Loading...
HomeMy WebLinkAboutStaff Report 6402 City of Palo Alto (ID # 6402) Finance Committee Staff Report Report Type: Action Items Meeting Date: 12/1/2015 City of Palo Alto Page 1 Summary Title: LBOC Financial Reports, Excess Bond Funds Discussion, and Discussion of Decommissioning the LBOC Title: Library Bond Oversight Committee Quarterly Reports Transmittal, Discussion and Recommendation Regarding Excess Library Bond Funds, and Discussion and Recommendation on the Decommissioning of the Library Bond Oversight Committee From: City Manager Lead Department: Public Works Recommended Motion Staff recommends that the Finance Committee: 1) Accept the Library Bond Oversight Committee (LBOC) quarterly reports transmittal (Attachments A, B, and C); 2) Accept the LBOC’s recommendation that $1,551,500 million be repaid to the infrastructure reserve fund using library bond funds that were spent on bondable improvements made to Rinconada Library; 3) Accept the LBOC’s recommendation to approve the “Last and Final List of Potential Expenses for Library Bond Funds” (Attachment D); and 4) Accept the LBOC’s recommendation that that the LBOC be decommissioned by the end of 2015. Background On August 4, 2008, Council approved placing a $76 million general obligation bond measure on the November 4, 2008 ballot to construct and complete a new Mitchell Park Library & Community Center, renovate and expand Rinconada Library (formerly the Main Library), and renovate the Downtown Library. This general obligation bond measure passed with a super majority (two-thirds + City of Palo Alto Page 2 1) of Palo Alto voters voting in favor of it. The ballot measure, Measure N, contained a provision for the appointment of a committee to oversee the expenditure of funds generated by the bond issuance. On March 16, 2009 the Library Bond Oversight Committee (LBOC) was formed. The LBOC meets quarterly and issues reports to Council and the public. Discussion The library capital projects are nearing final completion. Staff and the LBOC recommend the following: 1) Repayment of $1,551,500 to the infrastructure reserve fund using library bond funds that were spent on bondable capital improvements made to Rinconada Library; 2) Approval of the “Last and Final List of Potential Expenses for Library Bond Funds;” and 3) Decommissioning of the LBOC by the end of 2015 per the LBOC’s request. Repayment of $1,551,500 to the Infrastructure Reserve On May 20, 2013, City Council approved a budget amendment ordinance (BAO) that provided $1,551,500 from the infrastructure reserve fund for additional capital improvements at Rinconada Library that were not included in the original scope of work (Staff Report # 3696). The additional improvements were originally presented to Council and approved by them on July 25, 2011 (Staff Report # 1438). The work included: 1) Replacing the roof; 2) Replacing fire sprinkler system; 3) Re-facing work; 4) Replacing the basement sump pumps; 5) Upgrading storm water system; 6) Upgrading parking lot lighting; 7) Providing a teen room after-hours entrance; 8) Providing a broadcast center; and 9) Constructing a parking lot connection with the Art Center. City of Palo Alto Page 3 This additional work was eligible to be paid for using bond proceeds. In light of uncertainty regarding the final cost of the Mitchell Park Library & Community Center, Council elected to transfer $1,551,500 from the infrastructure reserve fund to pay for the Rinconada Library work, subject to potential future reimbursement with bond funds, if available. As work on the library projects concludes, staff is projecting that there will be approximately $4,053,095 in excess bond proceeds. Sufficient funds are available to return $1,551,500 to the infrastructure reserve. The return of the $1,551,500 to the infrastructure reserve will reduce the bond savings to approximately $2,501,595. Project bond savings can be used to either offset annual debt service resulting in reduced property tax assessments or to defease outstanding principal bonds which can lower the overall borrowing costs. Once a decision is made on whether or not to return $1,551,500 to the infrastructure reserve, the City’s Bond Counsel will advise the City on which option results in the greatest savings for Palo Alto property owners. The “Last and Final List of Potential Expenses for Library Bond Funds;” Measure N provides for a citizen committee to oversee the expenditure of funds generated by the bond measure. As work on the libraries nears final completion, the LBOC has asked staff to plan for decommissioning the Committee. The City Attorney’s Office determined that the LBOC can be decommissioned at the point that staff identifies and the Committee approves final bondable expenditures, even though final work, payment, and administrative steps remain. To satisfy this requirement, staff has compiled, and the LBOC has reviewed, the attached “Last and Final List of Potential Expenses for Library Bond Funds.” This list, which totals $853,720, includes encumbered or outstanding contracts, estimated costs for additional library work that is expected to be done but not yet contracted for, and a $75,000 contingency. Since the additional library work that is not encumbered or contracted for may City of Palo Alto Page 4 have unforeseen work and/or costs that could emerge and be covered by Measure N bond proceeds, staff contacted the City’s Bond Counsel about establishing a contingency fund. The Bond Counsel supported this contingency as long as expenses conformed to the scope of the Library projects. The Library Bond Oversight Committee agreed with this approach and approved a $75,000 contingency fund. Staff recommends that the Finance Committee recommend that Council approve the “Last and Final List of Potential Expenses for Library Bond Funds” totaling $853,720, including a $75,000 contingency. Additional Information For further information on the formation of the LBOC, please see the March 16, 2009 staff report titled “Adoption of a Resolution Establishing a Citizen Oversight Committee for Expenditures of Library Bond Funds” (Attachment E). Attachments:  Attachment A: LBOC Financial Reports Transmittal Letter_12-1-2015 (PDF)  Attachment B: LBOC Financial Report_7-29-2015 (PDF)  Attachment C: LBOC Financial Report (Revised)_11-17-2015 (PDF)  Attachment D: Last and Final List of Potential Expenses for Library Bond Funds-11-23- 2015 (PDF)  Attachment E: Resolution Establishing the LBOC_3-16-2009 (PDF) TO: Finance Committee FROM: Library Bond Oversight Committee DATE: December 1, 2015 SUBJECT: Library Bond Oversight Committee Financial Reports The Library Bond Oversight Committee (LBOC) has met with members of City staff on the progress of the library bond projects since 2009. Attached for your approval is the third quarter 2015 financial report (dated July 29, 2015) and the fourth quarter 2015 financial report (dated November 17, 2015) Based on the information provided, the Committee believes that the City’s financial reporting for all library-related projects is accurate and appropriate; however, these reports have not been independently audited. The Committee approves and forwards these reports to the Finance Committee and City Council. The LBOC in the past has discussed a range of issues related to Mitchell Park Library & Community Center and at one time was concerned that the resolution of claims and disputes might exhaust the bond funds; however, the LBOC is no longer concerned that issues related to Mitchell Park Library & Community Center or any of the other library projects will exhaust the bond funds. Additionally, the LBOC and staff have prepared a recommendation regarding the close- out of the library bonds and the termination of the LBOC for the Finance Committee, which will ultimately go to the City Council. This was discussed at the LBOC’s November 17, 2015 meeting. Submitted: Alice Smith Library Bond Oversight Committee Chair ATTACHMENTS: Attachment B: LBOC Quarterly Financial Report (dated July 29, 2015) Attachment C: LBOC Quarterly Financial Report (dated November 17, 2015) Attachment A 12345 6 7 8 (3 minus 1) (5 minus 1) (5 minus 4) (7 divide by 4) Measure N Estimates Changes in Measure Estimates Engineer's Estimate Project Budget June 2015 Projected Costs Diff. Between Measure N Estimates vs. Projected Costs $ Diff. Between Project Budget vs. Projected Costs % Diff. Between Project Budget vs. Projected Costs Downtown Library 4,000,000$ 1,212,000$ 5,212,000$ 4,212,000$ 4,191,782$ (191,782) 20,218$ 0.5% Mitchell Park & Community Center Library 50,000,000 (957,000) 49,043,000 47,725,437 45,000,000 5,000,000 2,725,437 5.7% Cubberley Temporary Library - 645,000 645,000 645,000 619,687 (619,687) 25,313 3.9% Rinconada (aka Main) Library *18,000,000 2,100,000 20,100,000 22,342,563 21,300,000 (3,300,000) 1,042,563 4.7% Art Center Temporary Library - 500,000 500,000 500,000 536,509 (536,509) (36,509) (7.3%) Total Prior to Bond Financing Costs 72,000,000 3,500,000 75,500,000 75,425,000 71,647,978 352,022 3,777,022 5.0% Bond Financing Costs **4,000,000 (3,500,000) 500,000 500,000 185,320 3,814,680 314,680 62.9% Grand Total 76,000,000$ -$ 76,000,000$ 75,925,000$ 71,833,298$ 4,166,702$ 4,091,702$ 5.4% Interest Earnings on the Project Bond Funds 283,608$ Projected Bond Savings 4,375,310$ *The Rinconada Library Project Budget, Projected Costs, and actual expenditures excludes $500,000 in expenses for connectivity between the Library and the Art Center funded by PF-09007 and excludes $1,800,000 (S.J. Amoroso Construction) expenditures, currently both are being funded by the Infrastructure Reserve. ** The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Budget Original Budget (per Measure N Ballot Measure)72,000,000$ -$ -$ 72,000,000$ Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 645,000 Temporary Main Library Facility - Art Center Auditorium 500,000 500,000 Net Other Budget Changes 2,280,000 2,280,000 Expenditures - Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 60,481,425 1,701,868 (62,183,293) Construction Costs -- - Contract Contingency 7,559,063 - (7,559,063) Other Contract Services 2,011,344 - (2,011,344) City (Inter-department) Service Charge 501,463 - (501,463) Miscellaneous Cost 228,455 - (228,455) Total Library Projects Expenditures 75,425,000 70,781,751 1,701,868 2,941,382 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)- - (835,640) 835,640 Total Bond Funds Less Bond Financing Costs 75,425,000 70,781,751 866,227 3,777,022 5.0% Bond Financing Costs (a)500,000 185,320 - 314,680 62.9% Grand Total 75,925,000$ 70,967,071$ 866,227$ 4,091,702$ 5.4% Interest Earnings on the Project Bond Funds 283,608 Projected Bond Savings 4,375,310 2010 GO Bond True Interest Cost (TIC)4.21% 2013 GO Bond True Interest Cost (TIC)3.85% ** The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Budget History and Projection Description of Activity Library Projects Budget to Actual Activities Summary Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 29, 2015 1 Attachment B Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 29, 2015 Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 4,000,000$ -$ -$ 4,000,000$ Budget Change 212,000 212,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 3,617,992 41,593 (3,659,585) Construction Costs - - - - Contract Contingency - 462,490 - (462,490) Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost - 3,163 - (3,163) Total Library Projects Expenditures 4,212,000 4,157,071 41,593 13,337 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)- - (6,881) 6,881 Total Bond Funds Less Bond Financing Costs 4,212,000$ 4,157,071$ 34,711$ 20,218$ 0.5% Reasons for Budget Increase of:212,000$ 1) Seismic upgrade 30,000$ July 2010 2) Roof replacement 125,000 June 2011 3) LEED - Green building upgrades 100,000 4) Construction Management Services increase 400,000 5) Fixed Equipment 187,000 6) Moving costs deemed to be bondable costs 50,000 7) Contingency adjustment 320,000 8) Transfer to Main Library (1,000,000) Net Budget Change 212,000$ Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 50,000,000$ -$ -$ 50,000,000$ Budget Change (2,274,563) (2,274,563) Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 36,669,147 422,105 (37,091,252) Contract Contingency - 6,101,432 - (6,101,432) Other Contract Services - 1,220,117 - (1,220,117) City (Inter-department) Service Charge - 320,534 - (320,534) Miscellaneous Cost - 224,578 - (224,578) Total Library Projects Expenditures 47,725,437 44,535,808 422,105 2,767,524 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)42,087 (42,087) Total Bond Funds Less Bond Financing Costs 47,725,437$ 44,535,808$ 464,193$ 2,725,437$ 5.7% Reasons for Budget Decrease of:(2,274,563)$ 1) LEED - Green building (Council approved) upgrades 1,200,000$ September 2010 2) Fixed Equipment 1,750,000 December 2014 3) Moving costs deemed to be bondable costs 100,000 4) Contingency adjustment (4,007,000) 5) Transfer to Main Library Project (1,317,563) Net Budget Change (2,274,563)$ Description of Activity Mitchell Park Library and Community Center Budget to Actual Activities Summary (PE-09006) Downtown Library Budget to Actual Activities Summary (PE-09005) Completed: Construction Began: Construction Began: Completed: Description of Activity 2 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 29, 2015 Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure)18,000,000$ -$ -$ 18,000,000 Budget Change 4,342,563 4,342,563 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 19,396,475 1,224,592 (20,621,067) Contract Contingency - 955,198 - (955,198) Other Contract Services - 763,301 - (763,301) City (Inter-department) Service Charge - 456 - (456) Miscellaneous Cost - 590 - (590) Total Library Projects Expenditures 22,342,563 21,116,021 1,224,592 1,950 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)(1,040,613) 1,040,613 Total Bond Funds Less Bond Financing Costs 22,342,563$ 21,116,021$ 183,979$ 1,042,563$ 4.7% Reasons for Budget Increase of:4,342,563$ Lowest Accepted Bids Exceeded the Engineer's Estimates 4,342,563$ June 2013 November 2014 Net Budget Change 4,342,563$ *The Rinconada Library Project Budget, Projected Costs, and actual expenditures excludes $500,000 in expenses for connectivity between the Library and the Art Center funded by PF-09007 and excludes $1,800,000 (S.J. Amoroso Construction) expenditures, currently both are being funded by the Infrastructure Reserve. Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000$ -$ -$ 645,000$ Budget Change -$ - Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 467,777 - (467,777) Contract Contingency - 38,470 - (38,470) City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost - 125 - (125) Total Library Projects Expenditures 645,000 517,618 - 127,382 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)102,069 (102,069) Total Bond Funds Less Bond Financing Costs 645,000$ 517,618$ 102,069$ 25,313$ 3.9% Description of Activity Rinconada (aka Main) Library Budget to Actual Activities Summary (PE-11000) Description of Activity Cubberley Temporary Library Budget to Actual Activities Summary (PE-09010) Construction Began: Completed: 3 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 29, 2015 Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Main Library Facility - Art Center Auditorium 500,000$ -$ -$ 500,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 330,034 13,578 (343,612) Contract Contingency - 1,474 - (1,474) Other Contract Services - City (Inter-department) Service Charge - 123,725 - (123,725) Miscellaneous Cost - - - - Total Library Projects Expenditures 500,000 455,233 13,578 31,189 Estimate of Pending Commitments/Costs and/or (Excess Encumbrances)67,698 (67,698) Total Bond Funds Less Bond Financing Costs 500,000$ 455,233$ 81,276$ (36,509)$ (7.3%) Description of Activity Art Center Temporary Library Budget to Actual Activities Summary (Project # PE-11012) 4 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure)4,000,000 Budget Change 212,000 Sub-total - 2010 Engineer's Budget Estimate 4,212,000 - - 4,212,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 418,563 08/24/10 Group 4 Architecture Research & Planning Architectural 362 09/21/10 Group 4 Architecture Research & Planning Architectural 135 08/03/10 Group 4 Architecture Research & Planning Architectural 16,233 08/03/10 Group 4 Architecture Research & Planning Architectural 56,000 08/10/10 Protech Consulting and Engineering Hazardous Material Testing 5,210 08/10/10 Turner Construction Company Construction Management Services 68,577 Oct. 21, 2010 Report 09/21/10 Group 4 Architecture Research & Planning Architectural 15 09/21/10 Group 4 Architecture Research & Planning Architectural 18,080 09/21/10 Group 4 Architecture Research & Planning Architectural 2,970 09/21/10 W.L. Butler Construction, Inc.Construction 93,177 10/05/10 Protech Consulting and Engineering Hazardous Material Testing 990 10/19/10 Group 4 Architecture Research & Planning Architectural 10,544 11/02/10 W. L. Butler Construction, Inc.Construction 69,984 11/02/10 Turner Construction Company Construction Management Services 27,984 11/02/10 Group 4 Architecture Research & Planning Architectural 11,864 12/07/10 Turner Construction Company Construction Management Services 55,174 12/07/10 Group 4 Architecture Research & Planning Architectural 11,688 Jan. 25, 2011 Report 12/07/10 W. L. Butler Construction, Inc.Construction 92,055 12/14/10 Group 4 Architecture Research & Planning Architectural 519 12/14/10 W. L. Butler Construction, Inc.Construction 159,940 01/04/11 Turner Construction Company Construction Management Services 27,984 01/07/11 Group 4 Architecture Research & Planning Architectural 11,688 01/21/11 West Coast Code Consultants, Inc.Plan Check 350 01/21/11 Turner Construction Company Construction Management Services 30,212 01/31/11 W. L. Butler Construction, Inc.Construction 211,220 02/18/11 W. L. Butler Construction, Inc.Construction 279,472 02/18/11 Group 4 Architecture Research & Planning Architectural 8,766 02/18/11 Turner Construction Company Construction Management Services 27,429 03/16/11 W. L. Butler Construction, Inc.Construction 277,033 April 26, 2011 Report 03/18/11 Group 4 Architecture Research & Planning Architectural 432 03/18/11 Group 4 Architecture Research & Planning Architectural 409 03/18/11 Group 4 Architecture Research & Planning Architectural 8,766 03/18/11 Group 4 Architecture Research & Planning Architectural 136 03/31/11 Pivot Interiors Design 2,250 03/31/11 Turner Construction Company Construction Management Services 17,808 04/07/11 Group 4 Architecture Research & Planning Architectural 13,149 04/19/11 Group 4 Architecture Research & Planning Architectural 2,795 04/25/11 W. L. Butler Construction, Inc.Construction 342,711 05/10/11 Turner Construction Company Construction Management Services 39,522 05/12/11 Group 4 Architecture Research & Planning Architectural 220 05/12/11 Group 4 Architecture Research & Planning Architectural 24,891 05/12/11 Group 4 Architecture Research & Planning Architectural 14,610 July 26, 2011 Report 05/17/11 Turner Construction Company Construction Management Services 28,334 05/27/11 W. L. Butler Construction, Inc.Construction 238,387 06/07/11 W. L. Butler Construction, Inc.Construction 352,713 06/07/11 Group 4 Architecture Research & Planning Architectural 14,610 06/09/11 Moovers, Inc.Moving Services 10,233 06/16/11 Group 4 Architecture Research & Planning Architectural 233 07/20/11 Group 4 Architecture Research & Planning Architectural 479 07/20/11 Group 4 Architecture Research & Planning Architectural 12,405 07/27/11 W.L. Butler Construction, Inc.Construction 157,980 07/27/11 Turner Construction Company Construction Management Services 26,028 08/31/11 Group 4 Architecture Research & Planning Architectural 19,560 October 25, 2011 Report 08/10/11 Group 4 Architecture Research & Planning Architectural 137 08/10/11 Group 4 Architecture Research & Planning Architectural 5,100 08/24/11 Turner Construction Company Construction Management Services 38,160 08/31/11 W.L. Butler Construction, Inc.Construction 137,659 09/14/11 Group 4 Architecture Research & Planning Architectural 2,550 09/14/11 Group 4 Architecture Research & Planning Architectural 1,116 12/07/11 Group 4 Architecture Research & Planning Architectural 5,100 10/19/11 Turner Construction Company Construction Management Services 1,176 12/21/11 Turner Construction Company Construction Management Services 3,806 January 18, 2012 11/09/11 Group 4 Architecture Research & Planning Architectural 1,146 12/07/11 W.L. Butler Construction, Inc.Construction 64,874 02/08/12 Group 4 Architecture Research & Planning Architectural 29 02/08/12 W.L. Butler Construction, Inc.Construction 22,796 02/22/12 Group 4 Architecture Research & Planning Architectural 8,408 March 28, 2012 Report 03/08/12 Group 4 Architecture Research & Planning Architectural 1,275 03/21/12 Group 4 Architecture Research & Planning Architectural 7 08/22/12 Group 4 Architecture Research & Planning Architectural 1,268 October 30, 2012 Report Downtown Library Activity Details (PE-09005) As of July 29, 2015 5 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Downtown Library Activity Details (PE-09005) As of July 29, 2015 10/03/12 Group 4 Architecture Research & Planning Architectural 71 01/09/13 Turner Construction Company Construction Management Services 434 January 23, 2013 Report Group 4 Architecture Research Architectural 41,593 Sub-total - Engineering and Architectural Costs - 3,617,992 41,593 (3,659,585) Contract Contingency Summary of Expenditures as of July 21, 2010 19,140 10/19/10 Group 4 Architecture Research & Planning Architectural 660 10/19/10 Group 4 Architecture Research & Planning Architectural 4,070 Oct. 21, 2010 Report 08/27/10 Asbestos Management Group Hazardous Material Testing 2,500 02/28/11 City of Palo Alto - Planning Plan Check Fee 93 April 26, 2011 Report 02/18/11 W. L. Butler Construction, Inc.Construction 15,686 04/25/11 W. L. Butler Construction, Inc.Construction 59,235 05/27/11 W. L. Butler Construction, Inc.Construction 163,149 07/01/11 Turner Construction Company Construction Management Services 1,123 July 26, 2011 Report 07/01/11 Turner Construction Company Construction Management Services 24,611 06/07/11 Group 4 Architecture Research & Planning Architectural 5,104 06/07/11 Group 4 Architecture Research & Planning Architectural 3,489 07/27/11 Group 4 Architecture Research & Planning Architectural 9,339 October 25, 2011 Report 08/31/11 W. L. Butler Construction, Inc.Construction 13,299 03/08/12 Group 4 Architecture Research & Planning Architectural 4,094 March 28, 2012 Report 02/08/12 W. L. Butler Construction, Inc.Construction 113,631 09/19/12 W. L. Butler Construction, Inc.Construction 10,000 October 30, 2012 Report 01/09/13 Turner Construction Company Construction Management Services 13,266 January 23, 2013 Report Sub-total - Contract Contingency - 462,490 - (462,490) Other Contract Services Summary of Expenditures as of July 21, 2010 2,225 08/27/10 Asbestos Management Group Hazardous Material Testing 25,700 Oct. 21, 2010 Report Sub-total - Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 43,990 07/13/11 City of Palo Alto - Public Works Parking Permit 230 October 25, 2011 Report 07/13/11 City of Palo Alto - Public Works Parking Permit 420 10/31/10 City of Palo Alto - Planning Plan Checking 861 Jan. 25, 2011 Report Sub-Total - City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,158 04/10/11 Santa Clara County Downtown-Notice of Completion Filing Fee 5 January 18, 2012 Report Sub-total - Miscellaneous Cost - 3,163 - (3,163) Grant Total 4,212,000 4,157,071 41,593 13,337 6 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 50,000,000$ Budget Change (2,274,563) Sub-total - 