HomeMy WebLinkAboutStaff Report 2519City of Palo Alto (ID # 2519) Finance Committee Informational Report Report Type: Informational Items Meeting Date: 2/28/2012 February 28, 2012 Page 1 of 1 (ID # 2519) Title: Library Bond Oversight Quarterly Report Q1 2012 Subject: Library Bond Oversight Committee Quarterly Report for January 2012 From: City Manager Lead Department: Public Works Please see attached Library Bond Oversight Committee First Quarter Report 2012. Attachments: 1st Quarter Report 1-12 (DOC) 2012 01 24 Revised Committee Financial Report (PDF) Prepared By:Debra Jacobs, Project Engineer Department Head:J. Michael Sartor, Director City Manager Approval: James Keene, City Manager TO: Finance Committee FROM: Library Bond Oversight Committee DATE: January 31 2011 SUBJECT: Library Bond Oversight Committee First Quarter Report – January 2012 The Library Bond Oversight Committee met in January, April, July, and October 2011 and January 2012. Members of the City staff and project management firm regularly attend our meetings. The Committee finds that the City’s financial reporting for all library-related projects is accurate and appropriate. The Committee forwards the January 18, 2012 financial report to the City Council, with Committee approval. Submitted: C.James Schmidt Library Bond Oversight Committee Chair ATTACHMENTS: Attachment A: Library Bond Oversight Committee Quarterly Financial Report as of January 18, 2012. 1 2 3 4 5 6 7 (3 minus 1) (4 minus 1) (4 minus 3) (6 divide by 3) Measure N Estimates Changes in Measure Estimates Engineer's Estimate Projected Costs Diff. Between Measure N Estimates vs. Projected Costs $ Diff. Between Engineer's Estimate vs. Projected Costs % Diff. Between Engineer's Estimate vs. Projected Costs Downtown Library 4,000,000$ 1,212,000$ 5,212,000$ 4,418,111$ (418,111) 793,889$ 15.2% Mitchell Park & Community Center Library 50,000,000 (957,000) 49,043,000 40,997,900 9,002,100 8,045,100 16.4% Cubberley Temporary Library - 645,000 645,000 619,687 (619,687) 25,313 3.9% Main Library 18,000,000 - 18,000,000 19,918,500 (1,918,500) (1,918,500) (10.7%) Art Center Temporary Library - 500,000 500,000 506,309 (506,309) (6,309) (1.3%) Total Prior to Bond Financing Costs 72,000,000 1,400,000 73,400,000 66,460,507 5,539,493 6,939,493 9.5% Bond Financing Costs (a)4,000,000 (1,400,000) 2,600,000 1,250,000 2,750,000 1,350,000 51.9% Grand Total 76,000,000$ -$ 76,000,000$ 67,710,507$ 8,289,493$ 8,289,493$ 10.9% a) Elimination of capitalized interest resulted in savings (or budget reduction) of $1.4 million for the 2010 bond issuance Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Budget Original Budget (per Measure N Ballot Measure)72,000,000$ -$ -$ 72,000,000$ Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 645,000 Temporary Main Library Facility - Art Center Auditorium 500,000 500,000 Net Other Budget Changes 255,000 255,000 Expenditures - Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 25,290,538 12,402,775 (37,693,313) Construction Costs - - - Contract Contingency 2,811,839 1,143,575 (3,955,414) Other Contract Services 230,052 738,830 (968,881) City (Inter-department) Service Charge 344,029 - (344,029) Miscellaneous Cost 74,859 3,816,651 (3,891,510) Total Library Projects Expenditures 73,400,000 28,751,316 18,101,831 26,546,853 Estimate of Pending Commitments/Costs - - 19,607,360 (19,607,360) Total Bond Funds Less Bond Financing Costs 73,400,000 28,751,316 37,709,191 6,939,493 9.5% Bond Financing Costs (a)2,600,000 571,208 678,792 1,350,000 51.9% Grand Total 76,000,000$ 29,322,524$ 38,387,983$ 8,289,493$ 10.9% 2010 GO Bond True Interest Cost (TIC)4.21% a) Elimination of capitalized interest resulted in savings (or budget reduction) of $1.4 million for the 2010 bond issuance in addition of the $571,208 in issuance costs, the Underwriter's portion of $348,010 is paid from bond premium City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of January 18, 2012 Description of Activity Library Projects Budget to Actual Activities Summary Budget History and Projection 1 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of January 18, 2012 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 4,000,000$ -$ -$ 4,000,000$ Budget Change 1,212,000 1,212,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 3,583,704 88,810 (3,672,513) Construction Costs - - - - Contract Contingency - 321,499 157,491 (478,990) Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost - 3,163 - (3,163) Total Library Projects Expenditures 5,212,000 3,981,792 246,301 983,907 Estimate of Pending Commitments/Costs - - 190,018 (190,018) Total Bond Funds Less Bond Financing Costs 5,212,000$ 3,981,792$ 436,319$ 793,889$ 15.2% Reasons for Budget Increase of:1,212,000$ 1) Seismic upgrade 30,000$ July 