Resolution No. 10174
Resolution of the Council of the City of Palo Alto in Support of
Caltrans’ Repaving Project on El Camino Real
R E C I T A L S
A.El Camino Real is a state highway maintained by the California Department of
Transportation (Caltrans); and
B.Caltrans plans to resurface El Camino Real in Palo Alto in 2024; and
C.Caltrans is prepared to install bicycle lanes along El Camino Real within the City of Palo
Alto, in addition to pavement rehabilitation, striping improvements, and curb ramps,
sidewalks, and driveway improvements to comply with Americans with Disabilities Act
(ADA) standards (the “project”); and
D.Use of the road as bicycle lanes would require the conversion of all on-street parking
along El Camino Real within the City of Palo Alto; and
E.Creating and maintaining a sustainable transportation system that provides safe,
comfortable, and convenient travel along and across streets through a comprehensive,
integrated transportation network that emphasizes walking, bicycling, use of public
transportation, and other modes to reduce greenhouse gas (GHG) emissions and the use
of single-occupancy motor vehicles is, and has been a major focus for the City of Palo Alto;
and
F.The adopted Transportation Element of the City of Palo Alto Comprehensive Plan 2030
includes the following goals, policies, and programs in support of bicycle facilities along El
Camino Real:
x Goal T-1 Create a sustainable transportation system, complemented by a mix of land
uses, that emphasizes walking, bicycling, use of public transportation and other
methods to reduce GHG emissions and the use of single-occupancy motor vehicles.
x Policy T-1.3 Reduce GHG and pollutant emissions associated with transportation by
reducing VMT and per-mile emissions through increasing transit options, supporting
biking and walking, and the use of zero-emission vehicle technologies to meet City and
State goals for GHG reductions by 2030.
x Policy T-1.16 Promote personal transportation vehicles as an alternative to cars (e.g.
bicycles, skateboards, roller blades) to get to work, school, shopping, recreational
facilities and transit stops.
x Policy T-1.19 Provide facilities that encourage and support bicycling and walking.
x Program T1.19.2 Prioritize investments for enhanced pedestrian access and bicycle use
within Palo Alto and to/from surrounding communities, including by incorporating
improvements from related City plans, for example the 2012 Palo Alto Bicycle +
Pedestrian Transportation Plan and the Parks, Trails & Open Space Master Plan, as
amended, into the Capital Improvements Program.
x Policy T-3.5 When constructing or modifying roadways, plan for use of the roadway by
all users.
DocuSign Envelope ID: DA453669-DFFD-469A-9766-2057C2650BEB
106_20240320_ts24 2
x Program T3.5.1 Continue to use best practices in roadway design that are consistent
with complete streets principles and the Urban Forest Master Plan, focusing on bicycle
and pedestrian safety and multimodal uses. Consider opportunities to incorporate best
practices from the National Association of City Transportation Officials guidelines for
urban streets and bikeways, tailored to the Palo Alto context.
x Policy T-3.11 Consider the objectives of the Grand Boulevard Initiative and the South El
Camino Boulevard Design Guidelines when designing roadway and pedestrian
improvements along El Camino Real.
x Policy T-3.12 Coordinate roadway improvements with other transportation and utility
infrastructure improvements such as sewer and water.
x Policy T-3.13 Work with Caltrans, Santa Clara County and VTA to improve east and west
connections in Palo Alto and maintain a circulation network that binds the city together
in all directions.
x GOAL T-6 Provide a safe environment for motorists, pedestrians and bicyclists on Palo
Alto streets.
x Policy T-6.1 Continue to make safety the first priority of citywide transportation
planning. Prioritize pedestrian, bicycle and automobile safety over motor vehicle level of
service at intersections and motor vehicle parking.
x Policy T-6.2 Pursue the goal of zero severe injuries and roadway fatalities on Palo Alto
city streets.
x GOAL T-8 Influence the shape and implementation of regional transportation policies
and technologies to reduce traffic congestion and GHG emissions.
x Policy T-8.2 Coordinate with local and regional agencies and Caltrans to maintain and
improve transportation infrastructure in Palo Alto, including the Multi-Modal Transit
Center.
x Policy T-8.8 Support regional bicycle and pedestrian plans including development of the
Bay Trail, Bay-to-Ridge Trail and the Santa Clara County Countywide Bicycle System.
x Program T8.8.1 Identify and improve bicycle connections to/from neighboring
communities in Santa Clara and San Mateo counties to support local trips that cross city
boundaries. Also advocate for reducing barriers to bicycling and walking at freeway
interchanges, expressway intersections and railroad grade crossings.
