Loading...
HomeMy WebLinkAboutStaff Report 2679 City of Palo Alto (ID # 2679) Finance Committee Staff Report Report Type: Meeting Date: 4/18/2012 April 18, 2012 Page 1 of 10 (ID # 2679) Summary Title: Wastewater Collection Utility Rate Adjustments Title: Utilities Advisory Commission Recommendation on Proposed Wastewater Collection Utility Rate Adjustments Effective July 1, 2012 From: City Manager Lead Department: Utilities Recommendation Staff and the Utilities Advisory Commission (UAC) recommend that the Finance Committee recommend that the City Council adopt a resolution (Attachment A) to: 1. Increase overall retail wastewater collection rates and annual revenues for Wastewater Collection Utility by 5.0 percent, or $715,000, effective July 1, 2012; 2. Effect a change to utilize winter-based water usage rates for commercial customers under Rate Schedule S-2 Section C.3; and 3. Amend Wastewater Collection Utility Rate Schedules S-1 and S-2, and add new Wastewater Collection Utility Rate Schedules S-6 and S-7, as attached. The recommended rate changes will trigger the notice and protest hearing procedures under Proposition 218. Executive Summary On March 6, 2012, the Finance Committee reviewed the long-term financial projections for the Wastewater Collection Fund, which showed a revenue requirement increase of 5% for the Fund for Fiscal Year (FY) 2013. This proposed 5% revenue increase, effective July 1, 2012, applies equally to all customer classes. The impact of the rate increase on residential customers’ bills is an increase of $1.90 per month. The impact of the proposed changes on commercial customers’ bills will vary depending on individual account water usage levels. The recommended rates include a change to the billing basis for commercial customers. Currently, monthly wastewater charges are based on monthly water usage for some customers and winter water usage for other customers with large irrigation usage. To remove the effect April 18, 2012 Page 2 of 10 (ID # 2679) of water used for irrigation, which does not flow into the wastewater system, the proposed commercial wastewater rate structure uses the winter-based water consumption for all commercial customers, except restaurants and the industrial dischargers. Restaurant rates are based on monthly water usage since water used in restaurants is largely for indoor use, which flows through the wastewater collection system. The bill impact for commercial customers due to the revision in billing basis depends on individual account water usage levels and seasonal water usage patterns. Background The Wastewater Collection Fund’s revenue requirement consists of a number of components including: treatment cost, collection system operations, Capital Improvement Program (CIP) projects, prudent funding of the Wastewater Collection Rate Stabilization Reserve (WW -RSR), and debt service payments. Any change in one or more of these components, or a change in retail revenue levels, can trigger a change, up or down, to the revenue re quirement. The last revenue increase to Wastewater Collection rates was a 5% overall revenue increase that went into effect on July 1, 2009. On July 1, 2011, Wastewater Collection rates were revised to implement a revenue-neutral cost of service adjustment to align rates with the cost of service. That alignment resulted in an average bill increase of 13% for residential customers and a decrease of 8% to commercial customers, but included no change to overall revenues. In March 2012, the Finance Committee reviewed the financial projections and revenue requirements for the Wastewater Collection Fund for FY 2013 through FY 2017. The financial projections showed the need for a 5% increase in revenue requirements for the Wastewater Collection Fund in FY 2013 followed by increases of 9%, 9%, 8% and 3% for the following years of the 5-year forecast horizon. Discussion Financial Projections Table 1 below shows the financial projections for the Wastewater Collection Fund for FY 2013 through FY 2017 as well as actual figures for FY 2011 and budgeted and projected figures for FY 2012. April 18, 2012 Page 3 of 10 (ID # 2679) Table 1: Five-Year Financial Plan – (in $thousands) Adopted Actual Adopted Projected 2011 2011 2012 2012 2013 2014 2015 2016 2017 1 2 % CHANGE IN RETAIL RATE 0%0%0%0%5%9%9%8%3% 3 PROJECTED CHANGE IN RETAIL SALES REVENUE - - - - 715 1,352 1,473 1,428 578 4 5 RETAIL SALES REVENUE 14,356 14,294 14,371 14,304 14,990 16,315 17,783 19,213 19,826 6 CONNECTION AND CAPACITY FEES 730 1,081 740 740 750 761 771 794 817 7 OTHER / TRANSFERS IN 393 300 278 278 278 278 278 278 278 8 INTEREST 445 454 480 480 414 364 332 325 336 9 TOTAL SOURCES OF FUNDS 15,924 16,129 15,868 15,802 16,431 17,717 19,164 20,609 21,257 10 11 TREATMENT 7,499 7,414 7,954 7,954 8,556 8,984 9,433 9,905 10,400 12 DISTRIBUTION OPERATIONS 4,472 4,316 4,606 4,626 5,015 5,115 5,217 5,322 5,428 13 DEBT SERVICE 129 129 129 129 129 129 129 129 129 14 RENT 115 115 106 106 108 110 113 115 117 15 OTHER/ TRANSFERS OUT 567 401 88 88 88 88 88 88 88 16 CAPITAL IMPROVEMENT PROGRAMS 4,130 4,630 4,274 4,274 4,404 4,516 4,705 4,793 4,990 17 TOTAL USES OF FUNDS 16,912 17,005 17,158 17,178 18,300 18,942 19,685 20,351 21,152 18 19 INTO / (OUT OF) RESERVES (988) (876) (1,289) (1,376) (1,869) (1,225) (521) 