STATUS REPORT ON COUNCIL ASSIGNMENT
LIGHTING IN THE DOWNTOWN AREA, CITY
FACILITIES
CMR:431:98
REGARDING
PARKS AND
This is an information report and no Council action is required.
BACKGROUND
On October 6, 1997, Council directed staff to pursue a range of lighting projects in the
downtown area and in City parks and facilities through.the Capitol Improvement Program
(CIP) process. (CMR:410:97, See Attachment A). Accordingly, several C~ projects were
adopted in June 1998 as part of the 1998-99 budget. The approved projects include:
Downtown Parking Lots (CIP#19920); Univ_ersity Avenue Intersections (CIP#19/508); City
Parks and Facilities (CIP# 19902); Johnson Park (CIP# 19903); and Emergency Call Boxes
(CIP#19916). Since there is a high degree of community interest in lighting levels
downtown, staff has prepared this information report to update Council and the community
regarding the status of these projects. The scope of these projects and the work accomplished
since June of this year are described below.
DISCUSSION
Downtown Parking Lots
The Utilities Department is leading a project to improve lighting in 15 City parking lots in
the downtown area. The intent is to make the parking lots safer for vehicle and pedestrian
traffic and to better conform to the guidelines of the Illuminating Engineering Society 0ES).
The affected parking lots are listed in the staff report that is included as Attachment A.
In this project, lower wattage luminaires will be replaced with 250 Watt high pressure
sodium luminaires in order to raise the lighting levels. In addition, most 20 foot and 25 foot
street light poles will be replaced with 30 foot poles to achieve greater light coverage. In
some instances, lights will be relocated from underneath tree canopies and some single mast
arm poles will be replaced by poles with double mast arms.
CMR:431:98 Page 1 of 4
The poles have been selected and some initial design work has been completed. Bids for the
poles have been received and orders will be processed in November. Delivery of the poles
will take approximately 16 weeks from the order date. The start of construction will be
delayed until Spring 1999 due to Winter weather considerations and to minimize disruptions
downtown during the holiday season. Staff expects that the project will be completed in the
Spring/Summer of 1999.
University. Avenue Intersections
Funding for improvements in lighting at several University Avenue intersections was
included in the Downtown Urban Design Project with the goal of enhancing both safety and
aesthetics in the downtown area. The project is a collaborative effort between the Utilities
Department and Public Works. The affected intersections are at High Street, Emerson Street,
Ramona Street, Bryant Street, Waverley Street and Cowper Street.
The work to be done includes upgrading intersection safety lights from mercury vapor to
more efficient high pressure sodium vapor lights to increase illumination. The signal poles
and fixtures that are now obsolete will be replaced. The number of intersection lights will
be increased, such that each of the six project intersections has four street lights. In addition,
four 12 foot decorative poles with post-tops will be added to four of the six intersections.
This will increase lighting at side street cross walks.
Some of the underground conduits needed for the new lights were installed during}he recent
downtown repaving project. Bids for the poles have been received and orders will be
processed in November. Delivery of the poles will take approximately 16 w~eks from the
order date. Preliminary design work has been completed and a Request for Bids will soon
be issued for the construction work. The project is expected to be completed in Spring 1999.
City Parks and Facilities
A CIP was approved in the 1998-99 budget to address the issue of nighttime exterior lighting
at City parks, community facilities and libraries. The Community Services Department will
hire a consultant to analyze current lighting levels and recommend changes in lighting,
landscaping and signage as appropriate to increase visibility and the feeling of safety for park
and facility visitors. Attachment C lists the City parks and facilities that will likely be
included in the study. A Request for Proposals is being finalized and will be sent in
November. Current nighttime conditions will be assessed during the Winter, when the parks
and facilities are at their darkest. Staff anticipates the completion of the consultant study in
early Spring 1999. In future years’ CIPs, staffwill return with recommendations, a resource
request and implementation timeline for the design and construction of the appropriate
improvements.
