Loading...
HomeMy WebLinkAboutStaff Report 4193 City of Palo Alto (ID # 4193) Finance Committee Staff Report Report Type: Action Items Meeting Date: 11/19/2013 City of Palo Alto Page 1 Summary Title: FY 2013 Year -End CIP Matrices Title: Fiscal Year 2013 Year -End Capital Improvement Program Projects Status Report From: City Manager Lead Department: Administrative Services RECOMMENDATION Staff recommends that the Finance Committee review and accept the information on the City’s Capital Improvement Program contained in this report. BACKGROUND This report provides information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of Fiscal Year (FY) 2013. The attached chart and matrices (Attachments A through D and Exhibit 1) list all CIP projects and their current status, and include any comments indicating a change in the scope or timing of the projects. The report is intended to update Council on the progress of all CIP projects that were open at the beginning of FY 2013, and on those that were added or completed during the fiscal year. The report also provides an update on the General Fund infrastructure strategy. DISCUSSION The following information provides detail for General Fund projects: o Chart depicting General Fund Capital Improvement Program Expenditures Summarized by Project Category for Fiscal Years 2009-2013 (Attachment A) o Supporting detail for General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 (Exhibit 1) o General Fund Transfers to Infrastructure Reserve for Fiscal Years 2009-2018 (Attachment B) City of Palo Alto Page 2 The following information provides detail for all funds: o Fiscal Year 2013 Year-End Capital Improvement Program Projects Status (Attachment C) o Continuous Capital Projects Expenditures for Fiscal Years 2009-2013 (Attachment D) In Attachments C and D, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. CIP projects are further categorized into minor projects (projects that can be completed within a one -year period) and multi-year projects (projects that have multi-year budgets and/or complex implementation schedules with identifiable phases). In Attachment C, the city departments have submitted information on their projects and commented on any issues that might cause a change in the scope or timing of the projects. The project status portion of the matrix identifies the phase of the projec t at fiscal year-end, and illustrates how much progress was made. Three distinct phases are utilized, as follows: Phase Activities Pre-Design  Preparation of a feasibility study  Development of a master plan  Definition of a project scope  Preparation of an Environmental Impact Report Design  Hiring a design consultant  Completion of project design  Soliciting bids or proposals Construction  Acquisition of major equipment  Installation  Implementation of a project City of Palo Alto Page 3 Attachment C includes information on the total budget of the project from inception, available budget as of the beginning of the fiscal year, fiscal year expenditures, fiscal year contingencies, fiscal year encumbrances, remaining balance in the project budget as of year -end, and the budget percent complete for the project. Attachment D lists all “continuous” projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. Continuous projects are listed by responsible department and fund and include five years of actual expenditures including the current fiscal year through June 30, 2013. Attachments C and D together represent all open CIP projects. RESOURCE IMPACT Following is a summary of the General Fund CIP budget through June 30, 2013. Total Adjusted Budget for FY 2013 $ 97,878,640 Less: Total Expenditures for FY 2013 (30,068,374) Less: Total Encumbrances as of June 30, 2013 (39,044,551) Remaining balance of the budget carried over to FY 2014 $ 28,765,715 Continuing projects PE-09006 Mitchell Park Library and Community Center and PE-11000 Main Library, and new project PG-13002 El Camino Park Playing Fields comprise a significant portion of the carry over amount. Total expenditures for the past five fiscal years and budgeted expenditures for the next five years are depicted in the following chart: City of Palo Alto Page 4 $20,386 $17,193 $22,122 $31,081 $33,954 $30,068 $32,235 $30,601 $21,278 $21,095 $0 $10,000 $20,000 $30,000 $40,000 FY 2018 FY 2017 FY 2016 FY 2015 FY 2014 FY 2013 FY 2012 FY 2011 FY 2010 FY 2009 General Fund Capital Improvement Program Expenditures Fiscal Years 2009-2013 Actual Fiscal Years 2014-2018 Projected ($ in thousands) Projects that were completed but still had remaining appropriations as of FY 2013 were closed at the beginning of FY 2014 and the balances will be returned to appropriate reserves. These projects are included in the Comprehensive Annual Financial Report (CAFR) CMR since Council approval is necessary. Below we have listed highlights of various projects from the General and Enterprise Funds: General Fund: LB-11000 – Furniture & Technology for Library Measure N Project Actual Infrastructure Expenditures Projected Infrastructure Expenditures City of Palo Alto Page 5 While the construction of the Mitchell Park Library & Community Center (MPL & CC) continues, purchases are being made for furniture, computers and other items funded through the Capital Project Fund. This branch is the second of three Measure N projects to be supported by the Palo Alto Library Foundation’s multi-million dollar campaign. Once completed, the MPL & CC, with a combined area of 56,000 square feet, will offer a valuable space for the community to use a wide variety of library and community center services (such as a computer training room and a game room) in an outstanding, environmentally friendly facility. PG-11001 – Cogswell Plaza Improvements The renovation of Cogswell Plaza, located downtown on Lytton Avenue between Ramona Street and Bryant Street, included replacement of the existing irrigation system, repair of damaged curbs, and renovation of the existing lighting. A new picnic area was added along with café style furnishings to accommodate the launch of public Wi-Fi at the park, funded with a combination of City funds and private contributions. Renovations also included path walkways, and plantings were selected for their water conservation attributes. PF-07000 Art Center Renovation Project This project was successfully completed in FY 2013 as a Public Private Partnership between the Friends of the Art Center and the City. The project included upgrades to mechanical, electrical, roofing, seismic, lighting, painting and accessibility, as well as a new Children’s Wing, improved exhibition galleries, and a refreshing of the Sculpture Garden. PE-12002 University Avenue Tree Well Improvements This project along University Avenue from Webster Street to Alma Street, included installing a new drip irrigation system, repairing damaged curbs and replacing landscaping in the planters and tree wells to enhance the downtown experience. PE-13022 University Avenue Pedestrian/Bicycle Underpass Rehabilitation Project This project, located at the underpass tunnel and ramp area leading from University Avenue to the train station, included crack sealing, repainting, signage replacement and lighting repair to provide a more welcoming entrance to downtown. PE-86070 Street Maintenance Program Beginning in 2011, the annual funding for streets was increased from $1.8 million to $3.8 million, and the latest five year budget plan increased the annual funding to $5.1 million effective for FY 2014. With this additional funding, the City has increased its average pavement condition index score (PCI) from 72 to 77, and is working toward a goal of reaching a City -wide City of Palo Alto Page 6 average score of 85 by 2019. One of the highlights of the FY 2013 street maintenance program was repaving Alma Street. The southern half of Alma Street was repaved from San Antonio Avenue to Colorado Avenue. Rubberized asphalt was used to overlay the road which not only diverted used tires from California landfills, but also provides a quieter driving surface compared to regular asphalt. A grant of over $1 million was utilized to fund most of the project’s costs. SD-11101 – Channing Avenue/Lincoln Avenue Storm Drain Improvements The second phase of storm drain improvements along Channing and Lincoln Avenues was completed in FY 2013. The new storm drains installed along Channing Avenue between Heather Lane and Newell Road and along Lincoln Avenue between Channing Avenue a nd Middlefield Road, will significantly improve the performance of the drainage system serving the Duveneck/St. Francis and Community Center neighborhoods. Enterprise Funds:  Electric o $3.6 million project to convert overhead electric facilities to undergr ound (Underground District 45) along portions of Palo Alto Avenue, Alma Street, High Street, Lytton Avenue and Cambridge Avenue was completed. AT&T needs to complete their work and remove the poles. o Several projects totaling approximately $3.0 million to rebuild different sections of electric facilities along Middlefield Road between Colorado Avenue and San Antonio Road were under construction. Taken as a whole they are 50 percent complete. This work involves replacing electric facilities that are reachi ng the end of their useful life. o $1.2 million project to replace a power transformer at Hanover substation was completed. Replacement of this transformer increases the reliability and capacity of this electric substation which serves customers in the Stan ford Research Park area. o $1.0 million project to rebuild and convert the electric system from 4kV to 12kV along Wilkie Way near west Charleston Avenue is 97 percent complete and is waiting for the completion of work along El Camino Real before it can be finished. This work involves replacing electric facilities that are reaching the end of their useful life and converting to a higher voltage to save on energy losses and reduce materials stock in Stores. o $0.8 million project to rebuild the electric system i n the Hewlett Subdivision (Los Trancos Road) in the western Palo Alto foothills was completed. This work involves replacing electric facilities that are reaching the end of their useful life. o $0.9 million project to rebuild the electric system near Foothills Park and Palo Alto Country Club in the western Palo Alto foothills is 95 percent complete. This City of Palo Alto Page 7 work involves replacing electric facilities that are reaching the end of their useful life.  