("yYouth 4Decoy") if the potential violation occurs when: (1) The yYouth 4Decoy is participating in a compliance check supervised by a peace officer or a code enforcement official of the £City Clara; (2) The yYouth 4Decoy is acting as an agent of a dDepartment or individual designated by the £City or County of Santa Clara to monitor compliance with this £Chapter; or (3) The yYouth 4Decoy is participating in a compliance check funded in part, either directly or indirectly through subcontracting, by the £City, the County of Santa Clara, or the California Department of Public Health. 4.64.130 Penalties for a violation by a iRetailer with a pPermit. (a) Administrative fine. In addition to any other penalty authorized by law, a (Retailer shall pay a fine if the Retailer; or any of the (Retailer's agents or employees, h -a -s v+efatedviolates any of the requirements, conditions, or prohibitions of this £Chapter,has-pled guilty, "no contcst" or its cguivolcnt to such a violation, or has admittcd to a such a violation.. {b} Amount of finc. The amount of the administrative fine for each such violation of this Chapter shall be as follows: (1) A fine not toexceed one hundred .doll3rS ($100.00) for a first , oI3tion within twelve month peFio ;A fine not to exceed $1,000 for each violation identified during the first instance in which the Retailer has committed a violation or violations; (2) A fine not to e ed two hundred dollars ($200.00) for a ccond violation within a twelve month p rind; A fine not to exceed $2,500 for each violation identified during a subsequent instance if the Retailer has committed a previous violation or violations within a 60 -month period: and 11620240822 ts24 Item 11: Staff Report Pg. 12 Packet Pg. 289 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter (3) 4.64 (Permits for Retailers within a twelve month period A fine not to exceed $5,000 for each of Tobacco Products) of . . . .. .. . .. . . ... Title 4 violations within a 60 -month period. (Eb) Time period for permit Permit suspension. In addition to any other penalty authorized by law, the Department may suspend a permit if the Department demonstrates that the Retailer or any of the Retailer's agents or employees has violated any of the requirements, conditions, or prohibitions of this Chapter. The period of the suspension shall be as follows: (1) For a first violation of this chaptcr at a location within any sixty month period, thc permit shall be suspcndcd for up to thirty calendar days. A suspension not to exceed 30 calendar days for an initial violation. (2) For a second violation of this chapter at a location within a sixty month period, the permit shall be suspended for up to ninety calendar days.A suspension not to exceed 180 calendar days if a Retailer commits a violation or violations during two instances within a 60 -month period. (3) For cach additional violation of this chaptcr at a location within any sixty month period, thepermit shall be suspcndcd for up to ^ ycar.When a permit is suspended based on a violation of this Chapter, the Department shall post a placard at the physical location used for Retailine Tobacco Products to notify the eeneral aublic of the suspension. The placard shall be: (A) Posted in the front window of the storefront used for Retailing Tobacco Products within five feet of the front door; or (B) Posted in a display case mounted on the outside front wall of the physical location used for Retailing Tobacco Products within five feet of the front door; or (C) Posted in a location approved by the Department to ensure proper notice to the general public and to patrons of the physical location used for Retailing Tobacco Products. (D) Once attached to a building or structure, a placard is not to be removed, altered, or covered until done so by an authorized representative of the Department or upon written notification from the Department. (c) Permanent Permit revocation. In addition to any other penalty authorized by law, the Department shall permanently revoke a Permit if a retailer commits a violation or violations during three instances within a 60 -month period. (d) Waiver or reduction of fines and penalties for first violation. The 4Department may, in its sole discretion, waive or reduce any fines and penalties for a {Retailer's first violation of any 12 11620240822 ts24 Item 11: Staff Report Pg. 13 Packet Pg. 290 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter rcquircmcnt, condition, or prohibition ofthis chaptersection, 4.64 (Permits for Retailers rcgulating youth acccss to tobacco products, if the rRetailer admits the vio ofTobacco Products) of agrees to forego a hearing on the allegations. Regardless of the dDepartme Title4 penalties for a first violation, the violation will be considered in determining the fines and suspension periods or revocation pcnaltics for any future violation. This subsection shall not apply to any violation involving a law regulating youth access to Tobacco Products. (e) Corrections period. The 4Department shall have discretion to allow a rRetailer a period of time to correct any violation of any requirement, condition, or prohibition of this £Chapter, other than a violation of a law regulating youth access to tTobacco pProducts. If the 4Department exercises its discretion to provide a corrections period, and a rRetailer's violation is corrected within the time allowed for correction, no penalty shall be imposed under this section. (f) Written notice of penalties. Whenever a fine is issued and/or a Permit is suspended or revoked based on a violation of this £Chapter, the 4Department shall provide the rRetailer written notice of the violation and the fine and suspension or revocation, including when the suspension or revocation shall take effect. (g) Appeals. Any penalties imposed under this section may be appealed pursuant to Section 4.64.150 of this Chapter. h) A timely aooeal shall stay enforcement of the aooealed aenalties until the final administrative decision of the Department is issued. 4.64.140 Penalties for retailing without a pPermit. (a) Administrative fine. In addition to any other penalty authorized by law, an administrative fins and an incligibility r od for application or issuancc of a permit a rRetailer shall 13e imposed pay a fine if a court of compctcnt jurisdiction dctcrmincs or the 4Department firms based on a prcpondcrancc of c idcnc^demonstrates; that any the-_ Retailer has engaged in retailing at a location without a valid Permit, either directly or through the person''s Retailer's agents or employees. has pled guilty, "no contet"erits eq Tt to such a The amount of the administrative fine for each violation, or has admitted to such Hof this Chanter shall be as follows: (1) A fine not to a ed o c hundred dollars ($100.00) for a first violation within a twclvc month period; A fine not to exceed $2,500 for each violation identified during the first instance in which the Retailer has committed a violation efor violations without a valid Permit; 13 11620240822 ts24 Item 11: Staff Report Pg. 14 Packet Pg. 291 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter (2) 4.64 (Permits for Retailers twelve month n iod• and A fine not to exceed $5,000 for each viol of Tobacco Products) of Title 4 violations within a 60 -month period without a valid Permit: and (3) A fine not to exceed five hundred dollars ($500.00) for each additional violation ,.,;thin a twelve month period A fine not to exceed $10,000 for each violation identified during a subsequent instance after the Retailer has twice committed a previous violation or violations within a 60 -month period without a valid Permit. (eb) Time period for Permit ineligibility. The ineligibility period shall be as follows: (1) For amt an initial violation of this section At a location within any sixty month period Chapter without a valid Permit, no new pPermit may be issued e -F -to the person Retailer or the location (unless ownership of the business at the location has been transferred in an aArm's ILength tTransaction) until thirty calendar days have passed from the date of the violation. (2) For a sccond violation of this section at a location within any sixty month n od , no ncw permit may bc issucd for thc person or thc location (unless owncrship of thc arm's calendar days havepassed from the date of the violation. If a Retailer commits a violation or violations during two instances within a 60 -month period without a valid Permit, no new Permit may be issued to the Retailer or the location (unless ownership of the business at the location has been transferred in an Arms Length tTransaction) until one year has gassed from the date of the second violation. (3) For each addition -,l violation of this section at a location If a Retailer commits a violation or violations during three instances within an- sxy6O-month period without a valid Permit, non permit may be issued for the person r the Retailer and the location (unless ownership of the business at the location has been transferred in an aArm's ILength tTransaction) shall be permanently ineligible for a Permit. until one year has passed from the date of the violation. (4c) Waiver of 4or reduction of fines and penalties for first violation. The 4Department may, in its sole discretion, waive or reduce any fines and penalties for a retailer's first violation of this section, unless thc violation also involves a violation of a law rcgulating youth acccss to tobacco products, if the (Retailer admits the violation in writing and agrees to forego a hearing on the allegations. Regardless of the 4Department's waiver of fines or penalties for a first violation, the violation will be considered in determining the penalties for any f„t„r violation fines and suspension periods or revocation for any future violation. This subsection shall not apply to any violation involving a law regulating youth access to Tobacco Products. 14 11620240822 ts24 Item 11: Staff Report Pg. 15 Packet Pg. 292 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter (ed) Written notice of penalties. Whenever a fine is issued and/or a jaPe4.64(PermitsforRetailers pursuant to this section, the dDepartment shall provide the Retailer writt of Tobacco Products) of and suspension, including when the suspension shall take effect. Title4 (#e) Appeals. Any penalties imposed under this section may be appealed pursuant to Section 4.64.150. 4.64.150 Appeals. (a) Any FRetailer served with a written notice of mss -violation may request an administrative hearing to appeal the existence of the violation, the amount of the fine, alder the length of #ie-a suspension, a revocation of a Permit, the sustained impoundment of Tobacco Products, and/or seizure of Tobacco Products by returning a completed hearing request form to the Office of the County Hearing Officer within ten days from the date of the written notice of penalties. (b) The FRetailer shall include the following in or with the hearing request form: (1) A statement indicating the reason the (Retailer contests the written notice of penalties; (2) Any evidence the FRetailer wants the #Hearing eOfficer to consider; (3) An advance deposit of the amount of any fine challenged; and (4) The address of the FRetailer and, if available, an email address that can be used for contact and correspondence by the Office of the County Hearing Officer and the Department. The FRetailer may request service of notice by mail. (c) The hearing request form shall be deemed filed on the date received by the Office of the County Hearing Officer. A timely appeal shall stay enforcement of the appealed penalties while the appeal is ongoing. (d) After receiving a timely hearing request form, the Hearing Officer shall notify the 4Department as soon as practicable and then shall schedule an administrative hearing. The Office of the County Hearing Officer shall provide the FRetailer and the 4Department at least ten calendar days' written notice of the date, time, and place of the administrative hearing and the name of the hHearing eOfficer who will conduct the hearing. The notice shall be given to the FRetailer either by email, if requested, or by first class mail, postage prepaid. (e) Between the time the FRetailer requests the administrative hearing and the time of the 1 Hearing eOfficer's decision, the FRetailer, the 4Department, and each of their representatives 15 11620240822 ts24 Item 11: Staff Report Pg. 16 Packet Pg. 293 of 377 Item 11 Attachment A - Ordinance Not Yet Approved Updating Palo Alto Municipal Code Chapter shall not engage in ex parte communications with the Office of the County4.64(PermitsforRetailers the hHearing eOfficer regarding the matters at issue in the hearing. of Tobacco Products) of Title 4 (f) The hearing shall be conducted by the hHearing eOfficer on the date, time, and place specified in the notice to the r -Retailer. A r -Retailer's failure to appear at the hearing shall constitute an abandonment of the hearing request and a failure to exhaust administrative remedies as a precedent to judicially challenge the existence of the violation and the imposition of the fine and suspension. (g) At the hearing, the Retailer and the c[Department shall have the opportunity to present evidence, including witnesses, relevant to the hHearing eOfficer's determination of the matter. Neither the provisions of the Administrative Procedure Act (Government Code Section 11500 et seq.) nor the formal rules of evidence in civil or criminal judicial proceedings shall apply to such hearing. The hHearing eOfficer may admit any evidence, including witnesses, relevant to the determination of the matter, except as otherwise provided in Section 4.64.160(c). (h) The written notice of penalties and any other reports prepared by or for the dDepartment concerning the violation shall be admissible and accepted by the hHearing eOfficer as prima facie evidence of the violation and the facts stated in those documents. (i) The hHearing eOfficer may continue the hearing from time to time, in teethe Hearing Officer's sole discretion, to allow for its orderly completion of the hearing. After receiving the evidence submitted at the hearing, the hHearing eOfficer may further continue the hearing and request additional information from either the 4Department or the f -Retailer. (j) After considering the evidence and testimony submitted the hHearing eOfficer shall issue a written decision regarding the matters properly raised in the request for administrative hearing. The hHearing eOfficer's decision shall: (1) Be based on a preponderance of the evidence. (2) Include a statement of the reasons for the decision. (3) Be issued within twenty calendar days of the close of the hearing. (4) Be served on both the r -Retailer and the 4Department. The decision shall be given to the r -Retailer either by email, if requested, or by first class mail, postage prepaid. (k) Based on the hHearing eOfficer's decision, the Office of the County Hearing Officer shall promptly refund to the r -Retailer any amount of the advance fine deposit the 4Department is not entitled to and shall provide the remainder to the dDepartment. (I) The hearing officer's written decision shall constitute the final administrative decision-ef thc-eity 16 11620240822 ts24 Item 11: Staff Report Pg. 17 Packet Pg. 294 of 377 Not Yet Approved 4.64.160 Enforcement. (a) Any violation of this EChapter is hereby declared to be a public nuisa Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) of Title 4 (b) Causing, permitting, aiding, abetting, or concealing a violation of any provision of this EChapter shall also constitute a violation of this EChapter. (c) Whenever evidence of a violation of this EChapter is obtained in any part through the participation of an individual under the age of twenty-one years old, such an individual shall not be required over his or hcrtheir objection to appear or give testimony in any civil or administrative process brought to enforce this EChapter and the alleged violation shall be adjudicated based upon the sufficiency and persuasiveness of the evidence presented. (d) Violations of this EChapter may be remedied by a legal action brought by the c attorney e -r -County of Santa Clara Office of the County Counsel pursuant to 4Division Al of the Ordinance Code of the County of Santa Clara, including, bu t„ t limited to, administrative For the purposes of the civil remedies provided in this chapter, each day on which a tobacco product is offered for sSale in violation of this EChapter, and each individual retail tobacco product that is sSold or 4Distributed in violation of this EChapter, shall constitute a separate violation of this EChapter. (e) Impoundment. 1) Based upon inspection findines or other evidence. the Department may impound Tobacco Products that are suspected of being or found to be offered for sSale or Distribution in violation of this Chapter. The Department may affix a label to the product that shall be removed only by the Department followine final written determination by the Department as described below. (2) No impounded Tobacco Products shall be used, removed, disposed, or offered for Sale unless the impoundment has been released. The decision by the Department may be appealed pursuant to the procedures set forth in Section 4.64.150. (3) Within 30 days of final determination whether the impounded products are authorized for sale under this Chapter, the Department shall release the impounded materials or order that unauthorized. impounded product shall be destroyed and properly disposed of at the cost of the Retailer. (f) Seizure. Tobacco Products offered for sale in violation of this Chapter are subject to seizure by the Department and shall be forfeited after the Retailer of the Tobacco Products 17 11620240822 ts24 Item 11: Staff Report Pg. 18 Packet Pg. 295 of 377 Not Yet Approved seized is given reasonable notice and an o rtunity to demonstrate that Item 11 attachment A - Ordinance Updating Palo Alto Municipal Code Chapter i.64 (Permits for Retailers of Tobacco Products) of Title 4 shall be destroyed and properly disposed of at the cost of the Retailer after all internal appeals have been exhausted and after the time in which to seek judicial review pursuant to Section 4.64.150 of this Chapter has expired. (g) All Retailers are responsible for the actions of their employees relating to compliance with this Chapter. The sale, offer to sell, or furnishing of any Tobacco Products by an employee shall be considered an act of the Retailer. (fh) The remedies provided by this €Chapter are cumulative and in addition to any other remedies available at law or in equity. 4.64.170. No conflict with federal or state lawNo conflict with fcdcraI or state Iawlnterpretation Nothing in this €Chapter shall be interpreted or applied so as to create any requirement, power, or duty that is preempted by, or in conflict with, federal or state law, rules, or regulations. (b) Nothing in this Chapter shall be construed to penalize the purchase, use, or possession of a Tobacco Product by any person not engaged in the retailing of such products. SECTION 3. If any section, subsection, clause or phrase of this Ordinance is for any reason held to be invalid, such decision shall not affect the validity of the remaining portion or sections of the Ordinance. The Council hereby declares that it should have adopted the Ordinance and each section, subsection, sentence, clause or phrase thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid. SECTION 4. The Council finds that this project is exempt from the provisions of the California Environmental Quality Act ("CEQA"), pursuant to Section 15061 of the CEQA Guidelines, because it can be seen with certainty that there is no possibility that the ordinance will have a significant effect on the environment. // // // // 11620240822 ts24 18 Item 11: Staff Report Pg. 19 Packet Pg. 296 of 377 Not Yet Approved SECTION 5. This ordinance shall be effective 31 days after ado INTRODUCED: PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney Mayor /e1»,091T �iJ Item 11 Attachment A - Ordinance Updating Palo Alto Municipal Code Chapter 4.64 (Permits for Retailers of Tobacco Products) of Title 4 City Manager Director of Public Works Chief of Police Director of Administrative Services 11620240822 ts24 19 Item 11: Staff Report Pg. 20 Packet Pg. 297 of 377 Item 12 Item 12 Staff Report City Council Staff Report Report Type: CONSENT CALENDAR CITY O F Lead Department: City Clerk PALO ALTO Meeting Date: October 21, 2024 Report #:2409-3526 TITLE SECOND READING: Adopt an Ordinance Adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 in the Palo Alto Municipal Code as well as Amendments to the Zoning District Map, and Rezoning of Parcels Within the NVCAP area (FIRST READING: September 23, 2024 PASSED 6-1 Kou no; PREVIOUSLY INTRODUCED: August 5, 2024 PASSED 6-1, Kou no) RECOMMENDATION This item was heard by the City Council on August 5, 2024 for a first reading and was approved 6-1, Kou no. Following the City Council's review on August 5, 2024, two changes were proposed to the subject ordinance that staff believes consistent with prior Council direction. These changes arguably introduce new or refined policy direction and therefore staff re -introduced the ordinance as first reading on September 23, 2024; the ordinance passed 6-1, Kou no. No changes were made, and the ordinance is now before you for a second reading. ATTACHMENTS Attachment A: Ordinance Adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 APPROVED BY: Mahealani Ah Yun, City Clerk Item 12: Staff Report Pg. 1 Packet Pg. 298 of 377 ***NOT YET APPROVED*** Ordinance No. Item 12 attachment A - Ordinance adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 Ordinance of the Council of the City of Palo Alto Adding Chapter 18.29(Nor Ventura (NV) District Regulations) and Amending Chapters 18.14 (Housing Incentives), 18.24 (Contextual Design Criteria and Objective Design Standards), 16.65 (Citywide Affordable Housing Requirements) to Implement the North Ventura Coordinated Area Plan (NVCAP) and 18.70.040 (Nonconforming use — Discontinuance) The Council of the City of Palo Alto ORDAINS as follows: SECTION 1. Findings and Declarations. The City Council finds and declares as follows: A. On November 13, 2017, the City Council for the City of Palo Alto (City) certified a Final Environmental Impact Report (EIR) for the City of Palo Alto 2030 Comprehensive Plan through Resolution No. 9720, made findings in relation to the Final EIR, adopted a mitigation monitoring and report plan (MMRP), and adopted a statement of overriding considerations through Resolution No. 9721 and adopted the City of Palo Alto 2030 Comprehensive Plan through Resolution No. 9722. B. The City of Palo Alto 2030 Comprehensive Plan Policy L-1.7 and Program L-4.10 calls for the preparation of a plan for the North Ventura and surrounding California Avenue area in order to establish the future of the North Ventura area as a walkable neighborhood with multi -family housing, ground -floor retail, a public park, creek improvements, and an interconnected street grid. C. On November 6, 2017, the City Council adopted a Resolution No. 9717 to initiate the local planning process for a North Ventura Coordinated Area Plan in accordance with Palo Alto Municipal Code Section 19.10.020. D. On April 30, 2018, the City Council appointed a total of 14 members of the working group to advise the staff, boards/commissions, and the Council during the preparation of the plan. E. The City conducted extensive community outreach in multiple languages since the NVCAP process has initiated in November 2017 including 17 meetings of the NVCAP Working Group; several community pop-up events; numerous meeting with stakeholders including school district, commercial property owners and tenants, interest groups in housing and transportation; two community workshops; one meeting of the Architectural Review Board (ARB); two meetings of the Historic Resources Board (HRB); six meetings of the Planning and Transportation Commission (PTC); and seven meetings of the City Council. F. Pursuant to the provisions and requirements of CEQA and CEQA Guidelines Section 15163, the City as lead agency, prepared a Supplemental Environmental Impact Report to the 2017 Comprehensive Plan Final EIR (SEIR) to analyze the potential environmental impacts resulting from adopting the NVCAP. G. On May 8, 2024, the PTC held a duly and properly noticed public hearing to consider a draft of the SEIR and the NVCAP, and recommended that the City Council adopt the draft NVCAP. H. On August 5, 2024, the City Council conducted a duly and properly noticed public hearing to take public testimony, consider the SEIR, reviewed the NVCAP and all pertinent maps, documents and exhibits, including the staff report, and all attachments, and oral and written public comments. I. On August 5, 2025, the City Council adopted the NVCAP and certified SEIR and other environmental documents associated with the NVCAP. 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 2 Packet Pg. 299 of 377 ***NOT YET APPROVED*** J. The City Council now desires to adopt modifications to the Palo Alto Muni the NVCAP. Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters 16.65 ent SECTION 2. Chapter 18.29 (North Ventura (NV) District Regulations) of Title 18 (Zoning) of the Palo Alto Municipal Code is added to read as follows: CHAPTER 18.29 NORTH VENTURA (NV) DISTRICT REGULATIONS 18.29.010 Purpose 18.29.020 Applicability of Regulations 18.29.030 Zoning Districts 18.29.040 Definitions 18.29.050 Permitted Uses 18.29.060 Development Standards 18.29.070 Parking and Loading 18.29.080 Context -Based Design Criteria and Objective Design Standards 18.29.090 Housing Incentive Programs for NV District 18.29.010 Purpose The purpose of the North Ventura district is to implement the vision and framework of the North Ventura Coordinated Area Plan (NVCAP) through use regulations and development standards. 