HomeMy WebLinkAboutStaff Report 6270
City of Palo Alto (ID # 6270)
Finance Committee Staff Report
Report Type: Action Items Meeting Date: 12/1/2015
City of Palo Alto Page 1
Summary Title: Utiltiies Department Organizational Assessment Update
Title: Recommendation that the Finance Committee Recommend that the
City Council Accept the Utilities Organization Assessment Update Report
From: City Manager
Lead Department: Utilities
Recommendation
Staff recommends that the Finance Committee recommend that the City Council accept the
Utilities organization assessment update report (attachment A).
Executive Summary
In 2014, Leidos Engineering, LLC (Leidos) conducted an organizational assessment (report link)
to evaluate the operations of the City of Palo Alto Utilities Department (CPAU). There were two
primary objectives of the organizational assessment. The first was to review the services CPAU
provides to determine optimal staffing levels; the second was to evaluate the trends and
challenges in the utilities industry (i.e., electric, gas, water, wastewater collection, fiber).
The report concludes that CPAU is appropriately organized and effective and performs as well
or better than comparable utilities. CPAU provides very reliable service to the residents and
businesses in Palo Alto at competitive rates while reflecting the values of the community it
serves. The report further notes that as with most utilities, there are opportunities to improve
operations and accordingly, CPAU and the City should further examine strategies to improve
performance and address issues associated with attracting, developing, and retaining its
workforce. CPAU’s mission is to continue providing safe, reliable, environmentally sustainable
and cost-effective services. CPAU has made improvements or initiatives are in progress to
address some of the areas where CPAU was not meeting best practices. CPAU will also
continue to track and evaluate our performance metrics through the strategic plan and
performance scorecard and make improvements when opportunities arise. The Finance
Committee requested an update of the organizational assessment report by the end of 2015.
Discussion
Leidos reviewed CPAU’s performance against more than 20 best practices for electric, water,
gas, fiber and wastewater collection services, concluding that CPAU operations reflect best
City of Palo Alto Page 2
practices in fourteen categories, is making good progress towards meeting best practices in
eight categories and needs significant work to meet best practices in only three categories.
At the highest level of consideration are five indicators that CPAU is performing very well:
1. Rates for utility services are competitive.
2. Service reliability is very good.
3. Customer satisfaction is improving.
4. The Utilities are in excellent financial condition.
5. The Utilities are effectively achieving the City’s environmental and social goals.
The main areas that CPAU is working towards to meet best practices are:
1. Information and Operating Technologies.
2. Operating Maintenance and Capital Planning.
3. Business Processes.
Information and Operating Technologies
CPAU is making improvements in its use of information and operating technologies to achieve
optimal performance. A high-level Utilities Information Technology Systems Review and Future
Needs Assessment was completed in August 2014 by a consultant. The study recommended
approximately 40 utilities technology related initiatives to increase operational efficiency,
enhance customer services and advance smart grid capabilities in the next 5 to 10 years. Some
of the key initiatives identified were an evaluation of the Enterprise Resource Planning (ERP)
and billing system, development of a strategic project roadmap, improvements in reporting,
and smart grid projects.
CPAU and the City’s IT Department are in the process of hiring a consultant to assist the City
with a comprehensive requirement gathering process to be able to select a new government-
oriented ERP system and a utility-focused billing and customer information system (CIS). The
utility CIS is a critical component of CPAU’s strategic technology roadmap because the CIS is
highly integrated with other system applications (e.g. an outage management system, a
customer portal, business reporting, smart grid metering).
In the past, one of the challenges in the area of information reporting was the lack of
specialized resources required to configure and operate the SAP reporting system for the
presentation of Utilities data. Over the past twelve months, the City has retained experienced
consultants to assist with key SAP CIS/billing initiatives, for example, to develop complex
interfaces to secure third party web applications in order to present consumption and usage
data to CPAU customers. Additionally, the 300-home residential advanced meter/customer
engagement (CustomerConnect) pilot program will continue until December 2016. Staff
anticipates a road-map with a full roll-out of advanced meters, and associated smart grid
technologies will be developed in the 2016 to 2017 time frame. The timeline of full
implementation will be dependent on the City’s initiative to upgrade its SAP ERP and CIS
systems.