258 105 20 21 ENDING RATE STABILIZATION RESERVE 5,784 5,896 4,078 6,382 4,513 3,288 2,767 3,024 3,129 22 ENDING PLANT REPLACEMENT RESERVE 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 23 ENDING COMMITMENTS & REAPPROPRIATIONS 10,250 24 25 SHORT TERM RISK ASSESSMENT VALUE 1,815 1,815 1,879 1,879 1,958 2,105 2,275 2,431 2,513 26 27 LONG TERM RATE STABILIZATION GUIDELINES 28 MINIMUM 2,156 2,156 2,156 2,156 2,253 2,456 2,677 2,891 2,978 29 MAXIMUM 4,311 4,311 4,311 4,311 4,506 4,911 5,353 5,782 5,955 30 Fiscal Year City of Palo Alto Wastewater Collection FINANCIAL PROJECTIONS (FY 2013 - FY 2017) ($'000) The total use of funds for the Wastewater Collection Fund is projected to increase from the FY 2012 budget of $17.2 million to $21.2 million in FY 2017, an average annual increase of 4.7%. The Wastewater Collection Fund did not have an overall revenue increase since July 1, 2009. In FY 2011, total retail sales revenue was $14.3 million (Table 1, Line 5). Sales revenue has generally been very stable since almost 60% of revenues comes from the residential customer class where 100% of revenue collection is through a fixed monthly customer charge. Revenue Requirement The revenue requirement of the Wastewater Collection Fund is the total amount of revenue it must collect in order to meet its operations and maintenance (O&M) expenses, debt service payments, rate-financed CIP expenditures and reserve requirements. This revenue is collected through wastewater rates, and may be supplemented by revenues from service connection and capacity fees, interest income, transfers in from other funds, and other miscellaneous revenues. The Wastewater Collection Fund is expected to have revenue shortfalls of $1.4 million and $2.6 million in FY 2012 and FY 2013, respectively. Due to healthy reserve levels in FY 2011, no revenue increases for wastewater collection services were requested in FY 2012. In order to April 18, 2012 Page 4 of 10 (ID # 2679) maintain sufficient reserves and avoid double digit rate increases in future years a r evenue increase of 5% is proposed in FY 2013. With projected rate adjustments of 9%, 9%, 8% and 3% in the subsequent four fiscal years, the Wastewater Collection Fund will be able to maintain reserve levels within the Wastewater Rate Stabilization Reserve (WW-RSR) Guidelines. Reserves and Risk Assessment The City Council establishes guidelines for the WW-RSR. As required by the reserve guidelines, staff performs an assessment of short-term risks for the fund on an annual basis. Table 2 below summarizes the end-of-year balances for the WW-RSR, the short-term risk assessment level and the long-term reserve guideline levels. The long-term reserve guidelines were established to manage risks over the longer term. The short -term risk assessment level was provided to the Finance Committee as part of the Wastewater Collection Fund’s financial forecast in March 2012. Staff does not recommend any changes to the WW-RSR guideline levels at this time. Table 2: Wastewater RSR Balance, Guideline Levels and Risk Asse ssment Level ($M) Wastewater Rate Stabilization Reserve FY 2012 FY 2013 FY 2014 Estimated End of Year Balance 6.4 4.5 3.3 Risk Assessment Level 1.9 2.0 2.1 Reserve Minimum Level 2.2 2.3 2.5 Reserve Maximum Level 4.3 4.5 4.9 The WW-RSR ended FY 2011 with a balance of $5.9 million. The expected balance at the end of FY 2012 of $6.4 million is above the long-term maximum guideline level. For FY 2013, with the proposed 5% revenue increase, the balance is projected to be at the long -term maximum guideline. With projected rate adjustments of 9%, 9%, 8% and 3% in the subsequent four fiscal years, the WW-RSR balance is expected to be maintained within reserve guideline levels. Wastewater Collection Fund Customer Profile and Revenue Collection As of June 2011, the Wastewater Collection Fund had approximately 22,080 wastewater service accounts. While approximately 93% of customer accounts fall into residential rate classification (S-1), this represents 60% of revenues. The remaining 40% of revenues are collected from commercial customers under Rate Schedule S-2. Recommended New Rate Schedules S-6 and S-7 Currently, Rate Schedule S-2 (Commercial Wastewater Collection and Disposal) contains subsections for three distinct customer groups: Restaurants (section C.1), Industrial Dischargers (section C.2), and Other (section C.3). Staff recommends revising Rate Schedule S-2 to apply only to customers covered under existing section C.3, and creating two new rate schedules: namely, S-6 (Restaurant Wastewater Collection and Disposal), applicable to customers currently covered under section C.1, and S-7 (Commercial Wastewater Collection and Disposal – Industrial Dischargers), applicable to customers currently covered under section C.2. The proposed change will clarify the applicability of commercial wastewater service rate schedules. This change is reflected in Table 3 below. Additionally, subsection D2 and D3 describing April 18, 2012 Page 5 of 10 (ID # 2679) Dischargers of Unmetered Contaminated Groundwater and Industrial Waste Discharge Fees are removed from Rate Schedule S-2 as these fees are better suited for inclusion under Municipal Fee Schedules. Current Billing Basis Under Rate Schedule S-2 Customers