Loading...
HomeMy WebLinkAbout1998-03-17 City CouncilCity City of Palo Alto Manager’s Report TO:HONORABLE CITY COUNCIL ATTN: FROM: DATE: SUBJECT: FINANCE COMMITTEE CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES MARCH 17, 1998 1997-98 MIDYEAR cAPITAL PROJECTS STATUS MATRIX ¯ IMPROVEMENT CMR:156:98 PROGRAM This is an informational report¯ and no Council action is. required. BACKGROUND This report provides the Finance Committee with information on the status of the City’s Capital Improvement Prograra_ (CIP) projects as of midyear 1997-98. In the attached matrix (Attachment A), all City departments have submitted infor~ttib-fi on their projects and commented on any issues which might cause a change in the scope or timing of the projects. Information in this report will keep Council abreast of progress on all CIP projects open as of the beginning of the fiscal year and on those projects which have been added or completed during the fiscal year. The attached matrix categorizes CIPs into minor projects (projects which can be completed within a one-year period) and multiyear projects (projects which have multiyear budgets and/or complex implementation, schedules with identifiable phases). The project status portion of the matrix identifies the phase the project is in at midyear. Information on phases gives Council a perspective on how much progress has been made on a project. Three distinct phases have been utilized, as follows: CMR:156:98 ---Page 1 of 3 Phase: Pre-Design Design Construction May Include: o Preparation of feasibility study o Development of a master plan o Definition ofp_~oject scope o Preparation of Environmental Impact Report o Hiring a design consultant o Completion of project design o Soliciting bids or proposals o Acquisition of major equipment ’ o Installation o Implementation of a project (e.e., computer application) The comments section of the matrix provides Council with information regarding substantial project delays or changes in the scope or cost of a project. The comments column Will be blank for projects which are on track and progressing as planned. In the attached matrix, projects are listed by department for th~ General Fund and by fund for the Enterprise and Intemal Service Funds. Within each department or fund, the projects are ordered by project number, which includes the year of Council approval (year of approval is shown by the second two digits of five-digit project numbers or the first two digits of four- digit project numbers). The matrix also includes information on the total or accumulated budgetfor projects, the remaining budget as of the beginning of the fiscal year, and the fiscal year expenditures through December 1997, including commitments (encumbrances). The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding.t0 reflect continuing replacement cycles or commitments. During fiscal year 1997-98, progress has been made on all of the City’s "continuous" projects; a listing of the projects is providedT&------- Council’s reference (Attachment B). At year-end, all completed CIPs will be closed and the, remaining balances t~tnsferred to the Budget Stabilization Reserve for General Fund projects; and for Utility Fund projects, to the appropriate Rate Stabilization Reserves .... _ ATTACHMENTS Attachment A: Midyear Capital Improvement Program Projects Status Matrix Attachment B: List of Continuous Projects CMR:156:98 Page 2 of 3 PREPARED BY: Tony Sandhu, Senior Accountant Trudy Eikenberry, Senior Accountant APPROVED BY: CITY MANAGER APPROVAL: Acting Director Administrative Services Emi~Harrison Assistant City Manager CC: n/a CMR:156:98 Page 3 of 3 o o o c)o 0 0 00 C) O0 ¯ "-o ~o~ ’0 ,0 o ATTACHMENT B General Fund L_jist of Continuous Pro’e Administrative Services 18614 19618 Financial Database Upgrade GIS Application Community Services 18617 19415 Art in Public Places Park Facilities Improvements Public Works 18903 18971 18670 18822 19o~8 19101 19309 Sidewalk Improvements Street Improvements (Utility Users Tax) Street Improvements (Street Improvement Fund) Computer Aided Map Cubberly Building Code Modification Tank Investigation and Removal ADA Compliance Utility Funds Electrical Fund 8928 8930 8931 8938 8944 9354 9703 9801 9802 9803 Electdc Customer Design and Connection Services Traffic Signal Upgrades Communications System Improvements Substation Protection Improvements Substation Facility Improvements Street Light Replacements Underground Cable and Equipment Replacement Fiber Optics Ring System Improvements Fiber Optics Customer Design and Connection Services Electric Distribution System Reconstruction and Improvements Water Fund 8013 8014 8015 8016 Water System Extensions Service & Hydrant Replacements Water Meters Water Main .Replacements Wastewater Collection 8020 8021 8022 9173 Sewer System Extension RWQCP Plant Equipment Replacement RWQCP System Flow Metering Sewer System Rehabilitation and Augmentation Gas Fund 8018 8019 8047 Gas Main Replacements Gas Meters & Regulators Gas System Extensions Storm Drainage Fund 8870 Collection System Improvements