2010 Engineer's Budget Estimate 47,725,437 - - 47,725,437 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 3,101,748 08/03/10 Group 4 Architecture Research & Planning Architectural 37,609 08/10/10 Group 4 Architecture Research & Planning Architectural 18,595 10/05/10 Group 4 Architecture Research & Planning Architectural 7,522 10/05/10 Group 4 Architecture Research & Planning Architectural 13,942 10/05/10 Group 4 Architecture Research & Planning Architectural 2,971 07/27/10 Moovers, Inc. Moving Services 435 09/21/10 Turner Construction Company Construction Management Services 163,918 10/19/10 Group 4 Architecture Research & Planning Architectural 47,110 10/19/10 State Water Resources Control Board Submitting Permit Registration Documents 375 Oct. 21, 2010 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 18,517 08/03/10 Peninsula Digital Imaging Reproduction Services 3,066 08/03/10 Peninsula Digital Imaging Reproduction Services 2,401 08/03/10 Peninsula Digital Imaging Reproduction Services 5,105 08/03/10 Peninsula Digital Imaging Reproduction Services 2,119 11/02/10 Bank of Sacramento - Flintco Pacific Escrow Construction 86,542 11/02/10 Flintco Pacific, Inc. Construction 778,876 11/02/10 Group 4 Architecture Research & Planning Architectural 1,037 12/07/10 Turner Construction Company Construction Management Services 635 12/07/10 Turner Construction Company Construction Management Services 70,780 12/07/10 Turner Construction Company Construction Management Services 64,319 12/07/10 Protech Consulting and Engineering Hazardous Material Testing 8,385 12/07/10 Peninsula Digital Imaging Reproduction Services 7,672 12/14/10 West Coast Code Consultants, Inc. Plan Check 26,820 12/14/10 Group 4 Architecture Research & Planning Architectural 46,200 Jan. 25, 2011 Report 12/21/10 Group 4 Architecture Research & Planning Architectural 46,297 12/21/10 Flintco Pacific, Inc. Construction 732,895 12/21/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 81,433 12/28/10 Flintco Pacific, Inc. Construction 757,231 12/28/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 84,137 01/04/11 Group 4 Architecture Research & Planning Architectural 2,942 01/04/11 Group 4 Architecture Research & Planning Architectural 4,564 01/04/11 Turner Construction Company Construction Management Services 73,919 1/21/2011 Group 4 Architecture Research & Planning Architectural 267 1/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 1/21/2011 Turner Construction Company Construction Management Services 105,917 2/1/2011 Flintco Pacific, Inc.Construction 1,098,865 2/1/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 126,732 2/18/2011 Flintco Pacific, Inc.Construction 1,497,190 2/18/2011 Turner Construction Company Construction Management Services 94,502 2/18/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 193,977 2/24/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,820 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,680 3/16/2011 West Coast Code Consultants, Inc.Plan Check (560) 3/16/2011 West Coast Code Consultants, Inc.Plan Check 560 April 26, 2011 Report 3/16/2011 Protech Consulting and Engineering Hazardous Material Testing 1,250 3/17/2011 West Coast Code Consultants, Inc.Plan Check 560 3/18/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/31/2011 Flintco Pacific, Inc.Construction 446,177 3/31/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 76,548 3/31/2011 Turner Construction Company Construction Management Services 94,572 4/11/2011 Group 4 Architecture Research & Planning Architectural 4,219 4/11/2011 Group 4 Architecture Research & Planning Architectural 127 4/11/2011 Group 4 Architecture Research & Planning Architectural 7,366 4/11/2011 Group 4 Architecture Research & Planning Architectural 80,956 4/20/2011 West Coast Code Consultants, Inc.Plan Check 140 4/20/2011 West Coast Code Consultants, Inc.Plan Check 280 4/20/2011 West Coast Code Consultants, Inc.Plan Check 560 3/29/2011 Palo Alto Stores Supplies/Parts 1,342 4/25/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 85,140 4/25/2011 Flintco Pacific, Inc.Construction 766,263 4/26/2011 Group 4 Architecture Research & Planning Architectural 2,528 5/10/2011 Turner Construction Company Construction Management Services 82,594 5/12/2011 Group 4 Architecture Research & Planning Architectural 683 5/12/2011 Group 4 Architecture Research & Planning Architectural 80,956 5/17/2011 Turner Construction Company Construction Management Services 101,701 5/17/2011 Flintco Pacific, Inc.Construction 815,307 July 26, 2011 Report 5/17/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 93,874 5/17/2011 Flintco Pacific, Inc.Construction 29,559 7/1/2011 Turner Construction Company Construction Management Services 99,493 Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 7 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 7/1/2011 Group 4 Architecture Research & Planning Architectural 19,540 7/1/2011 Group 4 Architecture Research & Planning Architectural 3,109 7/1/2011 Group 4 Architecture Research & Planning Architectural 17,038 7/1/2011 Group 4 Architecture Research & Planning Architectural 92,521 July 26, 2011 Report 7/1/2011 Group 4 Architecture Research & Planning Architectural 8,314 7/5/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 125,101 7/5/2011 Flintco Pacific, Inc.Construction 1,125,909 7/27/2011 Group 4 Architecture Research & Planning Architectural 57,826 7/27/2011 Group 4 Architecture Research & Planning Architectural 13,045 7/27/2011 Group 4 Architecture Research & Planning Architectural 1,954 7/27/2011 Flintco Pacific, Inc.Construction 2,316,525 7/27/2011 Flintco Inc. Escrow Construction 257,391 7/27/2011 Turner Construction Company Construction Management Services 127,367 October 25, 2011 Report 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,898 10/5/2011 Group 4 Architecture Research & Planning Architectural 57,826 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,647 10/5/2011 Flintco Pacific, Inc.Construction 483,144 10/5/2011 Flintco, Inc. Escrow Construction 53,683 10/19/2011 Turner Construction Company Construction Management Services 170,058 11/2/2011 Flintco Pacific, Inc.Construction 705,850 11/2/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/2/2011 Group 4 Architecture Research & Planning Architectural 2,060 11/2/2011 Flintco Pacific, Inc.Construction 78,428 11/30/2011 West Coast Code Consultants, Inc.Plan Check 420 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 Group 4 Architecture Research & Planning Architectural 2,051 11/30/2011 West Coast Code Consultants, Inc.Plan Check 700 January 18, 2012 Report 11/30/2011 Flintco Pacific, Inc.Construction 119,803 11/30/2011 Group 4 Architecture Research & Planning Architectural 1,722 11/30/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/30/2011 Group 4 Architecture Research & Planning Architectural 4,789 11/30/2011 Flintco, Inc. Escrow Construction 837,115 *12/21/2011 Turner Construction Company Construction Management Services 187,775 12/21/2011 Turner Construction Company Construction Management Services 129,453 12/21/2011 Turner Construction Company Construction Management Services 233,061 12/21/2011 Turner Construction Company Construction Management Services 2,385 12/21/2011 Turner Construction Company Construction Management Services 109 12/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 2/29/2012 West Coast Code Consultants, Inc.Plan Check 200 2/29/2012 Group 4 Architecture Research & Planning Architectural 1,600 3/21/2012 Group 4 Architecture Research & Planning Architectural 3,457 3/21/2012 Group 4 Architecture Research & Planning Architectural 19,603 2/1/2012 Flintco Pacific, Inc.Construction 940,940 2/1/2012 Flintco Pacific, Inc.Construction 104,549 2/1/2012 Group 4 Architecture Research & Planning Architectural 46,261 2/1/2012 Group 4 Architecture Research & Planning Architectural 654 March 28, 2012 Report 2/8/2012 Group 4 Architecture Research & Planning Architectural 6,417 2/24/2012 Turner Construction Company Construction Management Services 147,880 1/18/2012 Flintco Pacific, Inc.Construction 458,653 1/18/2012 Flintco Pacific, Inc.Construction 50,961 2/29/2012 Group 4 Architecture Research & Planning Architectural 46,261 3/21/2012 Flintco Pacific, Inc.Construction 722,810 3/21/2012 Flintco Pacific, Inc.Construction 80,312 3/21/2012 Group 4 Architecture Research & Planning Architectural 26,657 4/4/2012 Flintco Pacific, Inc.Construction 95,581 4/4/2012 Flintco Pacific, Inc. Escrow Construction 17,187 4/18/2012 Turner Construction Company Construction Management Services 129,709 4/18/2012 Turner Construction Company Construction Management Services 118,875 4/18/2012 Group 4 Architecture Research & Planning Architectural 2,100 4/18/2012 Group 4 Architecture Research & Planning Architectural 23,130 4/18/2012 Turner Construction Company Construction Management Services 120,219 5/9/2013 Sierra Traffic Markings Inc.Construction 7,990 5/9/2012 Group 4 Architecture Research & Planning Architectural 16,191 5/16/2012 Flintco Pacific, Inc.Construction 254,477 5/16/2012 Flintco Pacific, Inc. Escrow Construction 28,395 5/16/2012 Group 4 Architecture Research & Planning Architectural 2,069 5/16/2012 Group 4 Architecture Research & Planning Architectural 9,511 5/16/2012 Turner Construction Company Construction Management Services 116,415 6/20/2012 Group 4 Architecture Research & Planning Architectural 2,551 6/20/2012 Group 4 Architecture Research & Planning Architectural 16,191 July 5, 2012 Report 6/20/2012 Flintco Pacific, Inc.Construction 189,316 6/20/2012 Flintco Pacific, Inc. Escrow Construction 22,270 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 1,680 8 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 Flintco Pacific, Inc. Escrow Construction 20,813 7/5/2012 Flintco Pacific, Inc.Construction 173,537 7/25/2012 Group 4 Architecture Research & Planning Architectural 762 7/25/2012 Group 4 Architecture Research & Planning Architectural 16,191 8/8/2012 Flintco Pacific, Inc.Construction 11,297 8/8/2012 Group 4 Architecture Research & Planning Architectural 16,191 October 30, 2012 Report 8/8/2012 Flintco Pacific, Inc.Construction 85,728 8/22/2012 Group 4 Architecture Research & Planning Architectural 280 9/26/2012 Group 4 Architecture Research & Planning Architectural 84,027 10/3/2012 Group 4 Architecture Research & Planning Architectural 16,191 10/10/2012 Turner Construction Company Construction 22,926 11/14/2012 Group 4 Architecture Research & Planning Architectural 20,325 11/19/2012 West Coast Code Consultants, Inc.Plan Check 350 11/19/2012 Flintco Pacific, Inc.Construction 383,239 11/19/2012 Flintco Pacific, Inc.Construction 88,321 11/19/2012 West Coast Code Consultants, Inc.Plan Check 420 12/12/2012 Flintco Pacific, Inc.Construction 608,951 12/12/2012 Flintco Pacific, Inc.Construction 81,614 12/12/2012 Flintco Pacific, Inc.Construction 505,497 12/12/2012 Flintco Pacific, Inc.Construction 96,133 12/19/2012 Group 4 Architecture Research & Planning Architectural 93,220 January 23, 2013 Report 12/19/2012 Group 4 Architecture Research & Planning Architectural 30,758 12/26/2012 Flintco Pacific, Inc.Construction 13,946 12/26/2012 Flintco Pacific, Inc.Construction 31,893 12/26/2012 Turner Construction Company Construction Management Services 270,207 12/26/2012 Turner Construction Company Construction Management Services 754,125 12/26/2012 Flintco Pacific, Inc.Construction 9,728 12/26/2012 Flintco Pacific, Inc.Construction 14,250 1/23/2013 West Coast Code Consultants, Inc.Plan Check 160 1/23/2013 West Coast Code Consultants, Inc.Plan Check 560 1/23/2013 Group 4 Architecture Research & Planning Architectural 626 1/23/2013 Group 4 Architecture Research & Planning Architectural 783 2/6/2013 Group 4 Architecture Research & Planning Architectural 68,238 2/20/2013 Group 4 Architecture Research & Planning Architectural 38,341 April 12, 2013 3/6/2013 Group 4 Architecture Research & Planning Architectural 2,775 4/3/2013 Group 4 Architecture Research & Planning Architectural 73,745 06/12/13 Flintco Pacific, Inc.Construction 59,916 06/12/13 Flintco Pacific, Inc.Construction 31,230 06/12/13 Flintco Pacific, Inc.Construction 27,261 06/12/13 Flintco Pacific, Inc.Construction 12,816 04/08/13 Flintco Pacific, Inc.Construction 249,800 04/08/13 Flintco Pacific, Inc.Construction 184,896 04/08/13 Flintco Pacific, Inc.Construction 29,765 05/03/13 Flintco Pacific, Inc.Construction 350,886 July 23, 2013 04/24/13 Group 4 Architecture Research & Planning Architectural 91,837 04/24/13 Group 4 Architecture Research & Planning Architectural 450 06/05/13 Group 4 Architecture Research & Planning Architectural 50,003 05/01/13 Ross McDonald Company, Inc.Construction Services 495,000 04/24/13 West Coast Code Consultants, Inc.Plan Check 320 06/17/13 Flintco Pacific, Inc.Construction 142,218 06/19/13 Flintco Pacific, Inc.Construction 27,637 06/26/13 Group 4 Architecture Research & Planning Architectural 73,498 07/17/13 Group 4 Architecture Research & Planning Architectural 46,031 07/19/13 Flintco Pacific, Inc.Construction 106,656 07/31/13 Flintco Pacific, Inc.Construction 34,269 08/07/13 Flintco Pacific, Inc.Construction 72,222 08/14/13 Group 4 Architecture Research & Planning Architectural 46,080 08/14/13 Flintco Pacific, Inc.Construction 8,025 Sept. 25, 2013 08/22/13 Flintco Pacific, Inc.Construction 500,976 08/28/13 Flintco Pacific, Inc.Construction 73,759 09/11/13 Group 4 Architecture Research & Planning Architectural 58,299 09/25/13 Turner Construction Company Construction Management Services 65,864 09/25/13 Sign & Services Company Construction Services 66,903 09/30/13 Flintco Pacific, Inc.Construction 564,671 10/02/13 Turner Construction Company Construction Management Services 450,004 10/02/13 Flintco Pacific, Inc.Construction 70,944 10/09/13 Group 4 Architecture Research & Planning Architectural 66,584 10/11/13 Flintco Pacific, Inc.Construction 580,658 10/30/13 Flintco Pacific, Inc.Construction 64,518 11/13/13 Moovers, Inc.Moving Services 2,280 December 24, 2013 9 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 11/13/13 Sign & Services Company Construction Services 94,813 11/20/13 Turner Construction Company Construction Management Services 143,602 12/05/13 Group 4 Architecture Research & Planning Architectural 54,193 12/11/13 Turner Construction Company Construction Management Services 158,901 12/11/13 Sign & Services Company Construction Services 76,096 12/18/13 Turner Construction Company Construction Management Services 134,322 12/18/13 Ross McDonald Company, Inc.Construction Services 47,705 12/23/13 Group 4 Architecture Research & Planning Architectural 47,490 02/26/14 Group 4 Architecture Research & Planning Architectural 44 01/22/14 Group 4 Architecture Research & Planning Architectural 4,556 02/26/14 Group 4 Architecture Research & Planning Architectural 674 02/26/14 Group 4 Architecture Research & Planning Architectural 37,815 04/02/14 Group 4 Architecture Research & Planning Architectural 19,826 01/22/14 Sign & Services Company Construction Services 106,141 April 16, 2014 02/26/14 Sign & Services Company Construction Services 57,626 02/12/14 Envision Ware, Inc.Professional services 19,365 02/12/14 Envision Ware, Inc.Professional services 422,298 04/02/14 Turner Construction Company Construction Management Services 136,132 04/02/14 Turner Construction Company Construction Management Services 143,257 04/02/14 Turner Construction Company Construction Management Services 102,807 01/29/14 Moovers, Inc.Moving Services 1,000 05/21/14 Moovers, Inc.Moving Services 580 03/05/14 Ross McDonald Company, Inc.Construction Services 54,891 03/31/14 Return of Flintco Escrow (Previously Expensed)(2,628,576) 05/14/14 Group 4 Architecture Research & Planning Architectural 12,284 05/21/14 Moovers, Inc.Moving Services 1,544 July 2, 2014 05/28/14 Turner Construction Company Construction Management Services 130,209 05/28/14 Turner Construction Company Construction Management Services 110,969 05/28/14 Muzak LLC Construction Services 100,317 05/23/14 Protech Consulting and Engineering Hazardous Material Testing 1,540 06/11/14 Group 4 Architecture Research & Planning Architectural 18,326 06/18/14 Turner Construction Company Construction Management Services 109,939 12/23/13 One Workplace L Ferrari Storage 7,010 03/31/14 Envision Ware, Inc.Sorter System 973 06/26/13 Group 4 Architecture Research & Planning Architectural 73,498 10/22/14 Moovers, Inc.Moving Services 213 10/22/14 Moovers, Inc.Moving Services 924 10/22/14 Moovers, Inc.Moving Services 14,463 10/22/14 Moovers, Inc.Moving Services 472 11/12/14 Turner Construction Company Construction Management Services 104,843 January 14, 2015 12/03/14 Group 4 Architecture Research & Planning Architectural 64,500 12/17/14 Turner Construction Company Construction Management Services 11,809 12/17/14 Turner Construction Company Construction Management Services 24,983 12/29/14 Flintco Pacific, Inc.Settlement agreement ($4 million less $100,000)3,900,000 03/18/15 Turner Construction Company Construction Management Services 1,576 12/18/15 Sign & Services Company Construction Services 19,242 12/18/15 Sign & Services Company Construction Services 23,098 April 22, 2015 03/18/15 Turner Construction Company Construction Management Services 26,867 02/25/15 Turner Construction Company Construction Management Services 28,964 11/25/14 Turner Construction Company Construction Management Services 105,599 03/20/15 Turner Construction Company Construction Management Services 491,145 04/29/15 Group 4 Architecture Research & Planning Architectural 4,300 06/10/15 Turner Construction Company Construction Management Services 30,000 July 29, 2015 07/15/15 Muzak LLC Construction Services 250 07/15/15 Muzak LLC Construction Services 781 Group 4 Architecture Research & Planning Architectural 54,015 Turner Construction Company Construction Management Services 6,819 Ross McDonald Company, Inc.Construction Services 115,816 West Coast Code Consultants, Inc.Plan Check 1,270 One Workplace L Ferrari Storage 17,067 Sign & Services Company Construction Services 9,790 Contract Office Group, Inc.Storage 1,477 Muzak LLC Construction Services 48,139 Ginn and Crosby, LLC Legal Services 16,613 Project Controls and Forensics, LLC Legal Services 100,000 Lloyd F. McKinney Associates, Inc.Legal Services 1,100 Spring Electric Company Construction Services 50,000 Sub-total - Engineering Costs - 36,669,147 422,105 (37,091,252) Contract Contingency Summary of Expenditures as of July 21, 2010 104,373 08/03/10 Group 4 Architecture Research & Planning Architectural 1,771 10/05/10 Group 4 Architecture Research & Planning Architectural 25,951 Jan. 25, 2011 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 10,740 2/1/2011 Flintco Pacific, Inc.Construction 41,725 10 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 2/18/2011 Flintco Pacific, Inc.Construction 248,603 April 26, 2011 Report 3/31/2011 Flintco Pacific, Inc.Construction 242,754 8/31/2011 W. L. Butler Construction, Inc.Construction 22,713 8/24/2011 Flintco Pacific, Inc.Construction 987,123 8/24/2011 Turner Construction Company Construction Management Services 151,367 8/24/2011 Flintco Inc. Escrow Construction 117,936 8/24/2011 Group 4 Architecture Research & Planning Architectural 48,250 October 25, 2011 Report 8/24/2011 Group 4 Architecture Research & Planning Architectural 57,826 8/24/2011 Flintco Pacific, Inc.Construction 74,304 10/5/2011 Group 4 Architecture Research & Planning Architectural 37,306 11/30/2011 Group 4 Architecture Research & Planning Architectural 20,266 January 18, 2012 11/30/2011 Flintco Pacific, Inc.Construction 241,110 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560 2/29/2012 West Coast Code Consultants, Inc.Plan Check 360 March 28, 2012 Report 3/8/2012 Group 4 Architecture Research & Planning Architectural 9,937 2/29/2012 Turner Construction Company Construction Management Services 39,360 3/21/2012 Flintco Pacific, Inc.Construction 104,819 3/21/2012 Flintco Pacific, Inc.Construction 11,647 4/18/2012 Turner Construction Company Construction Management Services 656 4/4/2012 Group 4 Architecture Research & Planning Architectural 91,383 5/23/2012 Group 4 Architecture Research & Planning Architectural 25,039 7/5/2012 Group 4 Architecture Research & Planning Architectural 12,871 4/4/2012 Flintco Pacific, Inc.Construction 59,097 July 5, 2012 Report 5/16/2012 Flintco Pacific, Inc.Construction 1,077 6/20/2012 Turner Construction Company Construction Management Services 137,683 6/20/2012 Flintco Pacific, Inc.Construction 11,109 7/5/2012 Flintco Pacific, Inc.Construction 13,783 7/11/2012 Group 4 Architecture Research & Planning Architectural 65,495 8/22/2012 Group 4 Architecture Research & Planning Architectural 80,924 8/8/2012 Flintco Pacific, Inc.Construction 15,943 October 30, 2012 Report 10/3/2012 Turner Construction Company Construction Management Services 298,983 10/31/2012 Group 4 Architecture Research & Planning Architectural 1,578 12/26/2012 Group 4 Architecture Research & Planning Architectural 3,053 11/19/2012 Flintco Pacific, Inc.Construction 411,653 12/12/2012 Flintco Pacific, Inc.Construction 125,571 January 23, 2013 Report 12/12/2012 Flintco Pacific, Inc.Construction 359,703 12/26/2012 Flintco Pacific, Inc.Construction 73,605 12/26/2012 Flintco Pacific, Inc.Construction 96,352 04/08/13 Flintco Pacific, Inc.Construction 60,449 04/08/13 Flintco Pacific, Inc.Construction 31,269 04/08/13 Flintco Pacific, Inc.Construction 85,582 July 23, 2013 05/03/13 Flintco Pacific, Inc.Construction 188,366 05/01/13 4LEAF, Inc.Building Inspection 6,993 05/08/13 4LEAF, Inc.Building Inspection 8,381 07/19/13 Flintco Pacific, Inc.Construction 201,760 08/22/13 Flintco Pacific, Inc.Construction 162,856 08/07/13 4LEAF, Inc.Building Inspection 13,764 Sept. 25, 2013 08/07/13 4LEAF, Inc.Building Inspection 14,708 08/07/13 4LEAF, Inc.Building Inspection 11,045 09/18/13 4LEAF, Inc.Building Inspection 16,706 6/14/2013 Flintco Pacific, Inc.Construction 106,512 9/25/2013 Sign & Services Company Construction Services 40,944 December 24, 2013 9/30/2013 Flintco Pacific, Inc.Construction 73,825 1/22/2014 Group 4 Architecture Research & Planning Architectural 34,885 4/2/2014 Group 4 Architecture Research & Planning Architectural 12,600 4/16/2014 Group 4 Architecture Research & Planning Architectural 19,893 April 16, 2014 2/5/2014 4LEAF, Inc.Building Inspection 14,930 3/5/2014 4LEAF, Inc.Building Inspection 12,654 3/26/2014 4LEAF, Inc.Building Inspection 999 41850 Group 4 Architecture Research & Planning Architectural 32,543 9/3/2014 Group 4 Architecture Research & Planning Architectural 43,002 9/3/2014 Group 4 Architecture Research & Planning Architectural 16,172 9/17/2014 Group 4 Architecture Research & Planning Architectural 14,330 8/13/2014 Moovers, Inc.Moving Services 2,110 7/16/2014 Muzak LLC Construction Services 29,763 9/17/2014 Muzak LLC Construction Services 42,741 October 8, 2014 7/30/2014 Turner Construction Company Construction Management Services 107,060 9/3/2014 Turner Construction Company Construction Management Services 101,438 9/24/2014 Turner Construction Company Construction Management Services 74,899 10/8/2014 Group 4 Architecture Research & Planning Architectural 14,340 7/23/2014 4LEAF, Inc.Building Inspection 5,994 9/14/2014 4LEAF, Inc.Building Inspection 3,618 10/22/2014 Moovers, Inc.Moving Services 4,797 January 14, 2015 12/10/2014 4LEAF, Inc.Building Inspection 910 April 22, 2015 11 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 Sub-total - Contract Contingency - 6,101,432 - (6,101,432) Other Contract Services Summary of Expenditures as of July 21, 2010 93,750 07/01/11 FedEx Mailing 89 08/26/10 Bruce Beasley Sculpture 90,000 Oct. 21, 2010 Report 09/30/11 FedEx Coding Error Correction (89) October 25, 2011 Report 