City of Palo Alto Page 3
Operating Maintenance and Capital Planning
With regard to “Operating Maintenance and Capital Planning,” the Leidos report notes that the
key to providing safe and reliable distribution systems is the replacement of aging
infrastructure. Even though the City and CPAU have a robust annual capital budgeting process
designed to ensure the safety and reliability of the system, Leidos concluded that limited
human resource availability is driving capital spending rather than system expansion needs and
system performance. Leidos observed that capital projects are deferred because of insufficient
staff required to perform the associated work. Since the report was completed, the backlog of
infrastructure replacement projects has dropped significantly from $29 million (Electric, $6M;
Gas, $12M; Water, $3M; Wastewater, $8M) in FY 2011 when staff started tracking the capital
backlog to $9M (Electric, $4M; Gas, $0M; Water, $2M; Wastewater, $3M) in FY 2015. With the
completion of Gas Main Replacement project 19/20/21, the Gas Utility is now up to date with
planned infrastructure replacement. The following summarizes the status of CPAU’s capital
improvement programs:
Gas: Upcoming gas main replacement project GMR 22 is currently in the design phase
and on schedule.
Electric: Replacement of aging electric infrastructure has been delayed over the last
several years due to continuous vacancies in Engineering and Operations. CPAU recently
executed a three-year contract for a third party contractor to assist with the backlog of
overhead electric assets in order bring the backlog down to a manageable level for
existing staff.
Water. In FY 2015, the Water main replacement program received a few setbacks. An
unusually small number of bids were submitted that were unexpectedly high in cost,
which resulted in staff repackaging the bid twice after the initial bid. Unexpectedly high
costs were attributed to increased labor rates and material prices on high-density
polyethylene main pipes. In the end, Water Main Replacement project 25 was reduced
in size and scope. The results from the recently updated Water System Master Plan
provide staff with more information regarding the conditions of water mains and may
lead to staff recommendation of a revised replacement schedule.
Wastewater: The Wastewater Utility was similarly affected in terms of the small
number of bids received and increased labor costs.
Business Processes
Leidos reviewed a sampling of CPAU’s business processes. Some business processes are very
well defined, especially around customer service, risk management and wholesale commodity
transactions. In general, Leidos indicated that there is benefit for CPAU to invest more time and
energy in the development of business process definition.
To achieve progress on the Business Process front, the two largest Utilities divisions,
Engineering and Operations, have implemented a central repository system using Sharepoint
for business processes and procedures. One of the strengths of the Sharepoint application is
City of Palo Alto Page 4
document management. There are in-built features of version control, authorization access,
and approval. Policies and procedures are readily accessible and conveniently stored in one
location. The City is in the process of rolling out a cloud based version of Sharepoint. Once this
is fully deployed, other divisions in CPAU will receive training and be asked to manage their
policies and procedures on the new platform.
The three areas that CPAU is not meeting best practice performance levels are:
1. Workforce Development
2. Project Management
3. Work Management
Workforce Development
Workforce development and succession planning continues to be a top priority for the City and
for CPAU. Public agencies, including utilities across the nation, are facing a retirement wave and
anticipate losing 35 to 50 percent of their workforces within the next five years. CPAU will
continue to work with the People Strategy and Operations Department (PSO) and the City
Manager’s Office (CMO) on a workforce development plan and strategy to retain talented
employees and attract high-caliber recruits. CPAU will be updating its five year organizational
chart and matrix to identify skill set gaps as well as employees who are currently or soon to be
eligible for retirement. In the past couple of years, CPAU has rotated staff in various positions
to cross-train employees and reduce institutional knowledge loss with turnovers. Job rotation is
seen as a positive way to motivate employees, maximize current talent utilization, develop
leadership skills, reduce skillset gaps, and retain high-potential valuable employees. Staff is
establishing a succession planning committee to formalize a rotational program by the end of
2016.
