HomeMy WebLinkAbout1997-04-01 City Council (6)City of Palo Allto City Manager’s Repot, TO:HONORABLE CITY COUNCIL ATTENTION: FROM: FINANCE COMMITTEE CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES AGENDA DATE: APRIL 1, 1997 CMR:168:97 SUBJECT:1996-97 MIDYEAR PROGRESS REPORT ON KEY PLANS AND IMPACT MEASURES REOUEST Periodic performance reporting to the Council by City departments is an integral part of Mission Driven Budgeting (MDB). The status of key plans and impact measures is reported to Council at midyear and at the close of the fiscal year. City departments have submitted reports on the status, of their key plans and impact measures for the first six months of 1996-97. Progress is reported for all key plans. Impact measures are only reported on an exception basis. Exceptions consist of: a variance of.20 percent in the ~rojeeted year end result for an impact measure; or a variance of 20 percent based on the first six months of the fiscal year. In addition, an impact measure would be reported if there is significant information about which the Council should be informed. The majority of the key plans for 1996-97 are under way or are expected to be accomplished in 1996-97. Some key plans have experienced delays due to a shift in departmental priorities. Reprioritization is often, required as aresult of Council actions. City staffhas been doing a comprehensive quality control evaluation of impact measures.and, in the 1997-98 Proposed Budget, will include some changes to impact measures to try and improve clarity and provide more meaningful information. CMR:168:97 Page 1 of :~ PREPARED BY: Virginia Harrington, Budget Manager DEPARTMENT HEAD APPROVAL: Melis~a Cavallo Acting Director Administrative Services CITY MANAGER APPROVAL: CC: n/a Manager Page 2 of 2 FUNCTIONAL AREA: CONSULTATION & ADVISORY KEY PLANS 1. In 1996-97, provide legal review and analysis of Comprehensive Plan update issues. 2. Provide active legal support for the Stanford West-Sand Hill Road application. 3. Revise local CEQA guidelines to implement Development Review proposals and State law changes. STATUS 1. Primary legal review of the draft Comprehensive Plan and EIR was completed in the second quarter. 2. Ongoing. 3. The State of California has delayed completion of regulations needed to complete this plan. The guidelines revision will be started in 1996-97, but not completed until 1997-98. FUNCTIONAL AREA: LITIGATION ~a: DISPUTE RESOLUTION ¯ KEY PLANS 1. In 1996-97, investigate and implement a litiga- tion case management system with capability to index and retrieve information about City litiga- tion (both current and closed), and to schedule lit- igation calendars. STATUS 1. Several software packages have been reviewed. Selection process is ongoing. 2. Identify City regulatory and administrative programs where imposition of administrative civil penalties may be an appropriate alternative remedy for ordinance violations, and propose conforming ordinance changes. . 2. Under way now, following the code enforce- ment audit and hiring of contract staff. FUNCTIONAL AREA: OFFICIAL ~z: ADMINISTRATIVE DUTIES KEY PLANS STATUS 1. In 1996-97, prepare Board and Commission orientation program covering the Brown Act and Political Reform Act. 1. Video production cost estimates received; now developing a script for the orientation. 2. Prepare departmental archival records stor- age and retrieval plan, including provisions for electronic access. 2. No progress to date. This plan is likely to be deferred to 1997-98. FUNCTIONAL AREA: INTERNAL AUDITS & REVIEW KEY PLANS 1. In 1996-97; utilize programs and activities described in the City’s Mission Driven Budget in completing the risk assessment model. This model will be used as a tool for identifying potential areas for audit. 2. Coordinate a peer review of the City Auditor’s Office. 3. Utilize the Internet to fully describe audit services program. 4. Work with departments in developing control assessment programs 5. Develop and issue a report to Council reflecting the status of all audit recommendations. The City Manager will complete the current status section of this report STATUS 1. The model has been completed and will be used to compare budget to actual results for the 1996-97 fiscal year. 2. Based on current staffing levels, this key plan has been rescheduled for fiscal 1997-98. 3. The text format for the web page has been developed. This includes brief summaries of audits completed and the annual audit plan. 4. This key plan will be rescheduled due to current staffing levels. 5. The Annual Status of Audit Recommendations report was issued on January 27, 1997. FUNCTIONAL AREA: PROFESSIONAL ASSISTANCE &~ SERVICES KEY PLANS 1. In 1996-97, develop and issue a Request for Proposal (RFP) for external audit services. STATUS 1. The City negotiated a two year agreement with the current audit firm and, plans to go out to bid in 1998. FUNCTIONAL AREA: PUBLIC INFORMATION KEY PLANS 1. In 1996-97’ respond to external audit of the cable franchise. STATUS 1. Completed. The audit found the department in compliance with no findings or recommendations. MAJOR ACTIVITY: PUBLIC OUTREACH IMPACT MEASURES 4.Increase new programming hours by 10 percent on the cable government channel. 1996.97 SIX 1996-97 1995-96 1996-97 MONTHS ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 31%10%29%29% 4. The target was exceeded due to a nationwide effort to solicit nonprofit organization programming. MAJOR ACTIVITY: AGENDA/PACKET PROCESS IMPACT MEASURES 3.Ensure that no more than 5 percent of Council agenda rifles result In questions of clarification from the public or removal of the item from the aIjenda. 1996-97 SiX ’ 1995-96 1996.97 MONTHS ACTUALS ADOPTED ACTUALS 0%5%0% 3. Efforts to comply with the Brown Act resulted in exceeding the stated goal. 1996-97 ESTIMATED ACTUALS 0% FUNCTIONAL AREA: BOARD/COMMISSIONS RECRUITMENT IMPACT MEASURES 2.Increase the total number of Boards and Commissions applicants by 15 percent. 1996-97 SIX 1996-97 1995-96 1996.97 MONTHS .ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 20%15%0%15% 2. Only two recruitments took place during the reporting period. It is still possible to meet the target during the next six months. - 5 MAJOR ACTIVITY: COUNCIL/COMMIT. MEETINGS/MINUTES IMPACT MEASURES 2.Finalize 80 percent of minutes in six weeks for meetings less than 3 hours and 7 weeks for meetings that are more than 3 hours. 1996-97 SiX 1995-96 1996-97 MONTHS ACTUALS ADOPTED ACTUALS 54%70%64% 1996-97 ESTIMATED ACTUALS 70% 2. The City Clerk’s Office continues to fall short Of the stated goal, given current staffing and resources. FUNCTIONAL AREA: LEGISLATIVE RECORDS MANAGEMENT KEY PLANS STATUS 1. In 1996-97, provide for the Palo Alto Municipal Code (PAMC) to be available ¯ through electronic media. 2. In 1996-97, develop a Records Emergency Recovery Plan. 1. In process. Editorial review of the PAMC is underway which requires significant analysis and involvement of the City Attorney. 2. Completed. The Records Emergency Recovery Plan was completed and included in the Records and Information Management Plan. 6 FUNCTIONAL AREA: CITY MANAGEMENT KEY PLANS 1. In 1996-97, continue the implementation of the changes approved in the citywide Organizational Review. 2. Expand the use of volunteers throughout ¯ City departments by the efforts of a citywide coordinator of volunteer services 3. Implement a master plan forthe Internet which assures efficient public access to useful information and opportunities for the electronic conduct of City business. STATUS 1. The majority of the changes were implemented in the 1995-96 and 1996-97 budgets. 2. Established a foundation for a citywide volunteer program; program to be continued by a new volunteer coordinator. 3. Internet Master Plan preliminary draft has been prepared by the Administrative Services Department for review by Senior Management Group. Comments will be incorporated to produce final Master Plan. FUNCTIONAL AREA: CITY COUNCIL RELATIONS KEY PLANS 1. In 1996-97, develop a recommended strategy for financing the major programs and capital projects that represent Council priorities. 2. Complete a study of existing boards, commissions, task forces and committees which will enable the formulation of a Council policy on advisory bodies 3. Improve access to prior years’ records, in compliance with records management policy, by placing City Manager’s Reports (CMRs) on microfilm or an equivalent means of electronic storage. STATUS 1. Module I of the Infrastructure Management Plan was presented to the Finance Committee. Module II is scheduled for Finance Committee review in April 1997. 2. Currently underway, Expected to be complete by June 1997. 3. Currently underway. Expected to be complete by June 1997. FUNCTIONAL AREA: COMMUNITY/INTERGOV. RELATIONS KEY PLANS 1. In 1996-97, coordinate the successful introduction and enactment of one item of legislation of specific importance to Palo Alto. 2. Explore opportunities with the school district for cooperative programs, e.g., library services. 3. Pursue opportunities for cooperation with neighboring jurisdictions in the provision of certain fire-related services. 4. Produce a brochure which responds to most-frequently requested information about the City. STATUS 1. On hold due to vacancies in Assistant City Manager and Assistant to the City Manager positions. 2. In.process through participation on the City/. School Liaison Committee and the Buildings for Excellence Project Review Committee. 3. A proposal was submitted in response to City of Los Altos’ RFP for provision of fire services. Proposal was rejected. 4. On hold due to vacancies in Assistant City Manager and Assistant to the City Manager positions. FUNCTIONAL AREA: ECONOMIC RESOURCES KEY PLANS 1. In 1996-97, continue the Midtown business district revitalization process. STATUS 1. Conceptual Master Plan and one major building redevelopment have been approved by Council. Anticipate approvaI of at least one additional major building redevelopment by end of 1996-97. .MAJOR ACTIVITY: PROCESS FACILITATION IMPACT MEASURES I1.Provide guidance for not less than 20 new/existing businesses requiring assistance in the permit applications process., 1996-97 SIX 1996-97 1995-96 1996-97 MONTHS ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 21 20 21 31 1. Response to unusually’high level of commercial activity occurring in the first half Of the year. It is expected that .activity in second half year wilt be at originally predicted level. FUNCTIONAL AREA: FINANCIAL SUPPORT SERVICES KEY PLANS 1. In 1996-97, pursue implementation of Automatic Payment System (APS) for customer direct transfer of payments for utilities and other City services. 2. Begin development of an accounting ¯ policies and procedures manual focusing on areas critical to sound internal controls. 3. Conduct a physical inventory and provide fixed asset tags for General Fund fixed assets. 4. Develop and conduct training session to educate project managers in contract processes, procedures and practices. 5. Implement automated timekeeping to support time tracking under MDB and train. users in procedures for using, the system. 6. Consolidate the purchasing section at a single location to facilitate communication and improve effectiveness within the group for a more congenial climate for customers and suppliers. 7. Review, identify and begin implementation of recommendations of the Purchasing Process Steering Committee that will provide more efficient and effective processing of customer requests, and that will provide more control and accountability in the procurement process. STATUS 1. Project is delayed until completion of the Utilities Customer Information System (CIS). 2. This project is on track with the final completion date estimated to be June 1997. Approximately 80% of the manual is complete, with the final 20% in. progress. 3. This project is approximately 80% complete, with two General Fund departments remaining to be inventoried/tagged. This project is e~pected to be completed in June 1997. 4. Some planning being conducted, but aggressive execution of the key plan awaits the work of the Purchasing Process Steering Committee and the hiring of the new Contract Managers. 5. Project is delayed due to deficiencies inherent in the City’s current technology infrastructure. New client-server technology and Windows NT compatibility must be in place prior to implementation. It is estimated the that new technology solution will be complete in 1998-99. 6. CIP funding was requested in 1997-98. This key plan will not be realized until 1998-99. 7. Completed a review of existing purchasing processes. A number of process improvements have been implemented or are under way. Recommendations for major changes are being developed and implemented in nine key areas. MAJOR ACTIVITY: ACCOUNTING SERVICES IMPACT MEASURES 3.Achieve an average satisfaction rating of greater than 4.0 (highest rating being 5) on various accounting , training class surveys. 