Gas o $12.1 million contract for the replacement of 68,811 linear feet of gas main pipe and 1,412 services with PE pipe is 40 percent complete (Gas Main replacement Project 19B/21/21). o Replacement of the regulating equipment of Gas Station 3 is scheduled for 2014.  Water o $8.6 million contract for construction of the El Camino reservoir, pump station and well is 84 percent complete. o $4.8 million contract for the rebuilding of the Mayfield Pump Station is 99 percent complete. o $2.0 million contract for construction of the seismic retrofit of Mayfield reservoir is 90 percent complete. o $2.6 million contract for rehabilitation of the five existing wells is 100 percent complete.  Wastewater o $4.0 million contract for the replacement of 31,822 linear feet of wastewater main pipe and 649 sewer laterals with PE pipe is 78 percent comp lete (Sanitary Sewer Rehabilitation Project 22/23). o $4.3 million contract to perform closed circuit TV scans of sanitary sewer laterals for the presence of gas crossbores is 68 percent complete. GENERAL FUND INFRASTRUCTURE UPDATE Infrastructure strategy and funding continues to be a top priority for the City Council. The Infrastructure Blue Ribbon Commission (IBRC) was created in October 2010 to identify and prioritize the City’s infrastructure needs and to determine funding sources and financing mechanisms to address the City’s backlog and future needs. The IBRC issued its final report, Palo Alto’s Infrastructure: Catching Up, Keeping Up, and Moving Ahead , in December 2011. They recommended annual funding of $2.2 million for “keep -up” needs and annual funding of $4.2 million over ten years for “catch-up” needs. The IBRC also identified major capital expenditures of $210 million for “new and replacement” needs, including repl acement of the Public Safety Building and the Municipal Services Center. As recommended by IBRC, the annual capital transfer from the General Fund was increased by $2.2 million in the FY 2013 Adopted Capital Budget. Further, an Infrastructure Committee comprised of four Council members was formed in February 2013 to refine and further evaluate infrastructure projects and financing mechanisms, with input from public opinion surveys. City of Palo Alto Page 8 The Infrastructure Committee has refined the project list, reconciled it with the Five-Year Capital Improvement Plan (CIP Plan), and identified committed funding. The unfunded portion of infrastructure projects is estimated at $180 million. The Committee also identified currently available one-time funding sources and new sources that could potentially provide revenue to fund infrastructure needs. They are proceeding with further study in several areas such as increased transient occupancy or sales tax rates which would support debt service for Certificates of Participation, new general obligation bond measures, and a special tax to finance parking garages. Initial public opinion research was conducted in the spring of 2013. The findings were presented to the City Council in June 2013 during a study session and can be found at: https://www.cityofpaloalto.org/civicax/filebank/documents/34952 . A second phase of research is scheduled to be conducted in November 2013. The results of that poll will dictate which potential financing alternatives, if any, will be further explored. An update on the Infrastructure Committee’s work, along with their next steps, can be found at: https://www.cityofpaloalto.org/civicax/filebank/documents/37495. Attachments:  Attachment A: FY2013 GF CIP Expenditures By Project Category (Graph) (XLSX)  Exhibit 1: GF CIP Project Expenditures For FYs 2009-2013 (XLSX)  Attachment B: GF Xfers To Infra Reserve For FYs 2008-2017 (XLS)  Attachment C: FY13 YE Capital Projects Status (PDF)  Attachment D: Continuous Capital Projects Expenditures for Fiscal Years 2009 -2013 (XLS) Attachment A Buildings & Facilities Streets & Sidewalks Parks & Open Space Land & Land Improvements Other FY 2009 10,082 6,227 1,733 2,503 550 FY 2010 9,312 5,855 3,460 2,353 298 FY 2011 20,250 7,422 1,731 98 1,100 FY 2012 23,868 6,977 1,113 17 259 FY 2013 14,040 12,748 1,480 460 1,340 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 General Fund Capital Improvement Program Expenditures Summarized by Project Category for Five Years: Fiscal Years 2009-2013 ($ in thousands) Page 1 of 1 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities 5,019$ AC-09002 Community Theatre Sound System Replacement Buildings and Facilities 6,844 CA-01014 Community Services Facilities Lighting Enhancements Buildings and Facilities 3,663$ CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities 995$ 7,611$ 4,609$ 11,266 CC-10000 Replacement of Cubberley Gym B Bleachers Buildings and Facilities 6,739 29,495 CC-11000 Cubberley Gym Activity Room Buildings and Facilities 58,041 FD-08001 Fire Station #6 Improvements Buildings and Facilities 8,061 48,110 271 General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 Page 1 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 OS-07003 Foothills Park Maintenance Building Rehabilitation Buildings and Facilities 249,933 PE-04010 Children's Library Improvements & Expansion Buildings and Facilities 58,561 PE-04012 Mitchell Park Library & Community Center Improvements Buildings and Facilities 179,071 123 PE-04014 Animal Shelter Expansion & Renovation Buildings and Facilities 762,057 61,539 PE-05010 College Terrace Library Improvements Buildings and Facilities 337,154 1,545,763 846,020 7,344 4,600 PE-06001 San Antonio Bridge Structural Repairs & Maintenance Buildings and Facilities 494 82,782 PE-08005 Municipal Service Center Resurfacing Buildings and Facilities 752,021 326,898 Page 2 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities 51,098 30,634 PE-09005 Downtown Library Improvements Buildings and Facilities 78,162 562,707 3,133,576 714,043 31,093 PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities 509,024 3,278,486 10,381,000 14,213,182 8,691,974 PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities 28,866 518,623 110,020 2,205 412 PE-10002 Ventura Community Center and Park Buildings and Facilities 13,283 21,130 287,503 PE-11000 Main Library New Construction and Improvements Buildings and Facilities 792,913 1,139,804 741,837 PE-11012 Temporary Main Library Buildings and Facilities 96,435 429,616 Page 3 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-12017 City Hall 1st Floor Buildings and Facilities 63,537 91,491 PE-89004 Yacht Harbor Improvements Buildings and Facilities 21,584 PE-98020 Public Safety Building Buildings and Facilities 1,000,414 175,289 30,910 14,943 7,252 PE-95030 Downtown Parking Structure Buildings and Facilities 155 469 PF-00006 Roofing Replacement Buildings and Facilities 21,073 251,344 104,617 319,495 246,068 PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities 4,915,782 1,344,006 3,803,962 1,950,609 423,121 PF-01003 Building Systems Improvements Buildings and Facilities 114,152 36,098 74,876 59,798 34,320 Page 4 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PF-01004 Fire Station Improvements Buildings and Facilities 575,700 237,018 394 PF-02022 Facility Interior Finishes Buildings and Facilities 47,116 11,076 23,874 234,085 70,609 PF-04000 Security System Improvements Buildings and Facilities 8,903 3,581 PF-04010 Cubberley Mechanical & Electrical Upgrades Buildings and Facilities 5,218 9,369 PF-05002 Municipal Service Center Renovation Buildings and Facilities 12,057 3,530 12,176 PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities 1,290 12,897 141,633 7,869 PF-06003 Cubberley Community Center Fire Alarm System Buildings and Facilities 70,949 Page 5 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PF-06004 Cubberley Restroom Renovation Buildings and Facilities 27,422 3,129 11,849 PF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities 132,737 234,143 543,877 4,628,983 2,418,160 PF-07001 ADA Compliance - Cubberley Community Center Buildings and Facilities 13,512 205,388 PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities 7,592 6,150 131 PF-07011 Roth Building Maintenance Buildings and Facilities 1,931 3,729 1,205 PF-08000 Art Center Kiln Hood Replacement Buildings and Facilities 60,654 14,570 PF-09000 Children's Theatre Improvements Buildings and Facilities 30,199 Page 6 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PF-09002 Lucie Stern Community Center and Theatre Exterior Paint Buildings and Facilities 4,510 90,816 PF-10000 Civic Center Chiller Drive Replacement Buildings and Facilities 72,380 PF-10001 Rinconada Pool Plaster Buildings and Facilities 117,756 PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities 23,682 15,260 32,672 448,804 PF-93009 ADA Compliance Buildings and Facilities 121,617 235,410 9,994 167,537 10,019 Total Buildings and Facilities 10,082,066$ 9,311,891$ 20,250,843$ 23,867,878$ 14,040,559$ AC-86017 Art in Public Places Land and Land Improvements 21,556$ 17,256$ 77,956$ 17,171$ 59,526$ Page 7 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements 2,306,958 2,252,250 400,000 AS-09000 City of Palo Alto Municipal Airport Transition Project Land and Land Improvements 39,075 67,775 4,050 PE-09004 Los Altos Treatment Plant Master Plan Study Land and Land Improvements 135,905 15,468 16,278 Total Land and Land Improvements 2,503,494$ 2,352,749$ 98,284$ 17,171$ 459,526$ FD-09001 Fire Apparatus Equipment Replacement Miscellaneous 48,352$ 261,283$ FD-09002 Jaws of Life Hurst Tool Replacement