HomeMy WebLinkAboutStaff Report 2224City of Palo Alto (ID # 2224) Finance Committee Informational Report Report Type:Meeting Date: 12/14/2011 December 14, 2011 Page 1 of 5 (ID # 2224) Summary T itle: FY2011 Y/E CIP Status Report Title: Fiscal Year 2011 Year-End Capital Improvement Program Projects Status Report From:City Manager Lead Department: Administrative Services RECOMMENDATION Staff recommends that the Finance Committee review and accept the information on the City’s Capital Improvement Program contained in this report. BACKGROUND This report provides information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of Fiscal Year (FY) 2011. The attached graphs and matrix (Attachments 1 through 4 and Exhibit A) list all CIP projects and their current status, and include any issues that might cause a change in the scope or timing of the projects. The report is intended to update Council on the progress of all CIP projects that were open at the beginning of FY 2011, and on those that were added or completed during the fiscal year. The report also provides an update on the General Fund infrastructure backlog. DISCUSSION The attached graphs provide detail for General Fund projects: o General Fund Capital Improvement Program Expenditures Summarized by Project Category for Fiscal Years 2007-2011 (Attachment 1) o General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 (Exhibit A) o General Fund Transfers to Infrastructure Reserve for Fiscal Years 2007-2016 (Attachment 2) The attached matrix provides detail for all funds: o Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (Attachment 3) o Continuous Capital Projects Expenditures for Fiscal Years 2007-2011 (Attachment 4) 3 Packet Pg. 322 December 14, 2011 Page 2 of 5 (ID # 2224) In the attached matrix (Attachment 3), the city departments have submitted information on their projects and commented on any issues that might cause a change in the scope or timing of the projects. The matrix categorizes CIP projects into minor projects (projects that can be completed within a one-year period) and multi-year projects (projects that have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase of the project at fiscal year-end, and illustrates how much progress was made. Three distinct phases are utilized, as follows: Phase Activities Pre-Design ·Preparation of a feasibility study ·Development of a master plan ·Definition of a project scope ·Preparation of an Environmental Impact Report Design ·Hiring a design consultant ·Completion of project design ·Soliciting bids or proposals Construction ·Acquisition of major equipment ·Installation ·Implementation of a project In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. The matrix also includes information on the total budget of the project from inception, available budget as of the beginning of the fiscal year, fiscal year expenditures, fiscal year contingencies, fiscal year encumbrances, remaining balance in the project budget as of year-end, and the budget percent complete for the project. The matrix does not include “continuous” projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. Continuous projects are listed by responsible department and fund and include five years of actual expenditures including the current fiscal year through June 30, 2011 (Attachment 4). Attachments 3 and 4 together represent all open CIP projects in the City. 3 Packet Pg. 323 December 14, 2011 Page 3 of 5 (ID # 2224) RESOURCE IMPACT Below is a summary of the General Fund CIP budget through June 30, 2011. Total Adjusted Budget for FY 2011 $ 95,385,467 (1) Less: Total Expenditures for FY 2011 30,601,208 Less: Total Encumbered Balance as of June 30, 2011 31,691,326 (2) Remaining balance of the budget carried over to FY 2012 $ 33,092,933 (2) (1) Adjusted budget represents budget approved in FY 2011 and remaining unused budget from prior years that carried over to FY 2011. Adjusted budget for FY 2011 includes $53,012,133 in bond proceeds. (2) The encumbered balance of $31.7 million and the remaining balance of $33.1 million --a total of $64.8 million in FY 2011 --will be added to the adopted CIP budget in FY 2012 of $33.9 million. This will bring the total appropriations in FY 2012 to $98.7 million for the General Fund CIP projects. The status of projects that were carried over to FY 2012 are as follows: Pre-Design stage $ 4,370,829 Design stage 2,612,572 Construction stage 21,841,711 Complete 506,615 On going 3,761,206 Total $ 33,092,933 Projects that were completed but still had remaining appropriations as of FY 2011 were closed at the beginning of FY 2012 and the balances will be returned to appropriate reserves. These projects are included in the Comprehensive Annual Financial Report (CAFR) CMR since Council approval is necessary. GENERAL FUND INFRASTRUCTURE BACKLOG UPDATE To develop options to address the infrastructure backlog, the City Council created the Infrastructure Blue Ribbon Commission (IBRC). This Commission is tasked by Council to identify and prioritize the City’s infrastructure needs and to determine funding sources and financing mechanisms to address the City’s backlog and/or new needs. The IBRC will present its final report to the City Council in early 2012. Steps to address the infrastructure backlog are pending the outcome of the IBRC’s report and subsequent discussions with the City Council. CAPITAL PROJECTS APPROVED AFTER BUDGET PROCESS Attachment 6 shows capital projects approved by Council after the approval of the adopted budget for fiscal years 2007 through 2012. The inclusion of this list satisfies a request from the IBRC. Attachments: ·-a:Attachment 1 General Fund Capital Improvement Program Expenditures Summarized by Project Category for Fiscal Years 2007-2011 (XLS) 3 Packet Pg. 324 December 14, 2011 Page 4 of 5 (ID # 2224) ·-b:Exhibit A General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 (XLS) ·-c:Attachment 2 GF Xfers To Infra Reserve For FYs 2007-2016 (XLS) ·-d:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-e:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-f:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-g:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-h:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-i:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-j:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-k:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-l:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-m:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-n:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-o:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-p:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-q:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-r:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-s:Attachment 3 Fiscal Year 2011 Year-End Capital Improvement Program Projects Status (XLS) ·-t:Attachment 4 Continuous Capital Projects Expenditures for Fiscal Years 2007-2011 (XLS) ·-u:Attachment 5 Unexpected CIPs (XLS) 3 Packet Pg. 325 December 14, 2011 Page 5 of 5 (ID # 2224) Prepared By:Laura Kuryk, Manager of Accounting Department Head:Lalo Perez, Director City Manager Approval: ____________________________________ James Keene, City Manager 3 Packet Pg. 326 Attachment 1 General Fund Capital Improvement Program Expenditues Summarized by Project Category-Five Years-Fiscal Years 2007-2011 ($ in thousands) 5,924 30 612 1,387 2,107 7,926 17,986 5,797 2,654 453 2,977 3,630 5,859 21,370 10,082 2,503 110 440 1,733 6,227 21,095 9,312 2,353 291 7 3,460 5,855 21,278 20,250 98 211 889 1,731 7,422 30,601 02,0004,0006,0008,00010,00012,00014,00016,00018,00020,00022,00024,00026,00028,00030,00032,000 FY 2007 5,924 30 612 1,387 2,107 7,926 17,986 FY 2008 5,797 2,654 453 2,977 3,630 5,859 21,370 FY 2009 10,082 2,503 110 440 1,733 6,227 21,095 FY 2010 9,312 2,353 291 7 3,460 5,855 21,278 FY 2011 20,250 98 211 889 1,731 7,422 30,601 Totals 51,365 7,638 1,677 5,700 12,661 33,289 112,330 Buildings & Facilities Land & Land Improvements Miscellaneous Non- Infrastructure Management Plan Parks & Open Space Streets & Sidewalks Totals By Year Page 1 of 1 12/8/2011 3.a Packet Pg. 327 -: A t t a c h m e n t 1 G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m E x p e n d i t u r e s S u m m a r i z e d b y P r o j e c t Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category AC-02024 Children's Theatre Light & Sound Systems Upgrade Buildings and Facilities $4,978 AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities AC-09002 Community Theatre Sound System Replacement Buildings and Facilities CA-01014 Community Services Facilities Lighting Enhancements Buildings and Facilities 37,474 $30,760 $3,663 CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities $995 $7,611 CC-10000 Replacement of Cubberley Gym B Bleachers Buildings and Facilities 6,739 29,495 CC-11000 Cubberley Gym Activity Room Buildings and Facilities 58,041 General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 Page 1 of 21 12/8/2011 3.b Packet Pg. 328 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 FD-08001 Fire Station #6 Improvements Buildings and Facilities 8,061 48,110 OS-07003 Foothills Park Maintenance Building Rehabilitation Buildings and Facilities 56,535 30,442 249,933 PE-03004 Roth Building Wings Demolition Buildings and Facilities 86,745 PE-04010 Children's Library Improvements & Expansion Buildings and Facilities 2,369,589 813,189 58,561 PE-04011 Cambridge Parking Structure Improvements Buildings and Facilities 59,105 287,034 PE-04012 Mitchell Park Library & Community Center Improvements Buildings and Facilities 15,018 1,162,429 179,071 123 PE-04014 Animal Shelter Expansion & Renovation Buildings and Facilities 96,231 144,610 762,057 61,539 Page 2 of 21 12/8/2011 3.b Packet Pg. 329 