11/16/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services - Mitchell Park Library 3,776 12/21/11 ZFA Structural Engineers Mitchell Library Review 2,925 12/29/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 11,170 January 18, 2012 Report 12/29/11 State Water Resource Board Permit 505 02/08/12 Riedinger Consulting Outside Counsel 9,136 01/25/12 ZFA Structural Engineers Mitchell Library Review 9,289 01/25/12 ZFA Structural Engineers Mitchell Library Review 3,118 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,625 March 28, 2012 Report 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 9,960 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 10,423 03/14/12 Envision Ware, Inc.Professional services 5,850 04/04/12 ZFA Structural Engineers Mitchell Library Review 2,518 04/04/12 Riedinger Consulting Outside Counsel 28,371 04/04/12 Riedinger Consulting Outside Counsel 10,235 04/04/12 Riedinger Consulting Outside Counsel 24,585 05/09/12 Jam Services 3,897 July 5, 2012 Report 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,647 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 5,212 06/13/12 ZFA Structural Engineers Mitchell Library Review 1,732 06/20/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 4,549 06/20/12 Blackstone Discovery Legal Services for Mitchell Park Library 319 08/15/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 35,618 09/12/12 County of Santa Clara Mitchell Snack Bar - Environmental Health 220 October 30, 2012 Report 09/12/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 30,348 09/05/12 Bruce Beasley Sculpture 1,900 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 15,610 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 38,608 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 33,684 January 23, 2013 Report 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 77,708 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 12 03/26/14 3M Library Systems Library Self Check Stations 258 01/16/13 3M Library Systems Library Self Check Stations 80,578 3/20/2013 Bruce Beasley Sculpture 40,000 02/13/13 Ginn and Crosby, LLC Legal Services 1,272 02/13/13 Ginn and Crosby, LLC Legal Services 48 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 49,268 April 12, 2013 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 13,517 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 12,961 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 132,792 07/31/13 Ginn and Crosby, LLC Legal Services 2,688 07/31/13 Ginn and Crosby, LLC Legal Services 8,016 Sept. 25, 2013 10/30/13 Bruce Beasley Sculpture 50,000 December 24, 2013 02/05/14 Ginn and Crosby, LLC Legal Services 8,376 02/12/14 Ginn and Crosby, LLC Legal Services 7,111 April 16, 2014 03/26/14 Ginn and Crosby, LLC Legal Services 4,224 06/18/14 Ginn and Crosby, LLC Legal Services 1,248 06/18/14 Ginn and Crosby, LLC Legal Services 2,304 01/15/14 Ginn and Crosby, LLC Legal Services 14,952 02/26/14 National Construction Rentals Natl. Const. Rentals/Fencing&windscreen 2,317 03/05/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 638 03/05/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 635 July 2, 2014 03/12/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 251 04/30/14 Ginn and Crosby, LLC Legal Services 1,044 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 12/23/13 One Workplace L Ferrari Additional Storage (Reduction in Exp. from prev. drawdown) (8,890) 7/23/2014 Ginn and Crosby, LLC Legal Services 1,169 07/16/14 Contract Office Group, Inc.Storage 600 07/16/14 Contract Office Group, Inc.Storage 600 October 8, 2014 08/27/14 Ginn and Crosby, LLC Legal Services 25,430 09/17/14 Ginn and Crosby, LLC Legal Services 32,279 08/15/14 National Construction Rentals Natl. Const. Rentals/Fencing&windscreen 416 11/24/14 BIG-D Pacific Builders, LP Fence reimbursement (3,341) 11/05/14 Ginn and Crosby, LLC Legal Services 23,691 11/19/14 Ginn and Crosby, LLC Legal Services 25,544 January 14, 2015 11/25/14 Envision Ware, Inc.Professional services 27,400 12/17/14 Ginn and Crosby, LLC Legal Services 7,272 02/18/15 Ginn and Crosby, LLC Legal Services 2,352 11/24/14 National Construction Rentals Natl. Const. Rentals/Fencing&windscreen 193 12 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 09/24/14 National Construction Rentals Natl. Const. Rentals/Fencing&windscreen 416 12/31/14 All Fence Company Inc.Fence 1,525 12/18/14 The Preferred Image Signs 2,291 02/11/15 Ginn and Crosby, LLC Legal Services 3,330 April 22, 2015 03/25/15 Envision Ware, Inc.Professional services 1,061 02/06/15 Orchard Supply Locks 35 02/06/15 Amazon.com Signs 42 01/26/15 Deposits In Trans WF Misc.59 10/20/14 Sunnyvale Windustrial Construction materials 1,427 02/04/15 Santa Clara County Completion Filing Fee 5 03/25/15 Envision Ware, Inc.Professional services 20,047 06/17/15 One Workplace L Ferrari Storage 35,344 06/10/15 Ginn and Crosby, LLC Legal Services 1,152 05/05/15 Media Center AV System Modifications 150 July 29, 2015 05/01/15 Orchard Supply Construction materials 3,169 05/08/15 The Home Depot Construction materials 211 04/21/15 California Paint Company Construction materials 66 Sub-total - Other Contract Services - 1,220,117 - (1,220,117) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 176,008 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Library - Bldg A 70,153 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Teen Center - Bldg B 10,768 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Multipurpose Center - Bldg C 21,184 Oct. 21, 2010 Report 09/30/10 City of Palo Alto - Planning Demolition Permit MPL - 3700 Middlefield 525 09/30/10 City of Palo Alto - Planning Demolition Permit MPCC - 3800 Middlefield 525 09/28/10 City of Palo Alto - Planning Permit (Grading and Fill)1,830 10/31/10 City of Palo Alto - Planning Revision permit for Mitchell Park Library & CC 141 11/16/10 City of Palo Alto - Planning Architectural Review Board Fees 2,090 Jan. 25, 2011 Report 01/31/11 Palo Alto Stores Supplies/Parts 101 03/31/11 Palo Alto Stores Supplies/Parts 97 03/31/11 Palo Alto Stores Supplies/Parts 4,045 April 26, 2011 Report 03/31/11 Palo Alto Stores Supplies/Parts 89 03/31/11 Palo Alto Stores Supplies/Parts 661 06/14/10 Palo Alto Stores Reversal of Prior Charges (2,834) 03/29/11 Palo Alto Stores Reversal of Prior Charges (628) 03/30/11 Palo Alto Stores Reversal of Prior Charges (571) July 26, 2011 Report 04/04/11 Palo Alto Stores Reversal of Prior Charges (143) 04/30/11 City of Palo Alto - Public Works Underground Fire Supply/Hydrant Permit Fee 1,335 07/06/11 City of Palo Alto - Development Center Plan Check Fee 93 07/06/11 City of Palo Alto - Planning Plan Check Fee 89 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 137 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 October 25, 2011 Report 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 121 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 145 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 277 08/31/11 City Of Palo Alto - Planning Mitchell Library Plan Check 40 09/30/11 City of Palo Alto - Planning Mitchell Library - Permit Revision 89 10/31/11 City of Palo Alto - Development Center Plan Check Fee 113 January 18, 2012 10/31/11 City of Palo Alto - Development Center Plan Check Fee 325 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 97 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 109 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 85 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 4,056 March 28, 2012 12/31/11 City of Palo Alto - Planning Plan Review - modify permit 93 12/21/11 City of Palo Alto - Planning Plan Review - modify permit 85 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 89 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 121 04/25/12 City of Palo Alto - Stores Inventory Conduit, Rgid Steel T/C 10Ft length 2"181 04/25/12 City of Palo Alto - Stores Inventory Pipes - Valves - Fitting 4 04/30/12 City of Palo Alto - Planning Plan Review (Electrical Veh. Chargers permit)977 05/16/12 City of Palo Alto - Planning Plan Review (Ceiling Structural Chgs.) - Mitchell 344 05/16/12 City of Palo Alto - Planning Plan Review (foundation, framing, plumbing) - Mitchell Park L 364 July 5, 2012 05/16/12 City of Palo Alto - Planning Plan Review (Solar Water Heater) - Mitchell Park Library 165 05/16/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 05/31/12 City of Palo Alto - Planning MP -Plan Review for electrical signage permit 112 06/28/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 300 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 151 October 30, 2012 13 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 29, 2015 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 89 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 11/30/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 116 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 7 January 23, 2013 Report 03/31/13 City of Palo Alto - Development Center Architectural Review 92 April 12, 2013 04/17/13 Ginn and Crosby, LLC Legal Services 225 04/17/13 Ginn and Crosby, LLC Legal Services 432 06/05/13 Ginn and Crosby, LLC Legal Services 144 06/05/13 Ginn and Crosby, LLC Legal Services 5,243 06/05/13 Javis, Fay, Doporto & Gibson, LLP Legal Services 16,570 July 23, 2013 06/05/13 Javis, Fay, Doporto & Gibson, LLP Legal Services 38 06/19/13 David Neagley, AIA Legal Services 1,624 01/30/14 Brad Oldham Internation, Inc.Install of Stainless Owls 49 01/30/14 Brad Oldham Internation, Inc.Install of Stainless Owls 565 July 2, 2014 Sub-total - City (Inter-department) Service Charge - 320,534 - (320,534) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,315 06/30/10 Office Max (US Bank-Calcard) - Reversed Reverse office supplies charged to project (246) 06/30/10 Debra Jacobs Reverse prior travel and meeting expense (6) Oct. 21, 2010 Report 06/30/10 Karen Bengard Reverse prior travel and meeting expense (20) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (11) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (20) 03/30/11 Palo Alto Stores Supplies/Parts 4 April 26, 2011 Report 03/30/11 Palo Alto Stores Supplies/Parts 214 03/30/11 Palo Alto Stores Reversal of Prior Charges (4) 03/30/11 Palo Alto Stores Reversal of Prior Charges (214) July 26, 2011 Report 04/21/11 City of Palo Alto - Utilities Utility Connection Fee 68,559 02/15/12 Palo Alto Stores Supplies/Parts 4 02/15/12 Palo Alto Stores Supplies/Parts 176 March 28, 2012 Report 02/15/12 Palo Alto Stores Supplies/Parts 218 02/15/12 Palo Alto Stores Supplies/Parts 4 12/31/12 State Water Resources Control Board Submitting Permit Registration Documents 505 January 23, 2013 Report 02/06/13 4LEAF, Inc.Building Inspection 2,553 02/06/13 4LEAF, Inc.Building Inspection 8,769 April 12, 2013 03/13/13 4LEAF, Inc.Building Inspection 9,213 03/13/13 4LEAF, Inc.Building Inspection 10,656 08/21/13 4LEAF, Inc.Building Inspection 15,318 10/30/13 4LEAF, Inc.Building Inspection 9,713 12/05/13 4LEAF, Inc.Building Inspection 14,430 12/18/13 4LEAF, Inc.Building Inspection 14,708 10/16/13 Computerland of Silicon Valley Wi-Fi Connectivity (Wireless Access Points (WAPs) )25,615 December 24, 2013 11/26/13 CDW Government Uninterruptable Power Supplies for Computers 6,134 12/05/13 CDW Government Uninterruptable Power Supplies for Computers 301 12/18/13 State Water Resources Control Board Submitting Permit Registration Documents 664 11/06/13 Bibliotheca, Inc.Security Gates 12,375 04/23/14 4LEAF, Inc.Building Inspection 1,332 06/04/14 4LEAF, Inc.Building Inspection 1,887 July 2, 2014 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 16 07/04/14 California Paint Company Special Filler for Wood Bridges 176 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 76 October 8, 2014 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 154 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 63 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 41 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 19 04/15/15 Reconcilation Adjustment Adjustment (3,280) 11/06/13 Bibliotheca, Inc.Security Gates ($2,995 clerical error)- 03/31/13 Office Max (US Bank-Calcard) - Reversed Reversal of Bondable Expenditure (-$65 clerical error)- 10/16813 Ginn and Crosby, LLC Legal Services ($360 clerical error)- 10/09/14 Ginn and Crosby, LLC Legal Services ($288 clerical error)- 11/05/14 Ginn and Crosby, LLC Legal Services 3,145 10/22/14 Moovers, Inc.Moving Services 4,797 10/01/14 4LEAF, Inc.Building Inspection 5,200 January 14, 2015 10/29/14 4LEAF, Inc.Building Inspection 4,810 06/25/14 4LEAF, Inc.Building Inspection 3,219 Sub-total - Miscellaneous Cost - 224,578 - (224,578) Grant Total 47,725,437 44,535,808 422,105 2,767,524 14 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 18,000,000$ Budget Change 4,342,563 Sub-total - 2010 Engineer's Budget Estimate 22,342,563 - - 22,342,563 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 10/05/10 Group 4 Architecture Research and Planning Architectural 700 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 11/02/10 Group 4 Architecture Research and Planning Architectural 5,785 11/02/10 Group 4 Architecture Research and Planning Architectural 122,100 Jan. 25, 2011 Report 12/07/10 Group 4 Architecture Research and Planning Architectural 2,390 01/04/11 Group 4 Architecture Research and Planning Architectural 15,000 01/04/11 Group 4 Architecture Research and Planning Architectural 583 01/04/11 Group 4 Architecture Research and Planning Architectural 859 01/04/11 Turner Construction Company Construction Management Services 1,195 02/24/11 Group 4 Architecture Research and Planning Architectural 4,860 03/18/11 Group 4 Architecture Research and Planning Architectural 73,246 03/18/11 Group 4 Architecture Research and Planning Architectural 7,500 03/18/11 Group 4 Architecture Research and Planning Architectural 53 03/18/11 Group 4 Architecture Research and Planning Architectural 3,843 04/11/11 Group 4 Architecture Research and Planning Architectural 112,464 04/11/11 Group 4 Architecture Research and Planning Architectural 3,993 04/11/11 Group 4 Architecture Research and Planning Architectural 7,500 01/21/11 Group 4 Architecture Research and Planning Architectural 24,392 April 26, 2011 Report 01/21/11 Turner Construction Company Construction Management Services 1,434 01/21/11 Group 4 Architecture Research and Planning Architectural 2,500 01/24/11 Group 4 Architecture Research and Planning Architectural 1,500 01/21/11 Group 4 Architecture Research and Planning Architectural 447 02/18/11 Turner Construction Company Construction Management Services 478 02/18/11 Group 4 Architecture Research and Planning Architectural 48,831 02/18/11 Group 4 Architecture Research and Planning Architectural 2,653 02/18/11 Group 4 Architecture Research and Planning Architectural 3,238 05/12/11 Group 4 Architecture Research and Planning Architectural 6,250 05/12/11 Group 4 Architecture Research and Planning Architectural 40,052 05/12/11 Group 4 Architecture Research and Planning Architectural 12,411 05/12/11 Group 4 Architecture Research and Planning Architectural 3,263 05/17/11 Group 4 Architecture Research and Planning Architectural 4,553 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 31,374 07/01/11 Turner Construction Company Construction Management Services 9,169 07/11/11 Group 4 Architecture Research and Planning Architectural 11,100 07/11/11 Group 4 Architecture Research and Planning Architectural 488 07/11/11 Group 4 Architecture Research and Planning Architectural 15,687 07/27/11 Group 4 Architecture Research and Planning Architectural 319 07/27/11 Group 4 Architecture Research and Planning Architectural 1,150 07/27/11 Group 4 Architecture Research and Planning Architectural 1,875 07/27/11 Turner Construction Company Construction Management Services 5,572 08/10/11 Group 4 Architecture Research and Planning Architectural 31,374 08/24/11 Turner Construction Company Construction Management Services 2,868 October 25, 2011 Report 08/31/11 Group 4 Architecture Research and Planning Architectural 117 08/31/11 Group 4 Architecture Research and Planning Architectural 175 08/31/11 Group 4 Architecture Research and Planning Architectural 248 09/14/11 Group 4 Architecture Research and Planning Architectural 67 09/14/11 Group 4 Architecture Research and Planning Architectural 600 09/14/11 Group 4 Architecture Research and Planning Architectural 39,218 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 235,308 10/26/11 Group 4 Architecture Research and Planning Architectural 878 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 291 10/26/11 Group 4 Architecture Research and Planning Architectural 27 11/02/11 Group 4 Architecture Research and Planning Architectural 78,436 11/02/11 Group 4 Architecture Research and Planning Architectural 7,500 11/22/11 Group 4 Architecture Research and Planning Architectural 8,514 12/07/11 Group 4 Architecture Research and Planning Architectural 62,749 January 18, 2012 Report 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/14/11 Group 4 Architecture Research and Planning Architectural 79,172 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/21/11 Protect Consulting and Engineering Hazardous Material Testing 3,530 12/21/11 Group 4 Architecture Research and Planning Architectural 3,052 01/11/12 Group 4 Architecture Research and Planning Architectural 225 01/11/12 Group 4 Architecture Research and Planning Architectural 9,761 01/11/12 Group 4 Architecture Research and Planning Architectural 70,592 01/11/12 Group 4 Architecture Research and Planning Architectural 150 01/11/12 Group 4 Architecture Research and Planning Architectural 247 02/22/12 Group 4 Architecture Research and Planning Architectural 10,000 02/22/12 Group 4 Architecture Research and Planning Architectural 62,749 02/22/12 Group 4 Architecture Research and Planning Architectural 8,676 Rinconada (aka Main) Library Activity Details (PE-11000) As of July 29, 2015 15 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of July 29, 2015 02/22/12 Group 4 Architecture Research and Planning Architectural 3,590 March 28, 2012 Report 03/21/12 Group 4 Architecture Research and Planning Architectural 1,330 03/21/12 Group 4 Architecture Research and Planning Architectural 5,423 03/21/12 Group 4 Architecture Research and Planning Architectural 39,218 02/22/12 BIG-D Pacific Builders, LP Construction 32,500 12/21/12 BIG-D Pacific Builders, LP Construction 36,960 04/04/12 Group 4 Architecture Research and Planning Architectural 18,925 04/18/12 Group 4 Architecture Research and Planning Architectural 1,500 04/18/12 Group 4 Architecture Research and Planning Architectural 19 04/18/12 Group 4 Architecture Research and Planning Architectural 9,784 05/16/12 Group 4 Architecture Research and Planning Architectural 3,278 July 5, 2012 Report 05/16/12 Group 4 Architecture Research and Planning Architectural 29,046 05/30/12 Group 4 Architecture Research and Planning Architectural 39,504 06/20/12 Group 4 Architecture Research and Planning Architectural 13,884 07/05/12 Group 4 Architecture Research and Planning Architectural 407 07/05/12 Group 4 Architecture Research and Planning Architectural 2,500 07/25/12 Group 4 Architecture Research and Planning Architectural 1,613 07/25/12 Group 4 Architecture Research and Planning Architectural 1,535 07/25/12 Group 4 Architecture Research and Planning Architectural 1,992 October 30, 2012 Report 09/05/12 Group 4 Architecture Research and Planning Architectural 7,551 09/26/12 Group 4 Architecture Research and Planning Architectural 5,996 10/31/12 Turner Construction Company Construction Management Services 7,444 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 11/19/12 Group 4 Architecture Research and Planning Architectural 5,423 11/19/12 Group 4 Architecture Research and Planning Architectural 8,000 11/19/12 Group 4 Architecture Research and Planning Architectural 270 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 10/31/12 Turner Construction Company Construction Management Services 10,000 January 23, 2013 Report 10/11/12 Fastsigns signs 389 01/09/13 NOVA Partners, Inc.Construction Management Services 19,320 01/23/13 Group 4 Architecture Research and Planning Architectural 2,500 01/23/13 Group 4 Architecture Research and Planning Architectural 969 01/23/13 Group 4 Architecture Research and Planning Architectural 4,979 01/23/13 Group 4 Architecture Research and Planning Architectural 725 01/23/13 NOVA Partners, Inc.Construction Management Services 12,010 02/06/13 Group 4 Architecture Research and Planning Architectural 3,243 02/27/13 West Coast Code Consultants, Inc.Plan Check 13,300 02/27/13 NOVA Partners, Inc.Construction Management Services 18,280 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 30,776 04/03/13 NOVA Partners, Inc.Construction Management Services 17,000 04/24/13 Group 4 Architecture Research and Planning Architectural 13 05/08/13 Group 4 Architecture Research and Planning Architectural 479 05/08/13 Group 4 Architecture Research and Planning Architectural 9,324 05/22/13 Group 4 Architecture Research and Planning Architectural 1,641 05/22/13 Group 4 Architecture Research and Planning Architectural 157 July 23, 2013 04/24/13 NOVA Partners, Inc.Construction Management Services 16,360 05/22/13 NOVA Partners, Inc.Construction Management Services 18,280 04/10/13 ARC Signs 71 05/01/13 ARC signs 210 06/19/13 Metropolitan Van and Storage, Inc.Equipment Moving 31,367 06/26/13 NOVA Partners, Inc.Construction Management Services 6,134 07/31/13 NOVA Partners, Inc.Construction Management Services 31,565 08/21/13 NOVA Partners, Inc.Construction Management Services 30,750 08/21/13 West Coast Code Consultants, Inc.Plan Check 1,185 Sept. 25, 2013 08/21/13 Group 4 Architecture Research and Planning Architectural 34 07/27/13 Group 4 Architecture Research and Planning Architectural 17,341 08/21/13 Group 4 Architecture Research and Planning Architectural 43,310 09/25/13 S.J. Amoroso Construction Construction 1,396,323 09/25/13 ARC Reproductive Services 52 10/02/13 NOVA Partners, Inc.Construction Management Services 35,578 10/16/13 Group 4 Architecture Research and Planning Architectural 86,670 10/23/13 NOVA Partners, Inc.Construction Management Services 38,025 10/30/13 S.J. Amoroso Construction Construction 771,030 December 24, 2013 11/20/13 NOVA Partners, Inc.Construction Management Services 37,554 12/05/13 Group 4 Architecture Research and Planning Architectural 43,360 12/11/13 S.J. Amoroso Construction Construction 1,204,872 12/18/13 NOVA Partners, Inc.Construction Management Services 41,811 12/23/13 S.J. Amoroso Construction Construction 876,464 01/29/14 NOVA Partners, Inc.Construction Management Services 42,311 02/26/14 NOVA Partners, Inc.Construction Management Services 34,852 03/26/14 NOVA Partners, Inc.Construction Management Services 30,855 04/16/14 West Coast Code Consultants, Inc.Plan Check 613 01/29/14 Protech Consulting and Engineering Hazardous Material Testing 22,580 01/29/14 S.J. Amoroso Construction Construction 857,070 03/05/14 S.J. Amoroso Construction Construction 1,098,894 April 16, 2014 04/02/14 S.J. Amoroso Construction Construction 1,045,937 01/29/14 Group 4 Architecture Research and Planning Architectural 43,360 02/26/14 Group 4 Architecture Research and Planning Architectural 43,360 01/29/14 Group 4 Architecture Research and Planning Architectural 43,360 16 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of July 29, 2015 04/02/14 Group 4 Architecture Research and Planning Architectural 188,020 04/16/14 Group 4 Architecture Research and Planning Architectural 43,350 03/26/14 ARC Reproduction Services 258 04/02/14 Envision Ware, Inc.Professional services 1,795 11/29/04 Envision Ware, Inc.Professional services ($47,731 deleted) 05/14/14 NOVA Partners, Inc.Construction