Johnson Park
The Community Services Department will implement a range of lighting improvements in
Johnson Park in order to increase light levels, visibility and perceptions of safety along the
CMR:431:98 Page 2 of 4
park’s perimeter and its interior walkways. New light poles will be added and additional
fixtures will be placed on existing street light poles.
Preliminary design work has been completed and a Request for Bids is being developed for
release in December. A public process will be conducted to .solicit community concerns and
preferences as to lighting levels in this neighborhood park. In addition, the Architectural
Review Board (ARB) will be consulted regarding the aesthetic impact of new light fixtures.
Staff estimates that construction will begin in the Spring/Summer of 1999.
Emergency Call Boxes
The Police Department is working to install emergency call boxes in Johnson, Cogswell and
E1 Camino Parks. These call boxes will be centrally located in the parks and will assist
pedestrians in distress in two ways: when the call boxes are activated, they will provide a
direct connection to Police dispatch and a blue strobe light will go on, providing a visible
alert.
The Request for Bids has been developed and issued. Installation will begin once a contract
has been awarded. Staff expects to have the call boxes installed by Spring 1999.
General Lighting Issues "
In addition to the projects described above, several other lighting improvements are being
planned. These improvements include parking lot lighting on Sandhill Roa~ lighting
changes associated with the renovation of Mitchell Park and the addition of lighting in front
of the Teen Center.
There are several issues to be considered when designing lighting projects. The concerns and
needs of the public must, of course, be identified. In some instances, these needs may be
contradictory. Some residents might feel increased lighting is desirable in order to prevent
vandalism and tripping hazards and to generally improve their feelings of safety. Other
residents might prefer less lighting as a way to protect the privacy and calm of their homes.
Likewise, some businesses may want to control the light levels around their establishments
in order to promote a certain atmosphere. Also to be considered are the aesthetic impacts of
lighting poles and fixtures, which are of particular concern to groups like the ARB. In
addition, environmental groups may have concerns about energy use and efficiency. City
staffmust understand and weigh these sometimes conflicting perspectives, while at the same
time considering the IES guidelines which suggest the appropriate lighting levels for various
public settings and uses.
The City Manager’s Office has created a task force of staff members from the Utilities,
Police, Community Services, Public Works and Planning Departments,which are responsible
for various lighting projects. This group will meet as necessary to share information and
address the above issues. In addition, this group will coordinate their efforts in order to
leverage staff and contractor resources wherever possible to maximize timeliness and
CMR:431:98 Page 3 of 4
efficiency in the completion of the lighting projects described in this report.
RESOURCE IMPACT
At this point, no additional resource impacts have been identified.
POLICY IMPLICATIONS
The information contained in this report is consistent with existing City policy.
ATTACHMENTS
Attachment A:
Attachment B:
Recommendations Regarding Safety and Lighting in the Downtown
Area (CMR:410:97)
List of City Parks and Facilities
PREPARED BY: Audrey Seymour, Senior Executive Assistant
CITY MANAGER APPROVAL:
Assistant City Manager
CMR:431:98 Page4 of 4
ATTACHMENT A
City of Palo Alto
City Manager’s Repo
TO:HONORABLE CITY COUNCIL
FROM:
AGENDA DATE:
CITY MANAGER
OCTOBER 6, 1997
DEPARTMENT:
CMR:410:97
POLICE
UTILITIES
PUBLIC WORKS
COMMUNITY
SERVICES
PLANNING
SUBJECT:RECOMMENDATIONS REGARDING SAFETY AND
LIGHTING IN THE DOWNTOWN AREA
RECOMMENDATIONS
Staff recommends that the City Council directs staff to:
1)-include in requests for funds in the 1998-99 Capital Improvement Project (CIP) funding
for:
2)
a)
b)
c)
d)
increased lighting in downtown City parking lots that would make levels more
consistent with Illuminating Engineering Society’s (IES) guidelines;
additional lighting at Johnson Park;
a formal study on lighting needs at other City parks and facilities;
installation for emergency notification units in Johnson and E1 Camino Parks;
initiate formal discussions with the Joint Powers Board (JPB) regarding specific
upgrades and funding for additional lighting in the JPB parking lots east of the railroad
tracks; and
3)conduct a more detailed analysis to develop a proposal to increase the number and
location of additional pay telephones in the downtown area.