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-05002 Main Library Space Reconfiguration Buildings and Facilities 433,031 34,838 PE-05010 College Terrace Library Improvements Buildings and Facilities 39,277 273,077 337,154 1,545,763 846,020 PE-06001 San Antonio Bridge Structural Repairs & Maintenance Buildings and Facilities 2,702 2,338 494 82,782 PE-08005 Municipal Service Center Resurfacing Buildings and Facilities 11,323 752,021 326,898 PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities PE-09005 Downtown Library Improvements Buildings and Facilities 78,162 562,707 3,133,576 PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities 509,024 3,278,486 10,381,000 Page 3 of 21 12/8/2011 3.b Packet Pg. 330 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities 28,866 518,623 110,020 PE-10002 Ventura Community Center and Park Buildings and Facilities 13,283 PE-11000 Main Library New Construction and Improvements Buildings and Facilities 792,913 PE-89004 Yacht Harbor Improvements Buildings and Facilities 11,949 7,080 21,584 PE-98020 Public Safety Building Buildings and Facilities 623,270 1,093,208 1,000,414 175,289 30,910 PE-99006 MSC Feasibility Study Buildings and Facilities 542 PF-00006 Roofing Replacement Buildings and Facilities 76,769 256,831 21,073 251,344 104,617 Page 4 of 21 12/8/2011 3.b Packet Pg. 331 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PF-00020 Office Space Renovation and Reallocation Buildings and Facilities 19,647 PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities 438,192 106,643 4,915,782 1,344,006 3,803,962 PF-01003 Building Systems Improvements Buildings and Facilities 64,312 34,304 114,152 36,098 74,876 PF-01004 Fire Station Improvements Buildings and Facilities 50,514 232,168 575,700 237,018 394 PF-01005 Lucie Stern Community Center Improvements Buildings and Facilities 1,010 980 PF-02022 Facility Interior Finishes Buildings and Facilities 10,579 65,797 47,116 11,076 23,874 PF-04000 Security System Improvements Buildings and Facilities 618 5,983 8,903 3,581 Page 5 of 21 12/8/2011 3.b Packet Pg. 332 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PF-04001 General Building Study Buildings and Facilities 4,825 170,312 PF-04010 Cubberley Mechanical & Electrical Upgrades Buildings and Facilities 960,596 165,456 5,218 9,369 PF-05002 Municipal Service Center Renovation Buildings and Facilities 115,025 18,316 12,057 3,530 12,176 PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities 82,626 1,290 12,897 PF-06001 Ted Thompson Garage Improvements Buildings and Facilities PF-06002 Ventura Buildings' Improvements Buildings and Facilities PF-06003 Cubberley Community Center Fire Alarm System Buildings and Facilities 25,054 648,988 70,949 Page 6 of 21 12/8/2011 3.b Packet Pg. 333 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PF-06004 Cubberley Restroom Renovation Buildings and Facilities 27,422 PF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities 52,063 132,737 234,143 543,877 PF-07001 ADA Compliance - Cubberley Community Center Buildings and Facilities 37,815 13,512 205,388 PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities 247 32,980 7,592 6,150 PF-07011 Roth Building Maintenance Buildings and Facilities 141,046 17,909 1,931 3,729 PF-08000 Art Center Kiln Hood Replacement Buildings and Facilities 10,076 60,654 14,570 PF-09000 Children's Theatre Improvements Buildings and Facilities Page 7 of 21 12/8/2011 3.b Packet Pg. 334 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PF-09002 Lucie Stern Community Center and Theatre Exterior Paint Buildings and Facilities 4,510 90,816 PF-10000 Civic Center Chiller Drive Replacement Buildings and Facilities 72,380 PF-10001 Rinconada Pool Plaster Buildings and Facilities 117,756 PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities 23,682 15,260 PF-93009 ADA Compliance Buildings and Facilities 96,587 49,955 121,617 235,410 9,994 Total Buildings and Facilities $5,924,093 $5,796,904 $10,081,911 $9,311,891 $20,250,374 AC-86017 Art in Public Places Land and Land Improvements $29,545 $64,410 $21,556 $17,256 $77,956 Page 8 of 21 12/8/2011 3.b Packet Pg. 335 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements 2,590,061 2,306,958 2,252,250 AS-09000 City of Palo Alto Municipal Airport Transition Project Land and Land Improvements 39,075 67,775 4,050 PE-09004 Los Altos Treatment Plant Master Plan Study Land and Land Improvements 135,905 15,468 16,278 Total Land and Land Improvements $29,545 $2,654,471 $2,503,494 $2,352,749 $98,284 AS-10001 Sustainability Contingency Miscellaneous FD-09001 Fire Apparatus Equipment Replacement Miscellaneous $48,352 $261,283 FD-09002 Jaws of Life Hurst Tool Replacement Miscellaneous 60,905 Page 9 of 21 12/8/2011 3.b Packet Pg. 336 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 LB-11000 Furniture & Technology for Measure N Project Miscellaneous $28,124 LB-94018 Library Automation Service Miscellaneous $5,026 732 PD-04010 Fire Portable Radio Replacement Miscellaneous $1,695 112,526 PD-05010 Police Vehicle - Mounted Video Recording Miscellaneous 194,462 PD-07001 SWAT Van Replacement Miscellaneous 203,193 PD-08000 Crime Scene Evidence Collection Vehicle Miscellaneous 174,201 PD-93012 Fire Communications Computer Systems Miscellaneous 2,705 6,812 Page 10 of 21 12/8/2011 3.b Packet Pg. 337 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PD-99013 Police Records Management System Miscellaneous 31,307 PE-95030 Downtown Parking Structure Industrial Cost Pool Miscellaneous 405,213 91,576 155 469 PL-02023 Master Schematic Design Miscellaneous 8,270 2,090 PO-10002 Downtown Tree Grates Miscellaneous 29,879 8,136 Total Miscellaneous $612,345 $452,530 $110,144 $291,162 $210,930 FD-05000 Sixteen (16) ALS Monitors Non-Infrastructure Management Plan $214,734 $62,650 $434 PD-07000 Mobile Command Vehicle Non-Infrastructure Management Plan 695,337 Page 11 of 21 12/8/2011 3.b Packet Pg. 338 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-05001 Photovoltaic Design and Installations Non-Infrastructure Management Plan $578,740 2,184,597 325,978 $6,448 PE-07011 Library Service Model Analysis Non-Infrastructure Management Plan 266,912 1,478 PG-08001 Golf Course Driving Range Turf & Netting Non-Infrastructure Management Plan 511,921 PL-05002 Charleston/Arastradero Corridor Plan Non-Infrastructure Management Plan 529,889 32,076 193,613 PL-06001 Adobe Creek Bicycle Bridge Replacement Non-Infrastructure Management Plan 4,184 PL-06002 Comprehensive Parking Signage Plan Non-Infrastructure Management Plan 4,000 43,470 PL-06005 Installation of Ticket Machines Non-Infrastructure Management Plan 7,416 33,994 2,250 Total Non-Infrastructure Management Plan $1,386,957 $2,977,322 $440,010 $6,448 $889,384 Page 12 of 21 12/8/2011 3.b Packet Pg. 339 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 AC-10000 Junior Museum & Zoo New Bobcat Habitat Parks and Open Space $101,790 $23,210 OS-00001 Open Space Trails and Amenities Parks and Open Space $184,333 $257,594 $123,193 97,766 47,473 OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space 42,399 41,462 35,909 63,263 54,097 OS-00003 Bayland Parking and Site Improvements Parks and Open Space 83,605 OS-07000 Foothills Park Road Improvements Parks and Open Space 225,000 25,000 OS-07002 Foothills Park Interpretive Center & Open Space Maintenance Yard Parking Parks and Open Space 26,120 258,253 2,302 Page 13 of 21 12/8/2011 3.b Packet Pg. 340 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space 25,463 24,719 OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space PE-00101 Foothills Park - Vista Hill Parks and Open Space 18,720 PE-00107 Briones Park Improvements Parks and Open Space 760 PE-00110 College Terrace Park Improvements Parks and Open Space 32,914 97,998 154,927 522 PE-05300 Arastradero Preserve Gateway Parks and Open Space 89,118 1,519 9,156 PE-06004 Bowden Park Improvements Parks and Open Space 161,395 876 Page 14 of 21 12/8/2011 3.b Packet Pg. 341 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space 16,624 27,324 166,612 6,709 1,479 PE-06007 Park Restroom Installation Parks and Open Space 13,042 41,134 100,096 224,048 PE-06008 Johnson Park Improvements Parks and Open Space 73,681 8,648 PE-07002 Hoover Park Improvements Parks and Open Space 20,020 696,240 67,053 PE-07003 Ramos Park Improvements Parks and Open Space 37,554 458,628 PE-07005 California Avenue Improvements Parks and Open Space 64,985 49,900 465,324 53,810 PE-07006 Boulware Park Improvements Parks and Open Space 25,520 298,717 3,799 Page 15 of 21 12/8/2011 3.b Packet Pg. 342 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-07007 Cubberley Turf Renovation Parks and Open Space 190,950 969,963 PE-07009 Baylands Athletic Center Fencing, Dugout & Trailhead Parking Parks and Open Space 241,891 46,164 PE-08002 Peers Park Improvements Parks and Open Space 250,622 301,383 PE-08004 Lytton Plaza Renovation Parks and Open Space 23,530 725,733 2,545 PE-09002 Greer Park Phase IV Parks and Open Space 1,134 168,231 515,091 925,076 PE-98003 Mitchell Park Facilities Parks and Open Space 214,148 196,655 24,962 PG-00010 Park Facilities Improvements Parks and Open Space 1,361 Page 16 of 21 12/8/2011 3.b Packet Pg. 343 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PG-04010 Stanford/Palo Alto Community Playing Field Parks and Open Space 843,591 2,050 869 PG-06001 Tennis and Basketball Court Resurfacing Parks and Open Space 130,069 46,881 107,117 100,159 77,512 PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space 106,156 76,788 85,766 73,480 118,366 PG-07000 Heritage Park Playground Parks and Open Space 243,546 PG-07700 Golf Course Irrigation Pump, Motors & Control Panel Replacement Parks and Open Space 63,315 PG-09002 Park and Open Space Emergency Repairs Parks and Open Space 73,190 50,883 147,651 PG-09003 Park Maintenance