REQUEST
Council is requested to approve a conceptual design for the Council Chambers and a list of
improvements to the Council Chambers which will be included in the FY 1997-98budgetary
process.
RECOMMENDATIONS
Staff recommends that:
Council approve the conceptual design as presented in. the report titled "Council
Chamber Modernization Project, Conceptual Design Study," and
Council approve the.improvements listed in Exhibit B for consideration in the FY
1997-98 budgetary process.
POLICY IMPLICATIONS
Approval of this action does not represent any change to existing policies.
EXECUTIVE SUMMARY
In a survey completed in 1996, the Council indicated that while the basic configuration of the
Chambers is satisfactory, improvements are needed in the audio-video presentation system,
public podium, staff area, public seating area, and overall architectural decor. On May 6,
1996, (CMR:250:96) Council directed staff to proceed with developing a list of conceptual
improvements that would address the Council’s concerns.
On August 5, 1996, (CMR:364:96) Council approved a list of conceptual improvements for
the Council Chambers and staff proposed development of three alternative designs based on
the list. During the development of the design alternatives, it became apparent that the visual
and physical constraints of the Chambers precluded any substantive alternative physical
configuration for designs. Therefore, staff concentrated on developing variations in the
configuration of the dais/staff area, public seating area and the audio visual presentation
ClVIR:213:97 Page 1 of 3
System. The process and results are documented in Exhibit C a report titled "Council
Chamber Modernization ProjeCt, Conceptual Design Study." As detailed in Exhibit A, the
estimated cost of the comprehensive list of all improvements is $960,000.
While it is staff’s opinion that all of the improvements in the report are desirable, staff is
recommending not to construct two categories of the improvements due to their high cost,
estimated at $640,000. The audio visual presentation system would have included a multi-
media system that incorporated the latest audio visual mediums using touch screen monitors
and two rear projection screens and the overall architecture decor enhancements would have
consisted of a new louvered entrance, redesigning of the Council dias and adding a permanent
backdrop compatible with the louvered divider.
Staff is recommending a reduced scope of work that will address the majority of the Council’s
concerns and areas of safety and accessibility, estimated to cost $320,000 (a detailed scope
and estimate are the attached Exhibit B). Below is a brief description of the improvements.
General The carpet will be replaced throughout the Council Chambers since it is
showing signs of wear in heavily traveled areas and is a safety concern.
Staff area The staff tables will be remodeled to reduce congestion and the low wall
between staff and the public will be redesigned to reduce the appearance of separation
between staff and the public.
Audio Visual Prese~Jon
upgraded.
The sound system, microphones and speakers, will be
~ The TV booth will be removed to increase site lines for the public.
This will have an impact on MPAC’s operations in broadcasting the meetings in the
Chambers. Staff will work with MPAC and Cable Co-op to identify changes to their
operations. No specific proposal has been developed at this time.
The benches will be refurbished to increase comfort and space will be allocated for
wheel chair seating. The podium will be redesigned for accessibility. The sloped
floor will be flattened to provide accessibility to the public podium and staff areas.
If the project is approved with the FY 1997-98 budget, the design will occur during the first
half of FY 1997-98 and construction within the Council Chambers will occur in a timeline
centered around the Council’s vacation in the summer and fall of 1998.
~_S_CAL IMPACT_
The project will be part of the 1997-98 budget review process.
ENVIRONMENTAL ASSESSMENT
The project is exempt from the California Environmental Quality Act (CEQA) under Section
15301 of the CEQA Guidelines.
CMR:213:97 Page 2 of 3
ATTACHMENTS
A - Conceptual Design Study Improvements Summary with estimated costs
B - Reduced Scope of Work Improvements Summary with estimated costs
C - Council Chamber Modernization Project, Conceptual Design Study
PREPARED BY: John A. Carlson, Acting Assistant Director of Public Works
DEPARTMENT HEAD REVIEWS:
GLENN S. ROBERTS
Director of Public Works
CITY MANAGER APPROVAL:
CMR:213:97 Page 3 of 3
ATTACHMENT A
CONCEPTUAL DESIGN STUDY
IMPROVEMENT SUMMARY
AND
ESTIMATED COST
Below is a brief description of the proposed improvements shown in Exhibit A.
Council dais and staff area
The Council dais will be remodeled to accommodate individual monitors, and current and
future electronics/data/communications systems. A permanent backdrop compatible in design
toSahe louvered divider will be added behind the dais. Staff tables will be attached to the dais
and share a similar design with the dais. The low wall between staff and the public will be
redesigned to reduce the appearance of separation between staff and the public.
Audio Visual presentation
The .presentation system will incorporate the latest audio visual mediums using touch screen
monitors for control and utilize existing two rear projection screens located on the north wall.
The Public and staff will present and control their presentations from the public podium. The
City Clerk’s duties, such as voting and agenda management, will be electronically controlled
at the City Clerks desk and will be viewed from the rear projection screens and monitors.
The Council and staff will have individual monitors which will duplicate images that appear
on the rear projection screens.
The existing TV booth will be removed and a new wooden louvered entrance will be added.
The wooden louvered architecture will be expanded to include a permanent public notice,
packet and handout table and a new TV/radio booth at the south wall (optional). The existing
benches wilt be upgraded, but will not change in appearance, and space will be allocated for
wheel chair access. The sloped floor will be flattened to provide accessibility to the public
podium and staff areas.
The design will occur during the first half of FY 1997-98 and construction within the Council
Chambers will occur in a timeline centered around the Council’s vacation in the summer and
fall of 1998.
Page 1 of 2
ATTACHMENT A
CONCEPTUAL DESIGN STUDY
IMPROVEMENT SUMMARY
AND
ESTIMATED COST
The estimated Budget for the proposed work is:
General Chamber Configuration
Entrance and TV Booth Imp.
Ca .rpets
Public Seating
ADA Improvements, CIP
Total
Dais, Staff Area, and Public Podium
Presentation System
Total Construction Cost
Design, Construction and Inspection
Total Budget Estimate
$145,000
$45,000
$60,000
$325,000
$145,000
$740,000
$960,000
Page 2 of 2
ATTACHMENT B
REDUCED SCOPE OF WORK
IMPROVEMENT SUMMARY
AND
ESTIMATED COST
Below is a brief description of the reduced scope of work.
Staff area
Remodel the staff tables and redesign the low wall between staff and the public to reduce the
appearance of separation between staff and the public.
Audio Visual Presentation
Upgrade the sound system to improve the microphones and speakers.
Public Area
Improvements will include removing of the TV booth, refurbishing the benches (no change
in appearance), replacing the carpet (throughout Council Chambers), remodelling the podium
and allocating space for wheel chair seating. The sloped floor will flattened to provide
accessibility to the public podium and staff areas.
The estimated Budget for the proposed work is:
General Chamber Configuration
TV Booth Demolition.
Carpets
Public Seating
ADA Improvements, CIP
Total
Staff Area, and Public Podium
Presentation System
Total Construction Cost
Design, Construction and Inspection
Total Budget Estimate
$ 5,000
$45,000
$60,000
$75.000
$185,000
$ 20,000
$245,000
$320,000
Page 1 of 1