HomeMy WebLinkAbout1998-05-19 City Council (11)BUDGET ’98- ’99 City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER ATTN.: DATE: SUBJECT: FINANCE COMMITTEE DEP ~ARTMENT: PUBLIC WORKS MAY 19, 1998 CMR:242:98 PUBLIC WORKS DEPARTMENT CIP STATUS REPORT RECOMMENDATION This report is supplemental budget information regarding the Public Works Department Capital Improvement work status. No action is required. BACKGROUND The Public Works Department constructs and maintains the City’s infrastructure supported by the General Fund, excluding park and open space equipment and irrigation. The majority of the projects are approved as part of the budget process. The others are approved by Council during the fiscal year. It has been Public Works policy to schedule small projects to be completed during the same year they are budgeted, and to schedule the start of large projects needing more than one fiscal year to complete within the year they are budgeted. In recent years, there has been a backlog in General Fund CapitalImprovement Program CIP projec~ assigned to the Public Works Department due to an increasing workload without an increase in staff. In 1994, Hughes-Heiss Associates prepared a Staff Workload and Utilization Study for the Public Works Engineering Division. The study revealed that FY 1993-94 staffing was sufficient to accomplish the assigned CIP workload, and that staff was performing within efficiency guidelines. However, the study also revealed that, due to the amount of CIP projects scheduled in FY 1994-95, an additional 2.6 FTEs would be needed to keep the projects on schedule. Since the study, staffhas continued to track CIP staffing requirements and workload. The tracking indicates that, although current staff’mg is producing at approximately 30 to 40 percent above the Hughes-Heiss estimates, the backlog has increased. CMR:242:98 Page 1 of 2 Several steps have been taken to address the imbalance between workload and available staffing. []The FY 1998-99 budget proposes only "need to do" projects. The FY 1998-99 budget includes $200,000 in additional funds for consulting services to help reduce the backlog during FY 1998-99. Public Works staff has increased the use of consultants in a project management capacity for such large projects as the Downtown Parking Structures. DISCUSSION CIP Completion Plan The attached table, titled, "Public Works Department, FY 1997-2002 Work Plan" presents the proposed scheduling for all of the active.Public Works General Fund CIPs. The projects are color coded by Public Works Division and by scheduling status; start(ed), in-progress, or complete(d). For FYs 1998-99 through 2001-02, the projects are scheduled to minimize peak loading, not to match existing staff levels. There are currently 47 active CIPs: 31 projects were budgeted in previous years; 6 are budgeted and scheduled for this fiscal year; 6 are annual maintenance projects; and 4 are projects scheduled in the future. Of the 47 active CIPs, 21 projects have been delayed for various reasons such as approval delays with other agencies, and coordination with other projects. ATTACHMENTS Public Works Department, FY 1997-2002 Work Plan PREPARED BY: John A. Carl~sqn, Actirlg Assistant Director of Public Works DEPARTMENT HEAD: RO~s. CITY MANAGER APPROVAL~ Ci~Manager CMR:242:98 Page 2 of 2 ’~ ca @, 11/! }21 ~) (~ ’,i