HomeMy WebLinkAbout1998-10-05 City Council (14)City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL 6 FROM:CITY MANAGER DEPARTMENT:UTILITIES DATE:OCTOBER 5, 1998 CMR:381:98 SUBJECT:AMENDMENT No. 1 TO EXISTING FINANCING AGREEMENT No. 94-SAO-00047 BETWEEN THE CITY OF PALO ALTO AND THE UNITED STATES DEPARTMENT OF ENERGY AND DEPARTMENT OF INTERIOR FOR SHASTA POWERHOUSE REWIND PROJECT REPORT IN BRIEF This Report requests Council approval of an amendment of a contract between Palo Alto, the Western Area Power Administration (WAPA) and the U.S. Bureau of Reclamation (USBR) for funding maintenance work at the Shasta Power Plant which Council approved in May 1995 (CMR 323:95) The contract provided for some WAPA customers, including Palo Alto, to fund the rebuilding of three generators located at the Shasta Dam. The original scope of work is expected to be completed significantly under budget. This amendment will allow USBR to use the remaining funds to replace, rather than refurbish, the gener~r runners, thereby~ increasing the project output for the benefit of the funding customers. CMR:381:98 Page 1 of 3 RECOMMENDATION Staff recommends that Council approve Resolution of the City of Palo Alto authorizing the signing of Amendment No. 1 to Contract No. 94-SAO-00047. BACKGROUND In the early 1970’s, the USBR identified the need to rebuild five of the generators located at Shasta Dam. Through the standard government appropriations process, only two of the five.units were rebuilt prior to 1995. On May 23, 1995, sixteen WAPA customers, including Palo Alto, entered into a contract for rebuilding the remaining three generating units, referred to as the Shasta Rewind Project. The Shasta Rewind Project will result in the three generators being capable of generating an additional 47 megawatts of power. Under the contract, the customers agreed to advance funds to the USBR for the $21.175 million project in the form of periodic cash calls by USBR. In exchange, WAPA would credit the customers’ next month power bills for the cash call, plus interest. This funding mechanism allowed the USBR to proceed with the Shasta Rewind Project and expense the cost of the project to all customers. Currently, the USBR has completed the rebuild of Shasta Unit No. 4 on time and significantly under budget. The USBR now estimates that the entire Shasta Rewind Project will be completed for approximately $12 million, rather than the initial $21 million. In May 1998, the USBR approached the funding customers with a proposal to amend the contract scope of work to replace rather than refurbish the turbine runners for Shasta Units 3, 4, and 5, without increase to the current contract funding limits. The USBR has estimated that the three new runners would increase the power output of Shasta Dam by 51 megawatts for an overall increase of 98 megawatts (47 megawatts from rebuilding and 51 megawatts from replacing the runners), and increase the operating efficiency by approximately 2 percent to 5percent annually. Therefore, the dam would produce more power and energy with. the same amount of water releases. The costs for the replacement of the runners would be expensed andpaid for by all WAPA customers in proportion to their consumption of WAPA’s commercial firm power product during 2000-2004. DISCUSSION Palo Alto is a 35.9 percent participant in the contract. Amendment No. 1 provides the funding customers, with a right of first refusal to the additional generating capacity at the time each combined runner/generator project is completed. Therefore, by signing Amendment No. 1 to the contract, for no additional funding support, Palo Alto would receive a share of any on-going benefits from the additional 18 megawatts (35.9 