Shop Remodel Parks and Open Space 402 2,858 55,414 Page 17 of 21 12/8/2011 3.b Packet Pg. 344 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PG-11001 Cogswell Plaza Improvements Parks and Open Space PG-11002 Monroe Park Improvements Parks and Open Space PG-98001 School Site Irrigation Parks and Open Space 154 57,268 4,596 161,399 Total Parks and Open Space $2,106,881 $3,630,436 $1,732,969 $3,459,755 $1,730,681 PE-00103 Lucie Evans Center parking Lot Improvements Streets and Sidewalks $217 PE-00104 San Antonio Road Median Improvements Streets and Sidewalks 146,212 $153,112 $743,106 $239,404 $142,556 PE-00105 Embarcadero Road Median Improvements Streets and Sidewalks 178 1,191 Page 18 of 21 12/8/2011 3.b Packet Pg. 345 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PE-01013 El Camino Median Landscape Streets and Sidewalks 53,826 73,655 4,525 PE-01021 Homer Avenue Undercrossing Streets and Sidewalks 125,963 PE-06006 Alma Street Landscape Improvements Streets and Sidewalks 17,992 16,576 40,901 26,371 PE-10006 Bridge Rail, Abutment, and Deck Repair Streets and Sidewalks 167,062 PE-11011 Highway 101 Pedestrian / Bicycle Overcrossing Streets and Sidewalks 36,385 194,020 PE-86070 Street Improvements (Street Improvement Fund) Streets and Sidewalks 4,987,364 3,368,496 3,702,381 3,658,566 5,110,791 PL-00026 Safe Routes to School Streets and Sidewalks 4,472 105,802 30,000 20,750 Page 19 of 21 12/8/2011 3.b Packet Pg. 346 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PL-02005 El Camino Real/ Ventura Avenue Traffic Signal Streets and Sidewalks 110,000 PL-04010 Bicycle Transportation Plan Implementation Project Streets and Sidewalks 5,480 44,483 30,000 80,862 PL-05003 College Terrace Traffic Calming Streets and Sidewalks 125,372 17,088 545 PL-05030 Traffic Signal Upgrades Streets and Sidewalks 30,524 35,908 39,983 279,590 183,141 PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks 2,490 4,790 247,112 PL-11001 Dinah SummerHill Pedestrian/Bicycle Path Streets and Sidewalks PL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks 35,528 Page 20 of 21 12/8/2011 3.b Packet Pg. 347 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Exhibit A FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2011 PL-98013 School Commute Safety Improvements (SIF) Streets and Sidewalks 2,490 6,170 PL-99023 Page Mill/Hanover Streets and Sidewalks 200 PO-05054 Street lights Improvements Streets and Sidewalks 19,077 11,814 15,970 40,430 159,070 PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks PO-11001 Thermoplastic Lane Marking and Striping Streets and Sidewalks 29,639 PO-89003 Sidewalk Improvements Streets and Sidewalks 2,299,543 2,030,796 1,675,527 1,341,916 1,211,917 Total Streets and Sidewalks $7,926,420 $5,858,921 $6,227,373 $5,855,059 $7,421,556 Page 21 of 21 12/8/2011 3.b Packet Pg. 348 -: E x h i b i t A G e n e r a l F u n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 Attachment 2 Amount Transferred to Infrastructure Amount Returned to General Fund Net Amount Fiscal Year $(000)$(000)$(000) 2007 $8,736 $75 a $8,661 2008 $11,807 $117 $11,690 2009 $14,648 b $14,648 2010 $9,900 $3,243 $6,657 2011 $9,857 $9,857 2012 $10,438 $10,438 2013 $10,852 $10,852 2014 $11,294 $11,294 2015 $11,747 $11,747 2016 $12,217 $12,217 Total $111,496 $3,435 $108,061 Notes:a. Funds transferred to cover GF engineering costs for structures and grounds. b. Includes funding for the Public Safety Building $3,437K Sources: FY 2007 through 2011 are actual amounts FY 2012 through 2016 based on Long Range Financial Forecast General Fund Transfers to Infrastructure Reserve for Fiscal Years 2007-2016 $8,661 $14,648 $6,657 $11,690 $12,217 $11,747$11,294$10,852$10,438 $9,857 $5,000 $7,000 $9,000 $11,000 $13,000 $15,000 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Fiscal Year $000 Page 1 of 1 12/8/2011 3.c Packet Pg. 349 -: A t t a c h m e n t 2 G F X f e r s T o I n f r a R e s e r v e F o r F Y s 2 0 0 7 - 2 0 1 6 ( 2 2 2 4 : F Y 2 0 1 1 Y / E C I P S t a t u s R e p o r t ) Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments AS-09000 City of Palo Alto Municipal Airport Transition Project Land and Land Improvements $130,000 $23,150 $4,050 $0 $0 $5,000 $14,100 89%Design Mar 11 This CIP will be moved to the Airport Fund once these funds have been used. AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements $7,223,394 $74,124 $0 $0 $0 $0 $74,124 100%Complete The project will be closed at mid-year and remaining balance to be returned to Infrastructure Reserve. Balance was carried forward to FY 2012. AS-10001 Sustainability Contingency Miscellaneous $400,000 $400,000 $0 $0 $0 $0 $400,000 0%Pre-Design TBD No projects have been identified to date that require contingency funds. The funds are available for capital projects where additional funds would allow the effort to be completed in a more sustainable fashion. Of the $400,000 remaining balance, $300,000 will be returned to Infrastructure Reserve. MULTI-YEAR PROJECTS FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS GENERAL FUND ADMINISTRATIVE SERVICES DEPARTMENT Page 1 of 34 12/8/2011 3.d Packet Pg. 350 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-Design Jun 11 Staff in initial planning and development of scope of contract. AC-09002 Community Theater Sound System Replacement Buildings and Facilities $200,000 $200,000 $0 $0 $0 $0 $200,000 0%Pre-Design Jun 11 Staff in initial planning and development of scope of contract. AC-10000 Junior Museum & Zoo New Bobcat Habitat Parks and Open Space $125,000 $23,210 $23,210 $0 $0 $0 $0 100%Complete Project is complete but cannot be officially closed until Building Inspector signs off on occupancy permit. No more expenditures are anticipated. CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities $152,821 $151,826 $4,425 $3,186 $0 $9,815 $134,400 12%Design Dec 12 Project has been delayed as it will now be a design-and-build contract. CC-10000 Replacement of Cubberley Gym B Bleachers Buildings and Facilities $36,234 $29,495 $29,495 $0 $0 $0 $0 100%Complete Project completed and to be closed. CC-11000 Cubberley Gym Activity Room Buildings and Facilities $63,398 $63,398 $53,353 $4,688 $0 $0 $5,357 100%Complete Project completed and to be closed. Remaining balance to be returned to Infrastructure Reserve. OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space $175,000 $175,000 $0 $0 $0 $0 $175,000 0%Pre-Design Dec 12 Survey work for levee done by Public Works Engineering. Tentative construction in 2012 in conjunction with JPA project. PG-09003 Park Maintenance Shop Remodel Parks and Open Space $159,096 $155,836 $52,678 $2,736 $0 $0 $100,422 37%Design Jun 11 Since there is common shared space, this project will now be designed and constructed in- house by Public Works Facilities Management in conjunction with the Tree Division. PG-11001 Cogswell Plaza Improvements Parks and Open Space $150,000 $150,000 $0 $0 $0 $5,000 $145,000 3%Design TBD Staff in initial planning and development of scope of contract. PG-11002 Monroe Park Improvements Parks and Open Space $250,000 $250,000 $0 $0 $0 $0 $250,000 0%Design TBD Staff in initial planning and development of scope of contract. COMMUNITY SERVICES DEPARTMENT GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS Page 2 of 34 12/8/2011 3.e Packet Pg. 351 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments COMMUNITY SERVICES DEPARTMENT GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS OS-00001 Open Space Trails & Amenities Parks and Open Space $1,889,720 $244,487 $34,695 $12,778 $0 $59,684 $137,330 93%Ongoing Various trail improvements at Arastradero, Foothills Park, and Baylands. Three-year contract has been awarded. OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space $392,183 $39,791 $41,163 $12,934 $0 $1 ($14,307)Ongoing Three year contract has been awarded. Overage due to unforeseen work at Boronda Lake and future work to be adjusted and scaled back to cover costs of unforeseen maintenance. OS-07000 Foothills Park Road Improvements Parks and Open Space $375,000 $125,000 $0 $0 $0 $150,000 ($25,000)Ongoing Work will now be done in- house by Public Works Engineering or combined with their paving contracts. This is anticipated to result in future cost savings to address current overage. OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space $180,668 $130,486 $0 $0 $0 $0 $130,486 28%Ongoing Work will now be done in- house by Public Works Engineering or combined with their paving contracts. PG-06001 Tennis & Basketball Court Resurfacing Parks and Open Space $496,443 $103,451 $64,875 $12,637 $0 $16,095 $9,844 98%Ongoing Rinconada courts 1-6 completed. Request for Bids for Hopkins courts 1-3 and Terman Park tennis courts. PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space $525,668 $183,478 $105,706 $12,660 $0 $21,080 $44,032 92%Ongoing Projects completed in FY 2011 - Site Amenities: Benches at Mitchell Park; Refinished benches/softball benches at Greer Park; Replacement bike rack at Greer Park. Signage: Hopkins Creekside Park; El Palo Alto Park; Palo Alto Golf Course. Surface Repairs: Mitchell Park and Eleanor Pardee Park rubber playground surfacing; Palo Alto Bowling Green asphalt pathway repairs; Stanford Palo Alto pavers; DG pathways. MULTI-YEAR PROJECTS Page 3 of 34 12/8/2011 3.e Packet Pg. 352 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments COMMUNITY SERVICES DEPARTMENT GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS PG-09002 Park and Open Space Emergency Repairs Parks and Open Space $282,761 $158,688 $147,651 $0 $0 $6,459 $4,578 98%Ongoing Projects completed in FY 2011: Hoover Park fire damage repairs: demolition, new play structure, new surfacing, age appropriate signs, playground safety inspection. Eleanor Park trees: Landscape design and removal of hazardous trees, decomposite granite