CMR:410:97 Page 1 of 9
BACKGROUND
After the tragic homicide of Herbert Kay in early summer, the City Council at its June 23, 1997,
meeting, asked the City Manager to work with staff from the Police, Utilities, Public Works,
Planning, and Community Services Departments to determine which streets and public facilities
might need additional lighting or tree trimming to increase safety,; and to return to Council with
a report on what, if any, additional police crime prevention resources might be needed to
enhance prevention and safety efforts. This report provides information and recommendations
associated with the preliminary review of those issues.
DISCUSSION
Before presenting the findings of the preliminary evaluation and the associated conclusions that
have led to the recommendations, staff believes it is important to provide some limited
information about the Kay homicide. Because the case is still under investigation and still
sealed at the direction of the District Attorney’s Office and the Court, specific details about the
incident cannot be released at this time. However, it is still possible to share-the fact that the
incident was a random act that could have occurred at any location, in any city, at any time, or
under any lighting condition. The brutal reality is that the only certain way thisMolent crime
could have been prevented from occurring was if a police officer had been on that street at the
time of the attack. Because this.is not realistic, the evaluation of the conditions listed dbove and
the development of the associated recommendations .provide only means to improve and
enhance the perception of safety and should not be construed as absolute affirmations that such
acts will not occur in the future.
In response to the City Council’s assignment, a committee was formed with representatives
from the City Attorney’s Office, Police, Public Works, Utilities, Planning, and Community
Services Departments. The committee conducted preliminary evaluations into several areas
¯ including:
street and sidewalk lighting,
tree trimming,
parking lot and garage lighting,
park lighting,
emergency notification systems, and
police crime prevention resources.
The intent of the evaluation was to determine what, if anything, could be done to increase safety
and the community’s perception of safety. While the committee focused on the downtown area,
at the Council’s direction, some recommendations developed involve further study at City parks
CMR:410:97 Page
and facilities in other parts of the community. For this report, the downtown is defined as the
area bordered by E1 Camino Real to Webster Street and Forest Avenue to Lytton Avenue.
Street and Sidewalk Lighting
The Utilities Department, who owns and is responsible for most streetlights, follows IES
guidelines when designing roadway and parking lot lighting systems. Guidelines issued by IES
are simply recommendations and not meant to serve as legal standards. The main purpose of
providing lighting is to safeguard, facilitate and encourage vehicular and pedestrian traffic.
Lighting levels should accommodate the visual needs of vehicular and pedestrian nighttime
traffic. For street lights, the average recommended luminance is between 0.3 and 0.6 foot
candles measured from the ground, depending upon the area classification (e.g., commercial,
intermediate, residential). By utilizing an average foot candle, some areas are much darker and
some lighter, depending upon the height of the light pole. Lights on shorter poles create ,hot
spots" and therefore require more fixtures to light an area. It is important to emphasize ttiat
street lights are intended to illmninate streets and not sidewalks. The Utilities Department tries
to meet these guidelines whenever possible. Sometimes, the design has to be modified due to
different field conditions such as trees, buildings, and the layout of the streets. _
The Downtown Urban Design Improvements Master Plan was recently approved by the City
Council. Council has also approved the details and funding for the .completion of Phase One
of the Plan. Phase One includes improved street lighting at major intersections and comers on
University Avenue. Work on Phase One should begin in Spring of 1998. The acorn lights on
University Avenue will be raised to 12’-13’ in height; luminaires with the same form but With
less glare will eventually replace the existing acorns and will create pools of"white" light With
more natural color rendition. Those additions and improvements will create adequate lighting
for the sidewalk area on University Avenue.