percent of 51 megawatts) of hydro capacity for the years 2001- 2004. These benefits would accrue via obtaining the additional power at a cost that is reasonably anticipated to be CIVlR:381:98 Page 2 of 3 below the market price. Subsequently, when WAPA re-markets the Central Valley Project resources after 2004, the additional 98 megawatts will be available for allocation, thus providing additional resources for WAPA’s proposed post-2004 Marketing Plan allocation process. Palo Alto would benefit by securing approximately 5 additional megawatts via this process, enough to meet two percent ofPalo Alto’s needs. RESOURCE IMPACT Staff expects no impact on resources associated with approval of the contract amendment. POLICY IMPLICATIONS This recommendation is consistent with existing city policy. TIMELINE If Council approves, the signed Amendment No~ ~ will be forwarded to WAPA and USBR to meet their requested time line in early October. ENVIRONMENTAL REVIEW This program does not constitute a project for the purposes of the California Environmental Quality Act. ATTACHMENTS Amendment to Contract No. 94-SAO-00047 Resolution PREPARED BY:Tom Kabat, Senior Resource Planner Girish Balachandran, Manager Supply Resources Tom Habashi, Assistant Director of Utilities DEPARTMENT HEAD: D CITY MANAGER APPROVAL: CMR:381:98 Page 3 of 3 RESOLUTION NO. RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AUTHORIZING THE SIGNING OF AMENDMENT NO. 1 TO CONTRACT NOi 94-SAO-00047 WHEREAS, on June 20, 1995, the City Council adopted Resolution No. 7527, approving the $21,175,000 Contract No. 94-SAO-00047 between the Central Valley Project customers, including the City of Palo Alto, a 35.9 percent funding participant, the Western Area Power Administration and the United States Bureau of Reclamation for the funding of maintenance work at the Shasta Dam power plant; and ~ WHEREAS, Western and the Bureau wish to amend the scope of work to authorize additional maintenance work on Shasta Dam units 3, 4, and 5 and the purchase and installation of new turbine runners without changing the funding limit; and WHEREAS, Western will provide additional excess firm capacity to Western for the benefit of Project customers after the completion of work; NOW, THEREFORE, the Council of the City of Palo Alto does hereby RESOLVE as follows: SECTIQN io The City Council hereby authorizes the City Manager to sign the attached Amendment No. 1 to Contract No. 94-SAO-00047 on behalf of the City of Palo Alto. SECTIQN 2. The City Council hereby finds that the action hereby approved does not constitute a project under the California Environmental Quality Act, and no environmental assessment is required. INTRODUCED AND PASSED: AYES: NOES: ABSENT ABSTENTIONS: ATTEST:APPROVED:. Interim City Clerk APPROVED AS TO FORM: Senior Asst. City"Attorney Mayor City Manager Director of Administrative Services 980917 ~yn 0071516 Director of Uti~’ities ’Amendment No. 1 C0ntraet No. 94-SAO-00047 UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT, CALIFORNIA AND UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION CENTRAL VALLEY PROJECT, CALIFORNIA CONTRACT AMENDMENT NO. I FOR FUNDING OF MAINTENANCE woRK.AT SHASTA POWERPLANT CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF HEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTO PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING ¯-CITY OF ROSEVILLE CITY OF SANTA CLARA SACRAMENTO MUNICIPAL UTILITY DISTRICT SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT TURLOCK IRRIGATION DISTRICT CITY OF.UKIAH Amendment No. 1 Contract No. 94-SAO-00047 UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT, CALIFORNIA UNITED STATES DEPARTMENT OF INTERIOR BUREAU OF RECLAMATION " CENTRAL VALLEY PROJECT, CALIFORNIA .CONTRACT AMENDMENT NO. 1 FOR FUNDING OF MAINTENANCE WORK AT SHASTA POWERPLANT CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF I-IEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTO PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING CITY OF ROSEVILLE C1TY OF SANTA CLARA SACRAMENTO MUNICIPAL LrrILITY DISTRICI~ SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT TURLOCK IRRIGATION DISTRICT CITY OF UKIAH 1. 