Management Services 37,950 05/28/14 NOVA Partners, Inc.Construction Management Services 39,369 06/04/14 Group 4 Architecture Research and Planning Architectural 18,900 06/25/14 NOVA Partners, Inc.Construction Management Services 35,540 July 2, 2014 04/23/14 S.J. Amoroso Construction Construction 1,058,321 05/28/14 S.J. Amoroso Construction Construction 1,487,530 06/04/14 Group 4 Architecture Research and Planning Architectural 86,702 06/25/14 Group 4 Architecture Research and Planning Architectural 86,746 07/02/14 S.J. Amoroso Construction Construction 1,852,722 07/16/14 NOVA Partners, Inc.Construction Management Services 34,767 08/27/14 NOVA Partners, Inc.Construction Management Services 33,075 09/17/14 NOVA Partners, Inc.Construction Management Services 34,182 07/02/14 West Coast Code Consultants, Inc.Plan Check 1,203 08/13/14 Group 4 Architecture Research and Planning Architectural 39,700 07/30/14 PACIFIC GAS & ELECTRIC CO Survey 6,000 October 8, 2014 08/06/14 S.J. Amoroso Construction Construction 2,164,627 09/03/14 S.J. Amoroso Construction Construction 1,591,611 07/31/14 S.J. Amoroso Construction Construction 1,641,497 10/08/14 Group 4 Architecture Research and Planning Architectural 29,816 10/08/14 Group 4 Architecture Research and Planning Architectural 86,738 10/08/14 Group 4 Architecture Research and Planning Architectural 75,770 07/27/13 Group 4 Architecture Research and Planning Architectural 17,341 11/05/14 NOVA Partners, Inc.Construction Management Services 24,808 11/05/14 S.J. Amoroso Construction Construction 330,380 January 14, 2015 12/03/14 Group 4 Architecture Research and Planning Architectural 26,835 12/17/14 Group 4 Architecture Research and Planning Architectural 4,990 01/14/15 S.J Amoroso Contruction costs that are currently being funded by the Infrastructure Reserve (1,800,000) 02/04/15 NOVA Partners, Inc.Construction Management Services 1,566 01/28/15 NOVA Partners, Inc.Construction Management Services 1,600 02/25/15 NOVA Partners, Inc.Construction Management Services 13,485 April 22, 2015 03/04/15 S.J. Amoroso Construction Construction 31,481 01/28/15 S.J. Amoroso Construction Construction 140,321 05/13/15 NOVA Partners, Inc.Construction Management Services 1,094 July 29, 2015 05/06/15 S.J. Amoroso Construction Construction 17,917 05/22/15 Protech Consulting and Engineering Hazardous Material Testing 950 Protech Consulting and Engineering Hazardous Material Testing 2,280 Group 4 Architecture Research and Planning Architectural 210,022 NOVA Partners, Inc. Construction Management Services 312 AT&T Engineering Professional services 6,298 Schaff & Wheeler Consulting Storm Water (Third Party 600 Ross McDonald Company, Inc. Construction Services 24,612 West Coast Code Consultants, Inc. Plan Check 1,600 3M Library Systems Library System 1,317 Metropolitan Van and Storage, Inc. Equipment Moving 14,032 S.J. Amoroso Construction Construction 946,830 Applied Materials / Engineering, Inc. Professional services 16,689 Sub-total - Engineering and Architectural Costs - 19,396,475 1,224,592 (20,621,067) Contract Contingency 05/27/11 Group 4 Architecture Research and Planning Architectural 22,152 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 571 02/22/12 Group 4 Architecture Research and Planning Architectural 122 March 28, 2012 Report 11/19/12 Group 4 Architecture Research and Planning Architectural 124 January 23, 2013 Report 04/03/13 Group 4 Architecture Research and Planning Architectural 8,442 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 8,442 04/24/13 Group 4 Architecture Research and Planning Architectural 6,300 05/22/13 Group 4 Architecture Research and Planning Architectural 64,633 July 23, 2013 06/05/13 Group 4 Architecture Research and Planning Architectural 27,225 07/17/13 Group 4 Architecture Research and Planning Architectural 12,658 07/17/13 Group 4 Architecture Research and Planning Architectural 3,150 Sept. 25, 2013 08/21/13 Group 4 Architecture Research and Planning Architectural 9,900 08/21/13 Group 4 Architecture Research and Planning Architectural 9,900 06/21/13 NOVA Partners, Inc. Construction Management Services 9,480 December 24, 2013 04/16/14 Group 4 Architecture Research and Planning Architectural 15,750 April 16, 2014 04/23/14 S.J. Amoroso Construction Construction 16,461 July 2, 2014 07/02/14 West Coast Code Consultants, Inc. Plan Check 941 October 8, 2014 12/03/14 Group 4 Architecture Research and Planning Architectural 13,720 12/03/14 Group 4 Architecture Research and Planning Architectural 5,651 17 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of July 29, 2015 12/29/14 NOVA Partners, Inc.Construction Management Services 18,250 January 14, 2015 12/03/14 Group 4 Architecture Research and Planning Architectural 6,600 12/10/14 S.J. Amoroso Construction Construction 316,985 12/10/14 S.J. Amoroso Construction Construction 20,517 02/04/15 NOVA Partners, Inc.Construction Management Services 20 01/28/15 NOVA Partners, Inc.Construction Management Services 18,070 02/04/15 NOVA Partners, Inc.Construction Management Services 22,680 01/28/15 S.J. Amoroso Construction Construction 7,103 01/28/15 S.J. Amoroso Construction Construction 9,355 01/28/15 S.J. Amoroso Construction Construction 11,108 01/28/15 S.J. Amoroso Construction Construction 12,420 01/28/15 S.J. Amoroso Construction Construction 12,428 April 22, 2015 01/28/15 S.J. Amoroso Construction Construction 13,295 01/28/15 S.J. Amoroso Construction Construction 14,236 01/28/15 S.J. Amoroso Construction Construction 14,541 01/28/15 S.J. Amoroso Construction Construction 14,651 01/28/15 S.J. Amoroso Construction Construction 14,746 01/28/15 S.J. Amoroso Construction Construction 18,875 01/28/15 S.J. Amoroso Construction Construction 25,973 01/28/15 S.J. Amoroso Construction Construction 37,022 01/28/15 S.J. Amoroso Construction Construction 38,480 01/28/15 S.J. Amoroso Construction Construction 47,113 05/06/15 S.J. Amoroso Construction Construction 25,108 July 29, 2015 Sub-total - Contract Contingency - 955,198 - (955,198) Other Contract Services 12/05/12 Planet Orange Termite Inspection Fee 350 12/31/12 Fastsigns Sign 226 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 52,000 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 12,000 10/31/12 City of Palo Alto - Public Works Main Library Renovation - Plan Check Fee 115,654 12/06/12 City of Palo Alto - Development Center Architectural Review 2,678 January 23, 2013 Report 12/06/12 City of Palo Alto - Development Center Architectural Review 25 12/06/12 City of Palo Alto - Development Center Architectural Review 20 12/06/12 City of Palo Alto - Development Center Architectural Review 622 12/06/12 City of Palo Alto - Development Center Architectural Review 2,892 12/06/12 City of Palo Alto - Development Center Architectural Review 252 04/24/13 FedEx Mailing 111 04/24/13 FedEx Mailing 98 July 23, 2013 04/17/13 FedEx Mailing 111 06/30/13 Fastsigns Signs 1,423 07/31/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 Sept. 25, 2013 08/21/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/02/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/09/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 11/13/13 Metropolitan Van and Storage, Inc.Equipment Moving 500 December 24, 2013 11/20/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 12/18/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,665 04/02/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 02/12/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 April 16, 2014 04/02/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 01/29/14 FedEx Mailing 47 05/15/14 Protech Consulting and Engineering Hazardous Material Testing 3,270 05/07/14 Creative Machines, Inc.Plans and Technical Drawings 13,000 06/11/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 05/28/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 July 2, 2014 05/21/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 06/25/14 Metropolitan Van and Storage, Inc.Equipment Moving 800 07/02/14 AT&T Engineering and Construction 6,298 03/31/14 Envision Ware, Inc.Professional services 157 07/09/14 Applied Materials / Engineering, Inc.Professional services 110 07/09/14 Applied Materials / Engineering, Inc.Professional services 1,760 07/16/14 ARC Reproduction Services 71 08/06/14 Creative Machines, Inc.Plans and Technical Drawings 13,000 07/09/14 Chem Aqua Loop corrosion inhibitor chemical addition/water analysis 837 07/23/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 08/13/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 October 8, 2014 09/17/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/08/14 Applied Materials / Engineering, Inc.Professional services 5,601 10/08/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 07/11/14 City of Palo Alto Signage Review for ARB 698 07/22/14 City of Palo Alto Signage Review for ARB 2,918 11/12/14 Metropolitan Van and Storage, Inc.Equipment Moving 11,638 18 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of July 29, 2015 12/10/14 Metropolitan Van and Storage, Inc.Equipment Moving 450 12/17/14 Schaaf & Wheeler Consulting Storm Water 3 Party Review 2,500 January 14, 2015 10/22/14 Bibliotheca, Inc.Security Gates 18,800 10/31/14 Bibliotheca, Inc.Security Gates 1,645 02/24/15 Fastsigns Fastsigns 247 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 195 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 450 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 1,220 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 2,205 02/24/15 VKK Signmakers, Inc.Signs 3,472 April 22, 2015 03/25/15 Envision Ware, Inc.Professional services 26,650 11/24/14 Fastsigns Signs 245 03/25/15 3M Library Systems Library System 58,030 03/25/15 Envision Ware, Inc.Professional services 372,856 03/23/15 PolePal Lighting 1,080 11-Jun Peninsulators, Inc.Construction 1,950 July 29, 2015 Sub-total - Other Contract Services - 763,301 - (763,301) City (Inter-department) Service Charge 10/31/14 City of Palo Alto - Planning Review of sculpture signage and address sign 456 January 14, 2015 Sub-total - City (Inter-department) Service Charge - 456 - (456) Miscellaneous Cost 02/27/13 Fastsigns Signage 590 April 12, 2013 Sub-total - Miscellaneous Cost - 590 - (590) Grant Total 22,342,563 21,116,021 1,224,592 1,950 19 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Mitchell Park Library (Council Approved - CMR: 463:09) 645,000 Budget Change - gg Sub-total - 2010 Engineer's Budget Estimate 645,000 - - 645,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 439,283 10/05/10 Group 4 Architecture Research & Planning Architectural 5,774 Oct. 21, 2010 Report 08/24/10 Group 4 Architecture Research & Planning Architectural 329 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 19,191 April 26, 2011 Report 11/12/14 Ross McDonald Company, Inc.Construction Services 3,200 January 14, 2015 Sub-total - Engineering and Architectural Costs - 467,777 - (467,777) Contract Contingency Summary of Expenditures as of July 21, 2010 2,541 08/24/10 Johnstone Moyer, Inc.Temp. Library Improvements 24,604 Oct. 21, 2010 Report 08/27/10 West Corporation Temp. Lib. - Security Access Card & Alarm 310 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 6,045 April 26, 2011 Report 05/14/15 JCM Construction, Inc.Construction Services 4,970 January 29, 2015 Sub-total - Contract Contingency - 38,470 - (38,470) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 11,247 March 28, 2012 Report Sub-total - City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 125 March 28, 2012 Report Sub-total - Miscellaneous Cost - 125 - (125) Grant Total 645,000 517,618 - 127,382 Temporary Library at Cubberley (for Mitchell Facility) - Activity Details (PE-09010) As of July 29, 2015 20 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Main Library Facility - Art Center Auditorium 500,000 Sub-total - 2010 Engineer's Budget Estimate 500,000 - - 500,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 - 04/04/12 Group 4 Architecture Research & Planning Architectural 15,687 July 5, 2012 Report 04/04/12 Group 4 Architecture Research & Planning Architectural 11,288 07/25/12 Group 4 Architecture Research & Planning Architectural 1,121 October 30, 2012 Report 06/15/76 Ross McDonald Company, Inc.Library Shelving 7,176 06/19/13 Big-D Pacific Builders, LP Construction Services 253,627 July 23, 2013 08/16/13 Big-D Pacific Builders, LP Construction Services 29,997 Sept. 25, 2013 02/11/15 Ross McDonald Company, Inc.Library Shelving 1,100 April 22, 2015 04/22/15 JCM Construction, Inc.Construction Services 9,950 05/22/15 Securecom Construction Services 88 January 29, 2015 Group 4 Architecture Research & Planning Architectural 2,960 Ross McDonald Company, Inc.Library Shelving 829 Peninsulators, Inc.Construction Services 9,790 Sub-total - Engineering and Architectural Costs - 330,034 13,578 (343,612) Contract Contingency Summary of Expenditures as of July 21, 2010 - 04/30/13 Fastsigns Signs 593 04/30/13 Metropolitan Van and Storage, Inc.Equipment Moving 380 04/30/13 Fastsigns Signs 598 July 23, 2013 04/30/13 Fastsigns Signs 41 05/31/13 Fastsigns (Reversal of Drawdown)Signs (138) January 14, 2015 Sub-total - Contract Contingency - 1,474 - (1,474) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 - 04/30/13 City of Palo Alto - Planning Architectural Review 384 04/30/13 City of Palo Alto - Development Center Architectural Review 216 July 23, 2013 05/31/13 City of Palo Alto _ Development Center Architectural Review 122,489 06/30/13 City of Palo Alto _ Development Center Architectural Review 636 Sept. 25, 2013 Sub-total - City (Inter-department) Service Charge - 123,725 - (123,725) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 - Sub-total - Miscellaneous Cost - - - - Grant Total 500,000 455,233 13,578 31,189 Art Center Temporary Library - Activity Details (Project # PE-11012) As of July 29, 2015 21 12345 6 7 8 (3 minus 1) (5 minus 1) (5 minus 4) (7 divide by 4) Measure N Estimates Changes in Measure Estimates Engineer's Estimate Project Budget November 2015 Projected Costs Diff. Between Measure N Estimates vs. Projected Costs $ Diff. Between Project Budget vs. Projected Costs % Diff. Between Project Budget vs. Projected Costs Downtown Library 4,000,000$ 1,212,000$ 5,212,000$ 4,212,000$ 4,197,961$ (197,961) 14,039$ 0.3% Mitchell Park & Community Center Library 50,000,000 (957,000) 49,043,000 47,725,437 45,034,851 4,965,149 2,690,586 5.6% Cubberley Temporary Library - 645,000 645,000 645,000 645,000 (645,000) (0)(0.0%) Rinconada (aka Main) Library *18,000,000 2,100,000 20,100,000 22,342,563 21,666,400 (3,666,400) 676,163 3.0% Art Center Temporary Library - 500,000 500,000 500,000 465,148 (465,148) 34,852 7.0% Total Prior to Bond Financing Costs 72,000,000 3,500,000 75,500,000 75,425,000 72,009,361 (9,361) 3,415,639 4.5% Bond Financing Costs **4,000,000 (3,500,000) 500,000 500,000 185,320 3,814,680 314,680 62.9% Grand Total 76,000,000$ -$ 76,000,000$ 75,925,000$ 72,194,681$ 3,805,319$ 3,730,319$ 4.9% Interest Earnings/Market Value Change on the Project Bond Funds 322,776$ Projected Bond Savings 4,053,095$ *The Rinconada Library Project Budget, Projected Costs, and actual expenditures excludes $500,000 in expenses for connectivity between the Library and the Art Center funded by PF-09007 and excludes $1,551,500 (S.J. Amoroso Construction) expenditures, currently both are being funded by the Infrastructure Reserve. ** The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Budget Original Budget (per Measure N Ballot Measure)72,000,000$ -$ -$ 72,000,000$ Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 645,000 Temporary Main Library Facility - Art Center Auditorium 500,000 500,000 Net Other Budget Changes 2,280,000 2,280,000 Expenditures - Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 60,841,282 572,249 (61,413,531) Construction Costs -- - Contract Contingency 7,559,063 - (7,559,063) Other Contract Services 2,025,378 - (2,025,378) City (Inter-department) Service Charge 501,463 - (501,463) Miscellaneous Cost 228,455 - (228,455) Total Library Projects Expenditures 75,425,000 71,155,641 572,249 3,697,110 Estimate of Pending Commitments/Costs - - 281,471 (281,471) Total Bond Funds Less Bond Financing Costs 75,425,000 71,155,641 853,720 3,415,639 4.5% Bond Financing Costs (a)500,000 185,320 - 314,680 62.9% Grand Total 75,925,000$ 71,340,961$ 853,720$ 3,730,319$ 4.9% Interest Earnings/Market Value Change on the Project Bond Funds 322,776 Projected Bond Savings 4,053,095 2010 GO Bond True Interest Cost (TIC)4.21% 2013 GO Bond True Interest Cost (TIC)3.85% ** The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Budget History and Projection Description of Activity Library Projects Budget to Actual Activities Summary Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of November 17, 2015 (Revised 3) 1 Attachment C Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of November 17, 2015 (Revised 3) Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 4,000,000$ -$ -$ 4,000,000$ Budget Change 212,000 212,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 3,617,992 40,890 (3,658,882) Construction Costs - - - - Contract Contingency - 462,490 - (462,490) Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost - 3,163 - (3,163) Total Library Projects Expenditures 4,212,000 4,157,071 40,890 14,039 Estimate of Pending Commitments/Costs - - - - Total Bond Funds Less Bond Financing Costs 4,212,000$ 4,157,071$ 40,890$ 14,039$ 0.3% Reasons for Budget Increase of:212,000$ 1) Seismic upgrade 30,000$ July 2010 2) Roof replacement 125,000 June 2011 3) LEED - Green building upgrades 100,000 4) Construction Management Services increase 400,000 5) Fixed Equipment 187,000 6) Moving costs deemed to be bondable costs 50,000 7) Contingency adjustment 320,000 8) Transfer to Main Library (1,000,000) Net Budget Change 212,000$ Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 50,000,000$ -$ -$ 50,000,000$ Budget Change (2,274,563) (2,274,563) Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 36,754,397 303,621 (37,058,018) Contract Contingency - 6,101,432 - (6,101,432) Other Contract Services - 1,232,201 - (1,232,201) City (Inter-department) Service Charge - 320,534 - (320,534) Miscellaneous Cost - 224,578 - (224,578) Total Library Projects Expenditures 47,725,437 44,633,141 303,621 2,788,675 Estimate of Pending Commitments/Costs 98,089 (98,089) Total Bond Funds Less Bond Financing Costs 47,725,437$ 44,633,141$ 401,710$ 2,690,586$ 5.6% Reasons for Budget Decrease of:(2,274,563)$ 1) LEED - Green building (Council approved) upgrades 1,200,000$ September 2010 2) Fixed Equipment 1,750,000 December 2014 3) Moving costs deemed to be bondable costs 100,000 4) Contingency adjustment (4,007,000) 5) Transfer to Main Library Project (1,317,563) Net Budget Change (2,274,563)$ Description of Activity Mitchell Park Library and Community Center Budget to Actual Activities Summary (PE-09006) Downtown Library Budget to Actual Activities Summary (PE-09005) Completed: Construction Began: Construction Began: Completed: Description of Activity 2 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of November 17, 2015 (Revised 3) Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure)18,000,000$ -$ -$ 18,000,000 Budget Change 4,342,563 4,342,563 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 19,661,166 227,738 (19,888,904) Contract Contingency - 955,198 - (955,198) Other Contract Services - 765,251 - (765,251) City (Inter-department) Service Charge - 456 - (456) Miscellaneous Cost - 590 - (590) Total Library Projects Expenditures 22,342,563 21,382,662 227,738 732,163 Estimate of Pending Commitments/Costs 56,000 (56,000) Total Bond Funds Less Bond Financing Costs 22,342,563$ 21,382,662$ 283,738$ 676,163$ 3.0% Reasons for Budget Increase of:4,342,563$ Lowest Accepted Bids Exceeded the Engineer's Estimates 4,342,563$ June 2013 November 2014 Net Budget Change 4,342,563$ *The Rinconada Library Project Budget, Projected Costs, and actual expenditures excludes $500,000 in expenses for connectivity between the Library and the Art Center funded by PF-09007 and excludes $1,551,500 (S.J. Amoroso Construction) expenditures, currently both are being funded by the Infrastructure Reserve. Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000$ -$ -$ 645,000$ Budget Change -$ - Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 467,777 - (467,777) Contract Contingency - 38,470 - (38,470) City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost - 125 - (125) Total Library Projects Expenditures 645,000 517,618 - 127,382 Estimate of Pending Commitments/Costs 127,382 (127,382) Total Bond Funds Less Bond Financing Costs 645,000$ 517,618$ 127,382$ (0)$ (0.0%) Description of Activity Cubberley Temporary Library Budget to Actual Activities Summary (PE-09010) Construction Began: Completed: Description of Activity Rinconada (aka Main) Library Budget to Actual Activities Summary (PE-11000) 3 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of November 17, 2015 (Revised 3) Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Main Library Facility - Art Center Auditorium 500,000$ -$ -$ 500,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 339,949 - (339,949) Contract Contingency - 1,474 - (1,474) Other Contract Services - City (Inter-department) Service Charge - 123,725 - (123,725) Miscellaneous Cost - - - - Total Library Projects Expenditures 500,000 465,148 - 34,852 Estimate of Pending Commitments/Costs - - Total Bond Funds Less Bond Financing Costs 500,000$ 465,148$ -$ 34,852$ 7.0% Description of Activity Art Center Temporary Library Budget to Actual Activities Summary (Project # PE-11012) 4 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure)4,000,000 Budget Change 212,000 Sub-total - 2010 Engineer's Budget Estimate 4,212,000 - - 4,212,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 418,563 08/24/10 Group 4 Architecture Research & Planning Architectural 362 09/21/10 Group 4 Architecture Research & Planning Architectural 135 08/03/10 Group 4 Architecture Research & Planning Architectural 16,233 08/03/10 Group 4 Architecture Research & Planning Architectural 56,000 08/10/10 Protech Consulting and Engineering Hazardous Material Testing 5,210 08/10/10 Turner Construction Company Construction Management Services 68,577 Oct. 21, 2010 Report 09/21/10 Group 4 Architecture Research & Planning Architectural 15 09/21/10 Group 4 Architecture Research & Planning Architectural 18,080 09/21/10 Group 4 Architecture Research & Planning Architectural 2,970 09/21/10 W.L. Butler Construction, Inc.Construction 93,177 10/05/10 Protech Consulting and Engineering Hazardous Material Testing 990 10/19/10 Group 4 Architecture Research & Planning Architectural 10,544 11/02/10 W. L. Butler Construction, Inc.Construction 69,984 11/02/10 Turner Construction Company Construction Management Services 27,984 11/02/10 Group 4 Architecture Research & Planning Architectural 11,864 12/07/10 Turner Construction Company Construction Management Services 55,174 12/07/10 Group 4 Architecture Research & Planning Architectural 11,688 Jan. 25, 2011 Report 12/07/10 W. L. Butler Construction, Inc.Construction 92,055 12/14/10 Group 4 Architecture Research & Planning Architectural 519 12/14/10 W. L. Butler Construction, Inc.Construction 159,940 01/04/11 Turner Construction Company Construction Management Services 27,984 01/07/11 Group 4 Architecture Research & Planning Architectural 11,688 01/21/11 West Coast Code Consultants, Inc.Plan Check 350 01/21/11 Turner Construction Company Construction Management Services 30,212 01/31/11 W. L. Butler Construction, Inc.Construction 211,220 02/18/11 W. L. Butler Construction, Inc.Construction 279,472 02/18/11 Group 4 Architecture Research & Planning Architectural 8,766 02/18/11 Turner Construction Company Construction