HomeMy WebLinkAbout1998-10-19 City Council (7)City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL 3 FROM:CITY MANAGER DEPARTMENT: UTILITIES DATE:OCTOBER 19, 1998 CMR:396:98 SUBJECT:BID REJECTION TO POWER ENGINEERING CONTRACTORS FOR THE RESERVOIR UTILITY ACCESS ROAD AND SITE MAINTENANCE PROJECT - CIP#33306 RECOMMENDATION Staff recommends that Council reject the bid for the Reservoir Utility Access Road and Site Maintenance Project - Capital Improvement Program (CIP) No. 33306 submitted by Power Engineering Contractors in the amount of $262,826. DISCUSSION .... Project Description This project was to complete the final site maintenance of the City water reservoir sites and to install cathodic protection in the steel reservoirs. Specifically the work to be performed under the contract was furnishing and installing a galvanic cathodic protection system, installation of 1-1/2 inch of asphaltic concrete pavement overlay over the existing site pavement, fence repair work, and booster station roof repair work at the following reservoir and booster station sites: Corte Madera, Boronda, Park, Dahl, and Monte Bello. Bid Process Notices inviting formal bids for the Reservoir Utility Access Road and Site Maintenance Project were sent on June 30, 1998 to five builders’ exchanges~and four contractors. The bidding period was 49 calendar days. Two mandatory pre’bid meetings were held on July 23, 1998 and July 24, 1998, respectively; one bidder attended the two mandatory pre-bid meetings. Bids were received from one qualified contractor on August 18, 1998, as listed on the attached bid summary (Attachment A). The one bid submitted amounted to $262,826. Staff has reviewed the bid submitted and recommends that the bid of $262,826. submitted by Power Engineering Contractors be rejected. The bid is approximately 50 percent engineer’s estimate of $172,360. CMR:396:98 Page 1 of 2 The contractors who are qualified to perform the work contained in this project were in their peak construction season at the time of the project’s bid period and only one contractor sent a representative to the project’s mandatory pre-bid meeting. Staff believes that the bidding environment will improve later this calendar year and more qualified contractors will submit bids for the restructured project resulting in a lower bid. The demand for qualified contractors is usually much lower during the winter rn0nths in the Bay Area. RESOURCE IMPACT Funds for this project are included in the FY 1997-98 Utilities Department Water CIP budget No.33306. POLICY IMPLICATIONS This report does not represent any change to existing City policies. ENVIRONMENTAL REVIEW This project was considered to be categorically exempt from California Environmental Quality Act as part of the Council approval of the Reservoir Utility Access Roadway and Site Maintenance Project and no further environment review is necessary. ATTACHMENTS Attachment A: PREPARED BY: DEPARTMENT HEAD: Bid Summary Romel Antonio, Charles Borg, Roger Cwiak Director of Utilities CITY MANAGER EM r HARRISON Assistant City Manager CMR:396:98 Page 2 of 2 ./ Project Bid Sum Reservoir Utitit~ ~. Schedule ICode Madera Reservoir Total Schedules I - VII Attachment A s Roadway & Site Maintenance: 8/18F38 Bid Opening Date ; Bid Item #Description IEngr’s Estimate power Engineering I I 10 15 25 30 35 40 45 50 55 II - Boronda Reservoir Total 60 65 70 80 85 90 95 100 Park Res. & Booster Total 105 110 115 120 125 130 131 135 140 145 IV - Dahl Res. & Booster Total 150 155 160 165 170 175 180 185 190 195 V- Monte Bello Res. Total 200 205 210 " 215 220 225 230 235 240 VI - Code Booster 245 250 255 265 270 275 280 285Total VII - Bomnda Booster Total 290 295 300 305 310 315 320 325 Project Grand Total Schedules (!.VII) Mobilization Site Preparation Fence Cathodic Protection AC Berm 1-1/2" AC OvedayGlean Culverts/Catch Basins Cleanup Recycling Mobilization Site Preparation Fence AC Berm I~1-1/2" AC Oveday I lean Culverts/Catch Basins’ Cleanup Recycling Mobilization Site Preparation Fence jCathodic Protection AC Berm 1-112" AC Oveday Bldg. Roof Repairs ;lean Culverts/Catch Basins Cleanup Recycling Mobilization Site Preparation’Fence i Cathodic Protection AC Berm 1-1/2" AC Oveday Bldg, Roof Repairs t Clean Culverts/Catch Basin= Cleanup . I Recycling Mobilization Site Preparation I Fence I Cathodic Protection I AC Berm I1-1/2" AC Oveday IClean Culveds/Catch Basin,~ Cleanup Recycling I Mobilization Site Preparation Fence I 1-1/2" AC Oveday t Bldg. Roof RepairsiClean Culveds/Catch Basinsl Cleanup Recycling i i Mobilization I Site Preparation i Fence 1-1/2" AC Oveday Bldg. Roof Repairs Clean Culveds/Catch Basins Cleanup Recycling $3,000.$2,000 $6,0001 $1,100 $420 ~$1,680 $15,000 1 $11,000 $1,760 1 $7,480 $3,400 i $15,300$500 1 $3,2OO $1,000 1 $500 $1,000!$1 $32,080 $42,261 $2,ooo $1,500 $6,6501 $11,780 $2,000 !$8,500 $3,230i $13,500 $500 $1 $1,000 Il $500 st,oooi $I $21,380 $39,381 $3,500 $2,000 $4,000 $1,500 $5,950 $14,280 $15,000 !$10,000 $500 ~,$34O $2,380 $9,600 $1,050 !$8.750 $500 ~$2.600 $1,000 $500 $1,000 $1$34,880 ’,$49,571 $3,500 $2,000$3,000 I $3,000 $910 $4,992 $15,000 $10,000$25 j $17$4,930 I $18.300 $1,050 $8,750 S500[S2,900 $1,000 $250 $1,000 $1 $30,915 $80,210 $4,000 $2,000$4,000 $3,000 $350 $1,610 $15,000 $11,500 $2,750 $2,420 $4,845 $21,600$500 $3,000 $1,000 i $500 $1,000 1 $I$33,445 $45.631 $3,ooo !$1,5oo $2,000 I $I ,500 $10o1 $113 $510j $2.232 $1,050 $8,750$50O $2,700 $1,000i $500 $1,000 1 $1 $9,160 $17,296 $4,000 i $2,000 i $1,50(; $100 $7$850 ~$3,25(; $1,0501 $500 i $1.000 $50(;$I,OOoI ,lo,soo ]$1 $18,47e $172,360 $262,826