2. 3. 4. 5. 6. 7. ¯ AGREEMENT ....... .. ........ . . EFFECTIVE DATE AND .P~~ CQ_NTRACT TOREMAIN IN FULL FORCE AND EFFECT .......3MODIFICATION OF SECTION 6 OF THE PRIMARY CONTRACT ..........i i 3. MODIFICATION OF SECTION 9 OF THE PRIMARY CONTRACT 4EXECUTION IN COUNTERPART." ........... 1 2 3 4 5 6 7 8 9 10 1! 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT UNITED STATES DEPARTMENT OF INTERIOR BUREAU OF RECLAMATION CENTRAL VALLEY PROJECT, CALIFORNIA CONTRACT AMENDMENT NO. 1 FOR FUNDING OF MAINTENANCE WORK AT SHASTA POWER.PLANT CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF HEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTOPLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING CITY OF ROSEVILLE CITY OF SANTA CLARA SACRAMENTO MUNICIPAL UTILITY DISTRICTSAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT TURLOCK IRRIGATION DISTRICT CITY.OF UKIAH 1. ~l~.,~~: This Contract Amendment is made this ~ day of__ ., 1998, as part of and pursuant to the same authorities as Contract No. 94-SAO-00047, as amended (Primary Contract), between the UNITED STATES OF AMERICA (United States), (i) acting by and through the Administrator, Western Area Power Administration, Department of Energy, hereinafter called Western, represented by the officer exectiting this contract, or a duly appointed successor, hereinafter called the Contracting Officer, and (ii) acting by and through the’ Commissioner, Bureau of Reclamation, Department ofthe Interior, hereinafter called Reclamation, represented by the Regional Director, Mid-PacificRegion; and the CITIES OF ALAMEDA, BIGGS, GRIDLEY, HEALDSBURG, LODI, LOMPOC, PALO ALTO, REDDING, ROSEVILLE, SANTA CLARA, and UKIAH; the NORTHERN CALIFORNIA POWER AGENCY; the SACRAMENTO MUNICIPAL UTILITY DISTRICT (SMUD); the SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT. (]3.ART), a rapid transit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 district established pursumtto California Public Utility Code Section 28500et. seq.; the TURLOCK IRRIGATION DISTRICT (TID); and the 1NLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, all organized and existing under the laws of the State of California, hereinafter called the Customers; and all collectively called the Parties. o IT : 2.1 Western, Reclamation, and the Customers entered into Contract Nol 94-SAO-00047 (Primary. Contract) for funding of maintenance work at Shasta Powerplant. 2.2 ¯The Parties desire to modify the Primary Contract by deleting the requirement to replace the core iron for unit l~and adding the replacement of the turbine runners on generating units 3, 4, and 5 at Shasta Dam and Powerplant. 2.3 Replacement of the turbine runners is expected to increase the ultimate hydraulic capacity of Shasta Powerplant by an additional 51 megawatts (MW) over and above the 47 MW increase set forth in Section 9 of the Primary Contract. /// /// 2A The replacement 0f the turbine runners is not expected to increase the funding amount required above the original estimate of twenty-one million, one hundred seventy- five thousand dollars ($21,175,000.00) the Customers agreed to pay under.the Primary Contract. 2.5 This Contract Amendment revises Section 6 of the Primary Contract to include work associated with replacement of the turbine runners and revises Section 9 to incr6ase the amount of excess capacity from 47 MW to 98 MW. . 