CPAU is still struggling to recruit qualified employees, especially in the engineering and
operations areas, due to the high cost of living in the area, a compensation package that is
matched or exceeded by other hiring agencies or companies, and the number of utilities that
the City runs. CPAU will coordinate with PSO and CMO on a case-by-case basis to bring
onboard new hires for critical positions while also developing a citywide recruitment strategy.
In the meantime, CPAU is contracting with third party construction services to manage one
time, temporary increases in work related to capital projects and scheduled maintenance.
Project Management
CPAU does not have an enterprise project management system. Projects are currently being
managed in Microsoft Project, SharePoint, Excel, Access, and/or the contractor’s project
management system depending on the type, duration, size and complexity of the project.
Leidos recommended formal project management training for staff. Since 2013, CPAU hired a
consultant on two separate occasions to provide formal project management training to staff
involved with managing capital, operating, or technology projects. The three-day training
course covered areas including project failure and success, scope definition, time management,
City of Palo Alto Page 5
resource planning, cost control and risk management. CPAU will continue to offer project
management training to new and existing staff as needed.
Work Management
CPAU does not have an enterprise work management system to plan, execute and track
projects and tasks. CPAU uses various stand-alone systems to execute certain key work
management functions, such as SAP for work order management, but it does not have a holistic
work management system that can provide an enterprise view of forecasted labor, actual labor
and labor costs, project costs and other project tracking measures. In 2013, CPAU piloted a
utility work management software firm to manage and schedule all of its work, which included
forecasted labor for every job that was created. The software consolidated the tasks into one
system for integrated work order management, planning, scheduling, and dispatching, and had
the option of providing timekeeping. While most aspects of the work management system were
piloted, the timekeeping function was not piloted due to the complexity of integrating with the
SAP system. After the evaluation stage, staff declined to recommend the work management
solution because it was basically another system that would need to be managed due to its
inability to integrate fully with the SAP system including the billing portion of the system, the
high labor intensity to administer the program, and costs associated with the software. This
initiative will be re-visited in conjunction with the City’s evaluation of a new ERP and utility CIS.
Resource Impact
As a result of planned efforts related to evaluation of a new ERP, staff will be able to evaluate
opportunities that were identified by Leidos relating to a a new customer billing system,
deployment of smart grid projects and implementation of a work management system. The
resource impact of these recommendations will be submitted to Council as part of the budget
process and where applicable, in conjunction with the contract approval process.
Environmental Review
City Council acceptance of the Utilities Organization Assessment Update Report does not meet
the definition of a project, pursuant to Section 21065 of the California Environmental Quality
Act, thus no environmental review is required.
Attachments:
Attachment A: CPAU Response to Organizational Review - Status Update Nov 2015
(PDF)
Summary of Recommendations and Utilities Plans/Response – Taken from Table ES-3 in the
December 2013 City of Palo Alto Utilities Department Organization Assessment:
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Action Recommendations
CPAU Water-Wastewater-Gas Operations Division
CPAU Customer Service and Resource Management Divisions
Reallocate priorities and
workload for one FTE of
resources from the RMD to
energy efficiency planning,
reporting and program
development functions.
The goal is to free up one
FTE of CSS resources to
invest in EE program
marketing and targeted
customer service projects
including communication to
improve satisfaction among
residential customers.
Develop and adopt revised
Division work plans
Schedule: Implement
immediately or as soon as
practical
COMPLETED
Instead of reallocating an FTE from the
Resource Management Division (RMD)
to Utilities Marketing Services (UMS), in
FY 2014 Utilities reallocated the
workload of reporting and program
development from UMS to RMD, and
subsequently in early 2015, merged
UMS into RMD to facilitate a
comprehensive and efficienct approach
to supply and demand side portfolio
management.