Management Services 27,429 03/16/11 W. L. Butler Construction, Inc.Construction 277,033 April 26, 2011 Report 03/18/11 Group 4 Architecture Research & Planning Architectural 432 03/18/11 Group 4 Architecture Research & Planning Architectural 409 03/18/11 Group 4 Architecture Research & Planning Architectural 8,766 03/18/11 Group 4 Architecture Research & Planning Architectural 136 03/31/11 Pivot Interiors Design 2,250 03/31/11 Turner Construction Company Construction Management Services 17,808 04/07/11 Group 4 Architecture Research & Planning Architectural 13,149 04/19/11 Group 4 Architecture Research & Planning Architectural 2,795 04/25/11 W. L. Butler Construction, Inc.Construction 342,711 05/10/11 Turner Construction Company Construction Management Services 39,522 05/12/11 Group 4 Architecture Research & Planning Architectural 220 05/12/11 Group 4 Architecture Research & Planning Architectural 24,891 05/12/11 Group 4 Architecture Research & Planning Architectural 14,610 July 26, 2011 Report 05/17/11 Turner Construction Company Construction Management Services 28,334 05/27/11 W. L. Butler Construction, Inc.Construction 238,387 06/07/11 W. L. Butler Construction, Inc.Construction 352,713 06/07/11 Group 4 Architecture Research & Planning Architectural 14,610 06/09/11 Moovers, Inc.Moving Services 10,233 06/16/11 Group 4 Architecture Research & Planning Architectural 233 07/20/11 Group 4 Architecture Research & Planning Architectural 479 07/20/11 Group 4 Architecture Research & Planning Architectural 12,405 07/27/11 W.L. Butler Construction, Inc.Construction 157,980 07/27/11 Turner Construction Company Construction Management Services 26,028 08/31/11 Group 4 Architecture Research & Planning Architectural 19,560 October 25, 2011 Report 08/10/11 Group 4 Architecture Research & Planning Architectural 137 08/10/11 Group 4 Architecture Research & Planning Architectural 5,100 08/24/11 Turner Construction Company Construction Management Services 38,160 08/31/11 W.L. Butler Construction, Inc.Construction 137,659 09/14/11 Group 4 Architecture Research & Planning Architectural 2,550 09/14/11 Group 4 Architecture Research & Planning Architectural 1,116 12/07/11 Group 4 Architecture Research & Planning Architectural 5,100 10/19/11 Turner Construction Company Construction Management Services 1,176 12/21/11 Turner Construction Company Construction Management Services 3,806 January 18, 2012 11/09/11 Group 4 Architecture Research & Planning Architectural 1,146 12/07/11 W.L. Butler Construction, Inc.Construction 64,874 02/08/12 Group 4 Architecture Research & Planning Architectural 29 02/08/12 W.L. Butler Construction, Inc.Construction 22,796 02/22/12 Group 4 Architecture Research & Planning Architectural 8,408 March 28, 2012 Report 03/08/12 Group 4 Architecture Research & Planning Architectural 1,275 03/21/12 Group 4 Architecture Research & Planning Architectural 7 08/22/12 Group 4 Architecture Research & Planning Architectural 1,268 October 30, 2012 Report Downtown Library Activity Details (PE-09005) As of November 17, 2015 (Revised 3) 5 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Downtown Library Activity Details (PE-09005) As of November 17, 2015 (Revised 3) 10/03/12 Group 4 Architecture Research & Planning Architectural 71 01/09/13 Turner Construction Company Construction Management Services 434 January 23, 2013 Report Group 4 Architecture Research Architectural 40,890 Sub-total - Engineering and Architectural Costs - 3,617,992 40,890 (3,658,882) Contract Contingency Summary of Expenditures as of July 21, 2010 19,140 10/19/10 Group 4 Architecture Research & Planning Architectural 660 10/19/10 Group 4 Architecture Research & Planning Architectural 4,070 Oct. 21, 2010 Report 08/27/10 Asbestos Management Group Hazardous Material Testing 2,500 02/28/11 City of Palo Alto - Planning Plan Check Fee 93 April 26, 2011 Report 02/18/11 W. L. Butler Construction, Inc.Construction 15,686 04/25/11 W. L. Butler Construction, Inc.Construction 59,235 05/27/11 W. L. Butler Construction, Inc.Construction 163,149 07/01/11 Turner Construction Company Construction Management Services 1,123 July 26, 2011 Report 07/01/11 Turner Construction Company Construction Management Services 24,611 06/07/11 Group 4 Architecture Research & Planning Architectural 5,104 06/07/11 Group 4 Architecture Research & Planning Architectural 3,489 07/27/11 Group 4 Architecture Research & Planning Architectural 9,339 October 25, 2011 Report 08/31/11 W. L. Butler Construction, Inc.Construction 13,299 03/08/12 Group 4 Architecture Research & Planning Architectural 4,094 March 28, 2012 Report 02/08/12 W. L. Butler Construction, Inc.Construction 113,631 09/19/12 W. L. Butler Construction, Inc.Construction 10,000 October 30, 2012 Report 01/09/13 Turner Construction Company Construction Management Services 13,266 January 23, 2013 Report Sub-total - Contract Contingency - 462,490 - (462,490) Other Contract Services Summary of Expenditures as of July 21, 2010 2,225 08/27/10 Asbestos Management Group Hazardous Material Testing 25,700 Oct. 21, 2010 Report Sub-total - Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 43,990 07/13/11 City of Palo Alto - Public Works Parking Permit 230 October 25, 2011 Report 07/13/11 City of Palo Alto - Public Works Parking Permit 420 10/31/10 City of Palo Alto - Planning Plan Checking 861 Jan. 25, 2011 Report Sub-Total - City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,158 04/10/11 Santa Clara County Downtown-Notice of Completion Filing Fee 5 January 18, 2012 Report Sub-total - Miscellaneous Cost - 3,163 - (3,163) Grant Total 4,212,000 4,157,071 40,890 14,039 6 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 50,000,000$ Budget Change (2,274,563) Sub-total - 2010 Engineer's Budget Estimate 47,725,437 - - 47,725,437 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 3,101,748 08/03/10 Group 4 Architecture Research & Planning Architectural 37,609 08/10/10 Group 4 Architecture Research & Planning Architectural 18,595 10/05/10 Group 4 Architecture Research & Planning Architectural 7,522 10/05/10 Group 4 Architecture Research & Planning Architectural 13,942 10/05/10 Group 4 Architecture Research & Planning Architectural 2,971 07/27/10 Moovers, Inc. Moving Services 435 09/21/10 Turner Construction Company Construction Management Services 163,918 10/19/10 Group 4 Architecture Research & Planning Architectural 47,110 10/19/10 State Water Resources Control Board Submitting Permit Registration Documents 375 Oct. 21, 2010 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 18,517 08/03/10 Peninsula Digital Imaging Reproduction Services 3,066 08/03/10 Peninsula Digital Imaging Reproduction Services 2,401 08/03/10 Peninsula Digital Imaging Reproduction Services 5,105 08/03/10 Peninsula Digital Imaging Reproduction Services 2,119 11/02/10 Bank of Sacramento - Flintco Pacific Escrow Construction 86,542 11/02/10 Flintco Pacific, Inc. Construction 778,876 11/02/10 Group 4 Architecture Research & Planning Architectural 1,037 12/07/10 Turner Construction Company Construction Management Services 635 12/07/10 Turner Construction Company Construction Management Services 70,780 12/07/10 Turner Construction Company Construction Management Services 64,319 12/07/10 Protech Consulting and Engineering Hazardous Material Testing 8,385 12/07/10 Peninsula Digital Imaging Reproduction Services 7,672 12/14/10 West Coast Code Consultants, Inc. Plan Check 26,820 12/14/10 Group 4 Architecture Research & Planning Architectural 46,200 Jan. 25, 2011 Report 12/21/10 Group 4 Architecture Research & Planning Architectural 46,297 12/21/10 Flintco Pacific, Inc. Construction 732,895 12/21/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 81,433 12/28/10 Flintco Pacific, Inc. Construction 757,231 12/28/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 84,137 01/04/11 Group 4 Architecture Research & Planning Architectural 2,942 01/04/11 Group 4 Architecture Research & Planning Architectural 4,564 01/04/11 Turner Construction Company Construction Management Services 73,919 1/21/2011 Group 4 Architecture Research & Planning Architectural 267 1/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 1/21/2011 Turner Construction Company Construction Management Services 105,917 2/1/2011 Flintco Pacific, Inc.Construction 1,098,865 2/1/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 126,732 2/18/2011 Flintco Pacific, Inc.Construction 1,497,190 2/18/2011 Turner Construction Company Construction Management Services 94,502 2/18/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 193,977 2/24/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,820 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,680 3/16/2011 West Coast Code Consultants, Inc.Plan Check (560) 3/16/2011 West Coast Code Consultants, Inc.Plan Check 560 April 26, 2011 Report 3/16/2011 Protech Consulting and Engineering Hazardous Material Testing 1,250 3/17/2011 West Coast Code Consultants, Inc.Plan Check 560 3/18/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/31/2011 Flintco Pacific, Inc.Construction 446,177 3/31/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 76,548 3/31/2011 Turner Construction Company Construction Management Services 94,572 4/11/2011 Group 4 Architecture Research & Planning Architectural 4,219 4/11/2011 Group 4 Architecture Research & Planning Architectural 127 4/11/2011 Group 4 Architecture Research & Planning Architectural 7,366 4/11/2011 Group 4 Architecture Research & Planning Architectural 80,956 4/20/2011 West Coast Code Consultants, Inc.Plan Check 140 4/20/2011 West Coast Code Consultants, Inc.Plan Check 280 4/20/2011 West Coast Code Consultants, Inc.Plan Check 560 3/29/2011 Palo Alto Stores Supplies/Parts 1,342 4/25/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 85,140 4/25/2011 Flintco Pacific, Inc.Construction 766,263 4/26/2011 Group 4 Architecture Research & Planning Architectural 2,528 5/10/2011 Turner Construction Company Construction Management Services 82,594 5/12/2011 Group 4 Architecture Research & Planning Architectural 683 5/12/2011 Group 4 Architecture Research & Planning Architectural 80,956 5/17/2011 Turner Construction Company Construction Management Services 101,701 5/17/2011 Flintco Pacific, Inc.Construction 815,307 July 26, 2011 Report 5/17/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 93,874 5/17/2011 Flintco Pacific, Inc.Construction 29,559 7/1/2011 Turner Construction Company Construction Management Services 99,493 Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 7 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 7/1/2011 Group 4 Architecture Research & Planning Architectural 19,540 7/1/2011 Group 4 Architecture Research & Planning Architectural 3,109 7/1/2011 Group 4 Architecture Research & Planning Architectural 17,038 7/1/2011 Group 4 Architecture Research & Planning Architectural 92,521 July 26, 2011 Report 7/1/2011 Group 4 Architecture Research & Planning Architectural 8,314 7/5/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 125,101 7/5/2011 Flintco Pacific, Inc.Construction 1,125,909 7/27/2011 Group 4 Architecture Research & Planning Architectural 57,826 7/27/2011 Group 4 Architecture Research & Planning Architectural 13,045 7/27/2011 Group 4 Architecture Research & Planning Architectural 1,954 7/27/2011 Flintco Pacific, Inc.Construction 2,316,525 7/27/2011 Flintco Inc. Escrow Construction 257,391 7/27/2011 Turner Construction Company Construction Management Services 127,367 October 25, 2011 Report 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,898 10/5/2011 Group 4 Architecture Research & Planning Architectural 57,826 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,647 10/5/2011 Flintco Pacific, Inc.Construction 483,144 10/5/2011 Flintco, Inc. Escrow Construction 53,683 10/19/2011 Turner Construction Company Construction Management Services 170,058 11/2/2011 Flintco Pacific, Inc.Construction 705,850 11/2/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/2/2011 Group 4 Architecture Research & Planning Architectural 2,060 11/2/2011 Flintco Pacific, Inc.Construction 78,428 11/30/2011 West Coast Code Consultants, Inc.Plan Check 420 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 Group 4 Architecture Research & Planning Architectural 2,051 11/30/2011 West Coast Code Consultants, Inc.Plan Check 700 January 18, 2012 Report 11/30/2011 Flintco Pacific, Inc.Construction 119,803 11/30/2011 Group 4 Architecture Research & Planning Architectural 1,722 11/30/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/30/2011 Group 4 Architecture Research & Planning Architectural 4,789 11/30/2011 Flintco, Inc. Escrow Construction 837,115 12/21/2011 Turner Construction Company Construction Management Services 187,775 12/21/2011 Turner Construction Company Construction Management Services 129,453 12/21/2011 Turner Construction Company Construction Management Services 233,061 12/21/2011 Turner Construction Company Construction Management Services 2,385 12/21/2011 Turner Construction Company Construction Management Services 109 12/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 2/29/2012 West Coast Code Consultants, Inc.Plan Check 200 2/29/2012 Group 4 Architecture Research & Planning Architectural 1,600 3/21/2012 Group 4 Architecture Research & Planning Architectural 3,457 3/21/2012 Group 4 Architecture Research & Planning Architectural 19,603 2/1/2012 Flintco Pacific, Inc.Construction 940,940 2/1/2012 Flintco Pacific, Inc.Construction 104,549 2/1/2012 Group 4 Architecture Research & Planning Architectural 46,261 2/1/2012 Group 4 Architecture Research & Planning Architectural 654 March 28, 2012 Report 2/8/2012 Group 4 Architecture Research & Planning Architectural 6,417 2/24/2012 Turner Construction Company Construction Management Services 147,880 1/18/2012 Flintco Pacific, Inc.Construction 458,653 1/18/2012 Flintco Pacific, Inc.Construction 50,961 2/29/2012 Group 4 Architecture Research & Planning Architectural 46,261 3/21/2012 Flintco Pacific, Inc.Construction 722,810 3/21/2012 Flintco Pacific, Inc.Construction 80,312 3/21/2012 Group 4 Architecture Research & Planning Architectural 26,657 4/4/2012 Flintco Pacific, Inc.Construction 95,581 4/4/2012 Flintco Pacific, Inc. Escrow Construction 17,187 4/18/2012 Turner Construction Company Construction Management Services 129,709 4/18/2012 Turner Construction Company Construction Management Services 118,875 4/18/2012 Group 4 Architecture Research & Planning Architectural 2,100 4/18/2012 Group 4 Architecture Research & Planning Architectural 23,130 4/18/2012 Turner Construction Company Construction Management Services 120,219 5/9/2013 Sierra Traffic Markings Inc.Construction 7,990 5/9/2012 Group 4 Architecture Research & Planning Architectural 16,191 5/16/2012 Flintco Pacific, Inc.Construction 254,477 5/16/2012 Flintco Pacific, Inc. Escrow Construction 28,395 5/16/2012 Group 4 Architecture Research & Planning Architectural 2,069 5/16/2012 Group 4 Architecture Research & Planning Architectural 9,511 5/16/2012 Turner Construction Company Construction Management Services 116,415 6/20/2012 Group 4 Architecture Research & Planning Architectural 2,551 6/20/2012 Group 4 Architecture Research & Planning Architectural 16,191 July 5, 2012 Report 6/20/2012 Flintco Pacific, Inc.Construction 189,316 6/20/2012 Flintco Pacific, Inc. Escrow Construction 22,270 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 1,680 8 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 Flintco Pacific, Inc. Escrow Construction 20,813 7/5/2012 Flintco Pacific, Inc.Construction 173,537 7/25/2012 Group 4 Architecture Research & Planning Architectural 762 7/25/2012 Group 4 Architecture Research & Planning Architectural 16,191 8/8/2012 Flintco Pacific, Inc.Construction 11,297 8/8/2012 Group 4 Architecture Research & Planning Architectural 16,191 October 30, 2012 Report 8/8/2012 Flintco Pacific, Inc.Construction 85,728 8/22/2012 Group 4 Architecture Research & Planning Architectural 280 9/26/2012 Group 4 Architecture Research & Planning Architectural 84,027 10/3/2012 Group 4 Architecture Research & Planning Architectural 16,191 10/10/2012 Turner Construction Company Construction 22,926 11/14/2012 Group 4 Architecture Research & Planning Architectural 20,325 11/19/2012 West Coast Code Consultants, Inc.Plan Check 350 11/19/2012 Flintco Pacific, Inc.Construction 383,239 11/19/2012 Flintco Pacific, Inc.Construction 88,321 11/19/2012 West Coast Code Consultants, Inc.Plan Check 420 12/12/2012 Flintco Pacific, Inc.Construction 608,951 12/12/2012 Flintco Pacific, Inc.Construction 81,614 12/12/2012 Flintco Pacific, Inc.Construction 505,497 12/12/2012 Flintco Pacific, Inc.Construction 96,133 12/19/2012 Group 4 Architecture Research & Planning Architectural 93,220 January 23, 2013 Report 12/19/2012 Group 4 Architecture Research & Planning Architectural 30,758 12/26/2012 Flintco Pacific, Inc.Construction 13,946 12/26/2012 Flintco Pacific, Inc.Construction 31,893 12/26/2012 Turner Construction Company Construction Management Services 270,207 12/26/2012 Turner Construction Company Construction Management Services 754,125 12/26/2012 Flintco Pacific, Inc.Construction 9,728 12/26/2012 Flintco Pacific, Inc.Construction 14,250 1/23/2013 West Coast Code Consultants, Inc.Plan Check 160 1/23/2013 West Coast Code Consultants, Inc.Plan Check 560 1/23/2013 Group 4 Architecture Research & Planning Architectural 626 1/23/2013 Group 4 Architecture Research & Planning Architectural 783 2/6/2013 Group 4 Architecture Research & Planning Architectural 68,238 2/20/2013 Group 4 Architecture Research & Planning Architectural 38,341 April 12, 2013 3/6/2013 Group 4 Architecture Research & Planning Architectural 2,775 4/3/2013 Group 4 Architecture Research & Planning Architectural 73,745 06/12/13 Flintco Pacific, Inc.Construction 59,916 06/12/13 Flintco Pacific, Inc.Construction 31,230 06/12/13 Flintco Pacific, Inc.Construction 27,261 06/12/13 Flintco Pacific, Inc.Construction 12,816 04/08/13 Flintco Pacific, Inc.Construction 249,800 04/08/13 Flintco Pacific, Inc.Construction 184,896 04/08/13 Flintco Pacific, Inc.Construction 29,765 05/03/13 Flintco Pacific, Inc.Construction 350,886 July 23, 2013 04/24/13 Group 4 Architecture Research & Planning Architectural 91,837 04/24/13 Group 4 Architecture Research & Planning Architectural 450 06/05/13 Group 4 Architecture Research & Planning Architectural 50,003 05/01/13 Ross McDonald Company, Inc.Construction Services 495,000 04/24/13 West Coast Code Consultants, Inc.Plan Check 320 06/17/13 Flintco Pacific, Inc.Construction 142,218 06/19/13 Flintco Pacific, Inc.Construction 27,637 06/26/13 Group 4 Architecture Research & Planning Architectural 73,498 07/17/13 Group 4 Architecture Research & Planning Architectural 46,031 07/19/13 Flintco Pacific, Inc.Construction 106,656 07/31/13 Flintco Pacific, Inc.Construction 34,269 08/07/13 Flintco Pacific, Inc.Construction 72,222 08/14/13 Group 4 Architecture Research & Planning Architectural 46,080 08/14/13 Flintco Pacific, Inc.Construction 8,025 Sept. 25, 2013 08/22/13 Flintco Pacific, Inc.Construction 500,976 08/28/13 Flintco Pacific, Inc.Construction 73,759 09/11/13 Group 4 Architecture Research & Planning Architectural 58,299 09/25/13 Turner Construction Company Construction Management Services 65,864 09/25/13 Sign & Services Company Construction Services 66,903 09/30/13 Flintco Pacific, Inc.Construction 564,671 10/02/13 Turner Construction Company Construction Management Services 450,004 10/02/13 Flintco Pacific, Inc.Construction 70,944 10/09/13 Group 4 Architecture Research & Planning Architectural 66,584 10/11/13 Flintco Pacific, Inc.Construction 580,658 10/30/13 Flintco Pacific, Inc.Construction 64,518 11/13/13 Moovers, Inc.Moving Services 2,280 December 24, 2013 9 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 11/13/13 Sign & Services Company Construction Services 94,813 11/20/13 Turner Construction Company Construction Management Services 143,602 12/05/13 Group 4 Architecture Research & Planning Architectural 54,193 12/11/13 Turner Construction Company Construction Management Services 158,901 12/11/13 Sign & Services Company Construction Services 76,096 12/18/13 Turner Construction Company Construction Management Services 134,322 12/18/13 Ross McDonald Company, Inc.Construction Services 47,705 12/23/13 Group 4 Architecture Research & Planning Architectural 47,490 02/26/14 Group 4 Architecture Research & Planning Architectural 44 01/22/14 Group 4 Architecture Research & Planning Architectural 4,556 02/26/14 Group 4 Architecture Research & Planning Architectural 674 02/26/14 Group 4 Architecture Research & Planning Architectural 37,815 04/02/14 Group 4 Architecture Research & Planning Architectural 19,826 01/22/14 Sign & Services Company Construction Services 106,141 April 16, 2014 02/26/14 Sign & Services Company Construction Services 57,626 02/12/14 Envision Ware, Inc.Professional services 19,365 02/12/14 Envision Ware, Inc.Professional services 422,298 04/02/14 Turner Construction Company Construction Management Services 136,132 04/02/14 Turner Construction Company Construction Management Services 143,257 04/02/14 Turner Construction Company Construction Management Services 102,807 01/29/14 Moovers, Inc.Moving Services 1,000 05/21/14 Moovers, Inc.Moving Services 580 03/05/14 Ross McDonald Company, Inc.Construction Services 54,891 03/31/14 Return of Flintco Escrow (Previously Expensed)(2,628,576) 05/14/14 Group 4 Architecture Research & Planning Architectural 12,284 05/21/14 Moovers, Inc.Moving Services 1,544 July 2, 2014 05/28/14 Turner Construction Company Construction Management Services 130,209 05/28/14 Turner Construction Company Construction Management Services 110,969 05/28/14 Muzak LLC Construction Services 100,317 05/23/14 Protech Consulting and Engineering Hazardous Material Testing 1,540 06/11/14 Group 4 Architecture Research & Planning Architectural 18,326 06/18/14 Turner Construction Company Construction Management Services 109,939 12/23/13 One Workplace L Ferrari Storage 7,010 03/31/14 Envision Ware, Inc.Sorter System 973 06/26/13 Group 4 Architecture Research & Planning Architectural 73,498 10/22/14 Moovers, Inc.Moving Services 213 10/22/14 Moovers, Inc.Moving Services 924 10/22/14 Moovers, Inc.Moving Services 14,463 10/22/14 Moovers, Inc.Moving Services 472 11/12/14 Turner Construction Company Construction Management Services 104,843 January 14, 2015 12/03/14 Group 4 Architecture Research & Planning Architectural 64,500 12/17/14 Turner Construction Company Construction Management Services 11,809 12/17/14 Turner Construction Company Construction Management Services 24,983 12/29/14 Flintco Pacific, Inc.Settlement agreement ($4 million less $100,000)3,900,000 03/18/15 Turner Construction Company Construction Management Services 1,576 12/18/15 Sign & Services Company Construction Services 19,242 12/18/15 Sign & Services Company Construction Services 23,098 April 22, 2015 03/18/15 Turner Construction Company Construction Management Services 26,867 02/25/15 Turner Construction Company Construction Management Services 28,964 11/25/14 Turner Construction Company Construction Management Services 105,599 03/20/15 Turner Construction Company Construction Management Services 491,145 04/29/15 Group 4 Architecture Research & Planning Architectural 4,300 06/10/15 Turner Construction Company Construction Management Services 30,000 July 29, 2015 07/15/15 Muzak LLC Construction Services 250 07/15/15 Muzak LLC Construction Services 781 10/14/15 Flintco Pacific, Inc.Construction Services 85,000 November 17, 2015 11/17/15 Mood Media (formerly Muzak LLC)Construction Services 250 Group 4 Architecture Research & Planning Architectural 54,016 Ross McDonald Company, Inc.Construction Services 115,816 One Workplace L Ferrari Storage 18,497 Mood