2 1 2 3 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 2.6 The Parties expect that upon completion of the unit rewind work, any re~ulting excess capacity will be made available to the Customers pursuant to the terms 0f the Primary Contract. Upon completion of the installation of each turbine runner, any resulting excess capacity will be made available to the Customers as set forth in this Amendment. A.G.J?~,F.d~d~: The Parties agree to the terms and conditions set forth herein. EFFECTIVE DATE AND TERM OF CONT--:. This Contract Amendment shall become effective upon execution by all the Parties and remain in effect concurrently with the Primary Contract. 5. [~RIMARY CONTRACT TO REMAIN IN ~RCE AND EFFECT: Except as expressly modified by this Contract Amendment, the Primary Contract shall remain in full force and effect. 6. MODIFICATION OF SECTION 6’OF ~RIMARY CONTRACT: Section of the Primary Contract entitled "Work to be Performed.for the Shasta Re.wind Project:" is hereby modified as follows: 6.1 Section 6.2.5, of the Primary Contract is hereby deleted in its entirety and the following substituted in lieu thereof: "6.2.5 Furnishing era new thrust bearing for unit 2." /// 6.2 The following is h~reby added to the Primary Contract as a new Section 6.2.6: "6.2.6 Furnishing of all necessary material, equipment, and labor for the replacement of the unit turbine runners and associated components for generating units 3, 4, and 5." 1 2 3 4 6 7 8 9 10 il 12 13 .14 16 17 18 19 20 21 22 23 24 25 26 27 28 7.]~:LP_I]~..C,A.TION OF SECTION 9 OF ~ PRIMARY CONTRACT: The first paragraph in Section 9 of the Primary Contract is hereby deleted in its entirety and the following is substituted in lieu thereof: "9. ]~3~J~LT..Q_EX CE S S CAPACITY: Reclamation has determined that rewinding and increasing the nameplate ratings of Shasta units 3, 4, and 5 up to 125 MW each is expected to result in a tota! increase of approximately 47 MW in the capacity available at Shasta Powerplant when the storage in Shasta Lake exceeds 3.6 million acre feet (MAF). As requested by the Customers, Reclamation will increase the generator nameplate ratings of each of these units to ¯ 142 MW, as part of the work generally described in Section 6.2.3 ~nd 6.2.4 hereof. Additional electrical capacity, above 125 MW, is expected to be available when the turbine runners are replaced as set forth in Section 6..2.6. With the replacement of each turbine runner, the full 142 MW of nameplate rating of each unit will be available depending upon hydraulic conditions. Upon completion of the rewind work generally described in Section 6 hereof, Reclamation shall notify Western of the.amount of additional capacity available at Shasta. Upon completion of each turbine runner replacement, as generally described in Section 6 hereof, Reclamation shall notify Western of the amount of additional capacity available at Shasta. Reclamation shall provideWestern with the revised Shasta Powerplant capacity available as a functio~i of Shasta Lake water storage and reservoir elevations. Western shall use this information to update Exhibit. C attached hereto which shows the incremental increase, in Shasta capacity at certain Shasta Lake water storage and reservoir elevations. After~ ~ completion of the rewind work as generally provided under Sections 6.2.3 and 6.2.4 of this Contract and for the term of this Contract, the Customers will be given a right of first refusal to purchase excess capacity up tO 47 MW from the CVP in accordance with this Section 9. After completion of each turbine runner, replacement, as set forth in Section 6.2.6, and for the term of this