2010 2) Roof replacement 125,000 June 2011 3) LEED - Green building upgrades 100,000 4) Construction Management Services increase 400,000 5) Fixed Equipment 187,000 6) Moving costs deemed to be bondable costs 50,000 7) Contingency adjustment 320,000 Net Budget Change 1,212,000$ c) Permanent and built-in casework and equipment portions that are now deem to be bondable costs (part of $4.3 million in FF&E that in the 2008 estimate were identified as non-bondable costs) Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 50,000,000$ -$ -$ 50,000,000$ Budget Change (957,000) (957,000) Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 19,834,691 11,527,601 (31,362,292) Contract Contingency - 2,434,117 756,663 (3,190,780) Other Contract Services - 202,127 648,830 (850,956) City (Inter-department) Service Charge - 287,282 - (287,282) Miscellaneous Cost - 71,571 3,816,651 (3,888,222) Total Library Projects Expenditures 49,043,000 22,829,787 16,749,744 9,463,469 Estimate of Pending Commitments/Costs 1,418,369 (1,418,369) Total Bond Funds Less Bond Financing Costs 49,043,000$ 22,829,787$ 18,168,113$ 8,045,100$ 16.4% Reasons for Budget Decrease of:(957,000)$ 1) LEED - Green building (Council approved) upgrades 1,200,000$ 2) Fixed Equipment 1,750,000 3) Moving costs deemed to be bondable costs 100,000 4) Contingency adjustment (4,007,000) Net Budget Change (957,000)$ c) Permanent and built-in casework and equipment portions that are now deem to be bondable costs (part of $4.3 million in FF&E that in the 2008 estimate were identified as non-bondable costs) Description of Activity Description of Activity Mitchell Park Library and Community Center Budget to Actual Activities Summary (PE-09006) Downtown Library Budget to Actual Activities Summary (PE-09005) Completed: Construction Began: 2 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of January 18, 2012 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 18,000,000$ -$ -$ 18,000,000 Budget Change - - Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 1,407,565 426,447 (1,834,012) Contract Contingency - 22,723 150,432 (173,155) Other Contract Services - - 90,000 (90,000) City (Inter-department) Service Charge - - - - Miscellaneous Cost - - - - Total Library Projects Expenditures 18,000,000 1,430,289 666,879 15,902,833 Estimate of Pending Commitments/Costs 17,821,333 (17,821,333) Total Bond Funds Less Bond Financing Costs 18,000,000$ 1,430,289$ 18,488,211$ (1,918,500)$ (10.7%) Reasons for Budget Decrease of:-$ Net Budget Change -$ Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000$ -$ -$ 645,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 464,577 15,562 (480,139) Contract Contingency - 33,500 40,858 (74,358) City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost - 125 - (125) Total Library Projects Expenditures 645,000 509,448 56,420 79,132 Estimate of Pending Commitments/Costs 53,819 (53,819) Total Bond Funds Less Bond Financing Costs 645,000$ 509,448$ 110,239$ 25,313$ 3.9% Description of Activity Cubberley Temporary Library Budget to Actual Activities Summary (PE-09010) Description of Activity Main Library Budget to Actual Activities Summary (PE-11000) 3 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of January 18, 2012 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Main Library Facility - Art Center Auditorium 500,000$ -$ -$ 500,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs - 344,356 (344,356) Contract Contingency - - 38,131 (38,131) Other Contract Services - City (Inter-department) Service Charge - - - - Miscellaneous Cost - - - - Total Library Projects Expenditures 500,000 - 382,487 117,513 Estimate of Pending Commitments/Costs 123,822 (123,822) Total Bond Funds Less Bond Financing Costs 500,000$ -$ 506,309$ (6,309)$ (1.3%) Description of Activity Art Center Temporary Library Budget to Actual Activities Summary (Project # PE-11012) 4 Payment or Posting Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 4,000,000 Budget Change 1,212,000 Sub-total - 2010 Engineer's Budget Estimate 5,212,000 - - 5,212,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 418,563 08/24/10 Group 4 Architecture Research & Planning Architectural 362 09/21/10 Group 4 Architecture Research & Planning Architectural 135 08/03/10 Group 4 Architecture Research & Planning Architectural 16,233 08/03/10 Group 4 Architecture Research & Planning Architectural 56,000 08/10/10 Protech Consulting and Engineering Hazardous Material Testing 5,210 08/10/10 Turner Construction Company Construction Management Services 68,577 Oct. 21, 2010 Report 09/21/10 Group 4 Architecture Research & Planning Architectural 15 09/21/10 Group 4 Architecture Research & Planning Architectural 18,080 09/21/10 Group 4 Architecture Research & Planning Architectural 