on Rate Schedule S-2 are charged for wastewater services based on water usage. However, customers maintaining extensive irrigated landscaping may request to be billed for wastewater based on winter water usage (average water usage for the months of January through March) since water used for irrigation does not flow through the wastewater collection system. Water use for dedicated irrigation meters (Water Rate Schedule W -7) is exempt from wastewater collection charges. Table 3 provides the distribution of wastewater service accounts by rate schedule, billing basis, and revenue collection FY 2012. Table 3: Customer Profile and Revenue Collection Current Rate Schedule/ Section Proposed Rate Schedule Customer Class Billing Basis Number of Customers Billing Water Consumption (ccf/year) Total Revenue ($/year) S-1 S-1 Residential Fixed Charge 20,708 1,542,480(*) 8,610,123 S-2/C.3 S-2 Commercial Monthly Water Use 1,266 834,335 3,963,093 S-2/C.3 S-2 Commercial Winter Water Use 84 190,535 905,040 S-2/C.1 S-6 Restaurant Monthly Water Use 157 107,850 896,707 S-2/C.2 S-7 Industrial Dischargers Monthly or Winter Water Use 0 0 0 Total 22,215 2,675,257 14,374,963 (*) Assumes annual indoor water consumption based on 5 ccf per month per customer, adjusted to include approximately 5,000 apartment dwellings Recommended Changes to Billing Basis Used Under Rate Schedule S-2 Staff recommends placing all non-residential customers, except for restaurants and commercial/industrial dischargers, on a winter-based billing method. Industrial dischargers billing basis is defined in Rule 23 Section D and is based on indi vidual customer water use conditions. Since restaurant customers’ water usage is almost exclusively for cooking, cleaning and restroom applications, which are all activities that use the wastewater collection system exclusively, the current billing basis (monthly water use) is appropriate for restaurants. Recommended Changes to Quantity Rates Due to the Proposed Revisions to Billing Basis Proposed changes to the revised billing basis apply only to the quantity rates applicable under Section C.3 of Rate Schedule S-2. Using winter water usage as the basis instead of monthly water usage for these customers will lower the billing basis so that the rate would need to increase to result in the same revenue from the customer class. Table 4 shows the impact of changing the billing basis on the quantity rate both to be revenue -neutral and with the April 18, 2012 Page 6 of 10 (ID # 2679) proposed across-the-board 5% rate increase. The monthly revenue includes revenues from the minimum monthly charge. Table 4: Quantity Rate with Different Billing Bases for Non-residential Customers Monthly Usage (ccf) Monthly Revenue ($) Average Rate ($/ccf) Current – Mixed Billing Basis 85,817 407,630 4.75 Proposed – All Winter Billing Basis 75,756 ” 5.38 Proposed Change to Quantity Rate Current Quantity Rate 4.75 Quantity Rate with all winter billing basis 5.38 Proposed Quantity Rate (with winter billing basis and 5% rate increase) 5.65 Customer Bill Impact Due to Revised Billing Basis Figure 1 below shows the impact on commercial customers, excluding restaurants and industrial dischargers, of the proposed change to the quantity rate and billing basis. About 23% of customers would see no change to their bills since their water usage is low enough that only the minimum charge is paid. About 40% of customers would see a bill decrease. The remaining 37% would see higher bills, but only 9.5% of all customers would see impacts of greater than $50 per month. Figure 1: Bill Impact on Commercial Customers on Rate Schedule S-2, Section C.3. -$600 -$400 -$200 $0 $200 $400 $600 0%10%20%30%40%50%60%70%80%90% M o n t h l y b i l l c h a n g e Percent of Customer accounts Monthly Bill Impact: Commercial Customers 40.2% of customers see a bill decrease Nine customers will see decreases greater than $600 Eleven customers will see increases over $600 63.1% of customers see reduced or no change to bills 100% April 18, 2012 Page 7 of 10 (ID # 2679) Proposed Rate Adjustments due to Increased Revenue Requirements In order to collect required revenues for wastewater services, a 5% uniform rate increase is proposed for all rate classes. Staff reviewed customer usage data and found no need for a cost of service adjustment to rates since the completion of the 2011 cost of service study. Therefore, the proposed 5% revenue increase effective July 1, 2012 is applied equally to all customer classes. Table 5 presents current rates and proposed rates after t he required adjustments due to 5% uniform revenue increase and adjustment to the billing basis for commercial customers on Section C.3 of Rate Schedule S-2. Table 5: Proposed Rate Adjustments Rate Schedule Customer Class Current Rates Proposed Rates Monthly Charge(1) ($/month) Quantity Charge ($/ccf) Monthly Charge(1) ($/month) Quantity Charge ($/ccf) S-1 Residential 27.91 N/A 29.31 N/A S-2 (was S2.C.3) Commercial 27.91 4.75 29.31 5.65(2) S-6 (was S2.C.1) Restaurant 27.91 8.31 29.31 8.73 S-7 (was S2.C.2) Industrial Dischargers(3) 27.91 2.48 29.31 2.60 (1) Monthly charges indicated under S-1 are fixed monthly charges, and those under S-2 are minimum monthly charges. Minimum monthly charges apply if water usage is less