Miscellaneous 60,905 FD-12000 ALS EKG Monitor Replacement Miscellaneous 517,914$ Page 8 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 LB-11000 Furniture & Technology for Measure N Project Miscellaneous 28,124$ 178,774$ 531,457 LB-94018 Library Automation Service Miscellaneous 732 PE-12002 Tree Wells - University Avenue Irrigation Miscellaneous 28,743 152,993 PE-12004 Municipal Services Center Facilities Study Miscellaneous 220 PE-12009 Alma Guardrail Miscellaneous 5,888 34,353 PD-08000 Crime Scene Evidence Collection Vehicle Miscellaneous 174,201 6,039 PF-12004 Citywide Backflow Preventer Installations Miscellaneous 95,643 Page 9 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PO-10002 Downtown Tree Grates Miscellaneous 29,879 8,136 PO-12002 LATP Site Development Preparation & Security Miscellaneous 8,636 7,668 Total Miscellaneous 109,989$ 291,162$ 210,461$ 228,300$ 1,340,028$ FD-05000 Sixteen (16) ALS Monitors Non-Infrastructure Management Plan 62,650$ 434$ PD-07000 Mobile Command Vehicle Non-Infrastructure Management Plan 695,337 PE-05001 Photovoltaic Design and Installations Non-Infrastructure Management Plan 325,978 6,448$ PE-07011 Library Service Model Analysis Non-Infrastructure Management Plan 1,478 Page 10 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PL-05002 Charleston/Arastradero Corridor Plan Non-Infrastructure Management Plan 193,613 26,988$ PL-06001 Adobe Creek Bicycle Bridge Replacement Non-Infrastructure Management Plan 4,184 PL-06002 Comprehensive Parking Signage Plan Non-Infrastructure Management Plan 43,470 4,248 PL-06005 Installation of Ticket Machines Non-Infrastructure Management Plan 2,250 Total Non-Infrastructure Management Plan 440,010$ 6,448$ 889,384$ 31,236$ -$ AC-10000 Junior Museum & Zoo New Bobcat Habitat Parks and Open Space 101,790$ 23,210$ AC-12001 Junior Museum & Zoo Perimeter Fence and Footpath Parks and Open Space 31,101$ Page 11 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 OS-00001 Open Space Trails and Amenities Parks and Open Space 123,193$ 97,766 47,473 162,466$ 125,150 OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space 35,909 63,263 54,097 24,615 15,000 OS-07000 Foothills Park Road Improvements Parks and Open Space 25,000 150,000 OS-07002 Foothills Park Interpretive Center & Open Space Maintenance Yard Parking Parks and Open Space 2,302 OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space 25,463 24,719 4,130 13,248 OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space 54,098 PE-00110 College Terrace Park Improvements Parks and Open Space 154,927 522 Page 12 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-05300 Arastradero Preserve Gateway Parks and Open Space 9,156 PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space 166,612 6,709 1,479 429 486 PE-06007 Park Restroom Installation Parks and Open Space 41,134 100,096 224,048 98,119 147,865 PE-07002 Hoover Park Improvements Parks and Open Space 67,053 PE-07005 California Avenue Improvements Parks and Open Space 49,900 465,324 53,810 PE-07006 Boulware Park Improvements Parks and Open Space 3,799 PE-07007 Cubberley Turf Renovation Parks and Open Space 190,950 969,963 Page 13 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-07009 Baylands Athletic Center Fencing, Dugout & Trailhead Parking Parks and Open Space 46,164 PE-08002 Peers Park Improvements Parks and Open Space 301,383 PE-08004 Lytton Plaza Renovation Parks and Open Space 23,530 725,733 2,545 11,793 11,570 PE-09002 Greer Park Phase IV Parks and Open Space 168,231 515,091 925,076 142,030 8,078 PE-12003 Rinconada Park Master Plan & Design Parks and Open Space 121,690 118,299 PE-12012 Eleanor Pardee Park Improvements Parks and Open Space 21,827 26,641 PE-12013 Magical Bridge Playground Parks and Open Space 129,237 92,606 Page 14 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-13003 Parks Master Plan Parks and Open Space 29,193 PE-13005 City Hall/King Plaza Landscape Parks and Open Space 1,337 PE-13007 El Camino Park Dog Park Parks and Open Space 977 PE-13010 Greer Park Renovations Parks and Open Space 1,896 PE-13016 El Camino Park Expanded Parking Lot and New Restroom Parks and Open Space 8,886 PE-13020 Byxbee Park Trails Parks and Open Space 21,374 PE-98003 Mitchell Park Facilities Parks and Open Space 24,962 Page 15 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PF-12001 Parks and PWD Trees Work Space Improvements Parks and Open Space 836 7,515 PG-00010 Park Facilities Improvements Parks and Open Space 1,361 PG-04010 Stanford/Palo Alto Community Playing Field Parks and Open Space 869 PG-06001 Tennis and Basketball Court Resurfacing Parks and Open Space 107,117 100,159 77,512 53,635 506 PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space 85,766 73,480 118,366 105,225 168,788 PG-09002 Park and Open Space Emergency Repairs Parks and Open Space 73,190 50,883 147,651 52,875 42,793 PG-09003 Park Maintenance Shop Remodel Parks and Open Space 402 2,858 55,414 2,244 3,760 Page 16 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PG-11000 Hopkins Park Improvements Parks and Open Space 4,100 PG-11001 Cogswell Plaza Improvements Parks and Open Space 11,123 134,635 PG-11002 Monroe Park Improvements Parks and Open Space 3,200 PG-12002 Golf Course Tree Maintenance Parks and Open Space 21,014 PG-98001 School Site Irrigation Parks and Open Space 4,596 161,399 PG-13003 Golf Reconfiguring Parks and Open Space 406,950 Total Parks and Open Space 1,732,969$ 3,459,755$ 1,730,681$ 1,113,288$ 1,480,052$ Page 17 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-00104 San Antonio Road Median Improvements Streets and Sidewalks 743,106$ 239,404$ 142,556$ 676,384$ 314,834$ PE-01013 El Camino Median Landscape Streets and Sidewalks 4,525 PE-06006 Alma Street Landscape Improvements Streets and Sidewalks 40,901 26,371 PE-10006 Bridge Rail, Abutment, and Deck Repair Streets and Sidewalks 167,062 PE-11011 Highway 101 Pedestrian / Bicycle Overcrossing Streets and Sidewalks 36,385 194,020 115,011 263,479 PE-12011 Newell Road Bridge / San Francisquito Creek Bridge Replacement Streets and Sidewalks 55,715 328,933 PE-13011 Charleston/Arastradero Corridor Project Streets and Sidewalks 32,880 Page 18 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PE-13022 University Avenue Pedestrian/Bicycle Underpass Rehabilitation Streets and Sidewalks 178,901 PE-86070 Street Improvements (Street Improvement Fund) Streets and Sidewalks 3,702,381 3,658,566 5,110,791 3,170,679 7,097,782 PL-00026 Safe Routes to School Streets and Sidewalks 30,000 20,750 87,321 294,601 PL-04010 Bicycle Transportation Plan Implementation Project Streets and Sidewalks 30,000 80,862 103,599 57,921 PL-05003 College Terrace Traffic Calming Streets and Sidewalks 545 PL-05030 Traffic Signal Upgrades Streets and Sidewalks 39,983 279,590 183,141 244,272 385,302 PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks 2,490 4,790 247,112 341,683 963,546 Page 19 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PL-11001 Dinah SummerHill Pedestrian/Bicycle Path Streets and Sidewalks 188,187 2,845 PL-11002 California Avenue Transit Hub Corridor Streets and Sidewalks 16,361 81,210 PL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks 35,528 PL-11004 Alma Street Traffic Signal Improvements Streets and Sidewalks 645 PL-12000 Transportation and Parking Improvements Streets and Sidewalks 91,002 292,854 PL-98013 School Commute Safety Improvements (SIF) Streets and Sidewalks 2,490 6,170 PO-05054 Street Light Improvements Streets and Sidewalks 15,970 40,430 159,070 61,844 69,707 Page 20 of 21 11/12/2013 Exhibit 1 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Expenditures by Project Category for Fiscal Years 2009-2013 PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks 20,792 136,380 PO-11001 Thermoplastic Lane Marking and Striping Streets and Sidewalks 29,639 127,958 74,614 PO-12001 Curb and Gutter Repairs Streets and Sidewalks 1851 287,582 PO-12003 Foothills Fire Management Streets and Sidewalks 19,884 PO-89003 Sidewalk Improvements Streets and Sidewalks 1,675,527 1,341,916 1,211,917 1,673,715 1,864,954 Total Streets and Sidewalks 6,227,373$ 5,855,059$ 7,421,556$ 6,977,019$ 12,748,209$ Grand Total 21,095,901$ 21,277,064$ 30,601,209$ 32,234,892$ 30,068,374$ Page 21 of 21 11/12/2013 Attachment B Transfer to Infrastructure Return to General Fund Net Amount Fiscal Year (000's)(000's)(000's) 2009 14,648 a 14,648 2010 9,900 3,243 6,657 2011 9,857 9,857 2012 18,644 b 18,644 2013 22,257 c 22,257 2014 13,226 13,226 2015 13,627 13,627 2016 14,047 14,047 2017 14,509 14,509 2018 15,001 15,001 Total 145,716$ 3,243$ 142,473$ Notes:a. Includes funding for the Public Safety Building $3.4 million b. Includes one-time transfer of $7.6 million to reduce GF BSR to 18.5 percent target level c. Includes one-time transfer of $8.9 million to reduce GF BSR to 19.0 percent target level and $2.2 million annual "upkeep" costs Sources:FY 2009 through 2013 are actual amounts FY 2014 through 2018 based on FY 2014 Adopted Capital Budget 14,648 6,657 9,857 18,644 22,257 13,226 13,627 14,047 14,509 15,001 5,000 7,000 9,000 11,000 13,000 15,000 17,000 19,000 21,000 23,000 25,000 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 $000 Fiscal Year General Fund Transfers to Infrastructure Reserve for Fiscal Years 2009-2018 (000's) Page 1 of 1 11/12/2013 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements $7,223,394 $0 $400,000 $0 $0 $0 $0 100%Complete Complete Project Closed FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND ADMINISTRATIVE SERVICES DEPARTMENT MULTI-YEAR PROJECTS Page 1 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities $100,000 $100,000 $5,019 $0 $0 $1,082 $93,899 6%Pre-Design Jun 14 Needs assessment has been completed. Requests for Proposal prepared. AC-09002 Community Theater Sound System Replacement Buildings and Facilities $200,000 $200,000 $6,844 $0 $0 $1,257 $191,899 4%Pre-Design Jun 14 Needs assessment has been completed. Requests for Proposal prepared. AC-12001 Junior