18.29.020 Applicability of Regulations (a) The North Ventura districts shall apply to properties within the NVCAP and designated as North Ventura Coordinated Area Plan within the Palo Alto Comprehensive Plan. Where designated, the regulations set forth in this chapter shall apply in lieu of the comparable provisions established by the underlying zoning district regulations. (b) Refer to the NVCAP for design guidelines related to streets and buildings in conjunction with the regulations contained within this chapter. 18.29.030 Zoning Districts The North Ventura districts shall apply to properties designated on the zoning map by the symbol "NV" in front of the zoning district designation. The following zoning districts are intended to create and maintain sites for residential, commercial and mixed -use sites: (a) Single Family Residential District (NV -R1) The NV -R1 single family residential district is intended to create, preserve, and enhance areas suitable for detached dwellings with a strong presence of nature and with open area affording maximum privacy and opportunities for outdoor living and children's play. Minimum site area requirements are established to create and preserve variety among neighborhoods, to provide adequate open area, and to encourage quality design. Accessory dwelling units, junior accessory dwelling units and accessory structures or 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 3 Packet Pg. 300 of 377 Item 12 Attachment A - Ordinance ***NOT YET APPROVED*** Adding Chapter 18.29 and Amending Chapters buildings are appropriate. Community uses and facilities are allowed to the exten 18.14, 18.24, 18.70, and sing would result. 16.65 (b) Two Family Residential District (NV -R2) The NV -R2 two-family residential district is intended to allow a second dwelling unit, under the same ownership as the initial dwelling unit, in areas designated for single-family use or NVCAP by the Palo Alto Comprehensive Plan, under regulations that preserve the essential character of single-family use. Community uses and facilities are allowed to the extent no net loss of housing would result. (c) Medium Density Multiple -Family Residential District (NV -R3) The NV -R3 medium density multiple -family residential district is intended to create, preserve and enhance neighborhoods for multiple -family housing with better transition to lower density residential districts. Projects at this density are intended for larger parcels that will enable developments to provide their own parking spaces and to meet their open space needs in the form of garden apartments or cluster developments. While there is no maximum density in the NV -R3 residential district, the NVCAP anticipates realistic development yields ranging from 16 to 30 dwelling units per acre based on the applicable development standards. (d) High Density Multiple -Family Residential District (NV -R4) The NV -R4 high density multiple -family residential district is intended to create, preserve and enhance locations for apartment living at the greater density deemed appropriate for NVCAP. The most suitable locations for this district are along major transportation corridors which are close to mass transportation facilities and major employment and service centers. While there is no maximum density in the NV -R4 residential district, the NVCAP anticipates realistic development yields ranging from 61 to 100 dwelling units per acre based on the applicable development standards. (e) Low Density Mixed -Use District (NV-MXL) The purpose of the NV-MXL district is to allow for small-scale commercial and services with limited amount of residential that is compatible with the surrounding development. While there is no maximum density in the NV-MXL district, the NVCAP anticipates realistic development yields ranging from three to 17 dwelling units per acre. (f) Medium Density Mixed -Use District (NV-MXM) The purpose of the NV-MXM district is to allow for a compatible mix of residential and limited commercial. While there is no maximum density in the NV-MXM district, the NVCAP anticipates realistic development yields ranging from 31 to 70 dwelling units per acre. (g) High Density Mixed -Use District (NV-MXH) The purpose of the NV-MXH district is to allow for a mix of retail, restaurant, entertainment and commercial uses on the ground floor with residential on the upper floors, while maintaining a pedestrian - oriented streetscape. It is intended that the active ground floor retail space required will ensure neighborhood -oriented retail and services are provided within walking distance of high density residential. Ground floor active uses are required along El Camino Real. While no maximum density in the 3 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 4 Packet Pg. 301 of 377 ***NOT YET APPROVED*** NV-MXH district, the NVCAP anticipates realistic development yields ranging from per acre. (h) Public Facilities District (NV-PF) Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters 16.65 nits The NV-PF public facilities district is designed to accommodate governmental, public utility, educational, and community service or recreational facilities. Within the North Ventura area, an approximate one -acre portion of the NV-PF district may permit a 100% affordable housing project. 18.29.040 Definitions For the purposes of this chapter, the following definitions shall apply: (a) "Street yard" means a yard adjoining a street lot line and may also be a front lot line. 18.29.050 Permitted Uses (a) The uses of land allowed by this chapter in each zoning district are identified in the following tables. Land uses that are not listed in the tables are not allowed, except where otherwise noted. Where the last column on the following tables ("Subject to Regulations in") includes a section number, specific regulations in the referenced section also apply to the use; however, provisions in other sections not specifically referenced may apply as well. TABLE 1: PERMITTED AND CONDITIONALLY PERMITTED USES P = Permitted Use CUP = Conditional Use Permit Required TUP = Temporary Use Permit Required — = Not Permitted LAND USE NV- NV- NV- NV- NV- NV- NV- NV- Subject to R1 R2 R3 R4 MXL MXM MXH PF Regulations (1)(5) (5) In: ACCESSORY AND SUPPORT USES Accessory facilities P P P P P P P — 18.40 and activities 18.10.080 customarily 18.12.080 incidental to the permitted use Accessory Dwelling P P P P P P P — 18.09 Unit & Junior Accessory Dwelling Unit when accessory to primary and permitted residential use Home Occupations, P P P P P P P P 18.42 when accessory to 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 5 Packet Pg. 302 of 377 4 Item 12 * NOT YET APPROVED 'K''AttachmentA-Ordinance Adding Chapter 18.29 and Amending Chapters LAND USE NV- NV- NV- NV- NV- NV- NV- 18.14, 18.24, 18.70, and R1 R2 R3 R4 MXL MXM MXH 16.65 S In: (1)(5) (5) permitted residential use Horticulture, P P P P P P P — Gardening, and Growing of food products for consumption by occupants of a site EDUCATIONAL, RELIGIOUS, AND ASSEMBLY USES Private Clubs, — — — CUP CUP — — — Lodges, or Fraternal Organizations, excluding any such facility operated as a business for profit Private Educational CUP CUP CUP CUP CUP P P — Facilities Religious CUP CUP CUP CUP P P P — Institutions OFFICE USES(2) Administrative — — — — P P P — 18.29.050(a) Office Services Medical Offices — — — — P P P — 18.29.050(a) Professional and — — — — P P P — 18.29.050(a) General Business Offices PUBLIC/QUASI-PUBLIC USES Community Centers CUP CUP CUP CUP — — — CUP (3) Utility Facilities CUP CUP CUP CUP CUP CUP CUP — essential to provision of utility services but excluding construction or storage yards, maintenance facilities, or corporation yards. RECREATION USES Neighborhood — — CUP CUP — — — CUP Recreational (3) Centers 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 6 Packet Pg. 303 of 377 Item 12 *** NOT YET APPROVED *** Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters LAND USE NV- NV- NV- NV- NV- NV- NV- 18.14, 18.24, 18.70, and R1 R2 R3 R4 MXL MXM MXH 16.65 s In: (1)(5) (5) Commercial — — — — CUP CUP CUP CUP Recreation (3) Outdoor Recreation CUP CUP CUP CUP — CUP CUP CUP Services (3) Youth Clubs — — — — — — — CUP (3) RESIDENTIAL USES Single -Family P P — — — — — — Two -Family P P — — — — — — 18.42.180 Multiple -Family — — P P P P P p(4) Residential Care P P P P P P P — Homes RETAIL USES Eating and Drinking — — P P P P P CUP 18.40.160, Services, except (3) 18.29.050(c) drive-in and take- out services Personal Services — — P P P P P CUP 18.40.160, and Retail Services (3) 18.29. 050(c) of a neighborhood - serving nature Liquor stores — — — — — P P — 18.40.160, 18.29. 050(c) SERVICE USES Animal Care, — — — — P P P — 18.29. 050(c) excluding boarding and kennels Convalescent — — — CUP P P P — Facilities Day Care Centers CUP CUP CUP P P P P — 18.40.160 Large Family Day P P P P P P P p(3) Care Homes Small Family Day P P P P P P P p(3) Care Homes Large Adult Day CUP CUP P P P P P p(3) Care Homes Small Adult Day P P P P P P P p(3) Care Homes Financial Services — — — — P P P — 18.29.050(a) 18.29.060(b) General Business — — — — P P P — 18.29. 050(a) Services 18.29.060(b) Hotels — — — — — P P — 18.40.160, 18.16.060(d) 0160143_kb2_20240826_ay16 Item 12: Staff Report Pg. 7 Packet Pg. 304 of 377 Item 12 *** NOT YET APPROVED *** Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters LAND USE NV- NV- NV- NV- NV- NV- NV- 18.14, 18.24, 18.70, and R1 R2 R3 R4 MXL MXM MXH 16.65 5 In: (1)(5) (5) Personal Services — — — — P P P — 18.40.160, 18.29. 050(c) 18.29.060(b) AGRICULTURAL AND OPEN SPACE USES Park uses and uses — — — — — — — P incidental to park operation All facilities owned — — — — — — — P or leased, and operated or used, by the City of Palo Alto, the County of Santa Clara, the State of California, the government of the United States, the Palo Alto Unified School District, or any other governmental agency, or leased by any such agency to another party Utility Facilities — — — — — — — CUP TEMPORARY USES Temporary Uses — — TUP TUP — — — — 18.42.050 Farmer's Markets — — — — — CUP CUP — Temporary Parking — — — — — CUP CUP CUP Facilities, provided (3) that such facilities shall remain no more than five years Notes: (1) For NV-MXL zoning district, the total floor area of non-residential uses permitted and conditionally permitted on a lot shall not exceed 5,000 square feet. (z) For office uses, total floor area of permitted office uses on a lot shall not exceed 5,000 square feet. (3) Provided such use is conducted on property owned by the City of Palo Alto, the County of Santa Clara, the State of California, the government of the United States, the Palo Alto Unified School District, or any other governmental agency, and leased for said uses. (4) Only a 100% Affordable Housing Project is permitted. Development shall follow NV -R4 standards. (5) Ground floor uses shall comply with the ground floor edge framework set forth in NVCAP section 2.3. 0160 143_kb2_20240826_ay 16 Item 12: Staff Report Pg. 8 Packet Pg. 305 of 377 *** NOT YET APPROVED *** (a) Office Use Restrictions Item 12 Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 (1) Conversion of Ground Floor Housing and Non -Office Commercial to Office Medical, Professional, and Business offices shall not be located on the ground floor, unless any of the following apply to such offices: (A) Have been continuously in existence in that space since September 23, 2024 and as of such date, were neither non -conforming nor in the process of being amortized pursuant to Chapter 18.30(l); (B) Occupy a space that was not occupied by housing, neighborhood business service, retail services, personal services, eating and drinking services, or automotive service on September 23, 2024 or thereafter; (C) Occupy a space that was vacant on September 23, 2024; or (D) Are located in new or remodeled ground floor area built on or after September 23, 2024 if the ground floor area devoted to housing, retail services, eating and drinking services, and personal services does not decrease. (E) Along El Camino Real, the office use has a consistent flow of in -person customers visiting the business, such as a dentist or medical office. (2) Size Restrictions on Office Uses in the NV District (A) Total floor area of permitted office uses on a lot shall not exceed 5,000 square feet. (b) Late Night Use and Activities Late Night Use and Activities requirements established in Section 18.42.040 shall apply to NV zoning districts. (c) Active Ground Floor Commercial Uses The NVCAP requires active ground floor uses along the El Camino Real corridor and encourages active ground floor uses on other designated streets. Active uses are activities and functions that promote social engagement, vitality, and interaction within a community. Refer to NVCAP, Section 2.3 for detailed requirements. (1) Active ground floor commercial uses generally include retail, personal services, neighborhood business service, and eating and drinking establishments. These may also include other active uses such as daycare, building lobbies, spaces accessory to residential uses such as fitness rooms, workspaces, leasing offices, bicycle facilities (Class I) with direct access to the sidewalk. Office uses may be included only to the extent they are permitted in ground floor regulations, are consistent with 18.29.080(a) and have a regular flow of in -person customers. (2) Ground floor commercial uses are required for properties with frontage along El Camino Real, as shown in the NVCAP Section 2.3 (Ground Floor Edges) (3) Ground floor commercial uses shall have a minimum floor to ceiling height of 14 feet. 8 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 9 Packet Pg. 306 of 377 *** NOT YET APPROVED *** Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters (4) Retail or retail -like at the ground floor is required at the intersections of El 18.14, 18.24, 18.70, and live Avenue, and El Camino Real and Portage Avenue. 16.65 (5) 100% affordable housing projects are exempt from providing ground floor commercial uses. 18.29.060 Development Standards (a) The following tables specify the development standards that shall apply to NV district properties. Where the last column on the following tables ("Subject to Regulations in") includes a section number, specific regulations in the referenced section also apply to the development standard; however, provisions in other sections may apply as well. TABLE 1: LOW DENSITY RESIDENTIAL DEVELOPMENT STANDARDS DEVELOPMENT STANDARD NV -R1 NV -R2 Subject to Regulations In: Minimum Setbacks Setback lines imposed by a special 18.10.050 setback map pursuant to Chapter 20.08 of this code may also apply Street yard (ft) Pepper Ave: Olive Ave: 18.29.020(b) 10' to create a 10' 12' effective sidewalk width (1) Olive Ave: 10' Height (ft) 35' 35' Parking Refer to 18.29.070 Other development standards See regulations See regulations in Chapter 18.12 in Chapter 18.10 Notes: (1) The effective sidewalk width includes the pedestrian clear zone and landscape/furniture zone as described in PAMC 18.24.020. TABLE 2: MULTI -FAMILY RESIDENTIAL & MUTLI-FAMILY RESIDENTIAL MIXED -USE DEVELOPMENT STANDARDS DEVELOPMENT STANDARD NV -R3 NV -R4 Subject to Regulations In: Minimum Site Specifications Site Area (ft2) 8,500 Site Width (ft) 70 Site Depth (ft) 100 Minimum Setbacks Street Yard (ft) Park Blvd.: 15' Park Blvd.: 15' 18.29.020(b) Ash St: 5' Olive Ave.: 20' Acacia Ave: 5' Ash St.: 5' Portage Ave: 5' 9 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 10 Packet Pg. 307 of 377 *** NOT YET APPROVED *** Item 12 Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters DEVELOPMENT STANDARD NV -R3 NV -R4 18.14, 18.24, 18.70, and 16.65 S In: Page Mill Rd: sufficient to create a 12' effective sidewalk width(2)(3) Interior Side Yards (ft) 5' 5' Interior Rear Yards (ft) 10' 10' Build -to -Lines 50% of frontage built to setback(') 33% of side street built to setback(') Maximum Height (ft) Standard 45' 65' 18.29.100 Daylight Plane, for side and rear lot 10' initial height lines for sites abutting any NV -R1 or 45 -degree daylight plane angle NV -R2 district or abutting a site containing a single-family or two- family residential use in a mixed -use district Daylight Plane, for side and rear lot Refer to 18.24.050(b)(1)(C) lines for sites abutting any NV -R3, NV -R4, Planned Community, or mixed -use district that does not contain a single-family or two-family residential use Maximum Lot Coverage (%) Base 60 80 Additional area permitted to be 5 5 covered by covered patios or overhangs otherwise in compliance with all applicable laws Floor Area Ratio (FAR) Maximum Residential FAR 1.5:1 3.0:1 Maximum Non-residential FAR 0.15:1 0.15:1 18.29.050(c) Total Mixed -Use FAR 1.5:1 3.0:1 Residential Density (net units per acre) Maximum units per acre None None Minimum units per acre 16 61 Minimum Landscape/Open Space 30 10 Coverage (%)(4) Minimum Usable Open Space (ft2 150 150 per unit) Minimum Common Open Space (ft2 75 75 per unit) Minimum Private Open Space (ft2 50 50 per unit) 10 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 11 Packet Pg. 308 of 377 DEVELOPMENT STANDARD *** NOT YET APPROVED *** NV -R3 Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters NV -R4 118.14, 18.24, 18.70, and l 16.65 In: Landscape Requirements 18.40.130 Parking Refer to 18.29.070 Notes: (1) 25 -foot driveway access permitted regardless of frontage. (2) No parking or loading space, whether required or optional, shall be located in the first 10 feet adjoining the street property line of any required yard. (3) Any minimum front, street side, or interior yard shall be planted and maintained as a landscaped screen excluding areas required for access to the site. A solid wall or fence between 5 and 8 feet in height shall be constructed along any common interior lot line. (4) Landscape coverage may be provided above the ground -floor. TABLE 3: MIXED -USE DEVELOPMENT STANDARDS DEVELOPMENT NV-MXL NV-MXM NV-MXH Subject to STANDARD Regulations In: Minimum Site None Required Specifications Site Area (ft2) Site Width (ft) Site Depth (ft) Minimum Setbacks Street Yard (ft) Ash St.: 5' El Camino Park Blvd: 15' 18.29.020(b) Olive Ave.: 10' Real: sufficient El Camino Real: Portage Ave: 0' to create a 12' sufficient to Pepper Ave: 10' effective create a 12' sidewalk effective width(1)(2) sidewalk El Camino width(1X2) Real: sufficient Oregon to create a 12' Expy/Page Mill effective Rd: sufficient to sidewalk create a 12' width('02) effective Pepper: 10' sidewalk(1)(2) Olive Ave 10' Lambert Ave: 5' Ash St: 5' Acacia Ave: 5' Park Blvd: 15' Portage Ave: 5' Lambert Ave: 5' Portage Ave: 5' Acacia Ave: 5' 11 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 12 Packet Pg. 309 of 377 *** NOT YET APPROVED *** Item 12 Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters DEVELOPMENT NV-MXL NV-MXM NV -M 18.14, 18.24, 18.70, and STANDARD 16.65 s In: Build -to -Lines None For properties abutting El Camino Real: 50% of frontage built to setback(') 33% of side street built to setback(') Rear Yard (ft) 10' 10' for 10' for residential residential portion/ none portion/ none for commercial for commercial portion portion Rear Yard abutting 10' 10' 10' residential zone district (ft) Interior Side Yard (ft) 10' 5' 5' Build -to -lines None Required Permitted Setback Refer to Section 18.40.070 Encroachments Maximum Setback (ft) Not applicable El Camino El Camino Real: Real: 10' 10' Maximum Lot Coverage 50 100 100 (%) Minimum 20 10 10 Landscape/Open Space Coverage (%) Usable Open Space 150 per unit 18.16.090 (Private and/or Common) (ft2) Maximum Height (ft) 18.29.100 Standard 35' 55' 65' Ground Floor Height Refer to Section 18.24.060(c)(5)(A) Daylight Plane for lot Daylight plane height and slope shall be identical to lines abutting one or those of the most restrictive residential zoning district more residential zoning abutting the lot line districts Residential Density (net units per acre) Maximum units per None Required acre Minimum units per 3 31 61 acre Floor Area Ratio (FAR) Maximum Residential 0.5:1 2.0:1 3.0:1 FAR Maximum Non- 0.25:1 0.25:1 0.25:1 18.29.050(c) residential FAR(4) 18.29.060(c) 12 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 13 Packet Pg. 310 of 377 *** NOT YET APPROVED *** Item 12 Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters DEVELOPMENT NV-MXL NV-MXM NV -M 18.14, 18.24, 18.70, and STANDARD 16.65 s In: Minimum Mixed -Use 0.15:1 0.15:1 0.15:1 18.29.050(c) Ground Floor Commercial FAR Total Mixed -Use FAR 0.5:1(4) 2.0:1 3.0:1 Parking Refer to 18.29.070 Notes: (1) No parking or loading space, whether required or optional, shall be located in the first 10 feet adjoining the street property line of any required yard. (2) Any minimum front, street side, or interior yard shall be planted and maintained as a landscaped screen excluding areas required for access to the site. A solid wall or fence between 5 and 8 feet in height shall be constructed along any common interior lot line. (3) The 150 -foot measurement may be reduced to 50 feet at minimum, subject to approval by the Planning Director, upon recommendation by the Architectural Review Board pursuant to criteria set forth in Chapter 18.76. (4) As provided in 18.29.060(c), maximum FAR for hotels shall be 2.0:1. Hotel projects in the NV-MXL zone may reach a Total Mixed -Use FAR of 2.0:1. (b) Storefront Guidelines Where active use and retail frontages are required or located within the NV district on the ground floor, the following design standards shall apply: (1) Exterior windows on the ground floor shall use transparent glazing to the extent feasible. Low -e glass or minimal tinting to achieve sun control is permitted, so long as the glazing appears transparent when viewed from the ground level. (2) Window coverings are not permitted on the ground floor during typical business hours. Where operations preclude transparency (e.g., theaters) or where privacy requires window coverings, sidewalk - facing frontage shall include items of visual interest including displays of merchandise or artwork; visual access shall be provided to a minimum depth of three (3) feet. (3) No more than 10% of the total street -facing building facade or a maximum of 25 feet in width, whichever is greater, shall be dedicated to mechanical equipment rooms, parking garage entrances, exit stairs, and other facilities necessary for building operation. (c) Hotel Regulations (1) The purpose of these regulations is to allow floor area for development of hotels more than floor area limitations for other commercial uses, to provide a visitor -serving use that results in an enhanced business climate, increased transient occupancy tax and sales tax revenue, and other community and economic benefits to the city. (2) Hotels, where they are a permitted use, may develop to a maximum FAR of 2.0:1, subject to the following limitations: 13 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 14 Packet Pg. 311 of 377 *** NOT YET APPROVED *** Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters (A) The hotel use must generate transient occupancy tax (TOT) as provide 18.14, 18.24, 18.70, and the Palo Alto Municipal Code; and 16.65 (B) No room stays more than thirty days are permitted, except where the city council approves longer stays through an enforceable agreement with the applicant to provide for compensating revenues. (3) Hotels may include residential condominium use, subject to: (A) No more than twenty-five percent (25%) of the floor area shall be devoted to condominium use; and (B) No more than twenty-five percent (25%) of the total number of lodging units shall be devoted to condominium use; and (C) A minimum FAR of 1.0 shall be provided for the hotel/condominium building(s); and (D) Where residential condominium use is proposed, room stays for other hotel rooms shall not exceed thirty (30) days. (4) Violation of this chapter is subject to enforcement action for stays more than thirty days not permitted under the provisions of this chapter, in which case each day of room stay more than thirty days shall constitute a separate violation and administrative penalties shall be assessed pursuant to Chapters 1.12 and 1.16. 18.29.070 Parking and Loading All projects shall comply with the parking and loading standards in PAMC Chapters 18.52 and 18.54, unless a parking reduction is permitted pursuant to state law. If a reduction in automobile parking is permitted under Government Code Section 65863.2, a project will be subject to the requirement to provide electric vehicle spaces and accessible parking spaces that would have otherwise applied to the development if Government Code Section 65863.2 did not apply. 18.29.080 Context -Based Design Criteria and Objective Design Standards In addition to the development standards prescribed in 18.29.050, all Housing Development Projects shall comply with the objective standards outlined in Chapter 18.24, as defined herein. All other developments, and Housing Development Projects that elect to deviate from one or more objective design standards in Chapter 18.24, shall meet the Context Based Design Criteria, as determined by the Director pursuant to the Architectural Review process. In the event of any conflict between the development standards established in this Chapter and those established in Chapter 18.24, the NVCAP standards shall prevail. (a) Multiple Family Context -Based Design Criteria Refer to Section 18.13.060 for the Context Based Design Criteria. (b) Mixed -Use and Commercial Context -Based Design Criteria Refer to Section 18.16.090 for the Context Based Design Criteria. 