1996-97 SIX 1995~96 1996-97 MONTH ACTUALS ADOPTED ACTUALS >4.5 >4.0 n/a 3. No training classes held. Classes are being redesigned and will resume in the 4th quarter, 1996-97 ESTIMATED ACTUALS >4.0 MAJOR ACTIVITY: PURCHASING & CONTRACT ADMIN IMPACT MEASURES 3.Provide 4 purchasing seminars to promote effective purchasing procedures. 4.Increase inventory turns t~ 3 per year to minimize cash held in inventory. 1996,97 SIX 1996-97 1995-96 1996-9Z MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS rda 4 0 2 n/a 3. Vacancies in Purchasing prevented planned training. 4. Inventory turn-over has increased. Staff is working towards the target of 3 inventory turns for specific items. MAJOR ACTIVITY: STORES & WAREHOUSING IMPACT MEASURES 2.Provide an annual physical inventory count that is within 5 percent of related accounting records, 1996-97SIX 1996~7 1995-96 1996~7 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1%5%0.8%0.8% 2. Loss was reduced significantly because security was increased by reducing access to non-warehOuse employees. l0 ~! INCTIONAL AREA: PROPERTY MANAGEMENT KEY PLANS 1. In 1996-97, if Request For Proposal is approved; solicit, review and select a proposal for sale or lease of the Meadows Well site. 2. Assist leaseholders of Williams property and Chuck Thompson site in obtaining necessary City approvals and County grant funds to meet required conditions of leases. 3. If Request For Proposal is approved, solicit, review and select a proposal for sale or lease of the Tower Well site. 4. Support City Manager’s Office in implementation of Council direction for Arastradero preserve structures,, related donation, and development of stewardship concept. STATUS 1. The Meadows Well site was sold via requests for proposals on September 10, 1996 for $329,025. 2. Assisted Williams property leaseholder in. obtaining additional County grant funds and will continue to assist them in obtaining permits to meet their required lease conditions. 3. Solicited request for proposals for the Tower Well site and presented recommendation to Council. Council rejected all proposals. 4. The Arastradero Preserve Management Plan was adopted by Council and the RFP for the Arastradero Steward was approved in concept. A Staff committee has reviewed and interviewed the single response to the RFP. FUNCTIONAL AREA: MONEY MANAGEMENT KEY PLANS 1. In 1996-97, replace the outdated automated cash receipting system in Revenue Collections and at outlying facilities. 2. Define the requirements’for a collections management system, and begin .to work with the selected vendor on implementation. 3. Work with Utilities staff to implement charitable giving program for utility customers. STATUS 1. Staff negotiated with a vendor to acquire a new cash receipting system. The selected vendor went out of business prior to the contract completion, and the project has therefore been delayed. Staff is now investigating an alternative vendor. 2. Due to the delay of implementing the cash receipting system mentioned above, this project has been delayed as well. Staff believes it is prudent to.implement a new cash receipting system before automating its collections management system. 3. This program was approved by the City Council on December 16, 1996; the implementation process is under way, 11 MAJOR ACTIVITY: GENERAL BILLING &: COLLECTIONS IMPACT MEASURES 1995-96 ACTUALS 1996-97 ADOPTED 1996-97 SIX MONTH ACTUALS 3.Collect at least 60 percent of outstanding accounts for driving under the influence receivables. 6.Achieve an average satisfaction rating of 4.5 (of 5.0) on customer service surveys for the Revenue Collection public counter, 84%60%90% 4.9 4.5 n/a 3. Collections of receivables may occur unevenly over a short (6-9 month) period. 6. Survey is done annually in second half of the year. 1996-97 ESTIMATED ACTUALS 60% 4.5 FUNCTIONAL AREA: FINANCIAL PLANNINGr ANALYSIS &: REPORTS KEY PLANS STATUS 1. In 1996-97, review and test Community Services Department’s impact measures to assure accurate tracking and record keeping of the measures, and continued ¯ appropriateness. 2. Develop a system to maintain the roster of budgeted positions of the City which integrates with the new payroll and ¯ timekeeping systems. 3. Establish a computer equipment replacement fund to allow for the ongoing replacement of computer equipment. 4. Review and automate the process for collecting key plans and impact measures and report to Council twicea year on status of key plans and any changes to impact measures. 1. Deferred to 1997-98 due to higher priority projects. 2. Completed, is being utilized for development of the Proposed 1997-98 Interim Budget. 3. Will be included in the Proposed 1997-98 Interim Budget. 4. On hold, resources permitting, will be implemented during 1997-98. MAJOR ACTIVITY: BUDGET DEVELOPMENT-OPERATING AND CAPITAL IMPACT MEASURES 2.Obtain at least 3 budgeting awards from the California Society of Municipal Finance Officers (CSMFO) and the Governmental Finance Officers Association (GFOA). 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 5 3 0 5 2. Five awards have been applied for. Four from CSMFO were received in February 1997 and one from GFOA in March 1997, after the effective date of this report. 12 MAJOR ACTIWTY: CONSULTING & SPECIAL STUDIES IMPACT MEASURES 1.Identify a minimum of $100,000 in potential savings through analytical projects and special studies. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS $80,000 $100,000 $0 $50,000 1. It is anticipated that potential savings will be identified during the development of the Proposed 1997-98 Interim Budget. FUNCTIONAL AREA: CENTRALIZED APPLICATION SUPPORT KEY PLANS STATUS 1. In 1996-97, in response to a recommendation from the City’s external auditors, develop procedures and adopt standards for computer system documentation, to provide the necessary information for supporting and enhancing the City’s computer systems. 2. Assist in the acquisition and implementation of an automated revenue collection system for the City, improving the accuracy and timeliness of the fees collected throughout the City. 3. Complete the implementation of Phase I of the Customer Information System for Utilities, to improve accessto customer usage and billing information. 4. Assist in the implementation of an automated tirnekeeping system to facilitate the entry and greatly improve the accuracy of time card data for employees. 1. Procedures for capturing and documenting ASD/Informafion Technology Project Requests have been implemented. Criteria for evaluating and prioritizing projects have been defined and implemented. Guidelines and examples have been established for system and user documentation. The generation and evaluation of Request for Proposals (RFPs) has been standardized. Change control software, from three vendors, has been reviewed and analysis of each package is currently taking place. 2. The City issued an RFP, reviewed responses and selected a vendor. During the contract negotiations, the vendor went out of business. Contract discussions are continuing with an alternate. 3. The in-house development effort has suffered delays. The project team agreed that a purchased solution could be acquired for nearly the same costs and schedule with a reduced risk. Council was updated through a City Manager’s Report (CMR:455:96). An RFP was ’ developed and distributed to twelve vendors. Responses are due February 4, 1997. 4. The timekeeping system effort has been delayed due to technology infrastructure requirements not currently available within the City. The City is pursuing alternative solutions until the technology can be implemented within the City. 13 MAJOR ACTIVITY: NEW APPLICATION DEVELOPMENT IMPACT MEASURES 1. Set up. 4th generation tools and technology to provide access to an additional 10% of the City’s business systems information annually. (new) 2. Complete 90 percent of project schedule milestones according to schedule. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS n/a n/a 0 10% 90%90%60%90% 1. Data to be accessed by fourth generation tools will be migrated in the fourth quarter to meet the 10% goal. 2. The major focus, the Budget Position Control System, was more complex than expected. The project was delayed due to required new technology and additional IT staff time. MAJOR ACTIVITY: THIRD PARTY APPLICATION SUPPORT IMPACT MEASURES I1. Meet users computer program request milestones 90 percent of the time for all third party applications. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 90%90%70%90% 1. The major efforts were in IFAS and Lawson Payroll/Human Resources systems. Lawson wasdelayed primarily by the vendor negotiations phase of the project. MAJOR ACTIVITY: DATA BASE AND APPLICATION MANAGEMENT IMPACT MEASURES 1.Complete departmental requests for changes within agreed upon time frame 90 percent of the time. 2.Process 100 percent of the requests for data base setup or chan[~es within 24 hours.(new) 1996-97 SIX 199697 1995-96 1996-97.MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 90%90%50%65% n/a n/a 50%65% 1. Two vacancies in Information Technology delayed database related tasks. 2. Two vacancies in Information Technology delayed database related tasks. 14 FUNCTIONAL AREA: CENTRAL COMPUTER SUPPORT KEY PLANS 1. In 1996-97, move personal computer servers into the computer room to improve access and availability of those servers to the computer staff. 2. Acquire or develop application software to manage access to the City’s computers, Internet and outside resources. STATUS 1. Three existing servers were moved into the computer room and additional servers were acquired, installed and mounted in racks within the computer room. The environment is more secure and stable. The access and availability for users has been improved. 2. New computer hardware and software was acquired and implemented to provide secure access to the City’s servers and to allow the City personnel access to the Internet and other external servers. This implementation allowed the Library to begin offering remote access to its catalogue and the County’s catalogue. FUNCTIONAL AREA: PERSONAL COMPUTER KEY PLANS 1. In 1996-97, work with Finance and Budget Divisions to develop a strategic and financial plan for the replacement/upgrade of the City’s personal computer hardware. 2. Install personal computer server software to automate the inventory of PC equipment, provide the technicians with a remote diagnostic tool for problem solving and ability to upgrade to new versions of the software (e.g., new WordPerfect upgrades) by distributing the new versions over the network. 3. Implement a citywidenetwork operating system to improve printer and file sharing. The system will also expand the use of application sharing and improve the access to applications for City staff. STATUS 1. An inventory of the existing personal computers was completed and a strategih plan to replace the current installed base of personal computers over a three year period has been defined. The financial planning and allocation of funds is currently underway. 2. Analysis of requirements and availability of vendor software tools has occurred. The vendors have made presentations to IT staff of the most popular solutions. A "knowledge data base" with a collection of problems and associated solutions for use by the PC technicians, has been implemented. 3. The implementation of the NT file servers, was completed. The City staff is making much greater use of the file sharing capabilities in an organized and orderly manner. 15 FUNCTIONAL AREA: TELECOMMUNICATIONS KEY PLANS 1. In 1996-97, investigate and develop a plan to provide Wide Area Network backup capability. This will ensure continuous computer network connections to systems and applications for remote City sites. 2. Implementation of citywide network improvements to provide greater services, more reliable connections, and management tools to monitor the network traffic. Computer access and network reliability will be improved for City staff. STATUS 1. As the .City has installed Wide Area and Local Area Network services, it has replaced modem connections at these locations. Some modems have been left at these sites to provide back-up capability. The installation of the City’s fiber ring should become the primary connection and the COAX will become the back-up. Consequently, staff intends to concentrate on the fiber ring as the primary connection. 2. The upgrade of the Civic Center Local Area Network is in process. A vendor has been ¯ selected following an RFP process. CMR is being written to be presented to Council for approval. MAJOR ACTIVITY: TELEPHONE (TELECOMMUNICATIONS) USER SUPPORT 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS [ 2. Complete all communication requests within 7 7days 7days 9days 10-14daysIworkin~ days usin~ contract services. 2. Requests for the first six months were greater than usual due to support of a major Police Department project. 16 FUNCTIONAL AREA:. ARTS AND CULTURE KEY PLANS 1. In 1996-97, continue to investigate community support for a Performing Arts Center. 