pathway. Mitchell Park: playground equipment replacement. Heritage Park: Playground safety inspection. Johnson Park: Tire swing removal and reinstallation. Foothills Park: Irrigation system check. Rinconada Pool: Safety replacement of diving boards. MULTI-YEAR PROJECTS Page 4 of 34 12/8/2011 3.e Packet Pg. 353 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments FD-05000 16 ALS Monitors / Defibrillators Non - Infrastructure Management Plan $474,535 $1,186 $434 $0 $0 $0 $752 100%Ongoing We are currently testing the integration with a few monitors and should make a decision on purchasing by Mar 12. FD-08001 Fire Station #6 Improvements Buildings and Facilities $60,000 $51,939 $48,110 $0 $0 $273 $3,556 100%Complete Remaining balance to be returned to Infrastructure Reserve. FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND FIRE DEPARTMENT MINOR PROJECTS Page 5 of 34 12/8/2011 3.f Packet Pg. 354 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments LB-11000 Furniture & Technology for Library Measure N Project Miscellaneous $275,000 $275,000 $28,124 $0 $0 $192,117 $54,759 80%Ongoing Mar 14 Existing revenue and expenditures are for Downtown Library. Additional revenue is scheduled to be received as gifts from the Library Foundation in 2011 and 2012 for the remaining Measure N projects. FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND LIBRARY SERVICES DEPARTMENT MULTI-YEAR PROJECTS Page 6 of 34 12/8/2011 3.g Packet Pg. 355 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments PL-05002 Charleston/ Arastradero Corridor Plan Non- Infrastructure Management Plan $1,211,890 $431,106 $189,784 $1,095 $2,735 $19,340 $218,152 82%Construction Jun 12 Installation of the Arastradero Road Trial Restriping Project between El Camino Real and Gunn High School was completed in Sep 10. Additional improvements including traffic signal modification at Coulombe Drive and installation of enhanced pedestrian crosswalk at Clemo Drive were delayed into 2011 and improvements in response to community input were added including installation of speed signs at Hubbart Street and minor restriping corrections. Council approved an extension of the trial restiping project through Jun 12 due to Gunn High School modifying their bell schedule for the 2011-12 school year. PL-05003 College Terrace Traffic Calming Streets and Sidewalks $217,484 $74,055 $0 $0 $0 $1 $74,054 100%Construction Jun 11 A second phase traffic calming project on and along College Avenue, including median island chokers and traffic circles at Yale Street, have received positive support from the community. The community voted in support of permanent retention of the traffic calming treatments and staff is pursuing Council approval. PL-06001 Adobe Creek Bicycle Bridge Replacement Non- Infrastructure Management Plan $4,184 $0 $0 $0 $0 $0 $0 100%Complete City of Los Altos is lead agency for this inter-jurisdictional project. Construction was completed in summer 2009. City awaiting final accounting and invoicing from Los Altos for City's local match. PL-06005 Installation of Ticket Machines Non- Infrastructure Management Plan $94,900 $38,578 $0 $0 $0 $0 $38,578 59%Ongoing Aug 11 Installation of the initial ticket machines is complete and revenues from the machine show active use by the community. Additional ticket machines were requested by the Chamber and staff is considering alternative locations. PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks $1,872,003 $1,882,693 $213,520 $33,592 $0 $1,007,710 $627,871 66%Construction Dec 11 Construction of the El Camino Real & Stanford Avenue intersection improvements will be completed in Oct 11. Final punchlist improvements will be complete by the end of the calendar year. FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS Page 7 of 34 12/8/2011 3.h Packet Pg. 356 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS PL-11001 Dinah SummerHill Pedestrian Bicycle Path Streets and Sidewalks $300,000 $300,000 $0 $0 $0 $200,000 $100,000 67%Design Mar 12 This project is funded by the Summerhill Homes project and the City is responsible for the design and construction of a trail path to connect Wilkie Way with their development. A preliminary design is complete and staff will begin the community outreach process in 2012. PL-00026 Local and Neighborhood Collector Street Traffic Calming Program (SIF) Streets and Sidewalks $870,000 $351,502 $20,750 $0 $0 $79,195 $251,557 71%Ongoing This ongoing project implements traffic calming improvements along Residential Arterial Streets and also funds the development of Safe Routes to School Programs and Projects at schools. PL-04010 Bicycle Boulevards Implementation Project Streets and Sidewalks $291,149 $202,666 $80,091 $771 $0 $56,207 $65,597 77%Ongoing This ongoing project implements project recommendations from the City's Bike Transportation Plan. Active projects include an update of the Bike Transportation Plan and include a new Pedestrian section. Other active projects include bike rack deployments, bike route signage deployment, and the design of bike boulevard facilities. PL-06002 Comprehensive Parking Signage Plan Non- Infrastructure Management Plan $475,000 $427,530 $0 $0 $0 $7,047 $420,483 100%Ongoing The installation of color zone signage was completed in 2008. Current projects include hiring of a new Parking Manager to identify parking improvement strategies. At the end of FY 2011, the CIP will be closed and remaining funds transferred to a new CIP entitled Transportation and Parking Improvements. PL-11002 California Avenue Transit Hub Corridor Streets and Sidewalks $550,000 $550,000 $0 $0 $0 $0 $550,000 0%Design Jun 13 Staff hired RBF Consulting to manage the design phase of the project. Design will continue through Summer 2012 with Bid/Award in Fall 2012. PL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks $400,000 $400,000 $35,528 $0 $0 $0 $364,472 9%Design Dec 12 Staff is in the process of completing the necessary Caltrans Local Assistance documents to authorize the expenditure of funds for the project. PL-11004 Alma Street Traffic Signal Improvements Streets and Sidewalks $699,000 $699,000 $0 $0 $0 $0 $699,000 0%Pending N/A Staff is recommending the closure of this project as part of the mid-year CIP budget process. Grants allocated for the project by Caltrain are no longer available. MULTI-YEAR PROJECTS MINOR PROJECTS Page 8 of 34 12/8/2011 3.h Packet Pg. 357 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS PL-98013 School Commute Safety Improvements (SIF) Streets and Sidewalks $150,000 $108,659 $6,170 $0 $0 $1 $102,488 100%Complete This project will be closed at the end of the fiscal year and funds transferred to a new project entitled Safe Routes to School that is partially grant-funded. 12/8/2011 MULTI-YEAR PROJECTS Page 9 of 34 12/8/2011 3.h Packet Pg. 358 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments PD-07000 Mobile Command Vehicle Miscellaneous $700,000 $700,000 $695,337 $0 $0 $2 $4,661 99%Complete Vehicle construction completed and vehicle is now in service. Remaining balance to be returned to Infrastructure Reserve. PD-08000 Crime Scene Evidence Collection Vehicle Miscellaneous $180,000 $180,000 $174,201 $0 $0 $5,302 $497 100%Complete Vehicle construction completed and is now in service. Remaining balance to be returned to Infrastructure Reserve. 12/8/2011 GENERAL FUND POLICE DEPARTMENT MINOR PROJECTS FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Page 10 of 34 12/8/2011 3.i Packet Pg. 359 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments PE-00110 College Terrace Park Improvements Parks and Open Space $394,707 $5,341 $0 $0 $0 $0 $5,341 100%Complete Dec 11 Keep balance in the project until the warranty period ends in Fall of 2011 PE-06001 San Antonio Bridge Structural Repairs & Maintenance Buildings and Facilities $96,962 $91,429 $82,782 $0 $0 $0 $8,647 100%Complete Remaining balance to be returned to Infrastructure Reserve. PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space $240,480 $5,691 $789 $690 $0 $1 $4,211 98%Complete Mar 12 Remaining balance to be used on irrigation repairs. PE-07005 California Avenue Improvements Parks and Open Space $754,305 $174,095 $52,012 $386 $1,412 $34,570 $85,715 89%Complete Planning is the lead division in the designing phase with separate project number. PE-08004 Lytton Plaza Renovation Parks and Open Space $793,142 $43,879 $2,545 $0 $0 $25,606 $15,728 98%Complete CSD is still working with the Friends of Lytton Plaza on open items. PE-08005 Municipal Service Center Resurfacing Buildings and Facilities $1,090,241 $0 $0 $0 $0 $0 $0 100%Complete Project completed. Return funding to Infrastructure Reserve and Utilities. PE-09002 Greer Park Phase IV Parks and Open Space $2,032,251 $1,347,794 $882,058 $30,868 $12,150 $112,050 $310,668 85%Construction Dec 11 Pump and irrigation are underway. PE-09004 Los Altos Treatment Plant Master Plan Study Land and Land Improvements $175,750 $24,377 $7,412 $0 $8,866 $0 $8,099 95%Complete Project ended due to change in plans for the site. Return funding to Infrastructure Reserve and Refuse Fund. PE-10002 Ventura Community Center and Park Buildings and Facilities $346,913 $333,630 $0 $0 $0 $0 $333,630 4%Design Mar 12 Project is in the design phase and is 10% completed. PE-10006 Bridge Rail, Abutment, and Deck Repair Streets and Sidewalks $167,062 $0 $0 $0 $0 $0 $0 100%Complete PE-11011 Highway 101 Pedestrian/Bicycle Overcrossing Streets and Sidewalks $499,806 $463,421 $151,035 $40,811 $2,174 $8,202 $261,199 48%Pre-Design Nov 11 Staff is meeting with Boards and Commissions and Community to gather feedback. GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT MINOR PROJECTS Page 11 of 34 12/8/2011 3.j Packet Pg. 360 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT MINOR PROJECTS PF-04000 