18.29.090 Housing Incentive Programs for NV District 14 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 15 Packet Pg. 312 of 377 Item 12 *** NOT YET APPROVED *** AttachmentA- Ordinance Adding Chapter 18.29 and Amending Chapters (a) Housing development projects in the NV Districts may utilize any Housin 18.14, 18.24, 18.70, and or Affordable Housing Incentive Program set forth in Sections 18.14.030 and 18.14.0 16.65 18.29.100 Non -conforming Uses and Non -Complying Facilities (a) Office Use. (1) Any office use that is the most recently operating use and any office facility established prior to the effective date of this ordinance may remain as legal and non -conforming use and/or non -complying facility. (2) The legal and non -conforming office use described in subdivision (a)(1) shall be considered abandoned and may be replaced only by a conforming use if it ceases and thereafter remains discontinued for up to 24 consecutive months after the effective date of this ordinance. (3) A non -conforming office use which is changed to or replaced by a conforming use shall not be reestablished, and any portion of a site or any portion of a building, the use of which changes from a legal non -conforming use to a conforming use, shall not thereafter be used except to accommodate a conforming use. (4) The legal and non -conforming office use and/or non -complying office facilities shall be permitted to remodel, improve, or replace site improvements on the same site, for continual use and occupancy by the same use, provided such remodeling, improvement, or replacement complies with all of the following: (A) Shall not result in increased floor area. (B) Shall not relocate below grade floor area to above grade portions of the building. (C) Shall not result in an increase of the height, length, building envelope, building footprint or any other increase in the size of the improvement. For purposes of this section, "building envelope" shall mean the three-dimensional shape and size occupied by an existing building. It is not the maximum, buildable potential of the site. (D) Shall not increase the degree of noncompliance. (E) The Director may approve minor changes to the building's footprint, height, length, and the building envelope through Architectural Review of minor aesthetic architectural improvements and to improve pedestrian -orientation provided there is no increase to the degree of any non -complying feature. (b) Any other uses or facilities rendered non -conforming or non -complying by this Chapter shall be subject to Chapter 18.70, including the schedules for required termination of non -conforming uses under Section 18.70.070. 18.29.110 Transportation Demand Management Plan A transportation demand management plan shall be required for all new development projects or any projects that meet the conditions listed in PAMC Section 18.52.030(i). 15 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 16 Packet Pg. 313 of 377 *** NOT YET APPROVED *** SECTION 3. Table 1 of Section 18.14.020 (Housing Element Opportur 18.14 (Housing Incentives) of Title 18 (Zoning) of the Palo Alto Municipal Code is follows (additions underlined): Table 1 Housing Element Opportunity Site Development Standards (Residential and Commercial Mixed Use Districts) Item 12 achment A - Ordinance ding Chapter 18.29 and Amending Chapters 16.65 Base Zoning Maximum Far(') Minimum Residential Density Other District Landscape (du/ac)14) Development Coverage Standards Residential Total Minimum Maximum CC(2) 1.5 2.0 (3) 20 See base district See base district regulations: CC 1.25 1.25 (3) 20 regulation s: 18.16.0 60 18.16.060 CS (El Camino Real) 1.25 1.25 (3) 20 CS (Other) 1.25 1.25 (3) 20 See HE Appendix D CN (El Camino 1.25 1.25 30%(3) 20 See base Real) district regulation s: 18.16.0 60 CN (Other) 1.25 1.25 30%(3) 20 See HE Appendix D CD -C 2.0 2.0 (2) (3) 20 See base See base district district regulations: regulation 18.18.060 s: 18.18.0 60 CD -N 1.5 1.5 (3) 20 See HE Appendix D RP 1.25 1.25 (3) 25 None; 40 See base district du/ac regulations: anticipate 18.20.040 d RM-40 1.5 1.5 (3) 31 See base district regulations: RM-30 1.25 1.25 (3) 20 16 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 17 Packet Pg. 314 of 377 Item 12 'K''AttachmentA-Ordinance ' " NOT YET APPROVED Adding Chapter 18.29 and Amending Chapters RM-20 1.25 1.25 See 18.13.0 20 See 18.14, 18.24, 18.70, and 40 AppAppei 16.65 D NV -R3 See base district regulations: 18.29.060, except that maximum height shall be 50', maximum lot coverage shall be 70%, and minimum density shall be 25 du/ac. Notes: (1) Nothing in this table increases the non-residential floor area permitted in any district. (2) FAR may be increased with transfer of development rights; see Chapter 18.18 for details. (3) Landscape coverage may be provided above the ground -floor. If standard is not specified, refer to base district regulations. (4) Where no maximum density is provided in terms of du/ac, maximum density shall be determined by estimating the realistic development capacity of the site based on the objective development standards applicable to the project. Where noted, refer to Housing Element Appendix D: Sites Inventory for specified densities. SECTION 4. Section 18.24.010 (Purpose and Applicability) of Chapter 18.24 (Contextual Design Criteria and Objective Design Standards) of Title 18 (Zoning) of the Palo Alto Municipal Code is amended to read as follows (additions underlined, and unchanged text omitted by bracketed ellipses): 18.24.010 Purpose and Applicability (a) Purpose [...] (b) Applicability of Regulations These regulations apply to Housing Development Projects (as defined in Gov. Code 65589.5), both new construction and renovations, within the following zones and combining districts: (1) Chapter 18.12: R-1, for multiple -family uses only (2) Chapter 18.13: RM-20, RM-30, RM-40 (23) Chapter 18.16: CN, CC, CC(2), CS (.4) Chapter 18.18: CD -C, CD -S, CD -N (45) Chapter 18.20: MOR, ROLM, ROLM(E), RP, RP(5), GM (§6) Chapter 18.28: PF (7) Chapter 18.29: NV -N3, NV -R4, NV-MXM, NV-MXH (68) Chapter 18.34: PTOD combining district Housing Dcvcl„pmcnt Prof, cts include ..-.Multifamily housing with three or more units ("multiple -family use" as defined in Section 18.04.030), supportive and transitional housing, and residential mixed -use projects with at least two-thirds residential square footage shall meet the objective design standards. (c) Process and Alternative Compliance 17 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 18 Packet Pg. 315 of 377 *** NOT YET APPROVED *** Item 12 Attachment A - Ordinance Adding Chapter 18.29 and Amending Chapters 18.14, 18.24, 18.70, and 16.65 SECTION 5. Section 18.70.040 (Nonconforming use — Discontinuance) of Chapter 18.70 (Nonconforming Uses and Noncomplying Facilities) of Title 18 (Zoning) is amended to read as follows (additions underlined): 18.70.040 Nonconforming use - Discontinuance. (a) On any site having facilities thereon valued at less than one thousand dollars, any nonconforming use, other than a residential use, which is discontinued or abandoned or otherwise ceases operation and use of the site for a period of six months or longer shall not be resumed, reestablished, or continued, and all subsequent use of such site and facilities thereon shall conform to this title. (b) On any site not subject to subsection (a), a nonconforming use of facilities designed and constructed for nonresidential purposes which is discontinued or abandoned or otherwise ceases operation and use of the site for a period of one year or more shall not be resumed, and all subsequent use of such site and facilities thereon shall conform to this title. Notwithstanding the foregoing, a nonconforming use within the North Ventura Coordinated Area Plan boundaries may be reestablished unless the use is discontinued or abandoned or otherwise ceases operation and use of the site for a period of two years or more. (c) Notwithstanding the provisions of Section 18.70.030, or the provisions of subsections (a) and (b) of this section, in any residential district, a nonresidential, nonconforming use occupying facilities originally designed and constructed for residential use which is discontinued or abandoned or otherwise ceases operation and use of the site for a period of ninety days or greater shall not be continued or recommenced, and any subsequent use of the site and facilities shall conform to this title. This provision shall not be construed to prevent a change of ownership or management of such nonconforming use; provided, that any cessation of operation of the use is solely in connection with the transfer of ownership or management to a specifically designated person or entity and is solely for the purpose of accomplishing any transfer of title, equipment, operational control, or similar purpose. (d) The timeframes provided in this Section apply only when a use is both nonconforming and discontinued or abandoned or otherwise cease operation and use of the site. Only the most recently operating nonconforming use may be reestablished within the timeframes provided in thic c rtinn SECTION 6. Section 16.65.030 (Basic affordable housing requirement - residential ownership projects) of Chapter 16.65 (Citywide Affordable Housing Requirements) of Title 16 (Building Regulations) is amended to read as follows (additions underlined, and unchanged text omitted by bracketed ellipses): 16.65.030 Basic affordable housing requirement - residential ownership projects. The provisions of this section shall apply to all residential ownership projects, including the residential ownership portion of any mixed use project containing three or more units, except for any residential ownership project exempt under Section 16.65.025. (a) Unless an alternative is approved as described in Section 16.65.080, residential ownership projects shall provide the following: 18 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 19 Packet Pg. 316 of 377 Item 12 *** NOT YET APPROVED *** AttachmentA- Ordinance Adding Chapter 18.29 and Amending Chapters (1) For projects on sites of less than five acres, fifteen percent of the dwelling 4 18.14, 18.24, 18.70, and hall be made available at affordable sales price to very low, low, and moderate incom 16.65 (2) For projects on sites of five acres or more and all townhome projects in the NV districts, twenty percent of the dwelling units in the project shall be made available at affordable sales price to very low, low, and moderate income households; and (3) For projects that convert existing rental housing to condominiums, other residential ownership or nonresidential space or that remove existing rental housing, twenty-five percent of the dwelling units in the project shall be made available at affordable sales price to very low, low, and moderate income households. (4) Calculations of the number of affordable units required by this section shall be based on the number of dwelling units in the residential project, excluding any density bonus units. Projects shall not receive a credit for any existing dwelling units demolished as part of the project. (b) The affordable units shall be made available at the following affordable sales prices: [...j SECTION 7. Section 16.65.040 (Basic requirement - mixed use, nonresidential and residential rental projects) of Chapter 16.65 (Citywide Affordable Housing Requirements) of Title 16 (Building Regulations) is amended to read as follows (additions underlined; deletions struck through): 16.65.040 Basic requirement - mixed use, nonresidential and residential rental projects. Unless the mixed use, nonresidential or residential rental project is exempt under Section 16.65.025 or an alternative is approved as described in Section 16.65.080, all mixed use, nonresidential and residential rental projects shall pay housing impact fees as specified in Section 16.65.060 to mitigate the projects' impacts on the need for affordable housing; except: fQ that thcThe residential ownership portion of a mixed use project containing three or more units shall comply with Section 16.65.030. (2) In the NV districts, residential rental projects, including mixed use projects containing residential rental units, shall provide fifteen percent of the dwelling units in the project at rates affordable to lower income households. 19 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 20 Packet Pg. 317 of 377 Item 12 * NOT YET APPROVED 'K''AttachmentA-Ordinance Adding Chapter 18.29 and Amending Chapters SECTION 8. Pipeline Projects. This Ordinance and the NVCAP shall n 18.14, 18.24, 18.70, and ject application deemed complete prior to the effective date of this Ordinance..16.6s ted pursuant to such application shall be deemed a legal non -conforming structure and/or use, subject to the provisions of Palo Alto Municipal Code Chapter 18.70. INTRODUCED: PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney Mayor APPROVED AS TO CONTENT: City Manager Director of Planning and Development Services 20 0160143_kb2 20240826_ay16 Item 12: Staff Report Pg. 21 Packet Pg. 318 of 377 Item 13 Item 13 Staff Report City Council Staff Report Report Type: ACTION ITEMS CITY O F Lead Department: City Clerk PALO ALTO Meeting Date: October 21, 2024 Report #:2410-3555 TITLE Approval of FY 2025 Architectural Review Board, Historic Resources Board, Human Relations Commission, and Planning and Transportation Commission Workplans; CEQA status — not a project RECOMMENDATION The Architectural Review Board, Historic Resources Board, Human Relations Commission, and Planning and Transportation Commission recommend approval of each Commission's respective Fiscal Year 2025 Workplan. BACKGROUND Approval of the FY 2025 Architectural Review Board, Historic Resources Board, and Planning and Transportation Commission Workplans was agendized for the August 12, 2024 City Council meeting agenda. The item was removed off the agenda and has been rescheduled to October 21, 2024. On November 30, 2020, the City Council adopted the Boards, Commissions and Committees (BCC) Handbook', which implemented an annual review and approval of BCC workplans. Each BCC is required to prepare an annual workplan for Council's review and approval. The annual report should include the results of the prior year's workplan and should consist of up to three priorities. When applicable, the City Council would like to see metrics of community involvement and participation in meetings and activities included in the workplan. Council may refer additional items to the BCC in response to new developments. If the BCC would like to add an issue for review after an annual workplan has been approved the City Council, a prompt request by the BCC Chair to the City Council is required and the item will then be addressed by the City Council as a whole. 1 City Boards, Commissions, and Committees Handbook: https://www.cityofpa Ioa Ito.org/fi Ies/assets/pu bI is/v/2/city-clerk/pa Io-a Ito -boards -commissions -and -committees - handbook final 2022.pdf Item 13: Staff Report Pg. 1 Packet Pg. 319 of 377 Item 13 Item 13 Staff Report Each BCC will give a brief presentation summarizing its prior year accomplishments and FY 2025 workplan highlights. At this meeting, Council will review workplans for the Planning and Development -related BCCs: Architectural Review Board, Historic Resources Board, Planning and Transportation Commission, as well as the Human Relations Commission. Council reviewed Community Services- related BCCs (Parks and Recreation Commission, and Public Art Commission) at the October 7, 2024 meeting and infrastructure -related BCCs (Stormwater Management Oversight Committee and Utilities Advisory Commission) at the August 19, 2024 meeting. FISCAL/RESOURCE IMPACT Projects included in commission workplans ultimately require staff time and other City resources to complete. When possible, staff provide input to the commissions during workplan development to ensure the impact on staff time and resources is reasonable given staff workload and other competing priorities. STAKEHOLDER ENGAGEMENT Commission workplans are discussed publicly either in regular commission meetings or commission retreats. ENVIRONMENTAL REVIEW Council action on this item is not a project as defined by CEQA because this is a continuing administrative activity that will not result in direct or indirect physical changes in the environment. CEQA Guidelines section 15378(b)(5). ATTACHMENTS Attachment A: FY 2025 Architectural Review Board Workplan Attachment B: FY 2025 Historic Resources Board Workplan Attachment C: FY 2025 Human Relations Commission Workplan Attachment D: FY 2025 Planning and Transportation Commission Workplan APPROVED BY: Mahealani Ah Yun Item 13: Staff Report Pg. 2 Packet Pg. 320 of 377 ( ) CITY OF PALO ALTO Architectural Review Board 2024-2025 Workplan Staff Liaison: Claire Raybould, AICP, Principal Planner Lead Department: Current Planning, Planning and Development Services Division Item 13 attachment A - FY 2025 Architecture Review Board Workplan The Architectural Review Board is composed of five members, at least three of whom are architects, landscape architects, About the Board building designers or other design professionals. Terms are for three years. See Palo Alto Municipal Code (PAMC) Chapter 2.21. Residency is not required. For the ARB webpage go to bit.ly/paloaltoARB. • Peter Baltay (Chair) • Kendra Rosenberg (Vice Chair) • Mousam Adcock Boardmembers • Yingxi Chen • David Hirsch The Architectural Review Board reviews and makes recommendations to the Planning Director on the building design, site planning, landscape planning, massing and facades, material selection, lighting, signage and other related issues for most major Mission Statement new construction including additions and renovations that alter the exterior building face. The type of buildings reviewed include commercial, industrial, and multiple -family residential. In addition, the ARB is a resource as knowledgeable observers of many varied urban environments, to assist Palo Alto as it develops area plans to accommodate additional housing. Prior Year Accomplishments The ARB Scope of Review is fully noted in Title 18 of the Municipal Code, Chapter 18.76 under Section 18.76.020 as well as in Chapter 18.77 under Section 18.77.073. • See attached Summary Item 13: Staff Report Pg. 3 Packet Pg. 321 of 377 Item 13 Attachment A - FY 2025 Architectural Review Board Workplan PROJECT/GOAL 1: Review Planning applications for conformance with ARB Findings and Objective Standards BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED I LOCAL LAW / COUNCIL -APPROVED This is the Board's main mission and serves On -Going Planning staff prepare staff reports, Issuance of recommendations on Yes to ensure the City develops high quality packets and presentations. They ensure projects and high -quality architecture projects paper plan sets and material boards are throughout the City. ready for ARB review. Other departments, such as, City Attorney, Urban Forestry, Transportation, etc., may be required from time to time. Consultants, including CEQA consultants, may also be required. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE • Projects that include new housing units that will help with City reach its N/A regional housing needs allocation (RHNA) PROJECT/GOAL 2:Assist the City as it considers modifications to Objective Standards; Provide feedback based on research from projects as they go through the objective standards ministerial processes. Suggest ways to better address different housing typology. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW/ COUNCIL -APPROVED Streamline the objective standard review Provide high level modifications toAdditional staff at Planning so that the Council Approval No process and ensure that projects using objective standards to Council by quality and completeness of the work is he streamlined review process/objective he end of 2024; If directed by maintained. standards conform to the City's Council, work with staff to propose Comprehensive Plan, Goals and Policies, specific code language for Council including its high -quality design standards adopted by the end of FY 2025 HIGH LOWER PRIORITY COUNCIL -DIRECTED PRIORITY POLICY UPDATE In order of priority: No • Modifications to address objective standards (18.24) based on review of • Modifications to SB 9 objective standards several projects using the standards • Modifications to address townhome projects based on the feedback from the ARB Ad Hoc Committee on townhomes Item 13: Staff Report Pg. 4 Packet Pg. 322 of 377 Item 13 ,ttachment A - FY 2025 Architecture Review Board Workplan PROJECT/GOAL 3: Discuss specific Coordinated Area Plans that the ARB would recommend exploring/implement; If the City Council directs the preparation of those plans to staff, provide comments on those Coordinated Area Plans BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED I LOCAL LAW I COUNCIL -APPROVED his project would enhance implementation On -going Planning staff to help research policies and Increased adherence to Yes of the City's Comprehensive Plan programs; coordination with long range Comprehensive Plan policies planning section staff. HIGH LOWER PRIORITY COUNCIL -DIRECTED PRIORITY POLICY UPDATE • Coordinated Area Plan for San Antonio area • Encina Avenue No • Downtown Housing Plan • California Avenue PROJECT/GOAL 4: Provide feedback to staff and Council on the creation of new guidelines, ordinances, and/or streetscape, including but not limited to upcoming roof erraces, bird safe glazing and dark sky lighting regulations, parklets design, and streetscape designs. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW / COUNCIL -APPROVED he ARB has unique feedback to provideAnticipated to return to the Board in Staff time Council Approval Yes as a stakeholder as they have interest in spring/summer 2024 approving the aesthetic environment of he City while also understanding constraints that architects/developers may come across when implementing standards being considered HIGH LOWER PRIORITY COUNCIL -DIRECTED PRIORITY POLICY UPDATE • Roof Terraces • Monitor parklet and streetscape design No • Bird safe glazing / dark skys • Riparian setbacks PROJECT/GOAL 5: Improve Coordination between the Architectural Review Board and other boards, commissions and Council. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW / COUNCIL -APPROVED Item 13: Staff Report Pg. 5 Packet Pg. 323 of 377 • Improved coordination between boards/commissions and council to get feedback from colleagues on other board • More coordinated feedback from the City for developers Item 13 Attachment A - FY 2025 Archit( time • Staff provide su Review Board Workplan from PTC, ARB, meetings promptly following each meeting • Take direct feedback from the ARB on reviewed projects up for Council approval. The ARB can appoint a member to represent the board directly to the Council HIGH LOWER PRIORITY COUNCIL -DIRECTED PRIORITY POLICY UPDATE • Create liaisons between boards/commissions No Architectural Review Board of the City of Palo Alto Annual Report of Prior Year Accomplishments and ARB Recommendations for Fiscal Year 2025 Following is a review of the ARB's accomplishments over the past year and the Board's recommendations to Council regarding areas of work that should be prioritized in next fiscal year and opportunities for better coordination. Application Review. The ARB takes prides in its collaborative process of review, where members meld their individual opinions and experience into one democratic summary that improves proposed projects and therefore the quality of the Palo Alto built environment. This past year, the ARB reviewed approximately 20 projects including two major public projects, multi -family housing projects with inclusionary below market rate units, and commercial projects as well as larger retail modifications in Stanford Shopping Center, meeting Goal 1 of the 2024 annual work plan. Our review and oversight of the following projects has made a real and significant difference. Below are renderings of some of these projects showing the initial proposal and final design. Address/aroiect 3001 El Camino Real 3200 Park Boulevard 420 Acacia Ave 739 Sutter Avenue 3600 Middlefield Road 180 El Camino Real 180 El Camino Real 180 El Camino Real 123 Sherman Avenue 2501 Embarcadero 800 San Antonio Road SB 9 Objective Standards Review Building type Affordable Housing Development Agreement Housing (with inclusionary units) Housing (with inclusionary units) Fire Station Arhaus Facade Sushi Roku Facade Restoration Hardware Facade Office Advanced Water Purification System Mixed Use (Office and retail with inclusionary units) Ordinance/Plan Item 13: Staff Report Pg. 6 Packet Pg. 324 of 377 Item 13 Attachment A - FY 2025 Architectural In addition, a number of projects came in as a preliminary review to obtain early feedback from the ARB. The ARB's ed Review Board Workplan and boardmember feedback prior to formal application will help to incorporate key programming modifications and design changes in the early stage of development, helping to streamline the formal application. These included 640 Waverley Street, 616 Ramona Street, 1066 East Meadow Drive, and 70 Encina Avenue. The ARB provided valuable feedback to assist Council with respect to updating SB 9 standards. They also provided a comprehensive review and made recommendations on updates to the objective standards to better address townhome style designs. This work was consistent with Goal 2 of the fiscal year 2024 work plan. • The ARB provided valuable feedback to assist Council with respect to Preapproved Parklets Design. Although not explicitly identified in the work plan, this work was consistent with Goal 2 of the fiscal year 2024 work plan. • The ARB provided valuable feedback to assist Council with respect to the Dark Skies and Bird Safe Glazing Ordinance as well as the North Ventura Coordinated Area Plan consistent with Goal 3 of the fiscal year 2024 work plan. Additional work on this effort is expected in the next few months to further assist with these efforts prior to a final Council decision. Recommendations PAMC Section 2.21.030 directs the Architectural Review Board to report annually our "concerns.., with respect to the city's plans, policies, ordinances and procedures as these affect the projects which the board reviews." Our reviews are site specific — we look at individual development proposals, not broad policies. At the same time, we are directed to look at each project in both its physical and regulatory context — how it will enhance its neighborhood (or not) and how it will implement the City's polices, from the Comprehensive Plan to the various design guidelines the City uses. Because we look at many projects each year, and because many board members have years of experience in Palo Alto, patterns emerge and specific areas of concern have been identified. Our comments this year are centered around the increasing importance of housing projects to the city. 2. Objective Design Standard Refinements. In our continuing response to recently enacted state legislation, Palo Alto previously adopted objective design review standards for housing projects, effectively eliminating architectural review on residential and mixed -use projects where objective standards can be met in order to streamline review of those applications. Several residential projects over the past year were townhouse type developments (3200 Park Boulevard, 739 Sutter Avenue, 420 Acacia). In our review, it was noted that some of the current standards focused more on larger multi -family buildings. Therefore, some aspects of townhouse style design were not fully addressed/accommodated for in the standards. Through an Ad Hoc committee we studied many local townhouse developments and have provided the planning department with recommendations to modify the Objective Design Standards to address townhome designs as well as larger multi -family designs. The ARB recommends that refinements be made to the objective standards based on implementation of the standards for a series of projects as well as with the recommendations from the ARB regarding modifications for townhome designs. 