Media (formerly Muzak LLC)Construction Services 47,890 Ginn and Crosby, LLC Legal Services 16,302 Lloyd F. McKinney Associates, Inc.Legal Services 1,100 Spring Electric Company Construction Services 50,000 Sub-total - Engineering Costs - 36,754,397 303,621 (37,058,018) Contract Contingency Summary of Expenditures as of July 21, 2010 104,373 08/03/10 Group 4 Architecture Research & Planning Architectural 1,771 10/05/10 Group 4 Architecture Research & Planning Architectural 25,951 Jan. 25, 2011 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 10,740 2/1/2011 Flintco Pacific, Inc.Construction 41,725 2/18/2011 Flintco Pacific, Inc.Construction 248,603 April 26, 2011 Report 3/31/2011 Flintco Pacific, Inc.Construction 242,754 8/31/2011 W. L. Butler Construction, Inc.Construction 22,713 10 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 8/24/2011 Flintco Pacific, Inc.Construction 987,123 8/24/2011 Turner Construction Company Construction Management Services 151,367 8/24/2011 Flintco Inc. Escrow Construction 117,936 8/24/2011 Group 4 Architecture Research & Planning Architectural 48,250 October 25, 2011 Report 8/24/2011 Group 4 Architecture Research & Planning Architectural 57,826 8/24/2011 Flintco Pacific, Inc.Construction 74,304 10/5/2011 Group 4 Architecture Research & Planning Architectural 37,306 11/30/2011 Group 4 Architecture Research & Planning Architectural 20,266 January 18, 2012 11/30/2011 Flintco Pacific, Inc.Construction 241,110 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560 2/29/2012 West Coast Code Consultants, Inc.Plan Check 360 March 28, 2012 Report 3/8/2012 Group 4 Architecture Research & Planning Architectural 9,937 2/29/2012 Turner Construction Company Construction Management Services 39,360 3/21/2012 Flintco Pacific, Inc.Construction 104,819 3/21/2012 Flintco Pacific, Inc.Construction 11,647 4/18/2012 Turner Construction Company Construction Management Services 656 4/4/2012 Group 4 Architecture Research & Planning Architectural 91,383 5/23/2012 Group 4 Architecture Research & Planning Architectural 25,039 7/5/2012 Group 4 Architecture Research & Planning Architectural 12,871 4/4/2012 Flintco Pacific, Inc.Construction 59,097 July 5, 2012 Report 5/16/2012 Flintco Pacific, Inc.Construction 1,077 6/20/2012 Turner Construction Company Construction Management Services 137,683 6/20/2012 Flintco Pacific, Inc.Construction 11,109 7/5/2012 Flintco Pacific, Inc.Construction 13,783 7/11/2012 Group 4 Architecture Research & Planning Architectural 65,495 8/22/2012 Group 4 Architecture Research & Planning Architectural 80,924 8/8/2012 Flintco Pacific, Inc.Construction 15,943 October 30, 2012 Report 10/3/2012 Turner Construction Company Construction Management Services 298,983 10/31/2012 Group 4 Architecture Research & Planning Architectural 1,578 12/26/2012 Group 4 Architecture Research & Planning Architectural 3,053 11/19/2012 Flintco Pacific, Inc.Construction 411,653 12/12/2012 Flintco Pacific, Inc.Construction 125,571 January 23, 2013 Report 12/12/2012 Flintco Pacific, Inc.Construction 359,703 12/26/2012 Flintco Pacific, Inc.Construction 73,605 12/26/2012 Flintco Pacific, Inc.Construction 96,352 04/08/13 Flintco Pacific, Inc.Construction 60,449 04/08/13 Flintco Pacific, Inc.Construction 31,269 04/08/13 Flintco Pacific, Inc.Construction 85,582 July 23, 2013 05/03/13 Flintco Pacific, Inc.Construction 188,366 05/01/13 4LEAF, Inc.Building Inspection 6,993 05/08/13 4LEAF, Inc.Building Inspection 8,381 07/19/13 Flintco Pacific, Inc.Construction 201,760 08/22/13 Flintco Pacific, Inc.Construction 162,856 08/07/13 4LEAF, Inc.Building Inspection 13,764 Sept. 25, 2013 08/07/13 4LEAF, Inc.Building Inspection 14,708 08/07/13 4LEAF, Inc.Building Inspection 11,045 09/18/13 4LEAF, Inc.Building Inspection 16,706 6/14/2013 Flintco Pacific, Inc.Construction 106,512 9/25/2013 Sign & Services Company Construction Services 40,944 December 24, 2013 9/30/2013 Flintco Pacific, Inc.Construction 73,825 1/22/2014 Group 4 Architecture Research & Planning Architectural 34,885 4/2/2014 Group 4 Architecture Research & Planning Architectural 12,600 4/16/2014 Group 4 Architecture Research & Planning Architectural 19,893 April 16, 2014 2/5/2014 4LEAF, Inc.Building Inspection 14,930 3/5/2014 4LEAF, Inc.Building Inspection 12,654 3/26/2014 4LEAF, Inc.Building Inspection 999 41850 Group 4 Architecture Research & Planning Architectural 32,543 9/3/2014 Group 4 Architecture Research & Planning Architectural 43,002 9/3/2014 Group 4 Architecture Research & Planning Architectural 16,172 9/17/2014 Group 4 Architecture Research & Planning Architectural 14,330 8/13/2014 Moovers, Inc.Moving Services 2,110 7/16/2014 Muzak LLC Construction Services 29,763 9/17/2014 Muzak LLC Construction Services 42,741 October 8, 2014 7/30/2014 Turner Construction Company Construction Management Services 107,060 9/3/2014 Turner Construction Company Construction Management Services 101,438 9/24/2014 Turner Construction Company Construction Management Services 74,899 10/8/2014 Group 4 Architecture Research & Planning Architectural 14,340 7/23/2014 4LEAF, Inc.Building Inspection 5,994 9/14/2014 4LEAF, Inc.Building Inspection 3,618 10/22/2014 Moovers, Inc.Moving Services 4,797 January 14, 2015 12/10/2014 4LEAF, Inc.Building Inspection 910 April 22, 2015 Sub-total - Contract Contingency - 6,101,432 - (6,101,432) Other Contract Services 11 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) Summary of Expenditures as of July 21, 2010 93,750 07/01/11 FedEx Mailing 89 08/26/10 Bruce Beasley Sculpture 90,000 Oct. 21, 2010 Report 09/30/11 FedEx Coding Error Correction (89) October 25, 2011 Report 11/16/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services - Mitchell Park Library 3,776 12/21/11 ZFA Structural Engineers Mitchell Library Review 2,925 12/29/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 11,170 January 18, 2012 Report 12/29/11 State Water Resource Board Permit 505 02/08/12 Riedinger Consulting Outside Counsel 9,136 01/25/12 ZFA Structural Engineers Mitchell Library Review 9,289 01/25/12 ZFA Structural Engineers Mitchell Library Review 3,118 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,625 March 28, 2012 Report 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 9,960 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 10,423 03/14/12 Envision Ware, Inc.Professional services 5,850 04/04/12 ZFA Structural Engineers Mitchell Library Review 2,518 04/04/12 Riedinger Consulting Outside Counsel 28,371 04/04/12 Riedinger Consulting Outside Counsel 10,235 04/04/12 Riedinger Consulting Outside Counsel 24,585 05/09/12 Jam Services 3,897 July 5, 2012 Report 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,647 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 5,212 06/13/12 ZFA Structural Engineers Mitchell Library Review 1,732 06/20/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 4,549 06/20/12 Blackstone Discovery Legal Services for Mitchell Park Library 319 08/15/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 35,618 09/12/12 County of Santa Clara Mitchell Snack Bar - Environmental Health 220 October 30, 2012 Report 09/12/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 30,348 09/05/12 Bruce Beasley Sculpture 1,900 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 15,610 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 38,608 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 33,684 January 23, 2013 Report 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 77,708 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 12 03/26/14 3M Library Systems Library Self Check Stations 258 01/16/13 3M Library Systems Library Self Check Stations 80,578 3/20/2013 Bruce Beasley Sculpture 40,000 02/13/13 Ginn and Crosby, LLC Legal Services 1,272 02/13/13 Ginn and Crosby, LLC Legal Services 48 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 49,268 April 12, 2013 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 13,517 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 12,961 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 132,792 07/31/13 Ginn and Crosby, LLC Legal Services 2,688 07/31/13 Ginn and Crosby, LLC Legal Services 8,016 Sept. 25, 2013 10/30/13 Bruce Beasley Sculpture 50,000 December 24, 2013 02/05/14 Ginn and Crosby, LLC Legal Services 8,376 02/12/14 Ginn and Crosby, LLC Legal Services 7,111 April 16, 2014 03/26/14 Ginn and Crosby, LLC Legal Services 4,224 06/18/14 Ginn and Crosby, LLC Legal Services 1,248 06/18/14 Ginn and Crosby, LLC Legal Services 2,304 01/15/14 Ginn and Crosby, LLC Legal Services 14,952 02/26/14 National Construction Rentals Natl. Const. Rentals/Fencing & windscreen 2,317 03/05/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 638 03/05/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 635 July 2, 2014 03/12/14 United Site Services, Inc.Rental of Portable Toilets & Temporary Fencing 251 04/30/14 Ginn and Crosby, LLC Legal Services 1,044 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 06/18/14 Mobile Modular Management Corp.Rental of Trailers 759 12/23/13 One Workplace L Ferrari Additional Storage (Reduction in Exp. from prev. drawdown) (8,890) 7/23/2014 Ginn and Crosby, LLC Legal Services 1,169 07/16/14 Contract Office Group, Inc.Storage 600 07/16/14 Contract Office Group, Inc.Storage 600 October 8, 2014 08/27/14 Ginn and Crosby, LLC Legal Services 25,430 09/17/14 Ginn and Crosby, LLC Legal Services 32,279 08/15/14 National Construction Rentals Natl. Const. Rentals/Fencing & windscreen 416 11/24/14 BIG-D Pacific Builders, LP Fence reimbursement (3,341) 11/05/14 Ginn and Crosby, LLC Legal Services 23,691 11/19/14 Ginn and Crosby, LLC Legal Services 25,544 January 14, 2015 11/25/14 Envision Ware, Inc.Professional services 27,400 12/17/14 Ginn and Crosby, LLC Legal Services 7,272 02/18/15 Ginn and Crosby, LLC Legal Services 2,352 11/24/14 National Construction Rentals Natl. Const. Rentals/Fencing & windscreen 193 09/24/14 National Construction Rentals Natl. Const. Rentals/Fencing & windscreen 416 12/31/14 All Fence Company Inc.Fence 1,525 12/18/14 The Preferred Image Signs 2,291 12 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 02/11/15 Ginn and Crosby, LLC Legal Services 3,330 April 22, 2015 03/25/15 Envision Ware, Inc.Professional services 1,061 02/06/15 Orchard Supply Locks 35 02/06/15 Amazon.com Signs 42 01/26/15 Deposits In Trans WF Misc.59 10/20/14 Sunnyvale Windustrial Construction materials 1,427 02/04/15 Santa Clara County Completion Filing Fee 5 03/25/15 Envision Ware, Inc.Professional services 20,047 06/17/15 One Workplace L Ferrari Storage 35,344 06/10/15 Ginn and Crosby, LLC Legal Services 1,152 05/05/15 Media Center AV System Modifications 150 July 29, 2015 05/01/15 Orchard Supply Construction materials 3,169 05/08/15 The Home Depot Construction materials 211 04/21/15 California Paint Company Construction materials 66 09/30/15 JP Morgan P-Card (will be replaced by actual vendor name)4,003 07/31/15 JP Morgan P-Card (will be replaced by actual vendor name)1,788 08/31/15 JP Morgan P-Card (will be replaced by actual vendor name)256 November 17, 2015 08/31/15 JP Morgan P-Card (will be replaced by actual vendor name)153 03/31/15 JP Morgan P-Card (will be replaced by actual vendor name)5,845 07/31/15 JP Morgan P-Card (will be replaced by actual vendor name)39 Sub-total - Other Contract Services - 1,232,201 - (1,232,201) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 176,008 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Library - Bldg A 70,153 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Teen Center - Bldg B 10,768 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Multipurpose Center - Bldg C 21,184 Oct. 21, 2010 Report 09/30/10 City of Palo Alto - Planning Demolition Permit MPL - 3700 Middlefield 525 09/30/10 City of Palo Alto - Planning Demolition Permit MPCC - 3800 Middlefield 525 09/28/10 City of Palo Alto - Planning Permit (Grading and Fill)1,830 10/31/10 City of Palo Alto - Planning Revision permit for Mitchell Park Library & CC 141 11/16/10 City of Palo Alto - Planning Architectural Review Board Fees 2,090 Jan. 25, 2011 Report 01/31/11 Palo Alto Stores Supplies/Parts 101 03/31/11 Palo Alto Stores Supplies/Parts 97 03/31/11 Palo Alto Stores Supplies/Parts 4,045 April 26, 2011 Report 03/31/11 Palo Alto Stores Supplies/Parts 89 03/31/11 Palo Alto Stores Supplies/Parts 661 06/14/10 Palo Alto Stores Reversal of Prior Charges (2,834) 03/29/11 Palo Alto Stores Reversal of Prior Charges (628) 03/30/11 Palo Alto Stores Reversal of Prior Charges (571) July 26, 2011 Report 04/04/11 Palo Alto Stores Reversal of Prior Charges (143) 04/30/11 City of Palo Alto - Public Works Underground Fire Supply/Hydrant Permit Fee 1,335 07/06/11 City of Palo Alto - Development Center Plan Check Fee 93 07/06/11 City of Palo Alto - Planning Plan Check Fee 89 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 137 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 October 25, 2011 Report 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 121 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 145 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 277 08/31/11 City Of Palo Alto - Planning Mitchell Library Plan Check 40 09/30/11 City of Palo Alto - Planning Mitchell Library - Permit Revision 89 10/31/11 City of Palo Alto - Development Center Plan Check Fee 113 January 18, 2012 10/31/11 City of Palo Alto - Development Center Plan Check Fee 325 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 97 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 109 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 85 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 4,056 March 28, 2012 12/31/11 City of Palo Alto - Planning Plan Review - modify permit 93 12/21/11 City of Palo Alto - Planning Plan Review - modify permit 85 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 89 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 121 04/25/12 City of Palo Alto - Stores Inventory Conduit, Rigid Steel T/C 10Ft length 2"181 04/25/12 City of Palo Alto - Stores Inventory Pipes - Valves - Fitting 4 04/30/12 City of Palo Alto - Planning Plan Review (Electrical Veh. Chargers permit)977 05/16/12 City of Palo Alto - Planning Plan Review (Ceiling Structural Chgs.) - Mitchell 344 05/16/12 City of Palo Alto - Planning Plan Review (foundation, framing, plumbing) - Mitchell Park L 364 July 5, 2012 05/16/12 City of Palo Alto - Planning Plan Review (Solar Water Heater) - Mitchell Park Library 165 05/16/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 05/31/12 City of Palo Alto - Planning MP -Plan Review for electrical signage permit 112 13 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of November 17, 2015 (Revised 3) 06/28/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 300 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 151 October 30, 2012 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 89 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 11/30/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 116 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 7 January 23, 2013 Report 03/31/13 City of Palo Alto - Development Center Architectural Review 92 April 12, 2013 04/17/13 Ginn and Crosby, LLC Legal Services 225 04/17/13 Ginn and Crosby, LLC Legal Services 432 06/05/13 Ginn and Crosby, LLC Legal Services 144 06/05/13 Ginn and Crosby, LLC Legal Services 5,243 06/05/13 Javis, Fay, Doporto & Gibson, LLP Legal Services 16,570 July 23, 2013 06/05/13 Javis, Fay, Doporto & Gibson, LLP Legal Services 38 06/19/13 David Neagley, AIA Legal Services 1,624 01/30/14 Brad Oldham Internation, Inc.Install of Stainless Owls 49 01/30/14 Brad Oldham Internation, Inc.Install of Stainless Owls 565 July 2, 2014 Sub-total - City (Inter-department) Service Charge - 320,534 - (320,534) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,315 06/30/10 Office Max (US Bank-Calcard) - Reversed Reverse office supplies charged to project (246) 06/30/10 Debra Jacobs Reverse prior travel and meeting expense (6) Oct. 21, 2010 Report 06/30/10 Karen Bengard Reverse prior travel and meeting expense (20) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (11) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (20) 03/30/11 Palo Alto Stores Supplies/Parts 4 April 26, 2011 Report 03/30/11 Palo Alto Stores Supplies/Parts 214 03/30/11 Palo Alto Stores Reversal of Prior Charges (4) 03/30/11 Palo Alto Stores Reversal of Prior Charges (214) July 26, 2011 Report 04/21/11 City of Palo Alto - Utilities Utility Connection Fee 68,559 02/15/12 Palo Alto Stores Supplies/Parts 4 02/15/12 Palo Alto Stores Supplies/Parts 176 March 28, 2012 Report 02/15/12 Palo Alto Stores Supplies/Parts 218 02/15/12 Palo Alto Stores Supplies/Parts 4 12/31/12 State Water Resources Control Board Submitting Permit Registration Documents 505 January 23, 2013 Report 02/06/13 4LEAF, Inc.Building Inspection 2,553 02/06/13 4LEAF, Inc.Building Inspection 8,769 April 12, 2013 03/13/13 4LEAF, Inc.Building Inspection 9,213 03/13/13 4LEAF, Inc.Building Inspection 10,656 08/21/13 4LEAF, Inc.Building Inspection 15,318 10/30/13 4LEAF, Inc.Building Inspection 9,713 12/05/13 4LEAF, Inc.Building Inspection 14,430 12/18/13 4LEAF, Inc.Building Inspection 14,708 10/16/13 Computerland of Silicon Valley Wi-Fi Connectivity (Wireless Access Points (WAPs) )25,615 December 24, 2013 11/26/13 CDW Government Uninterruptable Power Supplies for Computers 6,134 12/05/13 CDW Government Uninterruptable Power Supplies for Computers 301 12/18/13 State Water Resources Control Board Submitting Permit Registration Documents 664 11/06/13 Bibliotheca, Inc.Security Gates 12,375 04/23/14 4LEAF, Inc.Building Inspection 1,332 06/04/14 4LEAF, Inc.Building Inspection 1,887 July 2, 2014 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 16 07/04/14 California Paint Company Special Filler for Wood Bridges 176 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 76 October 8, 2014 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 154 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 63 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 41 07/31/14 City of Palo Alto - Stores Inventory Safety Vest 19 04/15/15 Reconciliation Adjustment Adjustment (3,280) 11/06/13 Bibliotheca, Inc.Security Gates ($2,995 clerical error)- 03/31/13 Office Max (US Bank-Calcard) - Reversed Reversal of Bondable Expenditure (-$65 clerical error)- 10/16813 Ginn and Crosby, LLC Legal Services ($360 clerical error)- 10/09/14 Ginn and Crosby, LLC Legal Services ($288 clerical error)- 11/05/14 Ginn and Crosby, LLC Legal Services 3,145 10/22/14 Moovers, Inc.Moving Services 4,797 10/01/14 4LEAF, Inc.Building Inspection 5,200 January 14, 2015 10/29/14 4LEAF, Inc.Building Inspection 4,810 06/25/14 4LEAF, Inc.Building Inspection 3,219 Sub-total - Miscellaneous Cost - 224,578 - (224,578) Grant Total 47,725,437 44,633,141 303,621 2,788,675 14 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 18,000,000$ Budget Change 4,342,563 Sub-total - 2010 Engineer's Budget Estimate 22,342,563 - - 22,342,563 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 10/05/10 Group 4 Architecture Research and Planning Architectural 700 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 11/02/10 Group 4 Architecture Research and Planning Architectural 5,785 11/02/10 Group 4 Architecture Research and Planning Architectural 122,100 Jan. 25, 2011 Report 12/07/10 Group 4 Architecture Research and Planning Architectural 2,390 01/04/11 Group 4 Architecture Research and Planning Architectural 15,000 01/04/11 Group 4 Architecture Research and Planning Architectural 583 01/04/11 Group 4 Architecture Research and Planning Architectural 859 01/04/11 Turner Construction Company Construction Management Services 1,195 02/24/11 Group 4 Architecture Research and Planning Architectural 4,860 03/18/11 Group 4 Architecture Research and Planning Architectural 73,246 03/18/11 Group 4 Architecture Research and Planning Architectural 7,500 03/18/11 Group 4 Architecture Research and Planning Architectural 53 03/18/11 Group 4 Architecture Research and Planning Architectural 3,843 04/11/11 Group 4 Architecture Research and Planning Architectural 112,464 04/11/11 Group 4 Architecture Research and Planning Architectural 3,993 04/11/11 Group 4 Architecture Research and Planning Architectural 7,500 01/21/11 Group 4 Architecture Research and Planning Architectural 24,392 April 26, 2011 Report 01/21/11 Turner Construction Company Construction Management Services 1,434 01/21/11 Group 4 Architecture Research and Planning Architectural 2,500 01/24/11 Group 4 Architecture Research and Planning Architectural 1,500 01/21/11 Group 4 Architecture Research and Planning Architectural 447 02/18/11 Turner Construction Company Construction Management Services 478 02/18/11 Group 4 Architecture Research and Planning Architectural 48,831 02/18/11 Group 4 Architecture Research and Planning Architectural 2,653 02/18/11 Group 4 Architecture Research and Planning Architectural 3,238 05/12/11 Group 4 Architecture Research and Planning Architectural 6,250 05/12/11 Group 4 Architecture Research and Planning Architectural 40,052 05/12/11 Group 4 Architecture Research and Planning Architectural 12,411 05/12/11 Group 4 Architecture Research and Planning Architectural 3,263 05/17/11 Group 4 Architecture Research and Planning Architectural 4,553 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 31,374 07/01/11 Turner Construction Company Construction Management Services 9,169 07/11/11 Group 4 Architecture Research and Planning Architectural 11,100 07/11/11 Group 4 Architecture Research and Planning Architectural 488 07/11/11 Group 4 Architecture Research and Planning Architectural 15,687 07/27/11 Group 4 Architecture Research and Planning Architectural 319 07/27/11 Group 4 Architecture Research and Planning Architectural 1,150 07/27/11 Group 4 Architecture Research and Planning Architectural 1,875 07/27/11 Turner Construction Company Construction Management Services 5,572 08/10/11 Group 4 Architecture Research and Planning Architectural 31,374 08/24/11 Turner Construction Company Construction Management Services 2,868 October 25, 2011 Report 08/31/11 Group 4 Architecture Research and Planning Architectural 117 08/31/11 Group 4 Architecture Research and Planning Architectural 175 08/31/11 Group 4 Architecture Research and Planning Architectural 248 09/14/11 Group 4 Architecture Research and Planning Architectural 67 09/14/11 Group 4 Architecture Research and Planning Architectural 600 09/14/11 Group 4 Architecture Research and Planning Architectural 39,218 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 235,308 10/26/11 Group 4 Architecture Research and Planning Architectural 878 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 291 10/26/11 Group 4 Architecture Research and Planning Architectural 27 11/02/11 Group 4 Architecture Research and Planning Architectural 78,436 11/02/11 Group 4 Architecture Research and Planning Architectural 7,500 11/22/11 Group 4 Architecture Research and Planning Architectural 8,514 12/07/11 Group 4 Architecture Research and Planning Architectural 62,749 January 18, 2012 Report 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/14/11 Group 4 Architecture Research and Planning Architectural 79,172 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/21/11 Protect Consulting and Engineering Hazardous Material Testing 3,530 12/21/11 Group 4 Architecture Research and Planning Architectural 3,052 01/11/12 Group 4 Architecture Research and Planning Architectural 225 01/11/12 Group 4 Architecture Research and Planning Architectural 9,761 01/11/12 Group 4 Architecture Research and Planning Architectural 70,592 01/11/12 Group 4 Architecture Research and Planning Architectural 150 01/11/12 Group 4 Architecture