Loading...
HomeMy WebLinkAboutRESO 10227180321 cc 0260111 Resolution No. 10227 Resolution of the Council of the City of Palo Alto to Adopt a List of Projects for Fiscal Year 2025-2026 Funded by SB 1: The Road Repair and Accountability Act of 2017 R E C I T A L S A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and B. SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Palo Alto (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and C. The City must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and D. The City, will receive an estimated $1,790,739 in RMRA funding in Fiscal Year 2025-2026 from SB 1; and E. This is the seventh year in which the City is receiving SB 1 funding which enables the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and F. The City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and G. The funding from SB 1 will help the City maintain and rehabilitate various streets throughout the City this year and many similar projects into the future; and H. The 2018 California Statewide Local Streets and Roads Needs Assessment found that the City’s streets and roads are in “excellent” condition and this revenue will help us maintain the overall quality of our road system and implement complete streets projects over the next decade; and I. The SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW, THEREFORE, the Council of the City of Palo Alto RESOLVES as follows: SECTION 1. The foregoing recitals are true and correct. Docusign Envelope ID: 8D0B2CF6-B61A-4EB3-8FB9-A3D42C91E8C5 180321 cc 0260111 SECTION 2. The City of Palo Alto hereby adopts the following list of streets planned to be funded in-part or solely with fiscal year 2025-2026 with Road Maintenance and Rehabilitation Account revenues: FY 2026 Street Resurfacing Project includes pavement repair, sidewalk, valley gutter, curb and gutter replacement, upgraded curb ramps, and street paving. The following streets are included in the FY2026 Street Resurfacing Project: Ben Lomond Drive (Scripps Ave to Scripps Ave), Byron Street (Palo Alto Ave to Hawthorne Ave), Fabian Way (Charleston Rd to West Bayshore Rd), Hamilton Avenue (Emerson St to Ramona St), Hamilton Court (Hamilton Ave to End), Julie Court (Matadero Ave to End), Lambert Avenue (El Camino Real to Park Blvd), Lowell Avenue (Alma St to Emerson St), Miranda Avenue (Foothill Expwy to Hillview Ave), Palm Street (University Ave to End), Park Boulevard (Park Ave to Leland Ave), Patricia Lane (Hamilton Ave to Edgewood Dr), Pitman Avenue (Center Dr to Newell Rd), Waverley Street (Santa Rita Ave to N. California Ave), Wintergreen Way (Ross Rd to End). The estimated useful life is 30 years. Construction of FY2026 Street Resurfacing Project will start in Fall 2025 and be completed in Summer 2026. // // // // // // // // // // // // // // Docusign Envelope ID: 8D0B2CF6-B61A-4EB3-8FB9-A3D42C91E8C5 180321 cc 0260111 SECTION 3. The Council finds that the adoption of this resolution does not meet the definition of a project under Public Resources Code Section 21065, thus no environmental assessment under the California Environmental Quality Act is required. INTRODUCED AND PASSED: JUNE 2, 2025 AYES: BURT, LAUING, LU, LYTHCOTT-HAIMS, RECKDAHL, STONE, VEENKER NOES: ABSENT: ABSTENTIONS: ATTEST: _______________________________________________________ City Clerk Mayor APPROVED AS TO FORM:APPROVED: _______________________________________________________ Assistant City Attorney City Manager Docusign Envelope ID: 8D0B2CF6-B61A-4EB3-8FB9-A3D42C91E8C5 Certificate Of Completion Envelope Id: 8D0B2CF6-B61A-4EB3-8FB9-A3D42C91E8C5 Status: Completed Subject: RESO 10227 - FY 2025-2026 Project Funded by SB 1: The Road Repair and Accountability Act of 2017 Source Envelope: Document Pages: 3 Signatures: 4 Envelope Originator: Certificate Pages: 2 Initials: 0 Christine Prior AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 Christine.Prior@PaloAlto.gov IP Address: 165.225.242.87 Record Tracking Status: Original 6/9/2025 8:48:29 AM Holder: Christine Prior Christine.Prior@PaloAlto.gov Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: Docusign Signer Events Signature Timestamp Caio Arellano Caio.Arellano@CityofPaloAlto.org Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 6/9/2025 8:51:04 AM Viewed: 6/9/2025 11:42:01 AM Signed: 6/9/2025 11:43:03 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Ed Shikada Ed.Shikada@CityofPaloAlto.org City Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 6/9/2025 11:43:04 AM Viewed: 6/9/2025 3:56:10 PM Signed: 6/9/2025 3:56:19 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Ed Lauing Ed.Lauing@CityofPaloAlto.org Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 67.188.59.65 Sent: 6/9/2025 3:56:20 PM Viewed: 6/10/2025 7:56:06 AM Signed: 6/10/2025 7:56:29 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Mahealani Ah Yun Mahealani.AhYun@paloalto.gov Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 76.132.2.224 Signed using mobile Sent: 6/10/2025 7:56:31 AM Resent: 6/10/2025 7:59:24 AM Viewed: 6/10/2025 7:59:52 AM Signed: 6/10/2025 8:00:10 AM Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 6/9/2025 8:51:04 AM Envelope Updated Security Checked 6/9/2025 4:22:19 PM Certified Delivered Security Checked 6/10/2025 7:59:52 AM Signing Complete Security Checked 6/10/2025 8:00:10 AM Completed Security Checked 6/10/2025 8:00:10 AM Payment Events Status Timestamps