3. Coordinated Area Plans to encourage housing development and better planning • San Antonio Avenue area. The San Antonio Avenue area is experiencing increasing residential development but our zoning regulations for the area are outdated and focused on commercial development, resulting in applicant uncertainty and long entitlement processes. The existing one-story light industrial and commercial buildings will be substantially replaced in the coming decade. A coordinated area plan will allow us to consider larger issues such as Item 13: Staff Report Pg. 7 Packet Pg. 325 of 377 Item 13 Attachment A - FY 2025 Architectural transportation, neighborhood parks, city services, pedestrian/bicycle pathways, and integration with nearby deve Review Board Workplan as this area transforms. • Downtown. To increase housing, the downtown area needs revised standards to accommodate redevelopment of parking lots as to encourage housing additions while maintaining the vibrancy of the downtown area and its pedestrian friendly streetscape. • California Avenue area. With State requirements as outlined in AB 2097 and Builder's Remedy, the California Avenue area will experience more development then in the past. This area should have a coordinated area plan to better scope future development. • Encina Avenue area. The Encina Avenue area, between El Camino and the railroad is an excellent location for higher density housing. However, the adjacent Town and County shopping center, a low lying and historically significant facility, must be protected. Parking considerations are also paramount in this area. A coordinated area plan offers an efficient path towards increased density while protecting a much loved shopping area. 4. Bird safe glazing and dark sky regulations. The ARB should provide feedback to the planning staff, PTC and Council regarding upcoming bird safe glazing and dark sky lighting regulations. The ARB has observed an increased use of roof terraces to meet open space requirements in multi -family projects. These roof terraces can be limited by height requirements and privacy concerns. 5. City Council/Planning Commission communication. The Architecture Review Board has very little formal interaction with the City Council, the Planning Commission and the Historic Resources Board. Board members are forced to act on individual initiative to gain input from council members and other commissioners. Joint meetings with full boards are rarely productive; yet uncoordinated serial meetings leave commissioners unaware of feedback from colleagues on other boards. Applicants often feel that they are 'running a gauntlet' of approvals rather than facing a coordinated review. • Request staff to provide summary reports from PTC, ARB and HRB meetings promptly following each meeting. • Take direct feedback from the ARB on reviewed projects up for council approval where Council approval is required. The ARB can appoint a member to represent the board directly to the council. • Request staff to schedule joint preliminary discussions between the ARB, PTC and HRB chairs/vice-chairs on projects of common interest. These 'preliminary meetings' would not be to review specifics of a project; rather they would serve to coordinate the review process between boards and planning staff. • Appoint HRB, PTC and Council liaisons to the ARB to facilitate open communication between boards and commissions and city council. ARB liaisons will provide a clear channel for passing information between reviewing bodies, enabling all board and commission and council members, as well as the general public, direct access to relevant information on a project -by -project basis. Below are Renderings of approved projects from Initial proposal to Final Design from the list of reviewed projects. A summary of key modifications that were made to the design based on ARB feedback is also included: Item 13: Staff Report Pg. 8 Packet Pg. 326 of 377 739 Sutter Avenue - Initial Proposal 739 Sutter - Final Design Item 13 Attachment A - FY 2025 Architectural Review Board Workplan Private outdoor balconies for residents were increased to two levels on Sutter side but removed the roof deck Balconies facing single family residences were improved to maintain privacy for single family residences Massing around building corners were greatly improved 3001 Camino Real - Initial Proposal 3001 El Camino Real - Final Design Improved the central building circulation to make the site more useable and to facilitate the applicant's building code compliance. Recommended modification to the El Camino Real facade articulation to create greater visibility onto the street from the El Camino Real facing uses. Recommended design modifications that allowed for more visibility into the community room from Acacia to provide a more pedestrian -friendly facade along that street frontage. Item 13: Staff Report Pg. 9 Packet Pg. 327 of 377 123 Sherman Avenue - Initial Proposal 123 Sherman Avenue - Final Design Item 13 Attachment A - FY 2025 Architectural Review Board Workplan -The ARB focused on improving the entrance to and design of the first -floor commercial space at the corner to ensure the viability of a future tenant and to create interest at the corner -A focus on the detail and use of the full height decorative panels on portions of the perimeter of the upper floor office levels. -Increased vegetation planting -Revisions to the plans to ensure privacy of nearby residential uses and reduce light intrusion from this building into their units. 3200 Park Boulevard- Initial Proposal 3200 Park Boulevard - Final Design -Increased the widths of the pedestrian paseos to increase usability and reduce privacy impacts both through building setbacks and landscaping -recommended modifications to design, materials and color to increase the variability across different buildings, provide variation in height across the longer facades, and to provide interest on the end units -Simplified the forms along the southern facade of the cannery building, reducing design changes that detracted from the historic character of the building, particularly with respect to the windows below the monitor roof -Refined the color variations for the parking garage to help further break down the scale of the garage and brought down the height of the garage to reduce impacts on neighboring single-family residents and maintain the stepped height of the cannery, which relates back to its historic use with loading docks at the rear of the building Item 13: Staff Report Pg. 10 Packet Pg. 328 of 377 180 El Camino Arhaus- Initial Proposal 180 El Camino Real Arhaus - Final Design Item 13 Attachment A - FY 2025 Architectural Review Board Workplan -The initial design was well received; however, the applicant returned later to propose modifications based on tenant preferences. The ARB's initial recommendations, which were also incorporated into the final design, included minor revisions to the materials, to emphasize the entrance design, and to request additional details regarding the bicycle parking as it relates to this site and the overall facility 180 El Camino Restoration Hardware- Initial Proposal 180 El Camino Real Restoration Hardware- Final Design -Although the initial design was generally well received as a clean, light design, the ARB recommended minor modifications to make the white less glaring and more toned down. In particular, the ARB requested that metal accents to be a deeper hue to create more interest, depth, and warmth, recommended keeping green walls that were planned to be removed, and provided input to refine small details such as the lighting Item 13: Staff Report Pg. 11 Packet Pg. 329 of 377 180 El Camino Sushi Roku- Initial Proposal 180 El Camino Real Sushi Roku - Final Design Item 13 Attachment A - FY 2025 Architectural Review Board Workplan -Sushi Roku came to the ARB with a comprehensive design, steeped in the culture and rich in texture. The ARB had some questions regarding maintenance and detailing of exterior materials, but generally approved the design as proposed Q Q Q 800 San Antonio Road- Initial Proposal 800 San Antonio Road - Final Design - Building above grades were redesigned to avoid encroaching into setbacks - Main entrance volume expressed appropriately on the street with material and form - Improved trash pick-up logistics - Improved courtyard function and circulation - Improved internal circulation with widening hallways at back elevator - Provided planting soil depth above top of basement for ground floor softscape at base of building - (second ad hoc committee meeting pending) Item 13: Staff Report Pg. 12 Packet Pg. 330 of 377 2501 Embarcadero Road- Initial Proposal 2501 Embarcadero Road - Final Design - Colors muted to align with Baylands guidelines - Light pollution shielded from all sides using perforated metal below the roof - Color temperature of the lighting lowered, while maintaining high light levels for worker safety - Section of chain -link fence removed and replaced with board formed concrete to screen tank better from the street 420 Acacia Avenue- Initial Proposal 420 Acacia Avenue- Final Design - Overall, the project was well received as proposed. The ARB recommended minor improvements to provide better pedestrian circulation, clarify details of the rooftop open space, and ensure privacy between those spaces as well as for adjacent uses. Refined the details of how the private street relates to the neighboring parking facility. Item 13: Staff Report Pg. 13 Packet Pg. 331 of 377 Item 13 Attachment B - FY 2025 Historic Resources Board Workplan CITY OF } PALO ALTO Historic Resources Board 2024-2025 Workplan Overview Date approved by HRB 4/11/2024 (Amended 8/8/2024) Staff Liaison: Steven Switzer, Historic Preservation Planner Lead Department: Planning and Development Services The HRB is now five members, effective July 4, 2024. Four candidates are set for August 2024 interviews, for two positions. The City is a Certified Local Government (CLG) responsible for historic preservation - to identify, evaluate, register, and preserve historic properties within its jurisdictions and promote the integration of local preservation interests and concerns into local planning and decision -making processes. Staff prepares an annual About the Commission report of the activities of the Certified Local Government each spring for the prior year and submits these to the State Office of Historic Preservation. This HRB Work Plan covers July 2024 - July 2025. HRB member terms are for 3 years and are staggered per PAMC Section 2.27.020. For more information please visit https://www.cityofpaloalto.org/City-Hall/Boards-Commissions/Historic-Resources-Board. The Department webpages are a wealth of information, go to: https://www.cityofpaloalto.org/Departments/Planning-Development-Services/Historic-Preservation Alisa Eagleston-Cieslewicz (chair), Samantha Rohman (vice chair), Christian Pease, and Caroline Willis, Margaret Wimmer or Mike Makinen (until Current Commissioners two successors are appointed) Per Palo Alto Municipal Code Chapter 2.27 Historic Resources Board, Section 2.27.040 Duties, HRB purview is: (a) Render advice and guidance to a property owner upon the owner's application for alteration of any historic single-family or duplex building in the downtown area and any such building designated as significant elsewhere in the city Mission Statement (b) Inform the ARB of the historical and/or architectural significance of historic commercial and multiple -family structures in the downtown area and any such buildings designated as significant elsewhere in the City that are under review by the ARB. Submit recommendations to the ARB regarding proposed exterior alterations of such historic structures (c) Recommend to the Council the designation of additional buildings and districts as historic. Research available information and add historical information to the inventory sheets of historic structures/sites. This inventory is maintained in the department of planning and development services. (d) Perform such other functions as may be delegated from time to time to the HRB by the City Council. During the work plan period the HRB held 14 public meetings, met the objectives in the 'ongoing' goals 1 and 2 of the plan, completed goal 3 of the plan (providing recommendations on nominations of properties previously found eligible for the National and State historic registers to the City's local Prior Year Accomplishments historic inventory, unless property owners submitted objections to listing; known as the 2023 Historic Reconnaissance Survey), and many objectives set forth in goal 4 of the plan. The staff continued to implement policy L7.2 as an ongoing activity, and conducted three evening community meetings over the plan's term, to further encourage community participation. Item 13 Attachment B - FY 2025 Historic Resources Board Workplan CITY OF .. PALO ALTO Historic Resources Board 2024-2025 Workplan Staff Liaison: Steven Switzer, Historical Preservation Planner Lead Department: Planning and Development Services The Board/Commission's goals and purposes (purview) are set in Palo Alto Municipal Code Chapter 2.27 Historic Resources Board, Section 2.27.040 Duties. These duties include reviewing alterations to historic resources and providing recommendations on nominations to the local historic resources PURPOSE STATEMENT: inventory. The City's historic program includes the implementation of Comprehensive Plan policies on an ongoing basis including Policy L7.2 (preparation of historic evaluations to determine eligibility for the California Register of Historical Resources and associated tracking), Policy L7.1.1 (recommend eligible resources to the local inventory), and Policy L7.1.2: Reassess Historic Preservation Ordinance. Limited modification to PAMC 16.49, historic preservation, providing clarifications regarding the HRB's role. The HRB could discuss language PROJECT/GOAL 1: providing clarifications of its role with respect to three potential topics: (a) the nomination process, (b) the effect of HRB recommendations regarding exterior modifications to residential historic resources, and (c) category changes (upgrades, downgrades, removals) BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW / COUNCIL -APPROVED City Council direction and accommodation Council may provide in the PDS department workplan would be Well -written ordinance language that direction to modify The benefits are providing clarification of the Subject to Council direction, to begin in the needed. HRB subcommittee and staff of assists the public's understanding and PAMC 16.49; CLG HRB's role for the public second quarter planning and city attorney departments to calms the fears of property owners cities maintain historic prepare draft amendments for Council about governmental overreach preservation review and adoption ordinances. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Council may provide Lower priority: Goal item (c) - listed historic resources placed on the City's direction to modify Priority is high to enable greater understanding of the HRB's role and address property inventory in the late 1970s and 1980s have not been reviewed to determine whether PAMC 16.49; CLG owners' concerns with respect to Goal items (a) and (b) any modifications reduce critical aspects of integrity and drop or lower the properties' cities maintain historic local historic resource category. preservation ordinances Item 13 Attachment B - FY 2025 Historic Education and Creating New User -Friendly Resources/Communication Regarding Historic Preservation Resources Board Workplan preservation, including use of the existing zoning code incentives and State historic building code (b) improve upon communication types to provide the community accessible information, including the use of videos (linked to the City's and State's webpages) to help property owners understand the local PROJECT/GOAL 2: and State preservation incentives and codes, (c) continue to provide updates to the historic review process bulletin as needed to communicate CEQA requirements related to PAMC 16.49 and listed historic resources, and (d) enable the HRB staff liaison(s), the City's historic preservation consultant, and Chief Building Official to implement training providing an ongoing opportunity for HRB members, staff, and the community to gain working knowledge as to the use of the State's historic building code BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED I LOCAL LAW I COUNCIL -APPROVED The benefits would be to improve Goal 2 to begin during plan quarter 1 and Staff of PDS would be tasked as well as an Website contains links to information preservation in Palo Alto and clarity for continue through quarter 2 (October - resources and videos, to assist property N/A owners of historic properties. December) HRB ad hoc committee to make progress. owners, staff, and others. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Item (a) a table of existing zoning code incentives and another table of historic building code provisions and Item (b) improvements to types of communications used to promote Items (c) and (d) N/A historic preservation. PROJECT/GOAL 3: Conduct a survey of the local inventory resources listed prior to the 2023 Historic Reconnaissance Survey, to determine historic conditions. If Council directs a survey update, that work would require resources and may extend into the next year work plan. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED/LOCAL LAW / COUNCIL -APPROVED Determining conditions of existing inventory Budget for and assistance from qualified Data on conditions of buildings placed 2024 22, properties (listed prior to April ) Subject to Council direction/ resource consultant to assess conditions of prior to on the local inventory April 22, No would allow better clarity. allocation and to begin in fourth quarter inventory properties listed prior to April 22, 2024 2024 HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Item 13 Attachment B - FY 2025 Historic Resources Board Workplan Properties that have been demolished remove from local inventory Properties that have lost integrity over time that may need a category change No Additional preservation incentives (a) discuss and recommend additional zoning code incentives to continue the community engagement process that PROJECT/GOAL 4: began with the 2023 reconnaissance survey/ inventory update; (b) represent the HRB's interests during public hearings, or participate in joint meetings with the Planning and Transportation Commission and City Council, to review any proposed zoning code modifications incentivizing historic preservation incentives; (c) outreach to the community after adoption of any adopted new incentives. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED I LOCAL LAW / COUNCIL -APPROVED Benefit will be for all property owners who do Goal 2 to begin during plan quarter 2 (item PDS staff and CAO staff. City Council More historic properties are preserved Council may provide not currently see any benefit to listing their a) and subject to Council direction, direction and accommodation in the PDS for future enjoyment of the owners and direction to modify property on the City's historic inventory continue through quarter 4 (April - June department workplan would be needed. community, due to the additional PAMC title 18. 2025, items b and c) incentives. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Item a is to gather ideas for new incentives in the zoning code to add to a table of Subject to Council direction, items b and c would follow item a. N/A existing incentives in the zoning code. Establish a Historical Preservation Award Program. (a) discuss and determine the selection criteria for eligible projects and/or properties; (b) discuss PROJECT/GOAL 5: and determine frequency of awards (e.g., annual, bi-annual, 5 -year cycle, etc.); (c) select projects and/or properties to award; (d) conduct an award ceremony and present historic preservation awards. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW / COUNCIL -APPROVED Item 13: Staff Report Pg. 17 L Packet Pg. 335 of 377 Item 13 Attachment B - FY 2025 Historic Resources Board WorkpIan A HRB historical preservation award program would express appreciation for the efforts to preserve and protect Palo Alto's Goal 5 to begin during plan quarter 1 (item Staff of PDS would be tasked as well as an Establish historic preservation award Comprehensive Plan culturally, historically, and architecturally a) and continue through quarter 4 (April - HRB ad hoc committee to make progress. selection criteria and frequency of Policy L-7.6 significant places that create a vibrant and June 2025, items b and c) awards by end of 24-25 Fiscal Year. sustainable community that fully reflects Palo Alto's diverse past. