Loading...
HomeMy WebLinkAbout1998-02-17 City Council (20)City City of Palo Alto Manager’s Report TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE:FEBRUARY 17, 1998 CMR: 136:98 VEHICLE REPLACEMENT FUND STATUSSUBJECT: This is an information report and no Council action is required. - BACKGROUND In 1995-96, spending was curtailed in the Vehicle Replacement Fund (Fund) due to the internal audit of fleet usage and the potential to defer some scheduled replacements by extending the useful life of equipment. In addition, there was a delay in replacing a few of the items scheduled because of the difficulty in developing suitable specifications (fire vehicles), coupled with a lengthy procurement process. At the end of FY 1995-96, there was a backlog of vehicles to be replaced. In 1996-97, although progress was made to reduce the backlog, a backlog of $880,000 remained. DISCUSSION In FY 1997-98, in an effort to meet the Vehicle Replacement Fund’s Mission Driven Budget impact measure which targeted the replacement of vehicles within six months of their scheduled replacement date, Fleet Management aggressively worked to complete the ordering process for scheduled equipment and vehicle replacements, including backlogged items. In addition, changes in technology, safety requirements and inflation increased the cost of a few items beyond the amount budgeted. The Fund also incorporated replacement of some existing equipment (from the Golf Course) not previously budgeted in the Fund. As a result, the FY 1997-98 Budget is not sufficient to provide for the proposed joint purchase with Mountain View of an aerial ladder truck. Although the amount of budget appropriation is not sufficient, the Fund has reserves of $5.3 million available to provide for the purchase. During 1997-98, the most expensive item in the fleet, an aerial ladder truck, was scheduled for replacement at an estimated cost of $800,000. The Fire Department evaluated their existing aerial apparatus and determined that a 75-foot ladder truck ( instead of the budgeted 100-foot ladder) would be sufficient, decreasing the replacement cost to $500,000. The Fire Department planned to use the remaining budget of $300,000 to make a joint purchase of a CMR:136:98 Page 1 of 2 reserve aerial ladder truck with the City of Mountain View (see related CMR). Because of the progress made in reducing the backlog in 1997-98, there are not enough funds remaining in the FY 1997-98 Budget to make this joint purchase. Therefore, a budget amendment is being requested to fund this joint purchase, using available funds in the Vehicle Replacement Fund retained earnings. Staff anticipates completing the reduction of the backlog in 1998-99, which will require an increase to the proposed 1998-99 Budget. RESOURCE IMPACT A Budget Amendment Ordinance for an unscheduled joint purchase of an aerial ladder truck during 1997-98 is being submitted to Council in a separate report. The proposed FY 1998-99 Vehicle Replacement Fund Budget will include funding to eliminate the backlog. There are sufficient funds in Vehicle Replacement Fund reserves for the backlog elimination because of the previously unspent budget. As the end of FY 1997-98, reserve levels will continue to exceed targetlevels of approximately $3 million, which are intended to fund a typical one year replacement budget plus the most expensive item in the fleet. POLICY IMPLICATIONS ., This informational report does not contain any changes to existing City policies. PREPARED BY: Shari Reynolds, PUblic Works Administrator DEPARTMENT HEAD: GLENN S. ROBERTS CITY MANAGER. APPROVAL: Director of lic Works City Manage/ CMR: 136:98 Page 2 of 2