2. Support and assist the Friends of the Children’s Theatre in its efforts to raise funds for Phase II of the Golden Anniversary building project. 3. Include in the regular Children’s Theatre season at least one play focused on teenagers and develop further programming for teens. 4~ Explore opportunities for outside funding. to expand the Children’s Theatre Outreach After School Play Production Program to all Palo Alto Unified School District elementary and middle schools. 5. Celebrate the Children’s Theatre 65th Anniversary with community and alumni events. 61 Develop a curriculum guide, in conjunction with one exhibition each year, as an outreach tool for high school teachers to explore contemporary art with their students. 7. Initiate. programs for youths, teens and famih’es that includes: "Summer Arts", an intensive week long program for youth; classes, workshops, and special projects; and Family Days, in partnership with the Palo Alto Unified School District. STATUS 1. Master Plan Process is proceeding. Master Plan will ultimately address the need for a Performing Arts Center 2. In pr6cess - major milestone to be reached in February 1997 when fund-raising goal is reached. 3. In process - to be completed in the Spring of 1997. Teen leadership programs to be completed by Summer 1997. 4, Exploration finds that the Outreach program does not seem a likely candidate for outside funding since it is an established program needing expansion. 5. ComPleted with great success. 6. Planned for development in fourth quarter of 1996-97. 7. Four new art classes for Teens have been developed; Art of Audio; Drawing, Painting, and Sculpture. Eight new Art Mini-Camps, in collaboration with Open Space and Sciences, have been developed and will be presented in March. A Family Day in conjunction with Spirit Objects was presented in partnership with both the Palo Alto Unified School District and the Ravenswood School District. FUNCTIONAL AREA: ARTS AND CULTURE (CONTINUED) KEY PLAN STATUS 8. Explore the development and outside funding opportunities for a Visual Artist Mentor Program for teens. 8. Recommendations are being explored. The program is moving toward an artist-in-schools program in partnership with Cultural Kaleidoscope (non-City funding with Cultural Center staff and Project LOOK! support). There are now 4 pilot programs in 8 schools. MAJOR ACTIVITY: VISUAL ARTS 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATEDIMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS [ 1. Offer 10 exhibitions each year.15 10 7 10 1. Seven exhibitions have been preser~ted. In October there was an unplanned opportunity to present a selection of African sculpture. ~urNCTIONAL AREA: CUBBERLEY COMMUNITY CENTER KEY PLANS STATUS 1. In 1996-97, continue development of landscape plans for non-landscaped and -asphalt areas between building wings and begin planting. 2. Implement phase two of the athletic field irrigation and turf improvement program 3. Continue to develop promotional materials to encourage public use of Cubberley. 4. Finalize the design of the rest-room/ concession facility. 1. Design is in progress for planter areas, and planting is scheduled for early spring. 2. Completed. 3. Monthly events calendars continue to be distributed on a monthly basis, and advertising in the Palo Alto Weekly follows the same schedule. A facility rental brochure will be available for distribution by year-end. 4. This project is presently on hold pending the identification of a funding source. 18 MAJOR ACTIVITY: CUBBERLEY CENTER SERVICES IMPACT MEASURES 3.Increase hourly rental customers by 2 percent in 1996-97 and 3 percent in 1997-98. (new) 1996-97 SiX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS n/a 2%20%15% 3. Number of permits issued has risen substantially due in part to repeat users, but also due to new users. FUNCTIONAL AREA: GOLF SERVICES KEY PLANS 1. In 1996-97, initiate Phase II of the Golf Course Master Improvement Plan for development of design and construction documents. 2. Implement use of credit cards for payment of fees at the Golf Course. 3.. Enhance revenue flows during slow business periods through promotions and special fee packages. 4. Support Junior Golf Programs for local players; high schools, and East Palo Alto juniors. 5. Coordinate installation of an equipment wash facility. STATUS 1. Under way. Master Improvement Plan construction documents are 95% complete, 2. Complete. Credit card use for payment of golf fees implemented in October 1996. 3. Implemented. Super Twilight fees help to encourage late hour business and related revenues. 4. Under way. Support for Junior Golf- Programs, including playcards, discount fees, and tournament planning, in progress. 5. Under way. Equipment wash rack installation planned for June 1997. 19 FUNCTIONAL AREA: PARK SERVICES KEY PLANS 1. In 1996-97, provide, through annual renovations, Mode I athletic field conditions at Greer, Terman, E1 Camino parks (Mode levels I~VI are standards determined by the National Recreation and Park Maintenance Association for such areas as turf care, irrigation, litter control, and pruning. Levels range from Mode I, the highest level of maintenance to Mode VI, the lowest level of maintenance). 2. Replace and upgrade irrigation systems at Eleanor Park, E1 Palo Alto Park, and Lucie Stem Courtyard. 3. Complete installation of backflow devices at city facilities. 4. Improve athletic field conditions to a Mode II level at Jordan, JLS, and Walter Hayes ¯ school sites in accordance with the agreement with Palo Alto Unified School District. 5. Install new playground equipment at Cameron, Scott, and Werry parks. 6. Resurface tennis courts at Terman. Park. STATUS 1. Under way. 2. Irrigation system renovations at Eleanor Park and E1 Palo Alto Parkare in progress. Lucie Stem courtyard irrigation improvements deferred pending pathway renovations. 3. Completed.. 4. Athletic field renovations at Jordan and Walter Hayes School sites have been completed. Fields at JLS will not be improved until after the PAUSD building program is complete. 5. Playground renovation work under way at Cameron, Scott and Monroe Parks. Werry - park is incorrectly identified, Monroe Park will be renovated instead. 6. Under way. 2O FUNCTIONAL AREA: HUMAN SERVICES KEY PLANS 1. Assist with .the implementation of approved recommendations from the Positive Alternatives for Youth Master Plan. 2. Continue progress by internal staff committee to develop comprehensive approaches to the delivery of services to children and families. 3. Increase the quality of child care in Palo Alto by promoting national accreditation standards. STATUS 1. On track with program plug; grants have been received and accepted by Council; interviews are underway for new PAFY coordinator. 2. Better coordination has occurred within the department, with PAUSD, and with the children and family non-profit community. Group has been meeting regularly.and currently working on a special event for children and families to be held at Lucie Stern Community Center on May 17th. An intern from Stanford is assisting staff and the committee with development of a Children’s Calendar that is currently being distributed by PAUSD. 3.42 percent of all licensed child care centers in Palo Alto have successfully achieved the NAEYC National Accreditation. FUNCTIONAL AREA: LIBRARY SERVICES KEY PLANS 1. In 1996-97, continue .implementation of the Library Automation Capital Improvement Program (CIP) project, including electronic connection of Palo Alto Unified School District and City libraries’ catalogs. 2. Begin implementation of approved elements of the Library Master Plan. 3. Begin plan to improve efficiency of library ~ staff work areas. 4. Coordinate rehabilitation of Children’s Library, funded primarily through gifts. 5. Participate in implementation of Phase 2 of regional technology project of public libraries in Santa Clara County to provide County residents with better and easier access to all library collections/resources. STATUS 1. Project continues to be implemented. Expected completion in Fall, 1997. 2. Final draft Master Plan to be sent to City Manager by end of fiscal year. 3. Under Way at Main Library. 4. Project on-hold pending review of Library Master Plan. 5. Phase 2 in progress, completion anticipated in Summer 1997. 21 MAJOR ACTIVITY: LIBRARY OUTREACH IMPACT MEASURES 2.Provide library service to 45 home bound Palo Alto residents. 1996-97 SIX " 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 52 45 59 59 2. The increase in outreach and publicity efforts about the home bound program over last year is paying Off withan increased number of clients served. FUNCTIONAL AREA: OPEN SPACE & SCIENCES SERVICES KEY PLANS STATUS 1. In 1996-97, complete Phase I of the Foothills Park Water Management Plan capital project. 2. Complete Wildhorse Valley - Buckeye Creek repairs and restoration project, and implement annual maintenance on the sediment collection basins. 3. Create "PlaySpot", an interactive learning environment for children under five and their care givers at the Junior Museum and Zoo. 4. Draft a planning grant for the Junior Museum and Zoo to provide funds for enhanced programs and exhibits. 1. The RFP for the design has been sent out. 2. The repairs have been made. Funding has been provided to provide for .annual maintenance of the sediment collection basins. 3. Funding from the Palo Alto Rotary Club has been granted but not yet received. There will be a dedication ceremony and official "ribbon cutting" .in February. The letter of intent was approved for submission to the Peninsula Community Foundation as a preliminary step to submitting a grant application. 4. Staff submitted a grant to the Howard Hughes Medical Institute to provide funding for a duplicate set of animals for Zoo Interpretive Programs, to provide workshop and on-line science support to PAUSD and the Ravenswood School District and to purchase interactive exhibits. The grant would provide roughly $400,000 over four years. FUNCTIONAL AREA: OPEN SPACE/SCIENCE COMMUNITY PARTNERSHIP IMPACT MEASURES 1995-96 1996-97 ACTUALS ADOPTED 1996-97 SIX 1996-97 MONTH ESTIMATED ACTUALS ACTUALS 2,590 3,7002.Supplement existing City resources by maintaining an active volunteer program for the Open Space and Sciences, with volunteers performing 2,600 hours of volunteer service. 9,100 2,600 2. Volunteer involvement in Open Space and Sciences activities has increased substant~lly with increased participation from the Friends of Foothills Park and volunteer activities on the Arastradero Preserve. 22 FUNCTIONAL AREA: RECREATIONAL SERVICES KEY PLANS 1. In 1996-97, replace the decking around both pools and repair pipes as needed at Rinconada Pool facility. 2. Hire a professional events management firm to conduct the Palo Alto Run Series to produce an increase in net revenue, ~ quality, and participation. 3. Increase participation in Teen programs through expanded activities and collaboration with community groups. 4. Increase participation in the Adult Sports program through added diversity of offerings and promotion to the business community. STATUS 1. Structural problems on site have changed the scope of the project and necessitated major revisions. Construction is expected to begin in Fall of 1997. 2. Completed. 3. Participation has increased by 12%, primarily due to the fact that the Teen Center has now been open for one full year. 4. In progress. While business promotions have met with varying success, three softball leagues have been successfully added, drop-in sports continue to draw consistent participation, and the overall number of teams participating has increased by 23 teams, or 80%. MAJOR ACtiVITY: YOUTH & TEEN PROGRAMS IMPACT MEASURES 1. Offer programs that attract 50,000 youth and teen participants. 2. Recover 25 percent of direct youth and teen activity program costs, excluding the skateboard facility. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 57,000 50,000 38,810 56,000 24.8%25%49% .85% 1. Due to seasonal demand, interim figure is high. 2. Previously, this impact measure was calculated excluding summer sports camps and children’s classes. Including these programs provides a more complete view of the major activity, as significant resources are " dedicated, to these programs. Cost recovery ratios will increase dramatically by year-end as most revenue is received in the spring while related expenditures are incurred the following summer. MAJOR ACTIVITY: RECREATION FACILITIES 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS [ 2. Generate 2 percent increased program revenue through -6%2%7%3% Iimproved marketing and increased user fees. 2. Rentals of Community Center facilities have shown strong improvement. 23 24 FUNCTIONAL AREA: EMERGENCY RESPONSE KEY PLANS 1. In 1996-97, develop and implement a fire station alerting system, and make appropriate operational changes to reduce response times. 2. Based on Council direction, implement Paramedic Master Plan operational measures and revise quality improvement plan. 3. Evaluate mutual aid potential with neighboring jurisdictions for emergency medical responses. 