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Item (a) discuss and determine the selection criteria for eligible projects and/or properties and establish award frequency, and Item (b) discuss and determine award Items (c) and (d) No frequency (e.g., annual, bi-annual, 5 -year cycle, etc.) Item 13 Attachment C - FY 2025 Human Relations Commission Workplan C ) CITY OF PALO ALTO Human Relations Commission 2024-2025 Workplan Staff Liaison: Minka van der Zwaag, Human Services Manager Lead Department: Community Services This workplan covers portions of Fiscal Year 2024 and 2025 (May 2024 — April 2025) for the Human Relations Commission (HRC). The Commission is composed of 7 members who are residents of Palo Alto. Terms are for 3 years. See Palo Alto About the Commission Municipal Code (PAMC) Sections 2.16 and 2.22. For more information about the HRC please visit our webpage at http://www.cityofpaloaIto.org/gov/boards/hrc • Adriana Eberle (Chair) • Michelle Kraus (Vice Chair) • Don Barr Current Commissioners • Katie Causey • Amy Hsieh • Mary Kate Stimmler • Kaloma Smith HRC Mission: To promote the just and fair treatment of all people in Palo Alto, particularly our most vulnerable populations. By promoting awareness of issues and enabling conversations that enhance inclusion, the HRC strives to create a community where civility, respect and responsible actions are the norm. Mission Statement HRC Jurisdiction: Muni Code 2.22.050 (a) The Human Relations Commission has the discretion to act with respect to any human relations matter when the commission finds that any person or group does not benefit fully from public or private opportunities or resources in the community or is unfairly or differently treated due to factors of concern to the commission. (1) Public or private opportunities or resources in the community include, but are not limited to, those associated with ownership and rental of housing, employment, education and governmental services and benefits. (2) Factors of concern to the commission include, but are not limited to, socioeconomic class or status, physical condition or handicap, married or unmarried state, emotional condition, intellectual ability, age, sex, sexual preference, gender identity, race, cultural characteristics, ethnic background, ancestry, citizenship, and religious, conscientious or philosophical belief. (b) The commission shall conduct such studies and undertake such responsibilities as the council may direct. Item 13: Staff Report Pg. 19 Packet Pg. 337 of 377 Item 13 Attachment C - FY 2025 Human Relations Commission Workplan J Goal #1 — Core Responsibilities: Reviewed and made funding recommendations to Councii for ztwo-year human Services Resource Allocation Process (HSRAP) grants totaling $896,035 to fund critical needs in the community for FY 2024-25 (March and April 2023). A subcommittee of HRC commissioners and city staff served as the review committee for the Emerging Needs Prior Year Fund. In 2023, a total of 6 grants totaling $44,000 was approved (January, March, June, September 2023). Reviewed and made Accomplishments funding recommendations to the Finance Committee for 9 grants totaling $488,000 as part of the Community Development Block Grant (CDBG) Funding program for Fiscal Year 2023-24 (February 2023). Goal #2 — Inclusion & Belonging: Conducted a survey of the lived experience of Asian American, Native Hawaiian, and Pacific Islander (AANHPI) community members in Palo Alto in response to the Council's referral to research the lived experience of AANHPI communities (April 2023). Approved motion to forward the AANHPI survey results and a report to City Council (March 2024). Approval of HRC support of Multi Faith Peace Picnic and Prayer Services on September 11, 2023, on King Plaza (August 2023). Conducted a community listening session on Local Muslim, Palestinian, and Arab Experiences in the Face of Rising Islamophobia and Anti -Arab Hate (December 2023). Conducted a community listening session on Local Jewish Experiences in the Face of Rising Antisemitism (January 2024). Goal #3 - Public Safety: Approved recommendations to City Council for actions based on the recommendations made by the public at the Community Listening Sessions on local experiences of Islamophobia and Anti-Semitism (March 2024). Goal #4 — Climate Change: Presentation of the draft Frontline Communities Report, a report on the impact of climate on vulnerable communities in Palo Alto, by the Palo Alto Student Climate Coalition (August 2023). Goal #5 — Learning Sessions: Hosted an Older Adults Learning Series: Presentation of the results from the Avenidas' Community Assessment Survey of Older Adults (CASOA) by the Avenidas CEO. (September 2023). Presentations by Alta Housing, La Comida, Lytton Gardens, Oshman Jewish Community Center, Second Harvest Food Bank, and Social Services Agency of Santa Clara County (October 2023). Goal #6 - Emerging Needs: Additional recommendations passed in response to the City Council referral to the Commission on ways to improve implementation of current City renter protections (February and April 2023). Conducted a public hearing on the Recommendation of the Adoption of a Draft Ordinance Amending Palo Alto Municipal Code (PAMC) to Add Rental Registry Program (RRP) Ordinance. Approved to accept the basic framework of the RRP as presented by staff with outstanding issues needing to be addressed (May 2023). Item 13: Staff Report Pg. 20 Packet Pg. 338 of 377 Item 13 Attachment C - FY 2025 Human Funding Programs - Human Services Resource Allocation Process (HSRAP), Community Development Block Gr Relations Commission Workplan und. Continue to PROJECT/GOAL 1: review and give input to funding decisions. Priority during this workplan cycle includes assisting staff with the HSRAP application process for the FY26 funding cycle Core Responsibilities and reviewing the Human Needs Assessment prepared by RDA Consulting. The Needs Assessment assess the current human service needs of the Palo Alto community, the role of the program, the goals of the program, and how program impact is measured. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW! COUNCIL -APPROVED The funding programs provide human Ongoing Adhoc HRC subcommittee and staff time Results of Human Services Needs N/A services organizations with essential for the funding decisions. Assessment will provide the HRC, staff monetary support to serve vulnerable and Council with updated and vital and underserved residents of Palo Moderate level of staff and adhoc information on current human needs in Ito. subcommittee time. the community, concrete suggestions for changes/additions to the HSRAP priority of needs, application and/or review process, and increased ways in which to measure the effectiveness of the City's funding investment in Human Services organizations. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Continue to provide funding recommendations for HSRAP, CDBG and the Emerging N/A Needs Fund as needed. Inclusion & Belonging - Explore ways in which the Commission can continue to positively affect the sense of inclusion and belonging in the community. Projects PROJECT/GOAL 2: include: Inclusion and Belonging • Conduct Listening Session with local faith leaders to better understand their needs and the communities they serve. (I&B) • Revisit issues raised and recommendations from panelists at the 2023 Senior Learning Sessions and identify next steps. • Continue the work done to create connections and learn about the lived experiences of community members, such as the AANHPI, MENA, and Jewish communities. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW! COUNCIL -APPROVED All individuals who live, work or Summer -Fall 2024 Adhoc HRC subcommittee and staff time N/A worship in Palo Alto have the right to eel included and valued as members Moderate level of staff and adhoc of the community. subcommittee time. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Conduct Listening Session with local faith leaders to better understand their needs and the communities they serve. N/A Revisit issues raised and recommendations from panelists at the 2023 Senior Learning Sessions and identify next steps. Continue the work done to create connections and learn about the lived experiences of community members, such as the AANHPI, MENA, and Jewish communities. Item 13: Staff Report Pg. 21 Packet Pg. 339 of 377 Item 13 Attachment C - FY 2025 Human Public Safety - Explore and implement avenues to decrease incidences of crimes in the community. Relations Commission Workplan PROJECT/GOAL 3: • Convene a community meeting in 2024 to discuss hate crimes with representatives of law enforcement, city leadership, and experts in the field. Public Safety (PS) BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW/ COUNCIL -APPROVED All individuals who live, work or worship Summer -Fall 2024 Adhoc subcommittee and staff time. Space Measures may include: How many N/A in Palo Alto have the right to do so and marketing for educational people attend educational programming, without fear of verbal or physical abuse programming. specific actions taken by members of the or attack. public to combat hate crimes, and the Moderate level of staff and adhoc increased reporting of hate crimes. subcommittee time. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Convene a community meeting in 2024 to discuss hate crimes with representatives of law N/A enforcement, city leadership, and experts in the field. Public Health — Support current efforts to address youth mental health issues in the community. PROJECT/GOAL 4: • Request that a member of the HRC serve on the Mayor's mental health task force and/or explore ways in which the HRC can partner with high school Public Health (PH) groups working on mental health issues. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW! COUNCIL -APPROVED Goal coincides with the Council Goal of Member of HRC serves on Mayor's Task N/A "Community Health, Safety, Wellness & force and provides updates to the full Belonging" commission that may lead to other actions by the Commission. Low Level of Staff time HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE s the Mayor's Youth Mental Health Task Force has already been meeting, it is a high N/A priority to request participations by a member of the HRC. Item 13: Staff Report Pg. 22 1 Packet Pg. 340 of 377 Item 13 Attachment C - FY 2025 Human Housing, Economic Justice and Development - Relations Commission Workplan PROJECT/GOAL 5: • Identify ways in which HRC can provide assistance to support programs for unhoused community members (including RV dwellers). Housing, Economic Justice and Develo ment HEJD BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW! COUNCIL -APPROVED Providing active HRC participation in During the term covered by this workplan Staff and HRC commissioner time N/A actions to positively affect the lives of unhoused members of the community. Lower level of staff and adhoc subcommittee time. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Continued participation by HRC members on a local RV Dweller concerns committee, Other items to be determined during the year. N/A especially in light of looking for solutions to the loss of parking on El Camino Real and it's affect on RV dwellers. Climate Change - Explore ways in which climate change may disproportionately affect specific populations in the community. PROJECT/GOAL 6: • Engage with the Palo Alto Student Climate Coalition and the newly formed Youth Advisory Board (a formal City advisory board). Climate Change (CC) BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW! COUNCIL -APPROVED Climate change is a priority for the State Summer -Fall 2024 Yet to be determined based on outcome of N/A of California and the City of Palo Alto. Learning Sessions listed under Goal #7. Climate awareness and changes in habits help everyone thrive and special Adhoc subcommittee and staff time. attention should be paid to vulnerable populations. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Determine possible roll for a representative of the HRC to play with the newly formed N/A Youth Advisory Board (a formal City advisory board). Item 13: Staff Report Pg. 23 Packet Pg. 341 of 377 Item 13 Attachment C - FY 2025 Human Learning Sessions - Engage in learning sessions to gain more understanding on the following topics before rRelations Commission Workplan • Research and identify housing programs that could best address equity and access needs in the c amilies, low PROJECT/GOAL 7: income.) (HEJD) Learning Sessions • Availability and affordability of child care programs in the community (HEJD) • Explore ways in which Utility costs affect low-income members of the community and current city programs/services that provide assistance. (HEJD) • Research and identify housing programs that could best address equity and access needs in the community (cross sectional senior, families, low income.) (HEJD) • Better understand the demographics of city staff and commission to understand if there are underrepresented groups. (I&B) • Better understanding of the City's "Safe Streets for All" safety action plan (PH) • Examine the post COVID impact on the community, including housing as part of healthcare; inflation/unemployment/effects of Al. (PH) • Better understand the city's response to respite/shelter needs of the unhoused during extreme weather events. (CC) • Presentation on the City's Plan to positively affect climate change with an eye to understanding how it takes the needs of vulnerable populations into consideration. CC BENEFICIAL IMPACTS TIMELINE RESOURCES MEASURE OF STATE MANDATED /LOCAL NEEDED SUCCESS / COUNCIL- APPROVED APP Learning sessions are utilized by the During the term covered by this Staff and HRC commissioner time HRC discussions, deliberations, N/A HRC to explore an issue with the help workplan actions and recommendation are all of subject matter experts in order to 1) Lower level of staff and adhoc well served by the review of Become informed on the topic(s); 2) subcommittee time. information presented by subject Explore whether there is a role for the matter experts. HRC in addressing/recommending any action. HIGH LOWER COUNCIL -DIRECTED PRIORITY PRIORITY POLICY UPDATE Priority level of the individual Learning Sessions will be determined by the HRC. N/A Exploratory —Adhoc subcommittee to explore topics raised below at the Workplan retreat to further coalesce thinking before agendizing as a Learning Session. PROJECT/GOAL 7: • The financial hardship for many to live in the community as the income needed to afford living in Palo Alto is untenable. (HEJD) Exploratory • LGBTQI+/Pride events and recognition (I&B) • Create a grassroots effort to reengage vulnerable, underserved, minority community members in public meetings. Review/improve media and marketing outreach for the HRC. I&B BENEFICIAL IMPACTS TIMELINE RESOURCES MEASURE OF STATE MANDATED /LOCAL NEEDED SUCCESS / COUNCIL APP - APPROVED Fall -Winter Adhoc subcommittee and staff time. N/A HIGH LOWER COUNCIL -DIRECTED PRIORITY PRIORITY POLICY UPDATE Lower Priority N/A Item 13: Staff Report Pg. 24 Packet Pg. 342 of 377 Item 13 Attachment C - FY 2025 Human Emerging Issues - The HRC will identify emerging issues in the community, prioritize those that need further at Relations Commission Workplan Jies, including PROJECT/GOAL 8: those that involve significant staff time to the Council for approval. The Commission will also be responsive to future referrals by the Council. Emerging Issues BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED /LOCAL LAW! COUNCIL -APPROVED The HRC has the discretion to act with Ongoing TBD TBD N/A respect to any human relations matter when the commission finds that any person or group does not benefit fully from public or private opportunities or resources in the community, or is unfairly or differently treated due to factors of concern to the commission. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Lower priority N/A Item 13: Staff Report Pg. 25 Packet Pg. 343 of 377 CITY O F Transportation Workplan J PALO ALTO tanning an ransportation Commission (PTC) 2024-25 Workplan and 2023-24 Workplan Overview Date reviewed by PTC April 24, 2024 Staff Liaison: Amy French, Chief Planning Official, Planning and Development Services (PDS) Lead Department: Planning and Development Services (PDS); Office of Transportation (OOT) The seven -member Planning & Transportation Commission adopted its 2023-24 work plan on April 26, 2023. The members and chairs are listed below. Members serve 4 -year terms. See About the Commission Planning & Transportation Commission (PTC) webpage link: http://www.citvofpaloaIto.org/gov/boards/ptc/defauIt.asp • Doria Summa (Chair) • Bryna Chang (Vice Chair) • Bart Hechtman • Keith Reckdahl • Carolyn Templeton • Allen Akin • George Lu The Planning & Transportation Commission advises the City Council, Planning Director, and Chief Transportation Official on land use and transportation matters, including the Comprehensive zoning, transportation programs, and related matters. The Commission's primary responsibilities include: • Preparing and making recommendations to the City Council on the City's Comprehensive Plan and applying the Comprehensive Plan to proposed development, public facilities, and transportation in Palo Alto • Considering and making recommendations to the City Council on zoning map and zoning ordinance changes; any changes to Title 18 of the Palo Alto Municipal Code must be reviewed by the PTC and the City Council • Reviewing and making recommendations to the City Council on subdivisions and Site and Design Reviews, on appeals on variances and use permits • Considering other policies and programs affecting development and land use in Palo Alto for final City Council action • Reviewing and making recommendations on individual projects as described in the Municipal Code, and Open Space development; • Reviewing and making recommendations to the City Council on transportation, parking, and other related mobility issues • Ensuring robust community engagement and dialogue regarding planning, land use, and transportation and providing recommendations to the City Council regarding these matters and incorporating the public discussion. The PTC hearings provide a forum for public comment and public interaction Prior Year Accomplishments i ne r' i c. recommenaea tne revisea housing Bement, orainances, ana aeveiopment, proviaea reeaoacK in stuay sessions, recommenaea poncy airection, reviewea annual reports, compietea goais ana continues tne ongoing goals. Transportation Goal 1 Road Safety and Goal 9 BPTP: BPTP vision sessions (PTC, 4/29 CC), Safe Streets For All (PTC, 4/29 CC), El Camino Real bike lanes (PTC, 4/1 CC), traffic safety report reviews ongoing; Goal 2: Retail Recovery — sessions, ad -hoc, report to Council; Goal 3 ongoing; Goal 4 met: NVCAP and Certified SEIR and zoning code amendment (5/8 PTC, 6/10 CC); Goal 5 HE revision (4/15 PTC/Council adoption) and HE ordinances for: Safe Parking, Implementing HE Programs 1.1A, 1.1B (rezoning GM/ROLM), 1.3 (By -Right Housing on HE sites), Density Bonus law, HIP (6/12 PTC); Goal 6: State legislation implementation included SB9, AB2097 handouts and map; Goal 8: On Demand Transit— PA Link launched; Goal 10 Car Free St. - CMO; Goal 11 RRP 11/23 ord. - met; Goal 12: Dark Sky/ Bird -safe Glass (5/29 PTC); Goal 13: Stream Corridor not met (target dates end of summer); Other ordinances adopted in term: Electrification/Noise, Parklets, PHZs 800 San Antonio, 3265 ECR, 660 University; Projects reviewed: 575, 830 Los Trancos; 3200 Park/340 Portage, 2901 Middlefield; 4075 ECR, 2501 Embarcadero Item 13: Staff Report Pg. 26 1 Packet Pg. 344 of 377 CITY OF I Item13 PALOALTO Attachment D - FY 2025 Planning and Transportation Workplan Planning and Transportation Commission (PTC) 2024-2025 Workplan Staff Liaison: Amy French, Chief Planning Official, Planning and Development Services (PDS) Lead Departments: Planning and Development Services (PDS); Office of Transportation (OOT) PROJECT/GOAL 1: Safe Streets For All Safety Action Plan Review and su ort the ado tion of the Safe Streets for All Safet Action Plan BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED/LOCAL LAW/COUNCIL- Opportunity to investigate an area Estimated adoption by the end of 2024 Fully funded by a FHWA grant Adoption of plan by Council No of considerable public concern. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Safety for pedestrians, cyclists, and motorists is important. Reducing and/or eliminating The challenges in this area are addressed through existing committees and active No injury and death resulting from collisions is an important priority for many residents. A projects. The work continues regardless. public dialogue at the PTC is welcomed by those concerned members of the public. PROJECT/GOAL 2: Retail Ordinance Updates Council is likely to direct PTC to amend Zoning Code after staff presents the Retail Study prepared by MBI, reviewed by the PTC with support from PTC ad hoc committee; the study included consideration of AB 2097 and outreach. This is a Council priority (objective 18 of EDT): "Present to Council recommendations for a citywide retail zoning strategy and receive direction for zoning ordinance implementation." BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED/LOCAL LAW/COUNCIL- Overall, this project aims to ensure The high-level reviews of trends and best practices Consultant work, staff oversight, and These interrelated projects may result in Yes - Council assigned. a strong climate for retail in retail will be presented to Council June 10, 2024. meetings preparation, and participation the development of new ordinances businesses in Palo Alto that can The PTC is likely to receive Council direction for Title 18 from the local retail community. and/or broader policy recommendations allow residents to meet their daily changes in the 2024-25 plan year. to the City Council. needs and have a high quality of I ife. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE While this is an impactful body of work, the need to get it right and coordinate with Any shifts in retail trends that will endure are occurring and can benefit from further and existing and new resources outweighs the need to quickly pursue the work. Yes refined action by the City. PROJECT/GOAL 3: Area Planning This goal carries forward the prior year goal for neighborhood planning approaches and overall effectiveness of various approaches to neighborhood planning. The staff and PTC will consider new neighborhoods that esult from the 61h cycle Housing Element sites and demand for public facilities/services. For the Downtown Housing Plan, staff retained consultants and began outreach in April/May, with community assessment, community advisory group, and technical advisory group meetings, and formulation of goals and policies. For the San Antonio Road Area Plan the RFP will be released in summer 2024, and work with a consultant on the area plan can )eoin. BENEFICIAL IMPACTS I TIMELINE I RESOURCES NEEDED I MEASURE OF SUCCESS I STATE MANDATEDPPROVED �W/COUNCIL- A Development of preliminary schedule for By December 2024 Staff time to research and prepare a staff Successful conversation and possible No new area plans would enable City Council to report to PTC and ARB identification of an approach (or provide direction approaches) to guide the City's future. HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Council directed work on a preliminary schedule It would be timely to hold study sessions after the Housing Element has been Yes certified Item 13: Staff Report Pg. 27 Packet Pg. 345 of 377 PROJECT/GOAL 4: Housing Program Implementation Item 13 The PTC reviewed responses to HCD second -round comments with Council on April 15, 2024. PTC reviewed zone changes and Comp Plan amendments to achieve RHNA housi am implementation Attachment D - FY 2025 Planning and goals (see Council objectives list) for 2024-25: Program 3.4 Housing Incentive Program (including Program 3.4 E, Expand the El Camino Real Housing Focus Area at strategic locations dcember 31, 2024, 3rogram 6.5 Alternative Housing to be completed by June 2025. The PTC may also begin work on Program 3.7 (Objective Standards in SOFA) toward the goal of December 31, 2026 Transportation Workplan BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED/LOCAL LAW/COUNCIL- APPROVED Compliant housing element and programs to IPTC and Council reviewed on April 15th encourage housing development submittal for HCD certification; targets for Programs 3.4 and 6.5 fall within plan term. and consultant resources employed Implementation of programs by target dates - State Mandated HIGH PRIORITY I LOWER PRIORITY I COUNCIL -DIRECTED POLICY UPDATE l Housing Incentive Program I SOFA objective standards L. PROJECT/GOAL 5: State Law Implementation — Laws with Prior Effective Dates (AB 2097, AB 2011, SB6) and any new 2024 Laws to Become Effective 2025 B 2097, AB2011, SB6 Implementation and related policy considerations; includes development of policy considerations related to TDRs in Downtown and SOFA, parking district policies and in lieu parking fees, alternative parking facilities, loading zone, and ride -share passenger loading. BENEFICIAL IMPACTS I TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED I LOCAL LAW / COUNCIL - APPROVED Provide clarity to property owners and Study session with PTC and Ordinance Staff resources have been assigned. Adoption of ordinance amendments Yes - State potential developers. Recommendation during 2023-24 plan term HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE Implementing state laws and discuss policy considerations N/A Possibly - direction in April PROJECT/GOAL 6: Parking Programs The PTC will receive an update regarding options for improving the City's parking programs. This includes a Roadmap for Residential Parking Permit Program improvements and commercial parking improvements. Parking Data Portal - PTC will receive an update regarding arkin availability data. The new license plate reader technology allows for regular collection and reporting of parkin availability. BENEFICIAL IMPACTS I TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW / COUNCIL - APPROVED Feedback from PTC and continued Improved parking operations. Ongoing. Ongoing. engagement from the public. Yes HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE The staff work behind the project continues; proposed updates help advance the work. This project represents a large body of ongoing work to manage parking supply and Additionally, the public welcomes opportunities to engage w/the PTC on this topic. parking policy. Yes PROJECT/GOAL 7: Bicycle and Ped Transportation Plan Update citywide evaluation of the bicycle network and pedestrian network. The plan will identify opportunities to enhance and connect the network. BENEFICIAL IMPACTS I TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED / LOCAL LAW / COUNCIL - APPROVED Final plan update in 2025 Fully funded by a TDA3 grant Updated bike and ped plan No Updated bike/ped transportation plan HIGH PRIORITY LOWER PRIORITY COUNCIL -DIRECTED POLICY UPDATE N/A Update is timely, but not mandated by any state laws. No PROJECT/GOAL 8: Comprehensive Plan Policy Implementation. This includes Streamside Corridor changes in Title 18 and other Comp Plan policies that lead to Title 18 revisions. BENEFICIAL IMPACTS TIMELINE RESOURCES NEEDED MEASURE OF SUCCESS STATE MANDATED/LOCAL LAW/COUNCIL APPROVED Work through the relevant remaining Stream corridor ordinance July 31 PTC. Staff and consultant assistance — during a Adopted