than 6 ccf per month. (2) Includes change to winter water use billing basis. (3) Currently there are no customers in this class. April 18, 2012 Page 8 of 10 (ID # 2679) Customer Bill Impact from Proposed Rates Table 6 below shows the impact of the proposed rate increase on customer bills. Table 6: Impact of Rate Increase on Customer Bills Customer Current Bill Proposed Bill Proposed Increase Proposed Increase (%) Residential Customers $27.91 $ 29.31 $1.40 5% Restaurants (using 57 ccf/month) $ 473.67 $ 497.61 $23.94 5% Commercial Customers (not restaurants and industrial dischargers): Small water user (using less than 6 ccf/month) $ 27.91 $ 29.31 $1.40 5% Median water user (using 10 ccf/mo year-round) $ 47.50 $ 56.50 $9.00 19% Median water user (using 8 ccf/mo in winter, 12 ccf/mo in summer) currently billed on monthly water use basis $ 47.50 $ 45.20 -$2.30 -5% Large water user (using 1600 ccf/mo in winter, 3200 ccf/mo in summer) currently billed on monthly use basis $ 10,450 $ 9,040 -$1,410 -13% Large water user (using 1600 ccf/mo in winter, 3200 ccf/mo in summer) currently billed on winter basis $ 7,600 $ 9,040 $1,440 19% Comparison of Palo Alto Water Rates and Surrounding Cities For several years, Palo Alto's retail wastewater collection rates have generally been on par with surrounding areas. Table 7 below, which compares monthly wastewater collection bills using rates as of January 1, 2012 for Mountain View, Redwood City, Santa Clara and Menlo Park, indicates that the average residential customer in surrounding cities pays approximately 42 percent more than the average Palo Alto residential customer. At this time, the certainty or magnitude of other jurisdictions’ upcoming rate changes is not known. It should be noted that Palo Alto’s proposed residential rate increase to $29.31 would continue to be lowe r than the average benchmark level. Table 7: Monthly Residential Wastewater Collection Bill Comparison (rates in effect as of January 1, 2012) Wastewater Palo Alto Mountain View Redwood City Santa Clara Menlo Park Average Benchmark Residential $27.91 $22.99 $53.10 $24.54 $57.50 $39.53 Difference from CPAU -17.6% 90.3% -12.1% 106.0% 41.6% April 18, 2012 Page 9 of 10 (ID # 2679) Proposition 218 Water Rate Increase Procedure In addition to setting forth substantive requirements that certain types of utility rates, or “property-related fees”, be cost of service-based, Proposition 218 set forth procedural requirements that public agencies must follow in order to enact or increase a property -related fee. Since Proposition 218 applies to the wastewater rate increases described here, the City must provide written notice by mail to water customers subject to the proposed fees, followed by a public hearing held not less than 45 days after notice is mailed. The notice must include the amount of the fee, the basis upon which the fee was calculated, the reason for the fee, and the date, time and location of the public hearing. If a majority of customers submit written protests against the proposed fees, the City may not impose the fee. The notices are expected to be mailed out on May 1 with the public hearing currently scheduled for June 18, 2012. Commission Review and Recommendations On March 27, 2012, the UAC considered the staff proposal to increase Wastewater Collection Fund revenues by 5% effective July 1, 2012. With no discussion, the UAC voted unanimously (6-0) to recommend the staff recommendation that Council: 1. Increase overall retail wastewater collection rates and annual revenues for Wastewater Collection Utility by 5.0 percent, or $715,000, effective July 1, 2012; 2. Effect a change to utilize winter-based water usage rates for commercial customers under Rate Schedule S-2 Section C.3; and 3. Amend Wastewater Collection Utility Rate Schedules S-1 and S-2, and add new Wastewater Collection Utility Rate Schedules S-6 and S-7, as attached. The excerpted draft notes from the UAC’s March 27, 2012 meeting are provided as Attachment D. Resource Impact Approval of this rate proposal will result in a retail sales revenue increase of 5%, or $715,000 per year, to the Wastewater Collection Fund beginning on July 1, 2012. Environmental Review The restructuring of wastewater rates to meet operating expenses and financial reserve needs is not subject to the California Environmental Quality Act (CEQA), pursuant to Califor nia Public Resources Code Sec. 21080(b)(8) and Title 14 of the California Code of Regulations Sec. 15273(a) (1-4) (modification of rates for the purpose of meeting operating expenses, purchasing supplies, equipment or materials, meeting financial reserve needs and requirements and obtaining funds for capital projects necessary to maintain service within existing service areas). Attachments: Attachment A: Draft Resolution for Wastewater Rates Effective July 1, 2012 (PDF) April 18, 2012 Page 10 of 10 (ID # 2679) Attachment B: Financial Projections for the Wastewater Collection Fund (FY 2013 – FY 2017) (PDF) Attachment C: Utility Rate Schedules S-1, S-2, S-6. and S-7 (PDF) Attachment D: Excerpted Minutes of the March 7 UAC Meeting (PDF) 3-6-12 FIN Wastewater Excerpt (PDF) Prepared By: Ipek Connolly, Sr. Resource Planner Department Head: Valerie Fong, Director City Manager Approval: ____________________________________ James Keene, City Manager *NOT YET APPROVED* 120409 dm 6051704 ATTACHMENT _ Resolution No. _________ Resolution of the Council of the City of Palo Alto Adopting a Wastewater Collection Rate Increase, Amending Utility Rate Schedules S-1 and S-2 and Adopting New Utility Rate Schedules S-6 and S-7 WHEREAS, pursuant to Chapter 12.20.010 of the Palo Alto Municipal Code, the Council of the City of Palo Alto may by resolution adopt rules and regulations governing utility services, fees and charges; and WHEREAS, pursuant to Article XIIID Sec. 6 of the California Constitution, on June _, 2012, the City of Palo Alto held a public hearing to consider all protests against the proposed wastewater collection rate amendments; and WHEREAS, the total number of written protests presented by the close of the public hearing was less than fifty percent (50%) of the total number of customers and property owners subject to the proposed wastewater collection rate amendments; NOW, THEREFORE, the Council of the City of Palo Alto does hereby RESOLVE as follows: SECTION 1. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule S-1 (Domestic Wastewater Collection and Disposal) is hereby amended to read in accordance with sheet S-1-1, attached and incorporated. Utility Rate Schedule S-1, as amended, shall become effective July 1, 2012. SECTION 2. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, Utility Rate Schedule S-2 (Commercial Wastewater Collection and Disposal) is hereby amended to read in accordance with sheets S-2-1 and S-2-2, attached and incorporated. Utility Rate Schedule S-2, as amended, shall become effective July 1, 2012. SECTION 3. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, new Utility Rate Schedule S-6 (Restaurant Wastewater Collection and Disposal) is hereby added to read in accordance with sheet S-6-1, attached and incorporated. Utility Rate Schedule S-6 shall become effective July 1, 2012. SECTION 4. Pursuant to Section 12.20.010 of the Palo Alto Municipal Code, new Utility Rate Schedule S-7 (Commercial Wastewater Collection and Disposal – Special Discharge) is hereby added to read in accordance with sheets S-7-1 and S-7-2, attached and incorporated. Utility Rate Schedule S-7 shall become effective July 1, 2012. SECTION 5. The Council finds that the revenue derived from the authorized adoption enumerated herein shall be used only for the purpose set forth in Article VII, Section 2, of the Charter of the City of Palo Alto. ß *NOT YET APPROVED* 120409 dm 6051704 SECTION 6. The Council finds that a restructuring of wastewater collection rates to meet operating expenses, purchase supplies and materials, meet financial reserve needs and obtain funds for capital improvements necessary to maintain service is not subject to the California Environmental Quality Act (CEQA), pursuant to California Public Resources Code Sec. 21080(b)(8) and Title 14 of the California Code of Regulations Sec.15273(a)(1) and (3). After reviewing the wastewater rate staff reports presented to the Utilities Advisory Commission, the Finance Committee and Council, the Council incorporates these documents herein and finds that sufficient evidence has been presented setting forth with specificity the basis for this claim of CEQA exemption. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: ___________________________ ___________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED: ___________________________ ___________________________ Sr. Deputy City Attorney City Manager ___________________________ Director of Utilities ___________________________ Director of Administrative Services ($000's) Adopted Actual Adopted Projected 2011 2011 2012 2012 2013 2014 2015 2016 2017 1 0.0%0.0%0.0%0.0%5.0%9.0%9.0%8.0%3.0% 2 WASTEWATER REVENUE 3 REVENUE:14,371 14,304 14,371 14,304 14,304 15,020 16,371 17,845 19,272 4 RATE ADJUSTMENT 0 0 0 0 715 1,352 1,473 1,428 578 5 PRORATION IMPACT 0 0 0 0 (30)(56)(61)(59)(24) 6 TOTAL ADJUSTED REVENUE 14,371 14,304 14,371 14,304 14,990 16,315 17,783 19,213 19,826 7 DISCOUNTS/UNCOLLECT.(15)(11)0 0 0 0 0 0 0 8 INTEREST 445 454 480 480 414 364 332 325 336 9 CONNECTION AND CAPACITY FEES 730 1,081 740 740 750 761 771 794 817 10 OTHER / TRANSFERS IN 393 300 278 278 278 278 278 278 278 11 FROM RESERVES: 12 RATE STABILIZATION 988 876 1,289 0 1,869 1,225 521 0 0 13 COMMITMENTS & REPPROPRIATIONS 0 0 0 1,862 0 0 0 0 0 14 TOTAL FINANCIAL RESOURCES 16,912 17,005 17,158 17,663 18,300 18,942 19,685 20,609 21,257 15 OPERATING EXPENSES 16 TREATMENT 7,499 7,414 7,954 7,954 8,556 8,984 9,433 9,905 10,400 17 CUSTOMER DESIGN & CONN. (CIP)330 830 340 340 350 361 372 383 394 18 SYSTEM IMPROVEMENT (CIP)3,800 3,800 3,934 3,934 4,054 4,155 4,333 4,410 4,596 19 CUSTOMER SERVICES 269 281 266 286 292 298 304 310 316 20 OPERATIONS 2,709 2,422 2,818 2,818 3,141 3,204 3,268 3,334 3,400 21 ALLOCATED CHARGES:1,494 1,613 1,522 1,522 1,581 1,613 1,645 1,678 1,711 22 TOTAL MAJOR ACTIVITIES 16,101 16,360 16,834 16,854 17,975 18,615 19,355 20,019 20,818 23 DEBT SERVICE 129 129 129 129 129 129 129 129 129 24 TRANSFERS: 25 OPERATING TRANSFERS OUT 567 401 88 88 88 88 88 88 88 26 RENT 115 115 106 106 108 110 113 115 117 27 TOTAL OPERATING EXPENSES 16,912 17,005 17,158 17,178 18,300 18,942 19,685 20,351 21,152 28 RESERVE ADDITIONS: 29 PLANT