4. Review Foothills Park Fire Management Plan. STATUS 1. Specifications for the system are under development. Anticipated installation is June 1997. 2. Paramedic Master Plan has been implemented and service levels are continuing to be evaluated to ensure optimal level of service delivery. Quality improvement plan is being drafted. 3. Currently discussing possibility and logistics of automatic aid for paramedic service with Menlo Park Fire Protection District. 4. A draft of the revised Foothills Park Fire Management Plan has been completed and will be reviewed with other departments in 1996-97. MAJOR ACTIVITY: HAZARDOUS MATERIALS RESPONSE IMPACT MEASURES 1..To confine incidents to the room or area of origin 80 percent of the time.(1) 1996-97 SIX 1996-97 1995-96 1996.97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 100%80%90%90% 1. These percentages are only valid if other factors such as wind or explosions do not impact the hazardous materials situation. FUNCTIONAL AREA: ENVIRONMENTAL ~ SAFETY MANAGEMENT KEY PLANS STATUS 1..In 1996-97, coordinate countywi’de efforts to streamline hazardous waste regulations created as a result of passage of SB-1082. 2. Implement Emergency Preparedness Plan adopted by Council and provide training to City employees as needed. 1. Joint meetings with representatives of Santa Clara County cities, Santa Clara county Environmental Health Department and California Environmental Protection Agency (CAL-EPA) have been conducted and are ongoing to meet the requirements of SB-1082. The program will be finalized after further decisions are made by CAL-EPA later in the year. 2. The draft City Emergency Preparedness Plan has been submitted for final legal review and when approved by Council, scheduled training for City employees will be developed. 25 MAJOR ACTIVITY: DISASTER PREPAREDNESS 1995-96 IMPACT MEASURES ACTUALS 2.To conduct 6 community training classes on disaster 0% survival techniques annually. 1996-97 SIX 1996-97 1996-97 MONTH ESTIMATED ADOPTED ACTUALS ACTUALS 100%17%50% 2. Training the community is dependent upon the City Emergency Plan being adopted. The plan is being reviewed by the City Attorney. FUNCTIONAL AREA: TRAINING & PERSONNEL MANAGEMENT KEY PLANS STATUS 1. In 1996-97, develop and implement automated employee evaluation tracking system. 2. Provide training to supervisors on employee evaluations. 1. A department wide employee evaluation tracking system has been developed and is currently being used. 2. Training for supervisors in preparing employee evaluations is scheduled in 1997. FUNCTIONAL AREA: RECORDS &: INFORMATION MANAGEMENT KEY PLANS STATUS 1. In 1996-97, develop and implement an optical imaging records filing and management system. 1. The optical imaging records filing and management system has been implemented and records are currently being scanned into the system. 26 FUNCTIONAL AREA: EMPLOYEE COMPENSATION & BENEFITS KEY PLANS STATUS 1. In 1996-97, implement and communicate any employee benefit plan or mandated regulation changes. 2. Prepare bid specifications and seek competitive bids for the City’s Life, Long Term Disability and Dental Plans. 3. Negotiate agreement with Palo Alto Professional Fire Fighters, Local 1319 within 60 days of expiration of contracts. 1. Under way. 2. This key plan will be moved to 1997-98,~ as Request for Proposals will be sent out in October 1997. 3. Also a 1997-98 key plan. The current labor agreement expires June 30,1997. MAJOR ACTIVITY: CLASSIFICATION AND SALARY ADMINISTRATION IMPACT MEASURES 1.Assure classification system is current by reviewing 20 percent of position descriptions annually. 2.Survey on an annual basis 75 percent of all of benchmark classifications to determine competitive rates of pay. i995-96 1996-97 ACTUALS ADOPTED 1996-97 SIX MONTH ACTUALS 33%20%0% 100%75%0% 1. These activities occur during the second half of the fiscal year. 2. These activities occur during the second half of the fiscal year. MAJOR ACTIVITY: LABOR CONTRACT NEGOTIATION/MANAGEMENT IMPACT MEASURES 3.Negotiate agreements according to Council authorization with all three representation units within 60 days of expiration of contracts.. 1996-97 SIX 1995-96 1996-97 MONTH ACTUALS ADOPTED ACTUALS 70 days 60 days n/a 3. These activities occur duringthe second half of the fiscal year. 1996-97 ESTIMATED ACTUALS 20% 75% 199697 ESTIMATED ACTUALS 60 days 2? FUNCTIONAL AREA: WORKFORCE RECRUITMENT &: SELECTION KEY PLANS STATUS. 1. In 1996-97, develop and implement standards for personnel files, incorporating security measures, new legislative requirements and review/purging schedules. 1. Personnel files are currently being converted and review/purging schedules have been established. Establishment of security measures, including addition of fireproof cabinets and limited access policy, is currently underway. MAJOR ACTIVITY: EMPLOYEE SELECTION 1996-97 SIX 1996-97 1995-96 1996.97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS ]4. Fill 90 percent of positions within 90 days of job 74%90%50%75% ,posting. 4. Recruitment difficulties and current labor market have negatively impacted this target. MAJOR ACTIVITY: EMPLOYMENT RECORDS MAINTENANCE IMPACT MEASURES 1. Ensure that 100 percent of all personnel files are - updated within 10 days of receipt of status changes or other pertinent data. ¯1996-97 SIX 1996JJ7 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 30%100%50%80% 1. 100% of electronic personnel f!les are updated within lOdays; anticipated move toward paperless system (as a result of full Lawson implementation) should assure this target is met. FUNCTIONAL AREA: EMPLOYEE DEVELOPMENT/WORKLIFE KEY PLANS STATUS 1. In 1996-97, expand computer training program to include additional software applications and the use of self-paced video training for smaller groups. ¯1. Computer training has been expanded to include 3 new computer training programs. 28 MAJOR ACTIVITY: TRAINING PROGRAMS IMPACT MEASURES 2.Annually train 200 employees in supervisory and skills training courses. 4.Provide at least 150 spaces in computer trainingclasses. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1,400 200 263 285 399 150 261 500 2. Numbers/targets for 1997-98 will be adjusted to reflect increase in hoursof training,, due largely to addition of computer training programs. 4. Numbers/targets for 1997-98 will be adjusted to reflect increase in hours of training, due largely to addition of computer~ training programs. FUNCTIONAL AREA: TRANSPORTATION DEMAND MANAGEMENT KEY PLANS 1. In 1996-97, increase public transit use among employees by implementing and marketing the shuttle service between East Bayshore City facilities and the Mountain View CalTrain Station. STATUS 1. Shuttle program was implemented, but discontinued after three months due to low cost effectiveness. FUNCTIONAL AREA: RISK MANAGEMENT KEY PLANS. 1. In 1996-97, implement the Lawson Human Resources Information System module for workers’ compensation management and ¯ medical work restrictions. This will integrate with the Occupational Safety and Health Administration (OSHA) 200 module, also to be implemented. 2. Evaluate the City’s volunteer liability policy with the new Volunteer Coordinator position, including possible selection of a new policy to coincide with the new program and position. 3. Develop and implement all new mandated regulations, including Family and Medical Leave Act, California Family Rights Act and DOT Alcohol/Drug Testing. STATUS 1. Database has been developed and files are updated weekly. Some further programming will be required to make this module fully functional. 2. Completed. 3. All mandated processes are now in place and implementation is ongoing. 29 MAJOR ACTIVITY: WORKERS COMPENSATION PROGRAM IMPACT MEASURES I 2. Limit total number of open claims to 300per year. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 185 300 146 190 2. Lower goals have been submitted for 1997-98 to reflect actuals for past 2 years which have been significantly reduced. MAJOR ACTIVITY: LOSS CONTROL IMPACT MEASURES 1.To resolve loss control and insurance issues within 24 hours for 75 percent of all requests. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 75%75%95%95% 1. This measure has been increased to 95%for the 1997-98 budget, to reflect actual history. 3O FUNCTIONAL AREA: PUBLIC INVOLVEMENT, EDUCATION, ASSISTANCE KEY PLANS STATUS 1. Revise building code-related handout materials to conform with new model code editions. 1. All building code handouts were revised during the first quarter to comply with the new model code editions. 2. Update Customer handbooks for subdivisions and certificates of compliance. 3. Increase the use of the Internet to distribute permit information. 2. No handbook updates completed so far. Due to heavy workload and high development review activity, it is not expected that any handbook updates will occur this year. 3. Residential construction guide, and plan review status are now available on the Internet. MAJOR ACTIVITY: EDUCATION, INFORMATION, &; ASSISTANCE IMPACT MEASURES 2.Update 2 public handouts per year in a user friendly format to incorporate submittal requirements and standard conditions of approval for all City departments. 1995-96 .1996-97 ACTUALS ADOPTED 2 2 1996-97 SIX MONTH ACTUALS 0 2. Handouts not completed due to heavy workload and high development review activity. 1995-97 ESTIMATED ACTUALS 0 MAJOR ACTIVITY: BOARD, COMMITTEE, COMMISSION SUPPORT IMPACT MEASURES I1. Implement 50 percent of the recommendations for operational improvements identified at the Board and Commission annual retreats within one year. 1995-96 1995-97 ACTUALS ADOPTED 50%50% 1996..97 SIX MONTH ACTUALS n/a 1. No annual retreats held yet. 1995-97 ESTIMATED ACTUALS 50% FUNCTIONAL AREA: LIAISON, COORDINATION AND TECHNICAL ASSISTANCE KEY PLANS " STATUS 1. In 1996-97, utilizing the Town Architect and coordination with ~Utilities, conduct an architectural and industrial design workshop for padmount transformer covers. 2. Enhance the Santa Clara Valley Water District bridge design at the South E1 Camino Gateway~ 3. In 1996-97 and 1997-98, continue to participate in the Joint Venture Silicon Vailey uniform building code interpretation committee.31 1: Planning for workshop Under way. 2. The source of funding for this project, the Hyatt Cabana residential development, withdrew it’s application. Any enhancement project would need to find another source of funding. 3.The Department is actively participating in the Joint Venture Silicon Valley uniform building code interpretation committee; seireral uniform interpretations have been published. MAJOR ACTIVITY: LOCAL & INTERDEPARTMENTAL ACTIVITIES IMPACT MEASURES 11Dedicate 10 percent of Project Review Committee agenda time to discussion and coordination of current environmental issues or problems. 2.Convert 75 percent of all proposals for creek flood protection from concrete solutions to more natural solutions. 1995-96 ACTUALS 10% 1996-97 ADOPTED 10% 1996-97 SIX MONTH ACTUALS 5% 100%75%0% 1. Environmental issues not as pressing as project review matters. 2. Only one proposal received to date and resolution has not yet been reached. FUNCTIONAL AREA: DEVELOPMENT REVIEW 1996-97 ESTIMATED ACTUALS 10% 10o% KEY PLANS STATUS 1. Complete the entitlement process for the Sand Hill Corridor projects, including the Final Environmental Impact Report. 2. Implement the Palo Alto Medical Foundation entitlement approvals and assure compliance with all conditions through the building permit and construction phase. 1. Entitlement process on schedule. Final Environmental Impact Report completed in January 1997; City Council consideration now under way. 2. Tentative Map approval given by Council;. Building permit application filed in February 1997. MAJOR ACTIVITY: APPLICATION REVIEW & PROCESSING IMPACT MEASURES 2.Receive 100 percent of all applicable departmental comments within 10 days of a project’s submittal date. 1996-96 1996-97 ACTUALS ADOPTED 92%92% 1996-97 SIX MONTH ACTUALS 78% 2. Planning Division reIies on other departments/divisions to submit comments on time. 1996-97 ESTIMATED ACTUALS 80% 32 MAJOR ACTIVITY: PUBLIC PARTICIPATION/DECISION MAKING IMPACT MEASURES 2. Planning staff will attend neighborhood meetings regarding major development proposals 75 percent of the time requested. 3. Planning staff will attend neighborhood meetings regarding minor development proposals,50 percent of the time requested. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 100%75%50%75% 100%50%n/a 50% 2. Two requests were received due; to prior commitments and work toad, staff were only able to attend one. 3. No requests received. FUNCTIONAL AREA: CONSTRUCTION REVIEW/PROJECT MONITOR KEY PLANS STATUS 1. Implement streamlining strategies ¯ identified in 1995-96 streamlining project after funding and project are approved by Council. 2. Begin transition for inspectors from 2-way radios to cellular telephones. 3. Implement internal audit recommendations identified in the 1996 Audit of Code Enforcement and Building Inspection activities. 