ordinances to amend Title 18 No Comprehensive Plan policies and programs p p g Others TBD; Staff identifies these tasks in year when staff resources will be focused on to completion annual reports implementation of the Housing Element HIGH PRIORITY LOWER PRIORITY COUNCIL Some of the programs and policies are lower priority Yes — Comprehensive Plan Some of the programs and policies are higher priority Item 13: Staff Report Pg. 28 Packet Pg. 346 of 377 Item 14 Item 14 Staff Report CITY COUNCIL Staff Report From: City Clerk and City Manager CITY OF Report Type: ACTION ITEMS PALO ALTO Meeting Date: October 21, 2024 Report #:2408-3349 TITLE Adoption of City Council Positions on State and Local Measures Presented to Palo Alto Voters on the November 5, 2024 Ballot; CEQA status — not a project RECOMMENDATION Staff recommends that City Council review and discuss the November 5, 2024 state and local ballot measures and consider adoption of formal positions as relevant to the City of Palo Alto or desired by the City Council. BACKGROUND The Secretary of State has qualified ten measures for the November 5, 2024 statewide ballot. There is one local ballot measure in Palo Alto. There are no other measures from other relevant local jurisdictions (such as Santa Clara County, Palo Alto Unified School District, or Valley Transportation Authority) that will be presented to Palo Alto voters this year. This report summarizes the ballot measure that will be presented to Palo Alto voters on the November 5, 2024 ballot and recommends positions for the City Council to consider adopting. The positions are intended to provide information for Palo Alto voters to consider when casting their votes. The City Council considered taking positions on ballot measures on the November 3, 20201 and November 8, 20222 ballots. Townsend Public Affairs, the City's legislative consultant, prepared Attachment A which summarizes the statewide measures and includes potential local impacts of each measure. The staff -recommended positions are based on the City Council -approved 2024 legislative guidelines3. The legislative guidelines reflect and activate the City Council's priorities. The legislative guidelines follow one or more of the following four foundational principles: 1 City Council, 9/14/2020; Agenda Item 11, Staff Report #11550: https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=80624 2 City Council, 10/3/2022; Agenda Item #10; Staff Report #14787: https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82062 3 City of Palo Alto's 2024 Federal and State Legislative Guidelines: https://www.citvofDa Ioa Ito.org/files/assets/Du bl is/v/1/city-manager/legislation/adoated-2024-Iegislative- uidelines.pdf Item 14: Staff Report Pg. 1 Packet Pg. 347 of 377 Item 14 Item 14 Staff Report 1. Promote local fiscal sustainability 2. Support funding opportunities 3. Preserve local control 4. Protect the health and safety of the community Staff recommended positions only where the legislative guidelines clearly apply. At your discretion, Council may take positions on these or other ballot measures. ANALYSIS The below section summarizes the November 5, 2024 statewide and local ballot measures. Additional information on statewide and local measures, including arguments in favor and against, impartial analyses, and full text may be found at the California Secretary of State's Official Voter Information Guide4 or City's ballot measure pages. Statewide Ballot Measures Proposition Secretary of State Official Summary Staff Recommended Position Proposition 2 • Authorizes $10 billion in state general obligation bonds for No recommended repair, upgrade, and construction of facilities at K-12 public position. schools (including charter schools) and community colleges. • Provides funding for new facilities, to improve school health and safety conditions at existing facilities, and for classroom upgrades (e.g., science, engineering, transitional kindergarten, and vocational classrooms). • Expands eligibility for financial hardship grants for small and disadvantaged school districts. • Provides higher percentage of state matching funds to schools demonstrating greatest need. • Requires public hearings and performance audits. • Appropriates money from General Fund to repay bonds. Proposition 3 • Amends California Constitution to recognize fundamental Support. Applicable right to marry, regardless of sex or race. guidelines: Support • Removes language in California Constitution stating that policies that promote marriage is only between a man and a woman. equity. 4 California Secretary of State November 5, 2024 Official Voter Information Guide — Propositions: https://voterguide.sos.ca.gov/propositions/ s City of Palo Alto November 5, 2024 Ballot Measure D: https://www.cityofpaloaIto.org/Departments/City- Clerk/Municipal-Elections/November-5-2024-Ballot-Measure-D Item 14: Staff Report Pg. 2 Packet Pg. 348 of 377 Item 14 Item 14 Staff Report Proposition Secretary of State Official Summary Staff Recommended Position Proposition 4 • Authorizes $10 billion in state general obligation bonds for Support. Applicable various projects to reduce climate risks and impacts: $3.8 guidelines: Promotes the billion for safe drinking water and water resilience; $1.95 use of renewable billion for wildfire prevention and extreme heat mitigation; resources, water $1.9 billion for protection of natural lands, parks, and conservation, and the wildlife; $1.2 billion for protection of coastal lands, bays, flexible use of existing and oceans; $850 million for clean energy; and $300 million resources; Supports the for agriculture, protection of our natural • Prioritizes projects benefitting disadvantaged communities, environment, including • Requires annual audits. open space, trees/tree • Appropriates money from General Fund to repay bonds. canopy, and biodiversity. Proposition 5 • Allows local bonds for affordable housing for low- and Support. Applicable middle -income Californians, or for public infrastructure guidelines: Supports including roads, water, and fire protection to be approved lowering or maintaining of by 55% of voters, rather than current two-thirds approval voter thresholds for local requirement. revenue measures. • Bonds must include specified accountability requirements, including citizens oversight committee and annual independent financial and performance audits. • Allows local governments to assess property taxes above 1% to repay affordable housing and infrastructure bonds if approved by 55% of voters instead of current two-thirds approval requirement. Proposition 6 • Amends the California Constitution to remove the current No recommended constitutional provision that allows jails and prisons to position. impose involuntary servitude to punish crime (i.e., forcing incarcerated persons to work). • Prohibits the California Department of Corrections and Rehabilitation from punishing incarcerated persons for refusing a work assignment. Allows incarcerated persons to voluntarily accept work assignments in exchange for credit to reduce their sentences. Proposition • California's minimum wage is currently $16 per hour. This No recommended 32 measure increases that minimum, as follows: position. o Employers with 26 or more employees would pay $17 hourly for the remainder of 2024 and $18 hourly beginning on January 1, 2025. o Employers with 25 or fewer employees would pay $17 hourly beginning January 1, 2025, and $18 hourly beginning January 1, 2026. • Thereafter, as existing law provides, the minimum wage annually adjusts for inflation. • In addition to the generally applicable minimum wage described above, current laws establish a higher minimum wage in specified industries. This measure does not amend those laws. Item 14: Staff Report Pg. 3 Packet Pg. 349 of 377 Item 14 Item 14 Staff Report Proposition Secretary of State Official Summary Staff Recommended Position Proposition • Current state law (the Costa -Hawkins Rental Housing Act of No recommended 33 1995) generally prevents cities and counties from limiting position. the initial rental rate that landlords may charge to new tenants in all types of housing, and from limiting rent increases for existing tenants in (1) residential properties that were first occupied after February 1, 1995; (2) single- family homes; and (3) condominiums. • This measure would repeal that state law and would prohibit the state from limiting the ability of cities and counties to maintain, enact, or expand residential rent - control ordinances. Proposition • Requires health care providers meeting specified criteria to No recommended 34 spend 98% of revenues from federal discount prescription position. drug program on direct patient care. • Applies only to health care providers that: (1) spent over $100,000,000 in anyten-year period on anything otherthan direct patient care; and (2) operated multifamily housing reported to have at least 500 high -severity health and safety violations. • Penalizes noncompliance with spending restrictions by revoking health care licenses and tax-exempt status. • Permanently authorizes state to negotiate Medi-Cal drug prices on statewide basis. Proposition • Makes permanent the existing tax on managed health care No recommended 35 insurance plans (currently set to expire in 2026), which, if position. approved by the federal government, provides revenues to pay for health care services for low-income families with children, seniors, disabled persons, and other Medi-Cal recipients. • Requires revenues to be used only for specified Medi-Cal services, including primary and specialty care, emergency care, family planning, mental health, and prescription drugs. • Prohibits revenues from being used to replace existing Medi-Cal funding. • Caps administrative expenses and requires independent audits of programs receiving funding. Proposition • Allows felony charges for possessing certain drugs and for No recommended 36 thefts under $950 —both currently chargeable only as position. misdemeanors —with two prior drug or two prior theft convictions, as applicable. Defendants who plead guilty to felony drug possession and complete treatment can have charges dismissed. • Increases sentences for other specified drug and theft crimes. • Increased prison sentences may reduce savings that currently fund mental health and drug treatment programs, Item 14: Staff Report Pg. 4 Packet Pg. 350 of 377 Item 14 Item 14 Staff Report Proposition Secretary of State Official Summary Staff Recommended Position K-12 schools, and crime victims; any remaining savings may be used for new felony treatment program. Palo Alto Ballot Measure Proposition Ballot Question Staff Recommended Position Measure D Undedicates a 0.33 -acre portion of existing parkland in El Support. Applicable Camino Park for the purpose of creating a new road primarily guidelines: supports for transit vehicles linking the Palo Alto Transit Center with El expansion and/or Camino Real maintaining of public transit options throughout Palo Alto, especially funding for transit. FISCAL/RESOURCE IMPACT There is no financial impact associated with adopting support or oppose positions on ballot measures. The City Council annually budgets for legislative advocacy services, and these efforts are led by staff in the City Clerk's Office with stakeholder support across departments, especially the City Manager's Office. STAKEHOLDER ENGAGEMENT Staff from multiple departments are involved in the City's legislative advocacy process. Staff meet regularly with the City's legislative consultants to review pending state and federal activity, including legislation, grant opportunities, and ballot measures with potential impacts to the City. ENVIRONMENTAL REVIEW The City's legislative advocacy activities are not a project under section 15378(b)(25) of the California Environmental Quality Act Guidelines (administrative activities that will not result in direct or indirect physical change in the environment). ATTACHMENTS Attachment A: Townsend Public Affairs November 2024 Ballot Initiatives Memo APPROVED BY: Mahealani Ah Yun, City Clerk Staff: Christine Prior, Deputy City Clerk Item 14: Staff Report Pg. 5 Packet Pg. 351 of 377 TOWNSEND TPA MEMORANDUM To: City of Palo Alto Honorable Mayor Stone and Members of the City Council Ed Shikada, City Manager From: Townsend Public Affairs Niccolo De Luca, Vice President Carlin Shelby, Senior Associate Date: October 8, 2024 Subject: November 2024 Ballot Initiatives Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Memo On Tuesday, November 5, 2024, millions across the nation will cast their ballot in the General Election. Not only will voters be weighing in on nationwide races such as the Presidential and Congressional elections, but Californians will also be voting on Legislative offices, statewide ballot measures, as well as local offices and measures. In order for ballot initiatives, referendums, and constitutional amendments to qualify for the November 2024 ballot, measures had to collect sufficient signatures, or receive legislative approval, prior to June 27. Notably, the 2024 General Election ballot featured a number of last- minute changes, including intervention from the California Supreme Court to pull the Government Transparency and Taxpayer Protection Act from the ballot entirely, a series of deals with proponents of qualified ballot measures to remove them in exchange for legislative action, and the inclusion of two last-minute statewide bond proposals for climate and school facilities funding. Following the race to ballot finalization, the official November 2024 ballot will include 10 statewide ballot measures, ranging from statewide bond proposals, local rent control authority, a Proposition 47 referendum, and a statewide minimum wage increase. Below is a summary of statewide voter initiatives, as well as additional information related to those items that may impact local public agencies. Below is a comprehensive list of the 10 eligible initiatives that will be on the November 2024 ballot, in numerical order: Proposition 2: Issues $10 billion in bonds to fund construction and modernization of public K-14 education facilities. Proposition 3: Repeals Proposition 8 and establishes a right to marry. O Page 1 of 7 Item 14: Staff Report Pg. 6 Packet Pg. 352 of 377 Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Proposition 4: Issues $10 billion in bonds to fund state and local parks, en Memo tion projects, water infrastructure projects, energy projects, and flood protection projects. Proposition 5: Lowers the vote threshold from 66.67% to 55% for local bond measures to fund housing projects and public infrastructure. Proposition 6: Removes involuntary servitude as punishment for a crime from the state constitution. Proposition 32: Increases minimum wage to $18.00 an hour. Proposition 33: Repeals the Costa Hawkins Rental Housing Act. Proposition 34: Requires health care providers to spend 98% of revenues from federal discount prescription drug program on direct patient care. Proposition 35: Permanently authorizes a tax on managed care organizations to fund Medi-Cal programs. Proposition 36: Increases drug crime and theft penalties and allows a new class of crime to be called treatment -mandated felony, which allows the offender the option to participate in drug and mental health treatment. The following summaries correspond to initiatives that could have potential impacts on local public agencies. This list is not comprehensive of all measures that will appear on the statewide General Election ballot. PROPOSITION 2: Kindergarten Through Grade 12 Schools and Local Community College Public Education Facilities Modernization, Repair, and Safety Bond Act of 2024 Origin: Legislature — AB 247 Summary: If passed, this initiative issues $10 billion in bonds to fund the construction and modernization of public education facilities, with the following breakdown: • $4 billion for the modernization of school facilities, with at least 10% being reserved for small schools and $115 million for testing/remediation of lead in water • $3 billion for new construction of school facilities, with at least 10% being reserved for small school districts • $1.5 billion for community college facilities • $600 million for charter school facilities • $600 million for career technical education programs If approved, the new construction and modernization of K-12 school facilities will be carried out via the California Department of Education, based on facilities master plans that have been approved by local education agencies. Funding for community college facilities would be carried out through the existing capital outlay process overseen by the Community College Board of Governors and funded through the annual state budget process. O Page2of7 Item 14: Staff Report Pg. 7 Packet Pg. 353 of 377 Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Potential Local Agency Impacts: The construction and rehabilitation of p Memo are funded by a combination of state and local general obligation (GO) bonds, developer's fees and local assessments such as Mello -Roos community facilities districts. If approved by voters, the bond funds could work to lower developer fees and local assessments, thus decreasing the cost of building housing. Support and Opposition: Supporters of Proposition 2 include the California Federation of Teachers, the Californian Labor Federation, the California Republican Party, the Californian Democratic Party, and the State Superintendent of Public Instruction Tony Thurmond, among others. The Yes on Proposition 2 Campaign has raised $5.7 million in campaign funds. Opponents include the Howard Jarvis Taxpayers Association, with no official campaign PAC funding raised. PROPOSITION 4: The Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 Origin: Legislature — SB 867 Summary: If passed, this initiative issues $10 billion in bonds to fund state and local parks, environmental protection projects, water infrastructure projects, energy projects, and flood protection projects. With a general breakdown as follows: • $3.8 billion for safe drinking water, drought, flood, and water resilience programs • $1.5 billion for wildfire and forest resilience • $450 million for extreme heat mitigation • $1.2 billion for biodiversity programs • $300 million for sustainable, climate -smart farms and working lands programs • $1.2 billion for coastal resilience programs • $700 million for park creation and outdoor access • $850 million for clean air programs • <$20 million for administrative costs • Up to 10% of funds within each funding pot must be allocated to severely disadvantaged communities If approved, the funding would be distributed by a number of state agencies through various existing grant and funding programs. It is likely that the initial funding would be included as part of the FY 2025-26 state budget. Potential Local Agency Impacts: Proposition 4 includes funding for numerous programs that local agencies are eligible to apply for, including, but not limited to, park and open space, water storage and conveyance, wildfire and forest resilience, and coastal programs. If passed by voters, these funds would supplement the state's budget and provide additional insurance against potential budget deficit issues that could lead to spending reductions across climate -related accounts. Support and Opposition: Supporters of Proposition 4 include SEIU California, the California Democratic Party, California Professional Firefighters, the California Teachers Association, and the California Municipal Utilities Association, with $1.2 million raised in campaign funds. Opponents include the Howard Jarvis Taxpayers Association, the California Republican Party, and several Republican state legislators, with no campaign funds raised. O Page3of7 Item 14: Staff Report Pg. 8 Packet Pg. 354 of 377 PROPOSITION 5: Local Government Financing: Infrastructure: Voter Approval Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Affordable Housing a Memo Origin: Legislature — ACA 1, as Amended by ACA 10 Summary: This initiative reduces voter threshold requirements from 2/3 to 55% for general obligation bonds financing affordable housing, permanent supportive housing, or public infrastructure, and any associated ad valorem taxes needed to pay the interest and redemption charges on bonded indebtedness. This measure defines public infrastructure to include facilities for the delivery of public services, including education, police, fire protection, parks, recreation, open space, emergency medical, public health, libraries, flood protection, streets or highways, public transit, railroad, airports, and seaports. Additionally, facilities or infrastructure that are energy -related, communications -related, water -related, or wastewater -related also would qualify to be considered at the lower vote threshold. This measure would cap the maximum amount of any ad valorem tax on real property at 1% of the property's value. Potential Local Agency Impacts: By reducing the voter threshold for the passage of local bond measures, Proposition 5 will make it easier for local agencies to raise bond revenues. Investment initiatives often fail to reach the legal requirement of a 2/3 vote, a threshold under which opponents' votes count twice as much as those community members who support infrastructure investments. Current law authorizes school districts to pass bond measures at a 55% vote threshold. Proposition 5 would create voter threshold parity between school districts and cities, counties, and special districts. Notably, the provisions of Proposition 5 impact bond measures on the same ballot. If Proposition 5 receives a majority vote, the 55% threshold could be applied to major revenue measures such as the Bay Area Housing Finance Authority (BAHFA) $20 billion affordable housing bond, thus increasing its chance of passage. Support and Opposition: Supporters of Proposition 5 include the California Democratic Party, the California State Building and Construction Trades Council, the AIDS Healthcare Foundation, California YIMBY, and the California Labor Federation, with $5 million in campaign funds raised. Proposition 5 opponents include the California Chamber of Commerce, the Howard Jarvis Taxpayers Association, the California Republican Party, and Catalysts for Local Control, with $29.7 million in campaign funds raised. PROPOSITION 32: Raises Minimum Wage Origin: Citizen -led initiative Summary: This constitutional amendment increases the state minimum wage to $18.00 per hour by 2026 for all employers, and thereafter adjusts the rate annually by increases to the cost of living. Existing law requires annual increases to California's minimum wage until it has reached $15.00 per hour for all businesses on January 1, 2023. This measure extends these annual increases ($1.00 per year) until minimum wage —currently, $15.00 per hour for businesses with 26 or more employees, and $14.00 per hour for smaller businesses —reaches $18.00 per hour. Thereafter, as existing law requires, the minimum wage will annually adjust for inflation. In periods of decreased economic activity, or General Fund deficit, the Governor may suspend the annual increase up to two times, thereby extending the timeline for reaching $18.00 per hour. O Page4of7 Item 14: Staff Report Pg. 9 Packet Pg. 355 of 377 Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Potential Local Agency Impacts: Unclear change in annual state and loc Memo ely between a loss of a couple billion dollars and a gain of a few hundred million dollars. An increase in annual state and local government costs is likely between half a billion dollars and a few billion dollars. Support and Opposition: Supporters of Proposition 32 include the California Labor Federation, the Working Families Party California, the California Democratic Party, and the League of Women Voters of California, with over $609,000 in campaign funds raised. Opponents of Proposition 32 include the California Chamber of Commerce, the California Grocers Association, the California Republican Party, and the Howard Jarvis Taxpayers Association, with $65,000 in campaign funds raised. PROPOSITION 33: Expands Local Governments' Authority to Enact Rent Control on Residential Property Origin: Citizen -led initiative Summary: This constitutional amendment repeals the Costa Hawkins Rental Housing Act. Current state law (the Costa -Hawkins Rental Housing Act of 1995) generally prevents cities and counties from limiting the initial rental rate that landlords may charge to new tenants in all types of housing, and from limiting rent increases for existing tenants in (1) residential properties that were first occupied after February 1, 1995; (2) single-family homes; and (3) condominiums. This initiative would repeal that state law and would prohibit the state from limiting the right of cities and counties to maintain, enact, or expand residential rent -control ordinances. The measure repeals the limits on local rent control laws in Costa -Hawkins. Under the measure, cities and counties can regulate rents for any housing. They also can limit how much a landlord may increase rents when a new renter moves in. The measure itself does not make any changes to existing local rent control laws. Generally, cities and counties would have to take separate actions to change their local laws. However, in some cases, existing provisions in local rent control laws that are currently inoperative because they are prohibited by Costa -Hawkins could become operative without further action at the local level. The measure does not affect the requirement that rent control laws must allow landlords