Museum & Zoo Perimeter Fence and Footpath Parks and Open Space $50,000 $50,000 $31,101 $0 $0 $0 $18,899 100%Complete Sep 12 Project completed. To be closed in FY14. CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities $161,567 $152,961 $2,519 $8,747 $0 $3,682 $138,013 15%Design Jun 14 Project has been delayed as it will now be a design-and- build contract. OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space $175,000 $175,000 $54,098 $0 $0 $0 $120,902 31%Design Sep 14 Design and EIR complete. Project now independent of JPA and will no longer be paired with JPA flood control project. PG-09003 Park Maintenance Shop Remodel Parks and Open Space $159,096 $98,179 $3,760 $0 $0 $0 $94,419 41%Design Feb 14 Since there is common shared space, this project will now be Public Works Facilities Management. Project is out for bid. PG-11000 Hopkins Park Improvements Parks and Open Space $95,000 $95,000 $4,100 $0 $0 $8,400 $82,500 13%Design TBD Landscape architect hired for planning and development of scope of contract. Design complete. PG-11001 Cogswell Plaza Improvements Parks and Open Space $156,208 $145,866 $134,635 $0 $0 $11,231 $0 100%Complete Oct 12 Project Completed Dec 2012. To be closed in FY14. PG-11002 Monroe Park Improvements Parks and Open Space $250,000 $250,000 $3,200 $0 $0 $9,300 $237,500 5%Design TBD Landscape architect hired for planning and development of scope of contract. PG-11003 Scott Park Improvements Parks and Open Space $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Design TBD Design complete (paid under PG-06003). Staff preparing IFB. PG-12001 Stanford / Palo Alto Playing Field Netting Parks and Open Space $50,000 $50,000 $0 $0 $0 $0 $50,000 0%Design TBD Staff in initial planning and development of scope of contract. PG-12002 Golf Course Tree Maintenance Parks and Open Space $122,779 $122,779 $0 $0 $0 $0 $122,779 0%Ongoing TBD Funds for this CIP are not expended due to golf course renovations. Funds for this CIP will be moved into Golf's Operating budget. PG-12004 Sarah Wallis Park Improvements Parks and Open Space $65,000 $65,000 $0 $0 $0 $0 $65,000 0%Pre-Design TBD Staff in initial planning and development of scope of contract. PG-12005 Relocate Power Poles for Soccer Field Parks and Open Space $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Design TBD Project on hold pending staff land evaluation. OS-00001 Open Space Trails & Amenities Parks and Open Space $2,105,869 $311,723 $45,000 $80,150 $0 $8,038 $178,535 92%Ongoing TBD Various trail improvements at Arastradero, Foothills Park, and Baylands. Year 2 of 3 year contract. MULTI-YEAR PROJECTS FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT MINOR PROJECTS Page 2 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space $442,183 $64,920 $15,000 $0 $0 $0 $49,920 89%Ongoing TBD Year 2 of 3 year contract for maintenance of Boronda Lake. OS-07000 Foothills Park Road Improvements Parks and Open Space $525,000 $125,000 $0 $0 $0 $0 $125,000 76%Ongoing TBD Work is now in-house by Public Works Engineering or combined with their paving contracts to achieve cost savings. OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space $226,357 $226,357 $13,248 $0 $0 $0 $213,109 6%Ongoing TBD Work is now done in-house by Public Works Engineering or combined with their paving contracts. PG-06001 Tennis & Basketball Court Resurfacing Parks and Open Space $526,443 $35,618 $506 $0 $0 $0 $35,112 93%Ongoing TBD Staff in planning for FY14. FY14 projects are Mitchell Park and Hoover Park Design. Estimated IFB in Nov 2013. PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space $746,676 $389,877 $97,780 $71,008 $0 $55,521 $165,568 78%Ongoing TBD Projects completed in FY13 - Site Amenities: Cogswell Plaza trash receptacles and site furniture, bleachers at Hopkins Park; various bench replacements at Greer Park; basketball standard replaced at Greer Park; fence repairs at Mitchell Park tennis courts. Signage: design for Rinconada Cultural Center signage. Landscaping: Lucie Stern entryway and courtyard. PG-09002 Park and Open Space Emergency Repairs Parks and Open Space $357,761 $108,162 $42,793 $0 $0 $3,000 $62,369 83%Ongoing TBD Projects completed in FY13: Rinconada Park tennis court tripping hazard surface repairs. Werry Park repairs to playground structure. Briones Park repairs to playground structure. Heritage Park booster pump installation. Addison School booster pump repair. Playground safety repairs to various sites (Bol, Mitchell, Peers & Robles Parks). Foothills Park culvert repairs due to storm. PG-13001 Stanford / Palo Alto Soccer Turf Replacement Parks and Open Space $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-Design Jun 16 Staff in initial planning and development of scope of contract. PG-13002 El Camino Park Playing Fields and Amenities Parks and Open Space $3,435,286 $3,435,286 $0 $0 $0 $0 $3,435,286 0%Design Jun 14 Pending design changes to parking lot. PG-13003 Golf Reconfiguring Parks and Open Space $634,843 $634,843 $317,446 $89,504 $0 $228,341 ($448)100%Design Jun 15 Design 90% complete. Construction to begin in Apr 2014. Page 3 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FD-12000 ALS EKG Monitor Replacement Miscellaneous $617,850 $617,850 $517,914 $0 $0 $92,970 $6,966 100%Completed Dec 12 The Fire Department completed the acquisition of new ALS EKG monitors in Dec 2012. Project to be closed in FY14. FD-13000 Long Range CCTV Cameras Miscellaneous $65,000 $65,000 $0 $0 $0 $0 $65,000 0%Ongoing TBD The Fire Department is currently evaluating several Thermal Imaging Cameras. FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND FIRE DEPARTMENT MULTI-YEAR PROJECTS Page 4 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments LB-11000 Furniture & Technology for Library Measure N Project Miscellaneous $2,375,000 $2,168,102 $531,457 $0 $0 $754,451 $882,194 63%Ongoing Dec 15 Project activity is being coordinated with the construction schedule of the Mitchell Park Library & Community Center and Main Library Measure N building renovations. FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND LIBRARY SERVICES DEPARTMENT MULTI-YEAR PROJECTS Page 5 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments PL-05002 Charleston/ Arastradero Corridor Plan Non-Infrastructure Management Plan $1,001,385 $0 $0 $0 $0 $0 $0 100%Complete June 13 Project complete. To be closed in FY14. PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks $1,519,166 $963,546 $963,546 $0 $0 $0 $0 100%Complete Feb 12 Project complete. To be closed in FY14. PL-11001 Dinah SummerHill Pedestrian Bicycle Path Streets and Sidewalks $302,248 $118,898 $597 $2,248 $0 $0 $116,053 62%Ongoing TBD Majority of charges in FY13 to be reclassified to a different project. In-house design is complete. Hexagon Transportation Consultants completed traffic study. A community outreach meeting was held in Summer 2013. Estimated to begin construction in Spring 2014. PL-00026 Local and Neighborhood Collector Street Traffic Calming Program (SIF) ("Safe Routes To Schools") Streets and Sidewalks $1,234,187 $720,026 $227,415 $67,186 $0 $350,591 $74,834 94%Ongoing TBD This ongoing CIP implements traffic calming improvements along Residential Arterial Streets and funds the development of Safe Routes to School Programs and Projects at schools. PL-04010 Bicycle and Pedestrian Transportation Plan Implementation Project Streets and Sidewalks $341,149 $118,205 $57,921 $0 $0 $47,919 $12,365 96%Ongoing TBD This ongoing CIP implements project recommendations from the City's Bike/Ped Transportation Plan. Maybell and Matadero Bike Boulevards are currently in the public outreach and design phase and an RFP has been released for consulting for public outreach and design for ten additional bicycle boulevard facilities. PL-11002 California Avenue Transit Hub Corridor Streets and Sidewalks $1,726,609 $1,710,556 $79,800 $1,410 $0 $268,743 $1,360,603 21%Ongoing Dec 14 Design is complete. Project goes out to bid in Nov 2013. Anticipated construction start date: Dec 2013. PL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks $400,000 $364,472 $0 $0 $0 $0 $364,472 9%Ongoing Dec 13 An RFP is pending release of a Notice to Proceed from CalTrans who is providing grant reimbursement for the project. PL-12000 Transportation and Parking Improvements Streets and Sidewalks $893,998 $893,998 $292,854 $0 $0 $365,777 $235,367 74%Ongoing N/A A downtown parking study is underway. Additional parking programs, studies, and transportation projects are in the planning stages. FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS MULTI-YEAR PROJECTS Page 6 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space $240,966 $4,614 $0 $486 $0 $0 $4,128 100%Complete Mar 12 Project completed as of 6/30/2013. To be closed in FY14. PE-08004 Lytton Plaza Renovation Parks and Open Space $793,142 $32,086 $11,570 $0 $0 $0 $20,516 100%Complete Dec 12 Project completed as of 6/30/2013. To be closed in FY14. PE-09002 Greer Park Phase IV Parks and Open Space $1,959,108 $10,747 $2,554 $5,524 $0 $0 $2,669 100%Complete Dec 12 Project completed as of 6/30/2013. To be closed in FY14. PE-11011 Highway 101 Pedestrian/Bicycle Overcrossing Streets and Sidewalks $631,284 $397,514 $132,001 $131,478 $0 $84,743 $49,292 92%Pre-Design Mar 14 The feasibility study was completed in Nov 2011. Preliminary Engineering and Environmental assessment is in progress. Staff is working with Caltrans on various environmental studies as part of the Grant funding requirement. Council directed staff to implement a design competition for the project. PE-12002 Tree Wells - University Avenue Irrigation Miscellaneous $199,379 $199,379 $103,614 $49,379 $0 $42,218 $4,168 100%Complete Apr 13 Project completed as of 6/30/2013. To be closed in FY14. PE-12003 Rinconada Park Long Range Plan & Design Parks and Open Space $200,602 $142,359 $67,696 $50,603 $0 $15,664 $8,396 96%Design Jan 14 Project is in design phase; staff is presenting the design to PRC and ARB in Winter 