2,970 09/21/10 W.L. Butler Construction, Inc.Construction 93,177 10/05/10 Protech Consulting and Engineering Hazardous Material Testing 990 10/19/10 Group 4 Architecture Research & Planning Architectural 10,544 11/02/10 W. L. Butler Construction, Inc.Construction 69,984 11/02/10 Turner Construction Company Construction Management Services 27,984 11/02/10 Group 4 Architecture Research & Planning Architectural 11,864 12/07/10 Turner Construction Company Construction Management Services 55,174 12/07/10 Group 4 Architecture Research & Planning Architectural 11,688 Jan. 25, 2011 Report 12/07/10 W. L. Butler Construction, Inc.Construction 92,055 12/14/10 Group 4 Architecture Research & Planning Architectural 519 12/14/10 W. L. Butler Construction, Inc.Construction 159,940 01/04/11 Turner Construction Company Construction Management Services 27,984 01/07/11 Group 4 Architecture Research & Planning Architectural 11,688 01/21/11 West Coast Code Consultants, Inc.Plan Check 350 01/21/11 Turner Construction Company Construction Management Services 30,212 01/31/11 W. L. Butler Construction, Inc.Construction 211,220 02/18/11 W. L. Butler Construction, Inc.Construction 279,472 02/18/11 Group 4 Architecture Research & Planning Architectural 8,766 02/18/11 Turner Construction Company Construction Management Services 27,429 03/16/11 W. L. Butler Construction, Inc.Construction 277,033 April 26, 2011 Report 03/18/11 Group 4 Architecture Research & Planning Architectural 432 03/18/11 Group 4 Architecture Research & Planning Architectural 409 03/18/11 Group 4 Architecture Research & Planning Architectural 8,766 03/18/11 Group 4 Architecture Research & Planning Architectural 136 03/31/11 Pivot Interiors Design 2,250 03/31/11 Turner Construction Company Construction Management Services 17,808 04/07/11 Group 4 Architecture Research & Planning Architectural 13,149 04/19/11 Group 4 Architecture Research & Planning Architectural 2,795 04/25/11 W. L. Butler Construction, Inc.Construction 342,711 05/10/11 Turner Construction Company Construction Management Services 39,522 05/12/11 Group 4 Architecture Research & Planning Architectural 220 05/12/11 Group 4 Architecture Research & Planning Architectural 24,891 05/12/11 Group 4 Architecture Research & Planning Architectural 14,610 July 26, 2011 Report 05/17/11 Turner Construction Company Construction Management Services 28,334 05/27/11 W. L. Butler Construction, Inc.Construction 238,387 06/07/11 W. L. Butler Construction, Inc.Construction 352,713 06/07/11 Group 4 Architecture Research & Planning Architectural 14,610 06/09/11 Moovers, Inc.Moving Services 10,233 06/16/11 Group 4 Architecture Research & Planning Architectural 233 07/20/11 Group 4 Architecture Research & Planning Architectural 479.16 07/20/11 Group 4 Architecture Research & Planning Architectural 12,405 07/27/11 W.L. Butler Construction, Inc.Construction 157,980 07/27/11 Turner Construction Company Construction Management Services 26,028 08/31/11 Group 4 Architecture Research & Planning Architectural 19,560 October 25, 2011 Report 08/10/11 Group 4 Architecture Research & Planning Architectural 137 08/10/11 Group 4 Architecture Research & Planning Architectural 5,100 08/24/11 Turner Construction Company Construction Management Services 38,160 08/31/11 W.L. Butler Construction, Inc.Construction 137,659 09/14/11 Group 4 Architecture Research & Planning Architectural 2,550 09/14/11 Group 4 Architecture Research & Planning Architectural 1,116 12/07/11 Group 4 Architecture Research & Planning Architectural 5,100.00 10/19/11 Turner Construction Company Construction Management Services 1,176.00 12/21/11 Turner Construction Company Construction Management Services 3,806.42 11/09/11 Group 4 Architecture Research & Planning Architectural 1,146.02 Downtown Library Activity Details (PE-09005) As of January 18, 2012 5 Payment or Posting Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Downtown Library Activity Details (PE-09005) As of January 18, 2012 12/07/11 W.L. Butler Construction, Inc.Construction 64,873.60 Pivot Interiors Design - Modular Furniture Moovers, Inc.Moving Services 580 W.L. Butler Construction, Inc.Construction 22,796 Group 4 Architecture Research Architectural 65,434 Sub-total - Engineering and Architectural Costs - 3,583,704 88,810 (3,672,513) Contract Contingency Summary of Expenditures as of July 21, 2010 19,140 10/19/10 Group 4 Architecture Research & Planning Architectural 660 10/19/10 Group 4 Architecture Research & Planning Architectural 4,070 Oct. 21, 2010 Report 08/27/10 Asbestos Management Group Hazardous Material Testing 2,500 02/28/11 City of Palo Alto - Planning Plan Check Fee 93 April 26, 2011 Report 02/18/11 W. L. Butler Construction, Inc.Construction 15,686 04/25/11 W. L. Butler