COMPLETED
Probable Actions
Customer Support Services
Add one additional
classification each for utility
marketing representative
and for customer service
representative to increase
career progression
opportunities.
CPAU to develop
appropriate documentation
to send to the HR
Department.
Obtain appropriate City
approvals.
Schedule: Implement
immediately or as soon as
practical
COMPLETED
In FY2016, UMS reclassified the job
title of three Utility Account
Representatives to Marketing Program
Administrators to properly align their job
responsibilities with their titles. In order
to meet the City’s annual energy
efficiency (EE) goals, the administrators
are responsible for developing new EE
programs including 3rd party vendor
selection, contract negotiation, and
contract administration. UMS and RMD
also added one Business Analyst and
dropped one Utility Account Rep to
enhance and support Utility-specific
applications and databases to improve
efficiencies and data reporting.
COMPLETED
ATTACHMENT A
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
CPAU Water-Wastewater-Gas Operations Division
Outsource Water Meter
Calibrations, Testing, and
Installations.
Operations Division has
issued an RFP and plans to
complete outsourcing
process.
Schedule: Immediate (no
implementation plan
needed).
COMPLETED
In FY 2014, Operations awarded a two-
year contract to a 3rd party to replace
and/or repair large water meters. Meter
testing, calibrations, replacement and
construction are underway.
COMPLETED
Engineering Division
Reclassify two
administrative positions
(currently vacant). - One
to a computer technician
who will support GIS
functions and a second
position to a management
analyst to support contracts
planning, administration and
management.
Implementation analysis to
compare costs against
status quo and options and
consider other benefits and
costs.
If analysis is favorable,
reclassify positions in
budget
Make appropriate staffing
changes
Schedule: Start analysis
immediately and implement
changes by Q2 2014
COMPLETED
In FY 2013, one administrative position
was reclassified to an Engineering
Technician to assist with utilities
mapping in the new GIS system.
In FY 2014, another administrative
position was reclassified to a Utility
Coordinator to develop a contract
database and assist with contract
administration.
COMPLETED
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Study Recommendations
Resource Management Division
Study of service delivery
alternatives for some of
resource management
duties. These duties
include contracting with the
NCPA to conduct some of
the resource acquisition or
resource scheduling or
contracting with another
entity to perform these
functions (e.g. Santa
Clara, TEA, or ACES).
To be determined in
discussion with CPAU and
ASD
Schedule: By the beginning
of Q2 2014
COMPLETED
Resource Management Division had
discussions with alternate service
providers as well as with NCPA about
the cost of its provision of services.
The discussions with NCPA resulted in
a reduction of NCPA service costs by
$250,000, which is about what staff
believes could be saved with an
alternate service provider. NCPA fixed
several errors in the cost model
identified by CPAU and ultimately
agreed to update its cost allocation
methodology and requested that CPAU
be on the review team. Staff will
continue to monitor to determine
whether more cost savings can be
achieved by receiving services from
others. In addition, alternative
providers of certain competitive
services such as resource scheduling
will be sought competitively to
determine whether to have NCPA, or
an alternate provider, provide those
services.
COMPLETED
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Customer Service Support Division
Review CSS annual
workplan against customer
satisfaction goals and
evaluate whether CPAU is
under-investing in customer
service (technology,
staffing, or programs).
Make appropriate
recommendations.
To be determined in
discussion with CPAU
Schedule: Beginning of Q2
2014
IN PROCESS
Staff has made significant progress
towards improving online customer
interaction, particularly via the “My
Utilities Account” (MUA) portal. An
extensive survey of all MUA
participants, which had a remarkable
35% response rate, is being used to
identify which changes being
considered are the most valued by our
customers. Some features have
already been implemented, such as
more user-friendly landing pages and
internal navigation. CPAU will
continuously evaluate more complex
changes which are integrated with
City’s ERP and utility billing systems.