Security System Improvements Buildings and Facilities $275,000 $63,349 $3,581 $0 $0 $1 $59,767 78%Construction Jun 12 Work will be completed in FY 2012 pending staff resources. PF-06001 Ted Thompson Garage Improvements Buildings and Facilities $67,000 $67,000 $0 $0 $0 $0 $67,000 0%Pre-Design Jun 12 Work to be completed in FY 2012. PF-06004 Cubberley Restroom Renovation Buildings and Facilities $327,422 $327,422 $14,623 $12,799 $0 $0 $300,000 8%Pre-Design Jun 12 Work will be completed in FY 2012 pending staff resources. PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities $278,549 $237,730 $3,863 $2,287 $0 $0 $231,580 17%Design Dec 11 Project will be completed in FY 2012. PF-07011 Roth Building Maintenance Buildings and Facilities $424,395 $259,781 $0 $0 $0 $0 $259,781 39%Ongoing All initial work completed. Ongoing work is for maintenance and repairs. PF-09002 Lucie Stern Community Center and Theatre Exterior Paint Buildings and Facilities $107,684 $103,174 $76,550 $10,816 $3,450 $0 $12,358 100%Complete Return remaining balance to Infrastructure Reserve PF-10000 Civic Center Chiller Drive Replacement Buildings and Facilities $127,423 $55,043 $0 $0 $0 $0 $55,043 100%Complete Return remaining balance to Infrastructure Reserve PF-10001 Rinconada Pool Plaster Buildings and Facilities $206,126 $88,370 $0 $0 $0 $0 $88,370 100%Complete Return remaining balance to Infrastructure Reserve PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities $82,299 $58,617 $14,739 $521 $0 $43,356 $1 80%Design Jun 12 Status: ARB Design Review PO-10002 Downtown Tree Grates Miscellaneous $300,000 $270,121 $8,136 $0 $0 $0 $261,985 13%Construction Dec 15 Ongoing. Project is being done in conjunction with PO-89003 and tree replacement schedule. MINOR PROJECTS Page 12 of 34 12/8/2011 3.j Packet Pg. 361 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT MINOR PROJECTS PE-00104 San Antonio Road Median Improvements Streets and Sidewalks $2,195,007 $872,947 $103,139 $39,417 $0 $13,511 $716,880 67%Design Sep 12 Phase II: Tree removal/replacement, landscaping improvements, contaminated soil removal, street lights conduit replacement. PE-04014 Animal Shelter Expansion & Renovation Buildings and Facilities $1,641,830 $0 $0 $0 $0 $0 $0 100%Complete PE-05010 College Terrace Library Improvements Buildings and Facilities $3,723,874 $1,516,526 $650,778 $32,332 $162,910 $9,773 $660,733 82%Construction Dec 11 Construction began FY 2010. PWE staff is still working with Library staff on open items. PE-06006 Alma Street Landscape Improvements Streets and Sidewalks $131,934 $18,841 $0 $0 $0 $1 $18,840 86%Construction Dec 11 Replanting of plants in progress. PE-06007 Park Restroom Installation Parks and Open Space $927,029 $772,758 $178,707 $25,972 $19,369 $32,130 $516,580 44%Construction Jun 12 Seal Park Restroom construction commenced in late FY 2011. PE-07007 Cubberley Turf Renovation Parks and Open Space $1,160,913 $0 $0 $0 $0 $0 $0 100%Complete PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities $330,000 $330,000 $0 $0 $0 $300,000 $30,000 91%Ongoing This is an annual project. Funding will be used for repaving the Cubberley Parking lot. PE-09005 Downtown Library Improvements Buildings and Facilities $5,524,772 $4,883,903 $2,815,346 $72,930 $245,300 $725,048 $1,025,278 81%Construction Sep 12 Construction will be completed in FY 2012 but project should remain open until warranty period is over. PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities $49,743,741 $45,956,231 $9,578,324 $120,618 $682,059 $21,891,802 $13,683,428 50%Construction Aug 12 Construction began Jun 10. Project is 50% complete. PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities $792,770 $245,282 $72,261 $6,800 $30,959 $23,862 $111,400 86%Construction Dec 14 After final invoices are received, project should remain open until warranty period is over. Demobilization when Main Library has opened. PE-11000 Main Library New Construction and Improvements Buildings and Facilities $1,926,718 $1,926,718 $734,383 $35,807 $22,723 $1,102,693 $31,112 60%Design Jul 12 Currently have completed 60% of design phase. Construction expected to begin Jul 12. MULTI-YEAR PROJECTS Page 13 of 34 12/8/2011 3.j Packet Pg. 362 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT MINOR PROJECTS PE-11012 Temporary Main Library Buildings and Facilities $500,000 $500,000 $0 $0 $0 $0 $500,000 0%Construction Sep 12 Construction will begin in FY 2012. PE-98020 Public Safety Building Buildings and Facilities $4,291,838 $432,613 $28,882 $2,028 $0 $2 $401,701 91%Design TBD Project currently on hold. PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities $15,970,506 $6,662,845 $3,679,018 $76,984 $47,960 $2,178,284 $680,599 96%Construction May 12 Phase II construction to be completed in Dec 11. Roof is expected to be completed in the Spring of 2012. PF-01004 Fire Station Improvements Buildings and Facilities $2,580,317 $46,308 $394 $0 $0 $1 $45,913 100%Complete Remaining balance to be returned to Infrastructure Reserve. PF-04010 Cubberley Mechanical & Electrical Upgrades Buildings and Facilities $1,614,695 $36,562 $0 $0 $0 $0 $36,562 98%Design TBD Project on hold due to staff vacancy and lack of capital funds. Construction phase to be rescheduled for a later fiscal year. PF-05002 Municipal Service Center Renovation Buildings and Facilities $873,251 $693,940 $8,243 $3,933 $0 $0 $681,764 22%Design Jun 13 Project on hold per City Manager. PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities $342,289 $221,508 $7,526 $5,371 $0 $0 $208,611 39%Construction Jun 12 Roof contract awarded. HVAC and lighting efficiency remaining. PF-06002 Ventura Buildings Improvements Buildings and Facilities $90,000 $90,000 $0 $0 $0 $0 $90,000 0%Pre-Design TBD Developing scope of work. PF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities $4,599,293 $4,180,350 $448,996 $92,892 $1,989 $307,488 $3,328,985 28%Construction May 12 Currently under construction. PF-09000 Children's Theater Improvements Buildings and Facilities $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-Design TBD Developing scope of work. MULTI-YEAR PROJECTS Page 14 of 34 12/8/2011 3.j Packet Pg. 363 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 FY 2011 Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments GENERAL FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT MINOR PROJECTS PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-Design Dec 17 Contract award for inventory and initial assessment is tentatively scheduled for Dec 11 PO-11001 Thermoplastic Lane Marking & Striping Streets and Sidewalks $300,000 $300,000 $29,639 $0 $0 $88,771 $181,590 39%Ongoing Dec 15 Initial backlog is being done in conjunction with PE-86070. Annual contract will be set for ongoing maintenance. 12/8/2011 MULTI-YEAR PROJECTS Page 15 of 34 12/8/2011 3.j Packet Pg. 364 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date TE-01006 Enterprise Backup Solution Minor $70,000 $68,627 $0 $0 $0 $1 $68,626 2%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-01012 IT Disaster Recovery Plan Minor $510,000 $509,711 $0 $0 $0 $1 $509,710 0%Construction Jun 12 A draft disaster recovery plan has been completed. Planning SAP Windows server backup strategy. TE-05003 Internet Site Upgrade Minor $240,000 $42,262 $0 $0 $0 $0 $42,262 82%Construction Jun 12 The portion of the contract dealing with the intranet will be finalized after the revision to the Internet. TE-06002 9-1-1 Emergency Phone System Upgrade Minor $378,000 $27,274 $0 $0 $0 $0 $27,274 93%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-07001 Emergency Notification System Minor $150,000 $0 $0 $0 $0 $0 $0 100%Complete TE-07002 Police Auto- Citation System Minor $125,000 $67,191 $0 $0 $0 $0 $67,191 46%Pre-design Dec 11 System is up and running. Remaining budget will be used to finalize additional hardware needs. TE-08000 Library Technology Plan Minor $75,000 $18,766 $0 $0 $0 $0 $18,766 75%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-08003 Fire Radio Communications Equipment Minor $102,000 $7,179 $0 $0 $0 $0 $7,179 93%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-08004 Fire Mobile Data Computer Minor $250,000 $69,294 $95 $0 $0 $1 $69,198 72%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-09000 Public Safety Computer-Aided Dispatch Replacement Minor $1,300,000 $1,300,000 $0 $0 $0 $0 $1,300,000 0%Pre-design Dec 12 Contract is under negotiations. INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS Page 16 of 34 12/8/2011 3.k Packet Pg. 365 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS TE-11002 Police Mobile In- Car Video System Replacement Minor $310,000 $310,000 $0 $0 $0 $0 $310,000 0%Pre-design Jun 12 Currently developing requirements. TE-11003 Recurring Credit Card Payment Minor $150,000 $150,000 $0 $0 $0 $0 $150,000 0%Pre-design Jun 12 Currently developing requirements. TE-09001 Fiber Optic Communications to Remote Radio Sites Minor $153,000 $0 $0 $0 $0 $0 $0 100%Complete This project will be closed. TE-95016 Permit Information Tracking System Multi-Year $980,050 $210,376 $33,728 $0 $0 $31,416 $145,232 85%Construction Jun 13 Performed upgrade to the application Dec 10. Next phase will include Accela Customer Access and possibly additional module implementation. TE-02013 Institutional Network (I-Net) Multi-Year $1,000,000 $724,311 $120,189 $0 $0 $34,800 $569,322 43%Construction Jun 13 All major facilities in the City have been connected via fiber optic cable. TE-02016 Enterprise Resource Planning Multi-Year $5,018,476 $102,526 $0 $0 $0 $0 $102,526 98%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-07006 SAP Continuous Improvement Project Multi-Year $8,898,680 $95,694 $6,686 $0 $0 $0 $89,008 99%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-99010 Acquisition of New Computers Multi-Year $362,350 $142,599 $0 $0 $0 $0 $142,599 61%Construction Jun 13 This is an ongoing project for the acquisition of new computers. TE-00010 / TE-00021 Telephone System Replacement Multi-Year $2,646,587 $1,213,152 $18,396 $0 $0 $94,763 $1,099,993 58%Pre-design Jul 12 Project Management vendor selected. Preparing to go out to bid for cabling, networking, and phone system. MULTI-YEAR PROJECTS MINOR PROJECTS Page 17 of 34 12/8/2011 3.k Packet Pg. 366 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS TE-02015 Citywide GIS Data, Infrastructure and Applications Multi-Year $2,228,954 $615,229 $225,021 $0 $0 $13,704 $376,504 83%Construction Dec 12 Performing application upgrade and modifications. TE-05000 Radio Infrastructure Replacement Multi-Year $2,565,980 $1,971,265 $123,105 $0 $0 $133,260 $1,714,900 33%Pre-design Dec 16 This is a County-wide project. Awaiting project initiation from County. TE-06001 Library Radio Frequency Identification (RFID) Implementation Multi-Year $595,000 $427,414 $109,807 $0 $0 $82,439 $235,168 60%Construction Nov 13 The intent is to carry this funding over to FY 2012, add funding, and utilize for implementation per the upcoming Library Technology Plan. RFID implementation is being coordinated with the Library Construction /Remodeling Projects. TE-07000 Enterprise Application Infrastructure Upgrade Multi-Year $2,297,000 $755,859 $201,859 $0 $0 $1,408 $552,592 76%Construction Jun 12 $250K of this project is identified as a possible additional funding source for the Telephone System Replacement Project. Remaining dollars to be transferred to Application Maintenance Fund at FY 2012 for support contract. TE-07003 Bill and Payment Processing Multi-Year $330,000 $23,450 $23,450 $0 $0 $0 $0 100%Complete TE-08002 Electric Patient Care Report Multi-Year $85,000 $35,057 $0 $0 $0 $2 $35,055 59%Complete Jun 11 This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-10000 Collections Software Multi-Year $111,800 $111,800 $5,893 $0 $0 $74,720 $31,187 72%Construction Oct 11 Target Go-Live Date is Oct 11. MULTI-YEAR PROJECTS Page 18 of 34 12/8/2011 3.k Packet Pg. 367 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS TECHNOLOGY FUND Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date INTERNAL SERVICE FUND INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS TE-10001 Utility Customer Billing System Multi-Year $500,000 $350,000 $0 $0 $0 $0 $350,000 30%Pre-design Jul 12 Currently developing requirements. TE-11004 Utility Bill Information Enhancements Multi-Year $750,000 $750,000 $0 $0 $0 $0 $750,000 0%Pre-design Jul 12 Currently developing requirements. TE-11005 Implementation of Restructured Tiered Rates on Bills Multi-Year $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-design Jul 12 Currently developing requirements. MULTI-YEAR PROJECTS Page 19 of 34 12/8/2011 3.k Packet Pg. 368 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments*Contingencies Encumbrances Balance Complete Status Date Comments VR-00001 MSC Fuel Storage Tank Replacement Minor $225,000 $0 $0 $0 $0 $0 $0 100%Complete Project is complete and will be closed. VR-01000 MSC Equipment Maintenance Facility Mezzanine Storage Area Minor $275,000 $1 $0 $0 $0 $0 $1 100%Complete Project is complete and will be closed. Funds will be returned to funding source. VR-01001 MSC Fuel Storage Tank /Svc Island Replacement Minor $1,616,860 $127,500 $16,305 $0 $0 $8,928 $102,267 94%Complete Project is complete and will be closed. Funds will be returned to funding source. VR-01002 MSC Equipment Washing Facility Upgrade Minor $681,394 $0 $0 $0 $0 $0 $0 100%On Hold TBD On hold pending funding. VR-05001 Field Service Truck Minor $125,000 $0 $0 $0 $0 $0 $0 100%Complete Project is complete and will be closed. VR-06801 Replace City-Wide Fuel Transaction and Inventory Management System Minor $285,000 $148,043 $11,981 $0 $0 $35,658 $100,404 65%Ongoing Dec 11 System has been installed at one site; site preparation in progress at remaining two sites. VR-07001 Automated Motor Pool Reservation and Vehicle Key Management System Minor $125,000 $98,398 $0 $0 $0 $86,946 $11,452 91%Ongoing Mar 12 System has been implemented at Municipal Service Center (MSC). Second phase will include Civic Center. VR-08001 New Vehicles (2) For Utility Operations Minor $70,000 $0 $0 $0 $0 $0 $0 100%Complete Project is complete and will be closed. VR-09000 Vehicle Replacement Minor $2,545,000 $1,410,642 $897,179 $0 $0 $278,039 $235,424 91%Ongoing Jun 12 Awaiting purchase and delivery of several vehicles. VR-11000 Vehicle Replacement Minor $983,295 $761,090 $170,147 $0 $0 $11,268 $579,675 41%Ongoing Jun 12 Awaiting purchase and delivery of several vehicles. FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS INTERNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT Page 20 of 34 12/8/2011 3.l Packet Pg. 369 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 Labor FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments*Contingencies Encumbrances Balance Complete Status Date Comments FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS INTERNAL SERVICE FUND VEHICLE REPLACEMENT AND MAINTENANCE FUND PUBLIC WORKS DEPARTMENT VR-04010 Vehicle Maintenance Facility Upgrades Multi-Year $610,000 $266,393 $3,533 $0 $0 $4 $262,856 57%Ongoing Jun 12 Ongoing, specifications need to be written for next phase of upgrades. VR-07002 Diesel Truck Engine Emissions Retrofits Multi-Year $685,000 $197,147 $61,357 $0 $0 $1 $135,789 80%Ongoing Dec 11 Ongoing, Budget Adjustment Ordinance will be needed to cover difference in bid amount. VR-92006 Fuel Tank Storage/Upgrade Multi-Year $341,000 $111,001 $13,589 $0 $0 $0 $97,412 71%Design Mar 12 This is a design-build project. MULTI-YEAR PROJECTS Page 21 of 34 12/8/2011 3.l Packet Pg. 370 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments EL-04010 Foothills System Rebuild Minor $850,064 $102,960 $158 $0 $0 $102,802 88%Pre-design Dec 12 Some preliminary design and scoping work has been done. No additional work at this time due to understaffed situation. EL-09004 W. Charleston/Wilkie Way to South City Limit 4/12 kV Conversion Minor $507,556 $129,251 $32,928 $0 $0 $96,323 81%Construction Jun 12 Final design in progress. Out to bid for construction in Dec 11. EL-10008 Advanced Metering Infrastructure System Minor $310,911 $308,235 $52,690 $0 $115,657 $139,888 55%Complete Project will be close at mid-year and balance return to reserves. EL-11001 Torreya Court Rebuild Minor $100,397 $100,397 $4,372 $0 $0 $96,025 4%Design June 12 In design. EL-11004 Hewlett Subdivision Rebuild Los Trancos Minor $400,970 $400,970 $10,673 $0 $14,230 $376,067 6%Design June 12 In design. EL-11006 Rebuild UG District 18 Minor $350,147 $350,147 $1,616 $0 $0 $348,531 0%Dec 12 No work started due to staff vacancies. EL-11016 Electric Vehicle Charging Infrastructure Minor $135,083 $135,083 $0 $0 $18,547 $116,536 14%Design Dec 12 Work in progress. ELECTRIC FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS Page 22 of 34 12/8/2011 3.m Packet Pg. 371 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT MULTI-YEAR PROJECTS EL-02010 SCADA System Upgrades Multi-Year $712,213 $82,584 $39,561 $0 $0 $43,023 94%Design and Construction Ongoing This project involves upgrading the Supervisory Control & Data Acquisitions (SCADA) Portal and Master computer software and operating systems . EL-04012 Utility Site Security Improvements Multi-Year $908,854 $582,084 $72,260 $0 $4,360 $505,464 50%Construction Dec 12 Construction completed at Colorado Substation and Boranda Reservoir. Design completed for Corte Madera Booster/Reservoir, Quarry Booster, and Boronda Booster. EL-04014 Automated Meter Reading System Multi-Year $1,334,099 $296,157 $0 $0 $2 $296,155 78%Complete Pilot is completed, except for ongoing maintenance of installed system. Staff is analyzing installation and will use information during Smart Grid Feasibility Study (EL-10008). EL-05000 El Camino Underground Rebuild Multi-Year $1,620,339 $404,700 $219,030 $0 $24,730 $160,940 90%Design and Construction Jun 12 Portions of this project have been completed in conjunction with new business in the area of El Camino Real between Charleston and San Antonio roads. Construction Estimate package in progress. EL-11008 Rebuild UG District 19 Multi-Year $561,061 $510,106 $2,976 $0 $0 $507,130 10%Construction Mar 13 Substructure installation completed. Cable design and estimate pending crew availability. EL-06000 Park Blvd. 4/12kV Conversion Multi-Year $386,579 $49,924 $39,951 $0 $0 $9,973 97%Construction Apr 12 EL-06001 230 KV Electric Intertie Multi-Year $503,109 $137,922 $41,967 $0 $5,435 $90,520 82%Pre-design Ongoing Stanford Utilities has expressed interest in Stanford Linear Accelerator Center (SLAC) - Quarry Road Substation 60kV tie. Preliminary power flow and feasibility study complete, interconnection at Quarry Substation appears feasible. Working with Stanford and DOE to encourage SLAC participation in this project. Page 23 of 34 12/8/2011 3.m Packet Pg. 372 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT EL-06002 Underground District 45 Multi-Year $3,607,743 $1,483,226 $1,173,833 $0 $2 $309,391 60%Construction Mar 12 Substructure complete. Line construction in progress. EL-06003 Utility Control Center Upgrades Multi-Year $500,000 $53,374 $5,885 $39,500 $0 $7,989 98%Pre-design Ongoing Ergonomic and visual improvements for performance to operator environment. EL-08000 E. Charleston 4/12kV Conversion Multi-Year $653,255 $630,752 $38,102 $0 $0 $592,650 9%Design Mar 12 In design. EL-08002 E. Meadow/Alma/Loma 4/12kV Conversion Multi-Year $1,171,079 $991,933 $568,393 $9,525 $0 $414,015 65%Complete Project will be close at mid-year and balance return to reserves. EL-09000 Middlefield Underground Rebuild Multi-Year $625,786 $625,786 $0 $0 $0 $625,786 0%Design Mar 12 Engineering design