Construction, Inc.Construction 59,235 05/27/11 W. L. Butler Construction, Inc.Construction 163,149 07/01/11 Turner Construction Company Construction Management Services 1,123 July 26, 2011 Report 07/01/11 Turner Construction Company Construction Management Services 24,611 06/07/11 Group 4 Architecture Research & Planning Architectural 5,104 06/07/11 Group 4 Architecture Research & Planning Architectural 3,489 07/27/11 Group 4 Architecture Research & Planning Architectural 9,339 October 25, 2011 Report 08/31/11 W. L. Butler Construction, Inc.Construction 13,299 Group 4 Architecture Research & Planning Architectural 14,198 Turner Construction Company Construction Management Services 14,404 W.L. Butler Construction, Inc.Construction 123,786 Protech Consulting and Engineering Hazardous Material Testing 990 Moovers, Inc.Moving Services 4,113 Sub-total - Contract Contingency - 321,499 157,491 (478,990) Other Contract Services Summary of Expenditures as of July 21, 2010 2,225 08/27/10 Asbestos Management Group Hazardous Material Testing 25,700 Oct. 21, 2010 Report Sub-total - Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 43,990 07/13/11 City of Palo Alto - Public Works Parking Permit 230 October 25, 2011 Report 07/13/11 City of Palo Alto - Public Works Parking Permit 420 10/31/10 City of Palo Alto - Planning Plan Checking 861 Jan. 25, 2011 Report Sub-total - City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,158 04/10/36 Santa Clara County Downtown-Notice of Completion Filing Fee 5 Sub-total - Miscellaneous Cost - 3,163 - (3,163) Grant Total 5,212,000 3,981,792 246,301 983,907 6 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 50,000,000$ Budget Change (957,000) Sub-total - 2010 Engineer's Budget Estimate 49,043,000 - - 49,043,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 3,101,748 08/03/10 Group 4 Architecture Research & Planning Architectural 37,609 08/10/10 Group 4 Architecture Research & Planning Architectural 18,595 10/05/10 Group 4 Architecture Research & Planning Architectural 7,522 10/05/10 Group 4 Architecture Research & Planning Architectural 13,942 10/05/10 Group 4 Architecture Research & Planning Architectural 2,971 07/27/10 Moovers, Inc.Moving Services 435 09/21/10 Turner Construction Company Construction Management Services 163,918 10/19/10 Group 4 Architecture Research & Planning Architectural 47,110 10/19/10 State Water Resources Control Board Submitting Permit Registration Documents 375 Oct. 21, 2010 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 18,517 08/03/10 Peninsula Digital Imaging Reproduction Services 3,066 08/03/10 Peninsula Digital Imaging Reproduction Services 2,401 08/03/10 Peninsula Digital Imaging Reproduction Services 5,105 08/03/10 Peninsula Digital Imaging Reproduction Services 2,119 11/02/10 Bank of Sacramento - Flintco Pacific Escrow Construction 86,542 11/02/10 Flintco Pacific, Inc.Construction 778,876 11/02/10 Group 4 Architecture Research & Planning Architectural 1,037 12/07/10 Turner Construction Company Construction Management Services 635 12/07/10 Turner Construction Company Construction Management Services 70,780 12/07/10 Turner Construction Company Construction Management Services 64,319 12/07/10 Protech Consulting and Engineering Hazardous Material Testing 8,385 12/07/10 Peninsula Digital Imaging Reproduction Services 7,672 12/14/10 West Coast Code Consultants, Inc.Plan Check 26,820 12/14/10 Group 4 Architecture Research & Planning Architectural 46,200 Jan. 25, 2011 Report 12/21/10 Group 4 Architecture Research & Planning Architectural 46,297 12/21/10 Flintco Pacific, Inc.Construction 732,895 12/21/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 81,433 12/28/10 Flintco Pacific, Inc.Construction 757,231 12/28/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 84,137 01/04/11 Group 4 Architecture Research & Planning Architectural 2,942 01/04/11 Group 4 Architecture Research & Planning Architectural 4,564 01/04/11 Turner Construction Company Construction Management Services 73,919 1/21/2011 Group 4 Architecture Research & Planning Architectural 267 1/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 1/21/2011 Turner Construction Company Construction Management Services 105,917 2/1/2011 Flintco Pacific, Inc.Construction 1,098,865 2/1/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 126,732 2/18/2011 Flintco Pacific, Inc.Construction 1,497,190 2/18/2011 Turner Construction Company Construction Management Services 94,502 2/18/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 193,977 2/24/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,820 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,680 3/16/2011 West Coast Code Consultants, Inc.Plan Check (560) 3/16/2011 West Coast Code Consultants, Inc.Plan Check 560 April 