Research and Planning Architectural 247 02/22/12 Group 4 Architecture Research and Planning Architectural 10,000 02/22/12 Group 4 Architecture Research and Planning Architectural 62,749 02/22/12 Group 4 Architecture Research and Planning Architectural 8,676 Rinconada (aka Main) Library Activity Details (PE-11000) As of November 17, 2015 (Revised 3) 15 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of November 17, 2015 (Revised 3) 02/22/12 Group 4 Architecture Research and Planning Architectural 3,590 March 28, 2012 Report 03/21/12 Group 4 Architecture Research and Planning Architectural 1,330 03/21/12 Group 4 Architecture Research and Planning Architectural 5,423 03/21/12 Group 4 Architecture Research and Planning Architectural 39,218 02/22/12 BIG-D Pacific Builders, LP Construction 32,500 12/21/12 BIG-D Pacific Builders, LP Construction 36,960 04/04/12 Group 4 Architecture Research and Planning Architectural 18,925 04/18/12 Group 4 Architecture Research and Planning Architectural 1,500 04/18/12 Group 4 Architecture Research and Planning Architectural 19 04/18/12 Group 4 Architecture Research and Planning Architectural 9,784 05/16/12 Group 4 Architecture Research and Planning Architectural 3,278 July 5, 2012 Report 05/16/12 Group 4 Architecture Research and Planning Architectural 29,046 05/30/12 Group 4 Architecture Research and Planning Architectural 39,504 06/20/12 Group 4 Architecture Research and Planning Architectural 13,884 07/05/12 Group 4 Architecture Research and Planning Architectural 407 07/05/12 Group 4 Architecture Research and Planning Architectural 2,500 07/25/12 Group 4 Architecture Research and Planning Architectural 1,613 07/25/12 Group 4 Architecture Research and Planning Architectural 1,535 07/25/12 Group 4 Architecture Research and Planning Architectural 1,992 October 30, 2012 Report 09/05/12 Group 4 Architecture Research and Planning Architectural 7,551 09/26/12 Group 4 Architecture Research and Planning Architectural 5,996 10/31/12 Turner Construction Company Construction Management Services 7,444 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 11/19/12 Group 4 Architecture Research and Planning Architectural 5,423 11/19/12 Group 4 Architecture Research and Planning Architectural 8,000 11/19/12 Group 4 Architecture Research and Planning Architectural 270 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 10/31/12 Turner Construction Company Construction Management Services 10,000 January 23, 2013 Report 10/11/12 Fastsigns signs 389 01/09/13 NOVA Partners, Inc.Construction Management Services 19,320 01/23/13 Group 4 Architecture Research and Planning Architectural 2,500 01/23/13 Group 4 Architecture Research and Planning Architectural 969 01/23/13 Group 4 Architecture Research and Planning Architectural 4,979 01/23/13 Group 4 Architecture Research and Planning Architectural 725 01/23/13 NOVA Partners, Inc.Construction Management Services 12,010 02/06/13 Group 4 Architecture Research and Planning Architectural 3,243 02/27/13 West Coast Code Consultants, Inc.Plan Check 13,300 02/27/13 NOVA Partners, Inc.Construction Management Services 18,280 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 30,776 04/03/13 NOVA Partners, Inc.Construction Management Services 17,000 04/24/13 Group 4 Architecture Research and Planning Architectural 13 05/08/13 Group 4 Architecture Research and Planning Architectural 479 05/08/13 Group 4 Architecture Research and Planning Architectural 9,324 05/22/13 Group 4 Architecture Research and Planning Architectural 1,641 05/22/13 Group 4 Architecture Research and Planning Architectural 157 July 23, 2013 04/24/13 NOVA Partners, Inc.Construction Management Services 16,360 05/22/13 NOVA Partners, Inc.Construction Management Services 18,280 04/10/13 ARC Signs 71 05/01/13 ARC signs 210 06/19/13 Metropolitan Van and Storage, Inc.Equipment Moving 31,367 06/26/13 NOVA Partners, Inc.Construction Management Services 6,134 07/31/13 NOVA Partners, Inc.Construction Management Services 31,565 08/21/13 NOVA Partners, Inc.Construction Management Services 30,750 08/21/13 West Coast Code Consultants, Inc.Plan Check 1,185 Sept. 25, 2013 08/21/13 Group 4 Architecture Research and Planning Architectural 34 07/27/13 Group 4 Architecture Research and Planning Architectural 17,341 08/21/13 Group 4 Architecture Research and Planning Architectural 43,310 09/25/13 S.J. Amoroso Construction Construction 1,396,323 09/25/13 ARC Reproductive Services 52 10/02/13 NOVA Partners, Inc.Construction Management Services 35,578 10/16/13 Group 4 Architecture Research and Planning Architectural 86,670 10/23/13 NOVA Partners, Inc.Construction Management Services 38,025 10/30/13 S.J. Amoroso Construction Construction 771,030 December 24, 2013 11/20/13 NOVA Partners, Inc.Construction Management Services 37,554 12/05/13 Group 4 Architecture Research and Planning Architectural 43,360 12/11/13 S.J. Amoroso Construction Construction 1,204,872 12/18/13 NOVA Partners, Inc.Construction Management Services 41,811 12/23/13 S.J. Amoroso Construction Construction 876,464 01/29/14 NOVA Partners, Inc.Construction Management Services 42,311 02/26/14 NOVA Partners, Inc.Construction Management Services 34,852 03/26/14 NOVA Partners, Inc.Construction Management Services 30,855 04/16/14 West Coast Code Consultants, Inc.Plan Check 613 01/29/14 Protech Consulting and Engineering Hazardous Material Testing 22,580 01/29/14 S.J. Amoroso Construction Construction 857,070 03/05/14 S.J. Amoroso Construction Construction 1,098,894 April 16, 2014 04/02/14 S.J. Amoroso Construction Construction 1,045,937 01/29/14 Group 4 Architecture Research and Planning Architectural 43,360 02/26/14 Group 4 Architecture Research and Planning Architectural 43,360 01/29/14 Group 4 Architecture Research and Planning Architectural 43,360 16 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of November 17, 2015 (Revised 3) 04/02/14 Group 4 Architecture Research and Planning Architectural 188,020 04/16/14 Group 4 Architecture Research and Planning Architectural 43,350 03/26/14 ARC Reproduction Services 258 04/02/14 Envision Ware, Inc.Professional services 1,795 11/29/04 Envision Ware, Inc.Professional services ($47,731 deleted) 05/14/14 NOVA Partners, Inc.Construction Management Services 37,950 05/28/14 NOVA Partners, Inc.Construction Management Services 39,369 06/04/14 Group 4 Architecture Research and Planning Architectural 18,900 06/25/14 NOVA Partners, Inc.Construction Management Services 35,540 July 2, 2014 04/23/14 S.J. Amoroso Construction Construction 1,058,321 05/28/14 S.J. Amoroso Construction Construction 1,487,530 06/04/14 Group 4 Architecture Research and Planning Architectural 86,702 06/25/14 Group 4 Architecture Research and Planning Architectural 86,746 07/02/14 S.J. Amoroso Construction Construction 1,852,722 07/16/14 NOVA Partners, Inc.Construction Management Services 34,767 08/27/14 NOVA Partners, Inc.Construction Management Services 33,075 09/17/14 NOVA Partners, Inc.Construction Management Services 34,182 07/02/14 West Coast Code Consultants, Inc.Plan Check 1,203 08/13/14 Group 4 Architecture Research and Planning Architectural 39,700 07/30/14 PACIFIC GAS & ELECTRIC CO Survey 6,000 October 8, 2014 08/06/14 S.J. Amoroso Construction Construction 2,164,627 09/03/14 S.J. Amoroso Construction Construction 1,591,611 07/31/14 S.J. Amoroso Construction Construction 1,641,497 10/08/14 Group 4 Architecture Research and Planning Architectural 29,816 10/08/14 Group 4 Architecture Research and Planning Architectural 86,738 10/08/14 Group 4 Architecture Research and Planning Architectural 75,770 07/27/13 Group 4 Architecture Research and Planning Architectural 17,341 11/05/14 NOVA Partners, Inc.Construction Management Services 24,808 11/05/14 S.J. Amoroso Construction Construction 330,380 January 14, 2015 12/03/14 Group 4 Architecture Research and Planning Architectural 26,835 12/17/14 Group 4 Architecture Research and Planning Architectural 4,990 01/14/15 S.J Amoroso construction costs that are currently being funded by the Infrastructure Reserve (1,800,000) 02/04/15 NOVA Partners, Inc.Construction Management Services 1,566 01/28/15 NOVA Partners, Inc.Construction Management Services 1,600 02/25/15 NOVA Partners, Inc.Construction Management Services 13,485 April 22, 2015 03/04/15 S.J. Amoroso Construction Construction 31,481 01/28/15 S.J. Amoroso Construction Construction 140,321 05/13/15 NOVA Partners, Inc.Construction Management Services 1,094 July 29, 2015 05/06/15 S.J. Amoroso Construction Construction 17,917 05/22/15 Protech Consulting and Engineering Hazardous Material Testing 950 09/15/15 Group 4 Architecture Research and Planning Architectural 10,566 11/12/15 Group 4 Architecture Research and Planning Architectural 5,625 November 17, 2015 01/14/15 248,500 Group 4 Architecture Research and Planning Architectural 193,831 Ross McDonald Company, Inc. Construction Services 24,612 Tochi Professional services 9,295 Sub-total - Engineering and Architectural Costs - 19,661,166 227,738 (19,888,904) Contract Contingency 05/27/11 Group 4 Architecture Research and Planning Architectural 22,152 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 571 02/22/12 Group 4 Architecture Research and Planning Architectural 122 March 28, 2012 Report 11/19/12 Group 4 Architecture Research and Planning Architectural 124 January 23, 2013 Report 04/03/13 Group 4 Architecture Research and Planning Architectural 8,442 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 8,442 04/24/13 Group 4 Architecture Research and Planning Architectural 6,300 05/22/13 Group 4 Architecture Research and Planning Architectural 64,633 July 23, 2013 06/05/13 Group 4 Architecture Research and Planning Architectural 27,225 07/17/13 Group 4 Architecture Research and Planning Architectural 12,658 07/17/13 Group 4 Architecture Research and Planning Architectural 3,150 Sept. 25, 2013 08/21/13 Group 4 Architecture Research and Planning Architectural 9,900 08/21/13 Group 4 Architecture Research and Planning Architectural 9,900 06/21/13 NOVA Partners, Inc. Construction Management Services 9,480 December 24, 2013 04/16/14 Group 4 Architecture Research and Planning Architectural 15,750 April 16, 2014 04/23/14 S.J. Amoroso Construction Construction 16,461 July 2, 2014 07/02/14 West Coast Code Consultants, Inc. Plan Check 941 October 8, 2014 12/03/14 Group 4 Architecture Research and Planning Architectural 13,720 12/03/14 Group 4 Architecture Research and Planning Architectural 5,651 12/29/14 NOVA Partners, Inc. Construction Management Services 18,250 January 14, 2015 12/03/14 Group 4 Architecture Research and Planning Architectural 6,600 12/10/14 S.J. Amoroso Construction Construction 316,985 12/10/14 S.J. Amoroso Construction Construction 20,517 02/04/15 NOVA Partners, Inc. Construction Management Services 20 01/28/15 NOVA Partners, Inc. Construction Management Services 18,070 S.J Amoroso construction costs funded by the Infrastructure Reserve (originally estimated at $1.8 million on the Jan. 14, 2015 Financial Report resulting in total bondable costs being reduced by this amount; since actuals were lower ($1,551,500) than expected, the reports' bondable cost is understated by $248,500 so this cost difference is being added back) 17 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of November 17, 2015 (Revised 3) 02/04/15 NOVA Partners, Inc.Construction Management Services 22,680 01/28/15 S.J. Amoroso Construction Construction 7,103 01/28/15 S.J. Amoroso Construction Construction 9,355 01/28/15 S.J. Amoroso Construction Construction 11,108 01/28/15 S.J. Amoroso Construction Construction 12,420 01/28/15 S.J. Amoroso Construction Construction 12,428 April 22, 2015 01/28/15 S.J. Amoroso Construction Construction 13,295 01/28/15 S.J. Amoroso Construction Construction 14,236 01/28/15 S.J. Amoroso Construction Construction 14,541 01/28/15 S.J. Amoroso Construction Construction 14,651 01/28/15 S.J. Amoroso Construction Construction 14,746 01/28/15 S.J. Amoroso Construction Construction 18,875 01/28/15 S.J. Amoroso Construction Construction 25,973 01/28/15 S.J. Amoroso Construction Construction 37,022 01/28/15 S.J. Amoroso Construction Construction 38,480 01/28/15 S.J. Amoroso Construction Construction 47,113 05/06/15 S.J. Amoroso Construction Construction 25,108 July 29, 2015 Sub-total - Contract Contingency - 955,198 - (955,198) Other Contract Services 12/05/12 Planet Orange Termite Inspection Fee 350 12/31/12 Fastsigns Sign 226 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 52,000 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 12,000 10/31/12 City of Palo Alto - Public Works Main Library Renovation - Plan Check Fee 115,654 12/06/12 City of Palo Alto - Development Center Architectural Review 2,678 January 23, 2013 Report 12/06/12 City of Palo Alto - Development Center Architectural Review 25 12/06/12 City of Palo Alto - Development Center Architectural Review 20 12/06/12 City of Palo Alto - Development Center Architectural Review 622 12/06/12 City of Palo Alto - Development Center Architectural Review 2,892 12/06/12 City of Palo Alto - Development Center Architectural Review 252 04/24/13 FedEx Mailing 111 04/24/13 FedEx Mailing 98 July 23, 2013 04/17/13 FedEx Mailing 111 06/30/13 Fastsigns Signs 1,423 07/31/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 Sept. 25, 2013 08/21/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/02/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/09/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 11/13/13 Metropolitan Van and Storage, Inc.Equipment Moving 500 December 24, 2013 11/20/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 12/18/13 Metropolitan Van and Storage, Inc.Equipment Moving 1,665 04/02/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 02/12/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 April 16, 2014 04/02/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 01/29/14 FedEx Mailing 47 05/15/14 Protech Consulting and Engineering Hazardous Material Testing 3,270 05/07/14 Creative Machines, Inc.Plans and Technical Drawings 13,000 06/11/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 05/28/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 July 2, 2014 05/21/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 06/25/14 Metropolitan Van and Storage, Inc.Equipment Moving 800 07/02/14 AT&T Engineering and Construction 6,298 03/31/14 Envision Ware, Inc.Professional services 157 07/09/14 Applied Materials / Engineering, Inc.Professional services 110 07/09/14 Applied Materials / Engineering, Inc.Professional services 1,760 07/16/14 ARC Reproduction Services 71 08/06/14 Creative Machines, Inc.Plans and Technical Drawings 13,000 07/09/14 Chem Aqua Loop corrosion inhibitor chemical addition/water analysis 837 07/23/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 08/13/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 October 8, 2014 09/17/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 10/08/14 Applied Materials / Engineering, Inc.Professional services 5,601 10/08/14 Metropolitan Van and Storage, Inc.Equipment Moving 1,365 07/11/14 City of Palo Alto Signage Review for ARB 698 07/22/14 City of Palo Alto Signage Review for ARB 2,918 11/12/14 Metropolitan Van and Storage, Inc.Equipment Moving 11,638 12/10/14 Metropolitan Van and Storage, Inc.Equipment Moving 450 12/17/14 Schaaf & Wheeler Consulting Storm Water 3 Party Review 2,500 January 14, 2015 10/22/14 Bibliotheca, Inc.Security Gates 18,800 10/31/14 Bibliotheca, Inc.Security Gates 1,645 02/24/15 Fastsigns Fastsigns 247 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 195 18 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Rinconada (aka Main) Library Activity Details (PE-11000) As of November 17, 2015 (Revised 3) 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 450 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 1,220 02/04/15 Metropolitan Van and Storage, Inc.Equipment Moving 2,205 02/24/15 VKK Signmakers, Inc.Signs 3,472 April 22, 2015 03/25/15 Envision Ware, Inc.Professional services 26,650 11/24/14 Fastsigns Signs 245 03/25/15 3M Library Systems Library System 58,030 03/25/15 Envision Ware, Inc.Professional services 372,856 03/23/15 PolePal Lighting 1,080 06/11/15 Peninsulators, Inc.Construction 1,950 July 29, 2015 03/31/15 JP Morgan P-Card (will be replaced by actual vendor name)1,950 November 17, 2015 Sub-total - Other Contract Services - 765,251 - (765,251) City (Inter-department) Service Charge 10/31/14 City of Palo Alto - Planning Review of sculpture signage and address sign 456 January 14, 2015 Sub-total - City (Inter-department) Service Charge - 456 - (456) Miscellaneous Cost 02/27/13 Fastsigns Signage 590 April 12, 2013 Sub-total - Miscellaneous Cost - 590 - (590) Grant Total 22,342,563 21,382,662 227,738 732,163 19 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Mitchell Park Library (Council Approved - CMR: 463:09) 645,000 Budget Change - gg Sub-total - 2010 Engineer's Budget Estimate 645,000 - - 645,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 439,283 10/05/10 Group 4 Architecture Research & Planning Architectural 5,774 Oct. 21, 2010 Report 08/24/10 Group 4 Architecture Research & Planning Architectural 329 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 19,191 April 26, 2011 Report 11/12/14 Ross McDonald Company, Inc.Construction Services 3,200 January 14, 2015 Sub-total - Engineering and Architectural Costs - 467,777 - (467,777) Contract Contingency Summary of Expenditures as of July 21, 2010 2,541 08/24/10 Johnstone Moyer, Inc.Temp. Library Improvements 24,604 Oct. 21, 2010 Report 08/27/10 West Corporation Temp. Lib. - Security Access Card & Alarm 310 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 6,045 April 26, 2011 Report 05/14/15 JCM Construction, Inc.Construction Services 4,970 January 29, 2015 Sub-total - Contract Contingency - 38,470 - (38,470) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 11,247 March 28, 2012 Report Sub-total - City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 125 March 28, 2012 Report Sub-total - Miscellaneous Cost - 125 - (125) Grant Total 645,000 517,618 - 127,382 Temporary Library at Cubberley (for Mitchell Facility) - Activity Details (PE-09010) As of November 17, 2015 (Revised 3) 20 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Main Library Facility - Art Center Auditorium 500,000 Sub-total - 2010 Engineer's Budget Estimate 500,000 - - 500,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 - 04/04/12 Group 4 Architecture Research & Planning Architectural 15,687 July 5, 2012 Report 04/04/12 Group 4 Architecture Research & Planning Architectural 11,288 07/25/12 Group 4 Architecture Research & Planning Architectural 1,121 October 30, 2012 Report 06/15/76 Ross McDonald Company, Inc.Library Shelving 7,176 06/19/13 Big-D Pacific Builders, LP Construction Services 253,627 July 23, 2013 08/16/13 Big-D Pacific Builders, LP Construction Services 29,997 Sept. 25, 2013 02/11/15 Ross McDonald Company, Inc.Library Shelving 1,100 April 22, 2015 04/22/15 JCM Construction, Inc.Construction Services 9,950 05/22/15 Securecom Construction Services 88 January 29, 2015 09/15/15 Peninsulators, Inc.Construction 8,900 03/31/15 JP Morgan P-Card (will be replaced by actual vendor name)470 03/31/15 JP Morgan P-Card (will be replaced by actual vendor name)388 November 17, 2015 05/31/15 JP Morgan P-Card (will be replaced by actual vendor name)158 Sub-total - Engineering and Architectural Costs - 339,949 - (339,949) Contract Contingency Summary of Expenditures as of July 21, 2010 - 04/30/13 Fastsigns Signs 593 04/30/13 Metropolitan Van and Storage, Inc.Equipment Moving 380 04/30/13 Fastsigns Signs 598 July 23, 2013 04/30/13 Fastsigns Signs 41 05/31/13 Fastsigns (Reversal of Drawdown)Signs (138) January 14, 2015 Sub-total - Contract Contingency - 1,474 - (1,474) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 - 04/30/13 City of Palo Alto - Planning Architectural Review 384 04/30/13 City of Palo Alto - Development Center Architectural Review 216 July 23, 2013 05/31/13 City of Palo Alto _ Development Center Architectural Review 122,489 06/30/13 City of Palo Alto _ Development Center Architectural Review 636 Sept. 25, 2013 Sub-total - City (Inter-department) Service Charge - 123,725 - (123,725) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 - Sub-total - Miscellaneous Cost - - - - Grant Total 500,000 465,148 - 34,852 Art Center Temporary Library - Activity Details (Project # PE-11012) As of November 17, 2015 (Revised 3) 21 Library Bond Oversight Committee Encumbered or Outstanding Contracts Item Description Amount Sub‐totals Remaining work / Comments 1Group 4 ‐ Overall Design Contract (MPLCC)54,016$         Closeout & design of book drop 2Group 4 ‐ Overall Design Contract (Rinconada)94,931$         Closeout & design of book drop 3Group 4 ‐ Overall Design Contract (Downtown)40,890$         Closeout & LEED submittal 4Group 4 ‐ Construction Administration Contract for Rinconada 98,900$         Closeout & LEED submittal 5Ross McDonald Contract (built‐in cabinetry at MPLCC)115,816$       Closeout 6Ross McDonald Contract (built‐in cabinetry at Rinconada)24,612$         Closeout 7One Workplace (built‐in furnishings and storage for MPLCC)18,497$         Unlikely to be spent 8 Mood Media contract for broadcast media system at MPLCC 47,890$         Closeout 9 McKinney Associates ‐ General AV work at MPLCC 1,100$           Training 10 Sprigg Electric ‐ 10‐year warranty for photovoltaic system at MPLCC 50,000$         Needed for utilities rebate 11 GINN AND CROSBY, LLC ‐ outside legal counsel for unforeseen claims 16,302$         Unlikely to be spent 12 TOCHI ‐ Construction of additional manager's office at Rinconada Library 9,295$           Nearly complete     Total For Encumbered or Contracted Work 572,249$      Additional Library Work that is not Encumbered or Contracted 13 Drive‐Up Book Drop at Mitchell Park Library 30,000$         Construction estimate 14 Drive‐Up Book Drop at Rinconada Library 26,000$         Construction estimate 15 Lutron Switch labels for MPLCC 957$              Quoted and authorized 16 Replace two defective electronic panel meters (out of warranty) at MPLCC 4,159$           Quoted and authorized 17 New Projector Lens for Midtown Room at MPLCC 3,657$           Quoted and authorized 18 Projector adjustment for Midtown Room at MPLCC 525$              Quoted and authorized 19 Install rain gutter debris shields at Rinconada 5,000$           Construction estimate 20 Install fan and vent in Teen Zone storage area for AV system at MPLCC 4,000$           Construction estimate 21 Bond‐related restoration work on Cubberley Auditorium temporary library 127,382$       All remaining funds needed 22 Update signage for recent changes to Library Hours (MPLCC) 4,791$           Quoted and authorized 23 Contingency ‐ Mitchell Park Library 50,000$         Contingency 24 Contingency ‐ Rinconada Library 25,000$         Contingency    Total for  Additional Library Work that is not Encumbered or Contracted 281,471$         Grand Total (Estimated)853,720$      Last and Final List of Potential Expenses for Library Bond Funds Attachment D TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: City Manager's Office DATE: MARCH 16,2009 CMR: 176:09 REPORT TYPE: CONSENT SUBJECT: Adoption of a Resolution Establishing a Citizen Oversight Committee for Expenditures of Library Bond Funds RECOMMENDATION Staff recommends that Council adopt the attached resolution establishing a Citizen Oversight Committee to implement one of the oversight and accountability provisions of the library bond measure and direct staff to proceed with the solicitation for potential Committee members. BACKGROUND On August 4, 2008, Council approved placing a $76 million General Obligation bond measure on the November 4, 2008 ballot to construct and complete a new Mitchell Park Library and Community Center, renovate and expand Main Library and renovate Downtown Library (CMR:340:08). The ballot measure, Measure N, contained a provision for the appointment of a committee to oversee the expenditure of funds generated by the bond issuance. Specifically, the ballot proposition stated that: "LIBRARY, FACILITIES, COLLECTIONS, SAFETY IMPROVEMENT BOND. To ensure seismic safety, enhance disabled access, provide additional space to expand library collections, add new children's and group activity areas, replace outdated lighting, and provide proper ventilation and air conditioning systems, shall the City of Palo Alto issue bonds up to $76,000,000 to construct a new energy-efficient Mitchell Park Library and Community Center, expand and renovate Main Library, and renovate Downtown Library, with annual audits and independent citizen oversight?" On November 4, 2008, a super majority (2/3 + 1) of Palo Alto registered voters approved Measure N. Staff has begun implementing the capital improvement projects authorized by the ballot measure with the planning and design phases. On March 2, 2009 the Council approved a contract with Group 4 Architecture to proceed with the design of the libraries and community center as authorized by the bond measure. DISCUSSION Staf.f has met to discuss the options for establishing and appointing a Citizen Oversight Committee consistent with the bond measure language. Details to be established include: membership criteria, the duties of the Committee, and Committee procedures. Staff s CMR 176:09 Page 1 of3 Attachment E recommendations are summarized below and are included in the attached resolution. Also outlined is the proposed advertising and selection process for the Committee. The Council may provide additional direction to staff on any of the criteria outlined. 