Elements of Phase Two have generally been discussed, but funding and specific details have
yet to be developed. Some preliminary consideration has been given in Phase Two to inclusion
of side street lighting for the area. These elements include improving the side street sidewalk
areas, especially on Florence and Kipling Streets where both one block sections are used for
access to public parking and dead-ends at University Avenue, and for installation of moonlights
in trees to create additional lighting for pedestrian areas. Staff does not anticipate the
development of specific recommendations or funding requests until 1999. If Council feels that
the work on the side streets should be expedited, staff would need specific direction in that
regard.
CMR:410:97 Page 3 of..9
Tree Trimming
Coordination with the City’s Tree Management Program to improve street and parking lot
lighting is required to achieve IES lighting guidelines. Trees provide shade and cover while
street and par’king lot lights are designed to provide illumination. When trees are next to light
fixtures, a conflict occurs if the tree growth interferes with the intended light pattern. After a
preliminary analysis of the street lighting conditions in the downtown area, staff determined that
possible removal of a few trees and!or possible relocation of street lights is needed in order to
meet IES guidelines. The nimming will be accomplished as part of the regular tree management
program.
Trimming frequency of London plane trees on University Avenue has been changed from a five-
year to a three-year cycle. The more frequent trimming will not only reduce leaf drop, but also
provide improved lighting. The next tree trimming along University Avenue is scheduled to be
completed before the holiday season. Trees along the side streets off University Avenue will
be reviewed every three years and will be trimmed on an as needed basis.
The Downtown Urban Design Improvements Master Plan includes ongoing car~ and prtming
programs to optimize the trees’ Vigor and appearance. The Plan also addresses the species
selection to identify preferred replacement trees, with the intent that the replacements should
be similar in-character to those that would be removed.
Parking Lot and Garage Lighting
Utilities and Public Works Departments staff conducted an assessment of lighting in all
downtown parking lots. Utilities is responsible for maintaining the lights in 15 downtown open
parking lots where standard utility light poles and luminaries have been installed. All of the
lights in the downtown area, including those in parldng lots, have been upgraded during the last
ten years as part of a Capital Improvement Project to convert all City street lights to the more
efficient high pressure sodium luminaires. In 1994, in an effort to increase the lighting in the
downtown lots, Utilities upgraded many of the fixtures to 150 watts. The result has more than
doubled the average light levels in the downtown lots.
Based upon the most recent assessment of parking lot lighting, Utilities staff compared existing
light levels with IES guidelines for open parldng facilities. The intent was to assess the lighting
needed for pedestrian safety in a medium activity parking lot. The recommended level is 0.6
foot candles at ground level. The assessment concluded that in order to achieve the light level
consistent with IES guidelines, existing lamps would have to be retrofitted and/or the number
of poles and Iuminaires would have to be increased where necessary.
CMR:410:97
During the assessment, Utilities staff studied the photometric analysis of the existing and
proposed recommended changes. Where new street light poles and luminaires are
recommended for installation, locations were chosen carefully to avoid any conflicts with
existing trees in the area. Where alternative locations were not feasible, trees would need to
be trimmed to maintain the desired lighting levels, Attachment A provides a summary of the
upgrades and retrofitting that is-recommended for downtown parking lots.
The City receives a number of claims resulting from people tripping and/or falling in parking
lots. The recommended upgrades in the lighting levels in parking lots should not only enhance
people’s perception of safety but also provide better illumination to help reduce these accidents.
Lighting levels in the City parking garages in the downtown area have already been addressed.
Significant "white and light" improvements resulting from painting and improved lighting were
made in the Civic Center and Lot Q garages. The City is currently in the process of preparing
for some improvements to the Webster/Cowper garage.