STATUS UPDATE:
COMPLETE
A high-level Utilities IT Systems
Assessment was completed. The study
recommended approximately 40
Utilities technology related projects to
increase operational efficiency,
enhance customer services and
advance smart grid capabilities CPAU
is coordinating with IT on some of these
initiatives including a new billing
system, an interactive voice response
system, payment processing, and
reporting. Staff compares national
utility benchmarks against current
Customer Service functional staffing
levels to identify an optimum mix of staff
support for our multiple service and
billing functions.
CPAU should continue to
evaluate the need for the six
field customer service staff
that read meters if the City
decides to transition to two-
way meters and consider
options including retraining
and repurposing these staff
members, resizing the
division or outsourcing
repair and battery
replacement functions.
City to review annually as
part of the budget process.
Schedule: If the City
transitions to two-way
meters.
PILOT IN PROCESS
CPAU’s residential CustomerConnect
pilot program using smart meters is
underway. After the results of that pilot
program are evaluated, staff will update
the smart grid road map and determine
whether a full roll-out of smart meters is
advisable.
STATUS UPDATE:
COMPLETE
Approximately 300 customers are
enrolled in the residential Customer
Connect advanced meter pilot program.
The advanced meters provide hourly
utility usage information. Customers
can monitor their usage and make
informed decisions on their utility use.
CPAU is also able to detect electric
outages and water leakage faster while
lowering operational costs. The
program has been extended until the
end of 2016. Meter Reading staffing
requirements are currently being met
with a combination of permanent and
temporary staff in order to maintain
maximum flexibility if and when
decisions for the installation of two-way
(“smart”) meters are made.
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Operations Division, Electric and Wastewater Groups
Study Shifting to More
Reliance on Third Party
Contractors for Electric line
work and construction
Study (including costs-
benefits)
Issue RFP
Select Contractor(s) and
negotiate contract(s)
Schedule: Begin study in
six (6) months. If action is
taken, completion of
transition within two to four
years
COMPLETED
In FY 2015, Council approved a three-
year electric construction contract (Staff
report #5388) to assist CPAU with
maintenance and system improvement
of the City’s overhead electric
distribution system. The construction
service will also provide assistance
during emergencies and storm
situations.In FY 2016, Council
approved a three-year excavation
contract to augment staff by providing
utility trenching and substructure
installation services for capital
improvement projects.
COMPLETED:
City Warehouse and CPAU-
Operations Division to work
to improve interface
Specifically, the CPAU-ASD
team should analyze the
ratio of dollars expended
under work orders/service
to dollars expended under
“blanket” accounts.
Further, more generally, the
team should establish a
process to improve
coordination, efficiency, and
effectiveness.
Schedule: Q2 2014
COMPLETED
ASD worked closely with CPAU and
other departments in developing and
implementing a citywide inventory
management policy and procedures.
The policy and procedures included
proper roles and assignments,
inventory tracking and safeguarding.
ASD and CPAU are meeting
periodically to address slow moving
inventory and inventory stored outside
of the warehouse.
COMPLETED:
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Policy, Management and Capacity Building Recommendations
Staff Retention, Recruiting
and Training
CPAU and the HR
Department to develop a
five-year HR plan to
address retention,
succession, recruiting, and
replacement. Team to
review existing leadership
and people development,
training, apprenticeship,
retention, and recruitment
policies and identify gaps
against industry best
practice and what is needed
to meet HR/staffing goals.
A short-term action is for
CPAU’s AD (in coordination
with the HR Department) to
contract with a qualified
outside recruiter to focus on
key hires.
Schedule: Q1 2014 for
needs assessment and five
year plan scoping. Five-
year plan by May 2014.
ONGOING
CPAU developed succession plans for
each of its divisions and is seeking
assistance from the People, Strategy
and Operations (PSO) Department to
address the issues related to staff
retention, recruitment and training. A
significant factor for attracting and
retaining qualified employees is the
total compensation package offered.
STATUS UPDATE:
CPAU continues to work with PSO on
recruitment, retention and succession
planning. CPAU is updating the five
year succession plan including an
organizational chart and matrix for each
division identifying skill set gaps,
employee eligibility for retirement and
planned retirements.