1. Council approved the Permit Streamlining program February 1997, and staff is proceeding to implement. 2. Equipment was received in February. 1997; transition in progress. 3. Many audit recommendation have already been implemented, and others are currently under review. 33 FUNCTIONAL AREA: ADVANCE PLANNING KEY PLANS 1. Complete the Draft Comprehensive Plan and related Draft Environmental Impact Report. 2. Prepare a Cal/Ventura Coordinated Area Plan, after receiving Council approval. STATUS 1. Draft Comprehensive Plan and Draft EIR completed and distributed for public review in December 1996. 2. The Cal/Ventura Area Plan has been moved back to 1997-98 and the SOFA/PAMF plan moved up to 1996-97. The SOFA/PAMF plan will be under way in the next several months, extending into 1997-98. FUNCTIONAL AREA: TRANSPORTATION & PARKING MANAGEMENT KEY PLANS STATUS 1. Complete the traffic signal system evaluation and upgrade study. 2. Complete City Council review and approval of the Downtown Parking Structure feasibility study. 1. Project delayed due to a shift in priority to first complete the traffic signal timing study and traffic signal improvements along Embarcadero at Middlefield and Newell. The traffic signal timing study is proceeding and the consultant selection process is expected to be completed by May 1997. The equipment for the Embarcadero traffic signals has been ordered and work is expected to start in April. 2. The feasibility study is complete. The study report is tentatively scheduled for a Council meeting in March 1997 for referral to the Policy and Services Committee and Finance Committee for discussion and recommendation to the Council. MAJOR ACTIVITY: TRAFFIC SIGNALS MANAGEMENT IMPACT MEASURES J2. Modify/install traffic signals within I year of funding approval. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1 year 1 year 1 year 1 year 2. No new signals were approved within last year. MAJOR ACTIVITY: BICYCLE PROGRAMS IMPACT MEASURES I1. Achieve 75 percent occupancy rate for City bike locker rentals. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 61%75%55%65% 1. Bicycle locker rentals in some locations in the downtown are low; staff will be looking into ways to increase utilization over the next 6 months. FUNCTIONAL AREA: NEIGHBORHOOD SERVICES AND PROGRAMS KEY PLANS 1. Complete Phase 2 of the Citywide School Commute Safety Study. 2. Implement condition monitoring program on existing projects. 3. C0mplete the evaluation of the Lytton neighborhood traffic management plan and develop final implementation plans. STATUS 1. The consultant issued the final report on Phase I in August 1996. Before finalizing the study and report to the Council, staff will hold meetings with residents on streets where the consultant’s recommended bike lane improvements would impact existing on-street parking. The Phase I study recommendations will be forwarded to the Policy and Services Committee in the Spring. 2. Condition monitoring .program was implemented in November 1996. 3. The six month trial was concluded at the end of November 1996 and Council adopted a modified plan on a permanent basis on January 13,1997: Development of final implementation plans is subject to availability of funds, which staff will pursue through the normal 1998-2000 CIP process. MAJOR ACTiVITY: TRAF~C & PLANNING STUDIES 1995-96 IMPACT MEASURES ACTUALS ] 1. Complete 1 neighborhood traffic study annually,o 1996-97 SIX 199697 1996-97 MONTH ESTIMATED ¯ ADOPTED ACTUALS ACTUALS 1 1 1. Staff completed the evaluation of the 6 month trial of the Lytton Neighborhood traffic study. 35 FUNCTIONAL AREA: AFFORDABLE HOUSING & CDBG KEY PLANS 1. In 1996-97 and 1997-98, revamp and update the City’s Below Market Rate (BMR) program, including legislative authority, implementation mechanisms and administration. 2. Complete purchase and contractual arrangements with the Palo Alto Housing Corporation for the Alma Street Single Room Occupancy (SRO) project. KEY PLANS 1. Project start may be delayed to 1997-98. 2. Purchase and contractual arrangements completed. Ground broken and construction of SRO underway as of January 1997. MAJOR ACTIVITY: AFFORDABLE HOUSING DEVELOPMENT IMPACT MEASURES 1996-97 SIX 1995-96 1996-97 MONTH ACTUALS ADOPTED ACTUALS 1. increase the number of permanently affordable, low income rental housing units by an average annual increase of 25 units over a five year period (1995- 2O0O). 2.Complete I application for housing subsidy funds per two year budget cycle. 3.Negotiate a desirable Below Market Rate component into 100% of proposed housing projects by the first public hearing. 25 1~1 0 100%100%66% .1996-97 ESTIMATED ACTUALS 0 0 75% 1. No units will be counted until 107 unit Alma Place SRO development opens for occupancy next year. 2. Application for this two year budget cycle not yet completed, staff expects to do so in 1998-2000, 3. Three agreements were negotiated; 2 were approved by Council as negotiated by staff, the third was revised.by Council. MAJOR ACTIVITY:. COMMUNITY DEVELOPMENT PROJECTS IMPACT MEASURES 3.Finalize 60 percent of the physical improvement projects (such as rehabilitation, or housing projects) in the year allocated. 1995-96 1996-97 MONTH ACTUALS ADOPTED ACTUALS 25%60%0 3. Eight in progress, none yet completed. 1996-97 SIX 1996-97 ESTIMATED ACTUALS 50% 36 MAJOR ACTIVITY: FEDERAL & STATE GRANT MANAGEMENT IMPACT MEASURES 1.Have zero audit findings from any federal or state agency. 3.Respond to 100 percent of audit requests for information within .30 days. 1. No audits received. 3. No audits received. 1995-96 ACTUALS 0 0 100%100% 1996-97 SIX 1996-97 1996-97 MONTH ESTIMATED ADOPTED ACTUALS ACTUALS .n/a n/a n/a n/a FUNCTIONAL AREA: INFORMATION MANAGEMENT KEY PLANS 1. In 1996-97, develop strategies to transfer permit data from existing Building Inspection Permit system to new data base. 2. Implement a permit processing tracking system for Planning and Building, and Coordinate implementation with other City permitting departments. STATUS 1. Project delayed due to Planning Division Work Program adjustments, including additional assignments for Interim Historic Ordinance and Inventory Update, additional resources needed for Sand Hill Corridor entitlement process, Comprehensive Plan DEIR and high permit activity in the Development Review Section. 2. Project on hold due to other departmentpriorities and time available to implement the project. MAJOR ACTIVITY: RECORDS & MAP MANAGEMENT IMPACT MEASURES 2.Update zoning maps within 30 days of Council adoption of rezonin[~ 100 percent of the time. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 100%100%0%75% 2. Zone map change approval was received in November 1996; staff did not request map update until February due to work load. 37 38 FUNCTIONAL AREA: REQUEST FOR SERVICE KEY PLANS 1. In 1996-97, implement an automated scheduling system to maximize the use of available staffing. 2. Assist in the implementation of the¯ city-wide disaster preparedness plan. STATUS 1. Program identified and will be implemented in ¯ third quarter. 2. Assisted Fire Department in planning. Identified initial training requirements. Assessed current available resources. MAJOR ACTIVITY: CRITICAL INCIDENT RESOLUTION IMPACT MEASURES 1,After the initial police response, respond with specially trained units to the scene of critical incident within 1.5 hours after request. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1.4 1.5 1.0 1.5 1.Midyear actuals based on one incident for the first six months. Most personnel assigned to the specialty units were working that day. FUNCTIONAL AREA: COMMUNICATIONS SERVICES KEY PL~IS 1. In 1996-97, research and identify the cost/ benefit of the development of an in-house Computer Aided Dispatch system to the purchase of a predeveloped System. 2. Investigate the feasibility and costs associated with the implementation of an Emergency Medical Dispatch program, MAJOR ACTIVITY: POLICE DISPATCHING SERVICES STATUS 1. Consultant selected and analysis currently under way. Contact made with 95 CAD vendors to develop product information base to compare feasibility of in-house development versus off-the-shelf product. 2. Several plans are being considered. Met with Santa Clara County agencies to discuss future of Emergency Medical¯ Services (EMS) and Emergency Medical Dispatching (EMD) delivery. Provided preliminary training program cost estimates to Fire Department. Additional associated costs will be calculated during the third quarter. 1996-97 SIX 199S-97 199,5-96 199~-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS 13" Maintain a rati° °f sustained c°mplaints t0 Calls f°r serviceof less than 1 to 10,(300. 1.3 1 0 0 1. 3.No complaints based on over 16,000 police calls for service. MAJOR ACTIVITY: FIRE DISPATCHING SERVICES 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS I2. Maintain a ratio of sustained complaints to calls for service 1.6 1 0 0 [ at less than 1 to 10,000.I 2. No complaints based on over 3,200fire calls for service. FUNCTIONAL AREA: INVESTIGATION &: DISPOSITION KEY PLANS 1. Ensure case writing quality through enhanced supervisory review and spot checks by the watch commanders. 2. Direct resources toward the mitigation of fraud incidents by placing a greater emphasis on criminal investigation and education efforts involving the public and merchants. STATUS 1. A comprehensive report writing reformatting was completed. Conducted training for supervisors and watch commanders. Supervisory review at both .the patrol and investigative level shows far fewer errors despite the increasing numbers of new officers lacking experience. 2. Emphasis placed on fraud incidents through the "Downtown Detail" for street scares. Reallocated existing resources and enlisted community volunteers to assist the principal fraud investigator with casework. As part of the Downtown Health and Safety Program and other targeted efforts, officers and Community Policing personnel are advising merchants and citizens of popular fraud scams and measures to mitigate them. MAJOR ACTIVITY: INVESTIGATIONS IMPACT MEASURES 2.Return less than 10 percent of cases to patrol officers for follow-up due to deficiencies and!or incompleteness in the initial investigation. 3.Ensure that of all cases for which felony charges are requested, at least 75 percent have charges filed for prosecution by the District Attorneys’ Office. 1996-97 SIX 1996-97 199596 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 3.6%10%3%5% 92%75%94%90% 2. The utilization of the new report form and an organizational emphasis on enhanced supervisory review has resulted in better quality cas~ork. 3. Higher than anticipated rate is due in part to a lack of statistical experience in setting the original goal and PAPD" s higher standard of case investigation. 4O FUNCTIONAL AREA: TRAFFIC SERVICES KEY PLANS 1. In 1996-97, formalize implementation of ¯ "community traffic officer" program with an emphasis on speed reduction. 2. Formalize and expand the North County DUI strike force. 3. Reduce repeat DUI offenders through location and apprehension of individuals wanted for outstanding DUI warrants. STATUS 1. Traffic Officers have been assigned to specific areas including Downtown North/ University Ave., Embarcadero, Midtown, Barron Park, San Antonio Rd., Ventura area, and Alma/Railroad Corridor. Speeding citations issued by the Traffic Team have increased 156% (4,808 vs. 1,875) over the same period last year. This increase is due in part to the full implementation of the motorcycle unit and other traffic safety-related strategies. 2. Completed. Coordinated two strike force nights with the majority of law enforcement agencies in Santa Clara County during the Avoid The 13 program. As a result, 53 arrests were made and no DUI fatal accidents occurred during the campaign. 3. Implementation scheduled for the third quarter. MAJOR ACTIVITY: TRAFFIC ENFORCEMENT IMPACT MEASURES 1.Reduce injury accidents by 3 percent. 3.Maintain alcohol-related accidents 50 percent below national averages. 1996-97 SIX 1995.97 1995-96 1995.97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS (14.8%)3%7%5% 41%50%38°/o 45% 1. Although reduced 7%from the same period last year, injury accidents are still running 8% higher than 1994-95. 3. Lower than anticipated rate is due in part to a lack of statistical experience in setting the original goal. Midyear actuals are based on 28 alcohol related accidents with no associated fatalities. 41 MAJOR ACTIVITY: SCHOOL SAFETY IMPACT MEASURES I1.Achieve a 0 percent accident rate involving students walking or bic~lint~ to and from school. 1995-96 ACTUALS 0% 1996-97 ADOPTED 0% 1996-97 SIX MONTH ACTUALS 1. Student riding home from school was hit by a car. Rider deemed at fault. 1996-97 ESTIMATED ACTUALS 1 FUNCTIONAL AREA: PROACTIVE POLICING SERVICES KEY PLANS. 1. In 1996-97,.complete transition from the Drug Awareness Resistance Education training program to the Gang Resistance Education And Training program in order to effect a more comprehensive drug and gang prevention effort. 