completed. Estimating in progress. EL-09002 Middlefield/Colorado 4/12 kV Conversion Multi-Year $263,828 $254,702 $254,702 $0 $0 $0 100%Design Nov 11 Design completed. EL-09003 Rebuild UG District 17 (Downtown) Multi-Year $1,225,238 $942,270 $185,813 $0 $5,000 $751,457 60%Construction Mar 12 Substructure complete. Line construction begins Jun 12. MULTI-YEAR PROJECTS Page 24 of 34 12/8/2011 3.m Packet Pg. 373 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ELECTRIC FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT EL-10006 Rebuild UG District 24 Multi-Year $1,344,620 $1,135,149 $117,292 $0 $0 $1,017,857 24%Design Jun 12 Substructure installation complete. Electrical design work in progress. EL-10009 Street Light System Conversion Project Multi-Year $1,404,162 $1,351,892 $416,652 $0 $48,427 $886,813 37%Ongoing Dec 12 In procurement phase. EL-11000 Seale/Waverley 4/12 kV Conversion Multi-Year $40,000 $40,000 $0 $0 $0 $40,000 0%Jun 13 No work started due to staff vacancies. EL-11002 St. Francis/Oregon/Amarillo /Louis 4/12 kV Conversion Multi-Year $50,000 $50,000 $0 $0 $0 $50,000 0%Jun 13 No work started due to staff vacancies. EL-11003 Rebuild UG District 15 Multi-Year $80,348 $80,348 $3,826 $0 $0 $76,522 5%Jun 13 No work started due to staff vacancies. EL-11005 California Ave. Business District Rebuild (District 22) Multi-Year $2,332,378 $70,578 $3,073 $0 $0 $67,505 97%Complete Project closed and balance return to reserves. EL-11007 Rebuild Greenhouse Condo Area Multi-Year $151,091 $151,091 $30,893 $0 ($16,467)$136,665 10%Design Jul 12 In Design. Construction to be completed in FY 2012. EL-11010 UG District 47 - Middlefield, Homer Avenue, Webster Street and Addison Avenue Multi-Year $151,331 $151,331 $14,645 $0 $0 $136,686 10%Design Aug 12 Preliminary design work started . EL-11014 Smart Grid Technology Installation Multi-Year $500,000 $500,000 $0 $0 $0 $500,000 0%Pre-design Jan 17 Pending results of Smart Grid Assessment and approval by Council. EL-11015 Reconductor 60kV Overhead Transmission System with ACCR conductor Multi-Year $451,535 $451,535 $16,880 $0 $0 $434,655 4%Design Jun 14 Engineering and estimating in progress. MULTI-YEAR PROJECTS Page 25 of 34 12/8/2011 3.m Packet Pg. 374 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments GS-03010 CNG Sequential Fuel System Minor $39,285 $0 $0 $0 $0 $0 100%Closed GS-08000 Gas Station 2 Rebuild Minor $207,007 $203,591 $80 $0 $200,001 $3,510 25%Design Oct 11 Design approved, regulation skid to ship in Sep 11. GS-09000 Gas Station 1 Rebuild Minor $201,000 $200,485 $0 $0 $200,000 $485 10%Design Apr 12 Design effort ongoing, unit to ship by late 2011. GS-10000 Gas Station 3 Rebuild Minor $207,007 $206,931 $0 $0 $205,000 $1,931 10%Design May 12 Design effort ongoing, unit to ship by late 2011. GS-10002 General Shop Tooling Minor $66,129 $66,060 $50,736 $0 $0 $15,324 100%Complete Equipment purchased and installed. GS-10003 Cathodic Current Interrupters Minor $300,007 $299,931 $0 $0 $1 $299,930 25%Construction Dec 11 Specification complete project to bid Sep 11. GS-10004 Automating Test Station Minor $100,000 $100,000 $0 $0 $1 $99,999 25%Construction Dec 11 Specification complete project to bid Sep 11. GS-11001 Gas Station 4 Rebuild Minor $337,000 $337,000 $0 $0 $330,700 $6,300 10%Design Dec 11 Design effort ongoing, unit to ship by late 2011. ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS GAS FUND Page 26 of 34 12/8/2011 3.n Packet Pg. 375 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments ENTERPRISE FUND UTILITIES DEPARTMENT GAS FUND GS-00011 Compress Natural Gas Station Multi-Year $440,000 $0 $0 $0 $0 $0 100%Closed GS-01019 Global Positioning System Multi-Year $381,062 $118,925 $24,644 $0 $0 $94,281 75%Construction Jun 12 Integrating field data into mapping system, defining additional equipment needs. GS-08011 GMR - Project 18 Multi-Year $5,983,874 $4,991,311 $187,688 $0 $3,721,292 $1,082,331 0%Construction Apr 12 Project bid and awarded by Council, construction to start July 1, 2011. Includes a portion of GMR 19. GS-09002 GMR - Project 19 Multi-Year $6,285,168 $6,234,703 $565,506 $0 $953,052 $4,716,145 5%Design Jul 13 Remaining portion of GMR 19 to be combined with GMR 20, combined project will be in design phase in Fall 2011. GS-10001 GMR - Project 20 Multi-Year $644,014 $643,863 $0 $0 $0 $643,863 0%Design Jul 13 Design phase to start Oct 11 and include portions of GMR 19 to create a combined project GMR 19 and 20. Project to bid Jul 12. GS-11000 GMR - Project 21 Multi-Year $457,000 $457,000 $0 $0 $0 $457,000 0%Design Jul 11 Design phase to start Oct 11 for service line replacements and be combined with GMR 19B/20 project GS-11002 Gas System Improvements Multi-Year $195,000 $195,000 $16,500 $0 $6,667 $171,833 12%Ongoing This project addresses ongoing capital system improvements MULTI-YEAR PROJECTS Page 27 of 34 12/8/2011 3.n Packet Pg. 376 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WS-09000 Seismic Water Tank Valve Minor $800,000 $799,858 $21,143 $0 $14,554 $764,161 4%Construction Jul 15 Final report completed in Nov 10, construction to start Jan 12. WS-11001 Vacuum Excavation Equipment Minor $275,000 $275,000 $0 $0 $0 $275,000 0%Pre-Design Jul 12 Working with fleet to create specification. MINOR PROJECTS WATER FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT Page 28 of 34 12/8/2011 3.o Packet Pg. 377 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WATER FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT WS-07000 Water Regulation Station Improvements Multi-Year $1,070,000 $1,050,438 $90,860 $0 $62,541 $897,037 16%Construction Jul 15 Final report to be completed in Nov 11, construction to start Jan 12. WS-07001 Water Recycling Facilities Multi-Year $1,100,152 $767,890 $63,307 $0 $309,021 $395,562 64%Pre-Design Jun 16 Preparing Environmental Impact Report (EIR). Construction to be completed in 2016. WS-07004 Water System Portable Emergency Generators Multi-Year $466,000 $208,833 $0 $0 $1 $208,832 55%Construction May 12 Request for Quote (RFQ) will be issued in Sep 11 for lease options. WS-08001 Water Reservoir Coating Improvements Multi-Year $2,050,491 $2,044,809 $173,720 $0 $119,575 $1,751,514 15%Construction Jul 15 Final report to be completed in Nov 11, construction to start Jan 12. WS-08002 Emergency Water Supply Project Multi-Year $40,440,049 $32,536,845 $3,809,713 $0 $7,659,492 $21,067,640 48%Construction Dec 12 90% design submitted. WS-08017 WMR - Project 22 Multi-Year $3,164,469 $1,555,628 $1,326,619 $74,238 $0 $154,771 95%Complete WS-09001 WMR - Project 23 Multi-Year $3,120,999 $2,410,320 $274,175 $0 $29,499 $2,106,646 33%Design Feb 13 Design phase to begin during integration of WGW Mapping and GIS systems with estimated completion date of Sep 11. Construction to start Nov 11. Project combined with WMR 24. MULTI-YEAR PROJECTS Page 29 of 34 12/8/2011 3.o Packet Pg. 378 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WATER FUND FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND UTILITIES DEPARTMENT WS-10001 WMR - Project 24 Multi-Year $3,253,142 $3,197,883 $75,332 $0 $11,956 $3,110,595 4%Design Feb 13 Design phase to begin during integration of WGW Mapping and GIS systems with estimated completion date of Sep 11. Construction to start Nov 11. Project combined with WMR 24. WS-11000 WMR - Project 25 Multi-Year $292,000 $292,000 $0 $0 $0 $292,000 0%Pre-Design Sep 13 Project design to start Jul 12 and will be combined with WMR 26. WS-11003 Water Distribution System Improvements Multi-Year $204,623 $204,623 $50,852 $0 $6,667 $147,104 28%Ongoing TBD This project addresses on going capital distribution system improvements WS-11004 Water System Supply Improvements Multi-Year $200,993 $200,993 $10,924 $0 $1 $190,068 5%Ongoing TBD This project addresses ongoing capital supply system improvements MULTI-YEAR PROJECTS Page 30 of 34 12/8/2011 3.o Packet Pg. 379 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WC-09002 Root Treatment, Sediment and Dewatering Container Minor $60,064 $60,064 $706 $0 $0 $59,358 1%Pre-design N/A Changing conditions no longer allow for this container and this project should be cancelled. WC-11000 WC Reh/Aug. Prj 24 Multi-Year $290,000 $290,000 $0 $0 $0 $290,000 0%Pre-design Sep 13 This project will also include the WC Reh/Aug Prj 25 and the design effort will start May 12 with construction complete by Sep 13. WC-15002 Wastewater System Improvements Multi-Year $202,315 $202,315 $25,462 $0 $6,667 $170,186 16%Ongoing TBD This project addresses on going capital system improvements. MULTI-YEAR PROJECTS ENTERPRISE FUND UTILITIES DEPARTMENT MINOR PROJECTS WASTEWATER COLLECTION FUND Page 31 of 34 12/8/2011 3.p Packet Pg. 380 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WQ-10001 Plant Master Plan Minor $981,266 $981,266 $485,365 $0 $495,901 $0 100%Pre-Design Jun 12 Project on schedule. Stakeholder meetings commenced. Alternatives being developed. WQ-04010 Replacement of Existing Reclaimed Water Pipes Multi-Year $16,800,000 $0 $0 $0 $0 $0 100%Closed WQ-04011 Facility Condition Assessment and Retrofit Multi-Year $4,300,000 $2,730,777 $204,288 $0 $185,427 $2,341,062 0%Design Jun 12 Ongoing retrofit projects. WQ-06014 Disinfection Facility Improvement Program Multi-Year $20,469,469 $5,137,089 $2,455,365 $407,091 $712,592 $1,562,041 99%Complete Jun 12 Project complete. Startup complete. Warranty phase of project MINOR PROJECTS ENTERPRISE FUND PUBLIC WORKS DEPARTMENT WASTEWATER TREATMENT FUND MULTI-YEAR PROJECTS Page 34 of 34 12/8/2011 3.q Packet Pg. 381 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3 ENTERPRISE FUND REFUSE FUND PUBLIC WORKS DEPARTMENT Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments RF-09003 Recycling in Business District Minor $325,000 $325,000 $0 $0 $0 $325,000 5%Design Dec 11 A new Palo Alto-branded container