The department has initiated cross-
training and rotational assignments to
develop employee skill sets and provide
growth opportunities and plan to
continue this practice as these
opportunities arise.
CPAU is hiring a temporary Utilities
Recruiter to assist PSOD with
recruitments. The Utilities Recruiter is
responsible for full-cycle recruitment
including sourcing, screening,
scheduling, interviewing and hiring
candidates.
Strengthen the
Department’s Culture
Integrate assessment
findings in HR/staffing
plans. Brief divisions on the
cultural assessment’s
findings. Also, CPAU
should correlate these
findings with the last two
annual employee surveys.
Identify improvement
measures.
Schedule: Q1 2014 and
ongoing
ONGOING
CPAU has conducted four annual
employee surveys since 2011 and the
overall employee satisfaction rating had
been gradually improving until the most
recent survey. In 2015, 62% of the
employees reported being either “very
satisfied” or “satisfied”. This is the first
time the satisfaction score was below
the baseline of 63% set in 2011.
STATUS UPDATE:
Areas of improvement identified in the
survey were improved communication,
competitive compensation, new mobile
devices for the field, replacement
vehicles, and career development
opportunities.
As a result of the surveys, CPAU has
increased training, provided rotational
and cross-training assignments,
developed new job classifications, and
enhanced the employee recognition
program. Additionally, CPAU and IT
continue to work on mobile devices for
the field, and CPAU and Fleet are
replacing vehicles in order to improve
efficiency and effectiveness in the field.
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Investigate high current
ratio-electric and approach
to CIP project financing/debt
service
Investigate if CPAU/City’s
lack of debt service for CIP
projects is appropriate,
especially given the low
cost of borrowing (See
Figure 3-12, Current Ratio-
Electric for more details).
Schedule: Q2 2014
ONGOING
Since CIP expenditure levels have
been, and are projected to be, steady
for most utilities, rate funding is
appropriate. For unique or large
projects, debt funding is pursued. For
example, the $30 million Emergency
Water Supply and Storage project was
debt financed, but the annual water
main replacement projects are rate
funded.
STATUS UPDATE:
COMPLETE FOR WATER; ON-TRACK
FOR GAS
Master Plan for the Water Utility to
address infrastructure replacement
priorities has been completed. This data
is now being incorporated in the CIP
planning for the next CIP cycle. In
addition, an analysis of gas pipe
materials is in progress and will be used
to complete a gas master planning
process next year.
Expand Use of Master
Service Agreements
(MSAs)
Each division to develop a
prioritized list of current and
potential future MSAs and
preparing a schedule for
executing MSAs
Schedule: Q1 2014
DEFERRED
To ensure maximum collaboration and
to remove departmental silos, staff has
not pursued this recommendation. In
the meanwhile, CPAU is responding to
and providing feedback in customer
satisfaction surveys that are being
conducted by other departments.
ONGOING
CPAU continues to meet regularly with
internal departments (i.e. City
Attorney’s Office, Purchasing, IT,
PSOD, Public Works) to address
business needs and work prioritization.
Cost Comparison Study for
IT, Purchasing and HR
Services
Commission a study and
hire a consultant to
compare the quality and
costs of these services
provided as they are now
(by City Departments) to
those that could be provided
by contractor resources.
Alternatives should be
considered such as
increasing current
contractor support to
supplement current City
functions to largely
outsourcing these functions
while leaving City
management control for
these services in place.
Schedule: Q2 2014 – Issue
RFP for study
DEFERRED
Deferred until the completion of the
cost allocation study.
STATUS UPDATE:
In Fiscal Year 2015, ASD implemented
a new citywide budget system.
Therefore, the cost allocation study was
deferred until Fiscal Year 2016.
CPAU-City Cost Allocation Complete cost allocation
study and make
adjustments, as
appropriate.
Schedule: Q1 2015
DEFERRED
Deferred until the completion of the
cost allocation study.