26, 2011 Report 3/16/2011 Protech Consulting and Engineering Hazardous Material Testing 1,250 3/17/2011 West Coast Code Consultants, Inc.Plan Check 560 3/18/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/31/2011 Flintco Pacific, Inc.Construction 446,177 3/31/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 76,548 3/31/2011 Turner Construction Company Construction Management Services 94,572 4/11/2011 Group 4 Architecture Research & Planning Architectural 4,219 4/11/2011 Group 4 Architecture Research & Planning Architectural 127 4/11/2011 Group 4 Architecture Research & Planning Architectural 7,366 4/11/2011 Group 4 Architecture Research & Planning Architectural 80,956 4/20/2011 West Coast Code Consultants, Inc.Plan Check 140 4/20/2011 West Coast Code Consultants, Inc.Plan Check 280 4/20/2011 West Coast Code Consultants, Inc.Plan Check 560 3/29/2011 Palo Alto Stores Supplies/Parts 1,342 4/25/2011 Flintco Pacific, Inc. Escrow 2841-042 85,140 4/25/2011 Flintco Pacific, Inc.Construction 766,263 4/26/2011 Group 4 Architecture Research & Planning Architectural 2,528 5/10/2011 Turner Construction Company Construction Management Services 82,594 5/12/2011 Group 4 Architecture Research & Planning Architectural 683 5/12/2011 Group 4 Architecture Research & Planning Architectural 80,956 5/17/2011 Turner Construction Company Construction Management Services 101,701 5/17/2011 Flintco Pacific, Inc.Construction 815,307 July 26, 2011 Report 5/17/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 93,874 Mitchell Park Library and Community Center Activity Details (PE-09006) As of January 18, 2012 7 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of January 18, 2012 5/17/2011 Flintco Pacific, Inc.Construction 29,559 7/1/2011 Turner Construction Company Construction Management Services 99,493 7/1/2011 Group 4 Architecture Research & Planning Architectural 19,540 7/1/2011 Group 4 Architecture Research & Planning Architectural 3,109 7/1/2011 Group 4 Architecture Research & Planning Architectural 17,038 7/1/2011 Group 4 Architecture Research & Planning Architectural 92,521 July 26, 2011 Report 7/1/2011 Group 4 Architecture Research & Planning Architectural 8,314 7/5/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 125,101 7/5/2011 Flintco Pacific, Inc.Construction 1,125,909 7/27/2011 Group 4 Architecture Research & Planning Architectural 57,826 7/27/2011 Group 4 Architecture Research & Planning Architectural 13,045 7/27/2011 Group 4 Architecture Research & Planning Architectural 1,954 7/27/2011 Flintco Pacific, Inc.Construction 2,316,525 7/27/2011 Flintco Inc. Escrow Construction 257,391 7/27/2011 Turner Construction Company Construction Management Services 127,367 October 25, 2011 Report 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,898 10/5/2011 Group 4 Architecture Research & Planning Architectural 57,826 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,647 10/5/2011 Flintco Pacific, Inc.Construction 483,144 10/5/2011 Flintco, Inc. Escrow Construction 53,683 10/19/2011 Turner Construction Company Construction Management Services 170,058 11/2/2011 Flintco Pacific, Inc.Construction 705,850 11/2/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/2/2011 Group 4 Architecture Research & Planning Architectural 2,060 11/2/2011 Flintco Pacific, Inc.Construction 78,428 11/30/2011 West Coast Code Consultants, Inc.Plan Check 420 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 Group 4 Architecture Research & Planning Architectural 2,051 11/30/2011 West Coast Code Consultants, Inc.Plan Check 700 11/30/2011 Flintco Pacific, Inc.Construction 119,803 11/30/2011 Group 4 Architecture Research & Planning Architectural 1,722 11/30/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/30/2011 Group 4 Architecture Research & Planning Architectural 4,789 11/30/2011 Flintco, Inc. Escrow Construction 837,115 12/21/2011 Turner Construction Company Construction Management Services 187,775 12/21/2011 Turner Construction Company Construction Management Services 129,453 12/21/2011 Turner Construction Company Construction Management Services 233,061 12/21/2011 Turner Construction Company Construction Management Services 2,385 12/21/2011 Turner Construction Company Construction Management Services 109 12/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 Protect Consulting and Engineering Hazardous Material Testing 12,699 Movers, Inc.Moving Services 19,853 Group 4 Architecture Research Architectural 1,239,715 Turner Construction Company Construction Management Services 884,501 Flintco Pacific, Inc.Construction 8,926,193 West Coast Code Consultants, Inc.Plan Check 720 Sign and Services Company 443,920 Sub-total - Engineering Costs - 19,834,691 11,527,601 (31,362,292) Contract Contingency Summary of