2. Enhance participation in the community outreach to the Ventura neighborhood by staffing the police substation. 3. Increase police presence and enforcement efforts associated with criminal behavior in the downtown area through the implementation of the "Downtown Health and Safety Enhancement Program". 4. Expand the current job placement pilot program involving high school students and Palo Alto business owners to address recommendations of the Positive Alternatives for Youth Committee. STATUS 1. Transition complete. Involved 700 students in the GREAT program. 2. Initiated bicycle licensing program for Ventura neighborhood school area. Assigned School Resource Officer to the substation two afternoons each week.. 3. Program implemented. Concentrated on one- on-one contacts with merchants (943) and citizens (1,860). Incorporated annual "Holiday Detail" into program. 4. Accepted AB 3229 funds. Secured eight employment positions with two area businesses. Met with representatives of Alta Vista and Spangler schools. Scheduled to .meet with students and faculty during third quarter. MAJOR ACTIVITY: CRIME SUPPRESSION IMPACT MEASURES 1. Ensure Palo Alto’s violent crime rate remains within the lowest 7 percent of all California cities between 50,000 and 100,000 population. ¯ 1996~97 SIX 1995-96 1996-97 MONTH ACTUALS ADOPTED ACTUALS 8.75%7%n/a 1996-97 ESTIMATED ACTUALS 1. Crime rate figures for California cities are not yet available for comparison although violent crime in Palo Alto has decreased 1! % for the same six month period one year ago. 42 MAJOR ACTIVITY: YOUTH SERVICES IMPACT MEASURES 1.Increase participation by youth in the Explorer program by 25 percent. 3.Ensure identified police officers visit each adopted school once a week. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 25%25%(3%)(3%) <1 1 <1 1. Recruiting efforts have failed to produce desired results. 3. Higher than normal vacancy rate of sworn officers, the concentration on an enhanced Avoid the 13 campaign and the implementation of the Downtown Health and Safety program has limited the number of visits to schools. MAJOR ACTIVITY: COMMUNITY POLICING AND EDUCATION IMPACT MEASURES 1.Assist in the reduction of crime by 3 percent in targeted areas through Neighborhood Watch, community meetings and home security inspections. 2.Notify affected bus’messes and residences of identified violent crime trends within 48 hours after identification of trend. 3.Notify affected businesses and residences of identified non-violent crime trends within three days after identification of trend. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS -240%3%n/a 3% 48hrs 48hrs n/a 48hrs 3 3 1. Accurate figures were not kept due to vacancies and a transition in program leadership. Although neighborhood watch meetings have decreased 58%, home security inspections conducted have increased 143% over the same period last year. 2. No violent crime trends were identified. 3. Actuals based on one crime trend, a rash of auto burglaries, which was resolved through an arrest of the suspect. 43 FUNCTIONAL AREA: POLICE PERSONNEL’SERVICES. KEY PLANS 1. In 1996-97; implement and validate the - annual Agent/Sergeant promotional examination. 2. Validate and implement a revised entry level dispatcher recruiting, testing and hiring process. 3. Identify and develop an enhanced problem solving policing model and the corresponding required training. 4. Develop and implement a new Community Assistant position to supplement the reserves at special events and Stanford football games. STATUS 1. Job analysis for Sergeant and Agent completed. Promotional exam developed. Tests to be given in third quarter. 2. Investigating State (POST) dispatch certification. Completed review of existing recruiting, testing, and hiring process. Implemented various recruiting strategies. 3. Developed and field tested a problem solving policing model. Developed staffing plan without increasing department staffing levels. Training plan has been established. Training to occur in third quarter. 4. ]?rogram has been developed and implemented. MAJOR ACTIVITY: HIRING AND RETENTION IMPACT MEASURES 1.Maintain a vacancy rate of no more than 4 percent for sworn personnel. 3.Maintain a vacancy rate of no more than 4 percent for non-sworn personnel. 1996-97 SIX 1996-97 1995-96 1996.97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1.6%4%13%7% 3.7%4%2%3% 1. Higher than estimated vacancy rate canbe attributed to planned retirements, unplanned medical retirements, people leaving for other jobs, and a diminishing qualified applicant pool. Midyear actuals are based on an average vacancy rate for the first six months. Due to enhanced recruiting strategies, the depaf’tment is anticipating reaching authorized full staffing by the end of the year. 3. Lower than estimated vacancy rate ~lue to less than anticipated turnover. 44 MAJOR ACTIVITY: NON-MANDATORY TRAINING 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS 11" Pr°vide diversity training each year t°all P°liceDePartment personnel.79%,00%55%100% 1. Anticipate completing training in third and fourth quarters. MAJOR ACTIVITY: VOLUNTEER PROGRAM 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS 2. Increase the number of active volunteers by 5 n/a 5%16"/o ~ 5% percent. (New) 2. Higher than anticipated increase is due to interest through the Citizen’s Academy and revitalization in the recruitment of volunteers in numerous programs within the Police Department. The department is currently staffed with 139 active volunteers. FUNCTIONAL AREA: ANIMAL SERVICES KEY PLANS STATUS 1. In 1996-97, in light of the pending retirement of the City’s veterinarian, complete assessment of the position and begin recruitment for a new City veterinarian. 2. Implement staffing changes to accommodate the increase in services generated by the contract agencies of Mountain View, Los Altos, and Los Altos Hills and complete the transition to a new- superintendent. 3. In light of improved time tracking measures under MDB, investigate the feasibility of increasing direct cost recovery of the Spay and Neuter Clinic to more than 94 percent: i. Updated job description for veterinarian. Review .of spay and neuter operations to be completed during the third quarter. 2. Transition to a new superintendent completed. Identified staffing to accommodate increased services levels generated by the contract agencies. Expect implementation in third quarter. 3. Realized 100% direct cost recovery at midyear. MAJOR ACTIVITY: PET RECOVERY/ADOPTION SERVICES IMPACT MEASURES 2.Present a humane education program to 100 children via tours of the animal shelter. 3.Increase the number of animals at the shelter that are reunited with their owners by 5 percent. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1038 1 O0 26 1 O0 -1.48%5%-12%-8% 2. Less than anticipated number of children receiving humane education due to a lack of request for tours. Promotion of tours of the animal shelter will occur in third and fourth quarter. 3. Lower than anticipated percentage due to a decrease in the total number of stray animals handled by the animal shelter. MAJOR ACTIVITY: ANIMAL CARE IMPACT MEASURES 2.Provide a shelter hygiene program to keep disease outbreak at the shelter at less than 5 percent of the total animals handled. 1996-97SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 1.6%5%1%1% 2. Lower than anticipated rate is due in part to a lack of statistical experience in setting the original goal and stafJ" s commitment to separate and isolate animals, especially if any sign of illness is detected. MAJOR ACHVlTY: REGIONAL ANIMAL SERVICES 1996-97 SIX 1996.97 199~96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS I1.Respond to 85 percent of requests for service Within 64%85%61%- 80% 45 minutes. 1. Lower than estimated timely responses due to vacancies in temporary positions. Expect percentage to increase once additional temporary Animal Control Officer is hired and trained. 46 FUNCTIONAL AREA: PARKING SERVICES KEY PLANS 1. In 1996-97, evaluate security.services provided at Lots Q and J for possible modification. 2. Conduct follow-up evaluation of attendant parking for Lot S. STATUS 1. Altered hours of security services at Lot J and Q to address auto burglaries and other problems. 2. Evaluation of attendant lot conducted. Participated in meetings of the Chamber Parking Sub-committee. Added one hour free parking. Completed analysis which revealed an increase of lot usage and revenue received. FUNCTIONAL AREA: SPECIAL EvENTs KEY PLANS 1. In 1996-97, formalize the use of the Incident Command System in the coordination of large scale special events. 2. Assist in coordination of a Spring Music ¯ Festival. 3. Assist in the planning 0f 10 non2city sponsored events. STATUS 1. Implementation expected in third quarter. 2. Implementation expected in fourth quarter. 3. Assisted in the planning of fourteen events including President Clinton’s visit and the Bloomingdales Grand Opening Gala. MAJOR ACTIVITY: CITY SPONSORED EVENTS IMPACT MEASURES 1.Maintain an attendee/calls-for-service ratio of less than I percent at City sponsored events. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS .3%1%.02%".2% 1. Attendee/calls for service ratio is less than anticipated due in part to a lack of statistical experience in setting the original goal and the coordinated planning efforts of the participating departments. To date approximately 117,000 attendees have participated in nine City-sponsored events. 47 MAJOR ACTIVITY: NON-CITY SPONSORED EVENTS 1996-96 IMPACT MEASURES ACTUALS I1. Maintain an attendee/calls-for-service ratio of I percent .02% at special events.’ 1996-97 SIX 1996-97 1996-97 MONTH ESTIMATED ADOPTED ACTUALS ’ACTUALS 1%.22%.20% 1. Att’endee/calls for semice ratio is less than anticipated due in part to a lack of statistical experience in setting the original goal and the coordinated planning efforts of the participating departments. To date approximately 5,000 attendees have participated in fourteen non-City sponsored events. MAJOR ACTIVITY: STANFORD SPONSORED EVENTS IMPACT MEASURES 1. Maintain an attendee/calls-for-service ratio of I percent at Stanford University special events. ’ 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS .07%1%.01%.01% 1. Attendee/calls for service ratio is less than anticipated due in part to lack of statistical experience in setting the original goal and the coordinated planning efforts of the participating departments. To date approximately 267,000 attendees have participated in eight Stanford sponsored events requiring Palo Alto Police Department planning and coordination. FUNCTIONAL AREA: POLICE INFORMATION MANAGEMENT KEY PLANS STATUS 1. In. 1996-97, research, and identify the cost/ benefit of the development, of an in-house Computer Aided Dispatch system to the ¯ purchase of a predesigned system. 2. Revise customer service procedures to accommodate security remodel of the front desk area. 3. Implement informational requirements for Animal Services, including a Local and Wide Area Network, automated case reporting, and revenue collection software. 1. Consultant selected and analysis currently. underway. Contact made with 95 CAD vendors to develop product information base to compare feasibility of in-house development versus off the shelf product. 2. Construction began ".in January 1997. Anticipate revision of procedures to occur in April 1997.. 3. Installed PCs, wired for Local Area Network. Installed 12 port hubs. Installed new modems for City Hall access. Trenching and installation of Wide Area Network scheduled for third quarter. 48 MAJOR ACTIVITY: INFORMATION PROCESSING IMPACT MEASURES 2.Process 80 percent of police reports within 2 working days. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ~ACTUALS ACTUALS 58%80%55%65% 2. Lower than anticipated percentage of processing police reports is due to unplanned vacancies. 49 50 FUNCTIONAL AREA: STREETS KEY PLANS 1. In 1996-97, complete design of bicycle and vehicular improvements at the Page Mill Road and Foothill Expressway intersection. 2. Construct a permanent traffic barrier at the Bryant Street and Addison Avenue intersection. 3. Award a contract to resurface streets in the University Avenue Business District. .4. Upgrade double yellow lines with raised pavement markers in high traffic areas. STATUS 1. Project delayed by Stanford funding agreement. Design will start in May 1997. 2. Construction delayed to receive neighborhood & Arts Commission input. Construction should occur in 1997-98. 3. Construction delayed until summer 1998 due to a conflict with Utility underground project. 4. Has been.included in CIP overlay projects, which are ongoing. MAJOR ACTIVITY: STREETS-CIP SUPPORT IMPACT MEASURES 1.Bid 80 percent of all projects in the year they are budgeted for construction. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 100%100%0%100% 1. One project is done annually. It will be bid in Spring 1997. Measure will be revised for 1997-98. FUNCTIONAL AREA: SIDEWALKS KEY PLANS 1. In 1996-97, reduce existing backlog of "hot spot" sidewalk replacements by nine months. STATUS 1. "Hot spot" backlog has been reduced from nine to three months. FUNCTIONAL AREA: TREES KEY PLANS 1. In 1996-97, implement industry standard 7- year tree trim cycle. 