Staff also conducted a preliminary review of lighting levels at the JPB parking lots east of the
railroad-tracks, both north and south of University Avenue and concluded that some upgrades
would be needed. Costs for the upgrades are estimated to be approximately $50,0b0. JPB staff
indicated in an initial conversation _that they would be willing to entertain ideas to improve the
lighting in their lots. Further discussions would be required to determine specific upgrades,
costs, and funding. Staff recommends that Council direct staff to proceed with formal
discussions in this regard.
Due to the Council’s direction to focus on the downtown area, staff has not conducted an
assessment of lighting levels in other City parking lots in the California Avenue or Midtown
areas.
Downtown Parks
In addition to street, sidewalk and parking lot lighting, staff also looked at downtown parks to
assess lighting levels and safety considerations. They included Johnson, Scott, Cogswell, and
El Camino Parks. The illumination was increased in Cogswell Park about a year ago when the
trees and shrubs were trimmed and additional lighting installed. Staff has determined that
additional lighting is not needed in Scott Park.
While. outside the boundaries of the defmed downtown area used for this report, due to the
proximity to the downtown and the number of complaints that have been received from citizens,
Community Services staff and the CIP Design Consultant conducted a preliminary lighting
CMR:410:97 Page
analysis of Johnson Park. Staff concluded that the four existing light fixtures do not provide
sufficient light on the pathways and in the middle of the park. In addition to tree trimming that
needs to be completedin the middle of the park, the installation of seven new acorn luminaries
around the park perimeter, the addition of two cobra head fixtures on existing light poles at the
intersection of Kipling and Hawthorne Streets, and conversion of two fixtures to luminaries in
the center of the park are recommended. Cost for this work is estimated to be about $21,000.
Before the lighting improvement plan for the park would be finalized, Community Services staff
would ensure that input was received from members of the Downtown North Neighborhood
Association.
Staff also briefly looked at the lighting situation in E1 Camino Park. The initial review indicates
that some additional lighting would be beneficial. Due to the size and location of the park, a
more detailed study would be needed before specific recommendations could be.developed.
Because the focus of this assignment was the downtown, staff has not developed any
recommendations regarding security and lighting at other parks, around libraries, or City
community centers. However, staff believes that a formal analysis should be conducted to
determine what lighting improvements would be needed to enhance user safety for E1 Camino
Park and other City facilities. Depending upon the scope of work, costs for a lighting study
would range between $15,000 and $35,000. Staff will return during the 1998-99 Budget
process with a more detailed scope of work and more precise costs for the study.
Emergency Communication Systems
In addition to lighting, a person’s sense of safety is Often enhanced by their ability to request
assistance in emergency situations. As. a result, staff reviewed three types of emergency
communication mechanisms: police call boxes, emergency "blue phone" units, and traditional
pay telephones.
Police call boxes are used in some cities, providing direct communications to police dispatch
centers. However, they have significant limitations. The call box connection to the dispatch
center is made on a regular business line, not a 9-1-1 line, because of the way they must be
installed. In addition to initial purchase and installation cost of $400 per unit, there are ongoing
costs for monthly telephone line usage (about $20 per line per month), maintenance and
cleaning.
Emergency "blue phone" units, like those that were recently installed around Stanford
University Campus, reflect a newer technology than call boxes. Not only have they been
installed on college campuses, but also along freeways. The units can be powered by direct
current using solar power battery packs or alternating current with a hard line telephone
CMR:410:97 Page 6 of .9_:. / ~
connection, or a combination. The system can be used for 9-1-1 use only or for non-emergency
type calls. The added feature to these units is the flashing strobe light that is activated when
the emergency button is pressed. The strobe light draws attention to the area as it generates one
million candle power. The system does require daily checks to ensure proper operation. The
units are quite expensive, with a one time cost of about $18,000 per unit and annual
maintenance costs of almost $400 per unit. A review was completed to determine the number
of units needed for adequate coverage in the downtown area. Staff estimates that approximately
27 units would be needed.