REPLACEMENT 0 0 0 0 0 0 0 0 0 30 RATE STABILIZATION 0 0 0 486 0 0 0 258 105 31 TOTAL RESERVE ADDITIONS:0 0 0 486 0 0 0 258 105 32 TOTAL REVENUE REQUIREMENT 16,912 17,005 17,158 17,663 18,300 18,942 19,685 20,609 21,257 33 RESERVES BALANCES 34 PLANT REPLACEMENT 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 35 RATE STABILIZATION 5,784 5,896 4,078 6,382 4,513 3,288 2,767 3,024 3,129 36 TOTAL RESERVES BALANCES 6,784 6,896 5,078 7,382 5,513 4,287 3,766 4,024 4,129 37 38 COMMITMENTS & REAPPROPRIATIONS 10,250 39 RATE STABILIZATION RESERVE GUIDELINES 40 41 Short Term Risk Assessment Value 1,815 1,815 1,879 1,879 1,958 2,105 2,275 2,431 2,513 43 Long Term Rate Stabilization Guidelines 44 RSR Minimum 2,156 2,156 2,156 2,156 2,253 2,456 2,677 2,891 2,978 45 RSR Maximum 4,311 4,311 4,311 4,311 4,506 4,911 5,353 5,782 5,955 2011 2011 2012 2012 2013 2014 2015 2016 2017 Fiscal Year % CHANGE IN RETAIL RATE WASTEWATER COLLECTION E X P E N S E S R E V E N U E S R E S E R V E S FINANCIAL PROJECTIONS (FY 2013 - FY 2017) City of Palo Alto Wastewater Collection ߬¬¿½¸³»²¬Þ RESIDENTIAL WASTEWATER COLLECTION AND DISPOSAL UTILITY RATE SCHEDULE S-1 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-20121 Supersedes Sheet No S-1-1 dated 7-1-20092011 Sheet No S-1-1 A. APPLICABILITY: This schedule applies to each occupied residential dwelling unit. B. TERRITORY: This schedule applies everywhere the City of Palo Alto provides wastewater service. C. RATES: Per Month Each domestic dwelling unit .................................................................................................. $27.9129.31 D. SPECIAL NOTES: 1. Any dwelling unit being individually served by a water, gas, or electric meter will be considered as continuously occupied. 2. For two or more occupied dwelling units served by one water meter, the monthly wastewater charge will be calculated by multiplying the current wastewater rate by the number of dwelling units. 3. Each developed separate lot shall have a separate service lateral to a sanitary main or manhole. {End} • •••••• •• •• COMMERCIAL WASTEWATER COLLECTION AND DISPOSAL UTILITY RATE SCHEDULE S-2 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-20112 Supersedes Sheet No S-2-1 dated 7-1-20092011 Sheet No S-2-1 A. APPLICABILITY: This schedule applies to all all commercial establishments other than those served under Utility Rate Schedule S-1 (Domestic Wastewater Collection and Disposal), residential dwelling units and those served under Utility Rate Schedules S-6 (Restaurant Wastewater Collection and Disposal) or Rate Schedule S-7 (Commercial Establishments Wastewater Disposal – SpecialIndustrial Discharger). B. TERRITORY: This schedule applies everywhere the City of Palo Alto provides wastewater services. C. RATES: 1.Restaurants (A)Minimum charge per connection per month ..................................................$27.91 (B)Quantity Rates: Based on metered water, per 100 cubic feet ..................................................$8.31 2.Any establishment requiring special discharge monitoring as defined in Rule and Regulation 23, Section D. (A)Collection System Operation, Maintenance, and Infiltration Inflow: $1,978.61 per million gallons ($1.48 per 100 cubic feet of metered water). (B)Advanced Waste Treatment Operations and Maintenance Charge: $1,336.90 per million gallons ($1.00 per 100 cubic feet of metered water). (C)$247.56 per 1000 pounds of COD1 (D)$596.62 per 1000 pounds of SS2 (E)$3,983.85 per 1000 pounds of NH3 3 1 COD stands for Chemical Oxygen Demand 2 SS stands for Suspended Solids COMMERCIAL WASTEWATER COLLECTION AND DISPOSAL UTILITY RATE SCHEDULE S-2 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-20112 Supersedes Sheet No S-2-2 dated 7-1-20092011 Sheet No S-2-2 (F)$14,781.25 per 1000 pounds of toxics4 3.All Other Establishments (A1).Minimum Charge per connection per month .............................................................$27.919.31 (B2.)Quantity Rates, per 1: Based on metered water per 100 cubic feet (See Section D.1)...........................................$4.755.65 D. SPECIAL NOTES: 1.Upon application from establishments maintaining extensive irrigated landscapingT, the monthly charge for the quantity rate set forth in Section C.2 of this rate schedule will be based upon the average water usage for the months of January, February and March,and applied in July..If a water meter is identified as exclusively serving irrigation landscaping, such meter will be exempted from sewer wastewater charge calculations. 2.The City of Palo Alto Utilities Department may require Sewage wastewater metering facilities may be required, in which case service will be governed by terms of a special agreement between the City and the Customer. 3.Charges for large discharges will be determined on the basis of sampling as outlined in Utilities Rule and Regulation 23. However, for purposes of arriving at an accurate flow estimate, discharge meters, if installed, can be utilized to measure outflow for billing purposes. Annual charges will be determined and allocated monthly for billing purposes. 