2. Implement Tree Task Force recommendations funded in the budget. STATUS 1. In progress. 2. Implemented all recommendations targeted for 1996-97. 51 FUNCTIONAL AREA: STRUCTURES &: GROUNDS KEY PLANS 1. In 1996-97, implement the second phase of an Infrastructure Management Study. 2. Complete construction of the Alma Street bicycle bridge CIP improvements. 3. Implement a newspaper rack improvement project in the University Avenue Business District, contingent on Council approval. 4. Replace roofs on the Municipal Service Center Buildings A & B. 5. Complete design and construction of the Civic Center chiller replacement. 6. Remodel the front desk and entry doors of the Police Department for increased security. 7. Complete Phase I (Fire stations and Police Department) of the facility rekeying project. STATUS 1. Work on the second phase has been implemented and Module 2 Transportation & Traffic will be completed in 1996-97. 2. On schedule. 3. Project has been implemented and construction will occur this calendar year. 4. Complete. 5. Design phase in progress. 6. Design phase complete. Construction scheduled for third quarter 1996-97. 7. Will be started in Spring 1997. FUNCTIONAL AREA: PRIVATE DEVELOPMENT KEY PLANS 1. Provide timely plan review and input to the proposed Stanford West and Palo Alto Medical Clinic developments. 2. Participate in implementing improvements to the one stop counter on the 5th floor of the Civic Center. 3. Consolidate the encroachment and street work permits to facilitate private development projects. 4. Participate in the final development of a streamlined permit tracking system. STATUS 1. Reviews have been mallner0 3rocessed in a timely 2, Staff have participated in implementing improvements. 3. Consolidation has been completed to extent allowed by the Municipal Code. Further consolidation will occur as the Municipal Code is modified to streamline permit tracking. 4. Staff has participated in the development of the streamlinedpermit tracking system. 52 FUNCTIONAL AREA: GENERAL SERVICES KEY PLANS 1. In 1996,97, continue the redesign and installation of substructures to convert all of the remaining series incandescent street lights to high-pressure sodium (HPS) lights. .2. Modify traffic signals at University/ Middlefield and implement traffic signal changes and improvements as required by system needs. 3. Replace 6 obsolete traffic light controllers. STATUS 1. Substructure work is complete and 99 percent of the lights have been converted to HPS. The remaining non-HPS lights will be completed before year-end. 2. Modifications at University/Middlefield kiave been completed. 3. Controller replacement has been indefinitely delayed due to traffic study being performed. MAJOR ACTIVITY: TRAFFIC SIGNALS OPERATIONS/MAINTENANCE IMPACT MEASURES I1.Respond to all traffic signal system problems within 1hour. 1996-97 SIX 1996-97 1995-96 1996~97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 22 rnins 1 HR 26 mins 1 HR 1. Implemented a standby program for traffic signals/communications. This reduced the response time more than anticipated during this time period. MAJOR ACTIVITY: COMMUNICATIONS OPERATIONS/MAINTENANCE IMPACT MEASURES 1.Restore service.to all system users within 4 hours of an unscheduled system failure. 1995-96 ACTUALS 39 rains 1996-97 SIX 1996-97 1996-97 MONTH ESTIMATED ADOPTED ACTUALS ACTUALS 4 HRS 48 rnins 2 HRS 1. Goal was set high because of lack of historical data, Response to and restoration of unscheduled system failures is better than anticipated.. 53 MAJOR ACTIVITY: COMMUNICATIONS 1996-97 SiX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS 2.Limit communication system outages to less than a ~4 HRS 54 mins 6 rain 30 mins system-wide average of 4 hours per customer per year. 2. Due to system reliability, the actual outage time is lower than anticipated. FUNCTIONAL AREA: RESOURCE MANAGEMENT KEY PLANS 1. Conduct a feasibility study to analyze the cost and benefits of building the necessary infrastructure required to recharge electric Vehicles. 2. Coordinate the implementation of ¯guidelines for protecting confidentiality of utility, supplier and customer information. 3. Develop plans to address the need for a diverse portfolio of. supply resources .to meet increasing competitive pressures. 4. Develop methodology to benchmark, ~ against potential competitors, Palo Alto’s cost of providing supply resources and demand- side management program services. 5. Develop custom tailored marketing plans for each customer market segment. STATUS 1. Deferred to respond to restructuring of electric market. 2. Continuous efforts toward this goal. This is scheduled to be implemented by late 1996-97 or early 1997-98. 3. Staff has developed a model which assists in monthly power purchase decisions. 4. Deferred to respond to restructuring of electric market. 5. Ongoing ’activity; Includes residential fact sheets and commercial lighting coopera.tive advertising. 54 ]~’UNCTIONAL AREA: SUPPORT SERVICES &: RATES KEY PLANS 1. In 1996-97, coordinate the design of application software for users of the Customer Information System (CIS) Project and provide for .expanded billing capabilities which will become necessary under retail wheeling. 2. Work with Administrative Services Department staff to implement Charitable Giving Program (Project PLEDGE) for Utilities customers. 3. Implement and evaluate effectiveness of the automatic meter reading pilot project to increase customer satisfaction and achieve timely billing in a restructured electric industry. 4. Introduce new electric rates’ to separately price electric distribution, generation, and transmission services. STATUS 1. During the third quarter of 1996-97, staff will review four RFPs received for implementation of a new CIS. 2. A number of tasks are currently underway to implement Project PLEDGE before July 1, 1997. 3. During the third quarter of 1996-97, staff will review six RFPs received from vendors to implement an Automatic Meter Reading pilot project in 1997. 4. Cost of service study has been completed. Analysis is currently in progress to unbundle rates effective July 1,1997. MAJOR ACTIVITY: METER READING 1996-97 SIX 1996-97 ~ 1995-96 1996-97 MONTH ESTIMATEDIMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS [ 1. Exceed indus ~t~ standard for meter reader 4.6%4%4%8.3% [performance by at least 4 percent 1. Analysis of the impact measure indicates that the actual number represented by a 4% increase over national averages is so small (less than 10 meters per month) as to be trivial. A more meaningful measure of meter reader productivity will be substituted in 1997-98. FUNCTIONAL AREA: DISTRIBUTION SYSTEM KEY PLANS 1. In 1996-97, continue the conversion of Overhead (OH) facilities to Underground (UG) facilities by completing construction work on District #36 (Commercial Street / Corporation Way) and completing the planning and design on District #37 (Embarcadero/Seale/Middlefield). 2. Improve. system reliability and increase system capacity.by continuing construction on the replacement of the first transformer at Hanover Substation. In addition, design and complete construction on a second transformer replacement at Hanover Substation. 3. Replace deteriorated direct buried cable installed on Wilmar, Donald, and Georgia streets. 4. Complete the system capacity increase at Alma Substation by replacing a transformer and constructing an architectural facade along Alma Street. 5. Replace old and unreliable 4 kV equipment by converting the College Park Area to 12 kV. STATUS 1. Project is currently underway, Substructure work is complete and electrical construction will occur the second half of the year. 2. Transformer is on site and foundation design is currently in progress. 3. Cable replacement work on Wilmar, Donald, and Georgia streets has been delayed. Funding for 1996-97 will be spent on replacement on E1 Camino Real. 4. The Alma Expansion Project is in construction. 5. In construction. MAJOR ACTIVITY: DISTRIBUTION OPERATIONSfIVIAINTENANCE IMPACT MEASURES 2.Begin field restoration and repairs for unscheduled outages within 1 hour. . 3.Respond.to customer inquiries or problems within 2 hours.. (new) 1995-96 1996-97 ACTUALS ADOPTED 35 1 hr 1996-97 SIX MONTH ACTUALS 30 mins 1996-97 ESTIMATED ACTUALS 1 hour 1 hr 4 hrs 47 mins 2 hours 2. Number of outages less than anticipated during this time period. Also, excellent response time by crew personnnel. 3. Response time better than anticipated. FUNCTIONAL AREA: COMMERCIAL TELECOMMUNICATIONS KEY PLANS STATUS 1. Design and construct a fiber optic ring around Palo Alto by the end of the first quarter of 1997-98. 2. Negotiate "Early Market Entrant" agreements with telecommunications network developers and service providers prior to the completion of fiber ring construction. 3. Evaluate additional fiber optic cable deployment opportunities that would support the needs of network developers and serviceproviders. 4. Coordinate and implement a marketing effort on behalf of all companies that have "Early Market Entrant" agreements with the Electric Utility. 1. Conceptual design completed. Fiber optic cable ordered and received. Final construction drawings to be completed in third quarter 1996- 97. Completion of construction targeted for the second quarter of 1997-98. 2. Initiated fiber optic infrastructure license negotiations with several telecommunications network developers and services providers. 3. Incorporated feedback from network developers, service providers, and other interested parties into the design process. Enhanced the design to better address their needs without increasing the required budget. Conceptually explored potential future extensions. 4. Began planning a marketing effort on behalf of prospective licensees. MAJOR ACTIVITY: PLANNING/MARKETING/CONTRACT NEGOTIATIONS 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS Jl. Negotiate agreements for the lease of at least 10% of n/a 10%0%the fibers installed 1. Contract negotiations have been slowed to resolve legal and policy issues. 57 58 FUNCTIONAL AREA: RESOURCE MANAGEMENT KEY PLANS 1. Conduct a feasibility study to analyze the costs and benefits associated with building the citywide infrastructure necessary to fuel Compressed Natural Gas vehicles. 2. Coordinate implementation of guidelines for protecting confidentiality of utility, supplier and customer information. 3. Evaluate 10 Demand Side Management programs and begin implementation of the selected programs. 4. Develop methodology to benchmark, against potential competitors, Palo Alto’s cost of providing supply resources and demand- side management programs services. 5. Develop custom tailored marketing plansfor each customer market segment. 6. Coordinate activities to offer a competitive service package to customers who would choose to seek other suppliers. KEY PLANS 1. Information gathered, and an initial study completed of the existing compressor station, its economics and recommendations made to improve customer response to it. Further work on this key plan is preempted by preparation for electric restructuring and will be delayed until 1997-98. 2. This is scheduled for implementation in late 1996-97 or early 1997-98. 3. Completed evaluations. Implementing gas component of the Industrial Comprehensive Audit program. 4. Deferred until 1997-98. 5. Ongoing activity in response to competition. 6. Ongoing activity includes efficiency programs and compressed natural gas vehicles. 59 FUNCTIONAL AREA: SUPPORT SERVICES & RATES KEY PLANS 1. In 1996-97, support the design of application software for users of the Customer Information System (CIS) Project. 2. Implement operational changes and business process improvements identified by the Utilities Business Process Reengineering Study. 3. Implement and evaluate effectiveness of the automatic meter reading pilot project to increase customer satisfaction and achieve timely billing. 4. Work with Administrative Services Department staff to implement a Charitable ¯ Giving Program, (Project PLEDGE) for Utility customers. STATUS 1. During the third quarter of 1996-97, staff will review four RFPs received for implementation of a new CIS. 2. A new Automatic Call Distribution system is proposed for implementation in the Utilities Customer Service Center this fiscal year. The Administrative Services Department (ASD) is planning to coordinate with Utilities implementation of an automatic payment service option for Utilities customers. Credit cards are now accepted for Utilities payments at City Hall. 3. During the third quarter of 1996-97, staff will review six RFPs received from vendors to implement an Automatic Meter Reading pilot project in 1997. 