design has been prototyped and is being evaluated for further consideration. RF-09004 LATP Site Development Preparation Minor $200,000 $47,900 $24,479 $0 $22,889 $532 100%Complete Consultant's environmental risk assessment for cleanup of site was approved by regulatory agency for Areas A and B. Existing funds in balance will be released RF-10002 Flare Relocation Project Minor $700,000 $642,628 $21,420 $0 $41,760 $579,448 17%Design Sep 12 Design is 100% complete. Awaiting permit approvals prior to issuing for bid. RF-07001 Relocation of Landfill Facilities Multi-Year $1,500,291 $1,218,253 $67,705 $0 $30,316 $1,120,232 25%Design Feb 12 The relocation of the Recycling Center and a permanent Household Hazardous Waste (HHW) facility to be placed at the end of Embarcadero Way on the wastewater treatment plant property. Final design and California Environmental Quality Act (CEQA) review for the project is now in progress. RF-10003 Drying Beds, Material Storage and Transfer Area Multi-Year $122,700 $83,613 $8,613 $0 $0 $75,000 39%Pre-Design Nov 11 The cost of locating a facility on the former Los Altos Treatment Plant (LATP) site exceeded available funds, so the project was scaled back and relocated to the MSC. RF-11001 Landfill Closure Multi-Year $600,000 $600,000 $115,494 $24,477 $437,274 $22,755 80%Construction Feb 11 Construction is underway for the undergrounding of environmental control systems in the closed sections of the landfill and installing the remaining gas and leachate wells required by permit. Design of the Phase IIC cap and closure will begin soon with additional funds scheduled for FY 2012. FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MINOR PROJECTS MULTI-YEAR PROJECTS Page 32 of 34 12/8/2011 3.r Packet Pg. 382 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 3FY 2011 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Total Budget FY 2011 Budget Estimated Project Project Project From Available FY 2011 FY 2011 FY 2011 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments SD-08101 Alma Street Storm Drain Improvements Minor $803,622 $94,889 $39,772 $0 $1 $55,116 100%Complete Project will be close at mid-year and balance return to reserves. SD-06102 San Francisquito Creek Storm Water Pump Station Multi-Year $6,384,088 $118,983 $30,551 $22,268 $35,943 $30,221 100%Complete Jun 19 Required mitigation monitoring for 10 years (through FY 2019) is the only remaining task. SD-06104 Connect Clara Drive Storm Drains to Matadero Pump Station Multi-Year $953,480 $1 $0 $0 $0 $1 0%Pre-Design TBD On hold until project funding is identified. SD-11101 Channing Avenue/Lincoln Avenue Storm Drain Improvements Multi-Year $2,110,526 $2,081,624 $692,059 $0 $1,295,610 $93,955 100%Construction Sep 11 Phase 1 construction expected to be completed by Sep 11. Phase 2 design to occur during FY 2012. ENTERPRISE FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTS MULTI-YEAR PROJECTS STORM DRAINAGE FUND Page 33 of 34 12/8/2011 3.s Packet Pg. 383 -: A t t a c h m e n t 3 F i s c a l Y e a r 2 0 1 1 Y e a r - E n d C a p i t a l I m p r o v e m e n t P r o g r a m P r o j e c t s S t a t u s ( 2 2 2 4 : F Y 2 0 1 1 Attachment 4 Project Category Department/Fund Project Title FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Community Services : Land & Land Improvements AC-86017 Art in Public Places $29,545 $64,410 $21,556 $17,256 $77,956 Planning & Community Environment : Streets & Sidewalks PL-05030 Traffic Signal Upgrades 30,524 35,908 39,983 278,187 183,141 Public Works - General Fund : Streets & Sidewalks PE-86070 Street Improvements (Street Improvement Fund)4,987,364 3,368,496 3,702,381 3,323,063 4,710,791 Building & Facilities PF-00006 Roofing Replacement 76,769 256,831 21,073 227,495 104,617 Building & Facilities PF-01003 Building Systems Improvements 64,312 34,304 114,152 36,053 74,876 Building & Facilities PF-02022 Facility Interior Finishes 10,579 65,797 47,116 11,076 23,874 Building & Facilities PF-93009 ADA Compliance 96,587 49,955 121,617 216,133 9,994 Streets & Sidewalks PO-05054 Street lights Improvements 19,077 11,814 15,970 32,976 159,070 Streets & Sidewalks PO-89003 Sidewalk Improvements 2,299,543 2,030,796 1,675,527 952,503 1,611,917 Public Works - Storm Drainage Fund : SD-06101 Storm Drain System Replacement 202,652 675,832 445,582 81,878 488,793 Public Works - Wastewater Treatment Fund : WQ-80021 RWQCP Plant Equipment Replacement 238,280 1,156,156 2,544,261 403,293 66,916 WQ-80022 RWQCP System Flow Metering 180,000 0 56,245 0 28,468 Electric Fund : EL-02011 Electric Utility GIS 0 83,546 39,414 188,231 321,713 EL-06005 Fiber Optics Ring System Improvements 36,145 112,435 58,124 5,531 0 EL-06006 Fiber Optics Customer Design and Connection Services 131,930 134,498 195,808 17,203 0 EL-89028 Electric Customer Connections 3,402,213 1,982,607 1,467,233 1,702,232 1,882,242 EL-89031 Communications System Improvements $2,670 $50,458 $21,784 $0 $3,501 EL-89038 Substation Protection Improvements 46,187 423,904 94,411 133,185 129,086 EL-89044 Substation Facility Improvements 73,730 7,147 93,735 3,133 148,871 EL-98003 Electric Distribution System Reconstruction and Improvements 2,761,605 2,260,973 1,265,486 1,330,082 1,608,521 Fiber Optics Fund : FO-10000 Fiber Optic Customer Connections 0 0 0 68,373 88,061 FO-10001 Fiber Optic Network System Improvements 0 0 0 34,614 327,736 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2007-2011 Page 1 of 2 12/8/2011 3.t Packet Pg. 384 -: A t t a c h m e n t 4 C o n t i n u o u s C a p i t a l P r o j e c t s E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 ( 2 2 2 4 : F Y 2 0 1 1 Y / E C I P S t a t u s R e p o r t ) Attachment 4 Project Category Department/Fund Project Title FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2007-2011 Gas Fund : GS-02013 GS-03007 Directional Boring Equipment 0 63 59,410 0 162 GS-03002 GS-04003 GS-05002 Gas Main Replacements 1,858,052 433,894 38,121 87,706 86,159 GS-03008 Polyethylene Fusion Equipment Replacement 9,153 0 35,650 0 444 GS-03009 System Extensions-Unreimbursed 82,515 115 12,000 4,005 7,718 GS-06001 Gas Main Replacements, GMR-Project 16 344,176 2,256,296 2,423,677 89,180 127,056 GS-07002 Gas Main Replacements, GMR-Project 17 143,767 614,485 912,018 3,681,252 211,515 GS-80017 Gas System Extensions 675,874 609,566 356,666 347,412 471,001 GS-80019 Gas Meters and Regulators 253,784 272,386 244,129 313,598 294,191 Wastewater Collection Fund: WC-02002 WC-03003 WC-04002 Sewer System Rehabilitation and Augmentation, Project 15,16 and 17 3,374,976 1,394,506 8,840 27,141 122,870 WC-05003 WC-06003 WC-07004 Sewer System Rehabilitation and Augmentation, Project 18,19 and 20 3,048,500 1,378,862 2,154,931 1,761,725 94,468 WC-08012 WC-09001 WC-10002 Sewer System Rehabilitation and Augmentation, Project 21,22 and 23 0 126 285,858 543,313 1,928,374 WC-80020 Sewer System Extensions 493,863 561,620 370,253 251,152 224,066 WC-99013 Sewer Manhole Rehabilitation 441,705 116,173 48,227 168,722 378,841 Water Fund : WS-02003 Water Main Replacements, Project 16 81,310 4,629 19,695 0 0 WS-02014 Water-Gas Wastewater utilities GIS Data 216 0 33 204,583 289,694 WS-06002 Water Main Replacements, Project 20 595,117 1,830,359 93,554 349 10,821 WS-07003 Water Main Replacements, Project 21 3,328 57,923 226,559 1,383,427 1,432,826 WS-80013 Water System Extensions 178,680 400,152 295,194 285,945 258,968 WS-80014 Service and Hydrant Replacements 39,079 58,212 104,951 43,538 44,232 WS-80015 Water Meters 140,891 127,109 14,712 2,298 0 Page 2 of 2 12/8/2011 3.t Packet Pg. 385 -: A t t a c h m e n t 4 C o n t i n u o u s C a p i t a l P r o j e c t s E x p e n d i t u r e s f o r F i s c a l Y e a r s 2 0 0 7 - 2 0 1 1 ( 2 2 2 4 : F Y 2 0 1 1 Y / E C I P S t a t u s R e p o r t ) 9/1/2011 Fiscal Year Source Project Amount (thous.) Details 2007 CIP Budget Intermodal Transit Center (net of grants)182 Library Service Model Analysis 400 BAO Roth Building (maint. upgrades)415 Midyear (none) Subtotal 997 2008 CIP Budget Lytton Plaza 50 Golf Course driving range turf and netting*690 Golf course pump irrigation motors & control panel*50 BAO LATP Acquisition 2,700 Midyear (none) Subtotal 3,490 2009 CIP Budget LATP Master Plan Study 100 Airport transition project 50 Lytton Plaza 300 Jaws of Life equipment replacement*65 BAO (none) Midyear Cubberley Turf Renovation accelerated one year to provide field during emergency well construction (80) Overall cost increased by $820, but W ater Fund reimbursed $900K, so GF came out $80K ahead Subtotal 435 2010 CIP Budget Junior Museum Bobcat upgrade 70 net of $505K grant Highway 101 overpass 100 Downtown tree grates 300 BAO Highway 101 Overpass (seed funding)26 Midyear Thermoplastic marking and striping 250 Subtotal 746 2011 CIP Budget Dinah/Summerhill Pedestrian Bikepath 300 Sign reflectivity upgrade 100 Highway 101 Overpass 250 BAO Park Emergency Repair (trim eucalyptus leaves)58 Midyear California Ave. transit hub corridor 550 Subtotal 1,258 5-YR TOTAL 6,926 1-YR AVERAGE 1,385 *These projects may have been foreseen, but their departments did not feed in/were not integrated into the 5-year CIP budget process, so they appeared as "new projects." Please note the following "additional" projects or amounts are NOT included in the above for reasons indicated. Fiscal Year Project Reason for exclusion net $$ amt 2012 MSC Study Not in 5-year period 2007-2011 100 2012 Magical Bridge Not in 5-year period 2007-2011 300 (net of grants) 2009 Public Safety Bldg Project had been conceived well before 5-yr period 2007-2011 3,437 2006 Bressler PRoperty AcquisitionNot in 5-year period 2007-2011 760 ESTIMATE OF "UNEXPECTED" CIP EXPENDITURES FOR PERIOD FY 2007-2011 3.u Packet Pg. 386 -: A t t a c h m e n t 5 U n e x p e c t e d C I P s ( 2 2 2 4 : F Y 2 0 1 1 Y / E C I P S t a t u s R e p o r t )