HomeMy WebLinkAbout1998-07-27 City Council (18)TO: City of Palo Alto City Manager’s Report HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE:JULY 27, 19,98 CMR:309:98 SUBJECT:COUNCIL CHAMBERS REFURBISHING, PROJECT NO. 19625, CONSTRUCTION SCHEDULE This report provides an update on the construction schedule for the refurbishing of the City Council Chambers. No action is required. DISCUSSION The proposed improvements and funding were approved by the Ci.ty Council on November 17, 1997 (CMR:429:97). On April 6, 1998, the City Council authorized staff to hire a consultant and proceed with the improvements design for the City Council Chambers (CMR: 178:98). The scope of the improvements includes: Phase 1 Replacesound system, add personalized Council lighting on the dais and install sample bench seating; Phase 1. o 2 Upgrade the overhead and slide projectors with a new digital system and replace the screen; Remove the TV booth and relocate, if viable, to the back of the Chambers adjacent to the PoliceDepartment door; Raise the floor along the public side of the low wall to the level, of the staff area; Re-carpet the Chambers; Refurbish the public bench seating and provide for Uniform Building Code, Title 24, (Americans with Disability Act) accessability improvements; and Replace the low wall between staff and the public seating, move and upgrade the podium, and upgrade the seating arrangement in the staff area. Add overhead lighting for the dais The consultant has commenced the project design and has indicated that a majority of the work listed above will be designed and ready for construction in January 1999. The Phase 1 work to replace the sound system and add lighting on the dais, involves discrete "offthe CMR:309:98 Page I of 3 shelf’ items and can be installed separately from the other improvements during the Council’s vacation from August through mid-September 1998. In addition to the sound and lighting improvements, a small section of bench seating will be upgraded to be used as a pilot test sample. The installation of these improvements will be scheduled so as not to disrupt the Planning Commission meetings. The remaining Phase 2 work (Items 1 through 7) which requires more time to designand will undergo several review and approval processes, will be started in January 1999 as shown in the attached project Time Line. The improvements will need to be constructed in a specific sequence as follows: ® Demolition Floor, TV Booth Wall, Podium Lighting Carp__e_t Public Seating Multimedia Furniture _Remove carpet, benches, TV booth, and low wall. Raise the level of the floor area using lightweight concrete. Install electrical conduit and wall anchors in floor. If the new booth can be located in the Chambers, work will start on the booth. Install wall and podium after new floor has cured.. Install overhead lights for the dais. Install carpet. Install public seating. The benches are a specialty item and will require a long time between order and delivery dates. The estimated delivery time is ten weeks after the construction contract is awarded. Upgrade the multi-media equipment, and install a new screen after the carpet is installed. Install the staff area furniture after the carpet is installed. The Phase 2 improvements will require the closure of the City Council Chambers. It is anticipated that the Chambers will be closed between four to six weeks. The City Council and Planning Commission meetings are proposed to be held in another location. Two possible locations are the auditorium at the Cultural Center and the Cubberley Cultural Center Theater. At each site and others, if necessary, Staffwill be exploring the availability of the parking, staffing requirements/support ~to set up the room, provide janitorial services, and the ability to provide television and radio coverage. The selected site will minimize the impact on the Council’s and Planning Commission’s meetings. Also, the Phase 2 construction schedule may be adjusted to avoid conflicts with other functions at the selected site. TIME LINE A copy of the Project Time Line is attached. ATTACHMENT Council Chambers Refurbishing Project Time Line CMR:309:98 Page 2 of 3 PREPARED BY: John A. Carlson, Senior Engineer DEPARTMENT HEAD: ~ ~. ~~~’~ GLENN S. ROB/E-RTS Di ector of Put lic jWorks CITY MANAGER APPROVAL: qE FLElVlIt Manager CMR:309:98 Page 3 of 3 c C