4. A number of tasks are currently underway to implement Project PLEDGE before July. 1, 1997. FUNCTIONAL AREA: DISTRIBUTION SYSTEM KEY PLANS 1. In 1996-97, design and construct mandated Department of.Transportation and National Electrical Code safety improvements for Gas Station Number 3, located near Page Mill Road and Foothill Expressway. 2. Design and construct Phase 7 Gas Main Replacement Project that will replace mains on sections of the following streets: Greer, Ferne, Briarwood, San Antonio, Ely, Lundy, Alma, Hamilton, E1 Camino Real, Fabian, East Meadow, Porter, Hanover. These locations are subject to change based on system emergency and maintenance needs. STATUS 1. Design of mandated Department of Transportation improvements at Station 3 are 90 percent complete. Gas Station 3 improvements will be installed by end of 1996- 97. 2. Gas Main Replacement Phase 7 design is 50 percent completed. The Gas Main Replacement Project Phase 7 will be awarded by Council before the end of 1996-97. 6O FUNCTIONAL AREA: SOLID WASTE KEY PLANS 1. In 1996-97, expand curbside collection program to accept mixed paper. 2. Expand the current size requirement of compost material to a larger size. 3. Direct two-thirds of Palo Alto’s solid waste stream to the Sunnyvale Materials and Recovery Transfer Station (SMART) to achieve an additional 15 percent waste diversion goal. STATUS 1. Delayed due to staff needing time to determine effects of rate changes in the light of Proposition 218. 2. Expanding products offered. 3. Have directed two-thirds of waste stream to Sunnyvale achieving 14 percent recovery rate, including yard waste. MAJOR ACTIVITY: LANDFILL OPERATIONS IMPACT MEASURES 1.Annually recover 6 tons of recyclable materials from thelandfill disposal area. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 7.1 6 13 24 1. Higher volume is due to increased efficiency operation process and increased participation by the community. FUNCTIONAL AREA: COLLECTIONr HAULING &: DISPOSAL KEYPLANS 1. In 1996-97, oversee EIR and design of the former Los Altos Treatment Plant site for the refuse, collection, hauling and disposal operations yard. STATUS 1. Agreement awarded; Project EIR and design’ started. FUNCTIONAL AREA: STREET SWEEPING KEY PLANS 1. In 1996-97, remove 2,400 tons of leaves from City streets and properties for composting. STATUS 1. At mid-year removed 1,800 tons of leaves. 61 62 FUNCTIONAL AREA: STORM DRAINAGE SYSTEM IMPROVEMENTS KEY PLANS 1. In 1996-97, complete the upgrade of six storm drainage pump stations. 2. Design local storm drainage improvementsin the Barron Park neighborhood. 3. Complete a public outreach effort to assess the level of community interest in capital improvements which would increase the capacity of the City’s storm drainage system. 4. Coordinate with the Council, Finance Committee and the Utilities Advisory Commission on policy issues concerning the proposed Storm Drain Master Plan. 5. Continue construction of a storm drain pipeline replacement/rehabilitation project and design the next phase of work STATUS 1. Project on schedule. 2. Design phase started. 3. Completed. Will discuss findings with the Utility Advisory Commission and Council. 4. Will return to the Utility Advisory Commission to discuss impacts of Proposition 218. 5. Storm Drain Rehabilitation Project, Phase I, will be completed in third quarter of 1996-97. Design of Phase 2 will be completed by the fourth quarter of FY 1996-97. 63 FUNCTIONAL AREA: SUPPORT SERVICES & ~TES KEY PLANS 1. In 1996-97, assist with the design of application software for users of the Customer Information System (CIS) Project. 2. Work with Administrative Services Department staff to implement a Charitable Giving Program, (Project PLEDGE) for Utilities customers. STATUS 1. During the third quarter of 1996-97, staff will review four RFPs received for implementation of a new CIS. 2. A number of tasks are currently underway to implement Project PLEDGE before July 1, 1997. MAJOR ACTIVITY: CUSTOMER SERVICES IMPACT MEASURES J2.Receive fewer than 20 complaints annually regarding services provided by the City’s contract to clear sewer laterals. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 13 20 3 6 I 2. This measure of contractor performance is an important tool for monitoring individual contractors. Current. data indicates that the present contractor, having generated o~fly 3 complaints (vs. the 10 "allowed") in this half year is performing well byond expectations. However, since the contract must be opened to bid in the future, this impact measure should not be changed. 65 FUNCTIONAL AREA: COLLECTION SYSTEM KEY PLANS 1. In 1996-97, complete construction of wastewater collection system rehabilitation projects in Downtown, Southgate, College Terrace and San Antonio Road from Byron to East Charleston Road and at San Antonio Road and Transport Avenue. 2. Construct major.relief line in easement from East Bayshore and Amarillo under Highway 101 to the Regional Water Quality Control Plant near Embarcadero Way. and Amarillo and on Amarillo from Elmdale Place to E. Bayshore Road. STATUS 1. Sanitary Sewer Rehabilitation Phase VII is complete. Sanitary Sewer Rehabilitating Phase VI is 65 percent constructed in the College Terrace area and is scheduled for completion in 1996~97. 2. The Amarillo/Embarcadero Way Relief Sewer Project is in design phase. The design of the project is 30 percent complete. The construction contract is scheduled to be awarded in 1996-97. 66 FUNCTIONAL AREA: WASTEWATER TREATMENT OPERATION KEY PLANS 1. ~ 1996-97, prepare an implementation plan for long-term solids treatment and disposal. 2. Install two ORACLE Hle Servers for Plant process control data and operational reports. 3. Complete Phase I of the 72- inch interceptor sewer rehabilitation and begin Phase 2. This is a multi-year CIP.project. STATUS 1. Plan preparation underway; expect completion in spring of 1997. 2. Installation complete. 3. Investigation of 72 inch interceptor is scheduled for Summer 1997. MAJOR ACTIVITY: WQCP SYSTEM IMPROVEMENT (CIP) 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED IMPACT MEASURES ACTUALS ADOPTED ACTUALS ACTUALS 1. Bid 80 percent of all projects in the year they are 60%80%50%75% budseted for construction. 1. Bidding of projects behind schedule due to work load. FUNCTIONAL AREA: WASTEWATER ENVIRONMENTAL COMPLIANCE KEY PLANS STATUS 1. In 1996-97, generate data, supplies, and information needed to insure that the new discharge permit will have reasonable and achievable terms and conditions. 2. Develop reasonable and cost effective potential source control measures for pollutants on which the RWQCP may need to take further action in order to comply with the new discharge permit. 1. Fifty percent of the specialized plant data needed has been obtained, the consultant for . the modeling has been selected and the detailed plan for the upcoming 12 .months has been prepared. 2. New source control measure for construction practices, auto body shops and pesticide use have been developed and distributed. 67 68 FUNCTIONAL AREA: RESOURCE MANAGEMENT KEY PLANS 1. In 1996-97, actively participate with the Bay Area Water Users Association and the San Francisco Public Utilities Commission in the preparation of a Regional Water Integrated Resource Plan. 2.~Develop custom-tailored marketing plans for each customer market segment. 3. Research whether there is a significant correlation between the quality of Palo Alto’s water and the City’s ability to attract water sensitive industries. 4. Evaluate 3 Demand Side Management Programs and initiate the implementation of the selected programs. STATUS 1. Participated in the selection committee for Phase I consultant for the Water Supply Master Plan (WSMP). Selected for WSMP Steering Committee responsible for project overview- first meeting to be March 28, 1997. 2. Ongoing. Activities include Best Management Practices, residential irrigation workshops, and improvements to industrial water processes. 3. This has been deferred to 1997-98. 4. Evaluated and implemented the Landscape Irrigation Plan Check, the Large and Small Irrigation Audit Program, and the Process Water Auditing programs. ;~I.INCTIONAL AREA: SUPPORT SERVICES & RATES ¯ KEY PLANS 1. In 1996-97, assist with the design of application software for users of the Customer Information System (CIS) Project. 2. Implement operational changes and business process improvements identified by the Utilities Business Process Reengineeting Study. 3. Implement and evaluate effectiveness of the automatic meter reading pilot project to increase customer satisfaction and achieve timely billing ~ 4. Work with Administrative Services Department staff to implement Charitable Giving Program (Project PLEDGE) for utility customers. STATUS 1. During the third quarter of 1996-97, staff will review four RFPs received for implementation of a new CIS. 2. A new Automatic Call Distribution system is proposed for implementation in the Utilities Customer Service Center this fiscal year.The Administrative Services Department (ASD) is planning to coordinate with Utilities implementation of Automatic Payment Service option for Utilities customers. Credit cards are now accepted for Utilities payments at City Hall. 3. During the third quarter of 1996-97, staff will review six RFPs received from vendors to implement an Automatic Meter Reading pilot project in 1997. 4. A number ~of tasks are currently underway to implement Project PLEDGE before July 1,1997. FUNCTIONAL AREA: DISTRIBUTION SYSTEM KEY PLANS 1. In 1996-97, complete the installation of water main replacements in Phase X on sections of the following streets: Tasso, Byron, Middlefield, Melville, Kipling, Cowper, Ash and Kellogg. Design water main replacements for Phase XI which may include portions of Webster, Palo Alto Avenue, Lytton, Alma, Ramona and Birch streets. 2. Complete the removal and replacement of the interior and exterior coatings on Montebello Reservoir. Install corrosive control measures on Park, Corte Madera and Dahl. Perform. fence and pavement repairs on reservoir sites. STATUS 1. Water Main Replacement Phase X construction is completed. Contractor is working on punch list items. Water Main Replacement Phase XI. is in the design phase, which is 55 percent complete. Water Main Replacement Phase XI will be awarded by Council before end of 1996-97. 2. Montebello Reservoir interior and exterior recoating is complete. Installation of corrosion control will be delayed until 1997-98. 7O FUNCTIONAL AREA: VEHICLE REPLACEMENT/ADDITIONS KEY PLANS STATUS 1. In 1996-97, identify vehicles and equipment scheduled for replacement that may be purchased from manufacturer with. Compressed Natural Gas (CNG) systems. (Funding will be provided from Utilities/Gas CIP to purchase 30 vehicles with dedicated CNG). 2. Complete Vehicle Management System CIP, which includes installing monitoring equipment on 180 vehicles and developing custom reports for management. 1. In progress. Seven vehicles are identified for replacement with dedicated CNG ultra low emission status, 2. In progress. Wireless Vehicle Management System is installed in 40 vehicles including five Police Motorcycles. FUNCTIONAL AREA: VEHICLE REPLACEMENT/ADDITIONS KEY PLANS STATUS .1. In 1996-97, implement plan for fuel storage and fuel alternatives (CNG and Electric expanded use). 2. Investigate and if appropriate, develop agreements to provide maintenance service for outside agencies including joint use of fueling facilities where possible. 1. In progress. Utilities Marketing has taken the lead on expanded use of CNG and Electric vehicles and will complete long range plan in concert with Public Works future vehicle replacement programs. 2. Complete. Agreements have been completed with Ravenswood City School District and Palo Alto Unified School District for joint use of the City’s CNG fueling station for refilling new school buses. 71 MAJOR ACTIVITY: VEHICLE OPERATIONI MONITORING IMPACT MEASURES 2. Provide departments with monthly usage, accident and repair cost data reports which summarize exceptions of either under-utilized or excessive use vehicles. 1996-97 SIX 1996-97 1995-96 1996-97 MONTH ESTIMATED ACTUALS ADOPTED ACTUALS ACTUALS 7 7 2 4 2. Due to computer program limitations, information can only be provided on a quarterly basis. The measure will be changed in 1997-98 to reflect quarterly reports. MAJOR ACTIVITY: FUEL STORAGE AND DISPENSING IMPACT MEASURES 1. Ensure 95 percent of fuel dispensers are available for use annually through daily monitoring of fuel distribution and dispensing at all fueling locations. 2. Provide 4 percent annual fuel savings from use of Compressed Natural Gas (CNG) in vehicles from base year 1993-94. 1995-96 ACTUALS 1996-97 ADOPTED 95%95% 1996-97 SIX 1996-97 MONTH ESTIMATED ACTUALS ACTUALS 9O%95% 2%2%1%4% 1. Fire Station One was down five months for new tank. 2. CNG use increased second quarter of 1996-97. ?2 FUNCTIONAL AREA: PRINTING &: MAILING SERVICES KEY PLANS 1. In 1996-97, organize and establish a functional file system for citywide forms to reduce duplication, standardize, and reduce development time for customers. STATUS 1. Planning for filing system is under way. Expected completion by year end. 73