Manager’s Report
TO:HONORABLE CITY COUNCIL
FROM:CITY MANAGER DEPARTMENT:UTILITIES
DATE:
SUBJECT:
FEBRUARY 17, 1998 CMR:135:98
BUDGET AMENDMENT ORDINANCE FOR ’FIBER
CUSTOMER DESIGN AND CONNECTION SERVICES
AMOUNT OF-$250,000 AND FIBER OPTIC PROJECT
REPORT
OPTIC
IN THE,
STATUS
REPORT IN BRIEF
This report requeats that Council approve a Budget Amendment Ordinance in the amount of
$250,000 for Fiber Optic Customer Design and Connection Services Capital Improvement Program
(CIP) project (CIP No.9802). This project will install fiber optic connections for new
customers. These fiber optic connections may be made between the customer and the
existing fiber backbone or-directly between two customer sites, depending upon the
circumstances. More extensive new service connections are now expected than were
originally anticipated during the budgeting process. The City will be fully reimbursed for
the cost of installing these new service connections. As a result, this Budget Amendment
Ordinance will not result in a net reduction in Electric Fund reserves.
CMR: 135:98 Page 1 of 4
RECOMMENDATION
Staff recommends that the City Council adopt the attached Budget Amendment Ordinance
to increase Fiber Optic Customer Design and Connection Services budget appropriation by
$250,000 to ensure that staff will be able to respond to connection requests in a timely
manner for the remainder of FY 1997-98. All customer connection expenses will be offset
by an equal amount of customer revenue; therefore, there will be no net reduction in Electric
Fund Reserves.
BACKGROUND
On August 5, 1996, the City Council authorized staff to establish a Telecommunications
Program as a subfund of the Electric Utility and fund a positioning strategy involving the
Electric Utility’s development of a dark fiber optic ring around Palo Alto (CMR:361:96).
Staff has since performed the initial activities necessary to implement the commercial
telecommunications program as a dark fiber optic infrastructure license program.
The initial design concept involved installation of two fiber cables, one with 144 fibers and
the other with 96 fibers, in a single 15-mile ring. The design was later enhanced, without
impacting the budget, by increasing the number of route-miles and decreasing the number
fibers on many of the routes to achieve greater overall coverage. The modified design, as
shown in Figure 1, covers a 28-mile route, with the majority of the route consisting of a
single.144 strand fiber cable. This design also features a series of seven smaller rings that
enable greater customization than would-have been possible with a single large ring.
Construction has been completed for 24 of the 28 miles shown in Fi .gure 1. The remaining
construction will be completed as necessary to meet customer demand.
Fiber license agreements have been signed with two customers and advance engineering
studies have been completed for five others. In total, advance engineering studies have been
completed for connections to 29 different locations. Discussions are also underway with
several other parties. Annual fiber license fees are currently in excess of $200,000
per year, with additional fiber license revenues of $700,000 per year under discussion.
Although it is early to predict, licensing efforts .are on target for achieving capital cost
recovery within the expected 3-5 year time frame.-
DISCUSSION
The FY1997-98 budget for Fiber Optic Customer Design and Cormection Services (9802) is
$200,000, of which $33,000 has been spent. Based upon the level of interest expressed by
potential customers, staff anticipates the need for an additional $250,000.. Potential
customers have expressed the need to expedite dark fiber access upon execution of an
CMR: 135:98 Page 2 of 4
Municipal
Service Center
Deferred until FY1998-99
STANFORD
---- Underground Singlemode Fiber Cable
---- Aerial Singlemode Fiber Cable
~ Fiber Backbone Splice Point ("XY" = splice point nam~
Date: 1/17/98
Figure I - Palo Alto Fiber Backbone Route Map
agreement with the City. Adequate budget will allow staff to respond quickly tO these
customer requests.
¯Staffattributes the higher than expected demand for customer design and connection services
to two factors:
Initial demand for dark fiber has been stronger from end users than from
telecommunications carriers, resulting in a-greater demand for the City’s customer
design and connection services.
2.Several requests have been for custom fiber cable installations between locations where
it is not practical to use the fiber backbone. This requires additional up-front expenses
that can be substantial in some cases. In particular, projects Under discussion with three
prospective customers could require $350,000 of interconnection activities.