Traditional pay phones are also used as an emergency communication mechanism. While there
are telephones in businesses in the downtown area, a quick assessment revealed that there are
only about ten outside pay phones. Pay phones do provide users with the ability to request
emergency assistance by dialing 9-1-1 without charge. Initial cost for pay phones ($400) is
about the same for call boxes and considerably less than "blue phones." A monthly service
charge is required if the revenue generated by the individual unit is less than $40.
Staff has determined that while the "blue phone" system is probably the most effective for
emergency notification, the amount of funding needed to purchase,, install, and maintain a
system with adequate cover is cost prohibitive. However, after reviewing the nfimber of calls
for service in some of the downtown parks, staff recommends the installation of a unit in
Johnson, E1 Camino, and Cogswell Parks.. Staff will consider including request for funding for
these units in the 1998-99 CIPbudget. Ira unit is approved in E1 Camino Park, it is possible
that Santa Clara Valley Transportation Authority may assist in its fimding.
Staffwill continue to pursue the placement of more pay phones in the downtown area that are
available on a 24 hour basis.
Police Crime Prevention Resources
A part of the Council assignment was to review the level of police crime prevention resources
to determine what, if any, additional resources may be needed. Staff believes that additional
police personnel, other than those recommended in the staff report on the evaluation and
recommendations associated with the Downtown Health and Safe~y Detail (CMR:411:97) are
not warranted. While an increase in the number of police officers obviously adds to visibility,
there is no guarantee that such incidents like the Kay murder would not occur. Based upon the
currently authorized number of officers in Palo Alto, together with the relatively low violent
crime rate compared to cities of similar size, staff cannot justify a request for additional police
officers at this time.
CMR:410:97 Page 7 of~9 ! ~
As part of the Police Department’s implementation of its community policing philosophy, there
are potential strategies that may be applied to increase individuals’ sense of safety and reduce
the potential for crimes to occur. Because crimes, especially violent incidents,, are often
connected to the use of alcohol, recent efforts have been made to educate owners, managers,
and bar tenders of restaurants and bars all- over the City about Alcohol Beverage Control laws,
monitoring alcohol consumption of patrons, how to handle unruly patrons, when to call the
police, etc. This Bar Safe Program wi!l be continued in the future.
Another strategy Police staff will be pursuing includes the offering of personal safety classes
for citizens. There are a number of simple tips and tactics that individuals can use to decrease
their vulnerability and enhance their personal safety while outside their homes. Several classes
on personal safety were presented by the Police Department some years ago.
FISCAL IMPACT
Preliminary cost estimates for the recommendations that staff will include in the 1998-99 CIP
budget are as follows:
1)
2)
3)
4)
Increase lighting levels in the downtown City parking lots - $156,000
Upgrades of lighting in Johnson Park - $21,000
Installation of emergency notification units in Johnson, E1 Camino, and Cogswell Parks -
$54,000
Study of lighting needs at E1 Camino Park, other City parks and facilities - $15,000-
$35,000
The cost for upgrades to lighting in JPB Lots is estimated tobe about $50,000. At Council
direction, staff would work with JPB regarding funding and return to Council with additional
information.
POLICY IMPLICATIONS
All lighting upgrades that would be completed would be consistent with the Downtown Urban
Design Improvements Master Plan.
CMR:410:97 Page 8 of~.~ ( 2~"
ENVIRONMENTAL ASSESSMENT
Feasibility and Planning studies are statutorily exempt from California Environmental Quality
Act (CEQA). As projects are developed and specific proposals are made, additional CEQA
review may be required.