Contract, the Customers will be given a righ.t, of first refusal to purchase excess capacity from the CVP up to 17 MW per unit 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 completed in accordance with this Section 9. It is expected that aftdr all work described in Section 6 has been completed, a total of up to 98 MW of excess capacity from the CVP will be made available to the Customers for the term of rids Contract." ¯~ION IN COUNTERPART: This Contract Amendment may be executed in a number of counterparts and shall constitute a single document with the same force and effect as if each Party had signed all other counterparts. IN WITNESS WI-IEREOF, the parties have caused this Contract Amendment to be executed the day and year f’trst above written. The signatories hereto represent that they have been appropriately authorized to enter into this Contract on behalf of the Party for whom they sign. WESTERN AREA POWER ADMINISTRATION By: Title:~ - Address:~ore Drive "__ -4710 . BUREAU OF RECLAMATION By: Title:_" -"r __ Address: 1 1 12 13 14 15 16 17 18 19 20 21 22 23 24 26 27 28 1 (Seal) 2 Attest 3 By: 4 Title: 5 ¯ 6 (Seal) Attest 7 8 By: Title:9 0 (Seal) 1 Attest By: Title: " (Seal) Attest By: Title: (Seal) Attest By: Title:, (Seal) Attest By: Title: ciTY OF ALAMEDA By: Title: Address: CITY OF BIGGS By: Title: Address:. CITY OF GRIDLEY By: Title: Address:. CITY OF HEALDSBURG By: Title: Address:_ . CITY OF LODI By: Title: Address:, CITY OF LOMPOC By: Title: Address:. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 (Seal) Attest By: Title:.,, (Seal) Attest By:. Title:t (Seal) Attest By: .... Title:,, (Seal) Attest By:., Title:, (Seal) Attest By: Title:, (Seal) Attest Title:L NORTHERN CALIFORNIA pOWER AGENCY By: Title: Address:_ CITY OF PALO ALTO By: Title:_ .Address: PLUMAS-SIERRA RURAL. ELECTRIC COOPERATIVE By: Title: Address:, CITY OF REDDING By: Title: Address: CITY OF ROSEVILLE By: Title:, Address: CITY OF SANTA CLARA By: Title:. Address: 7 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 (Seal) 1 2 Attest 3 By:, Title: (Seal) Attest By:, Title: (Seal) . Attest By: Title: " (Seal) Attest By: Title: SACRAMENTO MUNICIPAL UTILITY DISTRICT By: Title: Address:, SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT By: Title: Address: TURLOCK IRRIGATION DISTRICT By: Title: Address :, cITY OF UKIAH By: Title: Address:, Contract No. 94-SAO-00047 RESOLUTION NO. BE IT RESOLVED BY THE ’OF The is authorized, on behalf of to execute this Contract Amendment With the Western Area Power Administration and Bureau ofReclamation titled Amendment No. 1 Contract No. 94-SAO-00047. Adopted: 9 1 2 3 4 5 .7 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 (Seal) Attest (Seal) Attest By:~ Title:_ (Seal) Attest By.:,, ¯ Title: (Seal) Attest .(Seal) Attest By: Title: (Seal) Attest By:~ _ Title:. NORTHERN CALIFORNIA POWER AGENCY By: Title: Address: CITY OF PALO ALTO By: Title: Address:_ PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Title: Address:. CITY OF REDDING By: Title: Address:, CITY OF ROSEVILLE By: Title: ....... Address: CITY OF SANTA CLARA By: Title: Address:_ Revision 1, Exhibit A :~ i~ Contract No. 94-SAO-00047 (Estimated Funding and Project Work Schedule) 1.This Revision 1 to Exhibit A, to be effective under and as a part of Contract No. 94-SAO-00047, shall become effective on ,1998, and shall remain in effect until superseded by another revised Exhibit A or upon termination of the Contract.. 