1. Committee membership criteria a .. Committee shall consist of five members. b. Committee members must be either a Palo Alto resident, an employee of a Palo Alto business, or own property within the City of Palo Alto. c. Committee members shall be selected and appointed by the City Council. It is anticipated that Council will use procedures similar to those used for appointments to City boards and commissions. d. Committee members shall serve for a term of four years. e. Committee members are preferred to have financial management, project management, architecture, engineering or other relevant experience. 2. Duties of the Committee a. Committee shall review the proposed budget for Measure N projects as prepared by staff in order to assess its consistency with the projects set forth in Measure N (Attachment B, Ordinance No.4996). b. Committee shall review quarterly financial reports prepared by City Administrative Services Department staff documenting expenditures related Measure N projects in order to assess the consistency of the expenditures with Measure N (Attachment B, Ordinance No.4996). c. Committee may review the external auditor's financial audits of the bond funds. The City Manager will work with the City Auditor's Office to ensure that requirements related to annual audits of the bond funds are satisfied. d. Committee shall be an advisory body only, and the City Council shall retain full authority to approve the budget and associated expenditures for Measure N Bond projects. e. Committee duties shall not include review of design and contract issues. 3. Procedures of the Committee a. Committee shall meet quarterly to review expenditures associated with Measure N. The Committee shall prepare a report documenting its findings with respect to the proposed expenditures and submit such report to the Finance Committee of the City Council following each meeting. b. The Committee shall conduct open public meetings, duly noticed in accordance with the Ralph M. Brown Act, California Government Code Section 54950, et seq. c. The Committee may establish rules and procedures governing the conduct of its meetings. Staff recommends that Council establish the Library Bond Citizen Oversight Committee by adopting the attached resolution and direct the City Clerk to solicit potential Committee members by placing advertisements announcing Committee vacancies in a CMR 176:09 Page 2 of3 newspaper of general circulation in the city, two times within a two week period. The expected timeline for selection and appointment of Committee members is described below. TIMELINE The following is the recommended timeline for appointment of members to the Library Bond Citizen Oversight Committee: Due date for member applications April 22 Appointment of Committee members May 4 RESOURCE IMPACT Committee members shall not be compensated for their service. There will be relatively minor costs incurred for staff to provide information to the Committee, attend Committee meetings, and draft the Committee's reports to Council. These staff costs will be covered within the project budget. POLICY IMPLICATIONS The formation of a Library Bond Citizen Oversight Committee as recommended in this report is required by the terms of the bond measure and Ordinance No. 4996 establishing those terms. ENVIRONMENTAL REVIEW Adoption of the attached resolution creating a Library Bond Citizen Oversight Committee is not considered a project for purposes of the California Environmental Quality Act (CEQA). Environmental review of all bond measure projects was completed prior to approval of the bond measure. ATTACHMENTS Attachment A: Resolution Establishing a Library Bond Citizen Oversight Committee Attachment B: Ordinance No.4996 ~ PREPARED BY: ___ ~~ ______ ~~_~==~ ________ ___ ~ ANN Manag en Fellow KELL Y MORARIU Interim Deputy City Manager CITY MANAGER APPROVAL: CMR 176:09 Page 3 of3 ** NOT YET APPROVED ** Attachment A Resolution No. --- Resolution of the Council of the City of Palo Alto Establishing a Citizen Oversight Committee for Expenditures of Library Bond Funds WHEREAS, on August 4,2008, the City Council approved Ordinance No. 4996 calling a special election and ordering the submission of a proposition incurring bonded debt for the purpose of construction and completion of a new Mitchell Park library and community center, renovation and expansion of Main Library, and renovations to Downtown Library, to Palo Alto voters at the special municipal election on November 4, 2008. WHEREAS, on November 4, 2008, Palo Alto voters approved Measure N, the proposition set forth in Ordinance No. 4996 for incurring bonded indebtedness. Ordinance 4996, as incorporated into the ballot language of Measure N, specifically provided for an independent citizen oversight committee to monitor expenditures of bond proceeds. NOW, THEREFORE, the Council of the City of Palo Alto does RESOLVE as follows: SECTION 1. Committee Established. The City of Palo Alto Library Bond Citizen Oversight Committee is hereby created to and to monitor expenditures of the funds raised by the issuance of bonds to ensure they are spent in accordance with the projects described in Ordinance No. 4996. SECTION 2. Committee Membership and Appointment. The committee shall consist of five members who are selected and appointed by the City Council for a term of four years. Committee members shall serve without compensation. Each Committee member shall be a resident of Palo Alto, an employee of a business located in Palo Alto, or an owner of real property within the City. No member shall be a council member, officer or employee of the City. SECTION 3. Committee Duties. The committee shall discharge its oversight duties by: (a) Meeting to review the expenditures for Measure N bond proceeds and assess the consistency of the expenditures with Ordinance No. 4996. The Committee shall prepare a report documenting its findings with respect to the expenditures and submit the report to the Finance Committee and the City Council following each meeting. SECTION 4. Meeting Procedures. The Committee shall conduct open public meetings, duly noticed in accordance with the Ralph M. Brown Act. The Committee may establish rules and procedures governing the conduct of its meetings. 090309 mb 8260979 1 ** NOT YET APPROVED ** SECTION 5. The City Clerk is directed to place advertisement announcing Committee vacancies in a newspaper of general circulation in the City, two times within a two week period. SECTION 6. The Council finds that this is not considered a project for purposes of the California Environmental Quality Act (CEQA). Environmental review of all bond measure projects was completed prior to approval of the bond measure. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: APPROVED: City Clerk Mayor APPROVED AS TO FORM: City Attorney City Manager Director of Administrative Services 090309 mb 8260979 2 Attachment B ORDINANCE NO. 4996 ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO CALLING A SPECIAL ELECTION AND ORDERING THE SUBMISSION OF A PROPOSITION INCURRING BONDED DEBT FOR THE PURPOSE OF CONSTRUCTION AND COMPLETION OF A NEW MITCHELL PARK LffiRARY AND COMMUNITY CENTER, RENOVATION AND EXPANSION OF MAIN LffiRARY, AND RENOVATIONS TO DOWNTOWN LffiRARY TO THE QUALIFIED VOTERS OF THE CITY OF PALO ALTO AT THE SPECIAL MUNICIPAL ELECTION TO BE HELD ON NOVEMBER 4,2008 WHEREAS, use of the Palo Alto libraries has increased; in fiscal year 2007-2008 circulation in Palo Alto libraries increased 8% over the prior year, and users checked out over 1.5 million books, periodicals, DVDs, and other materials; and WHEREAS, in a 2007 report, the City Auditor determined that Palo Alto libraries are in the poorest condition when compared to libraries in ten surrounding communities; and WHEREAS, the Auditor's report specifically noted that Palo Alto's libraries were overcrowded, had poor lighting and inadequate meeting spaces; and WHEREAS, Palo Alto libraries are cramped, have poor lighting, and have no room for expansion of collections or group study and quiet reading areas; and WHEREAS, Mitchell Park Library was built more than fifty years ago; over the past twenty years circulation there has tripled and it currently receives more than one thousand visitors per day; and WHEREAS, Mitchell Park Library has the highest circulation of all libraries in Palo Alto, but it is too small and outdated to serve the population that uses it today; and WHEREAS, many residents in our community, especially children and seniors, rely on Palo Alto libraries; and WHEREAS, some of the heaviest use occurs after school when children from the neighborhood schools gather to do homework, research and work on group projects; at these times, the libraries can be overcrowded and noisy, making it challenging for others to comfortably use the library, study, or access services; and WHEREAS, Mitchell Park, Main and Downtown libraries have poor ventilation and lack air conditioning; and WHEREAS, Mitchell Park, Main and Downtown libraries are too small to accommodate growth in library collections, which residents have identified as a priority for City libraries; and WHEREAS, under the conditions described above, our libraries cannot fully offer the services and resources our Palo Alto residents deserve; and WHEREAS, it is critical that the City provide libraries and community centers that afford earthquake safety by construction to modem seismic standards; and . WHEREAS, the City needs to ensure and enhance disabled access at its public libraries and community centers; and WHEREAS, libraries are an important community asset because they provide more than just books-they are a place for residents to learn and to gather and they enrich the culture of our City; and WHEREAS, on July 21, 2008, this City Council adopted, by a two-thirds vote of all the members of the Council, a Resolution entitled itA Resolution of the Council of the City of Palo Alto Determining That the Public Interest and Necessity Demand the Construction and Completion of a New Mitchell Park Library and Community Center and the Renovation of Main and Downtown Libraries and their Financing Through the Issuance of General Obligation Bonds" (the "Resolution"); and WHEREAS, in order to provide for the issuance by the City of its general obligation bonds to fmance the costs of constructing the new Mitchell Park library and community center and renovating and improving Main and Downtown libraries, it is necessary for this Council to pass an ordinance ordering the submission of the proposition of incurring bonded indebtedness for such purpose to the qualified voters of the City at an election; and WHEREAS, a Special Municipal Election for the City is to be held on Tuesday, November 4, 2008; and WHEREAS, the City Council desires to submit to the voters at the election the proposition of incurring bonded indebtedness as hereinafter set forth. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PALO ALTO, CALIFORNIA, does ordain as follows: SECTION 1. Ballot Proposition. That the following question shall be submitted to the voters of the City at the Special Municipal Election to be held on November 4,2008: "LmRARY FACILITIES, COLLECTIONS, SAFETY IMPROVEMENT BOND. To provide additional space to expand library collections, add new children's and group program areas, replace outdated lighting, provide modem ventilation and air conditioning systems, ensure seismic safety and enhance disabled access, shall the City of Palo Alto issue bonds up to $76,000,000 to construct a new energy-efficient Mitchell Park Library and Community Center, expand and renovate Main Library, and renovate Downtown Library, with annual audits and independent citizen oversight?" YES NO SECTION 2. Object and Pw:pose of Bonds. The object and purpose of incurring the indebtedness is to fmance the costs of constructing a new energy efficient, environmentally friendly library and community center at Mitchell Park and the costs of renovating and expanding Main Library and renovating Downtown Library, including enhancements at all three facilities for earthquake safety and disabled access, expanded space for library collections, meeting· and study areas, and new air conditioning, ventilation and lighting systems. The foregoing improvements are referred to herein as the "Improvements". The City wishes to construct the Improvements because the present library and community center at Mitchell Park, and the Main and Downtown libraries, are inadequate to serve the needs of the citizens of the City. SECTION 3. Estimated Cost of Improvements. The estimated cost of the portion of the costs of the Improvements to be paid for from the City's general obligations bonds is seventy-six million dollars ($76,()00,000). The estimated cost includes legal and other fees and the cost of printing the bonds and other costs and expenses incidental to or connected with the authorization, issuance and sale of bonds. The cost of constructing the Improvements in excess of $76,000,000 will be paid for from other funds of the City. SECTION 4. Principal Amount of Bonds. The amount of the principal of the indebtedness to be incurred is not to exceed seventy-six million dollars ($76,000,000). SECTION 5. Maximum Interest Rate. The maximum rate of interest to be paid on the indebtedness shall be twelve percent (12%) per annum. SECTION 6. Issuance and Sale of Bonds. This City Council does hereby call a special municipal election on Tuesday, November 4, 2008, and submit to the qualified voters of ,the City, at said Special Municipal Election, the proposition set forth in Section I hereof. The City proposes to construct and complete the Improvements, and to issue and sell General Obligation Bonds of the City pursuant to Article 1, commencing with Section 43600, of Chapter 4 of Division 4 of Title 4 of the California Government Code, in one or more series, in the maximum amount and for the objects and purposes set forth above, if two-thirds of all qualified voters voting on the proposition set forth above vote in favor thereof. The bonds are to be general obligations of the City, payable from and secured by taxes levied and collected in the manner prescribed by laws of the State of California. All of said bonds are to be equally and ratably secured, without priority, by the taxing power of the City. SECTION 7. Consolidation: Manner of Conducting Election. That in all particulars not recited in this Ordinance, the election shall be held and conducted as provided by law for holding municipal elections. That pursuant to the requirements of section 10403 of the Elections Code. the Board of Supervisors of the County of Santa Clara is hereby requested to consent and agree to the consolidation of a Special Municipal Election" with the Statewide Special Election on Tuesday, November 4, 2008, and said election shall be held in all respects as if there were only one election and only one form of ballot shall be used. SECTION 8. Procedure for Voting on Proposition. Ballots for the election shall be provided in the form and in the number provided by law. Voters shall be provided an opportunity to vote for or against the proposition on the ballot, in accordance With procedures to be adopted by the authorized officers of the County charged with conducting the election. SECTION 9. Time and Place of Election. Notice of the time and place of holding the election is given and the City Clerk is authorized, instructed, and directed to give further or additional notice of the election, in the time, form, and manner required by law. SECTION 10. Publication of Ordinance. This Ordinance shall be published once a day for at least seven days in a newspaper printed, published and circulated at least six days a week in the City, or once a week for two weeks in a newspaper printed, published and circulated less than six days a week in the City. The first of said publications shall, in either event, be within fifteen (15) days after the adoption of this ordinance. The City Clerk is hereby authorized and directed to make said publications and to transmit, for receipt no later than August 8, 2008, a certified copy of this Ordinance to the Board of Supervisors (the "Board of Supervisors") of Santa Clara County (the "County"), and a copy with the County Clerk of the County and the Registrar of Voters of the County. SECTION 11. Canvassing Election Returns. The Board of Supervisors is hereby authorized to canvass the returns of said City Bond Election. SECTION 12. Election Instructions. The Board of Supervisors is hereby requested to issue instructions to the County Elections Department to take any and all steps necessary for the holding of the said consolidated elections. SECTION 13. Accountability Requirements. As required by Section 53410 of the Government Code, a statement in substantially the following form shall be included on the ballot ,for the Bonds, and the City Council covenants to comply with the reporting requirements contained in Section 53411 of the Government Code: Accountability Measures As required by Section 53410 of the Government Code, the following accountability measures are hereby made a part of the City's Bond Measure "LffiRARY FACILITY, COLLECTIONS, SPACE, SAFETY IMPROVEMENT BOND" (the "~easure"): a) The specific purpose of the bonds is to build a new Mitchell Park libraty and community center, expand and renovate Main library, and renovate Downtown library; b) The proceeds from the sale of the City's bonds will be used only for the purposes specified in the Measure, and not for any other purpose; c) The proceeds of the Bonds will be deposited into a Library/Community Center Project Construction Fund to be held by the City; and d) The Administrative Services Director of the City shall file an annual report with the City Council of the City, commencing not later than November 1,2009, and annually thereafter, which report shall contain pertinent information regarding the amount of funds collected and expended, as well as the status of the Library/Community Center project listed in the Measure. · . SECTION 22. Effective Date. This Ordinance shall become effective immediately as an ordinance relating to an election pursuant to Government Code section 36937(a) upon its adoption by two-thirds vote of all the members of this City Council. The above ordinance was introduced with the fIrst reading waived at a regular meeting of the City Council on the 21st day of July, 2008, and passed and adopted at a regular meeting of said Council held on the 4th day of August, 2008, by the following vote: INTRODUCED: July 21,2008 PASSED: August 4, 2008 AYES: BARTON, BURT, DREKMEIER, ESPINOSA, KISHIMOTO, KLEIN, MORTON, SCHMID, YEH NOES: ABSENT: ABSTENTIONS: APPROVED AS TO FORM: APPROVED: ~~ "'Cit}TOmey Tax Rate Statement In Connection With City of Palo Alto Bond Measure_ An election will be held in the City of Palo Alto (the "City") on November 4, 2008, on the question of issuing bonds in the principal amount of$76,000,000 to fmance library and community center facilities as described in the bond measure. If the bonds are approved, the City expects to sell the bonds in one series. Principal and interest on the bonds will be paid from taxes levied on taxable property in the City. The following tax rate information is given to comply with Sections 9400-9404 of the Elections Code of the State of California. Based on estimated assessed valuations available at the time of filing of this statement: 1. The best estimate of the tax rate that would be required to be levied to fund this bond issue during the first fiscal year after the salt( of the first and only series of bonds, based on estimated assessed valuations available at the time of filing of this statement, is $0.02874 per $100 ($28.74 per $100,000) o( assessed valuation in fiscal year 2009-10. 2. The best estimate of the highest tax rate that would be required to fund this bond issue, based on estimated assessed valuations available at the time of filing this statement, is $0.02874 per $100 ($28.74 per $100,000) of assessed valuation in fiscal year 2009-10. 3. The best estimate of the average annual tax rate which would be required to be levied to fund this bond issue, based on estimated assessed valuations available at the time of filing of this statement, is $0.02698 per $100 ($26.98 per $100,000) of assessed valuation. Voters should note that the estimated tax rates are based on the assessed value of taxable property on the County's official tax rolls, not on the property's market value. In addition, taxpayers eligible for a property tax exemption, such as the homeowner's exemption, will be taxed at a lower effective tax rate than described above. Certain taxpayers may also be eligible to postpone payment of taxes. Property owners should consult their own property tax bills and the County Assessor to determine their property's assessed value and any applicable tax exemptions. The actual tax rates and the years in which they will apply may vary from those presently estimated, due to variations from these estimates in the timing of bond sales, the amount of bonds sold and market interest rates at the time of each sale, and actual assessed valuations over the term of repayment of the bonds. The estimates are based upon the City's projections and are not binding upon the City. The dates of sale and the amount of bonds sold at any given time will be determined by the City based on the need for construction funds and other factors. The actual interest rates at which the bonds will be sold will depend on the bond market at the time of each sale. Actual future assessed valuation will depend upon the amount and value of taxable property within the City as determined by the County Assessor in the annual assessment and the equalization process. Dated: August S . 2008 Larry Klein Mayor City of Palo Alto