2013. PE-12004 Municipal Services Center Facilities Study Miscellaneous $249,780 $249,780 $0 $0 $0 $0 $249,780 0%Pre-Design Jun 14 Draft scope of services for specialized consultant support is under review. Expect consultant to start work in January 2014 and recommend menu of options for city review by Apr 2014. PE-12009 Alma Guardrail Miscellaneous $122,754 $116,865 $27,488 $6,865 $0 $12 $82,501 100%Complete Dec 12 Project completed as of 6/30/2013. To be closed in FY14. PE-12013 Magical Bridge Playground Parks and Open Space $1,362,263 $1,298,073 $30,343 $62,263 $0 $116,107 $1,089,360 20%Design Jun 14 Design and construction documents are expected to be completed by Summer 2014 pending Friends of the Magical Bridge fund raising effort. PE-12017 City Hall First Floor Renovations Buildings and Facilities $1,438,176 $1,438,176 $16,077 $75,414 $0 $126,399 $1,220,286 15%Design Aug 14 Staff will return to Council for approval of contract amendment wth WMB Consultant to reflect proposed expansion to the project scope. PE-13003 Parks Master Plan Parks and Open Space $379,193 $379,193 $0 $29,193 $0 $0 $350,000 8%Design Jan 15 Consultant contract will be presented to Council for approval in Oct 2013. PE-13008 Bowden Park Parks and Open Space $157,000 $157,000 $0 $0 $0 $0 $157,000 0%Design Feb 14 Community outreach needs to occur and construction bidding of project is expected Summer of 2014. PE-13010 Greer Park Renovations Parks and Open Space $301,896 $301,896 $0 $1,896 $0 $0 $300,000 1%Design Jan 14 Community outreach needs to occur and construction bidding of project is expected Spring of 2014. PE-13016 El Camino Park Expanded Parking Lot and New Restroom Parks and Open Space $968,885 $968,885 $0 $8,886 $0 $0 $959,999 1%Design Apr 14 Project is currently in the design phase with construction to proceed upon completion of Utilities water reservoir project. PE-13020 Byxbee Park Trails Parks and Open Space $271,374 $271,374 $0 $21,374 $0 $0 $250,000 8%Design Dec 14 RFP for design services is being released. This project is being jointly managed by PWD Environmental Services and CSD Open Space. PF-04000 Security System Improvements Buildings and Facilities $275,000 $59,768 $0 $0 $0 $0 $59,768 78%Construction Jun 14 Additional security for MSC being installed. PF-06004 Cubberley Restroom Renovation Buildings and Facilities $339,271 $309,577 $0 $11,849 $0 $0 $297,728 12%Pre-Design Dec 14 Finalizing Design. Due to workload constraints this project has been delayed. PF-11001 Council Chambers Carpet Replacement Buildings and Facilities $80,000 $80,000 $0 $0 $0 $0 $80,000 0%Design Aug 14 This project scope has been included in the schedule for the Council Chamber Renovation project in FY14. FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTS Page 7 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT PF-13001 Lucie Stern Mechanical System Upgrade Buildings and Facilities $100,000 $100,000 $0 $0 $0 $0 $100,000 N/A N/A N/A Combined into PE-14015. Project will be closed in FY14. PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities $278,549 $231,580 $0 $0 $0 $0 $231,580 17%Design N/A Combined into PE-14015. Project will be closed in FY14. PF-07011 Roth Building Maintenance Buildings and Facilities $424,395 $258,576 $0 $0 $0 $0 $258,576 39%Ongoing Jun 14 All initial work completed. Ongoing work is for maintenance and repairs. PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities $688,999 $617,385 $448,804 $0 $0 $0 $168,581 100%Complete Nov 12 Project completed as of 6/30/2013. To be closed in FY14. PF-12001 Parks and PWD Trees Work Space Improvements Parks and Open Space $382,515 $382,515 $0 $7,515 $0 $331,200 $43,800 89%Construction Jan 14 Construction Bid Phase PF-12004 Citywide Backflow Preventer Installations Miscellaneous $250,000 $250,000 $95,643 $0 $0 $154,357 100%Complete Nov 12 Project completed as of 6/30/2013. To be closed in FY14. PO-10002 Downtown Tree Grates Miscellaneous $300,000 $261,985 $0 $0 $0 $4,000 $257,985 14%Ongoing Dec 15 Ongoing. Project is being done in conjunction with PO- 89003 and tree replacement schedule. PO-12000 Wilkie Way Bridge Deck Replacement Streets and Sidewalks $50,000 $50,000 $0 $0 $0 $40,205 $9,795 80%Construction Oct 13 Replacement deck materials are being evaluated for suitability. Construction is expected to be completed Oct 2013. Keep the project open for 1 year during the warranty period. PO-12001 Curb and Gutter Repairs Streets and Sidewalks $598,149 $598,149 $287,582 $0 $0 $262,590 $47,977 92%Construction Jun 14 Ongoing. This is an annual project being done in conjunction with PO-89003. PO-12002 LATP Site Development Preparation & Security Miscellaneous $250,000 $241,364 $7,668 $0 $0 $233,333 $364 100%Design Aug 15 Consultant performed geological analysis and sampled sludge ponds for H2S. New wetlands delineation will be required. PO-12003 Foothills Fire Management Streets and Sidewalks $200,000 $200,000 $19,884 $0 $0 $17,981 $162,135 19%Ongoing Jun 17 Burn was completed and clearing to still take place. Fire taking the lead on organization. PE-00104 San Antonio Road Median Improvements Streets and Sidewalks $2,231,622 $441,550 $278,218 $36,616 $0 $0 $126,716 100%Complete Apr 13 Project was completed in April 2013; project must stay open for 1 year during the warranty period. PE-05010 College Terrace Library Improvements Buildings and Facilities $3,515,312 $4,600 $4,600 $0 $0 $0 $0 100%Complete Jun 12 Project completed as of 6/30/2013. To be closed in FY14. PE-06007 Park Restroom Installation Parks and Open Space $959,230 $773,517 $115,665 $32,200 $0 $129,147 $496,504 48%Construction Oct 13 Briones Park restroom: Building is onsite and site work is underway and is expected to be completed in Oct 2013. PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities $478,902 $478,902 $30,634 $0 $0 $0 $448,268 6%Ongoing Jun 14 This is an annual project. Funding will be used for repaving the Mitchell Park Library parking lot once the construction of the library is completed. This project will also fund the repaving of Greer Park parking lot. PE-09005 Downtown Library Improvements Buildings and Facilities $4,530,826 $77,338 $25,039 $6,054 $0 $45,631 $614 100%Complete Dec 12 Project completed as of 6/30/2013. To be closed in FY14. PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities $49,207,819 $21,286,868 $8,150,334 $541,640 $0 $10,079,641 $2,515,252 95%Construction Nov 13 Construction began Sept 2010. Project is 95% complete. PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities $793,181 $135,673 $0 $412 $0 $23,861 $111,400 86%Construction Apr 15 After final invoices are received, project will remain open until warranty period is over. Demobilization when Mitchell Library has opened. MULTI-YEAR PROJECTS Page 8 of 30 Attachment C Total Budget FY 2013 FY 2013 FY 2013 FY 2013 FY 2013 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT PE-10002 Ventura Community Center and Park Buildings and Facilities $477,219 $462,187 $249,196 $38,307 $0 $96,945 $77,739 100%Complete Aug 13 Construction completed Aug 2013. PE-11000 Main Library New Construction and Improvements Buildings and Facilities $23,202,067 $23,202,067 $578,442 $163,395 $0 $20,436,139 $2,024,092 91%Construction Dec 14 Construction started June 2013 PE-11012 Temporary Main Library Buildings and Facilities $542,218 $445,783 $387,398 $42,218 $0 $4,888 $11,279 98%Construction Dec 14 Conversion of Art Center auditorium opened May 2013. This project must stay open as restoration of the Temp Main will occur when the Main Library reopens, which is expected to be Dec 2014. PE-12011 Newell Road Bridge / San Francisquito Creek Bridge Replacement Streets and Sidewalks $782,415 $782,415 $250,514 $78,419 $0 $271,176 $182,307 77%Pre-Design Jan 14 Project planning process has been modified to include an EIR analysis of multiple project alternatives. Council approved the contract amendment to the consultant to begin the alternatives analysis. PE-12012 Eleanor Pardee Park Improvements Parks and Open Space $700,002 $699,682 $640 $26,001 $0 $0 $673,041 4%Construction Feb 14 The construction contract is currently scheduled to go to Council for approval in Fall 2013. Construction is expected to be completed in Feb 2014 PE-13005 City Hall/King Plaza Landscape Parks and Open Space $51,337 $51,337 $0 $1,337 $0 $0 $50,000 3%Design Jan 14 Currently in design phase, public outreach is expected to take place in spring of 2014. PE-13007 El Camino Park Dog Park Parks and Open Space $260,977 $260,977 $0 $977 $0 $0 $260,000 N/A N/A N/A Environmental analysis determined this project not to be viable. To be closed in FY14. PE-13011 Charleston/Arastradero Corridor Project Streets and Sidewalks $493,384 $493,384 $0 $32,880 $0 $0 $460,504 7%Design Nov 14 Consultant has been selected and a contract is expected to be awarded in Nov 2013. PE-13022 University Avenue Pedestrian/Bicycle Underpass Rehabilatation Streets and Sidewalks $212,869 $212,869 $151,032 $27,869 $0 $26,008 $7,959 100%Complete Dec 12 Construction has been completed, under warranty period for 1 year. PE-98020 Police Building Project Buildings and Facilities $4,299,090 $102,171 $0 $7,252 $0 $0 $94,919 98%Design TBD Project currently on hold. PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities $16,041,182 $809,748 $352,444 $70,677 $0 $109,634 $276,993 98%Post-construction Dec 13 Civic Center Improvements are in the punch-list stage (final electrical panel tracing is still outstanding). Project must stay open. PF-05002 Municipal Service Center Renovation Buildings and Facilities $191,487 $0 $0 $0 $0 $0 $0 N/A N/A N/A Project on hold per City Manager. PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities $350,158 $92,577 $0 $7,869 $0 $0 $84,708 76%Construction Mar 14 Preliminary HVAC design. PF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities $7,764,485 $2,419,015 $2,298,872 $119,288 $0 $27,961 ($27,106)100%Complete Dec 12 Project completed as of 6/30/2013. Project to be closed in FY14. PF-09000 