HomeMy WebLinkAbout1998-11-17 City CouncilCity of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL ATTENTION: FINANCE COMMITTEE FROM: DATE: SUBJECT: CITY MANAGER NOVEMBER 17, 1998 DEPARTMENT: ADMINISTRATIVE SERVICES CMR:418:98 1997-98 YEAREND CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS REPORT This is an informational report and no Council action is required. BACKGROUND This report provides the Finance Committee with information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of the fiscal year 1997-98. In the attached matrix (Attachment A), all City departments have submitted information on their projects and commented on any issues which might cause a change in the scope or timing of the projects. Information in this report is intended to keep Council abreast of progress on all CIP projects that were open at the beginning of the 1997-98 fiscal year and on those projects which were added or completed during the same fiscal year. DISCUSSION The attached matrix categorizes CIP projects into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase the project was in at fiscal yearend. Information on phases is intended to give Council a p,erspective on how much progress was made on a project. Three distinct phases are utilized, as follows: CMR:418:98 Page 1 of 3 Phase:Activities: Pre-Design Design Construction o Preparation of feasibility study o Development of a master plan o Definition of project scope o Preparation of Environmental Impact Report o Hiring a design consultant o Completion of project design o Soliciting bids or proposals o Acquisition of major equipment o Installation o Implementation of a project The comments section of the matrix provides Council with information clarifying the status of certain projects. In general, the comments colunm will be blank for projects which are on- track and progressing as planned. In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. Within each department or fund, the projects are ordered by project number, which includes the year of Council approval (year of approval is shown by the second two digits of the 5-digit project number or the first two digits of 4- digit project numbers). The matrix also includes information on the total or accumulated budget for projects, the remaining budget as of the beginning of the fiscal year, and the fiscal year expenditures, through June 30, 1998, including commitments (encumbrances). (Total or accumulated budget was not readily available for a number of multi-year Enterprise Fund projects.) The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. During fiscal year 1997-98, progress was made on all of the City’s "continuous" projects (Attachment B). At yearend, all completed CIP’s were closedand the remaining balances transferred to the Budget Stabilization Reserve for General Fund projects; to Retained Earnings for Internal Service Funds; and for Utility Fund projects, to the appropriate Rate Stabilization Reserves. CMR:418:98 Page 2 of 3 ATTACHMENTS Attachmem A: Yearend Capital Improvement Projects Status Matrix Attachment B: List of Continuous Projects PREPARED BY:Robin Spencer, Staff Accountant Joyce Aung, Staff Accountant DEPARTMENT HEAD APPROVAL: Director, Admfinistrative Services CITY MANAGER APPROVAL: Manager CC: n/a CMR:418:98 Page 3 of 3 l- zuJ E == I--> IE ~-’~ I0 .._: (DO) ~e~- (o o =E~0 0 o 0 ZI,i oo o B uJrn ooo wz ~ oo 0 E0 t- O o o o_m E E ,-E E 0 0 0 0 0 :0 ~0 0 (..) 0 0 (:~(:D (:D (::D 0 8!8 8 g __. z I-- ~~ =z=<<l:: z ~. >- u. ,, Q oo 0 0 E o <~ z z ~. F-ZLU ~[,,, Z L~ E ~ZZ~ L ZLU E E i,-" > I-.-iE LIST OF CONTINUOUS PROJECTS Attachment B Administrative Services 18614 Financial Database Upgrade 19618 GIS Application 19808 Financial Applications Development Community Services 18617 Art in Public Places 19415 Park Facilities Improvements Public Works 18903 18971 18670 18822 19018 19101 19309 General Fund Sidewalk Improvements Street Improvements (Utility users tax) Street Improvements (Street Improvement Fund) Computer Aided Map Cubberley Building Code Modification Tank Investigation and Removal ADA Compliance 8870 Storm Drainage Fund Collection System Improvements Utilities 8928 8930 8931 8938 8944 0354 Electrical Fund Underground Improvements, Customer Design and Connection Services Traffic Signals Communications System Improvements Substation Protection Improvements Substation Facility Improvements Street Light Replacements Water Fund 8013 Water System Extensions 8014 Service and Hydrant Replacements 8015 Water Meters 8016 Water Main Replacements 8020 8021 8022 9173 Wastewater Collection Sewer System Extension RWQCP Equipment Replacement RWQCP System Flow Metering Sewer System Rehabilitation and Augmentation Gas Fund 8017 Gas System Extensions 8018 Gas Main Replacements 8019 Gas Meters and Regulators