43.Dischargers of Unmetered Contaminated Groundwater Quantity rates for collection and treatment of the contaminated groundwater will be based on the rates as defined under Section C(3)of this rate schedule. Discharge permits are issued by the Environmental Compliance Manager at the Water Quality Control Plant, 2501 Embarcadero Way, Palo Alto. 5.Industrial Waste Discharge Fee The following fees, as defined in section 16.09.010 of the Palo Alto Municipal Code,will be 3 NH3 stands for Ammonia 4 Toxics include sum of chromium, copper, cyanide, lead, nickel, silver, and zinc COMMERCIAL WASTEWATER COLLECTION AND DISPOSAL UTILITY RATE SCHEDULE S-2 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-20112 Supersedes Sheet No S-2-3 dated 7-1-20092011 Sheet No S-2-3 required for the issuance of an Industrial Discharge Permit, including any Exceptional Waste Permits (This fee may beFees in subsections (A), (B) and (C),below may be reduced to $250 for a one-time batch discharge permit).: (A)Small, non-categorical facilities $425 (B)Non-categorical/small categorical with only minor pollutant concerns $1,250 (C)Categorical or Significant Industrial Users with ability to impact the RWQCP $2,100 {End} RESTAURANT WASTEWATER COLLECTION AND DISPOSAL UTILITY RATE SCHEDULE S-6 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-2012 Sheet No S-6-1 A. APPLICABILITY: This schedule applies to all restaurants. B. TERRITORY: This schedule applies everywhere the City of Palo Alto provides wastewater services. C. RATES: 1. Minimum charge per connection per month .........................................................$29.3127.91 2. Quantity Rates, per 100 cubic feet of monthly metered water usage ........................$8.738.31 D. SPECIAL NOTES: 1. The City of Palo Alto Utilities Department may require wastewater metering facilities, in which case service will be governed by terms of a special agreement between the City and the Customer. {End} COMMERCIAL WASTEWATER COLLECTION AND DISPOSAL – INDUSTRIAL DISCHARGER UTILITY RATE SCHEDULE S-7 CITY OF PALO ALTO UTILITIES Issued by the City Council Effective 7-1-2012 Sheet No S-7-1 A. APPLICABILITY: This schedule applies to any establishment requiring sampling of industrial discharges in excess of 25,000 gallons per day, or special discharge monitoring, as defined in Rule and Regulation 23, Section D. B. TERRITORY: This schedule applies everywhere the City of Palo Alto provides wastewater services. C. RATES: 1. Collection System Operation, Maintenance, and Infiltration Inflow: $2,077.541,978.61 per million gallons ($1.5548 per 100 cubic feet of metered water). 2. Advanced Waste Treatment Operations and Maintenance Charge: $1,403.741,336.90 per million gallons ($1.0500 per 100 cubic feet of metered water). 3. $ 247.56 per 1000 pounds (lbs) of COD (Chemical Oxygen Demand) 4. $ 596.62 per 1000 lbs of SS (Suspended Solids) 5. $ 3,983.85 per 1000 lbs of NH3 (Ammonia) 6. $ 14,781.25 per 1000 lbs of toxics (chromium, copper, cyanide, lead, nickel, silver, and zinc) D. SPECIAL NOTES: 1. Water usage will be determined as defined in Rule and Regulation 23, Section D. If a water meter is identified as exclusively serving irrigation landscaping, such meter will be exempted from wastewater charge calculations. 2. The City of Palo Alto Utilities Department may require wastewater metering facilities, in which case service will be governed by terms of a special agreement between the City of Palo Alto and the Customer. 3. Charges for large discharges will be determined on the basis of sampling as outlined in Utilities Rule and Regulation 23, Section D.However, for purposes of arriving at an accurate flow estimate, discharge meters, if installed, can be utilized to measure outflow for billing purposes. Annual charges will be determined and allocated monthly for billing purposes. {End} Excerpted Draft Minutes of the March 27,2012 UAC Meeting NEW BUSINESS ITEM 2:ACTION:Wastewater Collection Utility Proposed Rate Adjustments Effective July 1, 2012 Having read the written report,the commissioners were ready to vote on the item without discussion. ACTION: Commissioner Cook made a motion,seconded by Commissioner Waldfogel,to support staff?s recommendation to recommend that the City Council: 1.Increase overall retail wastewater collection rates and annual revenues for Wastewater Collection Utility by 5.0 percent,or $715,000,effective July 1,2012; 2.Effect a change to utilize winter based water usage rates for commercial customers under Rate Schedule S 2 Section C.3;and, 3.Amend Wastewater Collection Utility Rate Schedules S 1 and S 2,and add new Wastewater Collection Utility Rate Schedules S 6 and S 7,as attached. ߬¬¿½¸³»²¬Ü FILENAME 1 FINANCE COMMITTEE Excerpt Special Meeting March 6, 2012 Wastewater Collection Fund Financial Projections Chair Shepherd indicated Staff would return with its official response and rates and for the Finance Committee (FC) to make decisions. Council Member Burt asked for a brief summary of the drivers for the cost increases. Ipek Connolly, Senior Resource Planner, presented a chart indicating the main cost categories for the Wastewater Collection Fund. She noted approximately 50 percent of costs were treatment, 25 percent for Capital Improvement Projects (CIP), and 25 percent for operations. She reported the projections were based on the information provided by the treatment plant in terms of anticipated cost increases. She stated that translated to a 5 percent cost