Children's Theater Improvements Buildings and Facilities $370,199 $370,199 $0 $30,199 $0 $234,869 $105,131 72%N/A N/A Combined into PE-14015. Project will be closed in FY14. PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks $193,445 $193,445 $135,742 $638 $0 $0 $57,065 71%Design Mar 14 Sign assessment complete. All data is being processed for inclusion in GIS PO-11001 Thermoplastic Lane Marking & Striping Streets and Sidewalks $350,000 $242,403 $74,614 $0 $0 $7,484 $160,305 54%Ongoing Jun 17 On-going annual contract in conjunction with PE- 86070 (Streets Maintenance Program Projects). Page 9 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments*Contingencies Encumbrances Balance Complete Status Date Comments VR-01001 MSC Fuel Storage Tank /Svc Island Replacement Minor $2,609,597 $79,545 $11,942 $0 $11,770 $2,001 $53,832 98%Ongoing Feb 14 ADC, Inc revising design then bid will be put out for construction. VR-06801 Replace City-Wide Fuel Transaction and Inventory Management System Minor $285,000 $109,838 $0 $0 $0 $23,851 $85,987 70%Ongoing Jun 14 Assessment of new system will be completed once upgrade of Assetworks is completed. VR-07001 Automated Motor Pool Reservation and Vehicle Key Management System Minor $125,000 $34,465 $23,486 $0 $0 $2,875 $8,104 94%Ongoing Jun 14 Pool vehicles at MSC and City Hall have been added into system. Employees have been trained on how to reserve a vehicle. Modifications of contract by end of FY14. VR-11000 Vehicle Replacement Minor $1,578,325 $807,246 $474,627 $0 $0 $0 $332,619 79%Ongoing Mar 14 Two vehicles remain to be purchased. Waiting for specifications to be written. VR-12001 In-Ground Vehicle Lift Minor $450,000 $400,000 $316,475 $0 $0 $0 $83,525 81%Complete Jun 13 Project is complete and will be closed. Funds will be returned to funding source in FY 2014. VR-13000 Vehicle Replacement Minor $3,415,767 $3,415,767 $487,965 $0 $0 $1,048,719 $1,879,084 45%Ongoing Jun 14 Specifications are still being written for five vehicles. VR-04010 Vehicle Maintenance Facility Upgrades Multi-Year $561,733 $262,860 $0 $0 $0 $24,292 $238,568 58%Ongoing Jun 14 Assessment of next step to be completed pending results of Fleet Maintenance Study. FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS MULTI-YEAR PROJECTS INTERNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT Page 10 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments*Contingencies Encumbrances Balance Complete Status Date Comments FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS INTERNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT VR-07002 Diesel Truck Engine Emissions Retrofits Multi-Year $846,488 $54,760 $29,415 $0 $0 $0 $25,345 97%Ongoing Dec 15 Next set of Diesel Particulate Filters (DPF) not needed until FY 2015. BAO will be needed to cover difference in bid amount. VR-92006 Fuel Tank Storage/Upgrade Multi-Year $260,378 $102,561 $92,897 $0 $0 $0 $9,664 96%Design Jun 14 Card reader installed and punch list completed. Additional scope to be added to bolster reliability of system. Page 11 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date TE-01012 IT Disaster Recovery Plan Minor $578,626 $578,337 $53,544 $0 $0 $75,002 $449,792 22%Construction Jun-15 A disaster recovery and business continuity assessment is underway which will determine disaster recovery requirements and feed into an overall disaster recovery plan. TE-05003 Internet Site Upgrade Minor $197,738 $0 $0 $0 $0 $0 $0 100%Complete Jun-13 Request has been submitted to close this CIP. TE-08004 Fire Mobile Data Computer Minor $250,000 $69,199 $8,116 $0 $0 $1 $61,082 76%Construction May-14 Final phase of project to replace Fire Mobile Data Computer due to new apparatus that has come online. TE-09000 Public Safety Computer-Aided Dispatch Replacement Minor $1,300,000 $1,198,293 $233,668 $0 $0 $0 $964,625 26%In Progress Dec-13 Computer Aided Dispatch (CAD) hardware and software installed, training and configuration to be completed . Records Management System (RMS) contract signed for the second portion. INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS Page 12 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS TE-11002 Police Mobile In- Car Video System Replacement Minor $310,000 $305,412 $0 $0 $0 $0 $305,412 1%Construction Dec-13 RFP process completed and contract awarded. Installation and training to be completed. TE-11001 Library Computer System Software Minor $500,000 $499,925 $0 $0 $0 $70,250 $429,675 14%Pre-design Jun-14 Working with Information Technology Department to create the Request for Information (RFI). TE-95016 Permit Information Tracking System Multi-Year $980,050 $176,648 $0 $0 $0 $0 $176,648 82%Construction Jun-15 Live, remaining funds to be utilized as enhancements to the system. TE-02013 Institutional Network (I-Net) Multi-Year $1,000,000 $575,887 $0 $0 $0 $0 $575,887 42%Construction Jun-15 In construction phase. Remaining funds to be utilized to purchase equipment for live broadcasts from community centers. TE-07006 SAP Continuous Improvement Project Multi-Year $8,898,680 $95,694 $0 $0 $0 $67,377 $28,317 100%On hold Jun-15 Road mapped enhancement efforts funded by this CIP are on hold pending results from an Enterprise Resource Planning (ERP) system evaluation slated for FY2014. TE-99010 Acquisition of New Computers Multi-Year $362,350 $259,815 $146,741 $0 $0 $0 $113,074 69%Construction Jun-15 This is an ongoing project for the acquisition of new computers. TE-00010 Telephone System Replacement Multi-Year $2,646,587 $2,544,583 $1,692,825 $0 $0 $96,807 $754,951 71%Construction Dec-13 Phase 1 complete: Upgrade of high-speed network and implementation of new telephone system. Phase 2: scheduled for Dec 2013. TE-13001 Interactive Voice Response System Multi-Year $200,000 $200,000 $0 $0 $0 $0 $200,000 0%Pre-design Jun-14 Currently in kick-off stage. The new phone system deployment is a dependency of starting this project, which has recently been deployed. MULTI-YEAR PROJECTS MINOR PROJECTS Page 13 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTSTE-13002 ESS/MSS Enhancements Multi-Year $150,000 $150,000 $0 $0 $0 $0 $150,000 0%On hold Jun-15 This project is dependent on another project to us to bring the system up to a higher enhancement pack, which has been placed on hold by the SAP Steering Committee until the results are received from an ERP system evaluation in FY2014. Page 14 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTSTE-13003 SAP Refuse Billing Improvements Multi-Year $250,000 $250,000 $0 $0 $0 $0 $250,000 0%On hold Jun-15 The start of the project is dependent upon the completion of a GreenWaste system upgrade, which is scheduled to be completed in FY2014. TE-13004 Infrastructure Management System Multi-Year $300,000 $300,000 $0 $0 $0 $1 $299,999 0%Pre-design Dec-14 Currently in the discovery phase. MULTI-YEAR PROJECTS Page 15 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTSTE-02015 Citywide GIS Data, Infrastructure and Applications Multi-Year $2,229,130 $209,087 $209,086 $0 $0 $0 $0 100%Complete Jun-13 Request has been submitted to close this CIP. TE-05000 Radio Infrastructure Replacement Multi-Year $2,565,980 $1,825,895 $103,016 $0 $0 $233,456 $1,489,423 42%Ongoing Dec 16 Maintenance to the Radio Infrastructure continues. Purchase of multi-band radios in Phase I. TE-06001 Library Radio Frequency Identification (RFID) Implementation Multi-Year $810,000 $607,860 $42,977 $0 $0 $19,264 $545,618 33%Construction Jun-15 Start date of the project is dependent upon the New Technology for Mitchell Park Library project. TE-07000 Enterprise Application Infrastructure Upgrade Multi-Year $2,297,000 $549,500 $33,600 $0 $0 $1,408 $514,492 78%Construction Dec-15 Road mapped enhancement efforts funded by this CIP are on hold pending results from an ERP system evaluation slated for FY2014. TE-10000 Collections Software Multi-Year $91,725 $9,725 $6,825 $0 $0 $0 $2,900 97%Complete Jun-14 Live, remaining funds to be used for maintenance of system. MULTI-YEAR PROJECTS Page 16 of 30 Attachment C FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 Labor FY 2013 FY 2013 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTSTE-10001 Utility Customer Billing System Multi-Year $350,000 $341,526 $75,438 $0 $0 $4,500 $261,588 25%Ongoing Dec-15 Enhancements to "My Utilities Account" online application were completed and we are currently assessing the application's future capabilities. TE-11005 Implementation of Restructured Tiered Rates on Bills Multi-Year $200,000 $200,000 $10,000 $0 $0 $0 $190,000 5%Construction Dec-13 There is a pilot project commencing and some changes to the invoice may be required based on customer feedback. TE-12001 Development Center Blueprint Multi-Year $1,738,001 $1,728,771 $105,766 $0 $0 $229,049 $1,393,955 20%Construction Jul-15 Phases I and II implemented, which upgraded Accela to provide mobile access in the field. Page 17 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments EL-04010 Foothills System Rebuild Minor $856,517 $109,255 $73,668 $0 $0 $35,587 96%Construction Oct 13 Portions of this project have been completed. The sections crossing the Palo Alto Country Club still remain under construction. EL-09004 W. Charleston/Wilkie Way to South City Limit 4/12 kV Conversion Minor $1,062,466 $635,000 $0 $0 $0 $635,000 40%Construction Jun 14 Construction is 95% complete. Remaining portion is delayed until the El Camino Real rebuild project is completed as they are connected. EL-10008 Advanced Metering Infrastructure System Minor $313,885 $254,343 $49,746 $0 $84,452 $120,145 62%Design Ongoing Phase 2 - implementation and planning for pilot projects are in progress. EL-11001 Torreya Court Rebuild Minor $103,301 $64,030 $48,406 $0 $0 $15,624 85%Complete EL-11004 Hewlett Subdivision Rebuild Los Trancos Minor $817,050 $587,824 $394,417 $0 $0 $193,407 76%Complete EL-11006 Rebuild UG District 18 Minor $354,298 $304,290 $61,335 $0 $0 $242,955 31%Design Mar 15 Design completed, will require additional