STATUS UPDATE:
In Fiscal Year 2015, ASD implemented
a new citywide budget system.
Therefore, the cost allocation study was
deferred until Fiscal Year 2016.
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
CPAU Managers to
Participate in Performance
Reviews of the Staff in other
Departments that the CPAU
Funds
CPAU department
managers should participate
in annual performance
reviews for all personnel
whose costs are charged to
CPAU.
Schedule: Annually
ONGOING
CPAU managers currently informally
provide input to the supervisors of
those employees who provide services
to CPAU for use in the annual
performance evaluations.
ONGOING
Improve advance planning
for CIP related
procurements
Action for Streamlined
Procurement for Efficient
and Effective Delivery
(SPEED) Committee
Schedule: Process in place
by the beginning of Q2 2015
IN PROCESS
Improvements to the procurement
processes have begun and are being
led by ASD.
STATUS UPDATE:
ASD has implemented PlanetBids as
the City’s eProcurement system. The
system provides vendor management,
solicitation, evaluation, project
reporting, contract compliance and
management, and emergency services.
As of July 13, 2015, all City of Palo Alto
solicitations are handled through
PlanetBids. In addition, to
implementing PlanetBids, the City has
implemented digital signature through
DocuSign. DocuSign has reduced the
turn-around time for signing contracts
by at least 50 percent, from an average
of 10 days to 5 or less. PlanetBids will
be fully implemented in the fall 2015
timeframe at which time, along with
benefits of digital signature, electronic
document management and managed
print services and other process and
policy improvements, the turn-around
time on CIP and other related
procurements will be reduced further.
Conduct twice yearly
purchasing requisition
training for CPAU staff
involved in purchasing
(including new hires)
ASD, Purchasing Division
and CPAU to develop and
launch a 60 minute training
Schedule: Begin Q1 2015
IMPLEMENTED
Staff training on all aspects of the
procurement processes has been
implemented by ASD. Advanced
purchasing training has been
undertaken by Marketing Services staff
in contract administration and project
management
COMPLETED
Summary of Recommendations – Updated November 2015
Recommendation Implementation
Actions/Schedule
Utilities Action Status Update
Improve Sharing of Best
Practices
CPAU to hold a forum
where people from each of
the Divisions present and
discuss best practices.
Create or expand repository
for best practices and tools
(possibly on SharePoint).
Schedule: Begin Q1 2015
ONGOING
Sharing of best practices has been
ongoing in the form of presentations at
divisional staff meetings, monthly safety
meetings, and special training.
SharePoint is in use by the Operations
and Engineering Divisions and the
Rates group in the Resource
Management Division.
INITIATION COMPLETED, EFFORT IS
APPROPRIATELY ONGOING
Annual review of staffing
adequacy for new and
emerging market areas.
Annually, as part of CPAU’s
annual budget process and
at other times as
appropriate, evaluate the
adequacy of staff capacity
(e.g., numbers and skill mix
in other areas and
associated customer
service functions) to ensure
that adequate resources are
allocated to new or
emerging market
developments.
Schedule: Annually
ONGOING
Annually, during the budget
development process, management
evaluates new initiatives and the
staffing requirements for both new
initiatives and any new regulatory
requirements. The Emerging
Technology/Test Bed program also
receives applications for new
technologies on a quarterly basis and
promising ideas are tested. These are
considered for ongoing implementation,
as appropriate, in the budget planning
process.
INITIATION COMPLETED, EFFORT IS
APPROPRIATELY ONGOING
Cost-benefit reviews of any
new program
Conduct a brief cost versus
benefit assessment of any
new program proposals with
potential material impact.
Schedule: Ongoing and as
part of annual budget
process
ONGOING
CPAU’s standard practice when
introducing any new programs is to
evaluate the cost effectiveness and
impact on rates and staffing.
COMPLETED
Note: this has an on-going nature. It is
CPAU’s standard practice to determine
cost-effectiveness of new programs.