increase per year over the next five years, which was the primary driver. She indicated CIP was less than 3 percent growth for standard inflation, and Staff built in 2 percent overall for operations costs. She said there were no major cost increases; therefore, it was almost entirely driven by inflation and cost increases. Council Member Burt asked why there was that much inflationary cost increase. Ms. Connolly reported this was based on the prior five years of treatment plant costs, which on average had increased about 5 percent. She stated they also were undertaking some capital work. She indicated this was Wastewater Collection Utility Services' CIP; the other one was treatment costs and part of that was their own CIP projects. She explained one of the drivers was their own investments, and two additional drivers of their costs were electricity and chemicals. Council Member Burt stated electric was stable. Valerie Fong, Utilities Director, thought the rate was stable, but did not know if their usage was stable. FILENAME 2 Phil Bobel, Watershed Protection Manager, reported the electric part was not going to increase dramatically from this point forward. He stated most of the costs at the treatment plant were CIP. He noted sewage treatment was not separated from the collections system CIP. H explained the long-range facility plan would include rebuilding the sewage treatment plant, which was well over 40 years old, over the next 25 years. Council Member Burt asked if the biggest proportion of the bluish-purple section of increase was a result of the plant having passed its useful life. Mr. Bobel indicated there would be more bond funding in the future and major expenses beyond 2017. Vice Mayor Scharff noted the current CIP increases were for band-aid repairs, and asked if the repairs would have to be repeated in the future. Mr. Bobel answered no. He explained Staff was being judicious about expenditures and band-aid repairs would not be rendered useless. Vice Mayor Scharff asked if the FC should consider bond financing now. Mr. Bobel thought he should discuss bond funding with Mr. Perez. Lalo Perez, Director Administrative Services, indicated the projects needed to be identified and a partner (INAUDIBLE). Council Member Price asked for the meaning of the risk assessment number mentioned on page 3 of the Staff Report and in Table 2, with regard to budgeted and actual. Ms. Connolly indicated reserve guidelines were shown with the gray line. She reported Staff managed the Fund to be within the minimum and maximum in the long term. For the short term, she noted the guidelines required Staff to review short-term risks. She explained that was done by reviewing the one-year revenue change between budgeted amounts and collected amounts in the case of the Wastewater Collection Fund, which was one number considered. She stated a second number was 15 percent of the CIP expenditures. She indicated those two numbers were taken every year to determine the short-term status; and this number was not significant for the Wastewater Collection Fund because revenues and CIP plans were stable and followed the minimum requirements. She noted reserve amounts were higher than required by the maximum guideline, because these guidelines were lowered in 2009. She stated there had not been a rate adjustment for wastewater collection for the last two years and all costs FILENAME 3 had not been collected because of the cushion in the reserves. She explained the City was utilizing the excess in the reserves and not raising rates in order to decrease the reserves to target levels. She said rates would increase in 2013 by only 5 percent, even though the revenue versus cost difference required more. She indicated future rates would have to be brought in line with annual expenditures. Joe Saccio, Assistant Director Administrative Services, explained the City was subsidizing the costs through the reserve in order to decrease the reserve level to a point between minimum and maximum levels. He stated at some point revenue would have to be increased to cover costs and not use the reserve. Ms. Fong noted there was a long-term and short-term risk assessment. She explained the short-term risk assessment was relevant when a volatile commodity was being purchased. She noted wastewater was not a volatile commodity; therefore, the short- term risk assessment was not that relevant in this particular utility. She indicated Staff used the same assessments for all utilities for points of comparison. Chair Shepherd asked if Staff had decided to fill the two new positions noted on page 2 of 5. Ms. Connolly answered it was proposed, not decided. She stated management would decide whether to proceed with that. Ms. Fong stated Staff had to make its case to the City Manager first, and included it in the interest of full disclosure. Chair Shepherd noted the positions were a business analyst and a inspector. Vice Mayor Scharff asked why Staff needed those positions. Ms. Fong indicated regulations had changed, and both positions would focus on regulations for gas and wastewater utilities. Chair Shepherd inquired whether the two positions would be shared, as $400,000 was quite a bit. Ms. Connolly stated $400,000 included a study assessment as well as Staff positions.