money to complete the work. This will be requested for FY 15 budget, and will then start bid process. EL-12002 Hanover 22 - Transformer Replacement Minor $1,200,450 $1,200,450 $1,106,441 $0 $94,009 $0 95%Construction Dec 13 As-built drawings still need to be processed and transferred to record set drawings. ELECTRIC FUND FY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS Page 18 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTSMULTI-YEAR PROJECTS EL-02010 SCADA System Upgrades Multi-Year $822,565 $153,375 $3,877 $0 $0 $149,498 82%Construction Jun 14 Obtaining approval for sole source contract with Efacec ACS to perform this upgrade. EL-04012 Utility Site Security Improvements Multi-Year $1,125,373 $619,657 $123,661 $0 $12,981 $483,015 50%Construction Ongoing Evaluating bids for Quarry, Hanover, Hansen Way and Park Blvd. substations. EL-05000 El Camino Underground Rebuild Multi-Year $1,925,994 $448,910 $52,623 $0 $0 $396,287 79%Construction Mar 14 Project estimate completed, waiting for availablity of CPAU crews to start construction and complete work. EL-11008 Rebuild UG District 19 Multi-Year $161,286 $106,315 $1,435 $0 $0 $104,880 35%Design Jun 14 Preparation of project cost estimate is in progress. EL-06001 230 KV Electric Intertie Multi-Year $606,154 $170,412 $7,889 $0 $2,450 $160,073 74%Pre-design Ongoing Stanford Utilities has expressed interest in Stanford Linear Accelerator Center (SLAC) - Quarry Road Substation 60kV tie. Preliminary power flow and feasibility study complete, interconnection at Quarry Substation appears feasible. Working with Stanford and DOE to encourage SLAC participation in this project. EL-06002 Underground District 45 Multi-Year $3,622,018 $213,630 $68,774 $0 $2,961 $141,895 60%Construction Jan 14 Electric work and customer connections completed. Waiting for completion of AT&T work and pole removal to close project. Page 19 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS EL-08000 E. Charleston 4/12kV Conversion Multi-Year $668,125 $375,965 $61,849 $0 $237,186 $76,930 88%Construction Jun 14 Construction of portions of this project completed. The remaining work is to be re-bid due to scope change. EL-09000 Middlefield Underground Rebuild Multi-Year $649,489 $562,595 $541,773 $0 $152,282 ($131,460)120%Design Mar 15 Construction of portions of this project in progress. The remaining work is to be re-bid due to scope change. EL-09003 Rebuild UG District 17 (Downtown) Multi-Year $1,251,693 $729,365 $244,936 $0 $0 $484,429 60%Complete Construction completed. EL-10006 Rebuild UG District 24 Multi-Year $1,350,481 $975,116 $48,235 $0 $272,117 $654,764 52%Design Jun 14 Preparation of construction estimate in progress. EL-13006 Sand Hill/Quarry 12kV Tie Multi-Year $50,011 $50,011 $120 $0 $0 $49,891 0%Design TBD Design in progress. EL-13007 Underground distribution System Security Multi-Year $300,000 $300,000 $0 $0 $0 $300,000 0%Pre-design TBD No work started due to limited staff availability. EL-13008 Upgrade electric Estimating System Multi-Year $150,000 $150,000 $0 $0 $0 $150,000 0%Design TBD Working with contractor on scope of work to complete this project. Staff may need to go back out to bid. MULTI-YEAR PROJECTS Page 20 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS EL-10009 Street Light System Conversion Project Multi-Year $3,479,558 $2,961,330 $802,947 $0 $48,433 $2,109,950 39%Ongoing Mar 14 Bid award for Phase III delayed due to ARB review. Bid to be awarded Nov 13. EL-11003 Rebuild UG District 15 Multi-Year $481,079 $469,486 $276 $0 $0 $469,210 2%Pre-design TBD No work started due to limited staff availability. EL-11007 Rebuild Greenhouse Condo Area Multi-Year $508,843 $378,085 $30,701 $0 $0 $347,384 32%Design Jun 14 Estimate completed. Will start bid process. EL-11010 UG District 47 - Middlefield, Homer Avenue, Webster Street and Addison Avenue Multi-Year $1,855,574 $1,825,346 $31,086 $0 $2 $1,794,258 3%Design Dec 14 Project estimate preparation in progress. EL-11014 Smart Grid Technology Installation Multi-Year $502,846 $488,233 $215,888 $0 $252,865 $19,480 96%Design Jan 17 Two pilot projects are in progress. EL-11015 Reconductor 60kV Overhead Transmission System with ACCR conductor Multi-Year $3,352,412 $3,136,176 $1,687,876 $0 $1,057,606 $390,694 88%Construction Aug 13 Phase 1 completed, Phase 2 to start construction in Aug 2013. EL-12001 UG District 46 - Charleston/El Camino Real Multi-Year $153,954 $99,883 $0 $0 $0 $99,883 35%Pre-design Jun 14 No work started due to limited staff availability. EL-12003 Hopkins Substation Rebuild Multi-Year $250,000 $0 $0 $0 $0 $0 0%Balance of $250K returned to reserves at year-end. EL-13004 Hansen Way/Hanover 12kV Ties Multi-Year $75,000 $75,000 $0 $0 $0 $75,000 0%Pre-design Jun 14 Project on hold as design alternatives are being developed and considered. EL-13005 Colorado 20/21-Transformers Replacements Multi-Year $100,000 $0 $0 $0 $0 $0 0%Balance of $100K returned to reserves at year-end. MULTI-YEAR PROJECTS Page 21 of 30 Attachment CFY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments GS-08000 Gas Station 2 Rebuild Minor $207,007 $99,752 $89,729 $0 $0 $10,023 95%Complete GS-09000 Gas Station 1 Rebuild Minor $201,000 $96,359 $89,729 $0 $0 $6,630 100%Complete GS-10000 Gas Station 3 Rebuild Minor $207,007 $100,461 $91,972 $0 $0 $8,489 96%Design Design completed. Delivery of the station is postponed until Summer 2014 due to PG&E work at the location. GS-11001 Gas Station 4 Rebuild Minor $337,000 $165,264 $148,366 $0 $0 $16,898 95%Complete GS-13003 Cooperatively-owned Back- up Generators Minor $315,000 $315,000 $0 $0 $0 $315,000 0%Pre-design TBD ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS GAS FUND Page 22 of 30 Attachment CFY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ENTERPRISE FUND UTILITIES DEPARTMENT GAS FUND GS-01019 Global Positioning System Multi-Year $381,062 $82,448 $0 $0 $0 $82,448 78%Construction Jun 14 Integrating field data into mapping system, defining additional equipment needs. GS-08011 GMR - Project 18 Multi-Year $5,870,883 $2,014,369 $1,577,676 $0 $324,693 $0 100%Complete Combined GMR 18/19A - retention payment to be paid by Sep 13. GS-09002 GMR - Project 19 Multi-Year $5,787,828 $5,484,734 $965,728 $0 $3,628,047 $890,959 40%Construction Jul 14 Combined GMR 19B-21.Consruction started Mar 13 GS-10001 GMR - Project 20 Multi-Year $6,616,749 $6,586,508 $66,667 $0 $5,417,474 $1,102,367 40%Construction Jun 14 Combined GMR 19B-21.Consruction started Mar 13. GS-11000 GMR - Project 21 Multi-Year $6,667,478 $6,657,013 $778,292 $0 $5,144,373 $734,348 40%Construction Jul 14 Combined GMR 19B-21.Consruction started on Mar 13. GS-11002 Gas System Improvements Multi-Year $514,349 $337,505 $111,624 $0 $25,881 $200,000 61%Ongoing TBD This project addresses ongoing capital system improvements GS-12001 GMR - Project 22 Multi-Year $94 $94 $94 $0 $0 $0 100%Design Jun 15 Construction funds to be delayed until FY 2014. GS-13002 General Shop Equipment/Tools Multi-Year $50,000 $50,000 $0 $0 $0 $50,000 0%TBD MULTI-YEAR PROJECTS Page 23 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WS-09000 Seismic Water Tank Valve Minor $4,100,000 $4,074,400 $3,226 $0 $7,013 $4,064,161 1%Design Jul 14 Final report completed in Nov 10, Mayfield seismic retrofit 100% completed; Boronda reservoir construction will commence Feb 14 and completed by Jul 14. WS-13003 GPS Equipment Upgrade Minor $200,000 $200,000 $0 $0 $0 $200,000 0%Pre-Design Jun 14 Working with Asset Management on group development. WS-13004 Asset Management Mobile Deployment Minor $100,000 $100,000 $0 $0 $0 $100,000 0%Pre-Design Jun 14 Working with group development. WS-13006 Water Meter Shop Renovations Minor $115,000 $115,000 $27,852 $0 $0 $87,148 24%Design Jun 14 Funding Operations efforts and providing ongoing support. WATER FUND FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS Page 24 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WATER FUND FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS WS-07000 Water Regulation Station Improvements Multi-Year $470,001 $341,036 $14,124 $0 $30,136 $296,776 37%Design Jul 16 Design to be completed by Dec 13. WS-07001 Water Recycling Facilities Multi-Year $901,126 $405,829 $11,310 $0 $193,914 $200,605 78%Pre-Design Jun 16 Preparing Environmental Impact Report (EIR). Construction to be completed in 2016. WS-08001 Water Reservoir Coating Improvements Multi-Year $2,550,491 $2,335,637 $26,503 $0 $57,619 $2,251,515 12%Design Jul 16 Construction to start Feb 14 on Boronda. WS-08002 Emergency Water Supply Project Multi-Year $36,306,630 $16,679,580 $9,549,960 $0 $5,876,175 $1,253,445 97%Construction Dec 13 El Camino reservoir, well, PS construction 75% complete. Mayfield Pump Station construction 100% complete. Wells rehabilitation construction 100% complete. WS-09001 WMR - Project 23 Multi-Year $3,136,843 $1,995,799 $1,871,110 $0 $124,689 $0 100%Construction Jun 13 Council approved in Apr 12; project completed; commenced ABM and GIS/Topobase updating process. MULTI-YEAR PROJECTS Page 25 of 30 Attachment C Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WATER FUND FY 2013 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS WS-10001 WMR - Project 24 Multi-Year $3,259,205 $3,052,947 $2,396,585 $0 $366,578 $289,784 91%Construction Jun 13 Council approved in Apr 12; project completed; commenced ABM and GIS/Topobase updating process. WS-11000 WMR - Project 25 Multi-Year $3,444,709 $3,436,906 $3,984 $0 $0 $3,432,922 0%Design Dec 14 Awaiting core-drill contract to be setup by Purchasing to complete the bid package of WMR-Project 25. WS-11003 Water Distribution System Improvements Multi-Year $494,011 $424,336 $98,398 $0 $5,000 $320,938 35%Ongoing Jun 14 This project addresses ongoing capital distribution system improvements. WS-11004 Water System Supply Improvements Multi-Year $493,995 $430,968 $71,324 $0 $62,162 $297,482 40%Ongoing Jun 14 This project addresses ongoing capital supply system improvements. WS-12001 WMR - Project 