G.The 2018 Caltrans District 4 Bike Plan identifies the implementation of Class IV protected
bikeways on El Camino Real in Palo Alto as a Tier 1 project; and
H.Caltrans is the lead agency for purposes of CEQA and has found this project Class 1
(existing facilities) categorically exempt under CEQA regulation 15301.
NOW, THEREFORE, the Council of the City of Palo Alto does RESOLVE as follows:
SECTION 1. The City Council of the City of Palo Alto hereby expresses its support for the
the removal of parking on El Camino Real within the City of Palo Alto to allow Caltrans to
proceed with its project.
DocuSign Envelope ID: DA453669-DFFD-469A-9766-2057C2650BEB
106_20240320_ts24 3
SECTION 2. Environmental Review. As the lead agency for this project, Caltrans has found
this project to be categorically exempt under CEQA regulation 15301 (existing facilities). Should the
City be determined to be a responsible agency under CEQA, the City has considered the lead
agency’s determination.
INTRODUCED AND PASSED: JUNE 18, 2024
AYES:
NOES: KOU
ABSENT: TANAKA
ABSTENTIONS:
ATTEST:
_______________________________________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
_______________________________________________________
Assistant City Attorney City Manager
_____________________________
Chief Transportation Official
BURT, LAUING, LYTHCOTT-HAIMS, STONE, VEENKER
DocuSign Envelope ID: DA453669-DFFD-469A-9766-2057C2650BEB
Certificate Of Completion
Envelope Id: DA453669DFFD469A97662057C2650BEB Status: Completed
Subject: Docusign: Resolution 10174 - Caltrans repaving
Source Envelope:
Document Pages: 3 Signatures: 5 Envelope Originator:
Certificate Pages: 2 Initials: 0 Vinhloc Nguyen
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
250 Hamilton Ave
Palo Alto , CA 94301
Vinhloc.Nguyen@CityofPaloAlto.org
IP Address: 199.33.32.254
Record Tracking
Status: Original
6/27/2024 10:14:17 AM
Holder: Vinhloc Nguyen
Vinhloc.Nguyen@CityofPaloAlto.org
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign
Signer Events Signature Timestamp
Tim Shimizu
Tim.Shimizu@CityofPaloAlto.org
Assistant City Attorney
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 6/27/2024 10:18:26 AM
Viewed: 6/27/2024 12:24:29 PM
Signed: 6/27/2024 12:25:24 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Philip Kamhi
Philip.Kamhi@CityofPaloAlto.org
Chief Transportation Official
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 174.236.225.152
Signed using mobile
Sent: 6/27/2024 12:25:25 PM
Viewed: 7/1/2024 12:02:59 PM
Signed: 7/1/2024 12:03:07 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ed Shikada
Ed.Shikada@CityofPaloAlto.org
Ed Shikada
City of Palo Alto
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 199.33.32.254
Sent: 7/1/2024 12:03:09 PM
Viewed: 7/1/2024 1:48:47 PM
Signed: 7/1/2024 1:48:58 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Greer Stone
greer.stone@cityofpaloalto.org
Vice Mayor
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 46.193.128.104
Sent: 7/1/2024 1:48:59 PM
Viewed: 7/2/2024 6:40:32 AM
Signed: 7/2/2024 6:41:23 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Signer Events Signature Timestamp
Mahealani Ah Yun
Mahealani.AhYun@CityofPaloAlto.org
City Clerk
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 73.241.64.7
Sent: 7/2/2024 6:41:24 AM
Viewed: 7/2/2024 8:39:57 AM
Signed: 7/2/2024 8:40:10 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/27/2024 10:18:26 AM
Certified Delivered Security Checked 7/2/2024 8:39:57 AM
Signing Complete Security Checked 7/2/2024 8:40:10 AM
Completed Security Checked 7/2/2024 8:40:10 AM
Payment Events Status Timestamps