RESOURCE IMPACT
A Budget Amendment Ordinance in the amount of $250,000 is requested to fund anticipated
Fiber Optic Customer Design and Connection Services (9802). Funds are available from the
Electric Fund Rate Stabilization Reserve. All costs will be recovered through revenues via
advance payment for all fiber optic customer design and connection services rendered. Thus,
revenues will be correspondingly increased by $250,000, resulting in no net reduction in Electric
Fmid Reserves:
POLICY IMPLICATIONS
Staff’s current project, enhanced by this request, extends the telecommunications program
that Council approved in August 1996. It offers the opportunity for the City to install
additional fiber optic cable and related infrastructure in response to customer requests that
can not be.handled by the fiber optic backbone. ¯
ENVIRONMENTAL REVIEW
As required by the California Environmental Quality Act, an environmental assessment was
prepared for the Electric Utility’s overall dark fiber infrastructure project resulting in a
Mitigated Negative Declaration (CMR: 177:97).
CMR:135:98 Page 3 of 4
ATTACHMENTS
Budget Amendment Ordinance
PREPARED BY:Van Hiemke, Utilities Telecommunications Manager
Tom Habashi, Assistant Director of Utilities
EDWAR~ J. MRIZF_~ " "
Director of Utilities
CITY MANAGER APPROVAL:
FLEMING
Ci~ Manager
CMR: 135:98 Page 4 of 4
ORDINANCE NO.
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING THE BUDGET.FOR THE FISCAL YEAR 1997-98 FOR
ADDITIONAL FUNDING IN.THE AMOUNT OF $250,000 FOR THE
FIBER OPTIC CUSTOMER DESIGN AND CONNECTION SERVICES CAPITAL
IMPROVEMENT PROJECT TO BE FULLY FUNDED BY REVENUE FROM
BILLABLE WORK ~
WHEREAS, pursuant to the provisions of Section 12 of Article
III of the Charter of the City of Palo Alto, ~he Council on June
23, 1997 did adopt a budget for fiscal year 1997-98; and
WHEREAS, Capital Improvement Program Project 9802 was
created in the Electric Fund to provide design and connection
services to fiber optic ~ustomers; and ~-
WHEREAS, on the basis .of advance engineering requests, the
City of Palo Alto is experiencing more extensive new service
requests than were originally anticipated, including.two-direct
interconnection projects which could cost $350,000; and
WHEREAS, there is insufficient funding in this Capital
Improvement Program project to support this levei of activity for
the remainder of the fiscal year and the appropriations for the
projects need to be increased; and
WHEREAS, the private property owners requesting these
services reimburse the utility I00 percent of the cost of the
service; and
WHEREAS, City Council authorization is needed to amend the
1997-98 budget as hereinafter set forth. .
NOW, THEREFORE, the Council of the City of Palo Alto does
ORDAIN as follows:
SECTION I. The sum of-Two Hundred Fifty Thousand Dollars
($250,000) is hereby appropriated to Capital Improvement Project
Number 9802, Fiber Optic Customer Design and Connection Services.
SECTION 2. Revenue from billable work in Capital
Improvement Project Number 9802 is increased by the sum of Two
Hundred Fifty Thousand Dollars ($250,000).
SECTION 3. This transaction will have no effect on the
Electric Rate Stabilization Reserve.
SECTION 3. As specified in Section 2.28..080(a)’~of the’
Palo Alto Municipal Code, a two-thirds vote of the City Council
¯ is required toadopt this ordinance. ’~
SECTION 4. As required by the California Environmental
Quality Act, an environmental assessment was prepared for the
Electric Utility’s overall dark fiber infrastructure project
resulting in a Mitigated Negative Declaration.
SECTION 5. As provided in Section 2.04.350 of the Palo
Alto Municipal Code, this ordinance shall become effective upon
adoption.
INTRODUCED AND PASSED:
AYES:
NOES:
~ABSTENTIONS:
ABSENT:
ATTEST:APPROVED:
City Clerk Mayor
APPROVED AS TO FORM:City Manager
Senior Asst. City Attorney Acting Director, Administrative
Services Department
Director of Utilities