to receive a fair rate of return. Further, the measure specifies that the state may not limit the right of cities and counties to maintain, enact, or expand rent control. However, the state still could set some minimum protections for renters, like the current statewide limit on rent increases. Potential Local Agency Impacts: According to the Legislative Analyst's Office (LAO), the proposed initiative could have economic ramifications for state and local revenues, particularly affecting property taxes, sales taxes, and income taxes. Regarding property taxes, there is an anticipated decrease over time due to a projected decline in rental property values. This decline would likely lead to reduced property tax payments by landlords. While property tax bills might reset at higher levels following property sales, any revenue gains from these adjustments are expected to be outweighed by overall revenue losses resulting from diminished property values. Sales tax revenues could potentially increase if renters redirect their savings from reduced rents toward purchasing taxable goods. This change in consumer spending behavior has the potential to bolster sales tax revenues collected by state and local governments. C) Page5of7 Item 14: Staff Report Pg. 10 Packet Pg. 356 of 377 Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives Memo Income tax payments by landlords are also expected to fluctuate. Some landlords may experience decreases in their income tax payments due to reduced rental income from lower rents. Conversely, landlords could see potential increases in income tax payments over time as they benefit from reduced expenses related to property acquisition, such as mortgage interest and property taxes. However, the net effect on state income tax revenues remains uncertain and will depend on various factors. Overall, the measure is likely to result in a reduction in state and local revenues, with property taxes expected to be the most significantly affected. The extent of these revenue losses will depend on how communities respond to the measure, particularly in terms of expanding or implementing rent control laws. Additionally, local governments may face increased costs associated with administering new or expanded rent control policies, potentially funded through fees imposed on owners of rental housing. Support and Opposition: Supporters of Proposition 33 include the AIDS Healthcare Foundation, the California Democratic Party, the California Nurses Association, UNITE HERE Local 11, and Consumer Watchdog, with $43.8 million in campaign funds raised. Proposition 33 opponents include the California Small Business Association, the California Council of Carpenters, California YIMBY, the California Chamber of Commerce, the California Republican Party, and several Democratic state legislators, with over $119 million in campaign funds raised. PROPOSITION 36: Allows Felony Charges and Increases Sentences for Certain Drug and Theft Crimes Origin: Citizen -led Initiative Summary: If approved by voters, this constitutional amendment would increase penalties for certain drug crimes by increasing sentence lengths and level of crime. The proposition would add fentanyl to the list of drugs that would warrant a felony charge if an individual possesses one of the listed drugs and a loaded firearm. The punishment for this crime is up to four years in prison, whereas currently possessing fentanyl and a loaded firearm is punishable by up to one year in jail. This initiative would increase sentences based on the quantity of certain drugs sold illegally. The measure would also require individuals who receive increased sentences because of this to serve their entire sentence in state prison, regardless of their criminal history. The proposition would increase penalties for certain theft crimes. For crimes where money or property worth $950 or less is stolen, the initiative would make the crime punishable as a felony for individuals who have two or more prior theft -related convictions. The initiative would make the punishment up to three years in jail or prison, depending on the individual's criminal history, an increase from the current six months. The initiative would also increase sentences based on the amount of property stolen. Potential Local Agency Impacts: According to the LAO, the proposed measure is expected to have significant implications for county jail populations and community supervision. It includes provisions that would shift certain sentences from county jails to state prisons, reducing local jail populations. Conversely, it introduces changes that could extend jail time for lower -level theft crimes, potentially increasing the number of people under county supervision. Moreover, the measure is anticipated to increase the number of individuals sentenced to prison, subsequently increasing the population under Post -Release Community Supervision (PRCS) upon their release. Overall, this could lead to a net annual increase of thousands in the county C) Page 6 of 7 Item 14: Staff Report Pg. 11 Packet Pg. 357 of 377 Item 14 Attachment A -Townsend Public Affairs November 2024 Ballot Initiatives correctional population. Financially, the growth in county correctional popu Memo d to incur additional costs, albeit partially offset by reduced expenses as individuals are shifted to state prisons. This net increase in county correctional costs is estimated to be potentially tens of millions of dollars annually. Additionally, the measure is expected to escalate local court -related workloads. This includes higher felony filings, which would increase demands on local prosecutors, public defenders, and other county departments involved in mandated treatment processes for felonies. The resulting rise in local court -related costs could also amount to tens of millions annually, depending on implementation specifics and the actual impact on case volumes. The measure's impact on state savings derived from Proposition 47 could reduce funding available for mental health services, substance use programs, truancy prevention, and victim services. The full extent of these fiscal effects will depend on how the measure alters the estimated savings attributed to Proposition 47 and other potential effects on crime rates and criminal justice expenditures. Support and Opposition: Supporters of Proposition 36 include Walmart, Target, Home Depot, the California District Attorneys Association, the California Correctional Peace Officers Association, the California Chamber of Commerce, and the California Republican Party, with $14.7 million in campaign funds raised. Proposition 36 opponents include Governor Gavin Newsom, Assembly Speaker Robert Rivas, Senate President Pro Tem Mike McGuire, ACLU of Northern California, and the California Democratic Party, with $3.7 million in campaign funds raised. C) Page 7 of 7 Item 14: Staff Report Pg. 12 Packet Pg. 358 of 377 Item 15 Item 15 Colleagues Memo CITY COUNCIL Colleagues Memo Sponsors: Council Member Lydia Kou and Vice -Mayor Lauing CITY OF PALO Meeting Date: October 21, 2024 Report #: 2410-3600 ALTO TITLE Colleagues Memo - Restoration of subjective aesthetic standards to Palo Alto's Wireless Communication Facilities (WCF) ordinance. RECOMMENDATION Repeal objective -only aesthetic standards for the siting and design of cell towers (WCFs) and restore subjective aesthetic standards, public hearings, and Architectural Review Board review. Support for Recommendation 1. The only reason that the City imposed "objective" standards was because the FCC forced it in new rules issued in 2018. PTC and others did not think this was the right path. In fact, Palo Alto's ordinance anticipated that the Council could quickly repeal the "objective" standards once it regained the authority to do so, because over 100 cities and the League of California Cities had already sued the FCC by the time that Palo Alto enacted the new ordinance in 2019. (PACC § 18.42.110(g)(h).) Here is what the Ninth Circuit said in August, 2020, when it struck down the FCC's restriction: We conclude that the FCC's requirement that all aesthetic regulations be "objective" is arbitrary and capricious. At the very least, the agency must explain the harm that it is addressing, and the extent to which it intends to limit regulations meant to serve traditional zoning objectives of preventing deployments that are unsightly or out of neighborhood character. . . The requirement that local aesthetic regulations be "objective" is neither adequately defined nor its purpose adequately explained. City of Portland v. United States, 969 F.3d 1020, 1042 (9th Cir. 2020). Before there were "objective -only" standards, there was a thoughtful list of subjective standards, a list that had been prepared collaboratively by multiple City departments and by the ARB. The City can seamlessly return to these standards now. 2. Careful and comprehensive review of wireless facilities is particularly necessary because federal law allows small cell sites that are not entirely hidden to be increased in height and girth by ten feet not withstanding zoning limits. (47 CFR § 1.6100(b)(7)(i).) This means Item 15: Staff Report Pg. 1 Packet Pg. 359 of 377 Item 15 Item 15 Colleagues Memo that even if a site complies with "objective" standards on the day it is approved, it can be altered in ways that will not be compliant in the future. No other permit operates this way. 3. Currently, because of the narrow scope of "objective" aesthetic review, issues with the site of a proposed cell tower are not even eligible to be considered. Having a robust and demanding discretionary application review process pushes applicants to self -regulate and submit the best option in the first place, so there will be less need for appeals. 4. Staff has concern with shot clock compliance. But in practice, the 60-90 day shot clocks are extended frequently - often because the applicant needs more time to get its own application organized and complete internal engineering or planning related to trenching and fiberoptic backhaul for installation. Moreover, so long as the City makes a Director -level decision before the shot clock period ends, it will have complied with the FCC regulations. (47 CFR § 1.6003(a).) The impact of the shot clocks expiring after a decision is made will only be to cut off any subsequent right to appeal lithe applicant does not agree to an extension. In many instances, due to the importance of cooperation from the City and the collaborative framework created by the Master License Agreement, cell tower applicants will likely enter into shot clock tolling agreements to stop the clock, even if it means allowing an appeal (sometimes that appeal will be for their own benefit). Recently, for example, AT&T agreed to extend the shot clock to allow a resident in Santa Cruz County to appeal because the County requested this extension so that their process can play out as intended in their ordinance. Voluntary shot clock tolling also goes both ways. If the City is approaching the end of the shot clock and does not have the information needed to approve the application, the City will deny the application to avoid blowing the shot clock. In those instances, the applicant needs the City's approval to extend the shot clock. As the regulations say, a tolling agreement to stop the shot clock requires "a written agreement between the applicant and the siting authority [i.e, the City]." (47 C.F.R. § 1.6003(d).) Caselaw confirms that denying an incomplete application, without offering the applicant further opportunity to remedy it, is lawful. (ExteNet Sys. v. City of Cambridge, 481 F. Supp. 3d 41, 51 (D. Mass. 2020).) It is also important to keep in mind that while shot clocks were tightened by the FCC small cell order from 2018, the concept was not new. Since 2009, a 90 -day FCC shot clock was in place for colocations. (FCC, Petition for Declaratory Ruling to Clarify Provisions of Section 332(c)(7)(B), 24 FCC Rcd 13994 (November 18, 2009),) so the City has had experience operating the discretionary process under similar time pressure. 5. Other cities have "small cell" cell tower ROW approval processes that include multiple levels of review, each with a publicly -noticed hearing (e.g.Carmel-by-the-Sea, Malibu, Martinez, Mill Valley, Pinole, San Francisco). Item 15: Staff Report Pg. 2 Packet Pg. 360 of 377 Item 15 Item 15 Colleagues Memo 6. Presently, unless there is an appeal to City Council, there is no opportunity at all for a public hearing because the Planning Director's decisions are made in private. (Note that the cell tower applicant may hold a "community meeting", but this is a one-sided show by the applicant. It is no substitute for real public participation, including input to city officials. (PACC § 18.42.110(d)(7)). ) 7. The inclusion of the ARB in the review process should not significantly increase the workload of Planning staff. It somewhat increases the load on the ARB, but this is something they want to take on. Moreover, applicants generally use consistent designs, so it should not be that burdensome for the ARB to review an application. The main question for them is how facilities can be camouflaged and best positioned to minimize esthetic impacts. In particular, the ARB is best qualified to prioritize siting and design goals. Right now, there is no prioritization going on. Staff evaluates cell tower applications solely on the basis of how few "exceptions" to objective standards they require, without taking into account what the exceptions are that are being sought. Hence, proximity to a residence, which is what residents care most about, is deemed no more important than, for example, the color of the paint used on the pole. 8. So far, the City has only approved one standard design for cell towers, a design for a tower located on a decorative metal lamp pole. As things stand now, the "objective" standards are not actually consistently objective, because applicants frequently request and obtain exceptions based on their own claims of necessity. (PACC § 18.42.110(k); Design Standards, p.8.) Since non-objective (that is, subjective) decisions and tradeoffs are being made all the time anyway, the question is, who should make them: The Planning Director or the ARB? The ARB is best qualified to do this. 9. More robust review is also important because cities, such as San Mateo, are finding that small cell applicants are not in fact compliant with permit conditions and are then resistant to remedying these deficiencies when they are discovered. 10. Staff acknowledge that they lack the expertise to assess the accuracy of any transmission - related assertions that applicants use to justify exceptions to the City's standards. The City should hire a technical expert that does not work for the telecom industry to quickly make sure applications are complete so that the shot clocks can be halted within the 10 days after receipt of the application, and also to advise on what is or is not technically feasible. This cost will, by law, be passed on to applicants. There are a few engineering firms that solely represent municipalities, such as Center for Municipal Solutions (http://www.telecomsol.com/www2/node/20), which review all applications submitted to some of its city clients. Item 15: Staff Report Pg. 3 Packet Pg. 361 of 377 Item 15 Item 15 Colleagues Memo BACKGROUND On September 26, 2018, the Federal Communications Commission (FCC) enacted the Declaratory Ruling and Third Report and Order, known as the "Small Cell Order," directing that local regulation of Small Wireless Facilities in the public right-of-way must be published in advance and be "(1) reasonable, (2) no more burdensome than those applied to other types of infrastructure deployments, and (3) objective." In response to the Small Cell Order, on June 13, 2019, the City Council adopted Ordinance 5465, which provided that Tier 2 wireless communication facilities (WCFs) (e.g., adding new equipment to an existing small wireless facility ("collocation")) and Tier 3 WCFs (e.g., new small wireless facilities) would be no longer be subject to site -specific review and approval by the Architectural Review Board (ARB) under Municipal Code Section 18.76.020, and instead would be required only to comply with objective standards to be established by resolution. To be clear, the shift to objective aesthetic standards didn't simply dispense with subjective standards, it a) eliminated public hearings for proposed cell towers, and b) left the decision to approve a cell tower solely in the hands of the Director of Planning & Development. On December 16, 2019, the City Council adopted Resolution 9873 amending and consolidating objective aesthetic, noise, and related standards for WCFs on streetlights and wood utility poles in the public rights of way. In recognition that the Small Cell Order was being challenged in a lawsuit brought by numerous municipalities against the FCC —a lawsuit City Council supported —Ordinance 5465 provides that in the event that "the City Council repeals all objective standards, an application [for a Tier 2 or 3 WCF] shall not be granted unless, in addition to the other requirements of this section, all of the architectural review findings in Section 18.76.020(d) can be made." On August 12, 2020, the Ninth Circuit issued its decision in City of Portland v. Federal Communications Commission, 969 F.3d 1020, 1041-43,1 ruling that the Small Cell Order's requirement that local regulations must "be no more burdensome" and "objective" exceeded the FCC's authority and "must be vacated." (A link to the Ninth Circuit's ruling is attached below.) FISCAL/RESOURCE IMPACT The recommendation to restore prior subjective wireless standards and ARB findings and processes is a straightforward task. This can be accomplished by directing staff to amend the Wireless Communications Facility ordinance (PAMC section 18.42.110) in a manner consistent 1 On Petitions for Review of Orders of the Federal Communications Commission, Publication; https://www.cityofpaloalto.org/files/assets/public/v/1/city-clerk/misc/18-72689.pdf Item 15: Staff Report Pg. 4 Packet Pg. 362 of 377 Item 15 Item 15 Colleagues Memo with this colleagues' memo. This process requires an ordinance amendment that would be reviewed by the Planning and Transportation Commission (PTC) which would forward a recommendation to the City Council for action. Alternatively, for a more expedient process, the City Council could bypass the PTC in accordance with PAMC section 18.80.090 and amend the WCF ordinance on a temporary basis, e.g. two years, with the additional direction to refer a permanent amendment to the PTC. However, modifying the design standards and review process poses additional resource impacts. Potentially the most significant impact would be to the ARB and City Council agenda management. Switching from the current process, in which the Planning Director reviews a project's compliance with the objective standards and subjective standards are applied to any requests for exceptions, to a fully discretionary review by the ARB will increase the amount of time it takes to process applications. Staff would need to anticipate potential appeals on every project and schedule final action hearings on the City Council's agenda prior to the ARB review hearing, in order to meet the mandated shot clock requirements, some of which are more stringent than those mentioned in the memo. While the colleagues' memo authors suggest an extension for application review or appeals can be granted if agreed upon by the parties, this approach cannot be mandated or relied upon for application processing. Applicants are unlikely to choose this approach when presently, state or federal law (or both) provides "deemed granted" approvals for all types of wireless project if the City fails to approve or deny it within the limited shot clock period. In short, wireless communications facility applications are expected to require time on the Council's agenda to make final subjective determinations on any appeal from the ARB's project decision. This would impact the Council's ability to advance other Council priorities or discussions without flexibility for rescheduling to a later week for agendas that are busy or run late. In addition, changing the design standards and review process will impact staff resources. Staff from Planning, Utilities, Public Works, Urban Forestry and the City Attorney's Office already participate in the application review, and would also need to be available for ARB and City Council meetings. While staff can engage professional service agencies to respond to application processing and review, administrative and overhead staff support will be required to review work products, reports, and to schedule meetings. Initial training on the review process and legal framework for wireless project decisions would also be required for ARB members, for work currently performed and coordinated by Planning staff. Public meetings before the ARB would require attendance from all departments contributing to wireless project review. A wholly subjective process may impact the quality of applications received, since there will be less guidance for project applicants on the City's standards for review. It would also increase the likelihood of applicant appeals or requests for judicial review if the City does not approve a project, which would require further legal services to defend. ATTACHMENTS Attachment A: DRAFT Resolution Repealing Objective -Only Standards Item 15: Staff Report Pg. 5 Packet Pg. 363 of 377 Item 15 Attachment A - DRAFT Resolution Repealing Objective -Only Standards DRAFT Resolution Repealing Objective Standards DRAFT The Council of the Charter City of Palo Alto RESOLVES as follows: SECTION 1. Findings and Declarations. a. On September 26, 2018, the Federal Communications Commission (FCC) enacted the Declaratory Ruling and Third Report and Order, known as the "Small Cell Order," directing that local regulation of Small Wireless Facilities in the public right-of-way must be published in advance and be "(1) reasonable, (2) no more burdensome than those applied to other types of infrastructure deployments, and (3) objective." b. In response to the Small Cell Order, on June 13, 2019, the City Council adopted Ordinance 5465, which provided that Tier 2 wireless communication facilities (WCFs) (e.g., adding new equipment to an existing small wireless facility ("collocation")) and Tier 3 WCFs (e.g., new small wireless facilities) would be no longer be subject to site -specific review and approval by the Architectural Review Board (ARB) under Municipal Code Section 18.76.020, and instead would be required only to comply with objective standards to be established by resolution. To be clear, the shift to objective aesthetic standards didn't simply dispense with subjective standards, it a) eliminated public hearings for proposed cell towers, and b) left the decision to approve a cell tower solely in the hands of the Director of Planning & Development. c. On December 16, 2019, the City Council adopted Resolution 9873 amending and consolidating objective aesthetic, noise, and related standards for WCFs on streetlights and wood utility poles in the public rights of way. d. In recognition that the Small Cell Order was being challenged in a lawsuit brought by numerous municipalities against the FCC —a lawsuit City Council supported —Ordinance 5465 provides that in the event that "the City Council repeals all objective standards, an application [for a Tier 2 or 3 WCF] shall not be granted unless, in addition to the other requirements of this section, all of the architectural review findings in Section 18.76.020(d) can be made." e. On August 12, 2020, the Ninth Circuit issued its decision in City of Portland v. Federal Communications Commission, 969 F.3d 1020, 1041-43, ruling that the Small Cell Order's requirement that local regulations must "be no more burdensome" and "objective" exceeded the FCC's authority and "must be vacated." f. The City Council now wishes to revoke the objective standards and subject Tier 2 and Tier 3 WCFs to review by the ARB. SECTION 2. Repeal of Objective Standards a. The City Council hereby repeals the "Objective Standards for Wireless Communication Facilities in the Public Rights of Way on Streetlight Poles and Wood Utility Poles" contained in Exhibits 1, 2 and 3 of Resolution 9873. b. The City Council hereby directs that an application for a Tier 2 and Tier 3 WCF permit "shall not be granted unless, in addition to the other requirements of this section, all of the architectural review findings in Section 18.76.020(d) can be made" by the ARB as provided in Municipal Code Section 18.42.110(g)(2) and (h)(2). Item 15: Staff Report Pg. 6 Packet Pg. 364 of 377 Item 15 Attachment A - DRAFT Resolution Repealing Objective -Only Standards c. The City Council hereby directs Staff, in Staff's review of Tier 2 and Tier 3 WCF applications, to apply the guidelines in place prior to the passage of Resolution 9873 —specifically, the guidelines that were prepared jointly by the ARB, by the Department of Planning & Development, and by the Utility Department —until such time that Staff brings to Council for consideration a revised list of guidelines, and Council approves these guidelines. d. In order to ensure and maintain the safety, property values and aesthetic qualities of Palo Alto streets and neighborhoods, the City Council hereby directs Staff, in Staff's review of Tier 2 and Tier 3 WCF applications, to apply this additional guideline: Locating a WCF within 100 feet of a residential building or within 300 feet of a public