2. The revised schedule for the work generally set forth in Section 6 and the.funding for such work is set forth as follows: AE_T.ISIT__Y Award Bid ’ Initial Contribution Date ~Disassembly of Unit 4 Delivery of Materials Install Components - Unit 4 Reassembly of Unit 4 Delivery of Materials Publish Turbine Spec Disassembly of Unit 5 Install Components - Unit 5 Award Turbine Contract 3/ ¯ Reassembly of Unit 5 COMPLETION FUNDING FUNDING DATE ’/ ~un 95 Feb 97 Jun 97 Dec 97 Oct 98 Oct, 98 Dec 98 Mar 99 Mar 99 Jun 99 Jan 96 $23,679 Jul 96 $150,314 Aug 96 $71,186 Nov 96 $55,000 Dec 96 $677,~622 Jan 97 $738,000 Mar 9.7 May 97 $867,000 $749,500 Jul 97 "$689,500 Aug 97 $541,149 Oct 97 Nov 97 $732,500" $774,577 Feb 98 $I,068,850 May 98 $395,538 Aug 98 $372,.674 Oct 98 $265,126 Dec. 98 $110,087 .Feb 99 $483,798 $700,’000 Apt 99 ~$320,317 Jun 99 $517,753 Aug 99 Oct 99 Dec 99 $87,000. $133,000 $236,674 1 of 6 ,- Revision 1, Exhibit A :Contract No. 94-SAO-00047 A C _TJ_Y LT_Y Turbine Model Evaluation Disassembly of Unit 3 Delivery of Materials Install Components - Unit 3 Reassembly of Unit 3 Delivery of First Turbine Disassembly of Unit 4 Installation of First Turbine Reassembly of Unit 4 Disassembly of Unit. 5 Delivery of Second Turbine Installation of Second Turbine Reassembly of Unit 5 Disassembly of Unit 3 Delivery of Third Turbine InstallaHon of Third Turbine Reassembly of Unit 3 Contingencies Total Cost COMPLETION DATE 1/ Dec 99 Jan 00 Apr 00 May 00 Jul 00 Dec 00 Dec 00 Jan, 01 May 01 Oct 01 Dec 01 Jan 02 May 02 Oct 02 Dec 02 Jan 03- May 03 FUNDING Feb 00 Apr 00 Jun 00 FUNDING $i,i00,000 $266,126 $313,174 $162,000 $2,000,000 $150,000 $100,000 $150,000 $150,000 $2,000,000. $i00,000 $150,000 $15o,ooo $2~ooo,ooo $i00,000 $150,000 $21,175,0.00 1/ 2/ 3/ Completion dates may be revised upon award of contract(s) by Reclamation. Funding dates listed are for the rew’md. Funding Dates for turbine runner installation to be inserted upon award of Contract(s)by ~ Reclamation. " 3.~RPART: This Contract Amendment may be executed in a number of counterparts and shall constitute a single document with the same force and effect as if each.Party had signed all other counterparts. 2 of 6 Revision 1, Exhibit A Contract No. 94-SAO-00047 IN WITNESS WHEREOF, the parties have caused this Revision 1, Exhibit A, to be executed the day and year first above written. The signatories hereto represent that they have been appropriately authorized to enter into this Contract on behalf of the Party for whomthey sign. WESTERN AREA POWER ADMINISTRATION By: Title: Regional Manager Address; 114 !~arkshore Drive Folsom: CA 956i0-4710 BUREAU OF RECLAMATION By: Title:Regional Director Address: 3 of 6 (Seal) Attest By:, Title: (Seal) Attest By:, Title: (Seal) Attest By: ¯ Title: (Seal) Attest By: Title:¯ (Seal) Attest By: Title:, (Seal) Attest By:, Title: Revision 1, Exhibit A ’ ~Contract No. 94-SAO-00047 CITY OF ALAMEDA By: Title:. Address: CITY OF BIGGS ¯By: Title: Address:. CITY OF GRIDLEY By: Title: Address:, CITY OF HEALDSBURG By: Title: Address: oCITY OF LODI By: . Title: Address: CITY OF LOMPOC By: Title:, ¯ Address: 4 of 6 (SeaD Attest By:, Title: Revision 1, Exhibit A ~:i!~:~:3ontract No. 94-SAO-00047 NORTHERN CALIFORNIA POWER AGENCY By: Title: .... Address: (Seal) Attest By: Title: CITY OF PALO ALTO By: Title:. Address: (Seal) Attest By:. Title: PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE By: Title: Address:. (Seal) Attest By:. Title: CITY OF REDDING By: Title: Address: CITY OF ROSEVILLE By: Address: CITY OF SANTA CLARA By: Title: Address:. (Seal) Attest By: Title:. (Seal) Attest By:, Title: 5 of 6 (Seal) Attest By: Title: Revision 1, Exhibit A i~2ontract No. 94-SAO-00047 SACRAMENTO MUNICEPAL UTILITY DISTRICT By: Title: Address:. (Seal) Attest By:. Title: SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT By: Title:. Address: (Seal) Attest By:. Title: TURLOCK IRRIGATION DISTRICT By: Title;. Address: CITY OF UKIA.H By: Title:. Address: (Seal) Attest By:. Title: 6 of 6