Expenditures as of July 21, 2010 104,373 08/03/10 Group 4 Architecture Research & Planning Architectural 1,771 10/05/10 Group 4 Architecture Research & Planning Architectural 25,951 Jan. 25, 2011 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 10,740 2/1/2011 Flintco Pacific, Inc.Construction 41,725.00 2/18/2011 Flintco Pacific, Inc.Construction 248,603.00 April 26, 2011 Report 3/31/2011 Flintco Pacific, Inc.Construction 242,754.00 8/31/2011 W. L. Butler Construction, Inc.Construction 22,712.50 8/24/2011 Flintco Pacific, Inc.Construction 987,123.00 8/24/2011 Turner Construction Company Construction Management Services 151,367.49 8/24/2011 Flintco Inc. Escrow Construction 117,936.00 8/24/2011 Group 4 Architecture Research & Planning Architectural 48,250.00 October 25, 2011 Report 8/24/2011 Group 4 Architecture Research & Planning Architectural 57,825.84 8/24/2011 Flintco Pacific, Inc.Construction 74,304.00 10/5/2011 Group 4 Architecture Research & Planning Architectural 37,305.95 11/30/2011 Group 4 Architecture Research & Planning Architectural 20,265.95 11/30/2011 Flintco Pacific, Inc.Construction 241,110.00 Moovers, Inc.Moving Services 117 Flintco Pacific, Inc.Construction 663,370 Protect Consulting and Engineering Hazardous Material Testing 1,375 Group 4 Architecture Research & Planning Architectural 25,601 Turner Construction Company Construction Management Services 66,200 8 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of January 18, 2012 West Coast Code Consultants, Inc.Plan Check Sub-total - Contract Contingency - 2,434,117 756,663 (3,190,780) Other Contract Services Summary of Expenditures as of July 21, 2010 93,750 07/01/11 FedEx Mailing 89 08/26/10 Bruce Beasley Sculpture 90,000 Oct. 21, 2010 Report 09/30/11 FedEx Coding Error Correction (89) October 25, 2011 Report 11/16/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services - Mitchell Park Library 3,776 12/21/11 ZFA Structural Engineers Mitchell Library Review 2,925 12/29/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 11,170 12/29/11 State Water Resource Board Permit 505 Bruce Beasley Sculpture 90,000 Group 4 Architecture Research Architectural 65,850 Constance Riedinger Legal Services 15,000 ZFA Structural Engineers 9,667 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 10,053 Envision Ware, Inc.Sorter System 442,889 Bibliotheca, Inc.15,370 Sub-total - Other Contract Services - 202,127 648,830 (850,956) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 176,008 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Library - Bldg A 70,153 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Teen Center - Bldg B 10,768 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Multipurpose Center - Bldg C 21,184 Oct. 21, 2010 Report 09/30/10 City of Palo Alto - Planning Demolition Permit MPL - 3700 Middlefield 525 09/30/10 City of Palo Alto - Planning Demolition Permit MPCC - 3800 Middlefield 525 09/28/10 City of Palo Alto - Planning Permit (Grading and Fill)1,830 10/31/10 City of Palo Alto - Planning Revision permit for Mitchell Park Library & CC 141 11/16/10 City of Palo Alto - Planning Architectural Review Board Fees 2,090 Jan. 25, 2011 Report 01/31/11 Palo Alto Stores Supplies/Parts 101 03/31/11 Palo Alto Stores Supplies/Parts 97 03/31/11 Palo Alto Stores Supplies/Parts 4,045 April 26, 2011 Report 03/31/11 Palo Alto Stores Supplies/Parts 89 03/31/11 Palo Alto Stores Supplies/Parts 661 06/14/10 Palo Alto Stores Reversal of Prior Charges (2,834) 03/29/11 Palo Alto Stores Reversal of Prior Charges (628) 03/30/11 Palo Alto Stores Reversal of Prior Charges (571) July 26, 2011 Report 04/04/11 Palo Alto Stores Reversal of Prior Charges (143) 04/30/11 City of Palo Alto - Public Works Underground Fire Supply/Hydrant Permit Fee 1,335 07/06/11 City of Palo Alto - Development Center Plan Check Fee 93 07/06/11 City of Palo Alto - Planning Plan Check Fee 89 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 137 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 October 25, 2011 Report 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 121 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 145 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 277 08/31/11 City Of Palo Alto - Planning Mitchell Library Plan Check 40 09/30/11 City of Palo Alto - Planning Mitchell Library - Permit Revision 89 10/31/11 City of Palo Alto - Development Center Plan Check Fee 113 10/31/11 City of Palo Alto - Development Center Plan Check Fee 325 Sub-total - City (Inter-department) Service Charge - 287,282 - (287,282) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,315 06/30/10 Office Max (US Bank-Calcard) - Reversed Reverse office supplies charged to project (246) 06/30/10 Debra Jacobs Reverse prior travel and meeting expense (6) Oct. 21, 2010 Report 06/30/10 Karen Bengard Reverse prior travel and meeting expense (20) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (11) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (20) 03/30/11 Palo Alto Stores Supplies/Parts 4 April 26, 2011 Report 03/30/11 Palo Alto Stores Supplies/Parts 214 03/30/11 Palo Alto Stores Reversal of Prior Charges (4) 03/30/11 Palo Alto Stores Reversal of Prior Charges (214) July 26, 2011 Report 04/21/11 City of Palo Alto - Utilities Utility Connection Fee 68,559 Group 4 Architecture Research Architectural 129,300 9 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of January 18, 2012 West Coast Code Consultants, Inc.Plan Check 3,160 Turner Construction Company Construction Management Services 270,729 Movers, Inc.Moving Services 6,533 Flintco Pacific, Inc.Construction 3,351,922 Protect Consulting and Engineering Hazardous Material Testing 10,616 Sign and Services Co.44,392 Sub-total - Miscellaneous Cost - 71,571 3,816,651 (3,888,222) Grant Total 49,043,000 22,829,787 16,749,744 9,463,469 10 Payment Date Purchasing Document Payee Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 18,000,000$ Budget Change - Sub-total - 2010 Engineer's Budget Estimate 18,000,000 - - 18,000,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 10/05/10 Group 4 Architecture Research and Planning Architectural 700 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 11/02/10 Group 4 Architecture Research and Planning Architectural 5,785 11/02/10 Group 4 Architecture Research and Planning Architectural 122,100 Jan. 25, 2011 Report 12/07/10 Group 4 Architecture Research and Planning Architectural 2,390 01/04/11 Group 4 Architecture Research and Planning Architectural 15,000 01/04/11 Group 4 Architecture Research and Planning Architectural 583 01/04/11 Group 4 Architecture Research and Planning Architectural 859 01/04/11 Turner Construction Company Construction Management Services 1,195 02/24/11 Group 4 Architecture Research and Planning Architectural 4,860 03/18/11 Group 4 Architecture Research and Planning Architectural 73,246 03/18/11 Group 4 Architecture Research and Planning Architectural 7,500 03/18/11 Group 4 Architecture Research and Planning Architectural 53 03/18/11 Group 4 Architecture Research and Planning Architectural 3,843 04/11/11 Group 4 Architecture Research and Planning Architectural 112,464 04/11/11 Group 4 Architecture Research and Planning Architectural 3,993 04/11/11 Group 4 Architecture Research and Planning Architectural 7,500 01/21/11 Group 4 Architecture Research and Planning Architectural 24,392 April 26, 2011 Report 01/21/11 Turner Construction Company Construction Management Services 1,434 01/21/11 Group 4 Architecture Research and Planning Architectural 2,500 01/24/11 Group 4 Architecture Research and Planning Architectural 1,500 01/21/11 Group 4 Architecture Research and Planning Architectural 447 02/18/11 Turner Construction Company Construction Management Services 478 02/18/11 Group 4 Architecture Research and Planning Architectural 48,831 02/18/11 Group 4 Architecture Research and Planning Architectural 2,653 02/18/11 Group 4 Architecture Research and Planning Architectural 3,238 05/12/11 Group 4 Architecture Research and Planning Architectural 6,250 05/12/11 Group 4 Architecture Research and Planning Architectural 40,052 05/12/11 Group 4 Architecture Research and Planning Architectural 12,411 05/12/11 Group 4 Architecture Research and Planning Architectural 3,263 05/17/11 Group 4 Architecture Research and Planning Architectural 4,553 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 31,374 07/01/11 Turner Construction Company Construction Management Services 9,169 07/11/11 Group 4 Architecture Research and Planning Architectural 11,100 07/11/11 Group 4 Architecture Research and Planning Architectural 488 07/11/11 Group 4 Architecture Research and Planning Architectural 15,687 07/27/11 Group 4 Architecture Research and Planning Architectural 319 07/27/11 Group 4 Architecture Research and Planning Architectural 1,150 07/27/11 Group 4 Architecture Research and Planning Architectural 1,875 07/27/11 Turner Construction Company Construction Management Services 5,572 08/10/11 Group 4 Architecture Research and Planning Architectural 31,374 08/24/11 Turner Construction Company Construction Management Services 2,868 October 25, 2011 Report 08/31/11 Group 4 Architecture Research and Planning Architectural 117 08/31/11 Group 4 Architecture Research and Planning Architectural 175 08/31/11 Group 4 Architecture Research and Planning Architectural 248 09/14/11 Group 4 Architecture Research and Planning Architectural 67 09/14/11 Group 4 Architecture Research and Planning Architectural 600 09/14/11 Group 4 Architecture Research and