school a) shall be least preferred; b) shall only be permitted when there is no other technically feasible location; and c) shall only be permitted if an expert, hired by the City and having no telecommunications industry or telecommunications industry -related clients for at least two years, has evaluated the WCF applicant's assertions as to technical feasibility. The City Council hereby directs Staff that its priority in the siting of WCFs is to maximize the distance between these facilities and residences. f. The City Council hereby directs Staff to provide the public with the text of any new or revised guidelines Staff wishes to propose to City Council at least thirty days before Staff brings these guidelines to City Council for consideration. SECTION 3. Savings. If any section, subsection, clause or phrase of this resolution or the attached standards is for any reason held to be invalid, such decision shall not affect the validity of the remaining portion or sections of the resolution and exhibits. The City Council hereby declares that it would have adopted the resolution and exhibits, and each section, subsection, sentence, clause or phrase thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid. SECTION 4. Environmental Review. The City Council finds that this resolution is exempt from the provisions of the California Environmental Quality Act (CEQA), pursuant to Section 15061 of the CEQA Guidelines, because it does not authorize the construction of WCFs in any locations where such facilities are not already permitted; therefore it can be seen with certainty that there is no possibility that the ordinance will have a significant effect on the environment. The resolution is further exempt under CEQA Guidelines sections 15301, 15302, 15303 and 15305 because it represents part of a comprehensive regulatory scheme governing minor alterations to existing facilities or small structures. Item 15: Staff Report Pg. 7 Packet Pg. 365 of 377 Item 16 Item 16 Staff Report CITY OF PALO ALTO City Council Staff Report From: City Manager Report Type: INFORMATION REPORTS Lead Department: Utilities Meeting Date: October 21, 2024 Report #:2408-3364 TITLE Informational Report on the Annual Review of the City's Renewable Procurement Plan, Renewable Portfolio Standard Compliance, and Carbon Neutral Electric Supplies for 2023; CEQA Status — Not a Project RECOMMENDATION No action is necessary in response to this staff report. EXECUTIVE SUMMARY Like all electric utilities in California, Palo Alto is subject to the state's Renewable Portfolio Standard (RPS) mandate of 60% by 2030. The City has also adopted a Carbon Neutral Plan, which led to the achievement of a carbon neutral electric supply portfolio starting in 2013 (and which was updated by Council in August 2020). In 2011, in compliance with state RPS regulations, the Council also formally adopted an RPS Procurement Plan and an RPS Enforcement Program that recognize certain elements of the state's RPS law applicable to publicly -owned utilities. The RPS Enforcement Program requires the City Manager, or their designee, the Utilities Director, to conduct an annual review of the Electric Utility's compliance with the procurement targets set forth in the City's RPS Procurement Plan. This staff report satisfies the reporting requirements of the City's RPS Enforcement Program, while also providing an update on the City's compliance with the Carbon Neutral Plan. The City continues to meet both its RPS and Carbon Neutral Plan objectives —even after selling 223,000 MWh of renewable energy in 2023. BACKGROUND The City currently has two independent procurement targets related to renewable and carbon neutral electricity: • RPS Procurement Plan (60% by 2030): The City's official renewable electricity goal is contained in the RPS Procurement Plan that the City was required to adopt under Section 399.30(a) of California's Public Utilities Code. This was adopted in December 2011 (Staff Item 16: Staff Report Pg. 1 Packet Pg. 366 of 377 Item 16 Item 16 Staff Report Report 22251, Resolutions 92142 and 92153) and updated in November 2013 (Staff Report 41684, Resolution 93815), December 2018 (Staff Report 97616, Resolution 98027), and December 2020 (Staff Report 116508, Resolution 99299). The last update to the RPS Procurement Plan brought it into alignment with the state's 60% RPS requirement (SB 100), which was signed into law in 2018. The RPS Procurement Plan and RPS Enforcement Program complement each other: the Procurement Plan establishes official procurement targets, while the Enforcement Program specifies the reporting and monitoring that is required of the Utilities Director while working to achieve those targets. The procurement requirement in the current version of the City's RPS Procurement Plan is that the City acquire renewable electricity supplies equal to 60% of retail sales by 2030, which is in line with the state's current RPS mandate. The RPS Procurement Plan also contains an escalating set of targets for six interim Compliance Periods (2011-2013, 2014- 2016, 2017-2020, 2021-2024, 2025-2027, and 2028-2030), as well as subsequent 3 -year compliance periods beginning in 2031. • Carbon Neutral Plan (100% Carbon Neutral Electricity): The Carbon Neutral Plan was adopted in March 2013 (Staff Report 355010, Resolution 932211) and updated in August 2020 (Staff Report 1155612, Resolution 991313), and requires that the City procure a carbon neutral electric supply portfolio starting in calendar year (CY) 2013. In general, this 1 Staff Report 2225: https://www.cityofpaloalto.org/files/assets/public/v/1/from-archive/agendas-minutes- reports/reports/city-ma nsger-reports-cm rs/2011/fi na l-staff-report-id-2225-renewable-energy-procu rement- enforcement-prop-12-12-11.pdf 2 Resolution 9214: https://www.cityofpaIoaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso-9214.pdf 3 Resolution 9215: https://www.cityofpaIoaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso-9215.pdf 4 Staff Report 4168: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city- manager-reports-cmrs/year-archive/2013/final-staff-report-id-4168 rps-procurement-plan-update.pdf 5 Resolution 9381: https://www.cityofpaIoaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso-9381.pdf 6 Staff Report 9761: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city- manager-reports-cmrs/year-archive/2018/final-staff-report-id9761 approval-of-the-2018-electric-integrated- resource-plan-and-related-documents.pdf 7 Resolution 9802: https://www.cityofpaIoaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso- 9802. pdf?t=40498.07 8 Staff Report 11650: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes- reports/reports/city-manager-reports-cmrs/yea r-archive/2020-2/id-11650.pdf?t=41063.12 9 Resolution 9929: https://www.cityofpaloalto.org/files/assets/public/v/1/city-clerk/resolutions/resolutions-1909- to-present/2020/reso-9929. pdf 10 Staff Report 3550: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes- reports/reports/city-manager-reports-cmrs/year-archive/2013/final-staff-report-id-3550 electric-supply-portfolio- carbon-neutral-plan.pdf 11 Resolution 9322: https://www.cityofpaIoaIto.org/files/assets/public/v/1/city-clerk/resolutions/reso-9322- 33835.pdf 12 Staff Report 11556: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes- reports/reports/city-manager-reports-cmrs/yea r-archive/2020-2/id-11566.pdf 13 Resolution 9913: https://www.cityofpaloalto.org/files/assets/public/v/1/city-clerk/resolutions/reso- 9913.pdf?t=40151.26 Item 16: Staff Report Pg. 2 Packet Pg. 367 of 377 Item 16 Item 16 Staff Report goal is expected to be achieved primarily through purchases made under the City's long- term renewable power purchase agreements (PPAs) and output from its hydroelectric resources. However, when the City Council approved an update to the Carbon Neutral Plan in August 2020, they also approved a new procurement strategy whereby the City does not keep all of the output of its long-term, in -state PPAs, but instead exchanges that output for less expensive out-of-state renewable generation (with the net proceeds used to fund local decarbonization programs). ANALYSIS The City continues to meet its objectives under the RPS Procurement Plan and the Carbon Neutral Plan and achieved an RPS level of 39.3% in 2023. This value is slightly short of the state's 41.25% RPS procurement "soft target" for the year; however, the City remains compliant with the state RPS procurement mandate, which is evaluated over a multi -year horizon (2021-2024 in this case). The City also has more than enough RPS supplies under contract to far exceed the state's soft target levels in the last year of the four-year compliance period —and beyond. Below is a summary of CPAU's progress toward satisfying its renewable energy and carbon neutral procurement targets. RPS Procurement Plan Compliance In CY 2023, the City initially received 519,843 MWh of renewable energy through its long-term contracts for wind, solar, landfill gas, and small hydro resources (which represents 62.3% of the City's total retail sales for that period). Additionally, the City received 486,132 MWh of large hydroelectric generation (representing 58.3% of the City's total retail sales), which is not classified as eligible renewable generation by the state. Based on the Council's decision in August 2020 to pursue the "REC Exchange Program" (Staff Report 1155614, Resolution 991315) the City sold 223,362 MWh of in -state renewable energy supplies, yielding $9.03 million in sales revenue, while purchasing 200,000 MWh of out-of-state renewable energy16, at a cost of $1.19 million. Figure 1 below depicts the City's load and supply resources for CY 2023, before and after the REC Exchanges described above. Accounting for these transactions, the City's net renewable energy supplies totaled 496,232 MWh, which represents 59.5% of the City's total retail sales for 2023. However, under the state's RPS regulations the majority of the out-of-state renewable energy purchases were not able to be applied to the City's RPS requirement, hence the City's official RPS level was only 39.3%. 14 Staff Report 11556: https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes- reports/reports/city-manager-reports-cmrs/yea r-archive/2020-2/id-11566.pdf 15 Resolution 9913: https://www.cityofpaloalto.org/files/assets/public/v/1/city-clerk/resolutions/reso- 9913.pdf?t=40151.26 16 Not including 30,000 MWh of RECs purchased on behalf of PaloAltoGreen customers. Item 16: Staff Report Pg. 3 Packet Pg. 368 of 377 Item 16 Item 16 Staff Report Figure 1: CY 2023 Electric Load and Supply Resources, With and Without REC Exchange Transactions 1,000,000 900,000 t 800,000 700,000 O J 600,000 (tf N 500,000 a O. Q 400,000 N U •L 300,000 U a) LU 200,000 100,000 0 ------------------------------------------------- "Unspecified Power" (Market Power + RECs)' Total Load (863,567 MWh) CY 2023 Baseline CY 2023 w/ REC Exchanges For CY 2024 to date, the City has contracted to sell about 160,000 MWh of in -state renewable generation and has purchased about 133,000 MWh of out-of-state renewable generation. Figure 2 below depicts the City's projected load and supply resources for CY 2024, before and after the REC Exchanges described above. Once these transactions are accounted for, they are projected to yield a total of about $10.9 million in net revenue, and an official RPS level of 44% (equal to the state's RPS soft target for 202411). 17 Note that even if the City were to fall short of the 44% RPS soft target in 2024 it would still be able to comply with its overall RPS obligation for the 2021-2024 compliance period, due to its accumulation of surplus RECs (or "Excess Procurement") from prior years. Item 16: Staff Report Pg. 4 Packet Pg. 369 of 377 Item 16 Item 16 Staff Report Figure 2: Projected CY 2024 Electric Load and Supply Resources, With and Without REC Exchange Transactions 1,100,000 1,000,000 900,000 �j- 800,000 700,000 O -a 600,000 M CA 0 500,000 O. 400,000 a'J 300,000 4J 200,000 100,000 0 CY 2024 Baseline CY 2024 w/ REC Exchanges "Unspecified Power" (Market Power + RECs) In accordance with the state's RPS Program requirements, CPAU's Procurement Plan is intended to yield a renewable electric supply portfolio that balances environmental goals with system reliability while maintaining low and stable retail electric rates. The state RPS program requires retail electricity suppliers like CPAU to procure progressively larger renewable electricity supplies across a series of separate multi -year Compliance Periods. CPAU's procurement targets, as well as its actual/projected procurement volumes and RPS levels, for the first three Compliance Periods are summarized in Table 1 below. Table 1: RPS Compliance Period Procurement Targets and Actual Procurement RPS Actual/Projected Retail Sales Procurement % of Retail Compliance Years Procurement (MWh) Target (MWh) Sales Period (MWh) 1 2011-2013 2,837,773 567,555 607,740 21.4% 2 2014-2016 2,801,056 605,949 826,855 29.5% 3 2017-2020 3,487,686 1,043,426 1,619,303 46.4% 4 2021-2024 3,302,501 1,318,639 1,318,639 39.9% TOTALS 12,429,016 3,535,570 4,372,537 35.2% Item 16: Staff Report Pg. 5 Packet Pg. 370 of 377 Item 16 Item 16 Staff Report Carbon Neutral Plan In CV 2023, CPAU achieved its goal, set forth in the Carbon Neutral Plan, of an electric supply portfolio with zero net greenhouse (GHG) emissions for the 11th consecutive year. Carbon neutrality was achieved in CV 2023 through existing hydro and renewable generation (wind, solar, and landfill gas). As discussed above, due to the Council's adoption of the REC Exchange Program in August 2020, the City sold 223,362 MWh of in -state renewable energy supplies, yielding $9.03 million in sales revenue, while purchasing 200,000 MWh of out-of-state renewable energy, at a cost of $1.19 million. Accounting for these transactions, the City's net renewable energy supplies totaled 496,232 MWh, which represents 59.5% of the City's total retail sales for 2023. The remainder of the City's needs were supplied by large hydroelectric resources. When the City Council approved an update to the Carbon Neutral Plan in August 2020, the primary change was to adopt an hourly carbon accounting methodology as the basis for determining whether the City has met its carbon neutrality objective. Using an annual accounting approach, the City had an overall surplus of 98,106 MWh of carbon neutral generation compared to its load (equal to 11.4% total load) in 2023, and thus substantially exceeded the carbon neutrality standard. Meanwhile, under the hourly carbon accounting approach,18 the City's electric supply portfolio also exceeded the carbon neutrality standard, being responsible for a net negative amount of GHG emissions: -1,617 metric tons of CO2 equivalent. See Figure 3 below for a depiction of the City's monthly total net CO2 emissions for 2023, as well as the monthly average emissions intensity for the California electric grid. 18 The City's hourly carbon accounting methodology entails calculating the city's net surplus or deficit carbon neutral supply position relative to its load in every hour of the year. The grid average electricity emissions intensity for each hour is then applied to each of these hourly surpluses or deficits to yield a net emissions contribution (or reduction) that the City's electric supply portfolio is responsible for in that hour. These hourly emissions totals are then summed across the entire year to yield the City's annual emissions total for the year. Item 16: Staff Report Pg. 6 Packet Pg. 371 of 377 Item 16 Item 16 Staff Report Figure 3: CY 2022 Monthly Net Electric Supply Emissions and CAISO Emissions Intensity —CAISO Emissions Intensity(lb CO2/MWh) —Palo Alto Monthly Net Emissions (MT CO2) 600 —Palo Alto Cumulative Net Emissions (MT CO2) 60 r4 0 0 U I- 400 a 40 vt SA O a) in eA 1A 200 20 W C 0 {A S ++ C O W 0 0 0 Jan Feb Mar Apr ay Jun Jul g Sep Oct ++ Nov ec 4) a0 a a O -200 -20 O U -400 For CY 2024, above average hydro conditions are expected to result in about 58% of the City's electric supply needs being supplied by hydroelectric resources (compared to a long-term annual average of about 45%), with the remainder coming from non -hydro renewable energy resources. FISCAL/RESOURCE IMPACT This is an informational report that has no fiscal or resource impact to the Utilities Department or the City. As noted above, the implementation of the REC Exchange Program resulted in net revenue of $7.84 million for CY 2023. STAKEHOLDER ENGAGEMENT This is an informational report only and no stakeholder engagement is necessary. �►l�AI Is1i►L�11�1>.><f1 Uc YI1 t This report is for informational purposes only with no action required by the Council. The Council's review of this report does not meet the definition of a "project" pursuant to Public Resources Code Section 21065, thus California Environmental Quality Act review is not required. APPROVED BY: Dean Batchelor, Director of Utilities Staff: James Stack, PhD, Senior Resource Planner Item 16: Staff Report Pg. 7 Packet Pg. 372 of 377 Item 17 Item 17 Staff Report City Council Staff Report Report Type: INFORMATION REPORTS CITY O F Lead Department: Administrative Services PALO LTO Meeting Date: October 21, 2024 Report #:2410-3599 TITLE City of Palo Alto Monthly Investment Activity Report for September 2024 (Unaudited) ATTACHMENTS Attachment A: Monthly Investment Activity Report - September 2024 APPROVED BY: Lauren Lai Item 17: Staff Report Pg. 1 Packet Pg. 373 of 377 Docusign Envelope ID: 4EE164D6-F6A3-4DB8-9FB3-24C0B14D3B0E Item 17 Attachment A - Monthly Investment Activity CITY OF PALO ALTO Report -September 2024 CITY OF MONTHLY INVESTMENT ACTIVITY REPORT PALO ALTO September 2024 (Unaudited) TO: Honorable City Council Report Posted at the City's Website: www.cityofpaloalto.org/ investmentreporting Above Link on Council Agenda of October 21, 2024 The City's Investment Policy' (Policy) and California Government Code Section 53607 requires that a report of transactions (investments, reinvestment, sold, and exchanged securities) be made available to the Council on a monthly basis. The attached list of transactions (Attachment A) also includes, though not required by the Policy or the government code, security maturities and cash movement activity in the City's two liquid operating cash pool accounts (Local Agency Investment Fund or LAIF and Fidelity accounts). Liquid cash are available on a daily basis but are invested by the two entities in a range of securities (e.g., treasuries, federal agencies, commercial paper, corporate bonds, time deposits, loans, and certificate of deposits/bank notes). This reporting requirement is separate and distinct from the quarterly investment report submitted under California Government Code Section 53646 that includes portfolio composition, a detailed list of all securities, performance compared to the Policy, overall compliance with the Policy, and the City's ability to meet expenditure requirements over the next six months. Prepared by: Approved by: DocuSigned by: N44 10/3/2024 DocuSigned by: �a E5��53B497C4A904B9._. 10/4/2024 119CA000B9DF4D1... Tarun Narayan Date Christine Paras Date Mgr. Treasury, Debt & Asst. Director ASD Investments DocuSigned by: 10/7/2024 66236E5C20284Bc... Lauren Lai Date Chief Financial Officer ' https://www.citvofpaloaIto.org/files/assets/public/v/1/administrative-services/investment-policies/adopted-investment-policy-1-39-asd.pdf Item 17: Staff Report Pg. 21 Packet Pg. 374 of 377 Docusign Envelope ID: 4EE164D6-F6A3-4DB8-9FB3-24C0B14D3B0E ent A ( )Item 17 Attachment A - Monthly Investment of Palo Alto City of Palo Alto Activity Report - September 2024 Svcs. Dept. Activity Report HamiltonAve., 4th Floor Palo Alto, CA 94301 PA LO Sorted By Safekeeper (650)329-2362 A LTO September 1, 2024 - September 30, 2024 Par Value Par Value Percent Beginning Current Transaction Purchases or Redemptions or Ending CUSIP Investment # Issuer of Portfolio Balance Rate Date Deposits Withdrawals Balance Safekeeper: Union Bank of California Negotiable Certificates of Deposits 320165JK0 2076 NCD First Farmers Bank & Trust 1.750 09/04/2024 0.00 245,000.00 14042TCP0 2089 NCD Capital One Bank USA NA 1.900 09/05/2024 0.00 245,000.00 7954504D4 2102 NCD Sallie Mae Bank 1.900 09/18/2024 0.00 245,000.00 33847E4E4 2414 NCD Flagstar Bank FSB 0.400 09/30/2024 0.00 249,000.00 Subtotal and Balance 12,870,000.00 0.00 984,000.00 11,886,000.00 Corporate Medium Term Bonds Subtotal and Balance 15,500,000.00 15,500,000.00 Federal Agency Bonds 880591 ER9 1519 Tennessee Valley Authority 2.875 09/16/2024 0.00 750,000.00 Subtotal and Balance 155,908,000.00 0.00 750,000.00 155,158,000.00 Treasury Securities (Notes) Subtotal and Balance 3,000,000.00 3,000,000.00 Municipal Bonds 799038NP5 2521 MUN San Mateo Cnty Comm. College D 0.500 09/02/2024 0.00 2,000,000.00 752147HH4 2522 MUN Rancho Santiago Comm College D 0.634 09/02/2024 0.00 450,000.00 799038NP5 2523 MUN San Mateo Cnty Comm. College D 0.500 09/02/2024 0.00 1,500,000.00 Subtotal and Balance 107,562,833.13 0.00 3,950,000.00 103,612,833.13 Supranationals (World Bank) Bonds Subtotal and Balance 26,500,000.00 26,500,000.00 Safekeeper Subtotal 53.040% 321,340,833.13 0.00 5,684,000.00 315,656,833.13 Safekeeper: U.S. Bank Negotiable Certificates of Deposits 33715LET3 2845 NCD First Technology Federal Credi 5.350 09/24/2024 0.00 249,000.00 23204HNL8 2848 NCD Customers Bank 5.300 09/23/2024 0.00 249,000.00 200339FB0 2856 NCD Comerica Bank Texas 5.250 09/30/2024 0.00 249,000.00 Portfolio CPA AP Run Date: 10/02/2024 - 23:37 (PRF_DA) 7.3.11 Item 17: Staff Report Pg. 3 Packet Pg. 375 of 377 eport Ver. 7.3.11 Docusign Envelope ID: 4EE164D6-F6A3-4DB8-9FB3-24C0B14D3B0E Item 17 City of Palo Alto Activity Report. Attachment A - Monthly Investment Page 2 September 1, 2024 - September 30, 2024 Activity Report - September 2024 Par Value Par Value Percent Beginning Current Transaction Purchases or Redemptions or Ending CUSIP Investment # Issuer of Portfolio Balance Rate Date Deposits Withdrawals Balance Safekeeper: U.S. Bank Negotiable Certificates of Deposits 28619WAH6 2915 NCD Elements Financial FCU 5.350 09/20/2024 0.00 249,000.00 98426AAC1 2929 NCD Y-12 Federal Credit Union Bank 5.250 09/29/2024 0.00 249,000.00 06644QAF8 3028 NCD BankFirst Norfolk 3.600 09/30/2024 249,000.00 0.00 301485AN8 3029 NCD Exchange State Bank 4.600 09/19/2024 249,000.00 0.00 94789PCJ1 3030 NCD Webster Five Cents Savings 4.550 09/19/2024 250,000.00 0.00 710649AD6 3031 NCD Peoples Bank - Pratt KS 4.550 09/23/2024 249,000.00 0.00 20368QAD8 3032 NCD Community Choice Credit Union 4.000 09/30/2024 249,000.00 0.00 21923MAA9 3033 NCD Cornerstone Community FCU 4.250 09/30/2024 249,000.00 0.00 Subtotal and Balance 30,129,000.00 1,495,000.00 1,245,000.00 30,379,000.00 Corporate Medium Term Bonds 037833DP2 3027 MTN Apple, Inc. 2.200 09/19/2024 1,000,000.00 0.00 Subtotal and Balance 12,530,000.00 1,000,000.00 0.00 13,530,000.00 Federal Agency Bonds 3133EN5S5 2789 Call Federal Farm Credit Bank . 5.900 09/12/2024 0.00 1,500,000.00 3133EPFB6 2865 Call Federal Farm Credit Bank . 5.840 09/12/2024 0.00 1,000,000.00 3133EPFB6 2880 Call Federal Farm Credit Bank . 5.840 09/12/2024 0.00 1,000,000.00 3133EPX75 2935 Call Federal Farm Credit Bank . 5.850 09/27/2024 0.00 1,000,000.00 3130AYV45 2963 Call Federal Home Loan Bank 6.000 09/14/2024 0.00 1,500,000.00 3130B0DM8 3017 Call Federal Home Loan Bank 6.000 09/13/2024 0.00 1,500,000.00 3130B2RP2 3025 Call Federal Home Loan Bank 5.250 09/25/2024 1,000,000.00 0.00 Subtotal and Balance 30,172,336.52 1,000,000.00 7,500,000.00 23,672,336.52 Treasury Securities (Notes) 91282CFN6 2701 TB U.S. Treasury 4.250 09/30/2024 0.00 1,000,000.00 Subtotal and Balance 2,500,000.00 0.00 1,000,000.00 1,500,000.00 Municipal Bonds 79772ECF4 2571 MUN San Francisco Cmnty Facs Dist 3.108 09/02/2024 0.00 300,000.00 544351 KT5 2800 MUN City of Los Angeles 2.840 09/02/2024 0.00 310,000.00 Subtotal and Balance 132,905,908.30 0.00 610,000.00 132,295,908.30 Supranationals (World Bank) Bonds 45906M3K5 2735 IBRD Intl Bk Recon & Development 4.500 09/30/2024 0.00 2,000,000.00 45906M3K5 2744 IBRD Intl Bk Recon & Development 4.500 09/30/2024 0.00 1,500,000.00 45818WFV3 3026 IADB Inter -American Dev. Bank 3.900 09/19/2024 1,000,000.00 0.00 Portfolio CPA AP Run Date: 10/02/2024 - 23:37 (PRF_DA) 7.3.11 Item 17: Staff Report Pg. 4 Packet Pg. 376 of 377 eportVer. 7.3.11 Docusign Envelope ID: 4EE164D6-F6A3-4DB8-9FB3-24C0B14D3B0E Item 17 City of Palo Alto Activity Report Attachment A - Monthly Investment Page 3 September 1, 2024 - September 30, 2024 Activity Report - September 2024 Par Value Par Value Percent Beginning Current Transaction Purchases or Redemptions or Ending CUSIP Investment # Issuer of Portfolio Balance Rate Date Deposits Withdrawals Balance Safekeeper: U.S. Bank Supranationals (World Bank) Bonds 459058KW2 3034 IBRD Intl Bk Recon & Development 4.625 09/24/2024 1,000,000.00 0.00 Subtotal and Balance 23,500,000.00 2,000,000.00 3,500,000.00 22,000,000.00 SafekeeperSubtotal 37.534% 231,737,244.82 5,495,000.00 13,855,000.00 223,377,244.82 Safekeeper: Not applicable - Cash/Managed Pool Accounts LAIF & Fidelity Cash Accounts SYS158 158 Fidelity Investments 4.810 46,084.56 0.00 SYS159 159 Local Agency Investment Fund 4.570 33,900,000.00 5,900,000.00 Subtotal and Balance 28,046,378.79 33,946,084.56 5,900,000.00 56,092,463.35 Safekeeper Subtotal 9.425% 28,046,378.79 33,946,084.56 5,900,000.00 56,092,463.35 Total 100.000% 581,124,456.74 Run Date: 10/02/2024-2337 Item 17: Staff Report Pg. 5 39,441,084.56 25,439,000.00 595,126,541.30 Portfolio CPA AP BA (PRF_DA) 7.3.11 Packet Pg. 377 of 377 eportVer. 7.3.11