26 Multi-Year $305,000 $305,000 $0 $0 $0 $305,000 0%Pre-Design Jun 14 Awaiting additional resource availability to start the design of WMR-Project 26; Cal Ave (WMR 26A) design complete and will piggy back on Transportation bid package to start construction Dec 13 through Jun 14. WS-13002 Fusion and General Equipment/Tools Multi-Year $50,000 $50,000 $24,055 $0 $0 $25,945 48%Ongoing Dec 14 This project addresses the purchase of PE fusion equipment for Operations to perform their work. MULTI-YEAR PROJECTS Page 26 of 30 Attachment CFY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WC-11000 WC Reh/Aug. Prj 24 Multi-Year $3,119,809 $3,119,809 $152,782 $0 $0 $2,967,027 5%Design Aug 14 This project will also include the WC Reh/Aug Prj 25 and the design effort started May 13 with construction complete by Aug 14. WC-12001 WC Reh/Aug. Prj 25 Multi-Year $3,212,000 $3,212,000 $53,498 $0 $32,002 $3,126,500 0%Design Aug 14 This project will also include the WC Reh/Aug Prj 24 and the design effort started May 13 with construction complete by Aug 14. WC-13001 WC Rehab/Aug. Prj 26 Multi-Year $0 $0 $0 $0 $0 $0 0%Pre-design Aug 15 Awaiting additional resource availability to start the design of WC Reh/Aug Prj 26. WC-13002 Fusion and General Equipment/Tools Multi-Year $52,187 $52,187 $24,055 $0 $0 $28,132 0%Ongoing TBD This project addresses replacing PE fusion tools needed by WGWW Operations to perform their work. WC-15002 Wastewater System Improvements Multi-Year $348,403 $267,870 $20,291 $0 $0 $247,579 29%Ongoing TBD This project addresses on going capital system improvements. MULTI-YEAR PROJECTS ENTERPRISE FUND UTILITIES DEPARTMENT WASTEWATER COLLECTION FUND Page 27 of 30 Attachment C ENTERPRISE FUND REFUSE FUND PUBLIC WORKS DEPARTMENT Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments RF-09004 LATP Site Development Preparation Minor $200,000 $21,349 $0 $0 $0 $21,349 89%Complete Project was successfully completed. Consultant's environmental risk assessment for cleanup of site was approved by regulatory agency for Areas A and B. RF-10002 Flare Relocation Project Minor $867,734 $774,280 $33,284 $0 $715,936 $25,060 97%Construction Mar 14 Design, permitting and bidding was completed in late 2011 and the bids exceeded available budget. A modified design and a rebid was completed and a contract was approved. A BAO was also approved and construction work is expected to be completed by Dec 13 with testing complete by Mar 14. RF-07001 Relocation of Landfill Facilities Multi-Year $825,968 $429,025 $222,833 $0 $180,175 $26,017 97%Construction Sep 13 The relocation of the Recycling Center has been cancelled. Improvements to the permanent Household Hazardous Waste (HHW) facility at the wastewater treatment plant property have been proceeding. Final design and permitting was completed and bid in mid 2012. No bids were received due to a purchasing problem. Rebid and a contract was approved on Jan 13 along with a BAO for $205,150. All permit sign-offs are expected in Sep 13. RF-10003 Drying Beds, Material Storage and Transfer Area Multi-Year $122,700 $53,031 $0 $0 $0 $53,031 57%Complete Additional material storage bunkers have been constructed at the MSC. Drying beds currently located on the 10 acres that was subject to Measure E are to be relocated inside the RWQCP under a future CIP. RF-11001 Landfill Closure Multi-Year $6,718,404 $6,010,110 $241,524 $0 $212,870 $5,555,716 17%Construction Dec 14 Construction was completed in Mar 12 for the undergrounding of environmental control systems in the closed sections of the landfill. Design for the Phase IIC cap is underway. Capping work is scheduled to be completed by Dec 14. FY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS MULTI-YEAR PROJECTS Page 28 of 30 Attachment CFY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments SD-06102 San Francisquito Creek Storm Water Pump Station Multi-Year $6,387,642 $48,836 $12,591 $0 $0 $36,245 99%Complete Jun 19 Required mitigation monitoring for 10 years (through FY 2019) is the only remaining task. SD-06104 Connect Clara Drive Storm Drains to Matadero Pump Station Multi-Year $953,480 $750,000 $0 $0 $0 $750,000 90%Design Feb 14 Project design is being performed by in-house staff. New construction funding has been programmed for FY 2014. SD-10101 Southgate Neighborhood Storm Drain Improvements Multi-Year $1,073,768 $982,702 $119,702 $0 $149,827 $713,173 90%Design Aug 13 Design to be completed by end of August and bid opening scheduled for October. Construction to end by Apr 14. SD-11101 Channing Avenue/Lincoln Avenue Storm Drain Improvements Multi-Year $5,911,374 $3,903,389 $1,739,329 $0 $1,132,492 $1,031,568 5%Pre-design Apr 14 Phase I & Phase II are complete. Phase III design was completed Feb 13 and construction scheduled for Summer 2014. Construction to be completed by Dec 14. MULTI-YEAR PROJECTS STORM DRAINAGE FUND ENTERPRISE FUND PUBLIC WORKS DEPARTMENT Page 29 of 30 Attachment CFY 2013 YEAR END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2013 Budget Estimated Project Project Project From Available FY 2013 FY 2013 FY 2013 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WQ-10001 Plant Master Plan Minor $1,554,497 $644,899 $322,701 $0 $295,594 $26,604 98%Construction Jun 14 Long Range facilities Plan Report 100% completed Oct 12; BAO for Biosolids Plan completed in Jan 13 for $421,678. Biosolids Facility Plan to be completed by Jun 14. Biosolids Facility Plan 60% complete. WQ-04011 Facility Condition Assessment and Retrofit Multi-Year $5,123,313 $2,953,032 $747,814 $0 $0 $2,205,218 57%Design Jun 14 Ongoing retrofit projects. Facility Repair and retrofit Project #2 construction completed. Facility Repair and Retrofit Project #3 at 90% design. MINOR PROJECTS ENTERPRISE FUND PUBLIC WORKS DEPARTMENT WASTEWATER TREATMENT FUND MULTI-YEAR PROJECTS Page 30 of 30 Attachment D Project Category Department/Fund Project Title FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Community Services - General Fund : Land & Land Improvements AC-86017 Art in Public Places $21,556 $17,256 $77,956 $17,171 $59,526 Planning & Community Environment - General Fund : Streets & Sidewalks PL-05030 Traffic Signal Upgrades 39,983 278,187 183,141 244,272 385,302 Public Works - General Fund : Streets & Sidewalks PE-86070 Street Improvements (Street Improvement Fund)3,702,381 3,323,063 4,710,791 3,170,679 7,097,782 Building & Facilities PF-00006 Roofing Replacement 21,073 227,495 104,617 319,495 246,068 Building & Facilities PF-01003 Building Systems Improvements 114,152 36,053 74,876 59,798 34,320 Building & Facilities PF-02022 Facility Interior Finishes 47,116 11,076 23,874 234,085 70,609 Building & Facilities PF-93009 ADA Compliance 121,617 216,133 9,994 167,537 10,019 Streets & Sidewalks PO-05054 Street lights Improvements 15,970 32,976 159,070 61,844 69,707 Streets & Sidewalks PO-89003 Sidewalk Improvements 1,675,527 952,503 1,611,917 1,673,715 1,864,954 Public Works - Storm Drainage Fund : SD-06101 Storm Drain System Replacement 445,582 81,878 488,793 242,488 745,927 Public Works - Wastewater Treatment Fund : WQ-80021 RW QCP Plant Equipment Replacement 2,544,261 403,293 66,916 589,965 1,840,887 WQ-80022 RW QCP System Flow Metering 56,245 0 28,468 0 0 Electric Fund : EL-02011 Electric Utility GIS 39,414 188,231 321,713 175,382 127,798 EL-06005 Fiber Optics Ring System Improvements 58,124 5,531 0 0 0 EL-06006 Fiber Optics Customer Design and Connection Services 195,808 17,203 0 0 0 EL-89028 Electric Customer Connections 1,467,233 1,702,232 1,882,242 2,522,815 2,802,451 EL-89031 Communications System Improvements $21,784 $0 $3,501 $0 $3,345 EL-89038 Substation Protection Improvements 94,411 133,185 129,086 200,418 188,049 EL-89044 Substation Facility Improvements 93,735 3,133 148,871 180,672 60,458 EL-98003 Electric Distribution System Reconstruction and Improvements 1,265,486 1,330,082 1,608,521 2,389,593 1,453,123 Fiber Optics Fund : FO-10000 Fiber Optic Customer Connections 0 68,373 88,061 125,913 291,425 FO-10001 Fiber Optic Network System Improvements 0 34,614 327,736 448,950 137,878 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2009-2013 Page 1 of 2 11/12/2013 Attachment D Project Category Department/Fund Project Title FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2009-2013 Gas Fund : GS-02013 GS-03007 Directional Boring Equipment 59,410 0 162 20,160 0 GS-03002 GS-04003 GS-05002 Gas Main Replacements 38,121 87,706 86,159 54,157 0 GS-03008 Polyethylene Fusion Equipment Replacement 35,650 0 444 0 24,055 GS-03009 System Extensions-Unreimbursed 12,000 4,005 7,718 0 90,838 GS-06001 Gas Main Replacements, GMR-Project 16 2,423,677 89,180 127,056 0 0 GS-07002 Gas Main Replacements, GMR-Project 17 912,018 3,681,252 211,515 139,958 577 GS-80017 Gas System Extensions 356,666 347,412 471,001 605,635 932,035 GS-80019 Gas Meters and Regulators 244,129 313,598 294,191 325,988 25,652 Wastewater Collection Fund: WC-02002 WC-03003 WC-04002 Sewer System Rehabilitation and Augmentation, Project 15,16 and 17 8,840 27,141 122,870 57,715 0 WC-05003 WC-06003 WC-07004 Sewer System Rehabilitation and Augmentation, Project 18,19 and 20 2,154,931 1,761,725 94,468 188,511 241,489 WC-08012 WC-09001 WC-10002 Sewer System Rehabilitation and Augmentation, Project 21,22 and 23 285,858 543,313 1,928,374 1,023,537 2,139,395 WC-80020 Sewer System Extensions 370,253 251,152 224,066 270,793 445,570 WC-99013 Sewer Manhole Rehabilitation 48,227 168,722 378,841 357,343 555,382 Water Fund : WS-02003 Water Main Replacements, Project 16 19,695 0 0 0 0 WS-02014 Water-Gas W astewater utilities GIS Data 33 204,583 289,694 222,244 282,573 WS-06002 Water Main Replacements, Project 20 93,554 349 10,821 0 0 WS-07003 Water Main Replacements, Project 21 226,559 1,383,427 1,432,826 528 0 WS-80013 Water System Extensions 295,194 285,945 258,968 551,131 528,788 WS-80014 Service and Hydrant Replacements 104,951 43,538 44,232 151,928 359,994 WS-80015 Water Meters 14,712 2,298 0 34,000 4,183 Page 2 of 2 11/12/2013