ATTACHMENTS
Attachment A - List of Recommended Parking Lot Lighting Upgrades
PREPARED BY~
REVIEWED BY:
Michael Jackson, Acting Deputy Public Works Director
Paul Dias, Director of Parks
Larry Starr, Assistant Director Utilities Electric Operations
Lynne Johnson, Assistant Police Chief
Jim Gilliland, Assistant Planning Official
Glenn Roberts, Public Works Director
Paul Thiltgen, Community Services Director
Ed Mrizek, Utilities Director
Chris Durkin, Police Chief
Ken Schreiber, Director of Planning and Community
Environment -
REPORT COORDINATOR: Lynne Johnson, Assistant Chief -
CITY MANAGER APPROVAL:
CC Dan Lorimer, Downtown North Neighborhood Association
Pat Burt, University South Neighborhood Association
Susan Frank, Chamber of Commerce Downtown Marketing
CMR:410:97 Page 9 of 9
ATTACHMENT A
Parking Lot A Emerson Street and Lytton Avenue
Parking Lot C Ramona Street between Lytton Avenue and University Avenue
Parking Lot D Hamilton Avenue and Waverley Street
Parking Lot E Gilman Street between Hamilton Avenue and Forest Avenue
Parking Lot F Florence Street between Lytton Avenue and University Avenue
Parking Lot G Gilman Street between Hamilton Avenue and Forest Avenue
Parking Lot H Hamilton Avenue and Cowper Street
Parking Lot K Lytton Avenue and Waverley Street
Parking L~t L Lytton Avenue and Bryant Street
Parking Lot N Emerson Street between University Avenue and Hamilton Avenue
Parking Lot O High Street_be .tween Lytton Avenue and University Avenue
Parking Lot P High Street between University Avenue and Hamilton Avenue
Parking Lot R Alma/High Street between University Avenue and Hamilton Avenue
Parking Lot S Bryant/Florence Street betweenLytton Avenue and University Avenue
Parking.Lot T Kipling street and Lytton Avenue
Below is a preliminary breakdown of the design requirement for each individual parking lot:
Parking
Lot #
A
D
E
F
H
L*
0
R*
Total
# Poles
Needed
2
3
6
2
2
2
4
3
1
2
3
3
3
4
3
43
# Lumin-
aires
Photo FT. Wire
150
3O0
100
100
ST. LT.
6
7
12
5
5-
3
7
6
4
-5
7
6
5
8
92
Cells
6
7
12
5
5
3
7
6
5
7
6
5
8
6
92
]~ oxes
100 2
1
2
2
2
100 2
2OO
150 1
50
100
150 - i
150 1
150
200 3
i50 3
2150 20
# ST. LT.
Based
Found.
2
2
2
2
2
1
4
3
21
Conduit
60
20
20
10
10
130
80
408
*Because there are sites for proposed par -tdng structures, upgrades may not occur in these lots.
ATTACHMENT B
FACILITIES TO BE STUDIED BY LIGHTING CONSULTANT
Lucie Stem Complex including the Ruth Stem Wing, Community Theatre,
Children’s Theatre, Boy Scout Offices, Girl Scout building, Children’s Library and
the Jr. Museum
Main Library and Art Center Complex
Downtown Library
College Terrace Library
Mitchell Park Complex including the Mitchell Park Library and Community
Center.
Terman Library
Cubberley Center (parking lots, fields, and building perimeter.)
Baylands Athletic Center
Baylands Interpretive Center
Foothills Park Interpretive Center
Rinconada Swimming Pool
Teen Center
PARKS
¯Bol Park ¯E1 Palo Alto Park
¯Boulware Park ¯Greer Park
¯Bowden Park ¯Hoover Park
¯Bowling Green Park ¯Hopkins Creekside
Park
¯Briones Park ¯Johnson Park
¯Cameron Park ¯Kellogg Park
¯Clark Park ¯Mayfield Park
¯Cogswell Plaza ¯Monroe Park
¯Eleanor Pardee Park ¯Peers Park
¯E1 Camino Park ¯Ramos Park
¯Rinconada Park
¯Robles Park
¯ScOtt Park
¯Seale Park
¯Terman Park
¯Wallis Park
¯Weishaar Park
¯Werry Park