Planning Architectural 39,218 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 235,308 10/26/11 Group 4 Architecture Research and Planning Architectural 878 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 291 10/26/11 Group 4 Architecture Research and Planning Architectural 27 11/02/11 Group 4 Architecture Research and Planning Architectural 78,436 11/02/11 Group 4 Architecture Research and Planning Architectural 7,500 11/22/11 Group 4 Architecture Research and Planning Architectural 8,514 12/07/11 Group 4 Architecture Research and Planning Architectural 62,749 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/14/11 Group 4 Architecture Research and Planning Architectural 79,172 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/21/11 Protect Consulting and Engineering Hazardous Material Testing 3,530 12/21/11 Group 4 Architecture Research and Planning Architectural 3,052 01/11/12 Group 4 Architecture Research and Planning Architectural 225 01/11/12 Group 4 Architecture Research and Planning Architectural 9,761 01/11/12 Group 4 Architecture Research and Planning Architectural 70,592 01/11/12 Group 4 Architecture Research and Planning Architectural 150 Main Library Activity Details (PE-11000) As of January 18, 2012 11 01/11/12 Group 4 Architecture Research and Planning Architectural 247 Group 4 Architecture Research and Planning Architectural 318,113 Turner Construction Company Construction Management Services 84,394 West Coast Code Consultants, Inc.Plan Check 10,800 Protect Consulting and Engineering Hazardous Material Testing 13,140 Sub-total - Engineering and Architectural Costs - 1,407,565 426,447 (1,834,012) Contract Contingency 05/27/11 Group 4 Architecture Research and Planning Architectural 22,152 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 571 Group 4 Architecture Research and Planning Architectural 139,682 Turner Construction Company Construction Management Services 10,750 Sub-total - Contract Contingency - 22,723 150,432 (173,155) Other Contract Services Creative Machines, Inc.Sculptures and Light Display 90,000 Sub-total - Other Contract Services - - 90,000 (90,000) City (Inter-department) Service Charge Sub-total - City (Inter-department) Service Charge - - - - Miscellaneous Cost Sub-total - Miscellaneous Cost - - - - Grant Total 18,000,000 1,430,289 666,879 15,902,833 12 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 g g Sub-total - 2010 Engineer's Budget Estimate 645,000 - - 645,000$ Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 439,283$ 10/05/10 Group 4 Architecture Research & Planning Architectural 5,774 Oct. 21, 2010 Report 08/24/10 Group 4 Architecture Research & Planning Architectural 329 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 19,191 April 26, 2011 Report Group 4 Architecture Research & Planning Architectural 12,362 Ross McDonald Company, Inc.Library Shelving 3,200 Sub-total - Engineering and Architectural Costs - 464,577 15,562 (480,139) Contract Contingency Summary of Expenditures as of July 21, 2010 2,541 08/24/10 Johnstone Moyer, Inc.Temp. Library Improvements 24,604 Oct. 21, 2010 Report 08/27/10 West Corporation Temp. Lib. - Security Access Card & Alarm 310 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 6,045 April 26, 2011 Report Group 4 Architecture Research & Planning Architectural 4,759 Working Person's Enterprises, Inc.Construction Services 30,649 West Corporation Temp. Lib. - Security Access Card & Alarm 1,910 Ross McDonald Company, Inc.Library Shelving 3,540 Sub-total - Contract Contingency - 33,500 40,858 (74,358) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 11,247 Sub-total - City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 125 Sub-total - Miscellaneous Cost - 125 - (125) Grant Total 645,000 509,448 56,420 79,132 Temporary Library at Cubberley (for Mitchell Facility) - Activity Details (PE-09010) As of January 18, 2012 13 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Main Library Facility - Art Center Auditorium 500,000 Sub-total - 2010 Engineer's Budget Estimate 500,000 - - 500,000$ Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 -$ Big-D Pacific Builders, LP Construction Services 344,356 Sub-total - Engineering and Architectural Costs - - 344,356 (344,356) Contract Contingency Summary of Expenditures as of July 21, 2010 - Big-D Pacific Builders, LP Construction Services 38,131 Sub-total - Contract Contingency - - 38,131 (38,131) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 - Sub-total - City (Inter-department) Service Charge - - - - Miscellaneous Cost Summary of Expenditures as of July 21, 2010 - Sub-total - Miscellaneous Cost - - - - Grant Total 500,000 - 382,487 117,513 Art Center Temporary Library - Activity Details (Project # PE-11012) As of January 18, 2012 14